REGIONAL CONFERENCE ON EAST AFRICAN RAILWAYS Revitalizing the Railways for Enhanced Regional Integration and Economic Growth

Size: px
Start display at page:

Download "REGIONAL CONFERENCE ON EAST AFRICAN RAILWAYS Revitalizing the Railways for Enhanced Regional Integration and Economic Growth"

Transcription

1 REGIONAL CONFERENCE ON EAST AFRICAN RAILWAYS Revitalizing the Railways for Enhanced Regional Integration and Economic Growth TANZANIA CURRENT PLANS FOR DEVELOPMENT OF EXISTING AND NEW RAILWAYS Presentation by Eng. Benhardard M. Tito: Managing Director: Reli Assets Holding Company Ltd At Mlimani City Conference Hall Dar es Salaam on March, Historical Back ground 1.1 Construction History The history of the railways in Tanzania dates back to the German colonial era, when in the early 1880s the first ever railway line in East Africa was built by the Germans from Tanga. The line reached Mombo in 1904 and finally reached Moshi and Arusha in 1911 and 1929 respectively. The branch line to connect with Kenya reached Taveta in The Central Line started to be laid at Dar es Salaam in 1905, reaching Morogoro in 1907 and finally reaching Mwanza in The branch from Tabora to Kigoma was laid in 1912, reaching Kigoma in The Central line was connected to Tanga line in The Chinese built 1860 km Cape Gauge (1067mm) TAZARA was constructed in a record time of 5 years from the port of Dar es Salaam to New Kapiri Mposhi, in Zambia between 1970 and The newest piece of railway in Tanzania, and indeed, in East Africa, is the 115 km long railway line between Manyoni and Singida which was laid at Manyoni in 1985 and reached Singida in A map of the railways construction history in Tanzania is shown in Appendix I. 1.2 Rail Transport Needs The need for rail transportation became obvious as commerce and economic growth started in earnest under the German administration. The introduction of sisal (the biggest cash crop then), coffee, rubber trees and cotton; and the abundance of hard wood timber available needed reliable transportation system. 1

2 The objective of building the railways was largely to transport raw materials and agricultural produce to the coast for onward export for value addition in Europe and bring back finished products. It is not historical accidents therefore that, all the railways in East Africa follow the East to West direction, i.e from coast to hinterland. 2.0 TRC / RAHCO Railway Network RAHCO manages a total of 2,707 kilometers of single track Meter Gauge railway network traversing across 12 out of 21 regions of Tanzania Mainland. The railway system has not evolved much after the last lines were laid by the colonialists. The length has remained largely the same and the signaling and telecommunication system has generally not caught up with modern technology. There are sections on the main line which have 80 years old rails. The Moshi- Arusha section has rails which are over 80 years old. In the link line most of the rails are about 46 years old. RAHCO railway network can be divided into two main categories, ie, Main Lines with a total track length of 2,256 km and Branch Lines totaling 451 km in length. The entire network has 128 railway stations in total, 115 stations on the main lines and the remaining 13 stations are located on the branch lines. The details are provided below. Main Lines: Dar es Salaam Tabora 840km Tabora Kigoma 411km Tabora Mwanza 379km Tanga-Moshi- Arusha 438km Ruvu Junction Mruazi Junction 188km Brach Lines: Kilosa Kidatu 108 km Kaliua - Mpanda 210 km Manyoni Singida 115 km Kahe Taveta (border with Kenya) 18 km The network serves four non-coastal, neighboring countries of Burundi, Rwanda, Uganda and the eastern Democratic Republic of Congo. It joins Kenya Railway network through the 18 km branch line from Kahe to Taveta. A map of the existing and proposed lines is shown in Appendix II. 2

3 The total railway network has an infrastructure design capacity of carrying 5 million tones of freight per annum. However, due to various reasons the design capacity utilization is currently about 10%. The track is characterized by generally light rails with rails poundage ranging mainly from 45lbs/yard to 60lbs/yard. The track has maximum section of 80lb /yd rails and rests on steel sleepers. Out of the total 2,707 km of the entire railway network, only 452 km has 80lbs/yard rails, which is only 16.7%. In the main lines the smallest section is 55.12lb/yd and on branch and Arusha line rail sections are as small as 45lb/yd. The sharpest curve on main line between Dar es Salaam and Kigoma and Mwanza is 8 degree curves. Maximum gradient on the main line is 2%. The current maximum speed allowed for passenger train is 60kph and for freight trains is 56 kph. Due to increased number of accidents related to the poor condition of infrastructure the allowable speed was reduced to 50kph for both passenger and Freight Trains on track with rail section of 80 lb/yd. For sections with smaller poundage the speed was reduced to 30kph and on branch lines the speed limit is 25kph. The track ballast used on the railway network is mainly granite stones of sizes between 25mm 50mm. In some branch lines no stone ballast is available and earth ballast is used. Stone ballast covers only about 60% of the total track length. Existing bridges (over 2 m.) can carry between 10 to 25 tons per axle with only about 18% of them built to carry 25 tons per axle. In the entire railway network steel sleepers are predominantly used. In some bridges wooden sleepers are used. A Table showing the current track profile is detailed in Appendix III and a Table showing bridges and their axle load rating is provided under Appendix IV. 3.0 Establishment of Reli Assets Holding Company Ltd Reli Assets Holding Company Limited (RAHCO) was established under Railway Act No. 4 of 2002 and became operational on 3rd September, This was a result of conclusion of a long process of concessioning a state owned Tanzania Railways Corporation (TRC), in which the Government decided to establish RAHCO as a custodian of railway assets and signatory to the Concession Agreement. 3

4 Vision Adequate, Reliable and State of the Art Railway Infrastructure in the Region by the 2025 Mission To Acquire, Develop and Manage Railway Infrastructure to Satisfy Present and Future Rail Transport Needs Roles and Functions RAHCO was established to undertake the following main roles and functions: To develop, promote and manage the rail infrastructure assets; To secure and provide rail infrastructure; To manage Tanzania Railways Corporation (TRC) residual assets and liabilities; To identify and develop new railway projects; To enter into agreement with other entities in order to secure the provision of rail transport services, whether by means of Concession, Joint Venture, Public-Private Partnerships or other means, and to this end to delegate its own function of providing rail transport services to one or more railway operators.; To monitor the Concession Agreement; To step in the event of a breach of contract by the Concession Operator, To upgrade the railway infrastructure beyond the level to be undertaken by the concessionaire; and To invest in railway assets and infrastructure, among others. As mentioned above the process to commercialize TRC was concluded in September, 2007 when M/s RITES of India was awarded the tender. Following the award, RITES and the Government of Tanzania formed a company known as Tanzania Railways Limited (TRL) on a 51% - 49% shareholding respectively. On 1 st October, 2007, TRL was handed over the activities of TRC with a mandate to operate railway transport services for a period of 25 years following the signing of a Concession Agreement on 3 rd September, 2007 between TRL and RAHCO on behalf of the Government of Tanzania. 4.0 Historical Facts Up to the late seventies and early eighties, rail transport was the predominant and most preferred mode for both freight and passengers, commanding over 70% market share of freight transport. However, over the years, rail infrastructure 4

5 and rolling stock became victims of inadequate funding, rendering the infrastructure to dilapidation. Slowly customers ran away from the railways to the road which from the mid eighties became beneficiaries of huge budget allocations. Current statistics show that the freight market of the Tanzania Railways Ltd (TRL) stands at less than 5%. The tables and graph below illustrate the dwindling performance of TRC/TRL for the last seven years. Net Tones Moved Transit 445, , , , , , ,576 Domestic 997, , , , , , ,465 TOTAL 1,442,713 1,333,249 1,128, , , , ,041 1,600,000 1,400,000 1,200,000 1,000, , ,000 Transit Domestic TOTAL 400, , Transit 445, , , , , , ,576 Domestic 997, , , , , , ,465 TOTAL 1,442,713 1,333,249 1,128, , , , ,041 Source: TRC/TRL 5

6 The same declining trend was also evident in passenger transportation as can be observed from the Table below First Class 11,204 11,179 11,373 9,869 12,561 8,278 2,927 Second Class Sleeping 50,531 50,388 50,672 47,505 55,765 34,950 15,811 Second Sitting 10,599 5,867 4,939 3,758 6, ,091 Third Class 574, , , , , , ,852 TTE 36,815 51,786 82,027 72,528 88,892 94,455 51,753 TOTAL 683, , , , , , ,434 Source: TRC/TRL 5.0 Current Status of Operations Since its take over in October 2007 the performance of the Concession has been unsatisfactory in almost all aspects as evidenced by the performance trend indicated above. In addition the following is the current status of operations: There has been very little track maintenance, as only 47km of track between Malongwe and Itigi stations has been relayed with 80Ib/yard rails. Rail materials for relaying the remaining 150km out of the 197 km west of Itigi which has very old rails and sleepers, have been received so far. However there is still a shortage of sleepers for relaying 80km to complete relaying the said 197km. The supply of these rails and sleepers was financed by the World Bank. 6

7 The quarry ballast stock at Tura is exhausted. The concessionaire has not produced any ballast since commencement date and they have no plans to revive production. There are also no ballast hoppers to carry the ballast as almost all of them were involved in accidents beyond economic repair and have been scrapped. Telecommunication and Signaling between Tabora and Kigoma which was completely vandalized has been enabled using VHF radios. Radio systems have their shortcomings and are not recommended for block signaling and issuance of permission to enter a block section. Train services are currently starting from Dodoma (458km from Dar es Salaam) following heavy rains that have washed away railway infrastructure including bridges between Kilosa and Gulwe. Restoration work is going on. Tanga line is dormant. Kahe Taveta branch, linking with KRC network is not operational. Kilosa Kidatu branch line is also not operational. 6.0 Rolling Stock. 6.1 Locomotives In December, 2009 TRL had a fleet size of 83 mainline locomotives of different classes, including, 89xx, 88xx, 73xx, 65xx, 64xx and 73Rxx (hired from India) Out of the total fleet size of 83 locomotives, serviceable locomotives were 63, equivalent to 75.9% The reduction in serviceable fleet is a result of inadequate funds allocated and secured for purchase of spare parts. Apart from the 73Rxx locomotives which are in a fairly good condition but fuel inefficient, the rest of the locomotives are old and almost all of them are beyond 30 years of age. 6.2 Wagons TRL has a holding fleet of 1357 wagons of different types. These types include Covered wagons, Open High wagons and Container wagons. Other types are Tank wagons, Cattle wagons, Phosphate wagons and Open Low (flat wagons). The whole fleet is serviceable and can therefore be utilized for transportation of cargo. 7

8 7.0 TRC / TRL Revenue and Productivity As for the other performance indicators, revenue earned also registered a declining trend as demonstrated on the Table below. Indicator Unit Revenue US$ Million Not availabl e The following table indicates the Productivity of TRC/ TRL in relation to Tonne / km per employee for the period 2001 to The trend shows that productivity slightly improved after the concession, although remaining far below a record high of 205,487 achieved by TRC in Unit Tone-km /employee Tonkm 164, , , , ,309 94, , , , Railway Transport Policy The Railway Transport Policy is spelt out in the National Transport Policy and Transport (2003) and Sector Investment Programme (2007/ /12). The two Policy and Program Documents recognize the main Goal of the Railway Sub Sector as being to rehabilitate, improve and expand railway network to enable exploitation of transport bulky natural resources and evacuation of products especially where long distance transport is involved. The Policy objective is to improve and expand railway network to enable the railway to play its role in the economic development of the country. The TSIP identify the following Strategic Targets for the Railways Sub Sector: Keeping railway infrastructure in public ownership or oversight, but at the same time bringing in public / private sector partnerships wherever possible. 8

9 Mobilizing financial resources through the Government and also through Government / Private sector partnerships while at the same time seeking for the support of Development Partners. Undertaking Railway Master-plan Study to determine level of modernization and infrastructure required, additional network needs and funding modalities. 9.0 Future Development Plans 9.1 Investment Plans RAHCO has recently adopted its first Strategic Corporate Plan which will be implemented starting from 2010/2011 Financial Year. The 5 year Plan is in line with the Government National Transport Policy (NTP), the Transport Sector Investment Program (TSIP) and to a larger extent the East African Railway Master Plan. The Strategic plan has identified a number of railway infrastructure development projects which include upgrading of the entire existing net work as well as construction of new railway lines. Plans are under way to implement the following projects, among others: (i) Upgrading of 982 km of railway line from Dar es Salaam to Isaka from the existing meter gauge to standard gauge and Construction of 694 km of new railway line from Isaka Kigali (Rwanda) / Keza / Gitega Musongati (Burundi). It is planned to widen the gauge of the entire RAHCO network from the present meter gauge to the Standard Gauge. This is in line with the East African Railways Master Plan which is due for ratification by Heads of States of Partner States. This may not sound justifiable in some corners but the fact of the matter is that RAHCO railway network is of last 100 plus years design with a lot of limitations requiring re-alignment of the track, curves reduction, bridges strengthening to carry heavier axle loads, there is need for gradient reduction and lastly, the light rails which are also very old and on steel tiers have to be replaced with heavier rails which shall require concrete tiers. The entire fleet of the rolling stock is very near to or has reached and most have passed their designed lifetime. In other words, the railway needs rebuilding and it does not make difference whether it is rebuilt in meter gauge or standard gauge. Upgrading of the gauge will also be done hand in hand with the following: - Use of pre stressed concrete sleepers 9

10 - Use of heavier rails with poundage of 120Lbs/yard or higher - Strengthen bridges to accommodate 32.5 tons axle load - Realignment to reduce gradient and curvature - Improve the existing stations and yards to accommodate longer trains - Upgrade the existing fiber optic cable system from Dare es salaam to Tabora - Installation of fiber optic telecommunication network between Tabora - Kigoma, Tabora - Mwanza and Isaka Rusumo / Ruvubu River. Upgrading of the railway network will result into running of heavier trains at higher speed and therefore more tonnage. Feasibility study for the construction of a new railway line at standard gauge from Musongati in Burundi and Kigali in Rwanda, to Isaka in Tanzania is complete. This was undertaken by DB Consultants from Germany. A Feasibility study for upgrading of a railway line from Isaka Dar es Salaam to Standard gauge is also complete. This was carried out by BNSF of United States of America. Widening of the track from Isaka to Dar es Salaam will ensure interconnectivity of the railway systems in the region. The next step for the new construction and upgrading is to undertake detailed engineering design. It expected that this project will be operational by (ii) Conducting Feasibility study for upgrading 1094 km of railway line from Isaka Mwanza and Tabora Kigoma and arterial lines (Kidatu, Singida and Mpanda) from meter gauge to standard gauge. As step towards upgrading of the entire network from the existing meter gauge to standard gauge feasibility studies will be commissioned for 1094 km of railway network as detailed above. (iii) Construction of 12km of a railway line from Kange to proposed port at Mwambani in Tanga and 25 km of a railway line from Kidomole (Link line) to the proposed port at Mbegani in Bagamoyo. These lines will be constructed in line with the Tanzania Port Authority (TPA) implementation schedule as port rail connections from the proposed new ports of Mwambani Tanga and Mbegani in Bagamoyo. Feasibility studies and engineering design will be commissioned once the exact locations and design of the proposed ports are determined by TPA. The 10

11 two ports are expected to assist in decongesting the port of Dar es Salaam and providing alternative routes for non coastal countries. (iv) Construction of about 664 km of a new railway line from Arusha to Musoma Construction of this line (which is currently in high demand by Uganda) will provide alternative route for transit goods to and from non coastal countries, in particular Uganda, Rwanda and Burundi. The line will include two branch lines to the already operational fertilizer plant at Minjingu and the other to the proposed soda ash plant at Wosiwosi near Lake Natron. 9.2 Cost & Timeline Cost and indicative timeframe of planned projects are in line with RAHCO Corporate Strategic Plan, whose relevant parts are reproduced below. Indicative Budget in Tshs. millions Target Description TOTAL A02: 982 km of railway line from Dar es salaam to Isaka upgraded from meter gauge to standard gauge by ,684 1, , , ,032 1,206,771 A03: Feasibility study for upgrading of 1094 km of Railway Line from Isaka Mwanza and Tabora Kigoma and arterial lines (Kidatu, Singida and Mpanda) from meter gauge to standard gauge conducted by ,797 1, ,811 A06: 442 km of new Railway Line from Isaka Rusumo / Keza Ruvubu River constructed by 2014 (part of Kigali /Musongati Isaka DSM Railway Project) 4, , , , ,839 1,529,080 A07: 12km of a Railway Line from Kange to proposed Port at , ,423 11

12 Mwambani in Tanga constructed by 2014 A08: 25 km of a Railway Line from Kidomole (Link line) to the proposed Port at Mbegani in Bagamoyo constructed by , ,533 A09: 230km of a Railway Line from Arusha Lake Natron constructed by 2014 (part of Arusha Musoma Railway Project) - 2, , , , ,404 GRAND TOTAL 7, ,182 1,148,941 1,062,522 1,132,495 3,725,022 Source: RAHCO Corporate Strategic Plan: 2009/ / Expected Impact of Investment Plan The National Strategy for Growth and Reduction of Poverty (NSGRP) identifies the transport sector as one of the key sectors that contribute toward poverty reduction. It is expected that Investment in the Railway Projects mentioned above will impact the following areas: Create employment in all categories of skilled, semi skilled and unskilled labour. This will increase household income and standard of living. Provide more effective and efficient rail connections for domestic as well as transit bulky traffic and facilitate effective use of alternative ports along the coast. Open and provide access and transportation to areas wealth with Mineral Deposits. Enhance accessibility / marketability of agricultural crops / products and so improve their competitiveness. Facilitate trade among the communities. Enable households to more easily access health facilities and hence reduce mortality rate. 12

13 Lowering transport cost and time of delivery of goods. This will enhance macroeconomic growth and stability of the country and region. Relieve roads from persistent damage due to its excessive use, as bulky traffic will be carried by a more efficient and durable railway infrastructure. This will lower roads maintenance and rehabilitation costs Strategy to Finance Additional Plans It is expected that Implementation of the planned Railway Projects will be through a number of financing options. The options include, but are not limited to the following: Government budget allocations, as appropriated by the Parliament; Grants and donations from Development partners and others financiers; Public Private Partnerships (PPP); Commercial Banks and Financial Institutions Conclusion For a decade now the performance of the railway sub sector has continued to drastically decline mainly due to inadequate funding for re-investment in infrastructure and rolling stock. The sub sector is now faced with aged and obsolete equipment and infrastructure, resulting into traditional customers diverting their goods to roads. At present the railway sub sector transports less than 5% of the total seaborne traffic. Thus the need for enhanced re investment in railway projects cannot be overemphasized. To reverse the trend support from the Government, Private Sector and Development Partners and Agencies and other stakeholder is needed now more than ever. Motto: Go Rail, Save the Road 13

East African Railways Master Plan Study. Final Report. Prepared for: East African Community. Prepared by: January 2009 CPCS Ref: 06089

East African Railways Master Plan Study. Final Report. Prepared for: East African Community. Prepared by: January 2009 CPCS Ref: 06089 East African Railways Master Plan Study Final Report Prepared for: East African Community Prepared by: January 2009 CPCS Ref: 06089 FINAL REPORT Acknowledgements CPCS Transcom would like to acknowledge

More information

Findings from a World Bank Transport Sector Mission to Tanzania, May 3 rd -14 th, 2004

Findings from a World Bank Transport Sector Mission to Tanzania, May 3 rd -14 th, 2004 United Republic of Tanzania Transport Sector Snapshot (A Work in Progress, June 25 th, 2004) Findings from a World Bank Transport Sector Mission to Tanzania, May 3 rd -14 th, 2004 Cordula Thum The findings,

More information

TANZANIA HARBOURS AUTHORITY PO Box 9184 DAR-ES-SALAAM TANZANIA

TANZANIA HARBOURS AUTHORITY PO Box 9184 DAR-ES-SALAAM TANZANIA TANZANIA HARBOURS AUTHORITY PO Box 9184 DAR-ES-SALAAM TANZANIA Phone: +255 22 211 0401 Fax: +255 22 211 3938 E-mail: dg@tanzaniaports.com Website: www.tanzaniaports.com The Tanzania Harbours Authority

More information

THE UNITED REPUBLIC OF TANZANIA Ministry of Industry and Trade. Investment Guide to the Textile and Garment Sub-sector

THE UNITED REPUBLIC OF TANZANIA Ministry of Industry and Trade. Investment Guide to the Textile and Garment Sub-sector THE UNITED REPUBLIC OF TANZANIA Ministry of Industry and Trade E VELOPME DE N T IT UN TEX TI L Investment Guide to the Textile and Garment Sub-sector TANZANIA MINISTERIAL FOREWORD Dr. Abdallah Omari Kigoda,

More information

PROJECT PREPARATION GRANT (PPG) APPLICATION FORM-3

PROJECT PREPARATION GRANT (PPG) APPLICATION FORM-3 PROJECT PREPARATION GRANT (PPG) APPLICATION FORM-3 1. PPG title To Harmonize the Legal, Regulatory and Institutional Framework for Sanitary and Phytosanitary (SPS) control Management System 2. Theme 1,

More information

CYBER SECURITY IN TANZANIA COUNTRY REPORT

CYBER SECURITY IN TANZANIA COUNTRY REPORT CYBER SECURITY IN TANZANIA COUNTRY REPORT Abstract Tanzania does not have specific legislations dealing with cyber security. Currently the laws which are in place were made before cyber security was an

More information

TANZANIA. Transport Sector Review

TANZANIA. Transport Sector Review TANZANIA Transport Sector Review Acknowledgement This Review was undertaken by the African Development Bank (AfDB) as part of its economic and sector work program in Tanzania. The country s needs for transport

More information

NATIONAL NUMBERING PLAN

NATIONAL NUMBERING PLAN UNITED REPUBLIC OF TANZANIA TANZANIA COMMUNICATIONS REGULATORY AUTHORITY NATIONAL NUMBERING PLAN And List of Numbering Resource Assignments (United Republic of Tanzania) Issued by: Director General, Tanzania

More information

ETIHAD RAIL. Corporate Presentation

ETIHAD RAIL. Corporate Presentation ETIHAD RAIL Corporate Presentation The UAE - A Diversifying Economy Etihad Rail is in line with the objective for further diversification of the UAE s economy as set by the National Charter 2021 and the

More information

UNITED REPUBLIC OF TANZANIA TANZANIA INVESTMENT CENTRE INVESTMENT CLIMATE AND OPPORTUNITIES IN TANZANIA

UNITED REPUBLIC OF TANZANIA TANZANIA INVESTMENT CENTRE INVESTMENT CLIMATE AND OPPORTUNITIES IN TANZANIA UNITED REPUBLIC OF TANZANIA TANZANIA INVESTMENT CENTRE INVESTMENT CLIMATE AND OPPORTUNITIES IN TANZANIA PRESENTATION TO THE CDM WORKSHOP DAR ES SALAAM INTERNATIONAL CONFERENCE CENTRE 21 ST JANUARY,2008

More information

STUDY TOUR TO CHINESE RAILWAY Presentation by Geetha Thoopal, Addl. Member (Finance), Ministry of Railways, Head of Delegation

STUDY TOUR TO CHINESE RAILWAY Presentation by Geetha Thoopal, Addl. Member (Finance), Ministry of Railways, Head of Delegation STUDY TOUR TO CHINESE RAILWAY Presentation by Geetha Thoopal, Addl. Member (Finance), Ministry of Railways, Head of Delegation TEAM MEMBERS Smt. Geeta Thoopal, AM/B Team Leader Sh. Vinay Mittal,, EDTT/M

More information

2013 On track for more!

2013 On track for more! 2013 On track for more! Parliament Government Jernbaneverket in Norwegian society Ministry of Fisheries and Coastal Affairs Ministry of Transport and Communications Norwegian Railway Inspectorate Norwegian

More information

CONTENTS Introduction Policy guidance at the ministerial level in Myanmar Railway Vision of National Transport Development Plan (Rail Sector) Rail

CONTENTS Introduction Policy guidance at the ministerial level in Myanmar Railway Vision of National Transport Development Plan (Rail Sector) Rail 13-15 October, 2014 Bangkok, Thailand CONTENTS Introduction Policy guidance at the ministerial level in Myanmar Railway Vision of National Transport Development Plan (Rail Sector) Rail Sector Strategic

More information

2012 On track for more!

2012 On track for more! 2012 On track for more! Parliament Government Jernbaneverket in Norwegian society Ministry of Fisheries and Coastal Affairs Ministry of Transport and Communications Norwegian Railway Inspectorate Norwegian

More information

Port of Beira. 22/06/12, Pretoria. Félix Machado Sales & Marketing Manager

Port of Beira. 22/06/12, Pretoria. Félix Machado Sales & Marketing Manager Cornelder de Moçambique Port of Beira 22/06/12, Pretoria Félix Machado Sales & Marketing Manager Why Choose the Beira Corridor? Reason 1: Location & Costs Reason 1: Location & Costs Beira Corridor Reason

More information

Establishment of REA/REF and Available Financing Opportunities for Rural Energy Projects Paper Presented on:

Establishment of REA/REF and Available Financing Opportunities for Rural Energy Projects Paper Presented on: RURAL ENERGY AGENCY (REA) Establishment of REA/REF and Available Financing Opportunities for Rural Energy Projects Paper Presented on: Workshop on Sustainable Access to Sustainable Energy Uhuru Hostel,

More information

AID FOR TRADE CASE STORY: ZIMBABWE

AID FOR TRADE CASE STORY: ZIMBABWE AID FOR TRADE: CASE STORY ZIMBABWE Date of submission : 31 January 2011 Region : Southern Africa Country : Zimbabwe Type : Project Author : Ministry of Industry and Commerce CHIRUNDU ONE STOP BORDER POST:

More information

ETIHAD RAIL FACTSHEET

ETIHAD RAIL FACTSHEET ETIHAD RAIL FACTSHEET ABOUT ETIHAD RAIL Introduction Pursuant to Federal Law no. 2 of 2009, Etihad Rail was formed with a mandate to manage the development, construction and operation of the UAE s national

More information

The applicants can submit the eligibility form from 07/01/2016 to 07/02/2016. For additional information, please contact: contact@seed-foundation.

The applicants can submit the eligibility form from 07/01/2016 to 07/02/2016. For additional information, please contact: contact@seed-foundation. SEED Foundation s 2016 call for proposals for pilot projects in favor of an innovative agricultural development aims at answering this question: how to encourage small structures with limited capacities

More information

REAL Value Innovation Teamwork Integrity Excellence. Company Profile

REAL Value Innovation Teamwork Integrity Excellence. Company Profile REAL Value Innovation Teamwork Integrity Excellence Company Profile REAL Insurance Tanzania Limited Company Profile About Real Insurance Tanzania Limited REAL BACKGROUND REAL Insurance Tanzania Limited

More information

International Conference on the Great Lakes Region

International Conference on the Great Lakes Region i International Conference on the Great Lakes Region Regional Programme of Action for Economic Development and Regional Integration Project No. 3.3.10 East African Submarine Cable System Project (EASSy)

More information

a growing market in an appealing business context with NO local competitors Wire and Cable Manufacturing in Rwanda

a growing market in an appealing business context with NO local competitors Wire and Cable Manufacturing in Rwanda a growing market in an appealing business context with NO local competitors Wire and Cable Manufacturing in Rwanda Construction in Rwanda is Big & Growing Trends in construction & materials: Construction

More information

Railway Research and Technology in China Today

Railway Research and Technology in China Today Railway Research and Technology in China Today Lan Wang China Academy of Railway Sciences 1 INTRODUCTION The railway as the backbone of integrative traffic transportation system in China is main artery

More information

TANZANIA. The land area of Tanzania is about 1 million square kilometres. This includes the offshore islands of Zanzibar, Pemba and Mafia.

TANZANIA. The land area of Tanzania is about 1 million square kilometres. This includes the offshore islands of Zanzibar, Pemba and Mafia. TANZANIA 1. INTRODUCTION 1.1 THE COUNTRY Tanzania lies on the East Coast of Africa between 1 O and 11 O S latitude and between 29o and 40 o E Longitude. It is bordered by Kenya in the North and shares

More information

Railway Reform in Europe: from endangered species to sustainable systems?

Railway Reform in Europe: from endangered species to sustainable systems? Railway Reform in Europe: from endangered species to sustainable systems? International workshop on railway reform Ankara, 8 October 2009 Paul Guitink 09 July 2009 1 Content of this presentation representing

More information

FINANCIAL AND OPERATING HIGHLIGHTS

FINANCIAL AND OPERATING HIGHLIGHTS Orca Exploration Group Inc. PO Box 3152 Road Town Tortola British Virgin Islands FOR IMMEDIATE RELEASE 30 April 2007 Orca Exploration (formerly EastCoast Energy Corporation) announces its results for the

More information

GOVERNMENT OF PAKISTAN MINISTRY OF PORTS AND SHIPPING

GOVERNMENT OF PAKISTAN MINISTRY OF PORTS AND SHIPPING GOVERNMENT OF PAKISTAN MINISTRY OF PORTS AND SHIPPING Mission Statement As more than 95 per cent of the total freight trade of Pakistan is seaborne, the overall objective of the Ministry of Ports and Shipping

More information

Coverage on Domestic Freight Transportation Services. Improving macroeconomic indicators to sustain domestic freight growth over next five years

Coverage on Domestic Freight Transportation Services. Improving macroeconomic indicators to sustain domestic freight growth over next five years Coverage on Spotlight Improving macroeconomic indicators to sustain domestic freight growth over next five years The Indian economy is slated to register a healthy growth of 8-9 per cent in GDP over the

More information

Briefing Note. Use of standard gauges for non-passenger rail vehicles. March 2013

Briefing Note. Use of standard gauges for non-passenger rail vehicles. March 2013 Briefing Note The Use of Standard Gauges for New Non-Passenger Rail Vehicles March 2013 1. Purpose This briefing note is written to guide the manufacturers and introducers of non-passenger rail vehicles

More information

MALARIA STATUS IN TANZANIA MAINLAND: AN OVERVIEW NATIONAL MALARIA FORUM- 25 TH APRIL 2014.

MALARIA STATUS IN TANZANIA MAINLAND: AN OVERVIEW NATIONAL MALARIA FORUM- 25 TH APRIL 2014. MALARIA STATUS IN TANZANIA MAINLAND: AN OVERVIEW NATIONAL MALARIA FORUM- 25 TH APRIL 2014. 1 Presentation Outline: Overview Intervention scale up/achievements Current malaria epidemiologic profile and

More information

World Bank Transport Forum, April 2009

World Bank Transport Forum, April 2009 0 Railways for Development An overview of China s Railway Development Program World Bank Transport Forum, April 2009 John Scales: Transport Coordinator, Beijing. Paul Amos: Strategy and Management Consultant

More information

UNIFE World Rail Market Study

UNIFE World Rail Market Study UNIFE World Rail Market Study Status quo and outlook 2020 Commissioned by UNIFE, the European Rail Industry And conducted by The Boston Consulting Group 2 1 Executive Summary This is the third "World Rail

More information

Opening up the bandwidth bottleneck in Africa. Martin Mutiiria, Director, Sales, Africa, WIOCC

Opening up the bandwidth bottleneck in Africa. Martin Mutiiria, Director, Sales, Africa, WIOCC Opening up the bandwidth bottleneck in Africa Martin Mutiiria, Director, Sales, Africa, WIOCC Martin Mutiiria Director, Sales - Africa Opening up the bandwidth bottleneck in Africa Africa Submarine Cables

More information

THE INTER-UNIVERSITY COUNCIL FOR EAST AFRICA

THE INTER-UNIVERSITY COUNCIL FOR EAST AFRICA THE INTER-UNIVERSITY COUNCIL FOR EAST AFRICA THE NEED TO ESTABLISH A REGIONAL SYSTEM OF ACCREDITATION OF HIGHER EDUCATION INSTITUTIONS AND PROGRAMMES IN EAST AFRICA 1.0 Introduction According to the World

More information

Railway Reform in South East Europe and Turkey: On the Right Track?

Railway Reform in South East Europe and Turkey: On the Right Track? KOSOVO RAILWAYS 329. Kosovo Railways (Hekurudhat e Kosovës; KR) is a joint stock company created in December 25 and previously known as UNMIK Railways. It was originally formed as the United Nations Interim

More information

DESIGNING A RESTORATION PROGRAM FOR THE BOMA A HISTORIC BUILDING IN BAGAMOYO, TANZANIA.

DESIGNING A RESTORATION PROGRAM FOR THE BOMA A HISTORIC BUILDING IN BAGAMOYO, TANZANIA. Tanzania: Juliery Kagya Mtobesya DESIGNING A RESTORATION PROGRAM FOR THE BOMA A HISTORIC BUILDING IN BAGAMOYO, TANZANIA. 1.0 INTRODUCTION During the period of 1850-1910 Bagamoyo was marked with trade in

More information

TANZANIA LINKING SAVINGS GROUPS TO MOBILE BANKING

TANZANIA LINKING SAVINGS GROUPS TO MOBILE BANKING TANZANIA LINKING SAVINGS GROUPS TO MOBILE BANKING September 211 I Access Africa Technical Learning Series : No. 2 Tanzania Bukoba Musoma Tarime Buhemba Mwanza Kibondo Geita Nzega Ngudu Shinyanga Mbulu

More information

TANZANIA CAPACITY BUILDING FOR TV PRODUCTION TRAINING FOR SAUT UNIVERSITY TV NATIONAL EQUIPMENT SUPPORT US$39,980

TANZANIA CAPACITY BUILDING FOR TV PRODUCTION TRAINING FOR SAUT UNIVERSITY TV NATIONAL EQUIPMENT SUPPORT US$39,980 TANZANIA 1. PROJECT TITLE A. PROJECT IDENTIFICATION CAPACITY BUILDING FOR TV PRODUCTION TRAINING FOR SAUT UNIVERSITY TV 2. NUMBER PDC/53 URT/01 3. CATEGORY OF MASS MEDIA TELEVISION 4. IPDC PRIORITY AREA

More information

Phase Attribute Identification using GPS Technology

Phase Attribute Identification using GPS Technology Phase Attribute Identification using GPS Technology Date 11 June 2009 John Sinclair Power Quality Manager Slide 1 Topics of Discussion Remote Phase Identification How it works Principals of operation Benefits

More information

Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:

Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page: Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page: Policy package: 2A: Rail liberalisation and harmonisation Measure 9: Updating the interoperability

More information

WATERWAYS in Finland

WATERWAYS in Finland WATERWAYS in Finland The efficient and economical running of Finland s vital international transport demands a comprehensive and safe network of fairways. The mission of the Finnish Maritime Administration

More information

NATIONAL PUBLIC PRIVATE PARTNERSHIP (PPP) POLICY

NATIONAL PUBLIC PRIVATE PARTNERSHIP (PPP) POLICY ` THE UNITED REPUBLIC OF TANZANIA PRIME MINISTER S OFFICE NATIONAL PUBLIC PRIVATE PARTNERSHIP (PPP) POLICY DAR ES SALAAM NOVEMBER, 2009 Restricted Circulation TABLE OF CONTENTS FOREWORD.... ii LIST OF

More information

THE CHALLENGES FACED BY BURUNDIAN ENTREPRENEURS IN THE UPCOMING EAST AFRICAN COMMON MARKET

THE CHALLENGES FACED BY BURUNDIAN ENTREPRENEURS IN THE UPCOMING EAST AFRICAN COMMON MARKET THE CHALLENGES FACED BY BURUNDIAN ENTREPRENEURS IN THE UPCOMING EAST AFRICAN COMMON MARKET Yvan Nezerwe, MBA Alliant International University, San Diego, CA ABSTRACT Burundi formally joined The East African

More information

1. List of Attendees Refer to Annex 1.

1. List of Attendees Refer to Annex 1. RECORD OF THE THIRD MEETING OF EACO WORKING GROUP 2 ON INFRASTRUCTURE DEVELOPMENT, CONNECTIVITY AND DIGITAL INCLUSION, FROM 22 ND TO 24 TH OCTOBER 2014, DAR ES SALAAM, TANZANIA 1. List of Attendees Refer

More information

MOZAMBIQUE PORTS AND RAILWAYS, E.P. Fact Sheet. Corporate Restructuring

MOZAMBIQUE PORTS AND RAILWAYS, E.P. Fact Sheet. Corporate Restructuring MOZAMBIQUE PORTS AND RAILWAYS, E.P. Fact Sheet Corporate Restructuring April/2006 SADC RAILWAY NETWORK POINTE NOIRE CONGO BRAZAVILLE KINSHASA HEBO DRC KINBU KABALO KIGOMA TABORA TANZANIA KENYA MOMBASA

More information

DAWEI Sea PROJECT Port Project DAWEI AND THE REGION

DAWEI Sea PROJECT Port Project DAWEI AND THE REGION February 2012 DAWEI Sea PROJECT Port Project DAWEI AND THE REGION PROJECT LOCATION Kunming India Middle East / Europe Dawei Africa Asia Regional Hub DAWEI Sea PROJECT Port Project DAWEI PROJECT OVERVIEW

More information

Fit for the European Rail Market Training Competence - Certification

Fit for the European Rail Market Training Competence - Certification SIAFI Europe Seminar Paris, 29 September 2008 Fit for the European Rail Market Training Competence - Certification European Railway Agency Interoperability Unit n 1 EU Rail Policy: The Core Aim To adapt

More information

12. Property Rates in Tanzania 1

12. Property Rates in Tanzania 1 12. Property Rates in Tanzania 1 [1] Role of Property Taxes within Tanzania In Tanzania, property-related taxes and charges in 1998 yielded about Tsh 7.1 billion (US$8.875 million) Tsh 3.8 billion (US$4.75

More information

Network Rail. Consultation on Traction Electricity Consumption Rates for Train Operating Companies. August 2008

Network Rail. Consultation on Traction Electricity Consumption Rates for Train Operating Companies. August 2008 Network Rail Consultation on Traction Electricity Consumption Rates for Train Operating Companies August 2008 2 1 Introduction... 3 Context & background... 3 2 Calculation of The New Electricity Consumption

More information

Title of Case presentation

Title of Case presentation Rural Electrification- Rwanda Title of Case presentation Study Fatin Ali Mohamed Industrial Development Officer UNIDO, Vienna, Austria UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Contents 1. Context

More information

Pendulum Business Loan Brokers L.L.C.

Pendulum Business Loan Brokers L.L.C. BUSINESS BROKERS DEVELOPING COMPONENT PART MANUFACTURING PARTNERSHIPS METAL PLASTIC ELECTRICAL Business Brokers Three (3) Component Part Manufacturing Partnerships Categories Hiram R. Davis Corporate Secretary

More information

engineering ministries international, east africa

engineering ministries international, east africa engineering ministries international, east africa East Africa is categorized by spiritual, physical and other debilitating poverties. This burden of poverty can only be lifted by God, through His Spirit

More information

VICTIMIZATION SURVEY IN TANZANIA

VICTIMIZATION SURVEY IN TANZANIA Vienna International Centre, PO Box 500, 1400 Vienna, Austria Tel.: (+43-1) 26060-0, Fax: (+43-1) 26060-5866, www.unodc.org VICTIMIZATION SURVEY IN TANZANIA Executive summary United Nations publication

More information

main type of locomotive in use, but over half of those had surpassed their durable lifespan. China Afghanistan Project Sites Nepal

main type of locomotive in use, but over half of those had surpassed their durable lifespan. China Afghanistan Project Sites Nepal Pakistan Diesel Electric Locomotives Rehabilitation Project (1) and Diesel Electric Locomotives Production Project (2) External Evaluator: Hajime Sonoda Field Survey: September 2004 1 Project Profile and

More information

Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa

Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa Integrated Public Transport National workshop on promoting sustainable transport solutions for East Africa Carly Koinange, GEF Sustran Consultant UN-HABITAT Urban Mobility Unit Urban Basic Services Branch

More information

Grain Trading Systems and Market Information

Grain Trading Systems and Market Information Grain Trading Systems and Market Information FAO/University of Pretoria workshop Presented by Stephen Kiuri Njukia RATES Program March 23 rd 24 th, 2006 RATES is commodity focused with an emphasis on regional

More information

Highlights of Organic Issues within National Agric Policy (20013)

Highlights of Organic Issues within National Agric Policy (20013) Highlights of Organic Issues within National Agric Policy (20013) (Ministry of Agriculture Food Security and Cooperatives Tanzania By. Mibavu, G. M. 1 Outline i. Introduction ii. Opportunities on Organic

More information

Ministry of Technology, Communication and Innovation

Ministry of Technology, Communication and Innovation Ministry of Technology, Communication and Innovation Expression of Interest for a Market Sounding Exercise For the implementation of a Third International gateway through the installation of a new submarine

More information

CAPACITY BUILDING OF LOCAL CONSULTANTS AND CONTRACTORS THE MOROGORO MODEL. Urs J. Studeli *

CAPACITY BUILDING OF LOCAL CONSULTANTS AND CONTRACTORS THE MOROGORO MODEL. Urs J. Studeli * CAPACITY BUILDING OF LOCAL CONSULTANTS AND CONTRACTORS THE MOROGORO MODEL by Urs J. Studeli * ABSTRACT Since independence there have been number of initiatives geared towards fostering the local construction

More information

SECTOR ASSESSMENT (SUMMARY): TRANSPORT, and INFORMATION AND COMMUNICATION TECHNOLOGY (ROAD TRANSPORT SUBSECTOR) 1

SECTOR ASSESSMENT (SUMMARY): TRANSPORT, and INFORMATION AND COMMUNICATION TECHNOLOGY (ROAD TRANSPORT SUBSECTOR) 1 Country Partnership Strategy: Kazakhstan 2012 2016 SECTOR ASSESSMENT (SUMMARY): TRANSPORT, and INFORMATION AND COMMUNICATION TECHNOLOGY (ROAD TRANSPORT SUBSECTOR) 1 1. Sector Performance, Problems, and

More information

Your Multimodal Partner. IBS, the 08/10/10

Your Multimodal Partner. IBS, the 08/10/10 GEFCO Your Multimodal Partner IBS, the 08/10/10 Summary 1. GEFCO some figures 2. GEFCO strategy and Know-how 3. GEFCO concept 4. GEFCO multimodal corridors 1. GEFCO some figures GEFCO key figures One of

More information

NEPAD ICT BROADBAND INFRASTRUCTURE PROGRAMME Part of the Programme for Infrastructure Development in Africa (PIDA)

NEPAD ICT BROADBAND INFRASTRUCTURE PROGRAMME Part of the Programme for Infrastructure Development in Africa (PIDA) NEPAD ICT BROADBAND INFRASTRUCTURE PROGRAMME Part of the Programme for Infrastructure Development in Africa (PIDA) Presentation to the Open Access Forum Tunis, November 12, 2010 Dr. Edmund Katiti Policy

More information

Biomass Supply Chains in South Hampshire

Biomass Supply Chains in South Hampshire Biomass Supply Chains in South Hampshire 1 Executive Summary This report provides an analysis of how biomass supply chains could be developed within the area covered by the Partnership for Urban South

More information

SMALLHOLDER MAIZE PRODUCTION EFFICIENCY IN KENYA

SMALLHOLDER MAIZE PRODUCTION EFFICIENCY IN KENYA EGERTON UNIVERSITY TEGEMEO INSTITUTE OF AGRICULTURAL POLICY AND DEVELOPMENT SMALLHOLDER MAIZE PRODUCTION EFFICIENCY IN KENYA John Olwande Regional Workshop on an Integrated Policy Approach to Commercializing

More information

Chairperson of the Board; Chief Executive Officer of PRASA, Mr Montana; Board Members; Acting Director General; Management Team from PRASA;

Chairperson of the Board; Chief Executive Officer of PRASA, Mr Montana; Board Members; Acting Director General; Management Team from PRASA; SPEECH BY THE MINISTER OF TRANSPORT, MS DIPUO PETERS, MP, ON THE ANNUAL GENERAL MEETING OF THE PASSENGER RAIL AGENCY OF SOUTH AFRICA (PRASA) ON 29 SEPTEMBER 2014 AT HATFIELD, PRETORIA Chairperson of the

More information

Public Procurement Innovation in Malaysia: E-Procurement

Public Procurement Innovation in Malaysia: E-Procurement Public Procurement Innovation in Malaysia: E-Procurement By: Professor Norma Mansor (Ph.D) Faculty of Economics and Administration University of Malaya, Kuala Lumpur Malaysia Contacts: Tel: +60379673600

More information

Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives

Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives Prefeasibility Study for the High Speed Line HU-RO Border Bucharest - Constanta Description and Objectives Timisoara - 13 th of September 2012 1 The European Vision for Railway Transport The European Commission's

More information

PJ 22/12. 7 February 2012 English only. Projects Committee/ International Coffee Council 5 8 March 2012 London, United Kingdom

PJ 22/12. 7 February 2012 English only. Projects Committee/ International Coffee Council 5 8 March 2012 London, United Kingdom PJ 22/12 7 February 2012 English only E Projects Committee/ International Coffee Council 5 8 March 2012 London, United Kingdom Sustainable input credit for financing the production end of the coffee value

More information

WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS

WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS WASTE STORAGE AND COLLECTION GUIDANCE FOR NEW DEVELOPMENTS CONTENTS Page 1 Introduction 2 2 Planning Applications 3 3 Internal Segregation of Waste 3 4 Housing Developments 4 5 Apartment Developments 5-6

More information

How to Design and Update School Feeding Programs

How to Design and Update School Feeding Programs CHAPTER 7 How to Design and Update School Feeding Programs Previous chapters highlight the need to improve the design of new school feeding programs and to revisit existing programs with a view toward

More information

Railway Business Strategy and R&D in Europe

Railway Business Strategy and R&D in Europe Railway Business Strategy and R&D in Europe Hitachi Review Vol. 61 (2012), No. 5 190 Keith Jordan Yoichi Sugita, Dr. Eng. Takayoshi Nishino Toshiaki Kono Kiyoshi Morita OVERVIEW: Hitachi s European railway

More information

Terms of Reference Project Title: Supporting Indian Trade and Investment for Africa (SITA)

Terms of Reference Project Title: Supporting Indian Trade and Investment for Africa (SITA) Terms of Reference Project Title: Supporting Indian Trade and Investment for Africa (SITA) Project Number: INT/71/21A Assignment title: International Consultant: Leather Tanning, Re-tanning and Finishing

More information

Ebenezer Quartey, Research Department, COCOBOD COCOBOD PRESENTATION. 1 Introduction

Ebenezer Quartey, Research Department, COCOBOD COCOBOD PRESENTATION. 1 Introduction Ebenezer Quartey, Research Department, COCOBOD COCOBOD PRESENTATION 1 Introduction The Ghanaian economy is dependent to a high degree on primary production in agriculture, mining and exports. The exports

More information

Tranformer Rail System - Project

Tranformer Rail System - Project Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY j2z Z Z (- -/ 7A Report No. 9449-TA Public Disclosure Authorized STAFF APPRAISAL REPORT THE UNITED REPUBLIC OF TANZANIA Public

More information

Multisectoral collaboration

Multisectoral collaboration Unit 6. MULTISECTORAL COLLABORATION 89 UNIT 6 Multisectoral collaboration Overview Objectives Why collaborate? What kind of collaboration can be developed? Activity International collaboration National

More information

Fertilizer is a world market commodity, which means that supply

Fertilizer is a world market commodity, which means that supply Supply & demand, Energy Drive Global fertilizer prices The Fertilizer Institute Nourish, Replenish, Grow Fertilizer is a world market commodity necessary for the production of food, feed, fuel fiber. &

More information

Transportation and development in Uganda

Transportation and development in Uganda Transportation and development in Uganda Hon Dr Christine Mwebesa, Member of Parliament in Uganda; Member Of Sessional Committee on Works Housing and Communications; Chairperson, Advocacy Sub Committee

More information

CHAPTER 5. Tanzania Education Sector Analysis 203

CHAPTER 5. Tanzania Education Sector Analysis 203 CHAPTER 5 EQUITY IN SCHOOLING In order to achieve long-term sustainability, the development of education systems must integrate the important equity dimension. Indeed, equity becomes a pillar of the analysis

More information

PPIAF Assistance in Kenya

PPIAF Assistance in Kenya June 2013 PPIAF Assistance in Kenya Since 2000 PPIAF has funded 23 activities in Kenya worth $5.8 million. Five of these activities were funded under the Sub-National Technical Assistance (SNTA) window.

More information

Relevant parameters for a reference test track Deliverable D1.7

Relevant parameters for a reference test track Deliverable D1.7 RIVAS Railway Induced Vibration Abatement Solutions Collaborative project Relevant parameters for a reference test track Deliverable D1.7 Submission date: 20/08/2012 Project Coordinator: Bernd Asmussen

More information

Transrapid Project Shanghai

Transrapid Project Shanghai Transrapid Project Shanghai Dipl. Ing. Dieter Hoffmann, Siemens AG Abstract Following brief negotiations initiated at the end of the year 2000, the contract for the supply of the airport link using the

More information

Executive summary. Global Wage Report 2014 / 15 Wages and income inequality

Executive summary. Global Wage Report 2014 / 15 Wages and income inequality Executive summary Global Wage Report 2014 / 15 Wages and income inequality Global Wage Report 2014/15 Wages and income inequality Executive summary INTERNATIONAL LABOUR OFFICE GENEVA Copyright International

More information

Republic of Angola. Law of Delimitation of The Sectors of Economic Activity: Law No 13/94

Republic of Angola. Law of Delimitation of The Sectors of Economic Activity: Law No 13/94 Republic of Angola Law of Delimitation of The Sectors of Economic Activity: Law No 13/94 2 September 1994 Law No 10/88, of July 2nd, called "The Law of Economic Activities", denies the private sector access

More information

Central African Republic Country Profile 2011

Central African Republic Country Profile 2011 Central African Republic Country Profile 2011 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Region: Sub-Saharan Africa Income Group:

More information

Below Rail Services provided by Aurizon Network Financial Statements for the year ended 30 June 2012. Aurizon Network Pty Ltd

Below Rail Services provided by Aurizon Network Financial Statements for the year ended 30 June 2012. Aurizon Network Pty Ltd Below Rail Services provided by Aurizon Network Financial Statements for the year ended 30 June 2012 Aurizon Network Pty Ltd ABN 78 132 181 116 Financial Statements for the year ended 30 June 2012 Pursuant

More information

ERTMS for a competitive railway

ERTMS for a competitive railway ERTMS for a competitive railway A joint cross-border traffic management system for railways Sweden and Europe need a competitive railway system. With the focus on this, EU decided in 1996 that a standardized

More information

Presentation at the EAC Legal Harmonization Conference 6 th & 7 th August 2012 Ngurdoto Mountain Lodge Arusha, Tanzania

Presentation at the EAC Legal Harmonization Conference 6 th & 7 th August 2012 Ngurdoto Mountain Lodge Arusha, Tanzania Presentation at the EAC Legal Harmonization Conference 6 th & 7 th August 2012 Ngurdoto Mountain Lodge Arusha, Tanzania JAPHETH KATTO CHIEF EXECUTIVE OFFICER CAPITAL MARKETS AUTHORITY (UGANDA) CHAIRPERSON

More information

Investment projects on PKP Polish Railway Lines network

Investment projects on PKP Polish Railway Lines network Railway Kolej of the nowoczesnych new technologies technologii Railway of the new technologies Investment projects on PKP Polish Railway Lines network Warsaw, October 2012 Jacek Poniewierski Director of

More information

Multi-Modal Logistics Hub (MMLH) in Yanbu

Multi-Modal Logistics Hub (MMLH) in Yanbu Multi-Modal Logistics Hub (MMLH) in Yanbu 2nd RCYCI Forum program 5 January 2016 Agenda Multi-Modal Logistics Hub (MMLH) study outcome in 2014 Education and employment requirements in MMLH Current status

More information

How is Greek shipping surviving the crisis?

How is Greek shipping surviving the crisis? How is Greek shipping surviving the crisis? By Ted Petropoulos Head of Petrofin Research PSMI published in Nafs September 2011 Since mid 2008, the world economy, the banking industry and shipping have

More information

THE CHALLENGES TO INTRODUCE NEW CEMENT TECHNOLOGIES INTO THE MARKET PLACE

THE CHALLENGES TO INTRODUCE NEW CEMENT TECHNOLOGIES INTO THE MARKET PLACE THE CHALLENGES TO INTRODUCE NEW CEMENT TECHNOLOGIES INTO THE MARKET PLACE Ladies & Gentlemen, In discussing the challenges that are facing new cement technologies to enter the market, I can give no better

More information

Office of Safety and Compliance

Office of Safety and Compliance The Federal Railroad Administration (FRA) was created by the Department of Transportation Act of 1966. It is one of ten agencies within the U.S. Department of Transportation concerned with intermodal transportation.

More information

PPP Models. Ownership of capital assets Responsibility for investment Assumption of risks, and Duration of contract.

PPP Models. Ownership of capital assets Responsibility for investment Assumption of risks, and Duration of contract. PPP Models The PPP models vary from short-term simple management contracts (with or without investment requirements) to long-term and very complex BOT form, to divestiture. These models vary mainly by:

More information

Case Story. The use of the WCO Time Release Study to measure border performance in a landlocked developing country (Uganda)

Case Story. The use of the WCO Time Release Study to measure border performance in a landlocked developing country (Uganda) Case Story The use of the WCO Time Release Study to measure border performance in a landlocked developing country (Uganda) Executive Summary (1) A Time Release study (TRS) is a unique tool 1 and method

More information

TANZANIA ELECTRIC SUPPLY COMPANY LTD (TANESCO) PRESENTATION ON THE TANZANIAN SOLAR PV-HYBRID WORKSHOP HELD IN BERLIN, GERMANY

TANZANIA ELECTRIC SUPPLY COMPANY LTD (TANESCO) PRESENTATION ON THE TANZANIAN SOLAR PV-HYBRID WORKSHOP HELD IN BERLIN, GERMANY TANZANIA ELECTRIC SUPPLY COMPANY LTD (TANESCO) PRESENTATION ON THE TANZANIAN SOLAR PV-HYBRID WORKSHOP HELD IN BERLIN, GERMANY 16 TH MARCH 2015 by Eng. Patrice Tsakhara Principal Engineer Small Power Projects

More information

Monthly Report PERFORMANCE OF THE ECONOMY. April 2016 MACROECONOMIC POLICY DEPARTMENT MINISTRY OF FINANCE, PLANNING AND ECONOMIC DEVELOPMENT

Monthly Report PERFORMANCE OF THE ECONOMY. April 2016 MACROECONOMIC POLICY DEPARTMENT MINISTRY OF FINANCE, PLANNING AND ECONOMIC DEVELOPMENT Monthly Report PERFORMANCE OF THE ECONOMY April 2016 MACROECONOMIC POLICY DEPARTMENT MINISTRY OF FINANCE, PLANNING AND ECONOMIC DEVELOPMENT www.finance.go.ug Contents ACRONYMS... 2 HIGHLIGHTS... 3 REAL

More information

Africa-China trading relationship

Africa-China trading relationship -China trading relationship tralac has been monitoring the trading relationship between and China for several years. This brief provides a synopsis of the latest -China trade data and an evaluation of

More information

South Hook Gas Company Ltd is a London-based liquefied natural gas (LNG) import company, which owns and manages the regasification

South Hook Gas Company Ltd is a London-based liquefied natural gas (LNG) import company, which owns and manages the regasification Energy for growth South Hook Gas Company Ltd is a London-based liquefied natural gas (LNG) import company, which owns and manages the regasification capacity and the gas supply from the South Hook LNG

More information

CHARCOAL PRODUCTION ACTIVITY COMPROMISE ENVIRONMENTAL COMPLIANCE, CONSERVATION AND MANAGEMENT STRATEGIES IN TANZANIA

CHARCOAL PRODUCTION ACTIVITY COMPROMISE ENVIRONMENTAL COMPLIANCE, CONSERVATION AND MANAGEMENT STRATEGIES IN TANZANIA CHARCOAL PRODUCTION ACTIVITY COMPROMISE ENVIRONMENTAL COMPLIANCE, CONSERVATION AND MANAGEMENT STRATEGIES IN TANZANIA UISSO, A.J. 1 BALAMA, C. 2 1 Tanzania Forestry Research Institute (TAFORI), P. o. Box

More information

Developing a Public-Private Partnership Framework: Policies and PPP Units

Developing a Public-Private Partnership Framework: Policies and PPP Units Note 4 May 2012 Developing a Public-Private Partnership Framework: Policies and PPP Units This note is the fourth in a series of notes on developing a comprehensive policy, legal, and institution framework

More information