1 Memors of the Faculty of Engneerng, Okayama Unversty, Vol.41, pp.20-30, January, 2007 Method for Producton Plannng and Inventory Control n Ol Refnery TakujImamura,MasamKonshandJunIma Dvson of Electronc and Informaton System Engneerng Graduate School of Natural Scence and Technology Okayama Unversty 3-1-1, Tsushma-Naka Okayama, (Receved November 13, 2006) Abstract In ths paper, we propose a smultaneous optmzaton method for nventory control and producton plannng problem for a chemcal batch plant. The plant conssts of blendng process, ntermedate storage tanks and fllng process. In the proposed method, the orgnal problem s decomposed nto producton plannng sub-problem and nventory control sub-problem. Then the decson varables are optmzed by alternately solvng each sub-problem. The soluton of the proposed method s compared wth that of centralzed optmzaton method. The effectveness of the proposed method s nvestgated from numercal computatonal results. 1 Introducton Recently, hgh-mx low-volume producton has been accelerated through necessty by the dversfcaton of customer s demand. Under these crcumstances, havng excess stock causes not only the ncrease n the nventory cost but also decrease n proft because of abrogaton of the stock when specfcaton of product s changed. Especally, n lubrcant manufacturng factory producng several hundred kl or more, proper nventory control s ndspensable. Therefore, t s necessary to make producton plannng that mnmzes total cost for productons wth mnmum nventory consderng entre factory at the same tme. Many of past researches about the producton management for chemcal plants drected to optmze producton plan under the condtons of gven due date for jobs or amount of producton etc [1][2]. However, such the optmzaton only of producton plan s nsuffcent from the vewpont of optmzaton of the entre factory. Therefore, t exsts necessty for plannng that mamura@cntr.elec.okayama-u.ac.jp consders both the producton plan and the nventory control at the same tme. Heretofore, the nventory control and the producton plannng n the lubrcant manufacturng factory have been herarchcally decded [3]. That s, nventory control system that s a superor system outputs the producton request to product by whch amount of nventory fall below reasonable nventory quantty, and the producton plannng system decde producton plan that s based on the producton request. However, such a method can t necessarly optmze total plan. The smultaneous optmzaton of nventory control and producton plannng have been studed[4][5], but these researches are drectng to model that s composed only sngle stage and equpment of gven process performance. However, the lubrcant manufacturng process s mult stage producton composed of the mxture process and the fllng process, etc. and ntermedate storages between them. And, the processng performance of equpment changes by the producton planoftheblendngmachneandallocatngjobtothe ntermedate storages. Therefore, past ntegrated op- Ths work s subjected to copyrght. All rghts are reserved by ths author/authors. 20

2 Takuj IMAMURA et al. MEM.FAC.ENG.OKA.UNI. Vol.41 tmzaton method can t be appled drectly to such a lubrcant manufacturng factory. In ths paper, producton system consdered producton process bear pecular complex restrctve constrants of chemcal plant and nventory control s modeled, and optmzaton method of coordnatng nventory control producton plannng s proposed. 2 Optmzaton problem of producton plannng and nventory control 2.1 Defnton of the problem Problems are for producton plannng and nventory controlofolrefneryplantasshownnfgure1. The problem treated here s defned n the followng. Fg. 1: Chemcal Plant Producton plannng Producton process s composed of blendng process, called#1process,nwhchrawmateralgroup#1and that of #2 are blended and fllng process, called #2 process, n whch materals from blendng process s packed n predetermned products wares. Both processes requre one tme perod for ts productons regardless of ts producton amounts. The capacty of blendng machne s predetermned for one perod of tmeandtsprohbtedtoblendamountsmorethan the capacty. On the other hand, fllng capacty s also determned beforehand. It s natural that both processes can not process same product at the same tme. Between these processes, there nstalled plural storage tanks actng as buffers storng blended materals n a certan perod of tme. The capactes for storage tanks are assumed to be suffcently large. It s prohbted to move blendng materals from one tank to another durng storng. Materals stored n tanks can be freely dverged nto plural jobs n the next fllng process. It s natural that the transfer lnes from some tanktothefollowngfllngprocesscannotbeusedfor other producton. In case of change n product knd for storage tank, change over s necessary nducng change over cost. Remanng product, named remanng ol, s stored n the tank for no change over. Flled materals are stored as product stocks Inventory control It s assumed that demands from customers are known forplannngperodsbothatpresentandpasttme. It s prohbted to have the shortage of nventory. Inventorycostsnducedfromtheamountofproductstorage. In our research, mnmum amount of products storage s assured to have the safety operatons. The amount s necessary for safety stock preparng probablstc changes n demand and occurrence of demands. The amount s calculated based on safety factor relatng to servce level and past demands data. The servce level s a probablty to be able to comply wth order mmedately when there s demand from the customer and the post-process[6]. Cost penalty s added n case of shortage n storage. 2.2 Mathmatcal model When t(t=1,2,,t)s set as a producton plannng perod, the ntegrated optmzaton problem of the nventory control problem and the producton plannng problem can be formulated as the followng mxed nteger lnear programmng(milp) problem. [Notatons] Sets: : Setofproducts R: Setoftanks Decson varables: St, P : Inventory level of product at the end of tme perodt ( S0, P ( ):gven) E t, : Shortageamountofnventoryofproductfrom amountofsafetystockattheendoftmeperod t 21

3 January 2007 Method for Producton Plannng and Inventory Control n Ol Refnery St,k, I : Intermedate nventory level of product n tankkattheendoftmeperodt ) (S I0,k, =0( k, ) B t,k, : Amountofblendngofproductntankkat thetmeperodt F t,k, : Amountoffllngofproductntankkatthe tme perod t { 1 (fb t,k, >0) δ t,k, = 0 (otherwse) γ t,k, = { θ t,k, = λ t,k, = ξ t,k,,= 1 (ff t,k, >0) 0 (otherwse) 1 (Ifproductsproducedusngtankk attmeperodt) 0 (otherwse) Cost coeffcents: 1 (If ntermedate nventory or remanng olofproductexstntankkattme perod t) 0 (otherwse) 1 (Iftsswtchedfrom tontank katthefrstoftmeperodt) 0 (otherwse) µ P : Factorofproductnventorycost ω: Penalty cost coeffcent for shortage amount of nventory from amount of safety stock µ I : Costcoeffcentforntermedatenventory φ: Cost coeffcent for blendng set up χ,: Penaltycostcoeffcentforproduct toproduct Constant data: T: Numberoftmeperod l: Maxmumlotsofblendngnonetmenterval F max : Maxmumamountoffllngnonetmenterval D t, : Amount of demand of product at perod t (gven) Q t, : Amountofsafetystockofproductatperodt [Problem Descrpton] (P):mn Z (1) Z= µ P St,+ P ωe t, + t, t, t,k.µ I St,k, I + φδ t,k, + χ,ξ t,k,, (2) t,k, t,k,, subject to St, P =SP t 1, + F t,k, D t, ( t, ) (3) k 0 ( t, ) (4) S P t, E t, Q t, S P t, ( t, ) (5) E t, 0 ( t, ) (6) St,k, I =SI t 1,k, +B t,k, F t,k, ( t, k, ) (7) δ t,k, l ( t) (8) k, F t,k, F max ( t) (9) k, δ t,k, +γ t,k, 1 ( t, k, ) (10) θ t,k, 1 ( t, k) (11) λ t,k, =1 ( t, k) (12) δ t,k, λ t,k, 0 ( t, k, ) (13) δ t,k, +λ t 1,k, λ t,k, 0( t, k, ) (14) δ t,k, +λ t 1,k, λ t,k, 0( t, k, ) (15) λ t 1,k, +λ t,k, 2 ξ t,k,, 0 ( t, k,, ) (16) λ t 1,k, +λ t,k, 2 ξ t,k,, 1 ( t, k,, ) (17) 0 F t,k, S I t 1,k, ( t, k, ) (18) S I t,k,,b t,k, 0 (19) (,, k R, t=1,,t) Eq.(2) represents objectve functon, and the frst term represents the nventory cost, the second term represents the penalty cost for shortage amount nventory fromamountofsafetystock, the thrdtermrepresents the ntermedate nventory cost, the forth term represents blendng set up cost and the ffth term represents change over cost. Eq.(3) represents the nventory flow constrant. Eq.(4) represents the amount of the product stock s nonnegatve. Eq.(5) and Eq.(6) represent the restrctons concernng the dfference between theamountofthesafetystockandtheamountofthe nventory. Eq.(7) represents the ntermedate nventory flow constrant. Eq.(8) represents the blendng operaton capacty constrant. Eq.(9) represents the fllng 22

4 Takuj IMAMURA et al. MEM.FAC.ENG.OKA.UNI. Vol.41 operaton capacty constrant. Eq.(10) represents that the prohbton of the smultaneous processng n blendng and fllng. Eq.(11) represents that there s one kndofproductthatcanbemantanedneachtankat the same tme. Eq.(12),Eq.(13),Eq.(14) and Eq.(15) representtheconstrantforλ t,k,. Eq.(16)andEq.(17) represent the constrant for ξ.eq.(18) represents mnmum amount and maxmum amount of the fllng of each product n correspondng tank at each tme perod. When the safety stock s calculated by usng thedemanddataath perodofthepast,theamount of demand of product D t τ, ( t = 1,,T, τ = 1,,H, =1,,I)atτ perodbeforetperodare gven, the amount of safety stock Q t, of product s computed by usng followng expressons. ( ( σ t, = 1 H H )) 2 τ=1 D t τ, D t τ, (20) H 1 H τ=1 Q t, =m LT σ t, (21) Here, σ t, represents the root-mean-square devaton ofproductatthetmeperodt. m representssafety factorofproduct. LT representsleadtmeofproduct. 2.3 Decomposton of the problem It s dffcult to optmze all varables at the same tme. The number of dscrete varables may rapdly ncrease n the model of the nventory control problem and producton plannng problem for chemcal plant. So, n ths research, the problem s optmzed decomposng orgnal problem to some sub-problems, and applyng the decentralzed optmzaton method. Artfcal varable Ft, ICP are ntroduced to the model from Eq.(1) to Eq.(19), and the constrant Eq.(22) s added. ThsproblemsnamedproblemP 2. F ICP t, = k F t,k, ( t=1,,t, ) (22) When Eq.(22) s relaxed by usng nonnegatve Lagrangemultplerν t,,relaxatonproblemrp 2 ofproblemp 2 canbeformulatedasfollows. (RP 2 ):mn L (23) L= µ P St, P + ωe t, + t, t, t,k.µ I St,k, I + φδ t,k, + χ,ξ t,k,, t,k, t,k,, + ( ν t, Ft, ICP ) F t,k, t, k subjectto Eq.(4) (19) (24) S P t,=s P t 1,+F ICP t, D t, ( t, ) (25) ( t=1,,t, ) Eq.(25) represents the nventory flow constrant. It s obtaned by transformng Eq.(3) usng Eq.(22). Lagrangan functon L can be descrbed as follows by consoldatng the varable. L=Z ICP +Z SP (26) Z ICP = t, µ P S P t, + t, ωe t, + t, ν t, F ICP t, (27) Z SP = µ I St,k,+ I t,k, t,k. t,k,φδ + ν t, F t,k, (28) t,k,,χ,ξ t,k,, t, WhenacertanLagranganmultplerν t, aregven, the relaxaton problem of mnmzng Lagrangan functon L can be decomposed to the followng sub-problem ICP andsp. (ICP):mn Z ICP (29) subjectto Eq.(4) (6),(25) F ICP t, 0 ( t=1,,t, ) (30) (SP):mn Z SP (31) subjectto Eq.(7) (19) Problem ICP s a sub nventory control problem mnmzng weghted sum of nventory cost, penalty cost for shortage amount of nventory from amount of safety stock. Here, artfcal varable Ft, ICP means the amount of the fllng of product at tme perod t that s requred of nventory control sde from the producton sde. In the followng, the Ft, ICP s called the amount of the fllng demand. Problem SP s a sub producton plannng problem mnmzng weghted sum of ntermedate nventory cost, blendng cost and change over cost. k 23

5 January 2007 Method for Producton Plannng and Inventory Control n Ol Refnery 3 Decentralzed soluton algorthm 3.1 Outlne of the algorthm In the algorthm of Lagrangan relaxaton, soluton process of each sub problem and update of Lagrangan multpler are carred out alternatvely. Bascally there s no assurance of convergence of the computaton. To prove the problem, the penalty functon method by Nshetal[7]sused. Inthemethod,thedstancefrom the feasble soluton s forced to added to the objectve functon as a penalty cost. As the results, feasblty of the obtaned soluton can be assured after ncreasng of penalty weght. The constructon of soluton process combnng ICP, nventory control sub-system, and SP, producton plannng sub-system s shown n Fgure 2. optmzaton of product plannng, and decdes nventory control plan that mnmze weghted sum of the nventory cost, the penalty cost for shortage amount of nventory from amount of safety stock and penalty to gap from feasble soluton. Step3 Product plannng The producton plannng sub-system decdes the producton plan consderng the fllng demand {Ft, ICP } to mnmze weghted sum of the ntermedate nventory cost, the blendng cost, the change over cost and penalty to gap from feasble soluton. Then,theamountofthefllng{F t,k, } obtaned by the optmzaton of product plannng s transfered to the nventory control sub-system. Step4 Evaluaton of convergence If the tentatve plan s feasble satsfyng Eq.(22), the calculaton s ended. Otherwse, algorthm proceeds to Step5. Fg. 2: Structure of optmzaton system The algorthm for solvng each sub problem s descrbed n the followng. Step1 Readng of ntal data Each sub-system retreves necessary data of the resource constrants, each cost coeffcent, and theamountofdemandofeachperodetc. Moreover,theamountofthesafetystockofeachproduct for total tme horzon s calculated. In addton, the weghtρnthe penalty terms ntalzed. Step2 Inventory control plannng The nventory control sub-system decdes the nventory control plan to mnmze the objectve functon, and passes amount of the fllng demand {Ft, ICP } the producton plannng sub-system. Here, though t optmzes wthout consderng the producton plannng sub-system n ntal teraton, n teraton snce the second tmes, t receve the amount of fllng of each product n correspondng tank at each perod {F t,k, }, t obtaned by Step5 Update of weght ρ The weght ρ s ncreased n ρ. Thereafter, algorthmrepeatsfromstep2to5untlconvergence of evaluaton. Frst of all, each sub-system retreves data as a preparaton. Afterwards, the nventory control sub-system and the producton plannng system optmze the orgnal problem by repeatng optmzaton of the each problem accordng to each objectve functon. Here, each sub-system exchanges the amount of fllng of correspondng product at each perod to satsfy the consstency of Inventory control plan and producton plan. Each sub-system adds penalty to the dfference between fllng plan preferable for each sub-system and the fllng plan obtaned from another sub-system to each objectve functon. The soluton of orgnal problem s gradually approachs to feasble soluton by ncreasng the value of the penalty coeffcent gradually fll the teraton ends. The flow of the algorthm s shownnfgure3. In the followng, optmzaton of each sub-system wll be stated. 3.2 Inventory control sub-system Inventory control sub-system In the target chemcal plant, due to the restrctons for usable number of tanks and maxmum number of 24

6 Takuj IMAMURA et al. MEM.FAC.ENG.OKA.UNI. Vol.41 for the plan. To overcome the dffcultes modfed constrant for SP sub-system s added to ICP sub-system as follows. F1,t ICP =0 ( t=1,,t) (34) Ft, ICP F max ( t=1,,t) (35) η t, K ( t=1,,t) (36) Fg. 3: Flow chart of proposed method lots n one tme nterval are predetermned. The feasblty of nventory plan determned by nventory control plan s affected from demand of fllng operatons for each tme perod. To reflect the effect, the dfference between fllng plan by nventory and that by producton plan s added to the objectve functon of nventory plannng as the penalty factor. Optmzaton problem ICP n the nventory control sub-system can be formulatedbyaddngabnaryvarableη t, asthefollowng mxed nteger lnear programng problems. η t, = { 1 (ff ICP t, >0) 0 (atherwse) ( t, ) (ICP):mn Z ICP (32) Eq.(34) represents constrant of the amount of the fllngnatthefrsttmeperod,andtsobtanedfrom the ntal condton of St,k, I, Eq.(18), and Eq.(22). Eq.(35) represents the upper bound of the amount of the fllng, and t s obtaned from Eq.(9) and (22). Eq.(36) represents upper bounds of number of productkndthatcanbethefllngprocessngforonetme perod. Ths constrant can be obtaned from problem settngofonlyonekndofproductcanbeprocessedat thesametmeneachtank. Theoptmalsolutoncan be obtaned by usng a commercal solver because ICP s mxed nteger lnear programmng problem ncludng contnuous varable. 3.3 Producton plannng In the target chemcal plant, capacty of producton s affected by producton plan because ntermedate storage of materals n tanks and dvergence of jobs n the fllng process may be occurred. The examples are shown n Fgure 4 and Fgure 5, where only one tank s usable for ntermedate storage. Z ICP = t, µ P S P t, + t, ωe t, + t, ρ η t, Γ t, (33) subjectto Eq.(4) (6),(25),(30) The thrdterm of rght sde nequaton(33) s the artfcally added factor representng dfference between thevalueoffllngplanη t, byicpandγ t, thatbysp. Γ t, represents the presence of the fllng plan of each product at each perod n producton plan computed byproductonplannnngsub-system. If k γ t,k, 1, thenγ t, =1,otherwsezero. IncreasngthevalueofweghtρaftersolvngSP sub problem, t becomes possble to derve feasble soluton. However, f we use only the penalty method, convergenttmeapttobelargeduetotheotherconstrants Fg. 4: Change of the producng capacty Fg.4 represents a Gantt chart of producton plan that desgned fllng of product A from second terms to fourth term. On the other hand, Fg.5 represents one that desgned fllng of product A from second terms tothrdtermandtofproductbatfourthterm. In both cases, one lot fllng s desgned from second term to fourth term. However, feasble soluton s obtaned n Fg.4 and nfeasble one s obtaned n Fg.5 due to the prohbton by constrants. Thus, the 25

7 January 2007 Method for Producton Plannng and Inventory Control n Ol Refnery h j,t,k =g j ( j J) (37) t,k x j,t,k =1 ( j J) (38) t,k a j = t x j,t,k ( j J) (39) t,k Fg. 5: Change of the producng capacty r j = a j d j ( j J) (40) capacty of each tme nterval n producton vares accordng to producton plan. In the plannng for nventory control, t s mpossble to reflect such change n producton capablty. As the result, calculated fllng request made by nventory control plannng may be nfeasble for producton. So t s necessary to revse the calculated fllng request from nventory for the total feasblty of obtaned results by updatng penalty factor ρ. In the proposed method, feasble soluton s created byft, ICP sdeemedtofllngjobofproductkndu (= ),duedated t (=t),amountoffllngg j (=F ICP t, ),and the devaton from due date s allowed wth penalty cost s named devaton from due date penalty cost. The producton plan sub-system can make feasble producton plan consderng the gven fllng demand, by usng ths method. The reason to gve producton plannng sub-system the devaton from due date penalty cost s the producton capacty changes greatly by changng the processng tme perod of blendng lots and fllng lots because these processes are batch process. The followng notatons are ntroduced nto problem SP. Sets: J: Setoffllngjobs. π : Setoffllngjobsthatsatsfyu j = Decson varables: h j,t,k : Amountoffllngjobjntankkattmeperod t { 1 (fh x j,t,k = j,t,k >0) 0 (otherwse) a j : Fllngdateoffllngjobj r j : Amount of fllng of product n tank k at the tme perod t Then, the followng constrants are added to problem SP. Eq.(37) and Eq.(38) represent that all the fllng jobs are processed. Eq.(39) represents the defnton constrantofa j. Eq.(40)representstheconstrantforr j. Moreover, the exstng constrant s converted as follows. S I t,k,=s I t 1,k,+B t,k, j π h j,t,k ( t, k, ) (41) h j,t,k F max ( t) (42) j,k δ t,k, +x j,t,k 1 ( t, k,, j π ) (43) 0 j π h j,t,k S I t,k, ( t, k, ) (44) (, k R, t=1,,t) Eq.(41) represents nventory flow constrants. It s obtaned by transformng Eq.(7). Eq.(42) represents the fllng operaton capacty constrant. It s obtaned by transformng Eq.(9). Eq.(43) represent that the prohbton of the smultaneous processng n blendng and fllng. It s obtaned by transformng Eq.(10). Eq.(44) represents mnmum amount and maxmum amount of fllng of each product n correspondng tank at each tme perod. It s obtaned by transformng Eq.(18). When t occurs the devaton from due date nventory plannng sub-system can t create feasble soluton that satsfy the fllng plan s obtaned by optmzaton of product plannng because of out of nventory. It causes delay of convergence of soluton. So the followng constrant that represents the lowest amount to be flled before each perod to out of nventory s not causedsaddedtoproblemsp. Thsconstrantsobtaned from Eq.(3) and Eq.(4) S P 0,+ t t =1 k j π h j,t,k (, t=1,,t) t D t, 0 ( t, ) (45) t =1 Therefore, problem SP can be formulated as a problem to mnmze weghted sum of the ntermedate nventory cost, the blendng set up cost, the changeover 26

8 Takuj IMAMURA et al. MEM.FAC.ENG.OKA.UNI. Vol.41 cost,andthedevatonfromdue date penaltycostto the fllng demand as follows. Here, κ 1, κ 2 n fourth term of Eq.(47) are added artfcally to match the value of penalty that s added to problem SP to the valueofpenaltythatsaddedtoproblemicp because those penaltes are dfferent. (SP):mn Z SP (46) Z SP = µ I St,k,+ I t,k, t,k, t,k,φδ + t,k,,w,ξ t,k,,+(κ 1 ρ+κ 2 ) j subjectto Eq.(8),(11) (17),(19),(37) (45) r j (47) It s dffcult to attan strct optmzaton because of the objectve functon of problem SP contans the changeover cost that depends on order of operaton. Then, the producton plan s optmzed by usng the algorthm of the followng SA (Smulated annealng mothod)[8] s the followng algorthms. Frst of all, to expand the search space of the soluton, the constrants of Eq.(8) and Eq.(11) are relaxed and added to the objectve functon as a penalty lke n Eq.(49). (SP):mn Z SP (48) Z SP = µ I St,k, I + t,k, t,k, t,k,φδ + t,k,,w,ξ t,k,,+(κ 1 ρ+κ 2 ) j + ζν t + ǫα t,k (49) t t,k subjectto Eq.(12) (17),(19),(37) (45) ν t δ t,k, l ( t, k, ) (50) k, ν t 0 ( t, k, ) (51) α t,k θ t,k, 1 ( t, k, ) (52) α t,k 0 ( t, k, ) (53) (, k R, t=1,,t) Here, ζ represents the penalty cost for the volaton of blendng operaton capacty constrant. ǫ represents the penalty cost for the volaton of resource constrant about tanks. Step1 Intal allocaton of the fllng jobs To satsfy due date, the fllng jobs are allocated toatank. r j Step2 Producton plannng Problem SP s solved by usng a commercal solver, and the producton plan that s satsfy allocatons ofthe jobsthatsdecde ntheprevous steps obtaned. Step3 Evaluaton of producton plan and adopton judgment The producton plan s evaluated by usng Eq.(49). And, the adopton judgment of the producton plan s decded accordng to the rule of the SA mothod. Step4 Neghborhood operaton To satsfy the constrant of Eq.(45), the allocatonofafllngjobthatstoselectatrandoms changed at random. And a regulated frequency repeatsfromstep2tostep4. 4 Numercal experments 4.1 Centralzed method To check the valdty of the proposed method, results are compared wth the centralzed total optmzaton method. The compared method s based on SA method. In the centralzed method, once fllng plan, thetmeoffllngofeachproductkndandtanknumber are made and then the volume of fllng s determnedbysaalgorthm. Andatthesametmeblendng volumes are also determned. The procedure of the centralzed method s gven as follows. Step1 Intal allocaton of γ t,k, Allgamma t,k, thatrepresentthepresenceofthe fllngplanofeachproductntankateachperod aredecded. Here,thosearedecdedasthetamp ahead plan and the constrants from Eq.(3) to Eq.(19)andγ t,k, =1aresatsfed. Step2 Decson of nventory plan and producton plan The nventory control plan and the producton plan that mnmze Eq.(2) and satsfy γ t,k, are decded n the prevous step usng a commercal solver. Step3 Evaluaton of producton plan and adopton judgment The nventory control plan and the producton plan obtaned n Step3 are evaluated. And, the 27

9 January 2007 Method for Producton Plannng and Inventory Control n Ol Refnery adopton judgment of the producton plan s decdedaccordngtotheruleofthesamethod. Step4 Neghborhood operaton t, k, and are selected at random, and γ t,k, s reversed. Table. 2: Parameters for the makng of demand product root-mean average amount -square devaton of demand A B C D E F G H I J Table. 3: Changeover cost data Fg. 6: Flow chart of centrazed method 4.2 Numercal Examples Numercal experments are conducted for 3 cases examples shown n Table1.The demand of each product at each perod n the plannng term and H term of past mmedately before the plannng term s generated usng normal random number based on root-mean -square devaton and average amount of demand are shownntable2. ThechangeovercostsshownnTable 3. The product data s shown n Table 4. Other datasshownntable5. Table. 1: Examples example Number of Number of Number of Tme Perod Product Tank CASE CASE CASE from\to Table. 4: Product Data product m LT S P 0, A B C D E F G H I J Expermental result and consderaton The system developed uses CPLEX8.0 as a commercal solver. An ntal value of the penalty coeffcent ρ 28

10 Takuj IMAMURA et al. MEM.FAC.ENG.OKA.UNI. Vol.41 Table. 5: Other data H: 5,µ I : 1,µ P : 4,l: 4 F max 1 : 500,ω: 3,φ: 100,κ 1 : 3 κ 2 : 10,ζ: 1000,ǫ: 3000 ssettobezeroand ρ=300. Moreover,theparameter of the SA method that s used when the system solvetheproblemsp ntheproposedmethodandthe centralzed method s shown n Table 6. Fg. 7: Comparson of computaton tme Fg. 8: Comparson of evaluaton value Table. 6: Parameters for the SA parameter Proposed Centrazed Method(SP) Method Maxmum Temperature Mnmum Temperture Coolng Perod Coolng Rate The comparng of computaton tme and evaluaton value of plans that are optmzed by the centralzed method and the proposed method are shown n Fgure 7 and Fgure 8. Moreover, Gantt charts that are obtanedbythosemethodsareshownnfgure9and Fgure10. Here,thealphabetsshowthekndofproduct and numbers show the value of the processng n these fgures. It can be confrmed that the proposed method obtans the better soluton n a short computaton tme compared wth centralzd method. Ths reason s thought that the SA method used for the centralzed method that can obtan the optmal soluton n nfnte tme s can t optmze problem enough n lmted tme because t s a method of searchng for the soluton at random. On the other hand, t s thought thatthe better soluton n shorttme canbe obtaned by the proposed method because t s possble to search for solutons near optcal soluton by teratng the optmzaton of the each sub-problem and the nformaton exchange between sub-systems. The effectveness of the proposed method to sach problems s nvestgated by these results. 4.4 Concluson Fg. 9: Ganttchart(Concentrated method) Fg. 10: Ganttchart(Proposed method) nventory control plannng and producton plannng are made alternatvely. The proposed method s revealed to show the better soluton n a short computaton tme compared wth centralzed method. The extenson of the proposed method to mprove soluton optmalty and reflecton of procurement whch leads to the total supply chan solver. In ths paper, decomposed soluton method s proposed to solve the chemcal plant wth two processes and ntermedate storage between them. In the method, 29

11 January 2007 Method for Producton Plannng and Inventory Control n Ol Refnery Reference [1] Toshhko Takeshta, Fujta Kaoru, Toshya Sanaka, Masash Matsukawa: Constrant-based schedulng system for Chemcal Process, Proceedngs the Schedulng Symposum 2002(2002) [2] Yoshhro Murakam, Hronobu Uchyama, Shnj Hasebe and Ior Hashmoto : Apprcaton of Repettve SA Method to Schedulng Problems of Chemcal Process, Transactons of the Insttute of Systems, Control and Informaton Engneers, Vol.10,No.3,pp (1997) [3] Hdetsugu Furuch : Development of Schedulng System for Batch Blendng of Lubrcant Ols (In Japanese), Instrumentaton, Vol. 40, No. 12 (1997) [4] Htosh Ima, Nobuo Sannomya: A Proposton for Smultaneous Determnaton of Orderng and Schedulng n a Manufacturng Process, Transactons of the Insttute of Systems, Control and Informaton Engneers, Vol. 16, No. 7, pp ,(2003) [5] M. Ago, T. Nsh, M.Konsh, J.Ima: Integrated optmzaton of schedulng and warehouse managemwnt usng an augmented Lagrangan decomposton and coordnaton method, Proceedngs of the 4th Symposum on Cybernetc Flexble Automaton, pp (2004) [6] Takao Enkawa, Kenj Ito : Method of Producton Management (In Japanese), Asakura shoten (1996) [7] T.Nsh,M.Konsh,Y.Hattor,S.Hasebe: A Decentralzed Supply Chan Optmzaton Method for Sngle Stage Producton Systems, Transactons of the Insttute of Systems, Control and Informaton Engneers, Vol. 16, No. 12, pp (2003) [8] Mutsunor Yagura, Toshhde Ibarak : Combnatonal Optmzaton Methaheurstcs (In Japanese), Asakura shoten(2001) 30

An MILP model for planning of batch plants operating in a campaign-mode

An MILP model for planning of batch plants operating in a campaign-mode An MILP model for plannng of batch plants operatng n a campagn-mode Yanna Fumero Insttuto de Desarrollo y Dseño CONICET UTN yfumero@santafe-concet.gov.ar Gabrela Corsano Insttuto de Desarrollo y Dseño

More information

Power-of-Two Policies for Single- Warehouse Multi-Retailer Inventory Systems with Order Frequency Discounts

Power-of-Two Policies for Single- Warehouse Multi-Retailer Inventory Systems with Order Frequency Discounts Power-of-wo Polces for Sngle- Warehouse Mult-Retaler Inventory Systems wth Order Frequency Dscounts José A. Ventura Pennsylvana State Unversty (USA) Yale. Herer echnon Israel Insttute of echnology (Israel)

More information

The Greedy Method. Introduction. 0/1 Knapsack Problem

The Greedy Method. Introduction. 0/1 Knapsack Problem The Greedy Method Introducton We have completed data structures. We now are gong to look at algorthm desgn methods. Often we are lookng at optmzaton problems whose performance s exponental. For an optmzaton

More information

2008/8. An integrated model for warehouse and inventory planning. Géraldine Strack and Yves Pochet

2008/8. An integrated model for warehouse and inventory planning. Géraldine Strack and Yves Pochet 2008/8 An ntegrated model for warehouse and nventory plannng Géraldne Strack and Yves Pochet CORE Voe du Roman Pays 34 B-1348 Louvan-la-Neuve, Belgum. Tel (32 10) 47 43 04 Fax (32 10) 47 43 01 E-mal: corestat-lbrary@uclouvan.be

More information

Chapter 4 ECONOMIC DISPATCH AND UNIT COMMITMENT

Chapter 4 ECONOMIC DISPATCH AND UNIT COMMITMENT Chapter 4 ECOOMIC DISATCH AD UIT COMMITMET ITRODUCTIO A power system has several power plants. Each power plant has several generatng unts. At any pont of tme, the total load n the system s met by the

More information

On the Optimal Control of a Cascade of Hydro-Electric Power Stations

On the Optimal Control of a Cascade of Hydro-Electric Power Stations On the Optmal Control of a Cascade of Hydro-Electrc Power Statons M.C.M. Guedes a, A.F. Rbero a, G.V. Smrnov b and S. Vlela c a Department of Mathematcs, School of Scences, Unversty of Porto, Portugal;

More information

Support Vector Machines

Support Vector Machines Support Vector Machnes Max Wellng Department of Computer Scence Unversty of Toronto 10 Kng s College Road Toronto, M5S 3G5 Canada wellng@cs.toronto.edu Abstract Ths s a note to explan support vector machnes.

More information

SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS

SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS SCHEDULING OF CONSTRUCTION PROJECTS BY MEANS OF EVOLUTIONARY ALGORITHMS Magdalena Rogalska 1, Wocech Bożeko 2,Zdzsław Heduck 3, 1 Lubln Unversty of Technology, 2- Lubln, Nadbystrzycka 4., Poland. E-mal:rogalska@akropols.pol.lubln.pl

More information

Project Networks With Mixed-Time Constraints

Project Networks With Mixed-Time Constraints Project Networs Wth Mxed-Tme Constrants L Caccetta and B Wattananon Western Australan Centre of Excellence n Industral Optmsaton (WACEIO) Curtn Unversty of Technology GPO Box U1987 Perth Western Australa

More information

Ants Can Schedule Software Projects

Ants Can Schedule Software Projects Ants Can Schedule Software Proects Broderck Crawford 1,2, Rcardo Soto 1,3, Frankln Johnson 4, and Erc Monfroy 5 1 Pontfca Unversdad Católca de Valparaíso, Chle FrstName.Name@ucv.cl 2 Unversdad Fns Terrae,

More information

Maintenance Scheduling by using the Bi-Criterion Algorithm of Preferential Anti-Pheromone

Maintenance Scheduling by using the Bi-Criterion Algorithm of Preferential Anti-Pheromone Leonardo ournal of Scences ISSN 583-0233 Issue 2, anuary-une 2008 p. 43-64 Mantenance Schedulng by usng the B-Crteron Algorthm of Preferental Ant-Pheromone Trantafyllos MYTAKIDIS and Arstds VLACHOS Department

More information

The Development of Web Log Mining Based on Improve-K-Means Clustering Analysis

The Development of Web Log Mining Based on Improve-K-Means Clustering Analysis The Development of Web Log Mnng Based on Improve-K-Means Clusterng Analyss TngZhong Wang * College of Informaton Technology, Luoyang Normal Unversty, Luoyang, 471022, Chna wangtngzhong2@sna.cn Abstract.

More information

1 Example 1: Axis-aligned rectangles

1 Example 1: Axis-aligned rectangles COS 511: Theoretcal Machne Learnng Lecturer: Rob Schapre Lecture # 6 Scrbe: Aaron Schld February 21, 2013 Last class, we dscussed an analogue for Occam s Razor for nfnte hypothess spaces that, n conjuncton

More information

Research Article Enhanced Two-Step Method via Relaxed Order of α-satisfactory Degrees for Fuzzy Multiobjective Optimization

Research Article Enhanced Two-Step Method via Relaxed Order of α-satisfactory Degrees for Fuzzy Multiobjective Optimization Hndaw Publshng Corporaton Mathematcal Problems n Engneerng Artcle ID 867836 pages http://dxdoorg/055/204/867836 Research Artcle Enhanced Two-Step Method va Relaxed Order of α-satsfactory Degrees for Fuzzy

More information

A hybrid global optimization algorithm based on parallel chaos optimization and outlook algorithm

A hybrid global optimization algorithm based on parallel chaos optimization and outlook algorithm Avalable onlne www.ocpr.com Journal of Chemcal and Pharmaceutcal Research, 2014, 6(7):1884-1889 Research Artcle ISSN : 0975-7384 CODEN(USA) : JCPRC5 A hybrd global optmzaton algorthm based on parallel

More information

A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION. Michael E. Kuhl Radhamés A. Tolentino-Peña

A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION. Michael E. Kuhl Radhamés A. Tolentino-Peña Proceedngs of the 2008 Wnter Smulaton Conference S. J. Mason, R. R. Hll, L. Mönch, O. Rose, T. Jefferson, J. W. Fowler eds. A DYNAMIC CRASHING METHOD FOR PROJECT MANAGEMENT USING SIMULATION-BASED OPTIMIZATION

More information

Optimal Bidding Strategies for Generation Companies in a Day-Ahead Electricity Market with Risk Management Taken into Account

Optimal Bidding Strategies for Generation Companies in a Day-Ahead Electricity Market with Risk Management Taken into Account Amercan J. of Engneerng and Appled Scences (): 8-6, 009 ISSN 94-700 009 Scence Publcatons Optmal Bddng Strateges for Generaton Companes n a Day-Ahead Electrcty Market wth Rsk Management Taken nto Account

More information

Optimization of network mesh topologies and link capacities for congestion relief

Optimization of network mesh topologies and link capacities for congestion relief Optmzaton of networ mesh topologes and ln capactes for congeston relef D. de Vllers * J.M. Hattngh School of Computer-, Statstcal- and Mathematcal Scences Potchefstroom Unversty for CHE * E-mal: rwddv@pu.ac.za

More information

Period and Deadline Selection for Schedulability in Real-Time Systems

Period and Deadline Selection for Schedulability in Real-Time Systems Perod and Deadlne Selecton for Schedulablty n Real-Tme Systems Thdapat Chantem, Xaofeng Wang, M.D. Lemmon, and X. Sharon Hu Department of Computer Scence and Engneerng, Department of Electrcal Engneerng

More information

Sciences Shenyang, Shenyang, China.

Sciences Shenyang, Shenyang, China. Advanced Materals Research Vols. 314-316 (2011) pp 1315-1320 (2011) Trans Tech Publcatons, Swtzerland do:10.4028/www.scentfc.net/amr.314-316.1315 Solvng the Two-Obectve Shop Schedulng Problem n MTO Manufacturng

More information

Research Article A Time Scheduling Model of Logistics Service Supply Chain with Mass Customized Logistics Service

Research Article A Time Scheduling Model of Logistics Service Supply Chain with Mass Customized Logistics Service Hndaw Publshng Corporaton Dscrete Dynamcs n Nature and Socety Volume 01, Artcle ID 48978, 18 pages do:10.1155/01/48978 Research Artcle A Tme Schedulng Model of Logstcs Servce Supply Chan wth Mass Customzed

More information

"Research Note" APPLICATION OF CHARGE SIMULATION METHOD TO ELECTRIC FIELD CALCULATION IN THE POWER CABLES *

Research Note APPLICATION OF CHARGE SIMULATION METHOD TO ELECTRIC FIELD CALCULATION IN THE POWER CABLES * Iranan Journal of Scence & Technology, Transacton B, Engneerng, ol. 30, No. B6, 789-794 rnted n The Islamc Republc of Iran, 006 Shraz Unversty "Research Note" ALICATION OF CHARGE SIMULATION METHOD TO ELECTRIC

More information

DEFINING %COMPLETE IN MICROSOFT PROJECT

DEFINING %COMPLETE IN MICROSOFT PROJECT CelersSystems DEFINING %COMPLETE IN MICROSOFT PROJECT PREPARED BY James E Aksel, PMP, PMI-SP, MVP For Addtonal Informaton about Earned Value Management Systems and reportng, please contact: CelersSystems,

More information

Dynamic Constrained Economic/Emission Dispatch Scheduling Using Neural Network

Dynamic Constrained Economic/Emission Dispatch Scheduling Using Neural Network Dynamc Constraned Economc/Emsson Dspatch Schedulng Usng Neural Network Fard BENHAMIDA 1, Rachd BELHACHEM 1 1 Department of Electrcal Engneerng, IRECOM Laboratory, Unversty of Djllal Labes, 220 00, Sd Bel

More information

行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告

行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告 行 政 院 國 家 科 學 委 員 會 補 助 專 題 研 究 計 畫 成 果 報 告 期 中 進 度 報 告 畫 類 別 : 個 別 型 計 畫 半 導 體 產 業 大 型 廠 房 之 設 施 規 劃 計 畫 編 號 :NSC 96-2628-E-009-026-MY3 執 行 期 間 : 2007 年 8 月 1 日 至 2010 年 7 月 31 日 計 畫 主 持 人 : 巫 木 誠 共 同

More information

J. Parallel Distrib. Comput.

J. Parallel Distrib. Comput. J. Parallel Dstrb. Comput. 71 (2011) 62 76 Contents lsts avalable at ScenceDrect J. Parallel Dstrb. Comput. journal homepage: www.elsever.com/locate/jpdc Optmzng server placement n dstrbuted systems n

More information

benefit is 2, paid if the policyholder dies within the year, and probability of death within the year is ).

benefit is 2, paid if the policyholder dies within the year, and probability of death within the year is ). REVIEW OF RISK MANAGEMENT CONCEPTS LOSS DISTRIBUTIONS AND INSURANCE Loss and nsurance: When someone s subject to the rsk of ncurrng a fnancal loss, the loss s generally modeled usng a random varable or

More information

An Integrated Approach for Maintenance and Delivery Scheduling in Military Supply Chains

An Integrated Approach for Maintenance and Delivery Scheduling in Military Supply Chains An Integrated Approach for Mantenance and Delvery Schedulng n Mltary Supply Chans Dmtry Tsadkovch 1*, Eugene Levner 2, Hanan Tell 2 and Frank Werner 3 2 1 Bar Ilan Unversty, Department of Management, Ramat

More information

Institute of Informatics, Faculty of Business and Management, Brno University of Technology,Czech Republic

Institute of Informatics, Faculty of Business and Management, Brno University of Technology,Czech Republic Lagrange Multplers as Quanttatve Indcators n Economcs Ivan Mezník Insttute of Informatcs, Faculty of Busness and Management, Brno Unversty of TechnologCzech Republc Abstract The quanttatve role of Lagrange

More information

Logical Development Of Vogel s Approximation Method (LD-VAM): An Approach To Find Basic Feasible Solution Of Transportation Problem

Logical Development Of Vogel s Approximation Method (LD-VAM): An Approach To Find Basic Feasible Solution Of Transportation Problem INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH VOLUME, ISSUE, FEBRUARY ISSN 77-866 Logcal Development Of Vogel s Approxmaton Method (LD- An Approach To Fnd Basc Feasble Soluton Of Transportaton

More information

Fault tolerance in cloud technologies presented as a service

Fault tolerance in cloud technologies presented as a service Internatonal Scentfc Conference Computer Scence 2015 Pavel Dzhunev, PhD student Fault tolerance n cloud technologes presented as a servce INTRODUCTION Improvements n technques for vrtualzaton and performance

More information

APPLICATION OF PROBE DATA COLLECTED VIA INFRARED BEACONS TO TRAFFIC MANEGEMENT

APPLICATION OF PROBE DATA COLLECTED VIA INFRARED BEACONS TO TRAFFIC MANEGEMENT APPLICATION OF PROBE DATA COLLECTED VIA INFRARED BEACONS TO TRAFFIC MANEGEMENT Toshhko Oda (1), Kochro Iwaoka (2) (1), (2) Infrastructure Systems Busness Unt, Panasonc System Networks Co., Ltd. Saedo-cho

More information

A GENETIC ALGORITHM-BASED METHOD FOR CREATING IMPARTIAL WORK SCHEDULES FOR NURSES

A GENETIC ALGORITHM-BASED METHOD FOR CREATING IMPARTIAL WORK SCHEDULES FOR NURSES 82 Internatonal Journal of Electronc Busness Management, Vol. 0, No. 3, pp. 82-93 (202) A GENETIC ALGORITHM-BASED METHOD FOR CREATING IMPARTIAL WORK SCHEDULES FOR NURSES Feng-Cheng Yang * and We-Tng Wu

More information

APPLICATION OF COMPUTER PROGRAMMING IN OPTIMIZATION OF TECHNOLOGICAL OBJECTIVES OF COLD ROLLING

APPLICATION OF COMPUTER PROGRAMMING IN OPTIMIZATION OF TECHNOLOGICAL OBJECTIVES OF COLD ROLLING Journal Journal of Chemcal of Chemcal Technology and and Metallurgy, 50, 6, 50, 2015, 6, 2015 638-643 APPLICATION OF COMPUTER PROGRAMMING IN OPTIMIZATION OF TECHNOLOGICAL OBJECTIVES OF COLD ROLLING Abdrakhman

More information

ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING

ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING ANALYZING THE RELATIONSHIPS BETWEEN QUALITY, TIME, AND COST IN PROJECT MANAGEMENT DECISION MAKING Matthew J. Lberatore, Department of Management and Operatons, Vllanova Unversty, Vllanova, PA 19085, 610-519-4390,

More information

Ant Colony Optimization for Economic Generator Scheduling and Load Dispatch

Ant Colony Optimization for Economic Generator Scheduling and Load Dispatch Proceedngs of the th WSEAS Int. Conf. on EVOLUTIONARY COMPUTING, Lsbon, Portugal, June 1-18, 5 (pp17-175) Ant Colony Optmzaton for Economc Generator Schedulng and Load Dspatch K. S. Swarup Abstract Feasblty

More information

Vehicle Routing Problem with Time Windows for Reducing Fuel Consumption

Vehicle Routing Problem with Time Windows for Reducing Fuel Consumption 3020 JOURNAL OF COMPUTERS, VOL. 7, NO. 12, DECEMBER 2012 Vehcle Routng Problem wth Tme Wndows for Reducng Fuel Consumpton Jn L School of Computer and Informaton Engneerng, Zhejang Gongshang Unversty, Hangzhou,

More information

Dynamic Pricing for Smart Grid with Reinforcement Learning

Dynamic Pricing for Smart Grid with Reinforcement Learning Dynamc Prcng for Smart Grd wth Renforcement Learnng Byung-Gook Km, Yu Zhang, Mhaela van der Schaar, and Jang-Won Lee Samsung Electroncs, Suwon, Korea Department of Electrcal Engneerng, UCLA, Los Angeles,

More information

Joint Scheduling of Processing and Shuffle Phases in MapReduce Systems

Joint Scheduling of Processing and Shuffle Phases in MapReduce Systems Jont Schedulng of Processng and Shuffle Phases n MapReduce Systems Fangfe Chen, Mural Kodalam, T. V. Lakshman Department of Computer Scence and Engneerng, The Penn State Unversty Bell Laboratores, Alcatel-Lucent

More information

Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm

Optimized ready mixed concrete truck scheduling for uncertain factors using bee algorithm Songklanakarn J. Sc. Technol. 37 (2), 221-230, Mar.-Apr. 2015 http://www.sst.psu.ac.th Orgnal Artcle Optmzed ready mxed concrete truck schedulng for uncertan factors usng bee algorthm Nuntana Mayteekreangkra

More information

Heuristic Static Load-Balancing Algorithm Applied to CESM

Heuristic Static Load-Balancing Algorithm Applied to CESM Heurstc Statc Load-Balancng Algorthm Appled to CESM 1 Yur Alexeev, 1 Sher Mckelson, 1 Sven Leyffer, 1 Robert Jacob, 2 Anthony Crag 1 Argonne Natonal Laboratory, 9700 S. Cass Avenue, Argonne, IL 60439,

More information

Omega 39 (2011) 313 322. Contents lists available at ScienceDirect. Omega. journal homepage: www.elsevier.com/locate/omega

Omega 39 (2011) 313 322. Contents lists available at ScienceDirect. Omega. journal homepage: www.elsevier.com/locate/omega Omega 39 (2011) 313 322 Contents lsts avalable at ScenceDrect Omega journal homepage: www.elsever.com/locate/omega Supply chan confguraton for dffuson of new products: An ntegrated optmzaton approach Mehd

More information

Preventive Maintenance and Replacement Scheduling: Models and Algorithms

Preventive Maintenance and Replacement Scheduling: Models and Algorithms Preventve Mantenance and Replacement Schedulng: Models and Algorthms By Kamran S. Moghaddam B.S. Unversty of Tehran 200 M.S. Tehran Polytechnc 2003 A Dssertaton Proposal Submtted to the Faculty of the

More information

An ACO Algorithm for. the Graph Coloring Problem

An ACO Algorithm for. the Graph Coloring Problem Int. J. Contemp. Math. Scences, Vol. 3, 2008, no. 6, 293-304 An ACO Algorthm for the Graph Colorng Problem Ehsan Salar and Kourosh Eshgh Department of Industral Engneerng Sharf Unversty of Technology,

More information

Forecasting the Demand of Emergency Supplies: Based on the CBR Theory and BP Neural Network

Forecasting the Demand of Emergency Supplies: Based on the CBR Theory and BP Neural Network 700 Proceedngs of the 8th Internatonal Conference on Innovaton & Management Forecastng the Demand of Emergency Supples: Based on the CBR Theory and BP Neural Network Fu Deqang, Lu Yun, L Changbng School

More information

Logistic Regression. Lecture 4: More classifiers and classes. Logistic regression. Adaboost. Optimization. Multiple class classification

Logistic Regression. Lecture 4: More classifiers and classes. Logistic regression. Adaboost. Optimization. Multiple class classification Lecture 4: More classfers and classes C4B Machne Learnng Hlary 20 A. Zsserman Logstc regresson Loss functons revsted Adaboost Loss functons revsted Optmzaton Multple class classfcaton Logstc Regresson

More information

Feature selection for intrusion detection. Slobodan Petrović NISlab, Gjøvik University College

Feature selection for intrusion detection. Slobodan Petrović NISlab, Gjøvik University College Feature selecton for ntruson detecton Slobodan Petrovć NISlab, Gjøvk Unversty College Contents The feature selecton problem Intruson detecton Traffc features relevant for IDS The CFS measure The mrmr measure

More information

A Binary Particle Swarm Optimization Algorithm for Lot Sizing Problem

A Binary Particle Swarm Optimization Algorithm for Lot Sizing Problem Journal o Economc and Socal Research 5 (2), -2 A Bnary Partcle Swarm Optmzaton Algorthm or Lot Szng Problem M. Fath Taşgetren & Yun-Cha Lang Abstract. Ths paper presents a bnary partcle swarm optmzaton

More information

Multi-Period Resource Allocation for Estimating Project Costs in Competitive Bidding

Multi-Period Resource Allocation for Estimating Project Costs in Competitive Bidding Department of Industral Engneerng and Management Techncall Report No. 2014-6 Mult-Perod Resource Allocaton for Estmatng Project Costs n Compettve dng Yuch Takano, Nobuak Ish, and Masaak Murak September,

More information

Imperial College London

Imperial College London F. Fang 1, C.C. Pan 1, I.M. Navon 2, M.D. Pggott 1, G.J. Gorman 1, P.A. Allson 1 and A.J.H. Goddard 1 1 Appled Modellng and Computaton Group Department of Earth Scence and Engneerng Imperal College London,

More information

Examensarbete. Rotating Workforce Scheduling. Caroline Granfeldt

Examensarbete. Rotating Workforce Scheduling. Caroline Granfeldt Examensarbete Rotatng Workforce Schedulng Carolne Granfeldt LTH - MAT - EX - - 2015 / 08 - - SE Rotatng Workforce Schedulng Optmerngslära, Lnköpngs Unverstet Carolne Granfeldt LTH - MAT - EX - - 2015

More information

Fuzzy Set Approach To Asymmetrical Load Balancing In Distribution Networks

Fuzzy Set Approach To Asymmetrical Load Balancing In Distribution Networks Fuzzy Set Approach To Asymmetrcal Load Balancng n Dstrbuton Networks Goran Majstrovc Energy nsttute Hrvoje Por Zagreb, Croata goran.majstrovc@ehp.hr Slavko Krajcar Faculty of electrcal engneerng and computng

More information

A Load-Balancing Algorithm for Cluster-based Multi-core Web Servers

A Load-Balancing Algorithm for Cluster-based Multi-core Web Servers Journal of Computatonal Informaton Systems 7: 13 (2011) 4740-4747 Avalable at http://www.jofcs.com A Load-Balancng Algorthm for Cluster-based Mult-core Web Servers Guohua YOU, Yng ZHAO College of Informaton

More information

The Choice of Direct Dealing or Electronic Brokerage in Foreign Exchange Trading

The Choice of Direct Dealing or Electronic Brokerage in Foreign Exchange Trading The Choce of Drect Dealng or Electronc Brokerage n Foregn Exchange Tradng Mchael Melvn & Ln Wen Arzona State Unversty Introducton Electronc Brokerage n Foregn Exchange Start from a base of zero n 1992

More information

Credit Limit Optimization (CLO) for Credit Cards

Credit Limit Optimization (CLO) for Credit Cards Credt Lmt Optmzaton (CLO) for Credt Cards Vay S. Desa CSCC IX, Ednburgh September 8, 2005 Copyrght 2003, SAS Insttute Inc. All rghts reserved. SAS Propretary Agenda Background Tradtonal approaches to credt

More information

SIMULATION OF INVENTORY CONTROL SYSTEM FOR SUPPLY CHAIN PRODUCER WHOLESALER CLIENT IN EXTENDSIM ENVIRONMENT

SIMULATION OF INVENTORY CONTROL SYSTEM FOR SUPPLY CHAIN PRODUCER WHOLESALER CLIENT IN EXTENDSIM ENVIRONMENT SIMULATION OF INVENTOY CONTOL SYSTEM FO SUPPLY CHAIN PODUCE WHOLESALE CLIENT IN EXTENDSIM ENVIONMENT Eugene Kopytov and Avars Muravjovs Transport and Telecommuncaton Insttute, Lomonosov Street, ga, LV-09,

More information

Risk-based Fatigue Estimate of Deep Water Risers -- Course Project for EM388F: Fracture Mechanics, Spring 2008

Risk-based Fatigue Estimate of Deep Water Risers -- Course Project for EM388F: Fracture Mechanics, Spring 2008 Rsk-based Fatgue Estmate of Deep Water Rsers -- Course Project for EM388F: Fracture Mechancs, Sprng 2008 Chen Sh Department of Cvl, Archtectural, and Envronmental Engneerng The Unversty of Texas at Austn

More information

1. Fundamentals of probability theory 2. Emergence of communication traffic 3. Stochastic & Markovian Processes (SP & MP)

1. Fundamentals of probability theory 2. Emergence of communication traffic 3. Stochastic & Markovian Processes (SP & MP) 6.3 / -- Communcaton Networks II (Görg) SS20 -- www.comnets.un-bremen.de Communcaton Networks II Contents. Fundamentals of probablty theory 2. Emergence of communcaton traffc 3. Stochastc & Markovan Processes

More information

Batch Scheduling for a Single Deteriorating Machine to Minimize Total Actual Flow Time

Batch Scheduling for a Single Deteriorating Machine to Minimize Total Actual Flow Time Proceedngs of the 2014 Internatonal Conference on Industral Engneerng and Operatons Management Bal, Indonesa, January 7 9, 2014 Batch Schedulng for a Sngle Deteroratng Machne to Mnmze Total Actual Flow

More information

Rate Monotonic (RM) Disadvantages of cyclic. TDDB47 Real Time Systems. Lecture 2: RM & EDF. Priority-based scheduling. States of a process

Rate Monotonic (RM) Disadvantages of cyclic. TDDB47 Real Time Systems. Lecture 2: RM & EDF. Priority-based scheduling. States of a process Dsadvantages of cyclc TDDB47 Real Tme Systems Manual scheduler constructon Cannot deal wth any runtme changes What happens f we add a task to the set? Real-Tme Systems Laboratory Department of Computer

More information

Selfish Constraint Satisfaction Genetic Algorithm for Planning a Long-distance Transportation Network

Selfish Constraint Satisfaction Genetic Algorithm for Planning a Long-distance Transportation Network JOURNAL OF COMPUTERS, VOL. 3, NO. 8, AUGUST 2008 77 Selfsh Constrant Satsfacton Genetc Algorthm for Plannng a Long-dstance Transportaton Network Takash Onoyama and Takuya Maekawa Htach Software Engneerng

More information

Linear Circuits Analysis. Superposition, Thevenin /Norton Equivalent circuits

Linear Circuits Analysis. Superposition, Thevenin /Norton Equivalent circuits Lnear Crcuts Analyss. Superposton, Theenn /Norton Equalent crcuts So far we hae explored tmendependent (resste) elements that are also lnear. A tmendependent elements s one for whch we can plot an / cure.

More information

Answer: A). There is a flatter IS curve in the high MPC economy. Original LM LM after increase in M. IS curve for low MPC economy

Answer: A). There is a flatter IS curve in the high MPC economy. Original LM LM after increase in M. IS curve for low MPC economy 4.02 Quz Solutons Fall 2004 Multple-Choce Questons (30/00 ponts) Please, crcle the correct answer for each of the followng 0 multple-choce questons. For each queston, only one of the answers s correct.

More information

Data Broadcast on a Multi-System Heterogeneous Overlayed Wireless Network *

Data Broadcast on a Multi-System Heterogeneous Overlayed Wireless Network * JOURNAL OF INFORMATION SCIENCE AND ENGINEERING 24, 819-840 (2008) Data Broadcast on a Mult-System Heterogeneous Overlayed Wreless Network * Department of Computer Scence Natonal Chao Tung Unversty Hsnchu,

More information

Analysis of Reactivity Induced Accident for Control Rods Ejection with Loss of Cooling

Analysis of Reactivity Induced Accident for Control Rods Ejection with Loss of Cooling Analyss of Reactvty Induced Accdent for Control Rods Ejecton wth Loss of Coolng Hend Mohammed El Sayed Saad 1, Hesham Mohammed Mohammed Mansour 2 Wahab 1 1. Nuclear and Radologcal Regulatory Authorty,

More information

Simulation and optimization of supply chains: alternative or complementary approaches?

Simulation and optimization of supply chains: alternative or complementary approaches? Smulaton and optmzaton of supply chans: alternatve or complementary approaches? Chrstan Almeder Margaretha Preusser Rchard F. Hartl Orgnally publshed n: OR Spectrum (2009) 31:95 119 DOI 10.1007/s00291-007-0118-z

More information

PSYCHOLOGICAL RESEARCH (PYC 304-C) Lecture 12

PSYCHOLOGICAL RESEARCH (PYC 304-C) Lecture 12 14 The Ch-squared dstrbuton PSYCHOLOGICAL RESEARCH (PYC 304-C) Lecture 1 If a normal varable X, havng mean µ and varance σ, s standardsed, the new varable Z has a mean 0 and varance 1. When ths standardsed

More information

Automated information technology for ionosphere monitoring of low-orbit navigation satellite signals

Automated information technology for ionosphere monitoring of low-orbit navigation satellite signals Automated nformaton technology for onosphere montorng of low-orbt navgaton satellte sgnals Alexander Romanov, Sergey Trusov and Alexey Romanov Federal State Untary Enterprse Russan Insttute of Space Devce

More information

DEVELOPMENT & IMPLEMENTATION OF SUPPLY CHAIN MANAGEMENT FOCUSING ON PROCUREMENT PROCESSES & SUPPLIERS 1.

DEVELOPMENT & IMPLEMENTATION OF SUPPLY CHAIN MANAGEMENT FOCUSING ON PROCUREMENT PROCESSES & SUPPLIERS 1. 1. Claudu V. KIFOR, 2. Amela BUCUR, 3. Muhammad Arsalan FAROOQ DEVELOPMENT & IMPLEMENTATION OF SUPPLY CHAIN MANAGEMENT FOCUSING ON PROCUREMENT PROCESSES & SUPPLIERS 1. LUCIAN BLAGA UNIVERSITY SIBIU, RESEARCH

More information

Activity Scheduling for Cost-Time Investment Optimization in Project Management

Activity Scheduling for Cost-Time Investment Optimization in Project Management PROJECT MANAGEMENT 4 th Internatonal Conference on Industral Engneerng and Industral Management XIV Congreso de Ingenería de Organzacón Donosta- San Sebastán, September 8 th -10 th 010 Actvty Schedulng

More information

Robust Design of Public Storage Warehouses. Yeming (Yale) Gong EMLYON Business School

Robust Design of Public Storage Warehouses. Yeming (Yale) Gong EMLYON Business School Robust Desgn of Publc Storage Warehouses Yemng (Yale) Gong EMLYON Busness School Rene de Koster Rotterdam school of management, Erasmus Unversty Abstract We apply robust optmzaton and revenue management

More information

How To Make A Network Of A Network From A Remnant N Inventory System

How To Make A Network Of A Network From A Remnant N Inventory System PRICE-DIRECTED CONTROL OF REMNANT INVENTORY SYSTEMS DANIEL ADELMAN The Unversty of Chcago, Graduate School of Busness, 1101 East 58th Street, Chcago, Illnos 60637, dan.adelman@gsb.uchcago.edu GEORGE L.

More information

An Integrated Approach of AHP-GP and Visualization for Software Architecture Optimization: A case-study for selection of architecture style

An Integrated Approach of AHP-GP and Visualization for Software Architecture Optimization: A case-study for selection of architecture style Internatonal Journal of Scentfc & Engneerng Research Volume 2, Issue 7, July-20 An Integrated Approach of AHP-GP and Vsualzaton for Software Archtecture Optmzaton: A case-study for selecton of archtecture

More information

Dynamic Fleet Management for Cybercars

Dynamic Fleet Management for Cybercars Proceedngs of the IEEE ITSC 2006 2006 IEEE Intellgent Transportaton Systems Conference Toronto, Canada, September 17-20, 2006 TC7.5 Dynamc Fleet Management for Cybercars Fenghu. Wang, Mng. Yang, Ruqng.

More information

FREQUENCY OF OCCURRENCE OF CERTAIN CHEMICAL CLASSES OF GSR FROM VARIOUS AMMUNITION TYPES

FREQUENCY OF OCCURRENCE OF CERTAIN CHEMICAL CLASSES OF GSR FROM VARIOUS AMMUNITION TYPES FREQUENCY OF OCCURRENCE OF CERTAIN CHEMICAL CLASSES OF GSR FROM VARIOUS AMMUNITION TYPES Zuzanna BRO EK-MUCHA, Grzegorz ZADORA, 2 Insttute of Forensc Research, Cracow, Poland 2 Faculty of Chemstry, Jagellonan

More information

In some supply chains, materials are ordered periodically according to local information. This paper investigates

In some supply chains, materials are ordered periodically according to local information. This paper investigates MANUFACTURING & SRVIC OPRATIONS MANAGMNT Vol. 12, No. 3, Summer 2010, pp. 430 448 ssn 1523-4614 essn 1526-5498 10 1203 0430 nforms do 10.1287/msom.1090.0277 2010 INFORMS Improvng Supply Chan Performance:

More information

Luby s Alg. for Maximal Independent Sets using Pairwise Independence

Luby s Alg. for Maximal Independent Sets using Pairwise Independence Lecture Notes for Randomzed Algorthms Luby s Alg. for Maxmal Independent Sets usng Parwse Independence Last Updated by Erc Vgoda on February, 006 8. Maxmal Independent Sets For a graph G = (V, E), an ndependent

More information

IMPACT ANALYSIS OF A CELLULAR PHONE

IMPACT ANALYSIS OF A CELLULAR PHONE 4 th ASA & μeta Internatonal Conference IMPACT AALYSIS OF A CELLULAR PHOE We Lu, 2 Hongy L Bejng FEAonlne Engneerng Co.,Ltd. Bejng, Chna ABSTRACT Drop test smulaton plays an mportant role n nvestgatng

More information

8 Algorithm for Binary Searching in Trees

8 Algorithm for Binary Searching in Trees 8 Algorthm for Bnary Searchng n Trees In ths secton we present our algorthm for bnary searchng n trees. A crucal observaton employed by the algorthm s that ths problem can be effcently solved when the

More information

Software project management with GAs

Software project management with GAs Informaton Scences 177 (27) 238 241 www.elsever.com/locate/ns Software project management wth GAs Enrque Alba *, J. Francsco Chcano Unversty of Málaga, Grupo GISUM, Departamento de Lenguajes y Cencas de

More information

Information Sciences

Information Sciences Informaton Scences 0 (013) 45 441 Contents lsts avalable at ScVerse ScenceDrect Informaton Scences journal homepage: www.elsever.com/locate/ns A hybrd method of fuzzy smulaton and genetc algorthm to optmze

More information

POLYSA: A Polynomial Algorithm for Non-binary Constraint Satisfaction Problems with and

POLYSA: A Polynomial Algorithm for Non-binary Constraint Satisfaction Problems with and POLYSA: A Polynomal Algorthm for Non-bnary Constrant Satsfacton Problems wth and Mguel A. Saldo, Federco Barber Dpto. Sstemas Informátcos y Computacón Unversdad Poltécnca de Valenca, Camno de Vera s/n

More information

NON-CONSTANT SUM RED-AND-BLACK GAMES WITH BET-DEPENDENT WIN PROBABILITY FUNCTION LAURA PONTIGGIA, University of the Sciences in Philadelphia

NON-CONSTANT SUM RED-AND-BLACK GAMES WITH BET-DEPENDENT WIN PROBABILITY FUNCTION LAURA PONTIGGIA, University of the Sciences in Philadelphia To appear n Journal o Appled Probablty June 2007 O-COSTAT SUM RED-AD-BLACK GAMES WITH BET-DEPEDET WI PROBABILITY FUCTIO LAURA POTIGGIA, Unversty o the Scences n Phladelpha Abstract In ths paper we nvestgate

More information

Stochastic Inventory Management for Tactical Process Planning under Uncertainties: MINLP Models and Algorithms

Stochastic Inventory Management for Tactical Process Planning under Uncertainties: MINLP Models and Algorithms Stochastc Inventory Management for Tactcal Process Plannng under Uncertantes: MINLP Models and Algorthms Fengq You, Ignaco E. Grossmann Department of Chemcal Engneerng, Carnege Mellon Unversty Pttsburgh,

More information

GENETIC ALGORITHM FOR PROJECT SCHEDULING AND RESOURCE ALLOCATION UNDER UNCERTAINTY

GENETIC ALGORITHM FOR PROJECT SCHEDULING AND RESOURCE ALLOCATION UNDER UNCERTAINTY Int. J. Mech. Eng. & Rob. Res. 03 Fady Safwat et al., 03 Research Paper ISS 78 049 www.jmerr.com Vol., o. 3, July 03 03 IJMERR. All Rghts Reserved GEETIC ALGORITHM FOR PROJECT SCHEDULIG AD RESOURCE ALLOCATIO

More information

A New Task Scheduling Algorithm Based on Improved Genetic Algorithm

A New Task Scheduling Algorithm Based on Improved Genetic Algorithm A New Task Schedulng Algorthm Based on Improved Genetc Algorthm n Cloud Computng Envronment Congcong Xong, Long Feng, Lxan Chen A New Task Schedulng Algorthm Based on Improved Genetc Algorthm n Cloud Computng

More information

Fisher Markets and Convex Programs

Fisher Markets and Convex Programs Fsher Markets and Convex Programs Nkhl R. Devanur 1 Introducton Convex programmng dualty s usually stated n ts most general form, wth convex objectve functons and convex constrants. (The book by Boyd and

More information

Research on Transformation Engineering BOM into Manufacturing BOM Based on BOP

Research on Transformation Engineering BOM into Manufacturing BOM Based on BOP Appled Mechancs and Materals Vols 10-12 (2008) pp 99-103 Onlne avalable snce 2007/Dec/06 at wwwscentfcnet (2008) Trans Tech Publcatons, Swtzerland do:104028/wwwscentfcnet/amm10-1299 Research on Transformaton

More information

An efficient constraint handling methodology for multi-objective evolutionary algorithms

An efficient constraint handling methodology for multi-objective evolutionary algorithms Rev. Fac. Ing. Unv. Antoqua N. 49. pp. 141-150. Septembre, 009 An effcent constrant handlng methodology for mult-objectve evolutonary algorthms Una metodología efcente para manejo de restrccones en algortmos

More information

Minimal Coding Network With Combinatorial Structure For Instantaneous Recovery From Edge Failures

Minimal Coding Network With Combinatorial Structure For Instantaneous Recovery From Edge Failures Mnmal Codng Network Wth Combnatoral Structure For Instantaneous Recovery From Edge Falures Ashly Joseph 1, Mr.M.Sadsh Sendl 2, Dr.S.Karthk 3 1 Fnal Year ME CSE Student Department of Computer Scence Engneerng

More information

Resource-constrained Project Scheduling with Fuzziness

Resource-constrained Project Scheduling with Fuzziness esource-constraned Project Schedulng wth Fuzzness HONGQI PN, OBET J. WIIS, CHUNG-HSING YEH School of Busness Systems Monash Unversty Clayton, Vctora 368 USTI bstract: - esource-constraned project schedulng

More information

Open Access A Load Balancing Strategy with Bandwidth Constraint in Cloud Computing. Jing Deng 1,*, Ping Guo 2, Qi Li 3, Haizhu Chen 1

Open Access A Load Balancing Strategy with Bandwidth Constraint in Cloud Computing. Jing Deng 1,*, Ping Guo 2, Qi Li 3, Haizhu Chen 1 Send Orders for Reprnts to reprnts@benthamscence.ae The Open Cybernetcs & Systemcs Journal, 2014, 8, 115-121 115 Open Access A Load Balancng Strategy wth Bandwdth Constrant n Cloud Computng Jng Deng 1,*,

More information

THE DISTRIBUTION OF LOAN PORTFOLIO VALUE * Oldrich Alfons Vasicek

THE DISTRIBUTION OF LOAN PORTFOLIO VALUE * Oldrich Alfons Vasicek HE DISRIBUION OF LOAN PORFOLIO VALUE * Oldrch Alfons Vascek he amount of captal necessary to support a portfolo of debt securtes depends on the probablty dstrbuton of the portfolo loss. Consder a portfolo

More information

A method for a robust optimization of joint product and supply chain design

A method for a robust optimization of joint product and supply chain design DOI 10.1007/s10845-014-0908-5 A method for a robust optmzaton of jont product and supply chan desgn Bertrand Baud-Lavgne Samuel Bassetto Bruno Agard Receved: 10 September 2013 / Accepted: 21 March 2014

More information

A Novel Methodology of Working Capital Management for Large. Public Constructions by Using Fuzzy S-curve Regression

A Novel Methodology of Working Capital Management for Large. Public Constructions by Using Fuzzy S-curve Regression Novel Methodology of Workng Captal Management for Large Publc Constructons by Usng Fuzzy S-curve Regresson Cheng-Wu Chen, Morrs H. L. Wang and Tng-Ya Hseh Department of Cvl Engneerng, Natonal Central Unversty,

More information

v a 1 b 1 i, a 2 b 2 i,..., a n b n i.

v a 1 b 1 i, a 2 b 2 i,..., a n b n i. SECTION 8.4 COMPLEX VECTOR SPACES AND INNER PRODUCTS 455 8.4 COMPLEX VECTOR SPACES AND INNER PRODUCTS All the vector spaces we have studed thus far n the text are real vector spaces snce the scalars are

More information

Enabling P2P One-view Multi-party Video Conferencing

Enabling P2P One-view Multi-party Video Conferencing Enablng P2P One-vew Mult-party Vdeo Conferencng Yongxang Zhao, Yong Lu, Changja Chen, and JanYn Zhang Abstract Mult-Party Vdeo Conferencng (MPVC) facltates realtme group nteracton between users. Whle P2P

More information

Feasibility of Using Discriminate Pricing Schemes for Energy Trading in Smart Grid

Feasibility of Using Discriminate Pricing Schemes for Energy Trading in Smart Grid Feasblty of Usng Dscrmnate Prcng Schemes for Energy Tradng n Smart Grd Wayes Tushar, Chau Yuen, Bo Cha, Davd B. Smth, and H. Vncent Poor Sngapore Unversty of Technology and Desgn, Sngapore 138682. Emal:

More information

Survey on Virtual Machine Placement Techniques in Cloud Computing Environment

Survey on Virtual Machine Placement Techniques in Cloud Computing Environment Survey on Vrtual Machne Placement Technques n Cloud Computng Envronment Rajeev Kumar Gupta and R. K. Paterya Department of Computer Scence & Engneerng, MANIT, Bhopal, Inda ABSTRACT In tradtonal data center

More information

The Retail Planning Problem Under Demand Uncertainty

The Retail Planning Problem Under Demand Uncertainty Vol., No. 5, September October 013, pp. 100 113 ISSN 1059-1478 EISSN 1937-5956 13 05 100 DOI 10.1111/j.1937-5956.01.0144.x 013 Producton and Operatons Management Socety The Retal Plannng Problem Under

More information