Chapter 11. MRP and JIT
|
|
- Rolf Clarke
- 7 years ago
- Views:
Transcription
1 Chapter 11 MRP and JIT (Material Resources Planning and Just In Time) MRP Even if MRP can be applied among several production environments, it has been chosen here as a preferential tool for the management of diversified production called job shop production. This method is based on master production planning (forecasts and confirmed orders) which is transposed in the operational objectives of this plan which are the Purchase orders for the components or raw materials and the work orders for the resources (men and machines). To compute this method, a lot of basic data is required: - the detailed bill of material of every product; - the furnisher s delay and production lead time for every product; - the routes (resource requirements). Time has been spent before reaching the sufficient computing capacities required to optimise a system with such a philosophy. The result is a noticeable improvement in productivity as the right component arrives at the right time on the right machine operated by the right human resources. Workshop managers do not have anymore to run and look after missing parts and purchasers don not have to follow and pay for urgent orders. Everybody can do his or her own job without stress and with real added value. MRP is a closed loop system. The scheduling (list of jobs and operations achieved within a time limit) is effectively applied after a test of availability. MRP I = first generation = availability of components MRP II = 2 nd generation = availability of components and resources.
2 The input of the system is the master production planning which is based on the forecasts which are transformed in successive steps of production which is called the master production schedule. This transformation is different either if the system only works on confirmed orders or for stock (order anticipation) or a mixed system. In the first case, starting from confirmed orders, usually a few months horizon is taken into account and is transformed into a master production schedule for a few weeks. In the second one, the production forecasts graph curve is smoother with stock which acts as buffers and the master production planning is transformed in a weekly master production schedule. In the third and last case, confirmed orders and forecasts are mixed. In example, if we want to determine the master production schedule in January, we have to take into account the confirmed orders for March and we know that we will have some more which can be estimated with the forecasts. The master production planning will be composed by confirmed orders and forecasts orders which will change their status in time. This will have an impact on the stock of some items as some will be dedicated for confirmed orders and others for forecast orders requiring confirmation. In this case, they could be used in urgent cases System implementation Different functions : - The master production planning must be set-up according to the order-book. Module Master Production Planning - The master production planning must be transformed into components and raw materials gross needs. Module Needs Calculation - Gross needs must be compared with the stock to determine what should be purchased or produced. Module Stock or Inventory Management. - Operations must be scheduled, either for purchase orders or work orders. Module MRP - Production schedule must be compared to the capacity available. Module Capacity or Work Centers Management - Work order must be sent followed. Module Workshop Management
3 Links between these functions Production Objectives Master Production Planning Needs Calculation Materials Scheduling If problem Capacity Scheduling NO Capacities YES Material Scheduling Execution Capacity Scheduling Execution If problem
4 Required data In a computised system, required data is organized into databases allowing automatic up-dates: if one characteristic changes, this modification will be automatically affect every required file. (1) The module master production planning is made of the order-book or the production forecasts and objectives. In example : A factory producing a range of products A, B, C, D requiring respectively 2, 4, 1 and 5 units of production capacity. The production planning can be translated into equivalent production units. January February March April This planning can be transformed in a production schedule for each items during March. Week 1 Week 2 Week 3 Week 4 A B C D Kinds of schedule for product A. Week 1 Week 2 Week 3 Week 4 A (1) A (2) A (3) April Needs Schedule (1) follows the needs (2) is composed of economic lots (i.e. : 60) (3) is following an economic period (i.e. : 3 weeks) Result: A master production schedule for A
5 (2) The module Needs calculation is linked to the bill of material, it means to the structure of every product. If product A is made 2 X and 1 Y and X is a 15 cm long milled piece made from a Gross bar of X. X A 2 1 Y A is a first level product X : first level component Gross X : second level component Gross X Every component must be identified in a unique way and according to its structure. The master production planning of A gives the gross needs for A, X, Y and Gross X. Then, by checking what is available or not in the stocks for every item, it will be possible to determine the net needs. (3) The module inventory or stock management is feed by : - a status giving the information if the item is purchased or manufactured - the stock level for every item - the purchase delay or the production lead time for every item - the different furnishers (with different delays) (4) The module MRP is feed by the need calculation and the purchase delay and production lead time. It can be illustrated as follows: T3 T2 T1 T0 Where : M1 M2 M3 M4 D Time T4 D = order delay T1 = lead time to assemble X and Y to make A T2 = lead time to mill Gross X to get X T3 = delay to get Gross X from the furnisher T4 = delay to get Y from the furnisher To = delay for transport and packaging
6 Starting from D, we can determine the latest moment to take action either to purchase the components or to launch the production up to final assembling. Another way would have be to start all operations as soon as possible and to determine the soonest moment when A can be available. By principle, the latest operation should take place before the expected dead line for distribution, if so there is a problem. In both cases, the output of this system is a list of time and actions either for purchasing or manufacturing. Up to now, we thought it was possible to schedule whenever we want a manufacturing or an assembling operation. In the case of MRP I the result was reached at that step. It was an infinite capacity scheduling. An improvement consisted in taking into account the fact that the capacity is limited (finite capacity scheduling). It means that if the module that estimates the gross requirements show us that it is time to mill pieces from X gross at M2, we have to check that one or several milling machines and one or more operators are available to do the job at M2. (5) The capacity scheduling module He is feed by : - the already planned load; - the maximum load available according to the timetable of each work or process centre; - the capacity required by each job in every work or process centre. Maximum capacity Time 100% 50% Load to schedule Histogram of the scheduled load In the above scheme, we notice that the load to be scheduled cannot be realized before week 3 (at least if we do not want to cut it)
7 (6) Execution of the load schedule and the material schedule Follow-up in the workshop Whatever the production systems or the operations management are, after the launching of the operations and the tasks (which is the last step of the scheduling), it is necessary to check the gaps between what has been planned and what has been realized effectively. It is in the workshop or at the shipyard that the information will be found regarding the execution of what has been scheduled. The most modern system consist in catching in the information system the number of the job, the number of the route, the number of the worker and the beginning and the end of this operation. It allows to check the matching with material planning status and consequently the delay, the lead-time and the costs. It is obvious that the observed gaps have an influence on the global delay of the analysed order and its cost, but also on other ulterior phases of the order or this particular operation itself. A delay in the manufacturing of a component in a system managed by a MRP will influence the starting date of the final assembling in example. Stocks follow-up As well as the execution status of the load planning, the material planning must be followed-up in order to ensure the necessary feed-back. So, the software must be run with a defined frequency to look at the consequences on the expected planning and the gaps in the workshop or in the stock. It will stop the team from doing nothing whilst waiting for a missing component. Such as during the simulation of the software, this component has been shown as an alarm and the assembling schedule cannot be made on time and why. Consequently, the manager will have few options : - delay in assembling, - find another way to buy or to manufacture the component, - change the schedule in order to avoid the delay (extra-hours). The simulation frequency to adjust the scheduling, the way the gaps are treated are the characteristics of the chosen software. It is evident that if you are not in the best situation wherein the gaps cannot be directly found in an integrated system, the principle which consist in evaluating the execution time in the workshop and taking into account the gaps to adapt the scheduling of the next operation is still worthwhile.
8 The reactivity of the system will not be as good, because the manager will be dealing with manual time consuming situation. Moreover, a manual system will not allow you to see all the consequences of a delay or a machine breakdown on everything that has been planned. We will often found ourselves in emergency situations: such as searching for pieces or dealing with all the operational changes with all the added costs that involves.. Example showing the material requirement planning technique. Gearbox Master planning Stock level Crammings Available : 16 units Order to be received : 20 units (week 3) Purchase delay : 5 weeks Economic purchase quantity : 20 units Bill of material Crammings x 2 Master production schedule for purchase Gross needs Available Order launch 20 Order reception 20 20
9 11.3 Evolution of operations management : From Taylor to World Class Manufacturing Introduction Ford and Taylor have given a lot to operations management in order to respond to an explosion of the needs in a world economy wherein demand was bigger than supply. Their growing productivity was sufficient to face demand which was continuously on the increase, in order to improve the average standard of living. The other side of the coin was for a lot of people, monotonous and repetitive task in which the global purpose was difficult to find. Charlie Chaplin in his film called Modern Times splendidly portrayed the excess of this scientific operations management. What were the characteristics of this kind of organisation? The words specialization and work division are those which characterize the contribution of Ford and Taylor in the best way. At that time, beginning of the 20 th century, only unqualified workforces were available. Factories had to train workers in a few simple repetitive tasks, leading to a production process based on a line design. Research and design, technical and administrative activities were centralized. Methods office was forwarding precise work orders. As the economic and social situation has changed, mainly from a system were what was produced was sold to a situation where it was not possible to sell what had been produced. The supply was bigger than demand. The power had changed from producer to customer. Competition has become tough, quality requirements as well Moreover, simple and repetitive tasks began to be automated. Technical progress had allowed this automation and the increase in labour costs has made it desirable and cost effective. Consequently, many parameters have converged : - automation - increase of flexibility constraints, costs on production quality - education level and so workers wishes
10 It leads to new kinds of organisations : Work enrichment Aggregation of coherent activities were implemented : instead of a big factory manufacturing a wide range of products, an accumulation of standalone profit centres or business units manufacturing each a defined range of products. It implied that some technical or management functions had to be decentralized. Notions of internal customers, customer-supplier relationships between teams located upstream and downstream appeared Total quality management (TQM) Quality is a competitive advantage. Quality is no more seen as only a function of quality control at the end of the line of production, but as a process which leads to enhancing all the factory departments: from the receipt of the raw materials and components, through the production steps and administrative procedures, delay respect, norms and specifications, afters sales service, documentation, etc. (Confer Chapter 13) Just in Time (JIT) JIT is an operations management philosophy which is based on delay reduction in every part of the production in order to reach the optimal results. These will be reached if the system gives to each operator, at every step of the process, every component or tool that it needs at the right time and place. The operational result is a reduction of the semi-finished products, inventories of raw materials or components and finished products and a shorter delays. This stock reduction allows financial economies on the invested capital and also on stock handling and stock management. To illustrate these results, just think about an automotive assembly-line. In the past, there were a stock of seats wherein seats were picked up according to the customer s order established two months earlier in the dealer s office.
11 Now, the car which is ordered by the dealer on the day X is entering the assembly-line on day X The bar code which identifies it, is read and the order for the required seat is send to the seat supplier which is located a few kilometres from the factory. This supplier has got a few hours to dressed the seat, to transport it and carry it close to the assembly-line where it should be assembled. There is only a limited stock of seats, but there is a continuous flow of trucks between the supplier and the automotive factory. We can imagine what the consequences are, if anything happens in such a scenario: a strike in the transport field can directly stop the factory activities, but also a few defective seats can disorganize the whole chain, as well as being in advance or too late in the assembling planning. So, the link with total quality management seems necessary, as well as inside the chain itself or externally in the supplier s organization. In the end, it is obvious that the suppliers cannot start such a partnership without a warranty of their production level. The reason why JIT is more than an operations management theory is because it includes different aspects such as lead-time reduction, total quality, supply chain integration from the suppliers up to the distributors. Consequently, the aim is to adjust the production time of the good as close as possible to the moment when the need appears. The outcomes are the increase of competitiveness and cost reduction : - the customers needs are more easily met due to the fact they have got the choice in a wider range of products within shorter period. - efficiency, flexibility and maximal productivity - enrichment of industrial work - waste reduction As we have seen, several conditions are required to develop such a concept, short production lead time, strict respect of the quantities, no stand-by or waste of time, no temporary stock between operations, equipment reliability, production quality and multiskilled human resources. Just in time will be possible only if we analyse the lay-out of the factory, if we adapt the tools, if the human resources are educated
12 As we have noticed, JIT is not an operations management method even if it is linked o a concept such as KANBAN. KANBAN is only a scheduling process based on the following concept. In a production sequence, jobs are launched during the phase X according to the needs of the next phase X+1 and so at the end according to the customer s orders or expeditions. This system, KANBAN, is performing for a continuous or regular production for which the lead time has been studied (it means that the an average constant rhythm has been defined and the load of the work centres has been balanced, and so the number of KANBAN cards between two work centres has been fixed). In such a situation, where there are few variations, wherein the short and long terms management functions are performed, KANBAN can achieve to regulate the system by itself. In other situations, KANBAN has to be combined with a long and middle terms planning device. Even if the process is led by the KANBAN inside the workshop, the quantity to be produced (number of cards) and the right time to produce is send by the planning software. Consequently, the system which is often combined with JIT is MRP WCM (World Class Manufacturing) The introduction of these 3 concepts (JIT, TQM and Work Enrichment) in the organisations is an essential cultural change to reach World Class Manufacturing (WCM). This cultural change requires above all the sensitisation and the education of the human resource, a reengineering of the lay-out and methods, an involvement of everybody without immediately requiring huge investments in new technologies. In example, to buy a software to manage the production such as an MRP an to believe that this will give directly an amelioration if you do not have a bill of materials, good sequences of operations, correct lead times, if you do not analyse added value operations and useless ones, if you do not squeeze the supplier s delay and the wastes levels, this will only change the costs. A few years after the introduction of JIT and TQM, the Japanese concept of KAIZEN or permanent progress appeared in Europe. This principle is that everybody must continually improve his regular job. The basic idea is that even if the conception of the product is of a good quality, the added value comes also during the production in the workshop and that many improvements can comes there.
13 Consequently, the people who are daily performing the production process are really the best ones to make proposals. It is possible for more complex situations to set-up quality circles or reflection groups. The management must be completely involved during this phase and evaluated on their ability to motivate people to improve the process or on the way they are leading a meeting group. Proposals have to be realized. To do so, decentralized means are needed : budget, technical means, sub-contracting, The OPT method Optimized Production Technology It is worth mentioning the OPT method even though it is rarely used. This Optimized Production Technology method consist in distinguish the critical resources (bottle neck) from non-critical ones and to schedule the critical flow with the highest priority. This philosophy can be summarized in 10 simple rules or in very complicated software composed of a planning module and a resources module. Rules are : 1) The bottle neck capacity is related to the system and not to its own capacity. The bottle neck capacity depends on the other resources. 2) Useful activity and utilization are not similar 3) 1 h more or less on the bottle neck is earned or lost for the whole system 4) 1 extra hour spent on a non-critical resource is useless 5) Bottle neck leads the production flow and the stock level inside 6) The transit batch does not have to be equal to the process batch 7) Batch size can be different and variable on critical and non-critical machines (bigger and smaller respectively) 8) Capacity and priority must be taken into account simultaneously 9) The aim is to balance the flow and not the capacity 10) Sum of individual performances is not equal to the system performance
LOGISTIQUE ET PRODUCTION SUPPLY CHAIN & OPERATIONS MANAGEMENT
LOGISTIQUE ET PRODUCTION SUPPLY CHAIN & OPERATIONS MANAGEMENT CURSUS CONTENTS 1) Introduction 2) Human resources functions 3) A new factory 4) Products 5) Services management 6) The processes 7) Planning
More informationOperations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology Madras
Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology Madras Lecture - 41 Value of Information In this lecture, we look at the Value
More informationUniversidad del Turabo MANA 705 DL Workshop Eight W8_8_3 Aggregate Planning, Material Requirement Planning, and Capacity Planning
Aggregate, Material Requirement, and Capacity Topic: Aggregate, Material Requirement, and Capacity Slide 1 Welcome to Workshop Eight presentation: Aggregate planning, material requirement planning, and
More informationBSCM Sample TEST. CPIM(Certified In Production & Inventory Management) - 1 -
BSCM Sample TEST. 1. Which of the following demand fulfillment approaches typically provides the longest delivery time? A) Engineer-to-order. B) Make-to-order. C) Assemble-to-order. D) Make-to-stock. 2.
More informationGlossary of Inventory Management Terms
Glossary of Inventory Management Terms ABC analysis also called Pareto analysis or the rule of 80/20, is a way of categorizing inventory items into different types depending on value and use Aggregate
More informationPARADIGMS THAT DRIVE COSTS IN MANUFACTURING. The whole purpose of a business enterprise is pretty simple to make a profit by selling
PARADIGMS THAT DRIVE COSTS IN MANUFACTURING The whole purpose of a business enterprise is pretty simple to make a profit by selling products or services to persons who desire those particular goods or
More informationToyota Production System. Lecturer: Stanley B. Gershwin
Toyota Production System Lecturer: Stanley B. Gershwin Primary source: Toyota Production System by Yasuhiro Monden See also: Decoding the DNA of the Toyota Production System by Steven Spear and H. Kent
More informationAppendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8)
Appendix O MANUFACTURING YOUTH APPRENTICESHIP PRODUCTION OPERATIONS MANAGEMENT PATHWAY PRODUCTION OPERATIONS MANAGEMENT (UNIT 8) Pathway: (Unit 8) PAGE 1 OF 17 Unit 8: Pathway 1. Assist to purchase materials
More informationISE 421 QUANTATIVE PRODUCTION PLANNING
ISE 421 QUANTATIVE PRODUCTION PLANNING LECTURE III MRP, MRPII, ERP, APS Dr. Arslan ÖRNEK 2013 2014 Fall Term PRODUCTION PLANNING & SCHEDULING (PP&S) PP&S is one of the most critical activities in a manufacturing
More informationTU-E2020. Capacity Planning and Management, and Production Activity Control
TU-E2020 Capacity Planning and Management, and Production Activity Control Copyright Jari Laine 11/23/2015 Copyright Jari Laine 11/23/2015 Different capacity planning options 1 4 7 10 13 16 19 22 25 28
More informationDependent vs Independent Demand. The Evolution of MRP II. MRP II:Manufacturing Resource Planning Systems. The Modules In MRP II System
MRP II:Manufacturing Resource Planning Systems IE 505: Production Planning Control Lecture Notes* Rakesh Nagi University at Buffalo * Adapted in part from Lecture Notes of Dr. George Harhalakis, University
More informationManufacturing Planning and Control
1 Chapter Manufacturing Planning and Control The manufacturing planning and control (MPC) system is concerned with planning and controlling all aspects of manufacturing, including managing materials, scheduling
More informationLean Manufacturing and Six Sigma
Lean Manufacturing and Six Sigma Research Questions What have we done in the past? What must we do in the future? How do we know these are the correct actions? 1 Lean Definitions Key concepts of lean:
More information8 given situation. 5. Students will discuss performance management and determine appropriate performance measures for an
PRESCRIPTION: 632 OPERATIONS MANAGEMENT This prescription replaces 232 Operations Management. ELECTIVE PRESCRIPTION LEVEL 6 CREDIT 20 VERSION 1 INTRODUCED 2007 AIM PREREQUISITES Students will understand
More informationWhat is Lean Manufacturing?
What is Lean Manufacturing? Levantar March 2012 www.levantar.co.uk info@levantar.co.uk Lean Guides for other sectors are available on our website www.levantar.co.uk e.g. Lean Office, Lean Legal, Lean Engineering
More informationThe problem with waiting time
The problem with waiting time Why the only way to real optimization of any process requires discrete event simulation Bill Nordgren, MS CIM, FlexSim Software Products Over the years there have been many
More informationHISTORY AND INTRODUCTION
HISTORY AND INTRODUCTION I 1 Introduction The APICS dictionary defines the term supply chain as either the processes from the initial raw materials to the ultimate consumption of the finished product linking
More informationChoosing Planning & Scheduling solutions for Metals
Choosing Planning & Scheduling solutions for Metals White Paper The planning and scheduling of metals production presents special problems because of the complexity of the manufacturing process and the
More informationLean enterprise Boeing 737 manufacturing Lean Production System
Student Self-administered case study Lean enterprise Boeing 737 manufacturing Lean Production System Case duration (Min): 45-60 Operations Management (OPs) Lean enterprise Worldwide Case summary: Assembling
More informationTHE BEGINNER S GUIDE TO LEAN
THE BEGINNER S GUIDE TO LEAN Professor Daniel T Jones Lean Enterprise Academy Who am I? Writer Machine and Lean Thinking books Researcher on how to do lean everywhere! Founder of the non-profit Lean Enterprise
More informationERP Meets Lean Management
Meets Lean Management James M. Noblitt, CPIM, CIRM Sr. Management Consultant High-Tech meets No-Tech! Digital Lean Visual Work Orders Push Data Entry Reports Security/Access Data Accuracy Complicated Spread
More informationManagement Information Systems
Faculty of Foundry Engineering Virtotechnology Management Information Systems Classification, elements, and evolution Agenda Information Systems (IS) IS introduction Classification Integrated IS 2 Information
More informationRealizing the Benefits of Finite Capacity Scheduling to Manage Batch Production Systems
Presented at the WBF North American Conference Baltimore, MD, USA 30 April - 4 May 2007 67 Alexander Drive PO Box 12277 Research Triangle Park, NC 27709 +1.919.314.3970 Fax: +1.919.314.3971 E-mail: info@wbf.org
More informationFunctional Area Systems Production / Operation Systems
ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Functional Area Systems Production / Operation Systems Lecture Outline 5, Part 2 ACS-1803 Introduction to Information Systems Examples:
More information26/10/2015. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems
ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Functional Area Systems Production / Operation Systems Lecture Outline 5, Part 2 ACS-1803 Introduction to Information Systems Examples:
More informationChapter 10 Just-in-Time JIT
Chapter 10 Just-in-Time JIT Aims of the Chapter After reading this chapter you should be able to do the following: Appreciate the view that stock is a waste of resources and should be eliminated appreciate
More informationEVERYTHING YOU NEED TO KNOW ABOUT INVENTORY
EVERYTHING YOU NEED TO KNOW ABOUT INVENTORY Introduction Inventory is considered the necessary evil of the supply chain. In fact, there has been a whole movement; lean manufacturing that has tried to reduce
More informationAPPLICATION OF KANBAN SYSTEM FOR MANAGING INVENTORY
Bulletin of the Transilvania University of Braşov Vol. 3 (52) - 2010 Series I: Engineering Sciences APPLICATION OF KANBAN SYSTEM FOR MANAGING INVENTORY M. APREUTESEI 1 I.R. ARVINTE 1 E. SUCIU 2 D. MUNTEANU
More informationQuality and Quality Control
1 Quality and Quality Control INSPECTION Inspection is the most common method of attaining standardisation, uniformity and quality of workmanship. It is the cost art of controlling the product quality
More informationAutomated Scheduling Methods. Advanced Planning and Scheduling Techniques
Advanced Planning and Scheduling Techniques Table of Contents Introduction 3 The Basic Theories 3 Constrained and Unconstrained Planning 4 Forward, Backward, and other methods 5 Rules for Sequencing Tasks
More informationShort-term Planning. How to start the right operation at the right shop at the right time? Just in Time (JIT) How to avoid waste?
Short-term Planning Material Requirements Planning (MRP) How to get the right material in the right quantity at the right time? Manufacturing Resource Planning (MRP2) How to start the right operation at
More informationManagement Information System Prof. Biswajit Mahanty Department of Industrial Engineering & Management Indian Institute of Technology, Kharagpur
Management Information System Prof. Biswajit Mahanty Department of Industrial Engineering & Management Indian Institute of Technology, Kharagpur Lecture - 03 Introduction III Welcome to all. Today let
More informationManufacturing Flow Management
Manufacturing Flow Management Distribution D Distribution Authorized to Department of Defense and U.S. DoD Contractors Only Aim High Fly - Fight - Win Supply Chain Management Processes Information Flow
More informationChapter 6. Inventory Control Models
Chapter 6 Inventory Control Models Learning Objectives After completing this chapter, students will be able to: 1. Understand the importance of inventory control and ABC analysis. 2. Use the economic order
More informationI. INTRODUCTION A. There are two aspects to an effective operating system: 1. Design 2. Control.
Operations Control Chapter 8 CHAPTER OUTLINE I. INTRODUCTION A. There are two aspects to an effective operating system: 1. Design 2. Control. B. Effective operations control is attained by applying the
More informationTU-E2020 ADVANCED OPERATIONS MANAGEMENT. Demand management Sales & Operations Planning Master Production Scheduling
TU-E2020 ADVANCED OPERATIONS MANAGEMENT Demand management Sales & Operations Planning Master Production Scheduling 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999
More informationERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner
ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner Peter Dolog dolog [at] cs [dot] aau [dot] dk 5.2.03 Information Systems September 16, 2008 2 Sales Finished and packaged
More informationTHIRD REGIONAL TRAINING WORKSHOP ON TAXATION. Brasilia, Brazil, December 3 5, 2002. Topic 4
THIRD REGIONAL TRAINING WORKSHOP ON TAXATION Brasilia, Brazil, December 3 5, 2002 Topic 4 INFORMATION TECHNOLOGY IN SUPPORT OF THE TAX ADMINISTRATION FUNCTIONS AND TAXPAYER ASSISTANCE Nelson Gutierrez
More informationVALUE STREAM MAPPING ICONS
Material Material ASSEMBLY Process I 300 Pieces 1 Day Inventory MRP Control Center "Go-See" Scheduling XYZ Corporation Outside Source Takt = 50 sec. C/T = 45 sec. C/O = 30 min. Uptime = 95% Scrap = 2%
More informationContinuous Sales & Operations Planning
Continuous Sales & Operations Planning Aamer Rehman VP, Manufacturing Solutions Las Vegas - Jan 27, 2012 Copyright 2012 Kinaxis Inc. All Rights Reserved. Prelude Volatility is a given in today s environment
More informationtimes, lower costs, improved quality, and increased customer satisfaction. ABSTRACT
Simulation of Lean Assembly Line for High Volume Manufacturing Hank Czarnecki and Nicholas Loyd Center for Automation and Robotics University of Alabama in Huntsville Huntsville, Alabama 35899 (256) 520-5326;
More informationOperations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras
Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Lecture - 36 Location Problems In this lecture, we continue the discussion
More informationAPICS acknowledges the Basics of Supply Chain Management Committee for its contributions in the development of this resource.
APICS acknowledges the Basics of Supply Chain Management Committee for its contributions in the development of this resource. Jim Caruso, CPIM, CSCP (chair) Carol Bulfer, CPIM James F. Cox, Ph.D., CFPIM,
More informationBLAST PAST BOTTLENECKS WITH CONSTRAINT BASED SCHEDULING
WHITE PAPER BLAST PAST BOTTLENECKS WITH CONSTRAINT BASED SCHEDULING Blast Past Bottlenecks with Constraint Based Scheduling By Bill Leedale, Senior Advisor, IFS North America The maximum output of many
More informationIntegrated Planning Workshop for
Discover How the World of Demand-Driven Manufacturing Will Impact and Improve your Business Demand Flow Technology Integrated Planning Workshop for Demand-Driven Production We all face the challenge of
More informationINTRODUCTION. What is Enterprise Resource Planning?
1 INTRODUCTION MGT2405, University of Toronto, Denny Hong-Mo Yeh What is Enterprise Resource Planning? According to the definition given in the APICS Dictionary (American Production and Inventory Control
More informationPriori ty ... ... ...
.Maintenance Scheduling Maintenance scheduling is the process by which jobs are matched with resources (crafts) and sequenced to be executed at certain points in time. The maintenance schedule can be prepared
More informationFundamentals Level Skills Module, Paper F5. Section A
Answers Fundamentals Level Skills Module, Paper F5 Performance Management December 2014 Answers Section A 1 A Division A: Profit = $14 4m x 30% = $4 32m Imputed interest charge = $32 6m x 10% = $3 26m
More information- 1 - intelligence. showing the layout, and products moving around on the screen during simulation
- 1 - LIST OF SYMBOLS, TERMS AND EXPRESSIONS This list of symbols, terms and expressions gives an explanation or definition of how they are used in this thesis. Most of them are defined in the references
More informationHow to Configure and Use MRP
SAP Business One How-To Guide PUBLIC How to Configure and Use MRP Applicable Release: SAP Business One 8.8 All Countries English October 2009 Table of Contents Purpose... 3 The MRP Process in SAP Business
More informationLean Principles by Jerry Kilpatrick
Lean Principles by Jerry Kilpatrick Introduction Lean operating principles began in manufacturing environments and are known by a variety of synonyms; Lean Manufacturing, Lean Production, Toyota Production
More informationAppendix Lean Glossary Page 1
Appendix Lean Glossary Page 1 Andon Board A visual control device in a work area giving the current status on performance to expectations and alerting team members to emerging issues. Batch-and- Queue
More informationJUST IN TIME (JIT) CONTEXT A PHILOSOPHY, A PROCESS P6/341-I ORIGINS:
JUST IN TIME (JIT) Original written by professor José Luis Fernández at IE Business School. Original version, 22 January 2004. Last revised, 18 July 2008. Published by IE Publishing Department. María de
More informationAWARE ENTERPRISE SYSTEM
AWARE ENTERPRISE SYSTEM The Aware Enterprise System from Aware Business Systems Pty Ltd is a remarkable software package designed for Australian manufacturers and distributors. Designed and developed in
More informationChapter 16 Inventory Management and Control
Chapter 16 Inventory Management and Control We shall be interested primarily in the control of material in manufacturing. Actually, we are concerned with the control of the flow of material from a raw
More informationOperations Management
Operations Management Short-Term Scheduling Chapter 15 15-1 Outline GLOAL COMPANY PROFILE: DELTA AIRLINES THE STRATEGIC IMPORTANCE OF SHORT- TERM SCHEDULING SCHEDULING ISSUES Forward and ackward Scheduling
More informationManufacturing. Manufacturing challenges of today and how. Navision Axapta solves them- In the current explosive economy, many
Manufacturing challenges of today and how Navision Axapta solves them- the solution for change; controlled by you. Manufacturing In the current explosive economy, many manufacturers are struggling to keep
More informationNEW MODELS FOR PRODUCTION SIMULATION AND VALIDATION USING ARENA SOFTWARE
NEW MODELS FOR PRODUCTION SIMULATION AND VALIDATION USING ARENA SOFTWARE Marinela INŢĂ 1 and Achim MUNTEAN 1 ABSTRACT: Currently, Lean Manufacturing is a recognized topic in many research fields, which
More informationHOW TO SUPPORT PURCHASING WITH ERP SYSTEMS AS INTEGRATOR OF NOVEL LOGISTIC TOOLS? ÁGOTA BÁNYAI 1
Advanced Logistic Systems, Vol. 7, No. 1 (2013), pp. 7 12. HOW TO SUPPORT PURCHASING WITH ERP SYSTEMS AS INTEGRATOR OF NOVEL LOGISTIC TOOLS? ÁGOTA BÁNYAI 1 Abstract: The increased complexity of globalised
More informationSimulations can be run at item and group level giving users flexibility. In brief
We all aim to optimize all kinds of aspects of our business, but we all also are aware it s very challenging to put reality in an optimization model. Nevertheless, we require insights which enable us to
More informationMATERIAL REQUIREMENTS PLANNING
MATERIAL REQUIREMENTS PLANNING A basic tool for performing the detailed material planning function in the manufacture of component parts and their assembly into finished items. MRP s Managerial objective
More informationERP(Enterprise Resource Planning) & MRP
ERP(Enterprise Resource Planning) & MRP Mr.Vijayakumar S 1 Session Objectives At the end of this session the delegate would have understood ERP ERP example SAP MRP and structure MRP1 & MRPII difference
More informationDatasheet Electronic Kanban Ultriva vs. ERP ekanban Modules By Narayan Laksham
Datasheet Electronic Kanban Ultriva vs. ERP ekanban Modules By Narayan Laksham Summary: Several ERP vendors offer rudimentary Kanban modules to compliment their MRP systems. However, these Kanban modules
More informationSchool of Management and Languages Capacity Planning
School of Management and Languages Capacity Planning Dr Neil Towers 1 Learning Objectives a. To understand Capacity Planning and Control b. To manage the supply chain capabilities effectively Dr Neil Towers
More informationMSc in Lean Operations. Module Descriptions
MSc in Lean Operations Module Descriptions 2010 BSP320 Lean Thinking & Practice To establish the roots, underlying philosophy and development of the lean thinking approach. By the end of the module, the
More informationOperations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras
Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Lecture - 1 Introduction (Challenges, Methodologies) We begin this course
More informationDEMAND DRIVEN SUPPLY NETWORK WITH SCOR FOR UZEL
Fit4Future DEMAND DRIVEN SUPPLY NETWORK WITH SCOR FOR UZEL Istanbul Chamber of Industry 25.Mart.2008 Tolga Yıldırım Supply Chain Strategy Specialist ABOUT SPEAKER Tolga Yıldırım Central Supply Chain Strategy
More informationLOGISTIQUE ET PRODUCTION SUPPLY CHAIN & OPERATIONS MANAGEMENT
LOGISTIQUE ET PRODUCTION SUPPLY CHAIN & OPERATIONS MANAGEMENT CURSUS CONTENTS 1) Introduction 2) Human resources functions 3) A new factory 4) Products 5) Services management 6) Methods 7) Planification
More informationIntroduction to Cost Accounting
Introduction to Cost Accounting Learning Objectives By the end of this chapter, you should be able to: Define cost accounting. State the five areas in which cost accounting can assist management. List
More informationMASTER PRODUCTION SCHEDULE
6 MASTER PRODUCTION SCHEDULE MGT2405, University of Toronto, Denny Hong-Mo Yeh So far, in discussing material requirement planning (MRP), we have assumed that master production schedule (MPS) is ready
More informationFrequently Asked Questions about New Leaf s National Accounts Program
Frequently Asked Questions about New Leaf s National Accounts Program What if I am already selling to some of these national accounts? Simple. Just let us know that you do not need us to present to these
More informationUnderstanding Automotive EDI Automating and Integrating EDI for Increased Efficiency and Improved Delivery Performance
WHITE PAPER Understanding Automotive EDI Automating and Integrating EDI for Increased Efficiency and Improved Delivery Performance September 1, 2010 Written by Donna M. Ward PMP and former co-chair of
More informationMRP, ERP och JIT. Styrningsnivåer. Johann Packendorff. The development of ERP. Increasing impact on the whole supply
MRP, ERP och JIT Johann Packendorff Styrningsnivåer The development of ERP Increasing impact on the whole supply network Manufacturing Resource Planning (MRPII) Material Requirements Planning (MRP) Web-integrated
More informationStrategic procurement
Strategic procurement B L A Ž E N K A K N E Ž E V I Ć, P H D Management philososphy in general is shifting towards more holistic views concerning the integration of material and information flows Procurement
More informationUnderstand How and Where Computers are used in Manufacturing
H. RESOURCE MANAGEMENT AND MANUFACTURING COMPUTING H1 Understand How and Where Computers are used in Manufacturing H1.1 List possible computer applications in manufacturing processes. Performance Objective:
More informationOperations Strategies
Operations Strategies OUTSOURCING! PERFORMANCE OBJECTIVES! TECHNOLOGY! INVENTORY MANAGEMENT! OVERCOMING RESISTANCE TO CHANGE! NEW PRODUCT DESIGN AND DEVELOPMENT! SUPPLY CHAIN MANAGEMENT!! GLOBAL SOURCING!
More informationPlanning Optimization in AX2012
Planning Optimization in AX2012 Streamline your manufacturing operations with Master Planning and Forecasting Kevin Cosman 11 June 2013 About the Presenter Kevin Cosman, Senior Solutions consultant with
More informationMaterial Requirements Planning. Lecturer: Stanley B. Gershwin
Material Requirements Planning Lecturer: Stanley B. Gershwin MRP Overview Primary source: Factory Physics by Hopp and Spearman. Basic idea: Once the final due date for a product is known, and the time
More informationThe Ten Principles of Material Handling
PLANNING PRINCIPLE The Ten Principles of Material Handling All material handling should be the result of a deliberate plan where the needs, performance objectives and functional specification of the proposed
More informationModule Information Production Planning and Control
Module Title Module Code Module Information Production Planning and Control EMM2517 1. MODULE SUMMARY Aims and Summary The intent of this module is to teach students the importance of manufacturing execution
More informationINVENTORY MANAGEMENT: ANALYZING INVENTORY TO MAXIMIZE PROFITABILITY
INVENTORY MANAGEMENT: ANALYZING INVENTORY TO MAXIMIZE PROFITABILITY Jon Schreibfeder Effective Inventory Management, Inc. Sponsored by Every company strives to improve profitability. Countless hours are
More informationFor Improved Efficiency, look at the supply Chain and Outsourcing Management
For Improved Efficiency, look at the supply Chain and Outsourcing Management SESSION 6 : ALTERNATIVE FOR APPROPRIATE HEALTHCARE MANAGEMENT Maurice Rizkallah Certified Supply Chain Professional APICS On
More informationTovota Production System: Beyond Large-Scale Production. by Taiichi Ohno
Tovota Production System: Beyond Large-Scale Production by Taiichi Ohno 1978 Taiichi Ohno is credited with creating the just-in-time production system. He still feels today that the goal of Toyota is to
More informationOracle Value Chain Planning Inventory Optimization
Oracle Value Chain Planning Inventory Optimization Do you know what the most profitable balance is among customer service levels, budgets, and inventory cost? Do you know how much inventory to hold where
More informationMCQ: Unit -2: Operation processes
MCQ: Unit -2: Operation processes 1.What type of process would a Cement plant be most likely to use? a. Continuous flow b. Project c c. Job shop d. Flow shop 2. Process selection is primarily considered
More informationSage 200 Manufacturing Datasheet
Sage 200 Manufacturing Datasheet Sage 200 Manufacturing is a powerful manufacturing solution that enables you to manage your entire supply chain in detail, end to end, giving you the information needed
More informationInventory Management, Just-in-Time, and Backflush Costing
Inventory Management, Just-in-Time, and Backflush Costing Inventory Management in Retail Organizations Inventory Management is planning coordinating controlling activities related to the flow of inventory
More informationAS9100 Quality Manual
Origination Date: August 14, 2009 Document Identifier: Quality Manual Revision Date: 8/5/2015 Revision Level: Q AS 9100 UNCONTROLLED IF PRINTED Page 1 of 17 1 Scope Advanced Companies (Advanced) has established
More informationProject and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi
Project and Production Management Prof. Arun Kanda Department of Mechanical Engineering Indian Institute of Technology, Delhi Lecture - 38 Basic Inventory Principles In today s lecture we are going to
More informationP2 Performance Management September 2014 examination
Management Level Paper P2 Performance Management September 2014 examination Examiner s Answers Note: Some of the answers that follow are fuller and more comprehensive than would be expected from a well-prepared
More informationImproving production and operation systems with RFID. Taking manufacturing to the next level: RFID Work-in-Process solutions from IBM
Improving production and operation systems with RFID Taking manufacturing to the next level: RFID Work-in-Process solutions from IBM RFID: A proven technology changing the factory floor Today the most
More informationID Class MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.
Exam: Operations Management Name Total Scors: ID Class MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question. 1) Which of the following incorporates the
More informationSupply Chain Management
Supply Chain Management Contents A. Definition and Terminologies B. Evolution of SCM C. Supply Chain Management D. Integrated Logistics E. Fulfillment Process F. Specialized Supply Chains G. Supply Chain
More informationEffective Replenishment Parameters By Jon Schreibfeder
WINNING STRATEGIES FOR THE DISTRIBUTION INDUSTRY Effective Replenishment Parameters By Jon Schreibfeder >> Compliments of Microsoft Business Solutions Effective Replenishment Parameters By Jon Schreibfeder
More informationIntroduction to production scheduling. Industrial Management Group School of Engineering University of Seville
Introduction to production scheduling Industrial Management Group School of Engineering University of Seville 1 Introduction to production scheduling Scheduling Production scheduling Gantt Chart Scheduling
More informationProcess design. Process design. Process design. Operations strategy. Supply network design. Layout and flow Design. Operations management.
Process design Source: Joe Schwarz, www.joyrides.com Process design Process design Supply network design Operations strategy Layout and flow Design Operations management Improvement Process technology
More informationprocesses 1 This survey report is written within the PWO Project: Production scheduling of batch
REPORT SURVEY SCHEDULING SOFTWARE* 1 Pieter Caluwaerts, Wim De Bruyn, Luiza Gabriel, Bert Van Vreckem University College Ghent Hogeschool GENT. GENT BELGIUM Pieter.Caluwaerts@hogent.be, Wim.Debruyn@hogent.be,
More informationOPTIMIZING PRODUCTION
REAL WORLD SCENARIOS Volume 2 Cases 7-12 OPTIMIZING PRODUCTION SQUEEZE MORE OUT OF PRODUCTION OPTIMIZING SCHEDULING PRODUCTION FLOW IMPROVEMENTS INTEGRATED MAINTENANCE PLANNING INTEGRATED PROJECT MANAGEMENT
More informationGetting Started with Lean Process Management
Getting Started with Lean Process Management Hi-Tec Exchange Conference San Francisco July 25, 2011 Missions To team with Organizational Leaders, Managers, & Employees to focus on customers & improve competitiveness,
More information