MECHANICAL ENGINEERING PLANT LAYOUT AND MATERIAL HANDLING UNIT I

Size: px
Start display at page:

Download "MECHANICAL ENGINEERING PLANT LAYOUT AND MATERIAL HANDLING UNIT I"

Transcription

1 MECHANICAL ENGINEERING PLANT LAYOUT AND MATERIAL HANDLING UNIT I 1. Which of the following is a strategic decision? [ B ] A. Facilitates location B. Plant location C. Plant layout D. Resources location 2. Which is an advantage for product layout? [ D ] A. Huge capital outlay B. Little flexibility. C. Discontinuity in production D. Lower cost of material handling 3. What is an advantage for process layout? [ C] A. Larger production cycle B. Higher material handling costs C. Interesting to workers D. Higher wage bill 4. Objective of plant layout is [ ] A) minimum material handling B) minimum equipment utilization C) minimum manpower utilization D) minimum utilization of floor area 5. O type flow pattern used in industry. [ D ] A) bottling plant B) steel plant C) cement plant D) paper plant 6) Which of the following processes most likely uses batch production? [ D ] A) Sugar Refinery B) Plastic Part Manufacturer C) Consumer Electronics D) Oil Refinery 7) Which of the following processes most likely uses repetitive or mass assembly lines production? [ B ] A) Commercial Printer B) Plastic Part Manufacturer C) Consumer Electronics D) Sugar Refinery 8) All of the following will increase the capacity of process except: [ C ] A) The purchase of additional equipment B) scheduled machine maintenance

2 C) Larger production lot sizes D) increasing the backlog before each machine 9. The pattern of plant layout is basically divided by the relationship between the and --- A) Commercial Printer B) Plastic Part Manufacturer [ D ] C) Consumer Electronics D) Number of products, Production quantity 10. The location of plant should be in such a place where the are available A) Larger production cycle B) Higher material handling costs [ D ] C) Interesting to workers D) Large scale economics 11. Flexibility cannot be achieved with [ D ] A) Moveable equipment B) Inexpensive equipment C) Sophisticated electronic equipment D) Immovable equipment 12 The most important objective behind plant layout is [ A ] A) Overall simplification and ease in integration of various functions B) Economy in machines C) Maximum travel time in plant D) Minimum work-in-progress 13. A low unit cost can be achieved by following [ B ] A) Process layout B) Product layout C) Fixed position layout D) Functional layout 14. A production line is to be designed for a job with three tasks. The task times are 0.3 minutes, 1.4 minutes, and 0.7 minutes. The maximum cycle time in minutes is: [ D ] A) 0.3 B) 0.7 C) 1.4 D) 2.4 E) none of these 15. If a line is balanced with 90 percent efficiency, the balance delay would be: [ A ] A) 10 percent B) 90 percent C) 100 percent D) unknown, since balance delay isn't related to efficiency E)none of the above 16. A common goal in process layouts is to [ A ] A) Minimize transportation distance B) Maximize distance between departments C) Standardize processes D) Convert to cellular layout as often as possible 17. are generally used for the transportation of powders, liquids and gases [ A ] A) Pipes B) 0.7 C) 1.4 D) Conveyors are suitable for production in routes [ D ] A) Standardize processes B) Convert to cellular layout as often as possible C) Share personnel D) Mass, fixed 19. For lifting heavy jobs in a shop, are made use of [ A ]

3 A) Overhead cranes B) bridge crane C) monorail D) True 20.A common goal in process layouts is to [ A ] A) Minimize transportation distance B) Maximize distance between departments C) Standardize processes D) Convert to cellular layout as often as possible UNIT II 1. Which layout facilitates high degree of automation to minimize fatigue and error? [ A] A) Product layout B) Process layout C) Flexible layout D) Fixed layout 2. For ship vessel industry the following layout is best suited: [ C ] A. Process layout B. Product layout C. Fixed position layout D. Plant layout 3. is concerned with the orderly storage and issuing of finished goods. [ C ] A) tool room B) receiving area C) shipping area D) warehousing area 4. Bin cards are used in keeping the records of [ B ] A) Man power B) machine utilization C) entry & exit of workers D) material storage 5. is a traction type conveyor. [ A ] A) Chute conveyor B) screw conveyor C) arm conveyor D) roller conveyor 6. The layout, wherein a breakdown in one machine leads to a breakdown of the entire production facility, is called [ D ] A) Chute conveyor B) screw conveyor C) arm conveyor D) Plant layout 7. Plant layout has three systems. They are ----and [ A ] A) Product layout, process layout, fixed layout B) trolls C) belt conveyor D) all of the above 8. In layout, the lines need to be balanced. [ D ] A) trolles B)belt conveyor C)all of the above D) Product layout 9. material handling in automobile industry is done by [ A ] A) overhead crane B) trolles C)belt conveyor D)all of the above 10. String diagram is used when [ D ] A) Team of workers is working at plate B) material handling is to be done C) overhead crane D) trolleys 11. Material handling and plant location is analyzed by [ D ] A) Gnatt chart B) Bin chart C) Emerson chart D) Travel chart

4 12. Which of the following statements regarding a pull system is true? [ D ] A) Large lots are pulled from upstream stations. B) Work is pulled to the downstream work stations before it is actually needed. C) Manufacturing cycle time is increased. D) Problems become more obvious 13. Fork lift trucks are used for horizontal path [ B ] A) Movement in fixed path B) Movement in non-fixed path C) Vertical movement in non-fixed path D) Horizontal movement in fixed path 14. is used for handling loads over long rectangular area in shipyard. [ C ] A) Jib crane B) gantry crane C) bridge crane D) monorail 15. for narrow aisles, long loads (like pipes, angles) truck is used. [ A ] A) Crane truck B) platform truck C) side load truck D) hand lift truck 16. are extensively used as material handling equipment in the case of product layout [ A ] A) Conveyors B) gantry crane C) bridge crane D) monorail 17. are used for person moving up and down [ A ] A) Elevators B) Inexpensive equipment C) Sophisticated electronic equipment D) Immovable equipment 18. Cycle time establishes the output rate for a line. [ A ] A) True B) False C) Manufacturing cycle time is increased. D) Problems become more obvious 19. The maximum cycle time in an assembly line is equal to the time for the longest task. [ B ] A)True B)False C) bridge crane D) monorail 20. One drawback of process layouts is that equipment utilization rates are lower than in a product layout. [ D ] A) gantry crane B) bridge crane C) monorail D) True UNIT III 1. Process layout is employed for [ A ]

5 A) Batch production B) Continuous type of product C) Effective utilization of machines D) Effective utilization of labor and machines 2. Which of the following is a determinant of productivity and profitability? [ B ] A) Resources layout B) Plant layout C) Plant location D) Facilities layout layout is generally has the best machine utilization [ A ] A) Product-oriented layout B) process layout C) flexible layout D) Fixed layout layout would be most appropriate in a fast food restaurant [ D ] A) Process layout B) flexible layout C) Fixed layout D) Product layout layout is most suitable for processing sugar from sugar cane [ A ] A) Product-oriented layout B) continuous type of product C) Effective utilization of machine D) all of the above 6. Work study is done with the help of [ C ] A) Process chart B) material handling C) stop watch D) all of the above 7. Process layout is employed for [ D ] A) Batch production B) continuous type of product C) Effective utilization of machine D) all of the above 8. For a product layout the material handling equipment must [ D ] A) Batch production B) continuous type of product C) Effective utilization of machine D) be designee as special purpose for aparticular application 9. Product layout is employed for [ A ] A) Batch production B) continuous type of product C) Effective utilization of machine D) all of the above 10. the most important objective behind plant layout is [ A ] A) Overall simplification safety of integration B) economy in space C) Maximum travel time in plant D) all of the above 11. Which of the following is considered more a corporate decision? [ D ] A) Plant layout B) Facilitates layout C) Resources layout D) Plant location 12. Which of the following is not a goal of plant layout? [ C ] A) Minimize the unit cost B) Optimize quality C) Last in first out inventory D) Lifting no more than one part at a time

6 13. Which layout has relatively high degree of flexibility? [ C ] A. Product layout B. process layout C. flexible layout D. Fixed layout 14. Material handling and plant location is analyzed by [ A ] A) gantt chart B) bin chart C) emersion chart D) travel chart 15. Respirators used for [ B ] A) Lung protection B) eye protection C) hand protection D) liver protection 16. Which of the following layouts is suited for mass production? [ B ] A) Process layout B) Product layout C) Fixed position layout D) Functional layout 17. In which of the following layouts, the lines need to be balanced? [ B ] A) Process layout B) Product layout C) Fixed position layout D) Functional layout 18. The process layout is best suited where [ A ] A) Specialization exists B) Machines are arranged according to sequence of operation C) Few numbers of non-standardized units are to be produced D) Mass production is envisaged 19. Templates are used for [ A ] a) a planning layout b)flow of material c)copying complicated profiles d) all of the above 20. In steel plant the most important system for material handling is [ D ] A) conveyors B) cranes and noists C) trucks D) locos

7 UNIT IV 1. Which of the following is considered more a corporate decision? [ D ] A) Plant layout B) Facilitates layout C) Resources layout D) Plant location 2. Which of the following is not a goal of plant layout? [ C ] A) Minimize the unit cost B) Optimize quality C) Last in first out inventory D) Lifting no more than one part at a time 3. Which layout has relatively high degree of flexibility? [ C ] A. Product layout B. process layout C. flexible layout D. Fixed layout 4. Material handling and plant location is analyzed by [ A ] A) gantt chart B) bin chart C) emersion chart D) travel chart 5. Respirators used for [ B ] A) Lung protection B) eye protection C) hand protection D) liver protection 6) Which of the following layouts is suited for mass production? [ B ] A) Process layout B) Product layout C) Fixed position layout D) Functional layout 7) In which of the following layouts, the lines need to be balanced? [ B ] A) Process layout B) Product layout C) Fixed position layout D) Functional layout 8) The process layout is best suited where [ A ] A) Specialization exists B) Machines are arranged according to sequence of operation C) Few numbers of non-standardized units are to be produced D) Mass production is envisaged 9. Templates are used for [ A ] a) a planning layout b)flow of material c)copying complicated profiles d) all of the above 10. In steel plant the most important system for material handling is [ D ] A) conveyors B) cranes and noists C) trucks D) locos 11. A production line is to be designed for a job with 4 tasks. The task times are 2.4 minutes, 1.4 minutes, 0.9 minutes, and 1.7 minutes. The maximum cycle time is and the minimum cycle time is minutes. [ A ] A) 6.4, 2.4 B) 0.7 C) 1.4 D) Four hundred and eighty minutes of production time are available per day. The demand for the product is 80 units per day. Each unit of the product requires 30 minutes of work. What is the theoretical maximum number of workstation? [ A ] A) 0.7 B) 1.4 C) 2.4 D) 5

8 13. Process layout is employed for [ A ] A) Batch production B) Continuous type of product C) Effective utilization of machines D) Effective utilization of labor and machines 14. Which of the following is a determinant of productivity and profitability? [ B ] A) Resources layout B) Plant layout C) Plant location D) Facilities layout layout is generally has the best machine utilization [ A ] A) Product-oriented layout B) process layout C) flexible layout D) Fixed layout layout would be most appropriate in a fast food restaurant [ D ] A) Process layout B) flexible layout C) Fixed layout D) Product layout layout is most suitable for processing sugar from sugar cane [ A ] A) Product-oriented layout B) continuous type of product C) Effective utilization of machine D) all of the above 18. Work study is done with the help of [ C ] A) Process chart B) material handling C) stop watch D) all of the above 19. Process layout is employed for [ D ] A) Batch production B) continuous type of product C) Effective utilization of machine D) all of the above 20. For a product layout the material handling equipment must [ D ] A) Batch production B) continuous type of product C) Effective utilization of machine D) be designee as special purpose for aparticular application UNIT V 1. Which of the following industries is likely to have low equipment utilization? [ D ] A) Auto manufacturing B) Beer making C) Television manufacturing D) Hospitals 2. Which one of the following technologies is used only for material handling, not for actual production or assembly? [ D ] A) Robots B) CNC C) CAD D) AGVs 3. A drawing of the movement of material, or people is a [ A ] A) Flow diagram B) process chart C) service blueprint D) process map

9 4. A helps to avoid crowding of jobs at a particular machine by change of route of some of the jobs or by diverting work to other machine. [ A ] A) Control chart B) Beer making C) Television manufacturing D) Hospitals 5. A compact estimate of the handling which must be done between various work stations is obtained from [ A ] A) TRVELING CHART B) CNC C) CAD D) AGVs 6. Material handling and plant location is analyzed by [ D ] A) gnat chart B)bin chart C) Emerson chart D) travel chart 7. In witch of the following layouts the lines need to the balanced [ B ] A) Process layout B) product layout C) fixed position layout D)plant layout 8. Witch of the following layout is suited to mass production [ B ] A) Process layout B) product layout C)fixed position layout D)plant layout 9. Witch of the following layout is suited to job production [ A ] A) Process layout B) product layout C)fixed position layout D)plant layout 10. Queing theory is used for [ D ] A)inventory problems B)traffic congestion studies C)job shop scheduling D)all of the above 11. Queing theory is associated with [ C ] A) Sales B) inspection time C) waiting time D) production time 12. The performance of a specific task in cpm is known as [ C ] A) Dummy B) event C) activity D) contract 13) The most important objective behind plant layout is [ A ] A) Overall simplification and ease in integration of various functions B) Economy in machines C) Maximum travel time in plant D) Minimum work-in-progress 14) A low unit cost can be achieved by following [ B ] A) Process layout B) Product layout C) Fixed position layout D) Functional layout 15. A production line is to be designed for a job with three tasks. The task times are 0.3 minutes, 1.4 minutes, and 0.7 minutes. The maximum cycle time in minutes is: [ D ] A) 0.3 B) 0.7 C) 1.4 D) 2.4 E) none of these

10 16. If a line is balanced with 90 percent efficiency, the balance delay would be: [ A ] A) 10 percent B) 90 percent C) 100 percent D) unknown, since balance delay isn't related to efficiency E)none of the above 17. A common goal in process layouts is to [ A ] A) Minimize transportation distance B) Maximize distance between departments C) Standardize processes D) Convert to cellular layout as often as possible 18. are generally used for the transportation of powders, liquids and gases [ A ] A) Pipes B) 0.7 C) 1.4 D) Conveyors are suitable for production in routes [ D ] A) Standardize processes B) Convert to cellular layout as often as possible C) Share personnel D) Mass, fixed 20. For lifting heavy jobs in a shop, are made use of [ A ] A) Overhead cranes B) bridge crane C) monorail D) True UNIT VI 1. In steel plant the most important system for material handling is [D ] A) Conveyors B) Cranes and hoists C) Trucks D) Locos 2. The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store. [ A ] A) Inflated system B) Primary cost method C) Current value method D) Fixed price method 3) For a product layout, the material handling equipment must [ C ] A) Have full flexibility B) Be general purpose type C) Be designed as special purpose for a particular application D) Employ conveyor belts, trucks, tractors etc. 4. In thermal stations, the coal from the coal handling plant is moved to the boiler bunker through [ D ] A) False B) Emerson chart C) Travel chart D) belt conveyoers 5. are used for horizontal movement of loads [ A ] A) hoists B) Primary cost method C) Current value method D) Fixed price method

11 6. The most important system adopted for material handling in steel plant is [ A ] A) Locomotive B) False C) have full flexibility D) Be general purpose type 7. Flexible manufacturing systems can handle a variety of dissimilar products. [ B ] A) True B) False C) Have full flexibility D) Be general purpose type 8. A job shop is similar to a batch production plant in that both may produce products or services to meet the customers' specifications. [ A ] A) True B) False C) have full flexibility D) Be general purpose type 9. Product layouts usually require less-skilled workers than process layouts. [ A ] A)True B) False C) Emerson chart D) Travel chart 10. The term group technology relates to the term part families. [ A ] A)True B) False C) Emerson chart D) Travel chart 11. Which of the following is a strategic decision? [ B ] A. Facilitates location B. Plant location C. Plant layout D. Resources location 12. Which is an advantage for product layout? [ D ] A. Huge capital outlay B. Little flexibility. C. Discontinuity in production D. Lower cost of material handling 13. What is an advantage for process layout? [ C] A. Larger production cycle B. Higher material handling costs C. Interesting to workers D. Higher wage bill 14. Objective of plant layout is [ ] A) minimum material handling B) minimum equipment utilization C) minimum manpower utilization D) minimum utilization of floor area 15. O type flow pattern used in industry. [ D ] A) bottling plant B) steel plant C) cement plant D) paper plant 16. Which of the following processes most likely uses batch production? [ D ] A) Sugar Refinery B) Plastic Part Manufacturer C) Consumer Electronics D) Oil Refinery 17. Which of the following processes most likely uses repetitive or mass assembly lines production? [ B ] A) Commercial Printer B) Plastic Part Manufacturer C) Consumer Electronics D) Sugar Refinery

12 18) All of the following will increase the capacity of process except: [ C ] A) The purchase of additional equipment B) scheduled machine maintenance C) Larger production lot sizes D) increasing the backlog before each machine 19. The pattern of plant layout is basically divided by the relationship between the and - -- A) Commercial Printer B) Plastic Part Manufacturer [ D ] C) Consumer Electronics D) Number of products, Production quantity 20. The location of plant should be in such a place where the are available A) Larger production cycle B) Higher material handling costs [ D ] C) Interesting to workers D) Large scale economics UNIT VII 1. Material handling and plant location is analyzed by [ D ] A) Gnatt chart B) Bin chart C) Emerson chart D) Travel chart 2. Which of the following statements regarding a pull system is true? [ D ] A) Large lots are pulled from upstream stations. B) Work is pulled to the downstream work stations before it is actually needed. C) Manufacturing cycle time is increased. D) Problems become more obvious 3. Fork lift trucks are used for horizontal path [ B ] A) Movement in fixed path B) Movement in non-fixed path C) Vertical movement in non-fixed path D) Horizontal movement in fixed path 4. is used for handling loads over long rectangular area in shipyard. [ C ] A) Jib crane B) gantry crane C) bridge crane D) monorail 5. for narrow aisles, long loads (like pipes, angles) truck is used. [ A ] A) Crane truck B) platform truck C) side load truck D) hand lift truck 6. are extensively used as material handling equipment in the case of product layout [ A ] A) Conveyors B) gantry crane C) bridge crane D) monorail

13 7. are used for person moving up and down [ A ] A) Elevators B) Inexpensive equipment C) Sophisticated electronic equipment D) Immovable equipment 8. Cycle time establishes the output rate for a line. [ A ] A) True B) False C) Manufacturing cycle time is increased. D) Problems become more obvious 9. The maximum cycle time in an assembly line is equal to the time for the longest task. [ B ] A)True B)False C) bridge crane D) monorail 10. One drawback of process layouts is that equipment utilization rates are lower than in a product layout. [ D ] A) gantry crane B) bridge crane C) monorail D) True 11. Which layout facilitates high degree of automation to minimize fatigue and error? [ A] A) Product layout B) Process layout C) Flexible layout D) Fixed layout 12. For ship vessel industry the following layout is best suited: [ C ] A. Process layout B. Product layout C. Fixed position layout D. Plant layout 13. is concerned with the orderly storage and issuing of finished goods. [ C ] A) tool room B) receiving area C) shipping area D) warehousing area 14. Bin cards are used in keeping the records of [ B ] A) Man power B) machine utilization C) entry & exit of workers D) material storage 15. is a traction type conveyor. [ A ] A) Chute conveyor B) screw conveyor C) arm conveyor D) roller conveyor 16. The layout, wherein a breakdown in one machine leads to a breakdown of the entire production facility, is called [ D ] A) Chute conveyor B) screw conveyor C) arm conveyor D) Plant layout 17. Plant layout has three systems. They are ----and [ A ] A) Product layout, process layout, fixed layout B) trolls C) belt conveyor D) all of the above 18. In layout, the lines need to be balanced. [ D ] A) trolles B)belt conveyor C)all of the above D) Product layout 19. material handling in automobile industry is done by [ A ] A) overhead crane B) trolles C)belt conveyor D)all of the above 20. String diagram is used when [ D ] A) Team of workers is working at plate B) material handling is to be done C) overhead crane D) trolleys

14 UNIT VIII 1. phase of equipment life is subjected to reliability study [ C ] A) Burn in B) Wear out C) Chance failure D) Burn in and wear out 2. Flexibility cannot be achieved with [ D ] A) Moveable equipment B) Inexpensive equipment C) Sophisticated electronic equipment D) Immovable equipment 3) The most important objective behind plant layout is [ A ] A) Overall simplification and ease in integration of various functions B) Economy in machines C) Maximum travel time in plant D) Minimum work-in-progress 4) A low unit cost can be achieved by following [ B ] A) Process layout B) Product layout C) Fixed position layout D) Functional layout 5. A production line is to be designed for a job with three tasks. The task times are 0.3 minutes, 1.4 minutes, and 0.7 minutes. The maximum cycle time in minutes is: [ D ] A) 0.3 B) 0.7 C) 1.4 D) 2.4 E) none of these 6. If a line is balanced with 90 percent efficiency, the balance delay would be: [ A ] A) 10 percent B) 90 percent C) 100 percent D) unknown, since balance delay isn't related to efficiency E)none of the above 7. A common goal in process layouts is to [ A ] A) Minimize transportation distance B) Maximize distance between departments C) Standardize processes D) Convert to cellular layout as often as possible 8. are generally used for the transportation of powders, liquids and gases [ A ] A) Pipes B) 0.7 C) 1.4 D) Conveyors are suitable for production in routes [ D ] A) Standardize processes B) Convert to cellular layout as often as possible C) Share personnel D) Mass, fixed 10. For lifting heavy jobs in a shop, are made use of [ A ]

15 A) Overhead cranes B) bridge crane C) monorail D) True 11. In steel plant the most important system for material handling is [D ] A) Conveyors B) Cranes and hoists C) Trucks D) Locos 12. The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store. [ A ] A) Inflated system B) Primary cost method C) Current value method D) Fixed price method 13. For a product layout, the material handling equipment must [ C ] A) Have full flexibility B) Be general purpose type C) Be designed as special purpose for a particular application D) Employ conveyor belts, trucks, tractors etc. 14. In thermal stations, the coal from the coal handling plant is moved to the boiler bunker through [ D ] A) False B) Emerson chart C) Travel chart D) belt conveyoers 15. are used for horizontal movement of loads [ A ] A) hoists B) Primary cost method C) Current value method D) Fixed price method 16. The most important system adopted for material handling in steel plant is [ A ] A) Locomotive B) False C) have full flexibility D) Be general purpose type 17. Flexible manufacturing systems can handle a variety of dissimilar products. [ B ] A) True B) False C) Have full flexibility D) Be general purpose type 18. A job shop is similar to a batch production plant in that both may produce products or services to meet the customers' specifications. [ A ] A) True B) False C) have full flexibility D) Be general purpose type 19. Product layouts usually require less-skilled workers than process layouts. [ A ] A)True B) False C) Emerson chart D) Travel chart 20. A common goal in process layouts is to [ A ] A) Minimize transportation distance B) Maximize distance between departments C) Standardize processes D) Convert to cellular layout as often as possible

Automated Material Handling and Storage Systems

Automated Material Handling and Storage Systems Automated Material Handling and Storage Systems How do we define automated material handling and storage systems? How do they work? What is automated guided vehicle systems? Automated Material Handling

More information

Computer Integrated Manufacturing CIM A T I L I M U N I V E R S I T Y

Computer Integrated Manufacturing CIM A T I L I M U N I V E R S I T Y MFGE 404 Computer Integrated Manufacturing CIM A T I L I M U N I V E R S I T Y Manufacturing Engineering Department Lecture 1 - Introduction Dr. Saleh AMAITIK Fall 2005/2006 Production Systems Production

More information

Atlas. Automatic Storage & Retrieval Systems

Atlas. Automatic Storage & Retrieval Systems Atlas Automatic Storage & Retrieval Systems PITCH - Servo belt driven LIFT Servo rack & pinion Overview Atlas Automatic Storage and Retrieval Systems (AS/RS) are the perfect solution for many stamping

More information

Production Operations management. Chapter 10. Plant Layout

Production Operations management. Chapter 10. Plant Layout Production Operations management Chapter 10 Plant Layout Plant Layout Plant Layout This Technical Measures Document refers to Plant Layout. Other relevant Technical Measures Documents are: Design Codes

More information

SUB: PLMH YEAR: IV, BRANCH: MECHANICAL ENGINEERING

SUB: PLMH YEAR: IV, BRANCH: MECHANICAL ENGINEERING SUB: PLMH YEAR: IV, BRANCH: MECHANICAL ENGINEERING Sl. UNIT-5 1 Explain the importance of material handling 2 Explain the relationship of material handling to plant layout 3 Explain importance of plant

More information

HealthandSafetyOntario.ca. Hazards. Introduction. Legislation

HealthandSafetyOntario.ca. Hazards. Introduction. Legislation Manual Materials handling Introduction Manual materials handling operations are carried out in most workplaces. Each handling task poses unique demands on the worker. However, workplaces can help workers

More information

Manufacturing. Material Handling. Facilities Design and FIFTH EDITION. Matthew P. Stephens. Fred E. Meyers. Purdue University Press

Manufacturing. Material Handling. Facilities Design and FIFTH EDITION. Matthew P. Stephens. Fred E. Meyers. Purdue University Press Manufacturing Facilities Design and Material Handling FIFTH EDITION Matthew P. Stephens Fred E. Meyers Purdue University Press West Lafayette, Indiana Contents CHAPTER 1 INTRODUCTION TO MANUFACTURING FACILITIES

More information

GANTRY ROBOTIC CELL FOR AUTOMATIC STORAGE AND RETREIVAL SYSTEM

GANTRY ROBOTIC CELL FOR AUTOMATIC STORAGE AND RETREIVAL SYSTEM Advances in Production Engineering & Management 4 (2009) 4, 255-262 ISSN 1854-6250 Technical paper GANTRY ROBOTIC CELL FOR AUTOMATIC STORAGE AND RETREIVAL SYSTEM Ata, A., A.*; Elaryan, M.**; Gemaee, M.**;

More information

Free Examples of plant layout drawing

Free Examples of plant layout drawing Free layout examples; a wide variety of industrial layouts, within different facility types. Principles of plant layout and design will apply widely. Free Examples of plant layout drawing Principles of

More information

choice for the application.

choice for the application. Accumulating Conveyors and Accumulating Machines Choosing the Right Accumulation Solution for your Application Planning for Accumulation Accumulation is required in high speed production lines to make

More information

Heavy Unit Load Handling Systems. Extensive Technology and Application Knowledge

Heavy Unit Load Handling Systems. Extensive Technology and Application Knowledge Heavy Unit Load Handling Systems Extensive Technology and Application Knowledge Real World Expertise Combined with the Widest Range of Product Solutions Anywhere. Dematic Heritage of Innovation Dematic

More information

Engineered Material Handling. Overhead Bridge Cranes and Gantry Cranes

Engineered Material Handling. Overhead Bridge Cranes and Gantry Cranes TM Engineered Material Handling Overhead Bridge Overhead and Gantry Bridge Cranes and Gantry Cranes Custom Engineered Crane Systems Gantry Cranes EMH builds a complete range of gantry cranes including

More information

Process design. Process design. Process design. Operations strategy. Supply network design. Layout and flow Design. Operations management.

Process design. Process design. Process design. Operations strategy. Supply network design. Layout and flow Design. Operations management. Process design Source: Joe Schwarz, www.joyrides.com Process design Process design Supply network design Operations strategy Layout and flow Design Operations management Improvement Process technology

More information

Interpreting the Numbers: From Data to Design. William Elenbark, Consultant Gross & Associates 732-636-2666; belenbark@grossassociates.

Interpreting the Numbers: From Data to Design. William Elenbark, Consultant Gross & Associates 732-636-2666; belenbark@grossassociates. Interpreting the Numbers: From Data to Design William Elenbark, Consultant Gross & Associates 732-636-2666; belenbark@grossassociates.com Robert Muller, Industrial Engineer Gross & Associates 732-636-2666;

More information

Automated Container Handling in Port Terminals

Automated Container Handling in Port Terminals Automated Container Handling in Port Terminals Overview. Shipping containers revolutionized the movement of goods, driving change and efficiency throughout the global supply chain. The next revolution

More information

Priori ty ... ... ...

Priori ty ... ... ... .Maintenance Scheduling Maintenance scheduling is the process by which jobs are matched with resources (crafts) and sequenced to be executed at certain points in time. The maintenance schedule can be prepared

More information

Facility Layout: Manufacturing and Services

Facility Layout: Manufacturing and Services Facility Layout: Manufacturing and Services 1 Facility Layout: Manufacturing and Services The aim of layout design is to organize the physical arrangement of economic activity centers within a facility

More information

How To Make A Fall Arrest Anchor System

How To Make A Fall Arrest Anchor System FALL ARREST TETHER TRACK RIGID RAIL ANCHOR SYSTEMS DESIGN: MOUNTING STYLE: LENGTHS: Built to withstand 900 pound maximum arresting force Ceiling mounted or free standing monorail & bridge anchor systems

More information

A Review of Assembly Line Changes for Lean Manufacturing

A Review of Assembly Line Changes for Lean Manufacturing IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) ISSN: 2278-1684, PP: 01-05 www.iosrjournals.org A Review of Assembly Line Changes for Lean Manufacturing Awasare Anant Dattatray 1, M.V.Kavade

More information

Cleveland Tramrail Bridge Components

Cleveland Tramrail Bridge Components Cleveland Tramrail Bridge Components 1 Tarca Rail Tarca Track features specially rolled high-carbon alloy steel rail with raised treads welded to a steel flange and web. Tarca is designed to provide maximum

More information

Ergonomic Solutions: Baggage Handling. Ergonomic Solutions: Baggage Handling. Division of Workers Compensation HS02-023B (02-14)

Ergonomic Solutions: Baggage Handling. Ergonomic Solutions: Baggage Handling. Division of Workers Compensation HS02-023B (02-14) Ergonomic Solutions: Baggage Handling Ergonomic Solutions: Baggage Handling Division of Workers Compensation HS02-023B (02-14) Table of Content Baggage Check-In 3 Transferring Baggage to Main Conveyor

More information

Machine Moving. By Norm Berls

Machine Moving. By Norm Berls Machine Moving By Norm Berls Machine Moving Sources Metalworking: Sink or Swim by Tom Lipton Google Images Vendor Web Pages YouTube Own experiences Formerly professional riggers and movers moved most heavy

More information

QUEST The Systems Integration, Process Flow Design and Visualization Solution

QUEST The Systems Integration, Process Flow Design and Visualization Solution Resource Modeling & Simulation DELMIA QUEST The Systems Integration, Process Flow Design and Visualization Solution DELMIA QUEST The Systems Integration, Process Flow Design and Visualization Solution

More information

DIE CASTING AUTOMATION AN INTEGRATED ENGINEERING APPROACH

DIE CASTING AUTOMATION AN INTEGRATED ENGINEERING APPROACH DIE CASTING AUTOMATION AN INTEGRATED ENGINEERING APPROACH Applied Manufacturing Technologies 219 Kay Industrial Drive, Orion, MI 48359 (248) 409-2100 www.appliedmfg.com 2 Die Casting Automation: An Integrated

More information

Determining The Right Lift Truck Navigation System. For Your Very Narrow Aisle (VNA) Warehouse

Determining The Right Lift Truck Navigation System. For Your Very Narrow Aisle (VNA) Warehouse Determining The Right Lift Truck Navigation System For Your Very Narrow Aisle (VNA) Warehouse Determining The Right Lift Truck Navigation System For Your Very Narrow Aisle (VNA) Warehouse Today s pressures

More information

Industrial Automation. Course Notes

Industrial Automation. Course Notes Industrial Automation Course Notes David O Sullivan Universidade do Minho May 2009 Syllabus Automation technologies; Manufacturing operations; Industrial control systems; Hardware components for automation;

More information

Masters of Business Administration MBA Semester 2 MB0044 Production & Operations Management Assignments

Masters of Business Administration MBA Semester 2 MB0044 Production & Operations Management Assignments Spring 2014 Exam July/Aug2014 Masters of Business Administration MBA Semester 2 MB0044 Production & Operations Management Assignments Q. No 1 Explain briefly elements of operations strategy? Ans.1 Operations

More information

Understanding Operations Management The Open University (2011)

Understanding Operations Management The Open University (2011) Understanding Operations Management The Open University (2011) 3 The transformation model 3.1 The transformation model The discussion above has highlighted the role of operations in creating and delivering

More information

15. How would you show your understanding of the term system perspective? BTL 3

15. How would you show your understanding of the term system perspective? BTL 3 Year and Semester FIRST YEAR II SEMESTER (EVEN) Subject Code and Name BA7201 OPERATIONS MANAGEMENT Faculty Name 1) Mrs.L.SUJATHA ASST.PROF (S.G) 2) Mr. K.GURU ASST.PROF (OG) Q.No Unit I Part A BT Level

More information

Nothing runs. modern system report. On its Iowa manufacturing campus, John Deere. is using AGVs to move tractor cabs down the

Nothing runs. modern system report. On its Iowa manufacturing campus, John Deere. is using AGVs to move tractor cabs down the Nothing runs like an AGV On its Iowa manufacturing campus, John Deere is using AGVs to move tractor cabs down the assembly line. The result has been savings in labor, a safer work environment and improved

More information

Tips for Eliminating and Controlling MSD Hazards

Tips for Eliminating and Controlling MSD Hazards Tips for Eliminating and Controlling MSD Hazards Force Gripping tools/equipment Provide tools that allow workers to grip the tool using a power grip Eliminate the use of pinch or key grips as much as possible

More information

The Training Material on Logistics Planning and Analysis has been produced under Project Sustainable Human Resource Development in Logistic Services

The Training Material on Logistics Planning and Analysis has been produced under Project Sustainable Human Resource Development in Logistic Services The Training Material on Logistics Planning and Analysis has been produced under Project Sustainable Human Resource Development in Logistic Services for ASEAN Member States with the support from Japan-ASEAN

More information

Memberships. W.F. Welding & Overhead Cranes Ltd. Since 1986. W.F. Welding & Overhead Cranes. 1-200 Ton Overhead Cranes. Jib Cranes.

Memberships. W.F. Welding & Overhead Cranes Ltd. Since 1986. W.F. Welding & Overhead Cranes. 1-200 Ton Overhead Cranes. Jib Cranes. Memberships Canadian Standards Association (CSA) W.F. is approved by the Canadian Welding Bureau and certified to CSA standard W47.1-03-Division 1. Other memberships include: W.F. Welding & Overhead Cranes

More information

Implementing Automation after Making Lean Improvements

Implementing Automation after Making Lean Improvements Implementing Automation after Making Lean Improvements Frank C. Garcia, P.E., Director Business Solutions & Engineering Services Tom Lawton, President Advent Design Corporation Bristol, PA, USA December

More information

Chapter 5 Supporting Facility and Process Flows

Chapter 5 Supporting Facility and Process Flows Chapter 5 Supporting Facility and Process Flows Process View of a Hospital Process Performance Inventory Turns Process Flow Structures 1 Definition of a Business Process A process is a set of activities

More information

Warning: This document may be duplicated for instructional use within the institution purchasing the case. Other duplication is prohibited.

Warning: This document may be duplicated for instructional use within the institution purchasing the case. Other duplication is prohibited. Title: Case Study: Automobile Final Assembly Plant Date approved for distribution: October 5, 1997 Authors: and Mikell P. Groover Professor of Industrial and Manufacturing Systems Engineering Michael G.

More information

Chapter 11. MRP and JIT

Chapter 11. MRP and JIT Chapter 11 MRP and JIT (Material Resources Planning and Just In Time) 11.1. MRP Even if MRP can be applied among several production environments, it has been chosen here as a preferential tool for the

More information

Process Flow Analysis of Diesel Engine Crankshaft Machining Line Layout

Process Flow Analysis of Diesel Engine Crankshaft Machining Line Layout Process Flow Analysis of Diesel Engine Crankshaft Machining Line Layout Mahesh R Kale 1, Prof. V.S. Jadhav 2 PG Student, Department of Mechanical Engineering, Government College of Engineering, Karad,

More information

Bringing good things ahead

Bringing good things ahead Bringing good things ahead Whatever your logistic needs, we can offer a conveyor solution. Our flexible systems primary and secondary packaging for single and multi packages, can transport your goods from

More information

Factory Physics: The Key to Green Industries

Factory Physics: The Key to Green Industries Factory Physics: The Key to Green Industries College of Engineering and Architecture - College Days 2012 EXHIBIT: Greening Industries Student Chapter Philippine Institute of Industrial Engineers (PIIE)

More information

Installation and Maintenance Manual for SPANCO Freestanding Modular Bridge Cranes & Monorails

Installation and Maintenance Manual for SPANCO Freestanding Modular Bridge Cranes & Monorails Manual No. 103-0045 REV. 12/08 Installation and Maintenance Manual for SPANCO Freestanding Modular Bridge Cranes & Monorails ISO 9001 REGISTERED 2 TABLE OF CONTENTS Important Dimensions for Modular Bridge

More information

Production and Operations Management

Production and Operations Management Production and Operations Management Norman Gaither Greg Frazier 1996 Wadsworth Publishing Company Chapter 1 Production and Operations Management (POM): An Introduction Overview Introduction Factors Affecting

More information

The Reliable Outsource

The Reliable Outsource The Reliable Outsource Machining of complex, precision parts up to a 7-foot cube and 14,000 pounds Vertical turning capacity from 30" to 84" diameter Horizontal turning capacity up to 36" diameter and

More information

WORK MEASUREMENT APPROACH FOR PRODUCTIVITY IMPROVEMENT IN A HEAVY MACHINE SHOP

WORK MEASUREMENT APPROACH FOR PRODUCTIVITY IMPROVEMENT IN A HEAVY MACHINE SHOP 5 th International & 26 th All India Manufacturing Technology, Design and Research Conference (AIMTDR 2014) December 12 th 14 th, 2014, IIT Guwahati, Assam, India WORK MEASUREMENT APPROACH FOR PRODUCTIVITY

More information

Fredriksons conveyor systems handle goods with a width from 20 mm up to 600 mm.

Fredriksons conveyor systems handle goods with a width from 20 mm up to 600 mm. Conveyor Solutions Whatever your logistic needs, we can offer a conveyor solution. Our flexible systems primary and secondary packaging for single and multi packages, can transport your goods from one

More information

Professor: Rafael Falcão

Professor: Rafael Falcão Professor: Rafael Falcão Ementa 1. Sistemas de Manufatura 2. Linhas de Montagem 3. Sistemas Seriais 4. Scheduling 5. Manufatura Integrada por Computador 6. Projeto e Engenharia Assistidos por Computador

More information

white paper JANUARY 2011 The Next- Warehouse Scanning and the Emergence of 2D Bar Codes

white paper JANUARY 2011 The Next- Warehouse Scanning and the Emergence of 2D Bar Codes JANUARY 2011 The Next- Generation Warehouse Long Range Scanning and the Emergence of 2D Bar Codes Table of Contents Introduction...3 Bar coding basics...4 Bar coding in the warehouse...4 Warehouse application

More information

COMPUTER INTEGRATED MANUFACTURING

COMPUTER INTEGRATED MANUFACTURING CHAPTER COMPUTER INTEGRATED MANUFACTURING 1 An overview of CIM is presented in this chapter. A brief account of the evolution of CIM is included. The major functions carried out in a manufacturing plant

More information

Whiting Equipment Canada Inc. Whiting Overhead Cranes

Whiting Equipment Canada Inc. Whiting Overhead Cranes Whiting Equipment Canada Inc. Whiting Overhead Cranes Whiting Overhead Cranes HANDLING INDUSTRY S TOUGHEST JOBS IN 1884 WHEN NORTH AMERICA WAS JUST BEGINNING TO FLEX ITS MANUFACTURING AND ECONOMIC MUSCLES,

More information

Process Layout Chapter 8

Process Layout Chapter 8 Process Layout Chapter 8 L L M M D D L L M M D D L L M M G G L L A A G G A A G G How Process Layout fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project

More information

Batching and Mixing Plants

Batching and Mixing Plants Batching and Mixing Plants Technique Strength Results Ready-mix plant with sheeted, square steel in-line bins. Precast and pipe factory with concrete in-line bins and bucket elevator. Individual solutions

More information

Slotting Techniques. Stephen Higgs Director, Warehouse Operations SYSCO Corporation

Slotting Techniques. Stephen Higgs Director, Warehouse Operations SYSCO Corporation 1 Slotting Techniques Stephen Higgs Director, Warehouse Operations SYSCO Corporation 2 Discussion Points Roles and Responsibilities Goals of Effective Slotting Slotting Tool Physical Layout and Rack Types

More information

Optimizing Sortation Throughput in High Volume Distribution Centers

Optimizing Sortation Throughput in High Volume Distribution Centers Optimizing Sortation Throughput in High Volume Distribution Centers From the pre merge through sortation, the FlexSort integrated sortation sub systemrecently released by Dematic is redefining efficiency

More information

COMPUTER INTEGRATED MANUFACTURING

COMPUTER INTEGRATED MANUFACTURING COMPUTER INTEGRATED MANUFACTURING 1. INTRODUCTION: Computer Integrated Manufacturing () encompasses the entire range of product development and manufacturing activities with all the functions being carried

More information

AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS

AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS Integrity, Reliability and Failure of Mechanical Systems Paper Ref: 3927 AN INDUSTRIAL APPLICATION OF THE SMED METHODOLOGY AND OTHER LEAN PRODUCTION TOOLS Eric Costa 1(*), Rui Sousa 1, Sara Bragança 1,

More information

The Evolution of Goods-to-Person Order Fulfillment

The Evolution of Goods-to-Person Order Fulfillment The Evolution of Goods-to-Person Order Fulfillment How to Meet Distribution Operations Challenges in the Age of E-Commerce By Thompson Brockmann February 2014 Principal, Tompkins International Introduction

More information

PALLETS ROLLER CONVEYOR LOADING CONVEYOR CHAIN TRANSFER TURNTABLE ROLLER STOP

PALLETS ROLLER CONVEYOR LOADING CONVEYOR CHAIN TRANSFER TURNTABLE ROLLER STOP AUGUST 12, 2014 INDEX 04 07 04 06 EMITTER REMOVER 07 08 10 12 14 BOXES BELT CONVEYOR BELT CONVEYOR GATE STRAIGHT SPUR CONVEYOR CONVEYOR SCALE 16 17 18 19 20 22 24 26 ALIGNERS WHEEL ALIGNER BRACKET CHUTE

More information

Federal Wage System Job Grading Standard for Powered Support Systems Mechanic, 5378. Table of Contents

Federal Wage System Job Grading Standard for Powered Support Systems Mechanic, 5378. Table of Contents Federal Wage System Job Grading Standard for Powered Support Systems Mechanic, 5378 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 GRADES... 2 TITLES... 3 HELPER AND INTERMEDIATE JOBS... 3 NOTE

More information

Six Steps To Optimized Order Fulfillment

Six Steps To Optimized Order Fulfillment Six Steps To Optimized Order Fulfillment White Paper How to properly classify, sort and store inventory in the correct storage systems automated and otherwise to increase throughput and reduce costs associated

More information

Position Description Questionnaire

Position Description Questionnaire Position Description Questionnaire To the Employee: This written information is of great value in understanding and evaluating the duties and responsibilities of the job that you presently hold. These

More information

CIM Computer Integrated Manufacturing

CIM Computer Integrated Manufacturing INDEX CIM IN BASIC CONFIGURATION CIM IN ADVANCED CONFIGURATION CIM IN COMPLETE CONFIGURATION DL CIM A DL CIM B DL CIM C DL CIM C DL CIM B DL CIM A Computer Integrated Manufacturing (CIM) is a method of

More information

times, lower costs, improved quality, and increased customer satisfaction. ABSTRACT

times, lower costs, improved quality, and increased customer satisfaction. ABSTRACT Simulation of Lean Assembly Line for High Volume Manufacturing Hank Czarnecki and Nicholas Loyd Center for Automation and Robotics University of Alabama in Huntsville Huntsville, Alabama 35899 (256) 520-5326;

More information

MANAGING MANUAL HANDLING A Guide for Managers and Heads of Departments

MANAGING MANUAL HANDLING A Guide for Managers and Heads of Departments MANAGING MANUAL HANDLING A Guide for Managers and Heads of Departments HEALTH & SAFETY UNIT SPRING 2006 CONTENTS INTRODUCTION...2 REGULATION...2 WHAT IS MANUAL HANDLING?...2 RESPONSIBILITIES...2 STRATEGY...2

More information

Chapter 16 Inventory Management and Control

Chapter 16 Inventory Management and Control Chapter 16 Inventory Management and Control We shall be interested primarily in the control of material in manufacturing. Actually, we are concerned with the control of the flow of material from a raw

More information

OPIM 631 Note on Process Analysis 1

OPIM 631 Note on Process Analysis 1 The Wharton School Quarter II The University of Pennsylvania Fall 1999 OPIM 631 Operations Management: Quality and Productivity Note on Process Analysis Introduction 1 In this course, we look at organizations

More information

Manufacturing Planning and Control

Manufacturing Planning and Control 1 Chapter Manufacturing Planning and Control The manufacturing planning and control (MPC) system is concerned with planning and controlling all aspects of manufacturing, including managing materials, scheduling

More information

Product, process and schedule design II. Chapter 2 of the textbook Plan of the lecture:

Product, process and schedule design II. Chapter 2 of the textbook Plan of the lecture: Product, process and schedule design II. Chapter 2 of the textbook Plan of the lecture: Process design Schedule design INDU 421 - FACILITIES DESIGN AND MATERIAL HANDLING SYSTEMS Product, process and schedule

More information

Housekeeping and Material Storage

Housekeeping and Material Storage 29CFR 1926.20(b)-Accident Reduction, 29CFR 1926.21- Safety Training & Education 29CFR 1926.20(a)-Unsafe Working Conditions Housekeeping and Material Storage Preparation 1. Read Applicable Background information

More information

TOWER BETON - VERTICAL BATCHING AND MIXING PLANTS CONCRETE BATCHING PLANTS

TOWER BETON - VERTICAL BATCHING AND MIXING PLANTS CONCRETE BATCHING PLANTS TOWER BETON - VERTICAL BATCHING AND MIXING PLANTS CONCRETE BATCHING PLANTS TOWER BETON Meeting the demands of customers needs and applying the most modern technology is what SIMEM focused on while designing

More information

HOW TO STORE MORE IN LESS SPACE and

HOW TO STORE MORE IN LESS SPACE and HOW TO STORE MORE IN LESS SPACE and 25 PRODUCTIVITY TIPS FOR WAREHOUSING AND MATERIAL HANDLING www.shelfplus.com 800-838-0473 SPACE PRODUCTIVITY Nothing is so useless as doing efficiently that which should

More information

Chapter 5. Process design

Chapter 5. Process design Chapter 5 Process design Slack et al s model of operations management Direct Product and service design Design Operations Management Deliver Develop Process design Location, layout and flow Key operations

More information

PLC Based Liquid Filling and Mixing

PLC Based Liquid Filling and Mixing PLC Based Liquid Filling and Mixing 1 Mihir Panchal, 2 Aashish Panaskar. 3 Prof. Lalit Kumar KJ College of Engineering and Management Research, Pune, India Abstract: The objective of this paper is to design,

More information

Automated Bottle Filling System

Automated Bottle Filling System Automated Bottle Filling System Bipin Mashilkar 1, Pallavi Khaire 1, Girish Dalvi 1 1 Assistant Professor, Department of Mechanical Engineering, Fr.C.Rodrigues Institute of Technology, Maharashtra, India

More information

PROGRAMMING TECHNIQUES. Chapter 5(Part 2)

PROGRAMMING TECHNIQUES. Chapter 5(Part 2) PROGRAMMING TECHNIQUES Chapter 5(Part 2) LEARNING OUTCOME At the end of this lesson, students will be able to: Understand the different types of planning techniques. Understand the network analysis. Formulate

More information

Occupational Safety & Health Council

Occupational Safety & Health Council Occupational Safety & Health Council GUIDANCE NOTES ON MANUAL HANDLING OPERATIONS dìáç~ååé=kçíéë=çå=j~åì~ä=e~åçäáåö=lééê~íáçåë 63 qüáë=dìáç~ååé=kçíéë=áë=áëëìéç=ñêéé=çñ=åü~êöé=~åç=å~å=äé=çäí~áåéç=ñêçã çññáåéë=çñ=íüé=lååìé~íáçå~ä=p~ñéíó=~åç=eé~äíü=_ê~ååük==fí=å~å=~äëç=äé=ççïåäç~çéç

More information

A Diagnostic Approach to Scheduling

A Diagnostic Approach to Scheduling Harish C Bahl * Neelam Bahl California State University, Chico, CA, U.S.A. Several algorithms and methodologies have been proposed for a variety of environments. In this paper, we suggest a diagnostic

More information

Management Information System Prof. Biswajit Mahanty Department of Industrial Engineering & Management Indian Institute of Technology, Kharagpur

Management Information System Prof. Biswajit Mahanty Department of Industrial Engineering & Management Indian Institute of Technology, Kharagpur Management Information System Prof. Biswajit Mahanty Department of Industrial Engineering & Management Indian Institute of Technology, Kharagpur Lecture - 02 Introduction Part II Welcome to all of you

More information

CNC ANGLE LINE OVERVIEW

CNC ANGLE LINE OVERVIEW CNC Angle Line The Ocean Clipper CNC ANGLE LINE OVERVIEW IS THE OCEAN CLIPPER CNC ANGLE LINE THE RIGHT ANGLE LINE FOR ME? This American made clip angle processing machine has been especially designed for

More information

High Capacity Hot Air Dryer

High Capacity Hot Air Dryer High Capacity Hot Air Dryer MADE IN AUSTRIA autumn 2015 www.zimmer-austria.com page 1 Hot air dryer type: Compact HC The modular construction of the high efficiency and powerful hot air nozzle dryer is

More information

OUTCOME 1 TUTORIAL 1 - MECHATRONIC SYSTEMS AND PRODUCTS

OUTCOME 1 TUTORIAL 1 - MECHATRONIC SYSTEMS AND PRODUCTS Unit 57: Mechatronic System Unit code: F/601/1416 QCF level: 4 Credit value: 15 OUTCOME 1 TUTORIAL 1 - MECHATRONIC SYSTEMS AND PRODUCTS 1. Understand the applications of a range of mechatronic systems

More information

Presentation of. factory at Segmon, Grums municipal.

Presentation of. factory at Segmon, Grums municipal. Presentation of factory at Segmon, Grums municipal. Office building Office building Office building Storehouse Space for annex Preparatory work with plinths for the extension of sheet metal building by

More information

Automated Receiving. Saving Money at the Dock Door. Page 8

Automated Receiving. Saving Money at the Dock Door. Page 8 Automated Receiving Saving Money at the Dock Door Page 8 Today s warehouse management and automated sortation systems are far easier to integrate than in the past. As a result, distribution centers are

More information

Belt Tensioning Methods for Small Package Conveyors What s the best solution?

Belt Tensioning Methods for Small Package Conveyors What s the best solution? Belt Tensioning Methods for Small Package Conveyors What s the best solution? Industrial White Paper By: Michael A. Hosch, P.E. Dorner Mfg. Corp. 975 Cottonwood Avenue Hartland, WI 53029 USA Phone: 800

More information

Flexible Manufacturing System

Flexible Manufacturing System Flexible Manufacturing System Introduction to FMS Features of FMS Operational problems in FMS Layout considerations Sequencing of Robot Moves FMS Scheduling and control Examples Deadlocking Flow system

More information

WHITE PAPER February 2012 Warehouse Bar Code or Voice Pick Label and Sign Installation: 6 Steps to Successful Installation

WHITE PAPER February 2012 Warehouse Bar Code or Voice Pick Label and Sign Installation: 6 Steps to Successful Installation WHITE PAPER February 2012 Warehouse Bar Code or Voice Pick Label and Sign Installation: 6 Steps to Successful Installation An ID Label Inc. White Paper 1 Table of Contents Page Successful Warehouse Label

More information

Quality and Quality Control

Quality and Quality Control 1 Quality and Quality Control INSPECTION Inspection is the most common method of attaining standardisation, uniformity and quality of workmanship. It is the cost art of controlling the product quality

More information

ARCO Electric Products Installation and Maintenance Manual Low Voltage Automatic Power Factor Correction Capacitor Systems 2013

ARCO Electric Products Installation and Maintenance Manual Low Voltage Automatic Power Factor Correction Capacitor Systems 2013 ARCO Electric Products Installation and Maintenance Manual Low Voltage Automatic Power Factor Correction Capacitor Systems 2013 READ CAREFULLY These instructions are intended to cover good practices in

More information

3D SCANNING: A NEW APPROACH TOWARDS MODEL DEVELOPMENT IN ADVANCED MANUFACTURING SYSTEM

3D SCANNING: A NEW APPROACH TOWARDS MODEL DEVELOPMENT IN ADVANCED MANUFACTURING SYSTEM 3D SCANNING: A NEW APPROACH TOWARDS MODEL DEVELOPMENT IN ADVANCED MANUFACTURING SYSTEM Dr. Trikal Shivshankar 1, Patil Chinmay 2, Patokar Pradeep 3 Professor, Mechanical Engineering Department, SSGM Engineering

More information

Steelworks Design Inc. Corporate Resume

Steelworks Design Inc. Corporate Resume Steelworks Design Inc. Corporate Resume Steelworks Design is a trusted partner to world-class manufacturers in the Nuclear, Pharmaceutical, Food & Beverage, Automotive and General Industry. Our specialties

More information

Work Cells and Cellular Manufacturing

Work Cells and Cellular Manufacturing Work Cells and Cellular Manufacturing Improving the fitness of the factory 1 Cellular Manufacturing Concept of performing all of the necessary operations to make a component, subassembly, or finished product

More information

NAPCS Product List for NAICS 54134: Drafting Services

NAPCS Product List for NAICS 54134: Drafting Services NAPCS List for NAICS 54134: Drafting Services National 54134 1 Drafting Producing detailed layouts, plans, drawings, illustrations, graphics or models based on engineering or architectural specifications,

More information

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built

More information

PRODUCTION AND OPERATIONS MANAGEMENT

PRODUCTION AND OPERATIONS MANAGEMENT 1 PRODUCTION AND OPERATIONS MANAGEMENT Introduction Product. Production. Management. Production and Operations Management an Overview. Definition of Production Operations Management. Objectives of Production

More information

IELTS General Training Reading Task Type 5 (Matching Headings) teacher s notes

IELTS General Training Reading Task Type 5 (Matching Headings) teacher s notes teacher s notes Description An activity to introduce how to choose headings for paragraphs of a text, focusing on forming a main idea using language students understand and ignoring unknown words Time

More information

MODERN SHIPBUILDING PRACTICE

MODERN SHIPBUILDING PRACTICE MODERN SHIPBUILDING PRACTICE GROUP TECHNOLOGY/PWBS/IPC GT is not new Has only had limited application in shipyards. Typical uses have been structural part variety reduction and development of pipe piece

More information

REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO

REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO Advantages of Port Lobito (1) Predominant geological locations Facing the Atlantic, Port Lobito locates around 30km north to Beguela City, and it

More information

Seradex White Paper. Using Project Management Software for Production Scheduling. Software Selection Spectrum

Seradex White Paper. Using Project Management Software for Production Scheduling. Software Selection Spectrum Seradex White Paper A Discussion of Issues in the Manufacturing OrderStream Using Project Management Software for Production Scheduling Frequently, we encounter organizations considering the use of project

More information

Material Flow Tracking

Material Flow Tracking Material Flow Tracking Product description ABF Industrielle Automation GmbH Deggendorfstraße 6 A-4030 Linz +43 (0)732 304030 0 office@abf.co.at www.abf.at Gustav Buchberger;Christian Hiebl 18.2.2015 Contents

More information

The Complete KASTO Program: Economic Sawing and Storing of Metal.

The Complete KASTO Program: Economic Sawing and Storing of Metal. The Complete KASTO Program: Economic Sawing and Storing of Metal. Expertise right down the line. For over 170 years, KASTO has been recognized for quality and innovation, and offers a complete range of

More information

all VAC LIFT ALL-VAC-LIFT Phone + 1.832.615.9110 4621 Redstart Street www.vac-lift.com Fax + 1.832.201.9101

all VAC LIFT ALL-VAC-LIFT Phone + 1.832.615.9110 4621 Redstart Street www.vac-lift.com Fax + 1.832.201.9101 ergonomic FORKLIFT vacuum ATTACHMENTs FOR ALL MATERIALS HANDLING FOR LIFTING METAL, WOOD, PLASTIC, STONE, CONCRETE, PAPER, AND MORE In Warehousing, Order Picking, Palletizing, Loading, Conveying, Production.

More information