1 "Pipe Bursting A Revolution for Telecom, Electric, Gas, & Water" Presented by the Leadership of the IPBA International Pipe Bursting Association A Division of NASSCO National Association of Sewer Service

2 AGENDA IPBA Green Technology The Basics Types of Systems Case Studies Summary

3 I P B A INTERNATIONAL PIPE BURSTING ASSOCIATION

4 IPBA HISTORY & BACKGROUND Founded in 2000 Division of NASSCO NASSCO Technical Advisor Gerry Muenchmeyer Promote, Train, & Educate Pipe Bursting Independent and Non-Biased Publications Re-Organization in 2010 that includes a 5 year strategic plan and revitalized membership.

5 IPBA Current Objectives Vision Expand the use and acceptance of pipe bursting as the trenchless technology of choice, in pipe replacement throughout North America.

6 IPBA Current Objectives Mission Advance the acceptance of Pipe Bursting through education, training, standards, marketing & governmental support to replace existing piping infrastructure in the most cost effective method.

7 IPBA Current Objectives Objective Expand awareness of Pipe Bursting for the rehabilitation of North America s aging infrastructure, by providing leadership and fulfilling our mission, on behalf of all IPBA membership.

8 Industry Stakeholders Contractors Pipeline system owners Engineering firms Manufactures & suppliers Academia Municipal General public/home owners

9 Working Committees Marketing Membership Education & Training Specifications Governmental

10 IPBA Leadership & Presenters IPBA Leadership Committee Brian Metcalf, Chairman & President/CEO of HammerHead Trenchless Equipment George Mallakis, Vice Chairman & Regional Manager, TT Technologies Trenchless Equipment Matt Timberlake, Marketing Committee President Ted Berry Trenchless Technologies Team LLC. Mike Woodcock, Education Committee & President of Portland Utilities Construction Andy Mayer, Member & President of Murphy Pipelines

11 GREEN TECHNOLOGY

12 GREEN TECHNOLOGY Traditional Open Cut Construction 1) Excavate and remove all material. 2) Lay new pipe. 3) Truck in new backfill. 4) Placement of new pavement. 5) Traffic and Public disruption

13 Reduction in Carbon Emissions by as much as 95% with Trenchless Construction Open Cut Pipe Bursting The debate regarding climate change, the beliefs in your community, and an increased environmental awareness demands that we adopt new methods that will help reduce carbon emissions.

14 Green Technology Pipe Bursting Reduction in excavation by as much as 85% when compared to traditional open cut excavation.

15 THE BASICS

16 Not just for Sewer and Water Rehabilitation History and Technology advancement Applications & equipment Project considerations Case studies Gas main replacement Sewer Main decommissioning Telecom Water Electric

17 What is Pipe Bursting? The breaking of an existing pipe, expanding the broken pipe into the surrounding soil while simultaneously pulling in the NEW factory manufactured pipe.

18 Brief History of Pipe Bursting Developed by British Gas in the late 70 s when they were faced with deteriorating gas lines in severely congested and developed areas. Open cutting to replace these lines was cost prohibitive and sometimes not an option. In conjunction with a utility contractor, British Gas developed the process of Pipe Bursting to replace Fracturable pipes including water, sewer & gas. Patents and Licensing for pipe bursting no longer exists today.

19 Benefits of Pipe Bursting Eliminates up to 85% of excavation Damage prevention: Follows the path of the existing utility reducing risks of utility strikes Especially cost effective when compared to an open cut utility relocation design Reduced traffic disruption Minimal surface disruption

20 Install same size or larger diameter pipe Pipe bursting is often more cost effective than other methods when long term owner costs and capacity needs are considered. Reduced impact on local residents and business.

21 What materials can be burst? Fracturable Pipes Cast iron, clay tile, concrete, reinforced concrete, asbestos cement, etc. Non-Fracturable Pipes Ductile iron, steel, galvanized, HDPE, lined pipe, etc.

22 Current Technology Utilization

23 TYPES OF SYSTEMS: PNEUMATIC

24 Pneumatic Pneumatic Hammer Winch Air compressor Specialized tooling to match conditions New Pipe Typically used in waste water/sewer systems

25 Pneumatic Systems Pneumatic hammer Burst head/pulling head Winch or pulling device Most widely used system in sewer main replacement industry Utilized only with Fracturable host pipe and HDPE

26 Pneumatic Systems Consists primarily of pneumatic hammer, bursting/pulling head and pulling device. Pneumatic hammer Burst head/tooling Winch.

27 TYPES OF SYSTEMS: STATIC

28 Static Hydraulic power pack Pulling/Lower unit Steel rod to provide static pulling Specialized tooling to match conditions New Pipe Machine tonnage capacities range from 20 tons to 300 tons available from several manufacturers.

29 Static Pipe Bursting Systems

30

31 TYPES OF SYSTEMS: COMPACT LATERAL

32 Compact/Lateral Hydraulic power pack Pulling/Lower unit Pulling cable/chain Specialized tooling to match conditions New Pipe Machine tonnage capacities range from 15 tons to 30 tons Typically utilized in replacement of fracturable sewer and nonfracturable water and gas services

33 Compact / Lateral Systems

34

35 IPBA PROJECT CONSIDERATIONS

36 IPBA Project Classification Class Depth of Pipe Existing Pipe Diameter New Pipe Diameter Options A <12 ft 4 12 Size for Size to 1 upsize Burst Length ft B >12 ft < 18 ft upsizes ft C > 18 ft or more upsizes > 450 ft Project classifications per IPBA (International Pipe Bursting Association) pipe bursting specification.

37 Upsizing: A Closer Look Note: the above illustrations assume flow line remains the same.

38 Upsizing Expansion (where it goes) Approximately 90% of compaction occurs upwards from the existing line.

39 Depth of Cover General rule is one (1) foot of cover for every inch of expansion 8 DIPS Burst Head Expander OD Clay Pipe Existing Pipe ID 5.94 Note: any compaction recedes over time. The deeper the line, the less chance of surface disruption

40 Soil Conditions

41 Going the Distance Increase static energy (pneumatic and static applications) Increase impact energy (pneumatic applications) Soil memory Race against time Reduce pipe friction Lubrication Tractor Effect Entry pit length

42 Depth of Existing Line Is there adequate depth of cover? Utility depth determines new pipe entry pit length. Entry pit length is minimum 2 ½ times depth With pipes larger than 12 diameter length of entry pit will increase

43 New Pipe Questions What kind of new pipe? HDPE is preferred pipe when pipe bursting Fusible PVC, restrained joint PVC, ductile (DI) and clay have been used successfully but require additional project and site considerations. IPS or DIPS? (OD vs. ID) Important for burst/pulling head adaptability Existing clay to DIPS is a single upsize What is the SDR Rating Recommend a min. of SDR17 for pipe bursting with HDPE

44 CASE STUDIES

45 SMALL DIAMETER THE 80/20 RULE

46 Small Diameter Sewer Main Houston Replaced 100,000 LF of 8, 10, & 12 Mostly 8 Product/Footage Pull Lengths Equipment 7 Diameter pneumatic tool with winch system

47 Small Diameter Pipe Bursting Most Pipe Bursting In The U.S. consists of Small Diameter Pipe Bursting 6, 8, 10, & 12 Size on Size or One Upsize Pipe bursting is the only trenchless technology that can increase the inside diameter (ID) of an existing pipe line.

48 Small Diameter Pipe Bursting Many municipalities look to pipe bursting as the first choice. City of Houston Jacksonville Electric Authority Knoxville Utility Board Others Pipe Bursting Actually Replaces the Existing Pipe.

49 10 VCP Sanitary Sewer Replace an existing 10 VCP gravity sewer with a new 10 HDPE in a sensitive area Product/Footage Installed in a single 300 burst Equipment 7 pneumatic tool and a 12 ton downhole winch No Flamingo's were harmed during the replacement of this utility!! 49

50 8 CI Sanitary Sewer Force Main Ogunquit, Maine Replaced 800 of 8 CI force main with new 10 HDPE Product/Footage installations Equipment 80 ton static burst unit 50

51 LARGE DIAMETER

52 Large Diameter Gravity Sewer Atlanta Upsized 25,000 LF 15 & 18 Concrete & Clay to 24 & 28 Product/Footage 250 to 350 Pull Lengths Equipment 18 Diameter Tool

53 Large Diameter Forcemain - Tallahassee Replaced 5,000 LF of 36 Hobas with 36 DIPS HDPE Product/Footage 600 Pull Lengths Equipment 24 Diameter Tool

54 MAIN REPLACEMENT - STEEL

55 Gas Main Replacement Steel Static Pipe Bursting Product/Footage 700 feet of 4 Steel to 4 HDPE Equipment 50 ton rod pulling machine, 20HP hydraulic power pack, 4 slitter

56 SERVICE REPLACEMENT - HDPE

57 Gas Service Replacement HDPE Static Pipe Bursting Product/Footage Gas service replacement Equipment Cable, specialized tooling, pulling medium

58 PRESSURE REPLACEMENT - STEEL

59 Pressure Sewer Replacement - Steel Static Pipe Bursting Product/Footage 150 mm steel to 160 mm HDPE Equipment 50 ton rod pulling machine, 20HP hydraulic power pack, 150 mm slitter

60 MAIN REPLACEMENT DUCTILE IRON

61 Water Main Replacement Ductile Iron Static Pipe Bursting Product/Footage Replacement of 1,800 feet of 4 ductile iron to 5 HDPE. Equipment 50 ton rod pulling machine, 20HP hydraulic power pack, 4 slitter

62 MAIN REPLACEMENT PVC

63 Sewer Main Replacement PVC Static Pipe Bursting Product/Footage 430 feet of 8" PVC to 12" HDPE, SDR 17 Equipment 125 ton rod pulling machine, 73HP hydraulic power pack, 8 slitter

64 MAIN PRE CHLORINATED PROCESSES

65 Preparation of Pipe All work involving the renewal of water lines using pipe bursting techniques shall be carried out as hygienically as practical in accordance with applicable specifications, procedures, codes, regulations, and laws of the governing regulatory authorities, and the American Water Association with all reasonable steps being taken to avoid contamination of water supplies. Murphy Pipeline Contractors, Inc. Telephone:

66 Preparation of the Pipe Murphy Pipeline Contractors, Inc. Telephone: A free chlorine residual of 25mg/L should be maintained for a minimum contact time of 24 hours. After thorough flushing the new pipe shall be sample at each end at intervals no greater than 1200 feet, only by fully qualified rehabilitation staff, who will then fill in a log book/passport form detailing the date, coil number and time sample was taken. A copy of this form will also be taped to the coil to ensure the correct pipe is referred to.

67 MAIN REPLACEMENT: CIPP/HDPE LINED CONCRETE

68 Sewer Main Replacement CIPP/HDPE Lined Concrete Static Pipe Bursting Sewer main replacement Product/Footage 2,500 feet of 8 Concrete lined with CIPP and Sliplined replaced with 8 HDPE Equipment HydroBurst HB100, PP70 Power Pack, Specialized Tooling

69 MAIN DECOMMISSIONING HDPE

70 Gas Main Decommissioning HDPE Static Pipe Bursting Product/Footage Decommissioning of 3,000 feet of HDPE gas main Equipment 12 ton cable winch, specialized tooling

71 There are growing concerns related to abandoned gas lines. Current decommissioning methods are expensive or do not provide visual proof of pipe taken out of service. Open cut pipe removal Void fill grouting

72 Cost Effective, Eliminates Doubt Permanently makes the old line unusable and obvious to all that is now a dead line. Production varies according to conditions and pipe type. In all cases cost is often just a fraction of the cost to dig up and discard.

73 SUMMARY & ACTION STEPS

74 Conclusion Nearly any kind of pipe can be burst or split and replaced with new pipe. The same benefits afforded to the sewer and water markets can be achieved in gas, telecom and electric industries. Advancements in technology and experience have been applied to and continue to expand into other markets outside of sewer and water. Pipe bursting is not just for sewer and water rehab anymore!

75 Action Steps Drive innovation use the technology Get involved - IPBA Tremendous opportunity to drive positive change across the industry

76 IPBA Leadership & Presenters IPBA Leadership Committee Brian Metcalf, Chairman & President/CEO of HammerHead Trenchless Equipment George Mallakis, Vice Chairman & Regional Manager, TT Technologies Trenchless Equipment Matt Timberlake, Marketing Committee President Ted Berry Trenchless Technologies Team LLC Mike Woodcock, Education Committee & President of Portland Utilities Construction Andy Mayer, Member & President of Murphy Pipelines

77 THANK YOU "Pipe Bursting: A Revolution for Telecom, Electric, Gas, & Water"

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA.

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. 1 Pipe Bursting A Mature and Diverse Trenchless Technology December 10, 2014 1:00 3:00 pm Eastern How to Participate Today

More information

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting? Pipe Bursting Case Study at Zeeland, MI Collections Seminar September 6, 2012 By: Brian Hannon, PE and John Racek, PE Presentation Agenda What is Pipe Bursting? History of Pipe Bursting Types of Pipe Bursting

More information

Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe

Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe As the Environmental Protection Agency tightens groundwater quality regulations, old leaking sewers lines made of pipe clay,

More information

INTERNATIONAL PIPE BURSTING ASSOCIATION. Guideline for Pipe Bursting

INTERNATIONAL PIPE BURSTING ASSOCIATION. Guideline for Pipe Bursting INTERNATIONAL PIPE BURSTING ASSOCIATION Prepared for: The International Pipe Bursting Association (IPBA) www.nassco.org/about_nassco/an_div_ipba.html Division of NASSCO 11521 Cronridge Drive, Suite J Owings

More information

Pneumatic Pipe Bursting

Pneumatic Pipe Bursting A Guide to Pneumatic Pipe Bursting with the GRUNDOCRACK SYSTEM Table of Contents 1) Foreword...4 2) Company Background...5 3) Pipe Bursting History...6 4) GRUNDOCRACK Concept...7 5) Project Considerations...

More information

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting Matt Werth General Manager PM Construction Pipebursting is the answer to many very difficult rehabilitation needs where there are almost

More information

Trenchless Methods for Service and Mainline Pipe Rehab and New Install

Trenchless Methods for Service and Mainline Pipe Rehab and New Install Trenchless Methods for Service and Mainline Pipe Rehab and New Install Eddie Ward TT Technologies, Inc. Tennessee Gas Association Distribution & Operations Conference April 9 th 11 th Murfreesboro, TN

More information

WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598

WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598 Lessons Learned from Large Diameter Sanitary Sewer Pipe Bursting Project: Conversion of Abandoned Gravity Sewer Main Into Upsized Sanitary Force Main South San Francisco, CA Kent Von Aspern,* Collins Orton**

More information

PLANNING CAREFUL NORTH VANCOUVER PIPE BURST REQUIRES

PLANNING CAREFUL NORTH VANCOUVER PIPE BURST REQUIRES WATER & SEWER REHAB TECHNOLOGIES NORTH VANCOUVER PIPE BURST REQUIRES CAREFUL PLANNING Close proximity to storage silos, poor ground conditions and clogged storm sewer pipe puts trenchless contractor to

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

Greensboro s Pilot Program for Water Pipe Bursting Leads to Expanded City Wide Program

Greensboro s Pilot Program for Water Pipe Bursting Leads to Expanded City Wide Program North American Society for Trenchless Technology (NASTT) NASTT s 2013 No-Dig Show Sacramento, California March 3-7, 2013 TA-T3-05 Greensboro s Pilot Program for Water Pipe Bursting Leads to Expanded City

More information

INTERNATIONAL PIPE BURSTING ASSOCIATION. Guideline for Sewer Lateral Pipe Bursting

INTERNATIONAL PIPE BURSTING ASSOCIATION. Guideline for Sewer Lateral Pipe Bursting INTERNATIONAL PIPE BURSTING ASSOCIATION Guideline for Sewer Lateral Pipe Bursting Prepared for: The International Pipe Bursting Association (IPBA) www.nassco.org/about_nassco/an_div_ipba.html Division

More information

Guideline Specification for the Replacement of Mainline Sewer Pipes By Pipe Bursting

Guideline Specification for the Replacement of Mainline Sewer Pipes By Pipe Bursting Guideline Specification for the Replacement of Mainline Sewer Pipes By Pipe Bursting Setting the Industry Standard for the Rehabilitation of Underground Utilities The International Pipe Bursting Association

More information

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene

More information

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

Sewer Line Rehabilitation

Sewer Line Rehabilitation 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing sanitary sewers using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

Platte River Interceptor Slipline Rehabilitation

Platte River Interceptor Slipline Rehabilitation Platte River Interceptor Slipline Rehabilitation Owner: Metro Wastewater Reclamation District Contractor: American West, Denver CO Slipline Pipe Manufacturer : Hobas Pipe USA Presented by: Tom Furie, Area

More information

LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM

LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper D-4-02 LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE

More information

Water Transmission & Sewer Force Main Renewal 16 through 60

Water Transmission & Sewer Force Main Renewal 16 through 60 Water Transmission & Sewer Force Main Renewal 16 through 60 North American Operations 1973 S 91 st Street Milwaukee WI 53227 4700 N Pearl Street Jacksonville FL 32206 office 414.321.2247 fax 414.321.2297

More information

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Education Master of Business Administration University of Houston, 1985 Bachelor of Science, Civil Engineering University

More information

Pipe Bursting Water Lines with Confidence

Pipe Bursting Water Lines with Confidence North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 Paper MM-T4-03 Pipe Bursting Water Lines with Confidence Tracy Weaver, Portland Utilities

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE

Sewer Water Pipeline Replacement with CERTA LOK RESTRAINED JOINT PVC PIPE 1.0 GENERAL 1.1 DESCRIPTION This section addresses the procedures to be employed for pipe bursting existing water/sewer pipelines, as identified on the drawings, and replacing with new Restrained Joint

More information

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009 Rehabilitation Alternatives MWEA Collection System Seminar October 1, 2009 Overview Types of Rehabilitation Trenchless Categories On-Line Replacement In-Situ Options Selecting the Best Solution Types of

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines

High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines High Density Polyethylene Liners for Rehabilitation of Corroded Pipelines Jeff Schell General Manager United Pipeline Middle East, Inc. Introduction HDPE Liners A cost effective and environmentally beneficial

More information

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced

More information

Pipe Bursting. Chapter 16

Pipe Bursting. Chapter 16 535 Introduction Underground service utilities in many American cities have been in place for over 100 years. While existing systems have functioned well beyond reasonably anticipated service life, underground

More information

Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives

Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 MM-T6-05 Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS

UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS U UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS 3. COMPANY PROFILE A growing company excelling in the fields of infrastructure repair and maintenance. 6. MANDREL TESTING Individually approved

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

Water Technology Fact Sheet Pipe Bursting

Water Technology Fact Sheet Pipe Bursting Water Technology Fact Sheet INTRODUCTION Under the traditional dig-and-replace method of sewer rehabilitation, a replacement or additional parallel sewer line is constructed by digging along the entire

More information

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines

More information

WATER, SEWER AND TRAFFIC IT S ALL ABOUT THE FLOW

WATER, SEWER AND TRAFFIC IT S ALL ABOUT THE FLOW North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 TA-T3-02 WATER, SEWER AND TRAFFIC IT S ALL ABOUT THE FLOW Mark Oberschmidt, P.E., Stantec,

More information

Flowtite Jacking Pipe

Flowtite Jacking Pipe U.S. COMPOSITE PIPE SOUTH, LLC. MEMBER OF KTI PIPE GROUP OF COMPANIES Flowtite Jacking Pipe 18585 Samuels Rd. Zachary, La. 70791 PH. 225-658-6166 Fax 225-658-0947 www.flowtitepipe.com Flowtite GRP Pipe

More information

1-800-327-8276 www.jfcson.com

1-800-327-8276 www.jfcson.com Trenchless Cost Effective Internal Pipe Rehabilitation 101 East Broadway, Hackensack, N.J. 07601 Folsom, NJ Linden, NJ Beltsville, MD Sylmar, CA 1-800-327-8276 www.jfcson.com In-Weg Internal Joint Sealing

More information

Water Main Lining A Sustainable Alternative to Open Cut Replacement

Water Main Lining A Sustainable Alternative to Open Cut Replacement Water Main Lining A Sustainable Alternative to Open Cut Replacement Sean O Dell, PE Baxter & Woodman, Inc. B&W Client Seminar, Crystal Lake May 1, 2014 Agenda Why, What, When, Where, Who, How Reduction

More information

CONSTRUCTION COST OF UNDERGROUND INFRASTRUCTURE RENEWAL: A COMPARISON OF TRADITIONAL OPEN-CUT AND PIPE BURSTING TECHNOLOGY SEYED BEHNAM HASHEMI

CONSTRUCTION COST OF UNDERGROUND INFRASTRUCTURE RENEWAL: A COMPARISON OF TRADITIONAL OPEN-CUT AND PIPE BURSTING TECHNOLOGY SEYED BEHNAM HASHEMI CONSTRUCTION COST OF UNDERGROUND INFRASTRUCTURE RENEWAL: A COMPARISON OF TRADITIONAL OPEN-CUT AND PIPE BURSTING TECHNOLOGY by SEYED BEHNAM HASHEMI Presented to the Faculty of the Graduate School of The

More information

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer

More information

4 Steps for Quality Sewer Performance in Perpetuity

4 Steps for Quality Sewer Performance in Perpetuity 4 Steps for Quality Sewer Performance in Perpetuity By Gerhard Gerry P. Muenchmeyer, P. E. Principal Muenchmeyer Associates, LLC E-mail gerry@muenchmeyerassoc.com INTRODUCTION A well maintained and functional

More information

CRISIS: WORLDWIDE DETERIORATING INFRASTRUCTURE SOLUTION: PIPE BURSTING, PROVEN METHOD OF REPLACEMENT PIPE BURSTING ADVANTAGES:

CRISIS: WORLDWIDE DETERIORATING INFRASTRUCTURE SOLUTION: PIPE BURSTING, PROVEN METHOD OF REPLACEMENT PIPE BURSTING ADVANTAGES: CRISIS: WORLDWIDE DETERIORATING INFRASTRUCTURE THE STATE OF THE INFRASTRUCTURE On an international scale, water, sewer, gas and other utilities are in need of replacement. Most are located in congested

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these

More information

Guidelines for Pipe Bursting

Guidelines for Pipe Bursting Guidelines for Pipe Bursting TTC Technical Report #2001.02 Jadranka Simicevic Raymond L. Sterling Prepared for: U.S. Army Corps of Engineers Engineering Research and Development Center (ERDC) 3909 Halls

More information

Annular Space Grouting of Slipline Products

Annular Space Grouting of Slipline Products Annular Space Grouting of Slipline Products by David Gellings(, M.APWA & John Jurgens(, M.WWCPA Traditional methods of using neat cement slurries, (Portland cement and water, cement with fly ash or cement

More information

LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION

LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION LIFELINE PIPELINE RESTORATION AND SEISMIC MITIGATION Le Val LUND 1 And P E M ASCE 2 SUMMARY A number of methods are discussed which can be used for lifeline pipeline rehabilitation and improving the seismic

More information

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology 2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)

More information

THE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs

THE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs THE BIG FIX: San Diego s Sewer Renewal Program By Steve Gibbs Public works administration would be easy if infrastructure lasted forever. It does not. Roads, bridges and sewers eventually wear out. Even

More information

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology

ENGINEERED SOLUTIONS. A2 Liner Pipe for Trenchless Technology ENGINEERED SOLUTIONS A2 Liner Pipe for Trenchless Technology A2 Liner Pipe Restores Deteriorated Sewers Cost-Effective Rehabilitation The increasing rate of sanitary and storm sewer deterioration requires

More information

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit

More information

DISTRIBUTION PIPING MATERIALS: BUILDING HYDRONIC SYSTEM MANAGEMENT. Jim Riley, Texas A&M University February 10, 2015

DISTRIBUTION PIPING MATERIALS: BUILDING HYDRONIC SYSTEM MANAGEMENT. Jim Riley, Texas A&M University February 10, 2015 DISTRIBUTION PIPING MATERIALS: BUILDING HYDRONIC SYSTEM MANAGEMENT Jim Riley, Texas A&M University February 10, 2015 Piping at Texas A&M 2 History of Distribution Piping at Texas A&M Concrete reinforced

More information

Pipeline Asset Management: From Assessment to Prioritized Projects List

Pipeline Asset Management: From Assessment to Prioritized Projects List PROGRAM MANAGEMENT INEERING Pipeline Asset Management: From Assessment to Prioritized Projects List TAWWA / WEAT Summer Seminar July 28, 2011 PLANN NING ENG Andrew Hunt, PE Asset Management Project Manager

More information

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines: Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

CHAPTER 6 - SANITARY SEWER

CHAPTER 6 - SANITARY SEWER CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings

More information

ASBESTOS CEMENT PIPE: WHAT IF IT NEEDS TO BE REPLACED?

ASBESTOS CEMENT PIPE: WHAT IF IT NEEDS TO BE REPLACED? ASBESTOS CEMENT PIPE: WHAT IF IT NEEDS TO BE REPLACED? G. Eric Williams, P.E. Professional Associate/Vice President, HDR Engineering, Inc., Sunset Beach, NC Kent Von Aspern, P.E. Senior Project Manager,

More information

SECTION 603 SANITARY SEWER FORCE MAINS

SECTION 603 SANITARY SEWER FORCE MAINS SECTION 603 SANITARY SEWER FORCE MAINS 1. GENERAL Pipelines for sanitary sewer force main systems shall conform to the following specifications and shall be installed at the locations indicated on the

More information

Waste Collection Systems

Waste Collection Systems Waste Collection Systems System Maintenance and Repair Maintenance and Repair Training Objectives To gain an understanding of: System Maintenance and Repair vocabulary System Maintenance and Repair techniques

More information

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials. PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,

More information

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount Engineer's Estimate DiPaolo Company 4350 DiPaolo Center Glenview, IL 60025 Stark Excavating, Inc. 1805 W. Washington Street Bloomington, IL 61701 Rowe Construction 1523 N. Cottage Avenue Bloomington, IL

More information

MUNI OWNER S CHRONICLE OF REPLACING 35 MILES OF ASBESTOS CEMENT WATER MAIN UTILIZING PRE-CHLORINATED WATER MAIN BURSTING

MUNI OWNER S CHRONICLE OF REPLACING 35 MILES OF ASBESTOS CEMENT WATER MAIN UTILIZING PRE-CHLORINATED WATER MAIN BURSTING MUNI OWNER S CHRONICLE OF REPLACING 35 MILES OF ASBESTOS CEMENT WATER MAIN UTILIZING PRE-CHLORINATED WATER MAIN BURSTING EDWARD ALAN AMBLER, PE BILL THOMAS, PHD, PE COLLINS ORTON AGENDA Introduction Asbestos

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development 7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014 Relining of Water Mains with Flexible High Pressure Pipelines Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014 Aging water main infrastructure The American Society of Civil Engineers

More information

Appendix A: Acceptable pipe and fitting materials

Appendix A: Acceptable pipe and fitting materials Watercare Services Limited Water and Code of Practice Content from the NZS 4404:2010 Land development and subdivision infrastructure has been reproduced for use in the Infrastructure Design s Manual for

More information

City of Balch Springs, Texas. Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement

City of Balch Springs, Texas. Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement City of Balch Springs, Texas Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement Balch Springs is a city in Dallas County, Texas, United States. It is a suburb of Dallas and part

More information

TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe

TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe TN 5.18 October 2015 In sanitary sewer, it is often necessary to use trenchless technology methods to install a casing pipe under high volume roads,

More information

Installation of Large Diameter Buried Pipes

Installation of Large Diameter Buried Pipes Installation of Large Diameter Buried Pipes Sullivan (Sully) Curran P. E., Executive Director I. Introduction and Scope There is an ongoing need to provide designers, specifiers, engineers, consultants

More information

Rehabilitation or Replacement? That Is The Question

Rehabilitation or Replacement? That Is The Question Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

Water and Sewer Utilities

Water and Sewer Utilities Water and Sewer Utilities Capital Improvement Program Utilities Water and Sewer Requested - $98,295,000 - $97,792,600 Funded - $32,951,600 Sewer 53.3% Sewer 54% Water 27% Water Water 46% 46.7% Sewer 73%

More information

Sustainable trenchless rehabilitation of supply pipelines applying static pipe bursting or close-fit lining

Sustainable trenchless rehabilitation of supply pipelines applying static pipe bursting or close-fit lining Sustainable trenchless rehabilitation of supply pipelines applying static pipe bursting or close-fit lining Björn Freimuth, Tracto-Technik GmbH & Co. KG, Germany Leaking oil, gas or water pressure pipelines

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

Kimberly H. Paggioli, P.E., Vice President, Marketing and Quality Control Richard C. Turkopp, P.E., Vice President, Engineering

Kimberly H. Paggioli, P.E., Vice President, Marketing and Quality Control Richard C. Turkopp, P.E., Vice President, Engineering Sliplining and Microtunneling of Large Diameter Pipelines Kimberly H. Paggioli, P.E., Vice President, Marketing and Quality Control Richard C. Turkopp, P.E., Vice President, Engineering HOBAS Pipe USA,

More information

Native InDesign 2890 SaniTite Brochure 1/8" 100 300 CMYK April 17, 07

Native InDesign 2890 SaniTite Brochure 1/8 100 300 CMYK April 17, 07 Sanitary Sewer Pipe Tough pipe for a tough environment SaniTite Sanitary Sewer Pipe delivers the features that engineers, contractors and municipalities demand durability, performance, handling, toughness

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE

SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE SECTION 33 11 00.11 POLYVINYL CHLORIDE (PVC) PIPE PART 1: GENERAL 1.01 SECTION INCLUDES PVC pressure pipe and fabricated fittings in nominal sizes 4-inches through 12-inches with cast iron pipe equivalent

More information

Repair or Replacement - Band-Aids vs. Surgery

Repair or Replacement - Band-Aids vs. Surgery Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing

More information

Pipeline Replacement using Relining

Pipeline Replacement using Relining Pipeline Replacement using Relining Mark Heathcote, March 2006 Relining of old pipeline systems is becoming an increasingly attractive option to asset owners and operators as an effective alternative to

More information

TRENCHLESS TECHNOLOGY GUIDELINES CLOSE FIT THERMOPLASTIC LINING

TRENCHLESS TECHNOLOGY GUIDELINES CLOSE FIT THERMOPLASTIC LINING TRENCHLESS TECHNOLOGIES RESOURCE CENTRE TRENCHLESS TECHNOLOGY GUIDELINES SECOND EDITION CLOSE FIT THERMOPLASTIC LINING NEW VERSION AUGUST 2005 1. OVERVIEW The use of liners that are deliberately deformed

More information

POTENTIAL FOR THE APPLICATION OF TRENCHLESS REHABILITATION TECHNOLOGIES IN KENYA: A FOCUS ON PIPE BURSTING.

POTENTIAL FOR THE APPLICATION OF TRENCHLESS REHABILITATION TECHNOLOGIES IN KENYA: A FOCUS ON PIPE BURSTING. POTENTIAL FOR THE APPLICATION OF TRENCHLESS REHABILITATION TECHNOLOGIES IN KENYA: A FOCUS ON PIPE BURSTING. Lameck Onsarigo, S.M. ASCE College of Technology, Architecture, and Applied Engineering, Bowling

More information

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of

More information

Beacon Hill Sewer District Standard Specifications

Beacon Hill Sewer District Standard Specifications Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions

More information

Letty Arvide-Gomar, PE

Letty Arvide-Gomar, PE Letty Arvide-Gomar, PE Outline DIP History and Applications Corrosion Issues Internal Cleaning Technologies Rehabilitation Options DIP History and Applications Corrosion Issues Internal Cleaning Technologies

More information

Rehabilitation Scenarios for Sustainable Water Mains. University, Montreal, Quebec, Canada, PH (514) 848-2424 ext. 8779; FAX (514) 848-7965; email:

Rehabilitation Scenarios for Sustainable Water Mains. University, Montreal, Quebec, Canada, PH (514) 848-2424 ext. 8779; FAX (514) 848-7965; email: Rehabilitation Scenarios for Sustainable Water Mains Khaled Shahata 1 ; Tarek Zayed 2 ; and Saad Al-Jibouri 3 1 Graduate Student, Department of Building, Civil, and Environmental Engineering, Concordia

More information

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General

SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL 1.01 Testing - General Testing shall be of the type and frequency described in each section and summarized in Item 1 of this section. In addition to

More information

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS PRODUCT CATALOGUE for This product catalogue has been downloaded from COSSD.com. Listed products/services and their descriptions are shown as supplied by the title company COSSD does not guarantee the

More information

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials

More information

by Leonard Friesenhahn, P.E.

by Leonard Friesenhahn, P.E. by Leonard Friesenhahn, P.E. of sight, out of mind is an adage your top administrators may apply to your campus Out wastewater collection system but as a facilities professional, you know how serious a

More information

Superior Pipe Restoration Solutions. Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com

Superior Pipe Restoration Solutions. Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com Superior Pipe Restoration Solutions Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com About Us Belco Pipe Restoration was founded with the concept of using British

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

Emerging Technologies in Wastewater Collection Systems

Emerging Technologies in Wastewater Collection Systems Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation

More information

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials

More information

SPR PE Steel Reinforced Liner

SPR PE Steel Reinforced Liner ENGINEERED SOLUTIONS SPR PE Steel Reinforced Liner Reline Done Right Contech is your single source for rehabilitation of sanitary & storm sewers, culverts and bridges. Contech Engineered Solutions has

More information

2.1 Development of Risk-Based Asset Management Framework

2.1 Development of Risk-Based Asset Management Framework SECTION 2 Development of Asset Management Framework 2.1 Development of Risk-Based Asset Management Framework As part of the master planning effort, WES developed a risk-based asset management framework

More information

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,