1 on BUILDING CONSTRUCTION By Shamsudheen Kottayil (10 B4)
2 CERTIFICATE This is to certify that Mr. SHAMSUDHEEN KOTTAYIL has conducted a seminar on: BUILDING CONSTRUCTION by learning the subject from various sources. Overall rating of the seminar preparation, data collection, documentation and presentation is Outstanding Director Dr.Abdul Nazer Dt:
3 Abstract Building Construction Key words: Building, Construction, Methods, Design, Estimation, Drawing, Planning, Foundation, Structure, As-Built. Building construction is one of the major activities that take place everywhere for residential, governmental and commercials purposes. With the advent of modern technology, building construction methods have been improved to build anywhere on the earth irrespective of the soil and weather conditions. Building construction is a project where lots of man power, equipments and materials are required. This project consists of many activities from foundation to finishing works. Schedule of activities with delivery of materials and manpower will be determined only by a scientific planning. To plan a project detailed design drawings and material specifications should be ready and thus to forecast the cost of the entire project. This seminar illustrates the general features of building construction based on a study conducted in Dubai; including design, drawing and planning aspects. Various parts of a building structure and different methods of construction are also discussed. I hope, this report can be used to learn the basics of building construction, for anyone who are new to this industry. Shamsudheen Kottayil ( Class No:10 B4) 29-October
4 Contents No. Description Page 1. Introduction The crew Parties involved Authorities Construction team Project process Construction procedure Flow diagram Software used Construction Drawings Site preparation Shoring and excavation Super structure Equipments and materials Electrical and mechanical works Finishes Completion stage References
5 1. Introduction Ancient people were lived in caves and huts. Gradually the mankind started to develop by all meaning like culturally and educationally and it made them to change the total life style. The modern people like to live beside the cities because the 90 percent of the life is connected to the cities. So there should be some convenient place to live beside the cities, and in the cities, it is not practical to have individual houses for all like in villages because lack of space, so the multi story buildings are found and it plays an integrated roll in mankind life The buildings are classified to many categories like commercial, residential, official, industrial, labour accommodation, hotels etc.,. There are authorities to approve and to control the construction projects, for example: Town Planning Department in Kerala. Buildings have to be very safe and maximum convenient place for the end-users, same time it has to be less expensive and more beautiful to look. So it is crystal clear that high qualified and specially trained people have to involve in this subject Sky scraper towers with very special features and small villas are not covered in this report, but design and construction of normal buildings like ground + 1 to G+35 stories in U.A.E are covered. The data has been collected through my working experience, visiting construction sites and my colleagues 2. The crew 2.1 Parties involved: Investor or Client: Building construction is a business and money is the main capital of this business like all others. Client is the owner of the building. The client should invest a big amount of money to develop the building The Consultant or Engineer: Consultants are the brain of the project and same time they are representatives of the client. They make a basic concept design of the building at the beginning as per the owner requirement and detailed design for construction within the limit of Authorities rules and regulation and obtain a design NOC from all relevant authorities. Authorities have written rules and regulation specifically for each type of buildings and the consultant also looks after the development and controls the contractor and finance flow as the construction in progress. Consultant should have qualified Architectural, Structural and Electro Mechanical engineers who can design the building. Architects concentrate aesthetics and ergonomics while structural engineers more concerned about the strength of the building. Electro Mechanical engineers take care of electrical supply, lighting facility, fire protection, cooling system and drainage services. It is in the scope of Consultant s work to inspect and certify the work which has been completed by the Main contractor on a monthly basis in order to the owner can release the payment to the Main Contractor. 4
6 2.1.3 Contractor: Contractor is a company who executes or constructs the project. Contractor has to have different skilled and unskilled labours, engineers and managers in various departments, construction equipments, etc., 2.2 Authorities All the authorities are mostly government representatives and look after the quality and safety of the developments and control the construction within the regulations set by the government. A No Objection certificate has to be obtained by the Consultant by submitting the preliminary details. Then again a set of detailed drawings should be provided to Municipality to obtain the final building permit including floor layout, longitude sections, stair details, electro mechanical services details, structural details are considered. Once the final building permit is issued the contractor can commence the site and a completion certificate has to be obtained by submitting as built drawings and specification when it is completed the project The main authorities are involved in the above topic are Dubai Municipality, Dubai Water and Electricity Department, Etisalat, Civil Defence, Dubai Roads and Transport Authority and Civil Aviation. As mentioned above the No Objection Certificate issued by the concern departments shows the details of existing services running around the subjected plot. So the designer can design the development at maximum convenient and avoid making damages by digging on existing services. 2.3 Construction Team Construction team consists of the following engineers and technicians in different filed headed by project manager. Site Engineer: to supervise and lead whole or part of a project Quantity Surveyor: works on quantities, specification, cash flow and approvals Planning Engineer: Planning and Monitoring Draughtsman: drawings Surveyor: Land surveying, GPS positioning, etc., Foreman: to lead a construction crew of specific task Skilled labour: experienced labour in a specific task, eg: carpenter, mason 3. Project process 3.1 Construction procedure: Once the preliminary design and approval has been finalized consultant prepare a tender document contains detail drawings, Tender and contract conditions, specification and Bill of Quantities, tender out on behalf of the investor to the well known contractors in town. The participated contractors have to submit their price within the specific date and time and job will be awarded to the most reasonable contractor by the owner. Then the consultant prepare three sets of drawings and specification which have to be stamped and signed by all parties and keep one copy each as a contract document for reference as an when the construction is on. No changes can be applied to the design without written approval by the owner and the consultant. The contractor should obtain approval for each and every part of the construction on a shop drawing which details how it will be applied on the building from the 5
7 consultant, prior to comments at the site. And the contractor also should obtain approval from the consultant on each and every material by specifying details of the manufactures, quality and origin. The Main Contractor appoints so many subcontractors by seeking the owner s and consultant s no objection to do the various works like Joinery, Sanitary Ware, Tiling, Water Proofing, Sauna, Aluminium works, Refuse Chute, Marble works etc. Planning Engineer has to prepare detailed schedule of activities and should be approved by all the parties involved. BOQ: is the Bills Of Quantities explains all the material specifications with the quantities 3.2 Flow diagram: General flow diagram of a construction process is presented below. Start Client requirement Preliminary design by consultant Tender documents: drawings and BOQ Selection of contractor Approval of materials, sub contractor, etc.. Begin construction Partial payment to contractor Review and monitoring Handing over End 3.3 Software used Some of the engineering softwares used are: AutoCAD for drawing by draughtsmen Primavera for planning and monitoring by planning engineers STAAD structural analysis and design by structural engineers 4. Construction 4.1 Drawings: As described above for each and every single part of the building has been explained in the drawings and specification. Drawings can be classified to four categories 6
8 commonly. They are Plan, Section, Elevation and Details. A plan indicates the top view and section indicates the cut view. Elevation represents the front view. Details detail the dimension, location and materials- how and where to be fixed Seminar 4.2 Site preparation: Once it is obtained a Building permit from concerned Authority the Contractor can comments work on site. Part of checking the water contents and strength of the plot, collecting some soil by digging in various part of the site and sent it to the laboratory. The contractor places some motor pumps in various part of the plot for some days and make sure the site is ready for excavation. This process is called dewatering. Also a Topographical survey plan is prepared by the specialized parties in that field. This plan has the geographical coordinates of the plot and it is referred to locate the existing site conditions and levels A fence has to be provide around the site and a sign board has to be placed showing the details including the Building Permit Number, owner and consultants details at the entrance gate of the site. 7
9 4.3 Shoring and excavation: After completion of all these pre arrangement, now it can be started to excavate the site. Most of the buildings have one or more basement floors those are used for Car Parking and stores. Basement floors are below ground level, so the plot has to be excavated to obtain enough clear head room below. To prevent the soil falling to the plot from the surrounding areas, a barrier has to be placed. This procedure is called Shoring. Makes holes like a bore well on plot boundary continuously and adjacently by machine till achieve the sufficient depth and fill it with iron and concrete. There are many kinds of shoring depends how deep the plot has to be excavated. A special approval has to be obtained to start the shoring work from Dubai municipality and RTA in order to avoid damaging the existing service pipe lines running surround the plot when it is excavated.. When the excavation is reached to the calculated level, very deep holes are made according the structural engineers instruction at specific distance and size inside the plot, and circle shape mesh, made of strong steel bars are dropped in to it and fills with concrete. This process is called piling, and those act like strong legs of the building, the whole building wait is distributed to the earth through the piles. Quantity 8
10 On the footings a huge quantity of iron bars are laid vertically and horizontally at specific distance and shape as designed by the structural engineers and fill with concrete it is called foundation slab. 9
11 4.4 Super Structure: Part of the building above ground level is called super structure. The following facts are considered for the design of super structure. Shear stress, compressive stress, tensile stress and wind load. Concept of this is to provide enough strength for the building to defend against to the pressure from various sides. Concrete columns and core walls around the lifts and stair cases and other important part of the building to prevent the natural calamities like, Earthquake and Storm. Columns and beams are designed in a particular size and location to distribute the building load to the earth Normally the height of each floor is 3.1 meter. With 200mm slab thickness. Some cases, instead of concrete structure, steal structures and pre-casted slabs are applied When the columns reached to a floor height level, the floor slab is casted. Columns and beams are act like bone in human body. Gap in between columns and beams is filled with block work which is called walls. The building strength is depends the structural engineer brain while the quality depends the architect s. Lifts are used to access floor to floor up and down in multi story Buildings. Even though there are lifts, stair cases should be provided. Because lifts work with electricity only, emergency situation the staircases are more considered, especially for fire exit. All the doors and openings in the slabs are to be provided with fire proofing system in order to prevent the fire spreading from place to place in a short time. The department of Civil Defence regulation instructs to provide necessary precautions prior to issue a building permit. 4.5 Equipments and Meterials: Tower crains and Fork Lifts are very important in construction, they handle heavy equipments and meterials to move all over the building and it is operated by an operator. Scaffolding helps the people to stand on and reach the higher level places and do the necessary works. Hoist acts like a lift at constructin stage. All the consultants and the contractors have to have temporoarly offices at the site and full time site engineers to look after the project. Window Craddle helps the technision to move around the building for the necessary actions. Mexer is used to make the concrete. There are many other equpiments also used. Refer the construction magzins. Water Proofing Membrain applies on the floor and roof slabs and all other wet areas to prevent the water leakage. Expansion Joints are fixed in between two slabs to reduce the span. Angle beeds, Raw Cool insulation, Sealant, Iron Mongery, Ducts, Thermalited blocks, Cable trays, Flexcel sheets, Gypsum boards, Aluminium Cladding Sheets, Tuffen Glasses, are a few meterials among the hundreds applies on the building for various purposes 10
12 Lifts, Automatic sliding doors, Car Park Barriors, Door access cards, Fire Alarm systems and Fire proofed doors are some of the technologies used in the building. 4.6 Electrical and Mechanical works: Electrical and Mechanical services make alive the building. Providing hot and cold water, air cooling system, lighting, ventilation, waste water discharge and fire protection system, are the major services. As mentioned above the owner has to provide enough number of transformers to generate sufficient power as suggested by DEWA and DEWA connects the power to substation. Ancient people used to use manual fan to get relieved from the hot climate, and then the Electrical fans are founded. Soon the Air Condition system became very common for this purpose. There are various kinds of Air condition units, such window A/C, Split Unit and Central A/C. Basic functioning for all of these are same. It has four main units. Evaporator, compressor, condenser and fan coil unit. Air inside the room is exhausted through the evaporator unit and passed through the fan coils. The compressor sprays the form type gas and makes cool the air and push back to the room with help of a fan located inside. Window air condition unit has all the units attached together while split A/c s evaporator unit is inside the room and rest parts are somewhere outside. The Central A/C has main central unit for all this mechanism and can be fixed anywhere in the building. The produced cooled air is distributed through ducts to all over the building. Another system is chilled water system. It has huge cooling tower unit. The chilled water is sprayed to fan coil so the produced air becomes cold. And it is distributed through the pipe lines to various places. Hot and cold water distribution is another major service. Cold water is produced with help of compressor and hot water with help of heater. Drainage system is how the used and waste water is discharged, and usually it does not require the power supply. It is an arrangement of pipelines in 11
13 a particular an accurate manner. Any how some case it may be needed a support of pressure pump to push or pull then, the power should be required. Fire Alarm and Fire Protection system work with help of many sensors which detect the smoke and Fire and give signal to make alarms then the people realize that something wrong in the building, get the necessary precautions. With the help of modern technology most of the buildings have been connected to the Department of Civil Defense, so the department can realize themselves the danger spot and rush to there without any information. 4.7 Finishes : finishes means, dressing and apply enough make-up for good look and protection for the building. Externally it decorate with plastering, Curtain walls, Cladding and painting while internally with tiles, marbles, ceilings, attractive lightings and furniture. Interior designer s ideas can make the building lovelier by internally for the end-users. 4.8 Completion stage The project has to be completed as programmed and agreed schedule. In case of any delay due to some parties failure to complete their scope of work without any reason, the owner can penalize those parties as it is mentioned in the contract document and the owner has also right to penalize the contractor in case he realize that any cheating or violation has been carried out in the construction. That is why the owner insists on the contractors to keep a security bond before they involve in the project. Failing to complete their scope of work the owner has right to encash the bond. At the stage of completion the contractor should prepare an as built set of the drawings and obtain all the authorities approval stamp on it. The contractor is also instructed to submit a warranty letter for the work and material applied on the building as well. These documents are the owner property, can be presented in case of any discrepancies raised in future. Anyhow there will be a one year maintenance period. If any self damages happen, that is contractor s liability to rectify the defects. The owner retains a 5% of money till this maintenance period is over. 12
14 References 1. My Colleagues Mr. Paul D Souza. Project Manager for Pull Man Hotel in Jumeirah Lakes 4. The Construction Week 5. Jumeirah Lake Towers. Dubai Contact Info: Shamsudheen Kottayil abunaseel71@googl .com Mobile:
CHAPTER 2 QUANTITY TAKE-OFF
CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate
More informationB-1 Buildings & Service Maintenance
B-1 Buildings & Service Maintenance B-1 Buildings & Service Maintenance SAFETY, HEALTH AND ENVIRONMENTAL POLICY: B-1 DATE OF ISSUE: AUGUST 1994. BUILDINGS AND SERVICES MAINTENANCE 1. Introduction It is
More informationRequirements for Building Application Submission
THE DEVELOPMENT CONTROL AND PLANNING BOARD P O Box 597 Phone: 869 465-2277 Bladen Commercial Development Fax: 869 465-5842 Basseterre, St. Kitts Email: phyplskb@caribsurf.com To: Architects, Designers
More informationBuildings Construction Procurement Strategy
Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides
More informationHow to Estimate the Cost of Support of Excavation for Foundation Installation. CPE Candidate No. 0113013. May 15, 2013
How to Estimate the Cost of Support of Excavation for Foundation Installation CPE Candidate No. 0113013 May 15, 2013 1 How to Estimate the Cost of Support of Excavation for Foundation Installation Table
More informationDesign Development Quality Management Phase Checklist Project Phase Checklist Series
Best Practices Design Checklist Project Phase Checklist Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA
More informationQuantity Takeoff. Dr. Ahmed Elyamany
Quantity Takeoff Dr. Ahmed Elyamany 1 Outline Importance of Quantity Takeoff Preparation of Quantity Takeoff Measurement Units Measuring excavation, P.C footings, Beams, Columns, slabs, and stairs. Solved
More informationSample Drawing Package for One and Two Family Dwelling Applications
Sample Drawing Package for One and Two Family Dwelling Applications For a full list of submission requirements, refer to the relevant checklist for your application found on our website: http://vancouver.ca/home-property-development/application-forms-and-checklists.aspx
More informationPROJECT COST ESTIMATES & FEASIBILITIES
PROJECT COST ESTIMATES & FEASIBILITIES Project Cost and budget management Project success elements Scope meet the scope defined for the project Budget It is within established budget Programme It is designed
More informationThe Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs:
RFQ number PR4877728 The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs: A- Supplying and installing 30 high wall A/C split unit 3HP- 24,000
More informationSECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
More informationReplacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay
Original HVAC Units: Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue Photo Essay One fan motor draws air from the lower section of the unit,
More informationARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill
ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION
More informationAGREEMENT FOR THE PROVISION OF CONSULTANCY ENGINEERING SERVICES
AGREEMENT FOR THE PROVISION OF CONSULTANCY ENGINEERING SERVICES This agreement is made and entered into, on day the. of, 1991 by and between: Mr/. of P.O. Box.. hereinafter refereed to as the "Owner" on
More informationQuantity Take-off. Quantity Take-off
Quantity Take-off Required Information for Cost Estimate Detailed drawings Specifications Available site data Available resource data (labor, material & equipment) Government regulations Applicable owner
More informationCITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT
Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide
More informationMULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3
TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete
More informationDESIGNERS GUIDE TO DOMESTIC CONSERVATORIES
WBCA 403 DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES A guide to assist those intending to install or who are involved in installing conservatories. Includes information about: conservatory and component
More informationREVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N
PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N
More informationSchematic Design: Quality Management Phase Checklist Project Phase Checklist Series
Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement
More informationHanson Building Products. precast basement solutions
Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete
More informationPLAN SUBMITTAL INFORMATION
PLAN SUBMITTAL INFORMATION APPLICATION FOR A BUILDING PERMIT Prior to drafting construction drawings, please check with the North Miami Beach Community Development Department concerning the following:
More informationConstruction Technologies Career Field Pathways and Course Structure
Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry
More informationBuilding Condition Assessment Report
Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.
More informationCity of Peterborough
City of Peterborough Building Division Basement Finishing Guide Residential Information Guides This information is intended to be used as an guide that outlines minimum requirements when finishing a basement,
More informationRENOVATION AND RESTORATION OF OLD BUILDINGS IN SRI LANKA
234 Abstract RENOVATION AND RESTORATION OF OLD BUILDINGS IN SRI LANKA Eng. Nandana Abeysuriya B.Sc. Eng (Hons), M.Eng.,C.Eng.,FIE(SL), Int PE(SL) 1A, Ananda Road, Melder Place, Nugegoda, Sri Lanka. Tel/Fax:
More informationDAYBREAK ATTACHED RESIDENCE DISCLOSURE STATEMENTS Acknowledgement of Receipt Form
Builder Name: Lot Number: Page 1of 6 DAYBREAK ATTACHED RESIDENCE DISCLOSURE STATEMENTS Acknowledgement of Receipt Form These disclosure statements (the Attached Residence Disclosure Statements ) are provided
More informationSAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT
SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer
More informationElevating Your House. Introduction CHAPTER 5
CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,
More informationSummary of Preliminary Assessment on Structural, Fire and Electrical Safety
Name of the Factory Address of the Factory Present Status of the Factory Structural Assessment Conducted by : Galaxy Stitch Ltd. : BSCIC Industrial Estate, Plot no. A102, Tongi Gazipur Bangladesh : Under
More informationPre-Drywall Inspection Report
SM MEDALLION INSPECTIONS helping people make informed decisions Pre-Drywall Inspection Report 5657 Garden Valley Place Milton, Georgia 30024 Prepared for Betsy and Paul Dougherty January12, 2015 Medallion
More informationTHE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass
More informationFREEPHONE: 0800 059 9112 EMAIL: admin@a1demolitionukltd.com. Asbestos Awareness. Toolbox Talk
FREEPHONE: 0800 059 9112 EMAIL: admin@a1demolitionukltd.com Asbestos Awareness Toolbox Talk ASBESTOS AWARENESS Why is it a Problem Asbestos was extensively used as a building material in the UK from the
More informationWhen is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
More informationAll substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
More informationSECTION 11 78 13 MORTUARY REFRIGERATORS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 78 13 MORTUARY REFRIGERATORS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in
More informationKing Post Wall Information
King Post Wall Information DAWSON-WAM specialise in the installation of piled retaining wall systems including steel sheet piling, concrete piled walls and king post walls. This document is our guide to
More informationServices Enclosures and Protected Shafts - Maintaining Compartmentation
Introduction When a fire resisting element is used to provide fire compartmentation, every opening that allows services to pass through the element must be adequately protected by sealing, or fire stopping
More informationRESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002
RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002 INDEX New Build Flat and Pitched Roofs Rainwater Goods Porches to Existing Buildings / Covered Links etc, Between Buildings Floors /
More informationBILL OF QUANTITY FOR THE HVAC WORKS OF The Institute of space technology, near Toll Plaza (G.T. Road,) Islamabad
BILL OF QUANTITY FOR THE HVAC WORKS OF The Institute of space technology, near Toll Plaza (G.T. Road,) Islamabad PLEASE MARK TICK ON LEFT BOX WHICH EQUIPMENT YOU HAVE QUOTED PROPOSAL BASED ON CHINESE EQUIPMENT
More informationCivil Engineering and Architecture (CEA) Detailed Outline
Civil Engineering and Architecture (CEA) Detailed Outline Unit 1: Overview of Civil Engineering and Architecture (23 days) Lesson 1.1: History of Civil Engineering and Architecture 1. Many features of
More information1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona
for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety
More informationBureau Veritas Contact Information
Bureau Veritas Contact Information Permit Submittal The permit documents and fees will be submitted to the city. Submittal documents should be complete to expedite plan review and permit issuance. Please
More informationPractice Note 2014-62
Practice Note 2014-62 Documentation Required for Applications for Building Permits Reference to the Building Code of Australia (BCA) in this Practice Note means Volume One and Volume Two of the National
More informationCONSTRUCTION LAW. Mechanical Roofing Contractor. Electrical Class A Air Conditioning. Contractor Class B Air Conditioning
CONSTRUCTION LAW I. Contractor Licensing 1. The Basic Rule: No person who is not certified or registered shall engage in the business of contracting in this state. FS 489.113. Pinellas County Code 22-14
More informationSWIMMING POOL, SPA, & HOT TUB GUIDELINES
SWIMMING POOL, SPA, & HOT TUB GUIDELINES Pool permit cost is based on the total value of the project. See Permit Fee Schedule Table 1A. A. Adopted construction codes and installation requirements 1. 2015
More informationPROJECT MANAGER / CONSTRUCTION
This CV is anonymous for security purposes - In order to obtain access to this candidate, you must be an identified business PROJECT MANAGER / CONSTRUCTION From the first day I began managing Hundred millions
More informationDesign and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities
At Macau International Airport (RFQ-198) Section 6 Bill of Quantities Bill Nr. 1 Preliminaries Bill Nr. 1 PRELIMINARIES NOTES : (1) The work shall be done during day time and night time according to CAM/ADA
More information- 5 - Table1. Maximum Compartment Volumes
- 5 - Part II - SPECIFIC REQUIREMENTS 5. Compartmentation 5.1 Every building should be divided into compartments by walls and floors to inhibit the spread of fire. 5.2 Compartment walls, compartment floors,
More informationGRC Porticos. Lightweight entrance porticos ABBEY ARTSTONE
GRC Porticos Lightweight entrance porticos ABBEY ARTSTONE GRC Porticos Lightweight entrance porticos Abbey Artstone's range of lightweight products designed for the construction industry is the only range
More informationQatar National Construction Standards 2010 Contents
1- General 01. Introduction 02. Use and Maintenance of the Site 03. Site Access and Entry onto the Site 04. Protection 05. Interference 06. Project Meetings 07. Submittals 08. Quality Assurance 09. Materials
More informationHow To Install An Overhead Sewer
Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage
More informationThe Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE
The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519
More informationBUILDING SAFETY UNIT
POLICY Page 1 of 5 SUBMITTAL REQUIREMENTS FOR ONE AND TWO FAMILY DWELLINGS, ADDITIONS AND RENOVATIONS All submittals shall be site specific and designed to the provisions of the 2012 International Residential
More informationProject : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI
Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI TENDER CLARIFICATIONS- no 3 dated 3rd Oct 13 issued in response
More informationNational Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook
National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook Trainee:... Training Provider:... Year:... Trainee Contact no:... Competency Based Skill Training Logbook Introduction
More informationSUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
More informationAPEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT
PROJECT MANAGEMENT / SUPPORT Capital Cost Savings Construction Monitoring and Assistance In-Plant Production Assistance In-Plant Maintenance Assistance Procurement Assistance Project Cost Estimating o
More informationKnock Down Rebuild. Building Process Building process - knock down rebuild 1
Knock Down Rebuild Building Process Building process - knock down rebuild 1 Building Process Your action Our action REMINDER Pre site Step 1 New Home Selection Congratulations. This marks the start of
More informationDoes Wall Township require an inspection by the building department on resale of a home?
Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,
More informationVOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1
More informationLaw No. (9) of 2012 Amending some provisions of Law No. (13) of 1997 Concerning the Civil Defense
Law No. (9) of 2012 Amending some provisions of Law No. (13) of 1997 Concerning the Civil Defense We, Hamad Bin Khalifa Al-Thani, Emir of the State of Qatar Having pursued the Constitution, And the Law
More informationPROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY
PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY GENERAL SPECIFICATIONS These specifications are intended to cover the construction of the
More informationTown of Beaumont. Lot Grading Guidelines
Town of Beaumont Lot Grading Guidelines LOT GRADING APPROVAL PROCESS Lot Grading Guidelines... 3 Introduction... 3 Purpose... 3 Definitions... 3 Lot Grading... 3 Lot Grading Plan... 3 Lot Grading Certificate...
More informationProfessional Engineers Providing Structural Engineering Services In Buildings
GUIDELINE Professional Engineers Providing Structural Engineering Services In Buildings 1995 Published by Association of Professional Engineers of Ontario Revised 12/11/98 CONTENTS INTRODUCTION...3 PART
More informationCertification: Building Plans Examiner. Exam ID: B3
Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building
More informationOPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY
Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic
More informationTechnical Notes 3B - Brick Masonry Section Properties May 1993
Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications
More informationD Sample Notices to Property Owners, Sample Affidavits, and Other Material
D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully
More informationSECTION 02401 SHEETING, SHORING AND BRACING
SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State
More informationCITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov
CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov Finishing a basement to make additional living space in a house is a popular construction project for many homeowners.
More informationWHEN IS A PERMIT REQUIRED?
WHEN IS A PERMIT REQUIRED? Any owner, builder, contractor, or other authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure,
More informationHow To Get A Building Permit In Florida
MIAMI-DADE COUNTY BUILDING DEPARTMENT PERMIT EXEMPTIONS Please note that the exemptions listed in this section are from Florida Building Code requirements only. Other State and County regulatory departments
More informationCOMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS
COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS Permit applicants shall submit three (3) COMPLETE SETS of plans and specifications with each application for a permit. Plans and specifications
More informationTECHNICAL SCHOOL. Construction. Construction. Build your future the INTEC way
TECHNICAL SCHOOL Construction Construction Build your future the INTEC way Contents page Introduction INTEC Basic Construction Principles Certificate INTEC Tendering Skills Short Course Certificate INTEC
More informationITEM DESCRIPTION SPECIFICATION TENDER OFFER
TECHNICAL SPECIFICATIONS PL1 & PL2 PLEASE TICK IF YOU COMPLY. SPECIFY YOUR OPTION IF YOU DON'T. ITEM DESCRIPTION SPECIFICATION TENDER OFFER Make (please specify) 1.0 Type Duplex Passenger Lift 2.0 Minimum
More informationCh. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM STORY HEIGHT
Ch. 58 DIVISION D-O 34 CHAPTER 58. DIVISION D-O ORDINARY COMMERCIAL, INDUSTRIAL, OFFICE Sec. 58.1. Division D-O occupancies. 58.2. Separation and mixed occupancy. OCCUPANCY GROUP CONSTRUCTION TYPE MAXIMUM
More informationHOUSE BUILDING DIGEST
HOUSE BUILDING DIGEST (Construction Specifications-Foundations) Creating Enabling Environment for Affordable Housing for All This is an attempt by BMTPC to provide useful but often ignored information
More informationfirst look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel
first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel What is GigaCrete GigaCrete is a family of products based on low carbon footprint Green ceramic binders
More informationChapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
More informationAll work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.
DIVISION 15 MECHANICAL SECTION 15100 - PLUMBING PART 1 - GENERAL SCOPE Plumbing work includes all domestic water, gas, and sanitary sewer systems as shown on plans. Also all fixtures and equipment which
More informationSECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
More informationLITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -
The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior
More informationFire Safety Requirements for Child Care Centre
Fire Safety Requirements for Child Care Centre A. Restrictions on Location Child care centre shall not be located : - (a) (b) in any premises designed for residential use; in any industrial building, warehouses,
More informationApplication for electricity connections Business premises. Electricity. Send your completed application form with supporting documentation to:
Electricity Thank you for considering for your electricity connections. We have put together these notes to help you fill out your and to ensure we receive all the correct information for your application
More informationOccupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School
Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The
More informationAvailable online at www.iseec2012.com I-SEEC 2012. Proceeding - Science and Engineering (2013) 583 590
Available online at www.iseec2012.com I-SEEC 2012 Proceeding - Science and Engineering (2013) 583 590 Proceeding Science and Engineering www.iseec2012.com Science and Engineering Symposium 4 th International
More informationL_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.
L_All_Vocatinal_Ed_Construction Sector: Construction Sr. No Specialisation Page No 1 Construction and Building Technology 02 1 P a g e 2 P a g e VOCATIONAL EDUCATIONAL QUALIFICATION FRAMEWORK (Sector -
More informationP r o j e c t C a s e S t u d y
P r o j e c t C a s e S t u d y Mangrove Place Project: Mangrove Place Start Date: 2009 Completion Date: Ongoing Location: Al Reem Island, Abu Dhabi, UAE Industry: Residential Developer: Luxury Real Estate
More informationBotetourt County, Virginia. Frequently Asked Questions
Botetourt County, Virginia Development Services Construction Compliance Frequently Asked Questions Permits... 2 When is a permit required?... 2 When is a permit NOT required?... 2 Who may apply for a permit?...
More informationProject Close Out Summary
Project Close Out Summary 1. Final Cleaning and Inspection 2. Testing and Certification 3. Demonstration of Systems and Equipment 4. Inspections by Authorities Having Jurisdiction 5. O&M Manuals and As
More informationLighthouse Engineering, L.L.C.
Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering
More informationEL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013
PERMIT AUTHORIZATION EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013 El Lago ordinances require the issuance of building permits as a method of enforcing code minimums, ensuring
More informationCHENNAI METROPOLITAN DEVELOPMENT AUTHORITY, CHENNAI-600 008 (ADMINISTRATION DIVISION)
CHENNAI METROPOLITAN DEVELOPMENT AUTHORITY, CHENNAI-600 008 (ADMINISTRATION DIVISION) Office Order No.01/2010 Dated:21.01.2010 Sub: Read: CMDA Enforcement Cell Issue of Completion Certificate for obtaining
More informationPLEASE REFER TO YOUR INDIVIDUAL QUOTE
STANDARD INCLUSIONS AND EXCLUSIONS SECONDARY DWELLING 16/04/2014 PLEASE REFER TO YOUR INDIVIDUAL QUOTE Inclusions Super Structure: Timber Frames including Roof Trussing and Framing, Internal and External
More information50 St Mary Axe London EC3
50 St Mary Axe London EC3 Letting specification 1.Structure and Envelope The main superstructure comprises of a braced steel fame (app 7m span / 90min fire rated) and the elevations are formed from a series
More information0 - Initial Services
Overview At All Australian Architecture we consider each project in terms of self contained stages (see below). Each stage is independent and does not tie you into completing every stage of your project
More informationGuidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems
Guidelines for energy efficient heating, ventilation and air conditioning (HVAC) systems If you're a designer or a BCA, this guidance on the energy efficiency of HVAC systems in commercial buildings may
More informationResidential Inspection Guidelines
Residential Inspection Guidelines 201 Pre-Pour Foundation Dimensions Building Location Certificate - if required in the building consent Construction and Advice Notes Check the building dimensions against
More information