1 HRIS v20 Project: updating software and infrastructure to bring business benefits Personnel Services June 2015

2 What are we doing and why? Implementing v20 software and 11g database Fully supported infrastructure and software Improvements sought by users Enable future projects Standard infrastructure on which to build DR plans Single Sign On Services Definition

3 Project Timeline Stage Proposed Dates Investigation/analysis May December 2014 Business case approval December 2014 Project preparation January 2015 Project kick-off February 2015 System review & test prep February March 2015 System April May 2015 UAT June 2015 Non functional & Integration testing July - August 2015 Parallel run Late September / October 2015 Go-live 26 th October 2015 Early life support Two months from Go-Live

4 HRIS V20 HIGH LEVEL PLAN (BASELINE 1) V2 11/6/2015 G 1 End Regression G 2 End of Func G 3 End G4 Go 2015 Key Milestones Live/P Run start Feb Mar Apr May Jun Jul Aug Sep Oct Nov Month PREPARATION TESTING GO LIVE PARALLEL PREPARATION RUNs Project Kickoff HRISTest Ready for Test Training Center available Year End Patch Strict Change Control PROD ready for Application Build LIVE & HRISTEST Config synchronised PROD ready PROD Acceptance JRE 6/8 Available Ready to Start UAT Refresh PROD Functional complete HRIS Team Completed V20 Familiarisation UAT testers Completed Training Non Functional complete Integration Complete 22/9 Start PRUN Data Refresh & Test 29/9 Start Parallel Run 1 23/10 FINAL Data Refresh For PROD LIVE & SUPPORT 27/10/15 Go Live 27/11 Pay From PROD 1. Project Management Supplier & Stakeholder Management Project Management Reporting and Controls Project Close 2. Functional 3. Training 4. Comms & Change 5. Reporting 6. Test Team V20 Training Test Prep Test Team Training Workshops & Reviews HRIS V20 testing UAT QRG updates UAT2 Data Cleansing on LIVE End to Data Cleansing / Additional UAT Preparation inc Letters for UAT End processes Configuration Changes and Letters Parallel Run Planning and Preparation Training Strategy & Prep for UAT Training Planning and Development Communications Activities & Business Change (and Business Readiness) Reporting Development Reporting (HRIS) Regression RT UAT Test Non Functional Prod SIT Management Test Management Interfaces Produce Test Scripts/Test Prep - Regression, Interfaces, SIT, UAT and NFT Parallel Run Prep / Support Parallel Runs Cutover PRUN & User Training 7. Technical SSO Reqs Integration/Interfaces Analysis Technical Design NFT Preparation Non Functional Including SSO, OAT, Perf, Penetration, Failover JRE Setup for Project JRE Mobilisation BAU JRE- UOX Rollout Integration SSO Design SSO Build, Test Cutover Planning Management Technical Builds / Release and Configuration Management Cut over 8. Service Transition Service Definition Service Transition 9. Core HR PROD Build Build QA Regression / UAT Support & Data Cleansing Support (inc Issue/Bug Resolution) Build TRAIN Project Management / Reporting / Resourcing Build PATCH Parallel Data Refresh Rehearsals for Cutover Prun /Handover To Live Support Post Go Live Support

5 Applicants and e-recruitment Applicants: Ability to forward the URL Back button to take applicant back to vacancy search results Jobs by E-recruitment: PDF pack creation more robust foreign characters (diacritics) issue fixed Inbuilt supporting statement functionality Online reference functionality

6 Personnel (1) Comments field added to allowance screen Cost allocations visible on salary approvals Address maintenance effective dates to build a history Substantive appointments and exact match: Ending substantive appointment where multiples exist much easier Unique appointment ID on all data items addresses data quality and reporting issues

7 Personnel (2) Weeks per year field (automates term time FTE) Rules-based continuous service dates Templates no longer stored on C drive Read only access to Appointment Details Direct appointments - gender defaults to unknown Further benefits listed on our webpage:

8 Implications for users HRIS User Group Training - minimal mandatory training and a low time commitment QRGs - updated to reflect v20 Webpage and monthly updates for users Briefings in preparation for go-live HRIS@admin.ox.ac.uk

HRIS v20 Project: updating software and infrastructure to bring business benefits

HRIS v20 Project: updating software and infrastructure to bring business benefits HRIS v20 Project: updating software and infrastructure to bring business benefits Go-Live Briefing September 2015 Personnel Services/IT Services Agenda What we are doing and why What is changing with v20:

More information

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

Analysis One Code Desc. Transaction Amount. Fiscal Period

Analysis One Code Desc. Transaction Amount. Fiscal Period Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00

More information

Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8

Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007

More information

Stephen Doune HRIS Project Manager Plan International

Stephen Doune HRIS Project Manager Plan International Stephen Doune HRIS Project Manager Plan International Content 1. About Plan International 2. The Challenge 3. The Vision 4. About Assima 5. The Projects 6. The Timeline 7. Partner Selection 8. Key 1st

More information

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017 From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days

More information

MONTHLY PROJECT PROGRESS REPORT

MONTHLY PROJECT PROGRESS REPORT MONTHLY PROJECT PROGRESS REPORT Project name: Project description: UCL School of Pharmacy Merger - IT & Data Programme A Programme to ensure all IT & Data elements of the UCL SoP Merger are co-ordinated

More information

Next Generation Tech (NGT) Competition 2015-16 Authored by Robyn Mussler, CEO, Resolution Management Inc., Career Ed PEF board member, Next

Next Generation Tech (NGT) Competition 2015-16 Authored by Robyn Mussler, CEO, Resolution Management Inc., Career Ed PEF board member, Next Next Generation Tech (NGT) Competition 2015-16 Authored by Robyn Mussler, CEO, Resolution Management Inc., Career Ed PEF board member, Next Generation Tech Program Chair Next Generation Tech Competition

More information

Ashley Institute of Training Schedule of VET Tuition Fees 2015

Ashley Institute of Training Schedule of VET Tuition Fees 2015 Ashley Institute of Training Schedule of VET Fees Year of Study Group ID:DECE15G1 Total Course Fees $ 12,000 29-Aug- 17-Oct- 50 14-Sep- 0.167 blended various $2,000 CHC02 Best practice 24-Oct- 12-Dec-

More information

Process Validation Workshops. Overview Session

Process Validation Workshops. Overview Session Process Validation Workshops Overview Session 2 Session Objectives: Prepare staff for participating in a Process Validation Workshop Clarify the Purpose of Process Validation Workshops Clarify Expected

More information

Cost effective methods of test environment management. Prabhu Meruga Director - Solution Engineering 16 th July SCQAA Irvine, CA

Cost effective methods of test environment management. Prabhu Meruga Director - Solution Engineering 16 th July SCQAA Irvine, CA Cost effective methods of test environment management Prabhu Meruga Director - Solution Engineering 16 th July SCQAA Irvine, CA 2013 Agenda Basic complexity Dynamic needs for test environments Traditional

More information

Schools Interoperability Framework (SIF) Project Overview

Schools Interoperability Framework (SIF) Project Overview Schools Interoperability Framework (SIF) Project Overview Agenda Introductions Quick review of past successes and challenges Overview of refined strategy Timeline Questions and answers 2 Review of Past

More information

ID Name Duration Start Finish Predecessors 26 03 10 17 24 31 07 14 21 28 05 12 19 26 02 09 16 23 30 06 13 20 27 04 11 18 25 01 08 15 22 29 06 13 20 27 03 10 17 24 31 07 14 21 28 07 14 21 28 04 11 18 25

More information

Enterprise Resource Planning (ERP) Program: Overview and Status Update

Enterprise Resource Planning (ERP) Program: Overview and Status Update Enterprise Resource Planning (ERP) Program: Overview and Status Update Human Resources (HR), Finance & Property Services (FPS), and Information Technology (IT) Departments For the Council Committee of

More information

Advisory User Group Meeting. October 18, 2011

Advisory User Group Meeting. October 18, 2011 Advisory User Group Meeting October 18, 2011 1 Agenda 11:30 Welcome Christine Lavoie 11:35 Session Objectives Christine Lavoie 11:40 USC s Research Administration System Christine Lavoie 11:50 Project

More information

Roles: Scrum Master & Project Manager

Roles: Scrum Master & Project Manager Roles: Scrum Master & Project Manager Scrum Master: Facilitate collaborative meetings Track team performance Remove impediments (Risk, Issue) Validate team alignment to Agile framework and scope Drive

More information

Committee of the Whole. January 22, 2014

Committee of the Whole. January 22, 2014 Committee of the Whole January 22, 2014 Drivers for 2003 IT Outsourcing Cost savings - privatization model ($2- $3MM/year) Cost avoidance Data center lease with County expiring ($3.5MM) Disaster recovery

More information

Campbell s Journey to Invoice Automation. Joyce Couts, Manager, Business Payment Services Jeff Nowlin, Sr. Manager, Information Technology

Campbell s Journey to Invoice Automation. Joyce Couts, Manager, Business Payment Services Jeff Nowlin, Sr. Manager, Information Technology [ Campbell s Journey to Invoice Automation Joyce Couts, Manager, Business Payment Services Jeff Nowlin, Sr. Manager, Information Technology [ Learning Points Hear why Campbell chose Open Text as their

More information

Consulting Services for Enterprise Resource Planning Project Planning and RFP Development Government Finance Officers Association

Consulting Services for Enterprise Resource Planning Project Planning and RFP Development Government Finance Officers Association Volusia County Schools Consulting Services for Enterprise Resource Planning Project Planning and RFP Development Government Finance Officers Association May 12, 2016 Agenda o Introductions o Approach &

More information

Strategies for a Successful E2E Systems Integration Test. Fiona Charles Let s Test May 9, 2012

Strategies for a Successful E2E Systems Integration Test. Fiona Charles Let s Test May 9, 2012 Strategies for a Successful E2E Systems Integration Test Fiona Charles Let s Test May 9, 2012 This session Describes key project management strategies I have used to manage large- scale Systems Integration

More information

PROJECT: Online Shop STATUS REPORT September 2015

PROJECT: Online Shop STATUS REPORT September 2015 PROJECT: Online Shop STATUS REPORT September Key Project Roles Project Sponsor: Paul Dowler Project Director: Program Manager: Project Manager: Ryan Giltrap Solution Coordinator: Ivan Saric Business Analyst:

More information

EDMS Project Stage 1 Business Plan

EDMS Project Stage 1 Business Plan EDMS Stage 1 Business Plan Corporate Information Support Branch DEPARTMENT OF TREASURY AND FINANCE Version 0.F (16 May 2005) TRIM Reference Number: 08/21227 (PM 001 Version 2.0 September 2002) Acknowledgements

More information

Consumer ID Theft Total Costs

Consumer ID Theft Total Costs Billions Consumer and Business Identity Theft Statistics Business identity (ID) theft is a growing crime and is a growing concern for state filing offices. Similar to consumer ID theft, after initially

More information

City of Minneapolis RCA Provision of IT Services. Committee of the Whole February 11, 2015

City of Minneapolis RCA Provision of IT Services. Committee of the Whole February 11, 2015 City of Minneapolis RCA Provision of IT Services Committee of the Whole February 11, 2015 Background IT Services contract with Unisys signed 12/2002 Unisys contract renegotiated in 2007 Reduced cost, added

More information

Bb Upgrade Timeline. Oct Nov Dec Jan 2011 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 2012. PDFmyURL.com

Bb Upgrade Timeline. Oct Nov Dec Jan 2011 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 2012. PDFmyURL.com Bb Upgrade Timeline Oct Nov Dec Jan 2011 Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan 2012 Technology Create a training plan for Bb early adopters and mentors Conduct Transitioning to Bb 9.1 training

More information

opennms reporting generation tool

opennms reporting generation tool opennms reporting generation tool Juan Pedro Escalona DevOps Southampton, UK - 2014 Juan Pedro Escalona DevOps / Systems Administrator with over 6 years experience administering different OS, network systems

More information

EMR Capacity Market Implementation Coordination Workshop

EMR Capacity Market Implementation Coordination Workshop EMR Capacity Market Implementation Coordination Workshop Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight

More information

Leveraging Technology For ICD-10 Program Management Using MS SharePoint 2010. Poster Presentation by Maithili Vadula

Leveraging Technology For ICD-10 Program Management Using MS SharePoint 2010. Poster Presentation by Maithili Vadula Leveraging Technology For ICD-10 Program Management Using MS SharePoint 2010 Poster Presentation by Maithili Vadula ICD-10 Project using SharePoint: Project Background: New structure for coding diagnosis

More information

2016 Examina on dates

2016 Examina on dates Please note the following informa on: The following exams are available throughout the year: Please click on the exam for which you wish to see the dates. When you have finished, you can select to return

More information

Session 3503: KARL STORZ: Cloud integration for ERP and SuccessFactors

Session 3503: KARL STORZ: Cloud integration for ERP and SuccessFactors Orange County Convention Center Orlando, Florida June 3-5, 2014 Session 3503: KARL STORZ: Cloud integration for ERP and SuccessFactors Donna Leong-Cohen and Michael Pitisci What we ll cover Learning Points

More information

Change Management Plan June 2013

Change Management Plan June 2013 Change Management Plan June 2013 Agenda Change Management by Phase Change Management Plan Department Readiness Training All Campus Communications Post-Implementation Support Resources 2 High Level Change

More information

Changes to 2015-16 reporting requirements. Teleconference December 2015

Changes to 2015-16 reporting requirements. Teleconference December 2015 Changes to 2015-16 reporting requirements Teleconference December 2015 Resources Click to download 2015-16 Indicative format: workplace profile and reporting questionnaire 2015-2016 workplace profile worksheets

More information

ICD-10 Training and Preparation The Road to ICD-10 April 23, 2015

ICD-10 Training and Preparation The Road to ICD-10 April 23, 2015 Seton Healthcare Family Health Information Management ICD-10 Training and Preparation The Road to ICD-10 April 23, 2015 Preparing for ICD*10 Introduction & Background ICD-10 preparation began in 2012 Approximately

More information

Oracle Cloud Been there, Done that!

Oracle Cloud Been there, Done that! Oracle Cloud Been there, Done that! What we have heard today Can we upgrade from 11i or R12 to Fusion? (sure lets call it Cloud) Oracle Cloud has many flavors Fusion (ERP, HCM etc), licensing (SaaS model),

More information

Bad Honnef 14.-15. September 2010. Reiner Schmitt. schmitt consulting. your license. our business

Bad Honnef 14.-15. September 2010. Reiner Schmitt. schmitt consulting. your license. our business Bad Honnef 14.-15. September 2010 Reiner Schmitt schmitt consulting your license. our business Agenda 1. Responsibilities @ SAP AG 2. Motivation / Challenges for Software License & Asset 3. Transparency

More information

Consolidating Multiple Product Development Systems at TreeHouse Foods into SAP Product Lifecycle Management

Consolidating Multiple Product Development Systems at TreeHouse Foods into SAP Product Lifecycle Management Consolidating Multiple Product Development Systems at TreeHouse Foods into SAP Product Lifecycle Management Kathy Kugelman, TreeHouse Foods Robin Patrawala, Linx-AS SESSION CODE: PL1288 AGENDA About TreeHouse

More information

Proposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre

Proposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre Proposal to Reduce Opening Hours at the Revenues & Benefits Coventry Call Centre Proposal To change the opening hours of the Revenues & Benefits Call Centre to 9am until 5pm Monday to Friday with effect

More information

Data Migration/Conversion to SAP from Legacy systems - Our Strategy

Data Migration/Conversion to SAP from Legacy systems - Our Strategy By, WWW.101ERPTEAM.COM Data Migration/Conversion to SAP from Legacy systems - Our Strategy Project Implementation Team ---------------------------------------- SAP Consulting Services - Implementation,

More information

Managing Open Source Code Best Practices

Managing Open Source Code Best Practices Managing Open Source Code Best Practices September 24, 2008 Agenda Welcome and Introduction Eran Strod Open Source Best Practices Hal Hearst Questions & Answers Next Steps About Black Duck Software Accelerate

More information

Resource Management Spreadsheet Capabilities. Stuart Dixon Resource Manager

Resource Management Spreadsheet Capabilities. Stuart Dixon Resource Manager Resource Management Spreadsheet Capabilities Stuart Dixon Resource Manager Purpose Single view of resource data Shows rolling demand vs supply for 14 months, 2 months back, current month, and 11 forward

More information

CENTERPOINT ENERGY TEXARKANA SERVICE AREA GAS SUPPLY RATE (GSR) JULY 2015. Small Commercial Service (SCS-1) GSR

CENTERPOINT ENERGY TEXARKANA SERVICE AREA GAS SUPPLY RATE (GSR) JULY 2015. Small Commercial Service (SCS-1) GSR JULY 2015 Area (RS-1) GSR GSR (LCS-1) Texarkana Incorporated July-15 $0.50690/Ccf $0.45450/Ccf $0.00000/Ccf $2.85090/MMBtu $17.52070/MMBtu Texarkana Unincorporated July-15 $0.56370/Ccf $0.26110/Ccf $1.66900/Ccf

More information

Supervisor Instructions for Approving Web Time Entry

Supervisor Instructions for Approving Web Time Entry Supervisor Instructions for Approving Web Time Entry Time Approval Deadlines by Category Local 2110 Members members submit time by NOON on Monday of the pay week. Time should be approved no later than

More information

How To Implement Fusion Hcm

How To Implement Fusion Hcm Fixed Scope Offering Fusion HCM Implementation Mindtree limited 2015 Agenda Business Objectives Product Overview Key Implementation Features Implementation Packages & Timelines High Level Scope Implementation

More information

Coordination and air quality monitoring during emergencies. Colin Powlesland Environment Agency

Coordination and air quality monitoring during emergencies. Colin Powlesland Environment Agency Coordination and air quality monitoring during emergencies Colin Powlesland Environment Agency Contents h Introduction h What do we want to achieve? h Implementation programme h Incident timeline h Proposed

More information

Driving Ongoing Success with the Coupa Customer Team

Driving Ongoing Success with the Coupa Customer Team Driving Ongoing Success with the Coupa Customer Team AGENDA Welcome Introductions Home Retail Group FirstPort Customer Success Organization Overview Driving Ongoing Success with the Coupa Customer 1. Home

More information

Detailed guidance for employers

Detailed guidance for employers April 2015 3 Detailed guidance for employers Appendix A: Pay reference periods This document accompanies: Detailed guidance no. 3 Assessing the workforce Pay reference period calendars where the definition

More information

ESSEX FIRE AUTHORITY Essex County Fire & Rescue Service

ESSEX FIRE AUTHORITY Essex County Fire & Rescue Service ESSEX FIRE AUTHORITY Essex County Fire & Rescue Service MEETING Policy & Strategy Committee AGENDA ITEM 7 MEETING DATE 25 March 2009 REPORT NUMBER SUBJECT REPORT BY Monitoring IT Transformation Progress

More information

OHA MAGI Medicaid System Transfer Project Oregon Eligibility (ONE) Overview Fall 2015

OHA MAGI Medicaid System Transfer Project Oregon Eligibility (ONE) Overview Fall 2015 OHA MAGI Medicaid System Transfer Project Oregon Eligibility (ONE) Overview Fall 2015 Table of Contents Project Overview 3 Eligibility and Enrollment 4 Project Mission and Key Benefits 5 Median Household

More information

How to develop a small business marketing plan

How to develop a small business marketing plan How to develop a small business marketing plan Introduction This template has been designed to assist you in the development of your marketing plan. Once you have undertaken each of the activities in this

More information

Energy Savings from Business Energy Feedback

Energy Savings from Business Energy Feedback Energy Savings from Business Energy Feedback Behavior, Energy, and Climate Change Conference 2015 October 21, 2015 Jim Stewart, Ph.D. INTRODUCTION 2 Study Background Xcel Energy runs the Business Energy

More information

Accident & Emergency Department Clinical Quality Indicators

Accident & Emergency Department Clinical Quality Indicators Overview This dashboard presents our performance in the new A&E clinical quality indicators. These 8 indicators will allow you to see the quality of care being delivered by our A&E department, and reflect

More information

City & County of San Francisco Permit & Project Tracking System

City & County of San Francisco Permit & Project Tracking System City & County of San Francisco Permit & Project Tracking System PPTS Sneak Preview March 20, 2013 Welcome & Opening Statements AGENDA 1. Opening Statements Department Directors 2. Project Background 3.

More information

Software Change Management Elements of a Software Change Management Strategy. SAP AGS - IT Planning May 2013

Software Change Management Elements of a Software Change Management Strategy. SAP AGS - IT Planning May 2013 Software Change Management Elements of a Software Change Management Strategy SAP AGS - IT Planning May 2013 Elements of a Software Change Management Strategy Introduction Introduction Software Change Management

More information

GTA Board of Directors September 4, 2014

GTA Board of Directors September 4, 2014 GTA Board of Directors September 4, 2014 Our Strategic Vision Our Mission A transparent, integrated enterprise where technology decisions are made with the citizen in mind To provide technology leadership

More information

Update of the new HR Information System (HRIS)

Update of the new HR Information System (HRIS) Update of the new HR Information System (HRIS) Heather Skevington - Business Services & Projects Anne Harkness - Personnel Services Richard McDonald - Business Services & Projects Mike Blackburn - Core

More information

Supplier Conference Call

Supplier Conference Call AE Operations Supplier Conference Call AGENDA Introduction Changes for the suppliers Next steps More information & Johnson Controls contacts 2 Johnson Controls, Inc. - INTERNAL Welcome to our supplier

More information

Michigan Student Data System

Michigan Student Data System Michigan Student Data System MERA November 2008 Trina Anderson Student Data Manager 1 What is MSDS? The Michigan Student Data System is the state student tracking system. It is the mechanism for districts

More information

fda Collateral & Valuation Reporting Outreach Industry Advisory Group DTCC

fda Collateral & Valuation Reporting Outreach Industry Advisory Group DTCC fda Collateral & Valuation Reporting Outreach Industry Advisory Group UAT and Production Planning. The following information will be provided to our clients. General information about the need for the

More information

UR Financials Project

UR Financials Project UR Financials Project Demo Days February 2015 Agenda UR Financials Project Update January Close Progress Reporting Enhancements Training Update Workday Releases Communications Saving Filters Demonstration

More information

Completed and Current Projects

Completed and Current Projects Completed and Current Projects This project list is updated regularly with the current status of each project and the milestones that have been achieved. You can see the latest information on each project

More information

1. Introduction. 2. User Instructions. 2.1 Set-up

1. Introduction. 2. User Instructions. 2.1 Set-up 1. Introduction The Lead Generation Plan & Budget Template allows the user to quickly generate a Lead Generation Plan and Budget. Up to 10 Lead Generation Categories, typically email, telemarketing, advertising,

More information

CAFIS REPORT 2015.10

CAFIS REPORT 2015.10 CAFIS REPORT 2015.10 INDEX Message CAFIS Inbound 03-06 07-08 CAFIS Arch 09-10 CAFIS Brain 11-12 CAFIS Global 13-14 What We Do 15-16 About CAFIS 17-18 Services for Member Stores 19-34 Services for Card

More information

Step by step to success: Introducing the iscala 3.0 Functional Service Pack

Step by step to success: Introducing the iscala 3.0 Functional Service Pack Step by step to success: Introducing the iscala 3.0 Functional Service Pack FSP2 Functional Highlights 14 October 2014 Rogla, Slovenia Szabolcs Ecsedi Product Marketing Manager, Epicor PROTECT EXTEND CONVERGE

More information

TERMS OF REFERENCE FOR THE HUMAN RESOURCES AND COMPENSATION COMMITTEE

TERMS OF REFERENCE FOR THE HUMAN RESOURCES AND COMPENSATION COMMITTEE I. PURPOSE The purpose of the Human Resources and Compensation Committee (the Committee ) is to assist the Board in fulfilling its obligations relating to human resource and compensation policy and related

More information

CHILDREN AND YOUNG PEOPLE'S PLAN: PLANNING AND PERFORMANCE MANAGEMENT STRATEGY

CHILDREN AND YOUNG PEOPLE'S PLAN: PLANNING AND PERFORMANCE MANAGEMENT STRATEGY CHILDREN AND YOUNG PEOPLE'S PARTNERSHIP BOARD CHILDREN AND YOUNG PEOPLE'S PLAN: PLANNING AND PERFORMANCE MANAGEMENT STRATEGY 1 Introduction 1.1 The purposes of this strategy are to set out: i) the arrangements

More information

Business Plan Example. 31 July 2020

Business Plan Example. 31 July 2020 Business Plan Example 31 July Index 1. Business Overview 1.1Objectives 1.2Vision Mission and Values 1.3 Keys to Success 2. Business Management 3. Services 2.1 Company Summary 2.2 Company Ownership 2.3

More information

Solvency II Preparation and IMAP James Latto

Solvency II Preparation and IMAP James Latto and James Latto Contents 2 1 Balancing priorities Insurers need to balance priorities over the next year: Main focus is often on Pillar 3 and external reporting needs sufficient focus Ensure smooth transition

More information

Automating New Market Entry Rollout

Automating New Market Entry Rollout Automating New Market Entry Rollout W H E R E T E C H N O L O G Y W O R K S F O R B U S I N E S S The material contained in this document is proprietary to Triniti (Triniti). This material may not be disclosed,

More information

Expense Requests. Stanford s system for Expense Reports, Reimbursements, and Non-PO Payments

Expense Requests. Stanford s system for Expense Reports, Reimbursements, and Non-PO Payments Expense Requests Stanford s system for Expense Reports, Reimbursements, and Non-PO Payments Procurement Organization Who are we? Chief Procurement Officer (Ben Moreno) Admin Procurement Director (David

More information

Building an Effective Roadmap

Building an Effective Roadmap Building an Effective Roadmap Jason Tanner Senior Consultant, Enthiosys Motivated from Within Thank you to our sponsors 2 Agenda What is an effective roadmap? What are roadmap benefits? Why do roadmaps

More information

RAD PROJECT PLAN <Please insert PROJECT NAME here> R.<Please insert RELEASE NUMBER here> FINANCIAL MANAGEMENT SERVICE

RAD PROJECT PLAN <Please insert PROJECT NAME here> R.<Please insert RELEASE NUMBER here> FINANCIAL MANAGEMENT SERVICE Name Duration % Complete Resource Names 1 RAD Release Schedule 120 days 0% 2 Start-Up Phase 10 days 0% 3 Create and Review Business Process Workflow 2 days 0%,Business Functional Lead,Executive Sponsor

More information

PROJECT: DLS Website Redesign STATUS REPORT May-June 2015

PROJECT: DLS Website Redesign STATUS REPORT May-June 2015 PROJECT: DLS Website Redesign STATUS REPORT May-June 2015 Key Project Roles Project Sponsor: Karen Johnson Executive Director, DLS Project Advisor: Vanessa Salway Program Manager: Project Manager: Steve

More information

Becoming a customer: NBN Co s Onboarding and Accreditation program

Becoming a customer: NBN Co s Onboarding and Accreditation program Becoming a customer: NBN Co s Onboarding and Accreditation program Matthew Lobb General Manager, Industry Engagement Ben Salmon Account Director Peter Girvan General Manager, National Test Facility Daniel

More information

THE QUALITY MANAGEMENT SYSTEM IS YOURS UP TO STANDARD?

THE QUALITY MANAGEMENT SYSTEM IS YOURS UP TO STANDARD? THE QUALITY MANAGEMENT SYSTEM IS YOURS UP TO STANDARD? Nigel Anderson, Head of Global Service Delivery Group Corporate Facilities Management, EMEA 1. SETTING THE SCENE Customer service expectations in

More information

RadBlue Load Tester Version 6. [Released: 09 DEC 2009]

RadBlue Load Tester Version 6. [Released: 09 DEC 2009] Version 6 [Released: 09 DEC 2009] In this release, we modified the database setup screen of the RLT installer to default to SQL server information (the recommended database). The Transcript has been modified

More information

Contributions Implementation Planning Concepts and Approach

Contributions Implementation Planning Concepts and Approach Contributions Implementation Planning Concepts and Approach Presented by: Philip Hind National Program Manager Data Standards and ecommerce Program Australian Taxation Office November 013 V1.1 1 Contents

More information

7 Characteristics of High Performing Firms. Smartsoftware Seminar

7 Characteristics of High Performing Firms. Smartsoftware Seminar 7 Characteristics of High Performing Firms Smartsoftware Seminar Key Characteristics 1. Rock Solid Reputation 2. Determined Leadership 3. Enlightened Management 4. Well Managed Projects 5. Innovative Culture

More information

How To Write A New Law On The Euro Zone

How To Write A New Law On The Euro Zone Consejo Superior Geográfico Especificaciones de Datos de los anexos II y III Pedro A. González 2012-04-13 Reunión GT Madrid 1 2012-04-13 Reunión GT Madrid 2 2 Detailed Implementing Rule Development Timetable

More information

Cash flow lesson suggestions & activities - CIMA

Cash flow lesson suggestions & activities - CIMA Cash flow lesson suggestions & activities - CIMA Learning outcomes Students should... Understand the structure of a cash flow forecast (AO1) and evaluate cash flow forecasts as decision making tools (AO3/4)

More information

Release of the Draft Cybersecurity Procurement Language for Energy Delivery Systems

Release of the Draft Cybersecurity Procurement Language for Energy Delivery Systems Release of the Draft Cybersecurity Procurement Language for Energy Delivery Systems Energy Sector Control Systems Working Group Supporting the Electricity Sector Coordinating Council, Oil & Natural Gas

More information

NHS BLOOD AND TRANSPLANT MARCH 2009 RESPONDING EFFECTIVELY TO BLOOD DONOR FEEDBACK

NHS BLOOD AND TRANSPLANT MARCH 2009 RESPONDING EFFECTIVELY TO BLOOD DONOR FEEDBACK 09/26 NHS BLOOD AND TRANSPLANT MARCH 2009 RESPONDING EFFECTIVELY TO BLOOD DONOR FEEDBACK EXECUTIVE SUMMARY From April 2009 an NHS wide common approach to complaint handling comes in to effect. This provides

More information

2012 CBECS: Preliminary Results and Timeline for Data Release

2012 CBECS: Preliminary Results and Timeline for Data Release 2012 CBECS: Preliminary Results and Timeline for Data Release Joelle Michaels, CBECS Survey Manager Interagency Sustainability Working Group September 18, 2012 Washington, DC U.S. Energy Information Administration

More information

EMA SPOR master data management roadmap

EMA SPOR master data management roadmap EMA SPOR master data management roadmap EU ISO IDMP Task Force meeting For information March 2015 Presented by: Kepa Amutxastegi Business Data and Support Department An agency of the European Union Roadmap

More information

OPERATING FUND. PRELIMINARY & UNAUDITED FINANCIAL HIGHLIGHTS September 30, 2015 RENDELL L. JONES CHIEF FINANCIAL OFFICER

OPERATING FUND. PRELIMINARY & UNAUDITED FINANCIAL HIGHLIGHTS September 30, 2015 RENDELL L. JONES CHIEF FINANCIAL OFFICER PRELIMINARY & UNAUDITED FINANCIAL HIGHLIGHTS September 30, 2015 RENDELL L. JONES CHIEF FINANCIAL OFFICER MANAGEMENT OVERVIEW September 30, 2015 Balance Sheet Cash and cash equivalents had a month-end balance

More information

Central Hosting. Case Study

Central Hosting. Case Study Central Hosting Case Study October, 2014 Central Hosting Case Study Background An Chéim was originally set up to procure, distribute and implement key MIS systems (hardware and software) for the Institutes

More information

ACTIVE MICROSOFT CERTIFICATIONS:

ACTIVE MICROSOFT CERTIFICATIONS: Last Activity Recorded : August 04, 2011 Microsoft Certification ID : 483228 KENT NORDSTROM Asbergsvagen 27 Soderhamn, 82637 SW kent@xpservices.se ACTIVE MICROSOFT CERTIFICATIONS: Microsoft Certified Solutions

More information

PowerSteering Hosting/Cloud Investments

PowerSteering Hosting/Cloud Investments Do the right work. Do the work right. cloud-based project, portfolio and work management software PowerSteering Hosting/Cloud Investments Sean Nathaniel, VP of Product Development 9/17/2013 How to Participate

More information

Executive Branch IT Reorganization Project Plan

Executive Branch IT Reorganization Project Plan Office of Information Resource Management Executive Branch Project Plan Work Program Funded by for IT Appropriations Reorganization 2007, 2009 and Five Small Projects Date: August 2009 Version: 1.3 Revision

More information

Oracle Taleo Professional/Consulting Services Descriptions December 10, 2015

Oracle Taleo Professional/Consulting Services Descriptions December 10, 2015 Oracle Taleo Professional/Consulting Services Descriptions December 10, 2015 Product Oracle Taleo Enterprise- Remote Systems Administration & Oracle HCM Cloud - Remote Systems Administration Oracle Taleo

More information

EDI Services helps healthcare network streamline workflow, increase productivity, and improve revenue cycle management.

EDI Services helps healthcare network streamline workflow, increase productivity, and improve revenue cycle management. GE Healthcare Results summary 2008 2010 Reduced eligibility rejection rate from 2% to 0.8% Reduced overall rejection rate from 6.4% to 4% Reduced cost to collect from 8.3% to 6.3% Increased the number

More information

Financial Operating Procedure: Budget Monitoring

Financial Operating Procedure: Budget Monitoring Financial Operating Procedure: Budget Monitoring Original Created: Jan 2010 Last Updated: Jan 2010 1 Index 1 Scope of Procedure...3 2 Aim of Procedure...3 3 Roles & Responsibilities...3 Appendix A Timetable...7

More information

1. Introduction. 2. Performance against service levels 1 THE HIGHLAND COUNCIL. Agenda Item. Resources Committee 26 th March 2003 RES/43/03

1. Introduction. 2. Performance against service levels 1 THE HIGHLAND COUNCIL. Agenda Item. Resources Committee 26 th March 2003 RES/43/03 1 THE HIGHLAND COUNCIL Resources Committee 26 th March 2003 Performance report for January / February 2003 Report by the Information Systems Client Manager Agenda Item Report No 18 RES/43/03 Summary This

More information

Enterprise Data Management. Data Factory as a Service (DFaS)

Enterprise Data Management. Data Factory as a Service (DFaS) Enterprise Data Management Data Factory as a Service (DFaS) Data Factory as a Service (DFaS) What is DFaS? DFaS offers a proven approach to deliver comprehensive services for end-to-end data conversion

More information

Procurement Planning

Procurement Planning MatriX Engineering Project Support Pinnacle Business Solutions Ltd www.pinsol.com www.matrix-eps.com Proc_Plan.doc Page 2 of 21 V_09_03 Contents 1.0 INTRODUCTION... 5 1.1 KPIS AND MEASURABLE TARGETS...

More information

CPSC ITDS/RAM Pilot System: PGA Message Set

CPSC ITDS/RAM Pilot System: PGA Message Set CPSC ITDS/RAM Pilot System: PGA Message Set Electronic Certificate Filing Test March 27, 2015 This presentation has not been reviewed or approved by the Commission and may not reflect its views CPSC Background

More information

Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda

Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda SAWS Sanitary Sewer Overflow Reduction Program Jeff Haby, P.E. Director Sewer System Improvements SA Military Engineers Meeting Agenda SAWS Overview Consent Decree CD Compliance Programs Program Transition

More information

Project Q Contact Management Service. UK Link Committee Meeting 10 November 2011

Project Q Contact Management Service. UK Link Committee Meeting 10 November 2011 Project Q Contact Management Service UK Link Committee Meeting 10 November 2011 Agenda 1. Project Q Update 1.1 Project Timeline Indicative Milestones 1.2 Service Name 1.3 Contact Management Service Landing

More information

JISC data.bris project & EPSRC Platform project: progress against workplan (October 2012)

JISC data.bris project & EPSRC Platform project: progress against workplan (October 2012) Project Name : data.bris DBSG/5/2 JISC data.bris project & EPSRC Platform project: progress against workplan (October 2012) WORKPACKAGES Month: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Oct 11 Nov Dec

More information