Selfish Constraint Satisfaction Genetic Algorithm for Planning a Long-distance Transportation Network

Size: px
Start display at page:

Download "Selfish Constraint Satisfaction Genetic Algorithm for Planning a Long-distance Transportation Network"

Transcription

1 JOURNAL OF COMPUTERS, VOL. 3, NO. 8, AUGUST Selfsh Constrant Satsfacton Genetc Algorthm for Plannng a Long-dstance Transportaton Network Takash Onoyama and Takuya Maekawa Htach Software Engneerng Co., Ltd., Tokyo, Japan E-Mal: {onoyama, taku}@htachsoft.jp Yoshtaka Sakura and Setsuo Tsuruta Department of Informaton Envronment, Tokyo Denk Unversty, Inza, Japan E-Mal: {ysakura, tsuruta}@se.denda.ac.jp Norhsa Komoda Graduate School of Informaton Scence and Technology, Osaka Unversty, Suta, Japan E-Mal: komoda@st.osaka-u.ac.jp Abstract To buld a cooperatve logstcs network coverng multple enterprses, a plannng method that can buld a long-dstance transportaton network s requred. Many strct constrants are mposed on ths type of problem. To solve ths problem effcently, a selfsh-constrant-satsfacton genetc algorthm (GA) s proposed. In ths type GA, each gene of an ndvdual satsfes only ts constrants selfshly, dsregardng constrants of other genes even n the same ndvdual. Further, to some extent, even ndvdual that volates constrants can survve over several generatons and has the chance of reparaton. Moreover, a constrant pre-checkng and dynamc penalty control methods are also appled to mprove convergence of GA. Our expermental result shows that the proposed method can obtan an accurate soluton n a practcal response tme. Index Term genetc algorthm, logstcs network, cooperatve logstcs, vehcle routng problem I. INTRODUCTION Logstcs cooperaton coverng multple enterprses s an effectve method for mprovng logstcs effcency of parts procurement []. However, ths cooperaton forms a cooperatve logstcs network consstng of several mutual sub-networks such as parts-collecton networks coverng parts supplers and depots (dstrbuton centers) and a long-dstance transportaton network coverng depots and factores. Thus, constructon of ths type of cooperatve logstcs network s therefore a very complcated task. Accordngly, usually ths task s dvded nto several phases [2, 3]. We already proposed a two-phased ( constructon phase and schedulng phase ) plannng method for optmzng a cooperatve logstcs network [4]. In the constructon phase, whch corresponds to strategc or tactcal level plannng, we make a parts-procurement plan correspondng to a producton plan and assgn resources such as drvers and vehcles to sub-networks [5, 6]. Next, n the schedulng phase, an actual transportaton schedule to evaluate the operablty of the network and to evaluate accurate logstcs cost based on the number of used vehcles s made. A smple mathematcal optmal plan s usually not readly accepted because of conflcts that arse n the dfferent enterprses. A human expert must thus evaluate the plan from many aspects and coordnate t wth consderaton of many non-systemzed condtons. To buld logstcs plans for the schedulng phase, soluton methods for schedulng a long-dstance transportaton network and for depot-centered parts-collecton networks whch provde at least human-expert-level accuracy wthn nteractve response tme are requred. We already proposed a VRP (Vehcle Routng Problem) [7, 8] soluton method for parts-collecton networks [9]. In ths paper, we propose a schedulng method for a long-dstance transportaton n the cooperatve logstcs network. A long-dstance transportaton network s not only drectly connected to the producton schedules of factores but also connected to many parts-collecton sub-networks. Moreover, ths network contans many transportaton ponts (depots and factores) dspersed all over the naton. And on the network, a vehcle dstrbutes and collects parts at the same tme. Strcter constrants are thus mposed on ths type of schedulng problem than those on a normal VRP. As a method for solvng VRP, IP (Integer Programmng)

2 78 JOURNAL OF COMPUTERS, VOL. 3, NO. 8, AUGUST 2008 has been appled [0]. Although, ths method can obtan the optmal soluton, t cannot satsfy the practcal response performance. The sweep method [] s a hgh-speed soluton adoptng comparatvely smple heurstcs. However, t s dffcult to solve a tough-constrant problem wth practcal accuracy. A mathematcal model such as a mnmum-cost-flow model wth a tme perod s also appled for constructng a large-scale transportaton network [2, 3, 4]. Ths method s sutable for determnng the transportaton capacty of each sub-network and for determnng the allocaton of the cost to each enterprse. However, t s mpossble to evaluate the accurate logstcs cost based on the number of used vehcles. Meta-heurstcs such as the tabu search or SA (Smulated Annealng) [5] combned wth a local search method such as cross-opt [6, 7] have also been proposed, and these methods can obtan hghly accurate solutons [8, 9]. However, t s dffcult to apply these methods to our problem because a vehcle pcks up and dstrbutes parts at the same tme. Moreover, some parts are drectly transported between factores, that s, not through depots. Thus, we cannot apply these local search methods to our problem. A method of applyng GA (Genetc Algorthm) that ntroduces route-exchange genetc operaton has also been proposed [20]. Although, t can obtan extremely accurate solutons, the response performance s nsuffcent for problems wth strct constrants. Wth the above-descrbed problems n mnd, we propose a method of applyng GA to solve the long-dstance transportaton problem. Ths soluton method satsfes both nteractve response performance and human-expert-level accuracy. The plannng of the long-dstance transportaton network and ts techncal problems are descrbed n secton 2. In secton 3, the concept of the method that meets the above requrements s proposed. In secton 4, the detal mplementaton of the method s descrbed. Secton 5 shows the expermental results for VRP benchmark problems. In secton 6, an experment on the long-dstance transportaton problem s explaned. Secton 7 presents our conclusons. II. LONG-DISTANCE TRANSPORTATION NETWORK PLANNING PROBLEM A. Cooperatve Logstcs Network Prevously, parts supplers ndvdually delvered ther own parts to factores. However, the cost of procurements logstcs ncreased because of the ncrease n hgh-mx, low-volume producton [2]. For ths reason, to realze total optmzaton of the procurements network, enterprses that belong to a supply chan set up a cooperatve logstcs network usng composed of depots (delvery center) as shown n Fg.. Ths cooperatve logstcs network conssts of several mutual sub-networks such as parts-collecton networks coverng parts supplers and depots and a long-dstance transportaton network among factores and depots. The key features of the long-dstance transportaton network are Parts collecton sub-networks Long-dstance transportaton sub-network Factory Factory Factory Fgure. Structure of cooperatve logstcs network. as follows. () Wde-area transportaton Factores and depots are located across a large natonwde area. Long-dstance transportaton s thus necessary for ths cooperatve logstcs. (2) Strct tme constrants Transportaton between depots and factores requres synchronzaton of the producton plans of each factory. Ths parts transportaton must therefore satsfy strct tme constrants. (3) Coexstence of pckup and delvery transportaton In ths network, parts are transported from depots to factores. Moreover, sem-fnshed products are transported from one factory to another. Vehcles thus pck up parts and delver parts smultaneously. (4) Mult depots There are several depots n the long-dstance transportaton network, and each depot has several vehcles. A vehcle starts from a depot and travels to several factores and other depots. Fnally, the vehcle returns to the orgnal depot. Along ths travelng route, some parts are drectly transported from a factory to other factores, that s, not through any depots. B. Techncal Problems Regardng Long-dstance Transportaton Network Plannng To mplement the schedulng method for the long-dstance transportaton network, the followng techncal problems must be addressed. () Human-expert-level optmalty for strct-constrant problems An optmal soluton for solvng the schedulng-phase problem s not always requred. However, to avod crucal error at estmaton of cost and operablty, at least, human expert-level optmalty s requred. (2) Response performance for nteractve operaton To realze a human expert s evaluaton from many aspects, response performance enablng nteractve operaton at least once or twce an hour s necessary. C. Model for Long-dstance Transportaton Network The schedulng problem s modeled, wth the followng

3 JOURNAL OF COMPUTERS, VOL. 3, NO. 8, AUGUST notatons, as follows. Q: maxmum loadng capacty of a vehcle. M: maxmum usable vehcles. {L } =..N : a set of loads. {w,.., w N, w N+,.., w 2N }: a set of pckup and delvery works. w 2- : pckup work of load L. w 2 : delvery work of load L. Q : amount of load that s pcked up or delvered at work w. When work w s a pckup work, Q s a postve value. On the contrary, Q s negatve, when work w s a delvery. Q satsfes (). Q = Q, Q > 0, Q < 0. () {P } =..P : a set of transportaton ponts (e.g., factores and depots). And Pl(w ) means the transportaton pont where work w s done. [e, l ] : A tme constrant for work w. A vehcle to whch work w s assgned must arrve to delvery pont Pl(w ) no later than l. When the vehcle arrves before e, t must wat the start of the work (pckup or delvery) untl e. M : number of vehcles that the dstrbuton pont P holds. M means the total of all M as (2). P M = M. (2) = A vehcle route s a sequence of works as follows. W = w, w,.., w 2 n ( P l( w ) = Pl( w )) n. (3) A vehcle starts from a depot and travels several ponts (factores and depots) to pck up or delver parts. The vehcle fnally comes back to the orgnal depot. Thus, a travelng route of a vehcle s represented as a sequence of works (pckup or delvery). wk W k -: the set of works before n the sequence. W k +: the set of works after work w n the sequence. k Wrk(W ) : the set of works contaned vehcle route W. WORK: the set of all works. t(p,p j ): vehcle travelng tme from ponts P to P j. tm(w ): total travelng tme of vehcle route W. n tm( W ) = t( Pl( w ), Pl( W )) + t( Pl( w ), Pl( W )). (4) j j+ n j= ω={w, W 2,,W m }: a transportaton plan, where ω s a set of vehcle routes that satsfy constrants (5) and (6). m U Wrk( W ) = WORK. (5) = WrkW ( ) I WrkW ( j) = ( j ). (6) Moreover, a vehcle route W that s contaned n ω must satsfy the followng constrants. (a) Lmtaton on number of vehcles. The number of the vehcle that starts from the depot must not exceed the number of vehcles held by the depot. (b) Tme constrant Let W j be a vehcle route that work w s assgned to, and be the arrval tme of the vehcle to Pl(w ). The arrval tme must not exceed tme constrant l. a j a j l. (7) (c) Vehcle-total-travelng-tme constrant tm(w )<T. (8) (d) Pck-up-and-delvery-work-order constrant The correspondng pck-up work and delvery work must be assgned to the same vehcle by the followng order (9). w2j W w w 2 j 2j +. (9) (e) Load-capacty-constrant for a vehcle j 0 Q Q ( j n). (0) k k = α: fxed cost for a vehcle. c(p, P j ) : vehcle transportaton cost from ponts P to P j. The vehcle travelng cost of route W s represented as (). n tc( W) = α + c( Pl( w ), Pl( w )) + c( Pl( w ), Pl( w )). () j= j j+ n The total cost of transportaton plan ω s thus represented as (2). m tc( ω) = tc( W ). (2) = III. CONCEPT OF THE PROPOSED SOLUTION METHHOD FOR THE COOPERATIVE LOGISTICS NETWORK SCHEDULING A. Concept of Selfsh-constrant-satsfacton GA To guarantee both response performance and optmalty n solvng the transportaton-plannng problem as descrbed n secton 2, we propose a GA method, whch we call selfsh-constrant-satsfacton GA. Ths method bascally conssts of the followng two deas. The frst dea s a new concept of a selfsh gene, whch s dfferent from Dawkns' selfsh gene. The orgnal selfsh gene proposed by R. Dawkns [22] les n the followng dea. Namely, all genes of an ndvdual cooperate wth each other, amng at the prosperty of the ndvdual for ts selfshness. Strctly speakng, all genes consttutng a chromosome cooperate wth each other, amng at the prosperty or reproducton of the chromosome to satsfy the chromosome's selfshness. We further developed ths dea; that s, each gene on a chromosome or an ndvdual acts selfshly to optmze only tself or the relatonshp between tself and ts surroundngs locally, wthout consderng the totalty of the ndvdual or other genes of the same ndvdual. When the constrant s qute severe and hgher optmalty s requred, t s natural to magne that such a local selfsh acton occurs. The second dea s a concept of lmted allowance. Namely, to some degree, a dvne beng, namely, God, or a natural system admts reproducton or prosperty of a chromosome or an ndvdual, each consttuent of whch s a selfsh gene. However, n the end, through reflecton or punshment at some approprate generatons, only ndvduals that satsfy the objectves or constrants can survve over generatons.

4 80 JOURNAL OF COMPUTERS, VOL. 3, NO. 8, AUGUST 2008 We came up wth the above two deas n order to fnd an effcent GA method that can optmally solve strct-constrant problems. Concretely speakng, n the GA method for solvng strct-constrant transportaton schedulng problems, each gene satsfes only the tme constrants drectly related to tself, n other words, t does not consder satsfyng the tme constrants of other genes n the same chromosome. Further, each such chromosome, each consttuent of whch s a selfsh gene, s allowed to survve over generatons under the followng condtons. That s to say, the chance of globally satsfyng constrants s gven through changng the structure of each consttutng gene per executon of GA s operaton such as crossover and mutaton. Furthermore, an ndvdual (strctly speakng, a chromosome or a unt genes' group) s not klled untl some partcular generatons even f t ncludes a selfsh gene that cannot globally satsfy constrants. In ths way, by allowng the selfshness of each consttutng gene and not examnng the global constrants satsfacton except for some partcular generatons, GA s executon tme s shortened. Moreover, by allowng varous types of ndvduals to survve, more optmal solutons are found. Both hgh optmalty and speedy responsveness are thus obtaned. In the real world of lvng thngs, a group of unt genes or an ndvdual that perfectly adapts to the envronment does not suddenly emerge n ther evolvng stages. Prmtve and mperfect lvng thngs, whch surely volate some rules or constrants, evolve slowly to adapt to ther envronment. Lkewse, ths phenomenon exsts n the optmzaton of GAs. If we try to contnue satsfyng all constrants at each generaton, the populaton sze often shrnks or the system falls nto a local mnmum. Effcent optmzaton cannot be attaned n ths fashon. When constrants are very severe, n the worst case, the whole populaton can be destroyed. Ths s to say, f a populaton conssts of only ndvduals that satsfy constrants, a remarkable mprovement s not expected. However, there s a rsk of fallng nto a local mnmum. For such reasons, we also gve a lmted chance of survval, reflecton or reparaton to the ndvduals that volate constrants. B. Penalty for Tme-constrant Volaton and Reparaton When we permt the exstence of ndvduals that volate tme constrants, t s natural that all ndvduals wll eventually volate the tme constrants. To avod ths, a penalty s added to the ftness value for an ndvdual that volates the tme constrants. Concretely speakng, the value n whch the penalty coeffcent s multpled by the cost that corresponds to the delay tme s added to the cost estmaton. Moreover, an ndvdual that volates tme constrants s repared at constant generaton ntervals. To repar the tme-constrant volatons, pars of pckup and delvery works on a vehcle route that volate the constrant are removed sngly. After these removals are performed for all vehcle routes, the removed pckup and delvery works are renserted nto a vehcle route that globally satsfy tme constrants. If there s no vehcle that can satsfy the tme constrants, a new vehcle s allocated to the transportaton. C. Dynamc Penalty Control The above mentoned penalty s regarded as lattude for ndvduals that volate tme constrants. The large lattude promotes the convergence of the objectve functon. On the other hand, the small lattude prompts a search n the constrant satsfacton solutons. However, t s dffcult to generate new ndvduals that satsfy all constrants for hard constrant problems. To avod ths problem, we apply a dynamc penalty control method [23]. Ths method promotes the optmzaton of the objectve functon by usng relatvely large lattude at start tme. Then, the lattude s decreased gradually n order to reduce the ndvduals that volate tme constrants n the populaton. In more detal, the penalty s ncreased exponentally from ntal value at each generaton. At the reparaton generaton, the penalty s turned down to the ntal value. D. Constrant Pre-checkng Method To obtan hghly optmal solutons by avodng the convergence nto the local mnmum, the GA must have enough populaton and generatons. However, long chromosomes contanng many genes are needed to represent our plannng problem. Therefore, both the mutaton operaton and the crossover operaton take a long calculaton tme. Moreover, the calculaton slows down because varous constrants on our proposed GA are checked. To avod such problems caused by varous constrants, we propose a constrant pre-checkng method. Ths method ntroduces nto our GA the concept of constrant propagaton utlzed as an effcent solvng method for constrant-satsfacton problems [24, 25]. Namely, ths method statcally analyses the constrants on the problem, before startng the GA. Ths reduces the overhead for dynamcally searchng nodes that cannot be vsted by one vehcle. Ths mproves the calculaton effcency of routes reconstructon durng the crossover and the mutaton of GA. That s, constrants brought by, for example, dstrbuton tme range, load capacty, and node s geographcal poston are statcally analyzed before startng the GA and set n a table of exclusve nodes. Thus, durng the executon of GA, the system does not need to dynamcally repeat the check of these constrants. In partcular, because dstrbuton ponts (factores and depots) are spread over a naton-wde area, the geographcal condtons effectvely reduce the combnaton of ponts that can be vsted by one vehcle. Snce there are many constrants on our long-dstance transportaton plannng problem, t s expected that ths method reduces the calculaton tme of the GA and realzes near-real-tme response performance. In the operaton of our cooperatve logstcs network, a vehcle does not go to a far pont (depot or factory) durng runnng neghborng ponts. Ths operatonal rule s represented by the followng constrants (3), (4), and (5). The x, y, and z represent transportaton ponts. When these three condton are satsfed, the pckup or delvery work at

5 JOURNAL OF COMPUTERS, VOL. 3, NO. 8, AUGUST y cannot be nserted nto a vehcle route between x and z. l 0 <t(x,z)<l. (3) t(x,y)+t(y,z)-t(x,z)>l 2. (4) t(x,y)+t(y,z)-t(x,z) >βt(x,z). (5) β,l 0, l, and l 2 are fxed values. IV. IMPLEMENTATION OF THE PROPOSED METHOD A. Structure of Chromosome The soluton to the long-dstance transportaton problem ncludes clusterng of loads, whch ndcate ther correspondence to vehcles, and ther travel routes n each cluster. To express both clusterng and routng nformaton, the chromosome structure shown n Fg. 2 (a) s appled. The chromosome s a sequence of work IDs of pckups and delveres. Table shows a detal of the load nformaton. The load nformaton conssts of ts orgn, destnaton, pckup work ID, and delvery work ID. The load s transported from P to P5, and ts pckup d s, and delvery work d s 2. In a smlar manner, the load 2 s transported from P3 to P4. In ths example, the frst vehcle of the chromosome n Fg. 2 (a) travels round P3, P4, P6, and P8 as shown n Fg. 2 (b). B. Schedulng Algorthm usng GA The selfsh-constrant-satsfacton GA constructs solutons dsregardng global constrants. Ths type GA generates ndvduals that volate tme constrants n the populaton. Consequently, to solve ths problem, these ndvduals have to be repared at constant generaton ntervals. Moreover, dynamc penalty control s also appled for effcent optmzaton. Thus, n addton to the normal genetc operatons such as selecton, crossover, and mutaton, reparaton for ndvduals that volate tme constrants and recalculaton of the penalty are performed as follows. Step. Generate ntal populaton. Step 2. Calculate penaltes. Step 3. Calculate ftness value for each ndvdual. Step 4. Perform selecton. Step 5. Perform crossover. Step 6. Perform mutaton. Step 7. Repar ndvduals that volate tme constrants. Step 8. Check termnates condton. Step 9. Go to step 2. TABLE. SAMPLE PICKUP AND DELIVERY WORK OF LOAD ID Orgn Destnaton Pckup Delvery work ID work ID P P5 2 2 P3 P P3 P P5 P P4 P P P Load: 2 P3 P4 (a) Vehcle Vehcle 2 Load: 3 P3 P6 Sample representaton of chromosome Vehcle : P3 P4 P6 P8 Vehcle 2: P P2 P5 (b) Load: 5 P4 P8 Load: P P5 Sample vehcle round routes Fgure 2. Sample representaton of chromosome and vehcle routes. C. Ftness Value and Selecton The ftness value of the ndvdual becomes larger, when the total cost becomes smaller. To be more precse, let U s an enough large fxed value compared to the total cost, and the ftness value s defned as (6). To create a next generaton, ndvduals are selected at a rate proportonal to ther ftness value. In addton, the elte ndvdual who has the hghest ftness value s always copy to the next generaton. U-tc(ω). (6) D. Crossover and Mutaton To realze the above concept of selfsh-constrantsatsfacton GA, an nserton method called selfsh NI (Nearest Inserton) s appled to put nodes nto a vehcle route. Wth ths method, a node s nserted nto a tour, usng NI method, f the node satsfes ts own constrants only. That s, the nfluence on the other nodes s not consdered. The crossover constructs a chld from two parents accordng to the followng process. () Determne the crossover pont n one parent chromosome. (2) Obtan vehcle routes represented by a group of genes located before the crossover pont n the chromosome. (3) Change the order of remanng nodes that are not contaned n any vehcle routes obtaned n (2) accordng to the order of nodes (genes) n the other parent s chromosome. (4) Insert the remanng nodes nto the route obtaned n (2) by usng the selfsh NI method n the order reordered n (3). (5) If no vehcle satsfes the tme and load-capacty constrants, a new vehcle s assgned to the transportaton of the load. In ths crossover process, when a pckup node s deleted from a vehcle route, the correspondng delvery node s also removed. Namely, a par consstng of a pckup work and a delvery work s deleted and nserted nto the same 2 Load: 6 P P2

6 82 JOURNAL OF COMPUTERS, VOL. 3, NO. 8, AUGUST 2008 vehcle route smultaneously. The mutaton randomly selects a mutaton node and deletes t together wth ts neghborng nodes. The deleted delvery ponts are renserted nto the transportaton plan usng the selfsh NI method. Ths delete and rensert process s done for each load. The pckup/delvery work par s always assgned to the same vehcle. E. Reparaton The selfsh-constrant-satsfacton method permts to survve ndvduals who volate tme constrants. Thus, these ndvduals should be repared at constant generaton ntervals by the followng two steps. () Elmnaton of loads that volate tme constrants If a pckup or delvery tme constrant s volated, both the pckup and delvery works are removed from a vehcle route. Accordngly, the chromosome shortens by ths elmnaton. (2) Renserton of elmnated load The removed pckup and delvery works are renserted nto a vehcle route whch satsfes constrants globally. When there s no vehcle whch satsfes all constrants, a new vehcle s assgned to the schedule and the elmnated pckup and delvery works are nserted nto the newly assgned vehcle. Namely, the pckup and delvery works are added to the end of the chromosome n Fg. 2 (a). F. Proposed Soluton Method We propose the followng two method usng the above mentoned elemental soluton methods. () Selfsh-constrant-satsfacton GA wth fx penalty Ths soluton method constructs a vehcle route usng the selfsh NI method and permts the exstence of ndvduals that volate constrants n the populaton. The penalty value s fxed for all generatons n ths method. (2) Selfsh-constrant-satsfacton GA wth dynamc penalty control Ths soluton method also permts the exstence of ndvduals that volates tme constrants. Moreover, the penalty for ndvduals that volates tme constrants s dynamcally modfed. In the next secton, experments to evaluate the effect of the above two selfsh-constrant-satsfacton GAs are performed. These tests compare them wth Non-selfsh GA. Non-selfsh GA apples conventonal non-selfsh NI method to crossover and mutaton operaton. Ths NI method nserts a node nto the poston that satsfes not only ts constrants but also the constrants of every other node n the same ndvdual. In case of such postons of nodes are not searched out, crossover or mutaton operaton assgns a new vehcle. V. EXPERIMENTS USING THE BENCHMARK PROBLEM To evaluate the proposed selfsh-constrant-satsfacton GA, we determned the penalty value for tme-constrant volatons, and the generaton gap nterval for the reparaton usng VRP benchmark problems [26]. We then compared the accuracy of the selfsh-constrant-satsfacton GA wth that of the global-constrant-satsfacton GA, whch satsfes all constrants all the tme, by these benchmark problems. In the next secton, to evaluate the proposed method, we appled t to the long-dstance-transportaton-network plannng problem. GA parameters of populaton sze, mutaton rate, and crossover rate were determned based on an exploratve experment. In ths experment, we executed GAs n 30 mnutes and compared solutons. As a result, we determned the populaton sze, mutaton rate, and crossover rate as 00, 5%, and 0% respectvely. A. Experment Parameters () Penalty coeffcent for tme-constrant volaton Our target long-dstance transportaton network contans about one hundred dstrbuton ponts (factores and depots). Thus, we selected a VRP benchmark problem wth 00 dstrbuton ponts to determne the parameter for our proposed GA. The accuracy of the soluton accordng to the change n the coeffcent s shown n Fg. 3. When there s no penalty, the error rate s over 0%. When the coeffcent s larger than 3, the error rate stays under 5%. In partcular, the error rate becomes less than 3% when a value from 5 to 0 s specfed for the coeffcent. Accordng to ths result, we determned the coeffcent as 5. (2) Generaton gap for gene reparaton Fg. 4 shows the change n the accuracy accordng to the change n the generaton gap nterval of the tme-constrant reparaton. The error rate s over 3% when the gap s less than 3. The accuracy becomes a mnmum when the gap s between 5 and 0. We thus determned the gap as 0 generatons. Error (%) Fgure Penalty coeffcent Correlaton between penalty coeffcent and accuracy.

7 JOURNAL OF COMPUTERS, VOL. 3, NO. 8, AUGUST Error (%) Generaton nterval for reparaton TABLE 2. ACCURACY OF EACH METHOD FOR PROBLEM Method Generaton Accuracy Non-selfsh GA, % Selfsh-constrant-satsfacton GA wth fx penalty, % Selfsh-constrant-satsfacton GA wth dynamc penalty control, % TABLE 3. ACCURACY OF EACH METHOD FOR PROBLEM2 Method Generaton Accuracy Non-selfsh GA, % Selfsh-constrant-satsfacton GA wth fx penalty, % Selfsh-constrant-satsfacton GA wth dynamc penalty control, % TABLE 4. ACCURACY OF EACH METHOD FOR PROBLEM3 Fgure 4. Correlaton between generaton gap and accuracy. B. Evaluaton of Accuracy To evaluate the accuracy of the soluton, we appled the proposed method to the VRP benchmark problems. Because of the tght connectons between the producton schedules of each factory, the long-dstance transportaton schedulng s assgned strct tme constrants. We prepared three problems: Problem, Problem 2, and Problem 3. Problem s the bench mark problem (R0) whch has the hardest tme constrants n bench mark problems. Problem 2 and Problem 3 have the same dstrbuton ponts and load nformaton as Problem. However, we reduced the tme wndows of Problem 2 to half of Problem. Moreover, Problem 3 has strcter tme-constrants than Problem 2. The tme wndows of Problem 3 are reduced to half of Problem 2. Thus, the tme wndows of Problem 3 are one fourth of Problem. These three problems have the same optmal soluton. In ths experment, we solve the problem usng the followng three methods. () Non-selfsh GA (2) Selfsh-constrant-satsfacton GA wth fx penalty (3) Selfsh-constrant-satsfacton GA wth dynamc penalty control Table 2 lsts the accuracy of above three methods for the Problem n calculaton of 000 generatons (when the soluton s converged). Though the accuracy of the non-selfsh GA exceeded 4.5%, the selfsh-constrantsatsfacton GAs can obtan the soluton wth under 3.0% error. Table 3 lsts the accuracy for the Problem 2. The both selfsh-constrant-satsfacton GAs obtans solutons wth 2.7% error. Moreover, table 4 shows the results for the Problem 3. The selfsh GAs can obtan the better soluton than the non-selfsh GA as the result of Problem 2. In partcular, the thrd method can obtan the soluton wth under 4.0% error. Method Generaton Accuracy Non-selfsh GA, % Selfsh-constrant-satsfacton GA wth fx penalty, % Selfsh-constrant-satsfacton GA wth dynamc penalty control, % C. Evaluaton of Response Performance To evaluate the constrant pre-checkng method that calculates the combnaton of ponts that the same vehcle cannot go around, we examned two methods: one uses constrant pre-checkng and the other does not use pre-checkng. The pre-checkng method bumps up the generatons that could be calculated wthn fve mnutes from 820 to 045 as shown n table 5. Moreover, t also mproves the accuracy from 2.9% to 2.6% error by the ncrease of the calculated generatons. VI. APPLICATION TO THE LONG-DISTANCE TRANSPORTATION PLANNING PROBLEM To evaluate the proposed method usng the same condton as the long-dstance transportaton problem, we prepared a transportaton problem wth mxed transportaton (.e., pckup and delvery) and many depots. Ths expermental network conssts of 70 factores and 30 depots. Moreover, 500 loads were prepared for the network. We set the orgn and destnaton, volume, and tme constrants for each load. The constant values, l 0, l, l 2, and β n (3), (4), and (5) were set as 0km, 00km, 700km, and 7 respectvely. Fg. 5 shows the convergence of the solutons. The proposed methods can calculate 300 generatons wthn 30 mnutes. Table 6 shows the solutons of 300 generatons GA. In ths experment the selfsh-constrant satsfacton GA wth fxed penalty can obtan about 0% less cost soluton than the non-selfsh GA. In addton, the cost s mproved 0.5% due to the dynamc penalty control method.

8 84 JOURNAL OF COMPUTERS, VOL. 3, NO. 8, AUGUST 2008 Cost Non-selfsh Fxed penalty Dynamc penalty 2) The second dea s the dynamc penalty control method. Ths method promotes the optmzaton of the objectve functon by ncreasng the penalty for the ndvduals that volate tme constrants accordng to the reparaton cycle. 3) The thrd dea s constrant pre-checkng method. In our problems, the dstrbuton ponts dspersed to a large natonwde area. Thus, ths method statcally analyses the constrants on the problem before startng the GA to reduce the overhead for dynamcally searchng nodes that cannot be vsted by one vehcle. Our expermental results revealed that our proposed method enables nteractve operatons once or twce an hour for problems on a practcal scale. Moreover, ths method can obtan solutons wth human expert-level accuracy for hard constrant problems Fgure 5. Generaton Convergence of solutons. TABLE 5. EFFECT OF CONSTRAINT PRE-CEHCKING METHOD Method Generaton Accuracy Non pre-checkng % Pre-checkng, % TABLE 6. ACCURACY OF SOLVINE LONG-DISTANCE TRANSPORTATION PROBLEM Method Cost Non-selfsh GA 3,52 Selfsh-constrant-satsfacton GA wth fx penalty 2,32 Selfsh-constrant-satsfacton GA wth dynamc penalty control 2,065 VII. CONCLUSION We proposed a plannng method for a long-dstance transportaton network that obtans both nteractve response performance and human expert-level accuracy. Ths soluton method s based on the followng three deas. ) Frst dea s selfsh-constrant-satsfacton GA. Each gene, whch consttutes an ndvdual, does not care about constrants of all other genes wthn the same ndvdual. Moreover, an ndvdual s not klled untl some partcular generatons even f t ncludes a selfsh gene that cannot globally satsfy constrants. Ths method enables to avod fallng nto a local mnm for strct-constrant problems. REFERENCES [] T. P. Stank and P. J. Daugherty: "The mpact of operatng envronment on the formaton of cooperatve logstcs relatonshps", n Transportaton Research Part E: Logstcs and Transportaton Revew, Vol. 33, No., pp , March 997. [2] M. Kubo, Logstcs engneerng, Tokyo: Asakura-Syoten, 200. [3] M. Wasner and G. Zapfel: An ntegrated mult-depot hub-locaton vehcle routng model for network plannng of parcel servce, n Int l Journal of Producton Economcs, Vol. 90, No. 3, pp , Aug [4] T. Onoyama, S. Kubota, K. Oyanag, and S. Tsuruta, A method for solvng nested combnatoral optmzaton problems a case of optmzng a large-scale dstrbuton network, n Proc. IEEE SMC 2000, pp , Oct [5] T. Onoyama, T. Maekawa, S. Kubota, and N. Komoda, Hgh-speed plannng method for cooperatve logstcs networks usng mxed nteger programmng model and dummy load, n Trans. Electrcal Engneerng n Japan, Vol. 64, No. 2, pp , Feb [n Trans. IEEJ, Vol. 27-C, No., pp.3-36, Jan. 2007]. [6] H. J. Sebastan: Strategc plannng of dstrbuton networks for letter and parcel mal usng optmzaton models, n Abstract of the 9th Int l Workshop on Complex Systems Modelng jontly wth the 6th Int l Symposum on Knowledge and Systems Scences (CSM/KSS 05), pp. 20-2, Aug [7] J. Bramel and D. Smch-Lev: The Logc of Logstcs, New York: Sprnger-Verlag (997). [8] M. Gendean, G. Laporte, and J.Y. Potvn, Vehcle routng modern heurstcs, n E. Aarts and J. K. Lenstra (Eds.), Local Search n Combnatoral Optmzaton, Prnceton: Prnceton Unversty Press, pp , 997. [9] T. Onoyama, T. Maekawa, S. Kubota, S. Tsuruta, and N. Komoda, Vehcle routng problem solvng method for a cooperatve logstcs network by usng mult-stage GA, n Trans. IEEJ, Vol. 27-C, No. 9, pp , Sep [0] P. Toth and D. Vgo: Exact soluton of the vehcle routng problem, n T.G Cranc and G. Laporte (Eds.), Fleet Management and Logstcs, Kluwer Academc Publshers, pp. -3, 998. [] T. Masu, S. Yurmoto, and N. Katayama, OR n Logstcs, Tokyo: Maksyoten, 998.

9 JOURNAL OF COMPUTERS, VOL. 3, NO. 8, AUGUST [2] H. Mohr, M. Kubo, and M. Mor, Dstrbuton plannng problem on manlne transportaton, n Abstract of Japan OR Socety 995, pp , Sep [3] S. Ataka and M. Gen, Soluton method of mult-product two-stage logstcs problem wth constrants of delvery course, n Trans. IEEJ, Vol. 28, No. 3, pp , March [4] H. Mohr, T. Watabnabe, M. Mor, and M. Kubo: Cost allocaton on vehcle routng problem, n Journal of the Operatons Research Socety of Japan, Vol. 40, No. 4, pp , Jan [5] S. M. Sat and H. Youssef: Iteratve Computer Algorthms wth Applcatons n Engneerng: Solvng Combnatoral Optmzaton Problems, Los Alamtos: IEEE Computer Socety, [6] N. Park, H. Okano, and H. Ima, A path-exchange-type local search algorthm for vehcle routng and ts effcent search strategy, n Journal of the Operatons Research Socety of Japan, Vol. 43, No., pp , Jan [7] E. Tallard, P. Badeau, F. Guertn, and J.-Y. Potvn: "A tabu search heurstc for the vehcle routng problem wth soft tme wndows", n Transportaton Scence, Vol. 3, No. 2, pp , Feb [8] M. Gendreau, H. Alan, and G. Laporte: A tabu search heurstcs for the vehcle routng problem, n Management Scence, Vol. 40, No. 0, pp , Oct [9] J. H. Hooker and N. R. Natraj: Solvng a general routng and schedulng problem by chan decomposton and tabu search, n Transportaton Scence, Vol. 29, No., pp , Jan [20] G. A. P. Kndervater and M. W. P. Savelsbergh: Vehcle routng: handlng edge exchanges, n E. Aarts and J. K Lenstra (Eds.), Local Search n Combnatoral Optmzaton, Prnceton Unversty Press, pp , 997. [2] H. Kuse: Logstcs and socal problems, n Journal of the Socety of Instrument and Control Engneers, Vol. 37, No. 3, pp , March 998. [22] R. Dawkns, The Selfsh Gene, London: Oxford Unversty press, 989. [23] Y. Sakura, T. Onoyama, S. Kubota, Y. Nakamura, and S. Tsuruta, Locally selfsh-gene tolerant dynamc control GA to solve constrant TSPs, n Trans. IPSJ, Vol. 48, No. SIG-9, pp , Dec [24] V. Kumar: Algorthms for constrants satsfacton problems: A survey, n AI Magazne, Vol. 3, No., pp , Jan [25] P. Shaw: Usng Constrant Programmng and Local Search Methods to Solve Vehcle Routng Problems, Berln: Sprnger-Verlag, 998. [26] M. M. Solomon: VRPTW benchmark problems. Dr. Onoyama s a member of the IEEE and others. Takuya Maekawa was born n 97. He receved the Bachelor of Scence from the Yamagata Unversty n Japan n 993. He joned Htach Software Engneerng Co., Ltd n 993 and he has been developed schedulng system. Hs man research nterests are VRP solvng method for logstcs plannng. Mr. Maekawa s a member of the IPSJ. Yoshtaka Sakura was born n 977. He receved Bachelor of Informaton Scence from the Unversty of Electro- Communcatons n He receved the PhD n Engneerng from the Unversty of Electro-Communcatons n He teaches at the Tokyo Denk Unversty from Hs man research nterest s theory and applcaton of evolutonal and learnng algorthms. Dr. Sakura s a member of the IEEE and IPSJ. Setsuo Tsuruta was born n 947. He receved the Bachelor from the Waseda Unversty n 97 and he completed the Master of Engneerng at the Nagoya Unversty. He receved the PhD n Engneerng from the Nagoya Unversty. He joned Htach Ltd n 973. In 2003, he joned the nformaton envronment faculty of Tokyo Denk Unversty as a professor. Hs research focuses on the schedulng system and ntellgent system. Prof. Tsuruta s member of IEEE and others. Norhsa Komoda was born n 950. He completed the Master of Engneerng at the Osaka Unversty n 974. He receved the PhD n Engneerng from the Osaka Unversty n 98. He joned Htach Ltd n 974. In 99 he joned the engneerng faculty of Osaka Unversty as assocate professor. Snce 992 he s professor of Graduate School of Informaton Scence and Technology of the Osaka Unversty. He s manly nterested n the nformaton system n the area of manufacturng and dstrbuton ndustry and knowledge based nformaton processng. Prof. Komoda s a member of IEEE and others. He receved 998 IEEJ Paper Award. Takash Onoyama was born n 959. He receved the Bachelor of Scence from the Osaka Unversty n 98. He receved the PhD n Informaton Scence from the Osaka Unversty n He joned Htach Software Engneerng Co., Ltd n Tokyo, Japan n 98. In 2003, he became Department Manager of Research & Development Department. The focus of hs research s concentrated wthn the topcs of plannng method for logstcs system.

Dynamic Fleet Management for Cybercars

Dynamic Fleet Management for Cybercars Proceedngs of the IEEE ITSC 2006 2006 IEEE Intellgent Transportaton Systems Conference Toronto, Canada, September 17-20, 2006 TC7.5 Dynamc Fleet Management for Cybercars Fenghu. Wang, Mng. Yang, Ruqng.

More information

On the Optimal Control of a Cascade of Hydro-Electric Power Stations

On the Optimal Control of a Cascade of Hydro-Electric Power Stations On the Optmal Control of a Cascade of Hydro-Electrc Power Statons M.C.M. Guedes a, A.F. Rbero a, G.V. Smrnov b and S. Vlela c a Department of Mathematcs, School of Scences, Unversty of Porto, Portugal;

More information

The Development of Web Log Mining Based on Improve-K-Means Clustering Analysis

The Development of Web Log Mining Based on Improve-K-Means Clustering Analysis The Development of Web Log Mnng Based on Improve-K-Means Clusterng Analyss TngZhong Wang * College of Informaton Technology, Luoyang Normal Unversty, Luoyang, 471022, Chna wangtngzhong2@sna.cn Abstract.

More information

Project Networks With Mixed-Time Constraints

Project Networks With Mixed-Time Constraints Project Networs Wth Mxed-Tme Constrants L Caccetta and B Wattananon Western Australan Centre of Excellence n Industral Optmsaton (WACEIO) Curtn Unversty of Technology GPO Box U1987 Perth Western Australa

More information

Research Article A Time Scheduling Model of Logistics Service Supply Chain with Mass Customized Logistics Service

Research Article A Time Scheduling Model of Logistics Service Supply Chain with Mass Customized Logistics Service Hndaw Publshng Corporaton Dscrete Dynamcs n Nature and Socety Volume 01, Artcle ID 48978, 18 pages do:10.1155/01/48978 Research Artcle A Tme Schedulng Model of Logstcs Servce Supply Chan wth Mass Customzed

More information

Sciences Shenyang, Shenyang, China.

Sciences Shenyang, Shenyang, China. Advanced Materals Research Vols. 314-316 (2011) pp 1315-1320 (2011) Trans Tech Publcatons, Swtzerland do:10.4028/www.scentfc.net/amr.314-316.1315 Solvng the Two-Obectve Shop Schedulng Problem n MTO Manufacturng

More information

A New Task Scheduling Algorithm Based on Improved Genetic Algorithm

A New Task Scheduling Algorithm Based on Improved Genetic Algorithm A New Task Schedulng Algorthm Based on Improved Genetc Algorthm n Cloud Computng Envronment Congcong Xong, Long Feng, Lxan Chen A New Task Schedulng Algorthm Based on Improved Genetc Algorthm n Cloud Computng

More information

Power-of-Two Policies for Single- Warehouse Multi-Retailer Inventory Systems with Order Frequency Discounts

Power-of-Two Policies for Single- Warehouse Multi-Retailer Inventory Systems with Order Frequency Discounts Power-of-wo Polces for Sngle- Warehouse Mult-Retaler Inventory Systems wth Order Frequency Dscounts José A. Ventura Pennsylvana State Unversty (USA) Yale. Herer echnon Israel Insttute of echnology (Israel)

More information

Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm

Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm Songklanakarn J. Sc. Technol. 37 (2), 221-230, Mar.-Apr. 2015 http://www.sst.psu.ac.th Orgnal Artcle Optmzed ready mxed concrete truck schedulng for uncertan factors usng bee algorthm Nuntana Mayteekreangkra

More information

What is Candidate Sampling

What is Candidate Sampling What s Canddate Samplng Say we have a multclass or mult label problem where each tranng example ( x, T ) conssts of a context x a small (mult)set of target classes T out of a large unverse L of possble

More information

A Secure Password-Authenticated Key Agreement Using Smart Cards

A Secure Password-Authenticated Key Agreement Using Smart Cards A Secure Password-Authentcated Key Agreement Usng Smart Cards Ka Chan 1, Wen-Chung Kuo 2 and Jn-Chou Cheng 3 1 Department of Computer and Informaton Scence, R.O.C. Mltary Academy, Kaohsung 83059, Tawan,

More information

"Research Note" APPLICATION OF CHARGE SIMULATION METHOD TO ELECTRIC FIELD CALCULATION IN THE POWER CABLES *

Research Note APPLICATION OF CHARGE SIMULATION METHOD TO ELECTRIC FIELD CALCULATION IN THE POWER CABLES * Iranan Journal of Scence & Technology, Transacton B, Engneerng, ol. 30, No. B6, 789-794 rnted n The Islamc Republc of Iran, 006 Shraz Unversty "Research Note" ALICATION OF CHARGE SIMULATION METHOD TO ELECTRIC

More information

Formulating & Solving Integer Problems Chapter 11 289

Formulating & Solving Integer Problems Chapter 11 289 Formulatng & Solvng Integer Problems Chapter 11 289 The Optonal Stop TSP If we drop the requrement that every stop must be vsted, we then get the optonal stop TSP. Ths mght correspond to a ob sequencng

More information

Vehicle Routing Problem with Time Windows for Reducing Fuel Consumption

Vehicle Routing Problem with Time Windows for Reducing Fuel Consumption 3020 JOURNAL OF COMPUTERS, VOL. 7, NO. 12, DECEMBER 2012 Vehcle Routng Problem wth Tme Wndows for Reducng Fuel Consumpton Jn L School of Computer and Informaton Engneerng, Zhejang Gongshang Unversty, Hangzhou,

More information

A GENETIC ALGORITHM-BASED METHOD FOR CREATING IMPARTIAL WORK SCHEDULES FOR NURSES

A GENETIC ALGORITHM-BASED METHOD FOR CREATING IMPARTIAL WORK SCHEDULES FOR NURSES 82 Internatonal Journal of Electronc Busness Management, Vol. 0, No. 3, pp. 82-93 (202) A GENETIC ALGORITHM-BASED METHOD FOR CREATING IMPARTIAL WORK SCHEDULES FOR NURSES Feng-Cheng Yang * and We-Tng Wu

More information

SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS

SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS Magdalena Rogalska 1, Wocech Bożeko 2,Zdzsław Heduck 3, 1 Lubln Unversty of Technology, 2- Lubln, Nadbystrzycka 4., Poland. E-mal:rogalska@akropols.pol.lubln.pl

More information

A Load-Balancing Algorithm for Cluster-based Multi-core Web Servers

A Load-Balancing Algorithm for Cluster-based Multi-core Web Servers Journal of Computatonal Informaton Systems 7: 13 (2011) 4740-4747 Avalable at http://www.jofcs.com A Load-Balancng Algorthm for Cluster-based Mult-core Web Servers Guohua YOU, Yng ZHAO College of Informaton

More information

Scatter search approach for solving a home care nurses routing and scheduling problem

Scatter search approach for solving a home care nurses routing and scheduling problem Scatter search approach for solvng a home care nurses routng and schedulng problem Bouazza Elbenan 1, Jacques A. Ferland 2 and Vvane Gascon 3* 1 Département de mathématque et nformatque, Faculté des scences,

More information

benefit is 2, paid if the policyholder dies within the year, and probability of death within the year is ).

benefit is 2, paid if the policyholder dies within the year, and probability of death within the year is ). REVIEW OF RISK MANAGEMENT CONCEPTS LOSS DISTRIBUTIONS AND INSURANCE Loss and nsurance: When someone s subject to the rsk of ncurrng a fnancal loss, the loss s generally modeled usng a random varable or

More information

Ant Colony Optimization for Economic Generator Scheduling and Load Dispatch

Ant Colony Optimization for Economic Generator Scheduling and Load Dispatch Proceedngs of the th WSEAS Int. Conf. on EVOLUTIONARY COMPUTING, Lsbon, Portugal, June 1-18, 5 (pp17-175) Ant Colony Optmzaton for Economc Generator Schedulng and Load Dspatch K. S. Swarup Abstract Feasblty

More information

A Memetic Algorithm for the Vehicle Routing Problem with Time Windows

A Memetic Algorithm for the Vehicle Routing Problem with Time Windows A Memetc Algorthm for the Vehcle Routng Problem wth Tme Wndows Jean Berger and Mohamed Barkaou Defence Research and Development Canada - Valcarter, Decson Support System Secton 2459 Pe-XI Blvd. North,

More information

Fault tolerance in cloud technologies presented as a service

Fault tolerance in cloud technologies presented as a service Internatonal Scentfc Conference Computer Scence 2015 Pavel Dzhunev, PhD student Fault tolerance n cloud technologes presented as a servce INTRODUCTION Improvements n technques for vrtualzaton and performance

More information

An MILP model for planning of batch plants operating in a campaign-mode

An MILP model for planning of batch plants operating in a campaign-mode An MILP model for plannng of batch plants operatng n a campagn-mode Yanna Fumero Insttuto de Desarrollo y Dseño CONICET UTN yfumero@santafe-concet.gov.ar Gabrela Corsano Insttuto de Desarrollo y Dseño

More information

Maintenance Scheduling by using the Bi-Criterion Algorithm of Preferential Anti-Pheromone

Maintenance Scheduling by using the Bi-Criterion Algorithm of Preferential Anti-Pheromone Leonardo ournal of Scences ISSN 583-0233 Issue 2, anuary-une 2008 p. 43-64 Mantenance Schedulng by usng the B-Crteron Algorthm of Preferental Ant-Pheromone Trantafyllos MYTAKIDIS and Arstds VLACHOS Department

More information

Ants Can Schedule Software Projects

Ants Can Schedule Software Projects Ants Can Schedule Software Proects Broderck Crawford 1,2, Rcardo Soto 1,3, Frankln Johnson 4, and Erc Monfroy 5 1 Pontfca Unversdad Católca de Valparaíso, Chle FrstName.Name@ucv.cl 2 Unversdad Fns Terrae,

More information

APPLICATION OF PROBE DATA COLLECTED VIA INFRARED BEACONS TO TRAFFIC MANEGEMENT

APPLICATION OF PROBE DATA COLLECTED VIA INFRARED BEACONS TO TRAFFIC MANEGEMENT APPLICATION OF PROBE DATA COLLECTED VIA INFRARED BEACONS TO TRAFFIC MANEGEMENT Toshhko Oda (1), Kochro Iwaoka (2) (1), (2) Infrastructure Systems Busness Unt, Panasonc System Networks Co., Ltd. Saedo-cho

More information

A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION. Michael E. Kuhl Radhamés A. Tolentino-Peña

A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION. Michael E. Kuhl Radhamés A. Tolentino-Peña Proceedngs of the 2008 Wnter Smulaton Conference S. J. Mason, R. R. Hll, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler eds. A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION

More information

Open Access A Load Balancing Strategy with Bandwidth Constraint in Cloud Computing. Jing Deng 1,*, Ping Guo 2, Qi Li 3, Haizhu Chen 1

Open Access A Load Balancing Strategy with Bandwidth Constraint in Cloud Computing. Jing Deng 1,*, Ping Guo 2, Qi Li 3, Haizhu Chen 1 Send Orders for Reprnts to reprnts@benthamscence.ae The Open Cybernetcs & Systemcs Journal, 2014, 8, 115-121 115 Open Access A Load Balancng Strategy wth Bandwdth Constrant n Cloud Computng Jng Deng 1,*,

More information

An Analysis of Central Processor Scheduling in Multiprogrammed Computer Systems

An Analysis of Central Processor Scheduling in Multiprogrammed Computer Systems STAN-CS-73-355 I SU-SE-73-013 An Analyss of Central Processor Schedulng n Multprogrammed Computer Systems (Dgest Edton) by Thomas G. Prce October 1972 Techncal Report No. 57 Reproducton n whole or n part

More information

RELIABILITY, RISK AND AVAILABILITY ANLYSIS OF A CONTAINER GANTRY CRANE ABSTRACT

RELIABILITY, RISK AND AVAILABILITY ANLYSIS OF A CONTAINER GANTRY CRANE ABSTRACT Kolowrock Krzysztof Joanna oszynska MODELLING ENVIRONMENT AND INFRATRUCTURE INFLUENCE ON RELIABILITY AND OPERATION RT&A # () (Vol.) March RELIABILITY RIK AND AVAILABILITY ANLYI OF A CONTAINER GANTRY CRANE

More information

Preventive Maintenance and Replacement Scheduling: Models and Algorithms

Preventive Maintenance and Replacement Scheduling: Models and Algorithms Preventve Mantenance and Replacement Schedulng: Models and Algorthms By Kamran S. Moghaddam B.S. Unversty of Tehran 200 M.S. Tehran Polytechnc 2003 A Dssertaton Proposal Submtted to the Faculty of the

More information

Logical Development Of Vogel s Approximation Method (LD-VAM): An Approach To Find Basic Feasible Solution Of Transportation Problem

Logical Development Of Vogel s Approximation Method (LD-VAM): An Approach To Find Basic Feasible Solution Of Transportation Problem INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH VOLUME, ISSUE, FEBRUARY ISSN 77-866 Logcal Development Of Vogel s Approxmaton Method (LD- An Approach To Fnd Basc Feasble Soluton Of Transportaton

More information

Survey on Virtual Machine Placement Techniques in Cloud Computing Environment

Survey on Virtual Machine Placement Techniques in Cloud Computing Environment Survey on Vrtual Machne Placement Technques n Cloud Computng Envronment Rajeev Kumar Gupta and R. K. Paterya Department of Computer Scence & Engneerng, MANIT, Bhopal, Inda ABSTRACT In tradtonal data center

More information

A multi-start local search heuristic for ship scheduling a computational study

A multi-start local search heuristic for ship scheduling a computational study Computers & Operatons Research 34 (2007) 900 917 www.elsever.com/locate/cor A mult-start local search heurstc for shp schedulng a computatonal study Ger BrZnmo a,b,, Marelle Chrstansen b, Kjetl Fagerholt

More information

Feature selection for intrusion detection. Slobodan Petrović NISlab, Gjøvik University College

Feature selection for intrusion detection. Slobodan Petrović NISlab, Gjøvik University College Feature selecton for ntruson detecton Slobodan Petrovć NISlab, Gjøvk Unversty College Contents The feature selecton problem Intruson detecton Traffc features relevant for IDS The CFS measure The mrmr measure

More information

A heuristic task deployment approach for load balancing

A heuristic task deployment approach for load balancing Xu Gaochao, Dong Yunmeng, Fu Xaodog, Dng Yan, Lu Peng, Zhao Ja Abstract A heurstc task deployment approach for load balancng Gaochao Xu, Yunmeng Dong, Xaodong Fu, Yan Dng, Peng Lu, Ja Zhao * College of

More information

Optimization Model of Reliable Data Storage in Cloud Environment Using Genetic Algorithm

Optimization Model of Reliable Data Storage in Cloud Environment Using Genetic Algorithm Internatonal Journal of Grd Dstrbuton Computng, pp.175-190 http://dx.do.org/10.14257/gdc.2014.7.6.14 Optmzaton odel of Relable Data Storage n Cloud Envronment Usng Genetc Algorthm Feng Lu 1,2,3, Hatao

More information

Forecasting the Direction and Strength of Stock Market Movement

Forecasting the Direction and Strength of Stock Market Movement Forecastng the Drecton and Strength of Stock Market Movement Jngwe Chen Mng Chen Nan Ye cjngwe@stanford.edu mchen5@stanford.edu nanye@stanford.edu Abstract - Stock market s one of the most complcated systems

More information

Data Mining from the Information Systems: Performance Indicators at Masaryk University in Brno

Data Mining from the Information Systems: Performance Indicators at Masaryk University in Brno Data Mnng from the Informaton Systems: Performance Indcators at Masaryk Unversty n Brno Mkuláš Bek EUA Workshop Strasbourg, 1-2 December 2006 1 Locaton of Brno Brno EUA Workshop Strasbourg, 1-2 December

More information

An Interest-Oriented Network Evolution Mechanism for Online Communities

An Interest-Oriented Network Evolution Mechanism for Online Communities An Interest-Orented Network Evoluton Mechansm for Onlne Communtes Cahong Sun and Xaopng Yang School of Informaton, Renmn Unversty of Chna, Bejng 100872, P.R. Chna {chsun,yang}@ruc.edu.cn Abstract. Onlne

More information

Software project management with GAs

Software project management with GAs Informaton Scences 177 (27) 238 241 www.elsever.com/locate/ns Software project management wth GAs Enrque Alba *, J. Francsco Chcano Unversty of Málaga, Grupo GISUM, Departamento de Lenguajes y Cencas de

More information

AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE

AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE AN APPOINTMENT ORDER OUTPATIENT SCHEDULING SYSTEM THAT IMPROVES OUTPATIENT EXPERIENCE Yu-L Huang Industral Engneerng Department New Mexco State Unversty Las Cruces, New Mexco 88003, U.S.A. Abstract Patent

More information

Traffic State Estimation in the Traffic Management Center of Berlin

Traffic State Estimation in the Traffic Management Center of Berlin Traffc State Estmaton n the Traffc Management Center of Berln Authors: Peter Vortsch, PTV AG, Stumpfstrasse, D-763 Karlsruhe, Germany phone ++49/72/965/35, emal peter.vortsch@ptv.de Peter Möhl, PTV AG,

More information

Enabling P2P One-view Multi-party Video Conferencing

Enabling P2P One-view Multi-party Video Conferencing Enablng P2P One-vew Mult-party Vdeo Conferencng Yongxang Zhao, Yong Lu, Changja Chen, and JanYn Zhang Abstract Mult-Party Vdeo Conferencng (MPVC) facltates realtme group nteracton between users. Whle P2P

More information

1. Fundamentals of probability theory 2. Emergence of communication traffic 3. Stochastic & Markovian Processes (SP & MP)

1. Fundamentals of probability theory 2. Emergence of communication traffic 3. Stochastic & Markovian Processes (SP & MP) 6.3 / -- Communcaton Networks II (Görg) SS20 -- www.comnets.un-bremen.de Communcaton Networks II Contents. Fundamentals of probablty theory 2. Emergence of communcaton traffc 3. Stochastc & Markovan Processes

More information

Module 2 LOSSLESS IMAGE COMPRESSION SYSTEMS. Version 2 ECE IIT, Kharagpur

Module 2 LOSSLESS IMAGE COMPRESSION SYSTEMS. Version 2 ECE IIT, Kharagpur Module LOSSLESS IMAGE COMPRESSION SYSTEMS Lesson 3 Lossless Compresson: Huffman Codng Instructonal Objectves At the end of ths lesson, the students should be able to:. Defne and measure source entropy..

More information

A hybrid global optimization algorithm based on parallel chaos optimization and outlook algorithm

A hybrid global optimization algorithm based on parallel chaos optimization and outlook algorithm Avalable onlne www.ocpr.com Journal of Chemcal and Pharmaceutcal Research, 2014, 6(7):1884-1889 Research Artcle ISSN : 0975-7384 CODEN(USA) : JCPRC5 A hybrd global optmzaton algorthm based on parallel

More information

Efficient Project Portfolio as a tool for Enterprise Risk Management

Efficient Project Portfolio as a tool for Enterprise Risk Management Effcent Proect Portfolo as a tool for Enterprse Rsk Management Valentn O. Nkonov Ural State Techncal Unversty Growth Traectory Consultng Company January 5, 27 Effcent Proect Portfolo as a tool for Enterprse

More information

An Integrated Approach for Maintenance and Delivery Scheduling in Military Supply Chains

An Integrated Approach for Maintenance and Delivery Scheduling in Military Supply Chains An Integrated Approach for Mantenance and Delvery Schedulng n Mltary Supply Chans Dmtry Tsadkovch 1*, Eugene Levner 2, Hanan Tell 2 and Frank Werner 3 2 1 Bar Ilan Unversty, Department of Management, Ramat

More information

Recurrence. 1 Definitions and main statements

Recurrence. 1 Definitions and main statements Recurrence 1 Defntons and man statements Let X n, n = 0, 1, 2,... be a MC wth the state space S = (1, 2,...), transton probabltes p j = P {X n+1 = j X n = }, and the transton matrx P = (p j ),j S def.

More information

2008/8. An integrated model for warehouse and inventory planning. Géraldine Strack and Yves Pochet

2008/8. An integrated model for warehouse and inventory planning. Géraldine Strack and Yves Pochet 2008/8 An ntegrated model for warehouse and nventory plannng Géraldne Strack and Yves Pochet CORE Voe du Roman Pays 34 B-1348 Louvan-la-Neuve, Belgum. Tel (32 10) 47 43 04 Fax (32 10) 47 43 01 E-mal: corestat-lbrary@uclouvan.be

More information

The Greedy Method. Introduction. 0/1 Knapsack Problem

The Greedy Method. Introduction. 0/1 Knapsack Problem The Greedy Method Introducton We have completed data structures. We now are gong to look at algorthm desgn methods. Often we are lookng at optmzaton problems whose performance s exponental. For an optmzaton

More information

Institute of Informatics, Faculty of Business and Management, Brno University of Technology,Czech Republic

Institute of Informatics, Faculty of Business and Management, Brno University of Technology,Czech Republic Lagrange Multplers as Quanttatve Indcators n Economcs Ivan Mezník Insttute of Informatcs, Faculty of Busness and Management, Brno Unversty of TechnologCzech Republc Abstract The quanttatve role of Lagrange

More information

Chapter 4 ECONOMIC DISPATCH AND UNIT COMMITMENT

Chapter 4 ECONOMIC DISPATCH AND UNIT COMMITMENT Chapter 4 ECOOMIC DISATCH AD UIT COMMITMET ITRODUCTIO A power system has several power plants. Each power plant has several generatng unts. At any pont of tme, the total load n the system s met by the

More information

DEFINING %COMPLETE IN MICROSOFT PROJECT

DEFINING %COMPLETE IN MICROSOFT PROJECT CelersSystems DEFINING %COMPLETE IN MICROSOFT PROJECT PREPARED BY James E Aksel, PMP, PMI-SP, MVP For Addtonal Informaton about Earned Value Management Systems and reportng, please contact: CelersSystems,

More information

Research Article Enhanced Two-Step Method via Relaxed Order of α-satisfactory Degrees for Fuzzy Multiobjective Optimization

Research Article Enhanced Two-Step Method via Relaxed Order of α-satisfactory Degrees for Fuzzy Multiobjective Optimization Hndaw Publshng Corporaton Mathematcal Problems n Engneerng Artcle ID 867836 pages http://dxdoorg/055/204/867836 Research Artcle Enhanced Two-Step Method va Relaxed Order of α-satsfactory Degrees for Fuzzy

More information

Allocating Collaborative Profit in Less-than-Truckload Carrier Alliance

Allocating Collaborative Profit in Less-than-Truckload Carrier Alliance J. Servce Scence & Management, 2010, 3: 143-149 do:10.4236/jssm.2010.31018 Publshed Onlne March 2010 (http://www.scrp.org/journal/jssm) 143 Allocatng Collaboratve Proft n Less-than-Truckload Carrer Allance

More information

RESEARCH ON DUAL-SHAKER SINE VIBRATION CONTROL. Yaoqi FENG 1, Hanping QIU 1. China Academy of Space Technology (CAST) yaoqi.feng@yahoo.

RESEARCH ON DUAL-SHAKER SINE VIBRATION CONTROL. Yaoqi FENG 1, Hanping QIU 1. China Academy of Space Technology (CAST) yaoqi.feng@yahoo. ICSV4 Carns Australa 9- July, 007 RESEARCH ON DUAL-SHAKER SINE VIBRATION CONTROL Yaoq FENG, Hanpng QIU Dynamc Test Laboratory, BISEE Chna Academy of Space Technology (CAST) yaoq.feng@yahoo.com Abstract

More information

Data Broadcast on a Multi-System Heterogeneous Overlayed Wireless Network *

Data Broadcast on a Multi-System Heterogeneous Overlayed Wireless Network * JOURNAL OF INFORMATION SCIENCE AND ENGINEERING 24, 819-840 (2008) Data Broadcast on a Mult-System Heterogeneous Overlayed Wreless Network * Department of Computer Scence Natonal Chao Tung Unversty Hsnchu,

More information

Many e-tailers providing attended home delivery, especially e-grocers, offer narrow delivery time slots to

Many e-tailers providing attended home delivery, especially e-grocers, offer narrow delivery time slots to Vol. 45, No. 3, August 2011, pp. 435 449 ssn 0041-1655 essn 1526-5447 11 4503 0435 do 10.1287/trsc.1100.0346 2011 INFORMS Tme Slot Management n Attended Home Delvery Nels Agatz Department of Decson and

More information

Method for Production Planning and Inventory Control in Oil

Method for Production Planning and Inventory Control in Oil Memors of the Faculty of Engneerng, Okayama Unversty, Vol.41, pp.20-30, January, 2007 Method for Producton Plannng and Inventory Control n Ol Refnery TakujImamura,MasamKonshandJunIma Dvson of Electronc

More information

Design and Development of a Security Evaluation Platform Based on International Standards

Design and Development of a Security Evaluation Platform Based on International Standards Internatonal Journal of Informatcs Socety, VOL.5, NO.2 (203) 7-80 7 Desgn and Development of a Securty Evaluaton Platform Based on Internatonal Standards Yuj Takahash and Yoshm Teshgawara Graduate School

More information

Optimal Bidding Strategies for Generation Companies in a Day-Ahead Electricity Market with Risk Management Taken into Account

Optimal Bidding Strategies for Generation Companies in a Day-Ahead Electricity Market with Risk Management Taken into Account Amercan J. of Engneerng and Appled Scences (): 8-6, 009 ISSN 94-700 009 Scence Publcatons Optmal Bddng Strateges for Generaton Companes n a Day-Ahead Electrcty Market wth Rsk Management Taken nto Account

More information

Minimal Coding Network With Combinatorial Structure For Instantaneous Recovery From Edge Failures

Minimal Coding Network With Combinatorial Structure For Instantaneous Recovery From Edge Failures Mnmal Codng Network Wth Combnatoral Structure For Instantaneous Recovery From Edge Falures Ashly Joseph 1, Mr.M.Sadsh Sendl 2, Dr.S.Karthk 3 1 Fnal Year ME CSE Student Department of Computer Scence Engneerng

More information

Forecasting the Demand of Emergency Supplies: Based on the CBR Theory and BP Neural Network

Forecasting the Demand of Emergency Supplies: Based on the CBR Theory and BP Neural Network 700 Proceedngs of the 8th Internatonal Conference on Innovaton & Management Forecastng the Demand of Emergency Supples: Based on the CBR Theory and BP Neural Network Fu Deqang, Lu Yun, L Changbng School

More information

Application of Multi-Agents for Fault Detection and Reconfiguration of Power Distribution Systems

Application of Multi-Agents for Fault Detection and Reconfiguration of Power Distribution Systems 1 Applcaton of Mult-Agents for Fault Detecton and Reconfguraton of Power Dstrbuton Systems K. Nareshkumar, Member, IEEE, M. A. Choudhry, Senor Member, IEEE, J. La, A. Felach, Senor Member, IEEE Abstract--The

More information

Mooring Pattern Optimization using Genetic Algorithms

Mooring Pattern Optimization using Genetic Algorithms 6th World Congresses of Structural and Multdscplnary Optmzaton Ro de Janero, 30 May - 03 June 005, Brazl Moorng Pattern Optmzaton usng Genetc Algorthms Alonso J. Juvnao Carbono, Ivan F. M. Menezes Luz

More information

Optimal Joint Replenishment, Delivery and Inventory Management Policies for Perishable Products

Optimal Joint Replenishment, Delivery and Inventory Management Policies for Perishable Products Optmal Jont Replenshment, Delvery and Inventory Management Polces for Pershable Products Leandro C. Coelho Glbert Laporte May 2013 CIRRELT-2013-32 Bureaux de Montréal : Bureaux de Québec : Unversté de

More information

LITERATURE REVIEW: VARIOUS PRIORITY BASED TASK SCHEDULING ALGORITHMS IN CLOUD COMPUTING

LITERATURE REVIEW: VARIOUS PRIORITY BASED TASK SCHEDULING ALGORITHMS IN CLOUD COMPUTING LITERATURE REVIEW: VARIOUS PRIORITY BASED TASK SCHEDULING ALGORITHMS IN CLOUD COMPUTING 1 MS. POOJA.P.VASANI, 2 MR. NISHANT.S. SANGHANI 1 M.Tech. [Software Systems] Student, Patel College of Scence and

More information

In some supply chains, materials are ordered periodically according to local information. This paper investigates

In some supply chains, materials are ordered periodically according to local information. This paper investigates MANUFACTURING & SRVIC OPRATIONS MANAGMNT Vol. 12, No. 3, Summer 2010, pp. 430 448 ssn 1523-4614 essn 1526-5498 10 1203 0430 nforms do 10.1287/msom.1090.0277 2010 INFORMS Improvng Supply Chan Performance:

More information

Support Vector Machines

Support Vector Machines Support Vector Machnes Max Wellng Department of Computer Scence Unversty of Toronto 10 Kng s College Road Toronto, M5S 3G5 Canada wellng@cs.toronto.edu Abstract Ths s a note to explan support vector machnes.

More information

Fuzzy Set Approach To Asymmetrical Load Balancing In Distribution Networks

Fuzzy Set Approach To Asymmetrical Load Balancing In Distribution Networks Fuzzy Set Approach To Asymmetrcal Load Balancng n Dstrbuton Networks Goran Majstrovc Energy nsttute Hrvoje Por Zagreb, Croata goran.majstrovc@ehp.hr Slavko Krajcar Faculty of electrcal engneerng and computng

More information

IMPACT ANALYSIS OF A CELLULAR PHONE

IMPACT ANALYSIS OF A CELLULAR PHONE 4 th ASA & μeta Internatonal Conference IMPACT AALYSIS OF A CELLULAR PHOE We Lu, 2 Hongy L Bejng FEAonlne Engneerng Co.,Ltd. Bejng, Chna ABSTRACT Drop test smulaton plays an mportant role n nvestgatng

More information

Dynamic Pricing for Smart Grid with Reinforcement Learning

Dynamic Pricing for Smart Grid with Reinforcement Learning Dynamc Prcng for Smart Grd wth Renforcement Learnng Byung-Gook Km, Yu Zhang, Mhaela van der Schaar, and Jang-Won Lee Samsung Electroncs, Suwon, Korea Department of Electrcal Engneerng, UCLA, Los Angeles,

More information

Dynamic Constrained Economic/Emission Dispatch Scheduling Using Neural Network

Dynamic Constrained Economic/Emission Dispatch Scheduling Using Neural Network Dynamc Constraned Economc/Emsson Dspatch Schedulng Usng Neural Network Fard BENHAMIDA 1, Rachd BELHACHEM 1 1 Department of Electrcal Engneerng, IRECOM Laboratory, Unversty of Djllal Labes, 220 00, Sd Bel

More information

Optimization of network mesh topologies and link capacities for congestion relief

Optimization of network mesh topologies and link capacities for congestion relief Optmzaton of networ mesh topologes and ln capactes for congeston relef D. de Vllers * J.M. Hattngh School of Computer-, Statstcal- and Mathematcal Scences Potchefstroom Unversty for CHE * E-mal: rwddv@pu.ac.za

More information

Answer: A). There is a flatter IS curve in the high MPC economy. Original LM LM after increase in M. IS curve for low MPC economy

Answer: A). There is a flatter IS curve in the high MPC economy. Original LM LM after increase in M. IS curve for low MPC economy 4.02 Quz Solutons Fall 2004 Multple-Choce Questons (30/00 ponts) Please, crcle the correct answer for each of the followng 0 multple-choce questons. For each queston, only one of the answers s correct.

More information

INVESTIGATION OF VEHICULAR USERS FAIRNESS IN CDMA-HDR NETWORKS

INVESTIGATION OF VEHICULAR USERS FAIRNESS IN CDMA-HDR NETWORKS 21 22 September 2007, BULGARIA 119 Proceedngs of the Internatonal Conference on Informaton Technologes (InfoTech-2007) 21 st 22 nd September 2007, Bulgara vol. 2 INVESTIGATION OF VEHICULAR USERS FAIRNESS

More information

An Alternative Way to Measure Private Equity Performance

An Alternative Way to Measure Private Equity Performance An Alternatve Way to Measure Prvate Equty Performance Peter Todd Parlux Investment Technology LLC Summary Internal Rate of Return (IRR) s probably the most common way to measure the performance of prvate

More information

Testing and Debugging Resource Allocation for Fault Detection and Removal Process

Testing and Debugging Resource Allocation for Fault Detection and Removal Process Internatonal Journal of New Computer Archtectures and ther Applcatons (IJNCAA) 4(4): 93-00 The Socety of Dgtal Informaton and Wreless Communcatons, 04 (ISSN: 0-9085) Testng and Debuggng Resource Allocaton

More information

A Genetic Algorithm Based Approach for Campus Equipment Management System in Cloud Server

A Genetic Algorithm Based Approach for Campus Equipment Management System in Cloud Server JOURNAL OF ELECTRONIC SCIENCE AND TECHNOLOGY, VOL. 11, NO. 2, JUNE 2013 187 A Genetc Algorthm Based Approach for Campus Equpment Management System n Cloud Server Yu-Cheng Ln Abstract In ths paper, we proposed

More information

An ACO Algorithm for. the Graph Coloring Problem

An ACO Algorithm for. the Graph Coloring Problem Int. J. Contemp. Math. Scences, Vol. 3, 2008, no. 6, 293-304 An ACO Algorthm for the Graph Colorng Problem Ehsan Salar and Kourosh Eshgh Department of Industral Engneerng Sharf Unversty of Technology,

More information

行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告

行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告 行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告 畫 類 別 : 個 別 型 計 畫 半 導 體 產 業 大 型 廠 房 之 設 施 規 劃 計 畫 編 號 :NSC 96-2628-E-009-026-MY3 執 行 期 間 : 2007 年 8 月 1 日 至 2010 年 7 月 31 日 計 畫 主 持 人 : 巫 木 誠 共 同

More information

Period and Deadline Selection for Schedulability in Real-Time Systems

Period and Deadline Selection for Schedulability in Real-Time Systems Perod and Deadlne Selecton for Schedulablty n Real-Tme Systems Thdapat Chantem, Xaofeng Wang, M.D. Lemmon, and X. Sharon Hu Department of Computer Scence and Engneerng, Department of Electrcal Engneerng

More information

Managing Cycle Inventories. Matching Supply and Demand

Managing Cycle Inventories. Matching Supply and Demand Managng Cycle Inventores Matchng Supply and Demand 1 Outlne Why to hold cycle nventores? Economes of scale to reduce fxed costs per unt. Jont fxed costs for multple products Long term quantty dscounts

More information

Robust Design of Public Storage Warehouses. Yeming (Yale) Gong EMLYON Business School

Robust Design of Public Storage Warehouses. Yeming (Yale) Gong EMLYON Business School Robust Desgn of Publc Storage Warehouses Yemng (Yale) Gong EMLYON Busness School Rene de Koster Rotterdam school of management, Erasmus Unversty Abstract We apply robust optmzaton and revenue management

More information

VRT012 User s guide V0.1. Address: Žirmūnų g. 27, Vilnius LT-09105, Phone: (370-5) 2127472, Fax: (370-5) 276 1380, Email: info@teltonika.

VRT012 User s guide V0.1. Address: Žirmūnų g. 27, Vilnius LT-09105, Phone: (370-5) 2127472, Fax: (370-5) 276 1380, Email: info@teltonika. VRT012 User s gude V0.1 Thank you for purchasng our product. We hope ths user-frendly devce wll be helpful n realsng your deas and brngng comfort to your lfe. Please take few mnutes to read ths manual

More information

18 (2008), 211 220 INCREASING THE RENTABILITY OF TRANSPORTATION AND DISTRIBUTION ACTIVITIES BY USING VEHICLE ROUTING APPLICATIONS

18 (2008), 211 220 INCREASING THE RENTABILITY OF TRANSPORTATION AND DISTRIBUTION ACTIVITIES BY USING VEHICLE ROUTING APPLICATIONS Increasng the rentablty of transportaton and dstrbuton actvtes by usng vehcle routng applcatons UNIVERSITATEA DIN BACĂU STUDII ŞI CERCETĂRI ŞTIINŢIFICE Sera: MATEMATICĂ Nr. 18 (2008), pag. 211 220 INCREASING

More information

Response Coordination of Distributed Generation and Tap Changers for Voltage Support

Response Coordination of Distributed Generation and Tap Changers for Voltage Support Response Coordnaton of Dstrbuted Generaton and Tap Changers for Voltage Support An D.T. Le, Student Member, IEEE, K.M. Muttaq, Senor Member, IEEE, M. Negnevtsky, Member, IEEE,and G. Ledwch, Senor Member,

More information

Traffic-light a stress test for life insurance provisions

Traffic-light a stress test for life insurance provisions MEMORANDUM Date 006-09-7 Authors Bengt von Bahr, Göran Ronge Traffc-lght a stress test for lfe nsurance provsons Fnansnspetonen P.O. Box 6750 SE-113 85 Stocholm [Sveavägen 167] Tel +46 8 787 80 00 Fax

More information

Study on Model of Risks Assessment of Standard Operation in Rural Power Network

Study on Model of Risks Assessment of Standard Operation in Rural Power Network Study on Model of Rsks Assessment of Standard Operaton n Rural Power Network Qngj L 1, Tao Yang 2 1 Qngj L, College of Informaton and Electrcal Engneerng, Shenyang Agrculture Unversty, Shenyang 110866,

More information

A DATA MINING APPLICATION IN A STUDENT DATABASE

A DATA MINING APPLICATION IN A STUDENT DATABASE JOURNAL OF AERONAUTICS AND SPACE TECHNOLOGIES JULY 005 VOLUME NUMBER (53-57) A DATA MINING APPLICATION IN A STUDENT DATABASE Şenol Zafer ERDOĞAN Maltepe Ünversty Faculty of Engneerng Büyükbakkalköy-Istanbul

More information

Rate Monotonic (RM) Disadvantages of cyclic. TDDB47 Real Time Systems. Lecture 2: RM & EDF. Priority-based scheduling. States of a process

Rate Monotonic (RM) Disadvantages of cyclic. TDDB47 Real Time Systems. Lecture 2: RM & EDF. Priority-based scheduling. States of a process Dsadvantages of cyclc TDDB47 Real Tme Systems Manual scheduler constructon Cannot deal wth any runtme changes What happens f we add a task to the set? Real-Tme Systems Laboratory Department of Computer

More information

VoIP Playout Buffer Adjustment using Adaptive Estimation of Network Delays

VoIP Playout Buffer Adjustment using Adaptive Estimation of Network Delays VoIP Playout Buffer Adjustment usng Adaptve Estmaton of Network Delays Mroslaw Narbutt and Lam Murphy* Department of Computer Scence Unversty College Dubln, Belfeld, Dubln, IRELAND Abstract The poor qualty

More information

Learning with Imperfections A Multi-Agent Neural-Genetic Trading System. with Differing Levels of Social Learning

Learning with Imperfections A Multi-Agent Neural-Genetic Trading System. with Differing Levels of Social Learning Proceedngs of the 4 IEEE Conference on Cybernetcs and Intellgent Systems Sngapore, 1-3 December, 4 Learnng wth Imperfectons A Mult-Agent Neural-Genetc Tradng System wth Dfferng Levels of Socal Learnng

More information

Calculating the high frequency transmission line parameters of power cables

Calculating the high frequency transmission line parameters of power cables < ' Calculatng the hgh frequency transmsson lne parameters of power cables Authors: Dr. John Dcknson, Laboratory Servces Manager, N 0 RW E B Communcatons Mr. Peter J. Ncholson, Project Assgnment Manager,

More information

Dynamic Scheduling of Emergency Department Resources

Dynamic Scheduling of Emergency Department Resources Dynamc Schedulng of Emergency Department Resources Junchao Xao Laboratory for Internet Software Technologes, Insttute of Software, Chnese Academy of Scences P.O.Box 8718, No. 4 South Fourth Street, Zhong

More information

Simulation and optimization of supply chains: alternative or complementary approaches?

Simulation and optimization of supply chains: alternative or complementary approaches? Smulaton and optmzaton of supply chans: alternatve or complementary approaches? Chrstan Almeder Margaretha Preusser Rchard F. Hartl Orgnally publshed n: OR Spectrum (2009) 31:95 119 DOI 10.1007/s00291-007-0118-z

More information

HP Mission-Critical Services

HP Mission-Critical Services HP Msson-Crtcal Servces Delverng busness value to IT Jelena Bratc Zarko Subotc TS Support tm Mart 2012, Podgorca 2010 Hewlett-Packard Development Company, L.P. The nformaton contaned heren s subject to

More information

A method for a robust optimization of joint product and supply chain design

A method for a robust optimization of joint product and supply chain design DOI 10.1007/s10845-014-0908-5 A method for a robust optmzaton of jont product and supply chan desgn Bertrand Baud-Lavgne Samuel Bassetto Bruno Agard Receved: 10 September 2013 / Accepted: 21 March 2014

More information