2 Contents Recap of Chazey recommendations HR opportunities for transformation and preliminary timeline OFCCP conciliation agreement update 2

3 Summary of Chazey Partners recommendations Campus HR Recommendations Consolidate the four service centers into a single HR shared services organization to further develop standard practices and improve efficiency. Assess the optimal workflow among transactional/administrative, professional/technical and policy/strategic aspects for best alignment with the two specialty centers and HR leadership. Develop/expand new roles to provide strategic and tactical support to business leaders at UCSF. Enhance technology to enable HR work, focusing on workflow and document management, case management and performance metrics, and integration of existing systems. Develop and share performance measurements that include input, operational, and output performance indicators. Continue to consider integrated solutions for campus and health system functions as appropriate, although this is not a recommendation to integrate campus and health system HR at this time. Report includes a potential future savings of up to 24 FTE Feasibility depends on Assumption of $3.3M in 1X implementation costs (project & technology) UCPath services provided as planned New organization structure as recommended by Chazey we need to understand what elements of Chazey s recommendations are reasonable at UCSF 3

4 Human Resources opportunities for transformation Organization Optimize organizational structures to streamline delivery single service center, dedicated postdoc service line, optimal LER structure Assess and actualize recommendations from Chazey Partners independent study Business Processes Identify quick wins for customers and partner to address key challenges with simple fixes Apply LEAN to improve processes/workflow that directly impact customer interactions Priority areas are improved post doc processes, LER processes, and onboarding Technology Deploy CRM technology to transform the customer engagement experience Digitalize personnel files to enable direct, effortless and intelligent access to HR information and records Optimize Enterprise Data Warehouse to support planning and decision-making in staff and academic personnel 4

5 Org - Client Tech Process Integrated Plan Dec. 14 Mar. 15 Jun. 15 Sept. 15 Dec. 15 Org Change Step 1 Shared Services Consolidation Org Change Step 2 Postdoc service line LER workflow/roles Improve through new workflow New Value Consolidate Shared Services Integration (As-is workflows) CEM & Quality Teams Standardize & Develop Tools Quick wins/key challenges Website/Process Documentation Priority process improvement within existing workflow Post Doc service line LER roles/workflow OFCCP Workflow Enhanced Client Engagement (performance reporting) Lean Improvements Tiered workflow: Design & Implement CIF/Account managers Portal efiles Case Management Ticketing Savings through efficiency Or New services 5

6 Customer engagement Customer representatives to participate in selection of new director positions Repurpose/engage SPA subcommittee members for advice on Assessing and understanding customer impact of changes Feedback on communication and change management tools to ensure customer needs are thoroughly considered Postdoc workflow design LER structure and workflow design Identifying key challenges for customers to develop quick wins 6

7 Communication Current efforts HR Update Quarterly Update from AVC HR Website Advisory Board meetings Control points meetings Targeted stakeholder groups, including AB subcommittees and planned quick wins workgroup 7

8 Lean process improvement HR is participating in a FAS-wide lean pilot focused on onboarding A cross-functional cohort with representatives from IT, HR, Police, PMO and academic departments completed valuestream mapping of the onboarding process in October Identified at least 12 sub-processes and 71 steps in the current process Set the goal of reducing the time involved in onboarding from 17 days to 8 days (without visa) Teams are now participating in kaizen workshops over the next six months for a detailed look at improvements in door access, new hire forms, badging, systems/tools, and orientation sessions Kaizen #1 (early November) resulted in a process that will enable new hires to receive a badge with appropriate door access on the first day of work Building HR expertise in lean process improvement principles in order to expand/adapt it more broadly within the HR organization 8

9 Technology strategy HR is in the process of developing a roadmap to deploy CRM technology to transform the customer engagement experience and optimize Enterprise Data Warehouse to support planning and decision making in Staff and Academic Personnel Human Resource Management System Transaction Processing System Manages HR actions Processes payroll Manages benefits Serves as System of Record for Payroll and basic HR data Integration with secondary local UCSF systems focused on critical AP functions (Advance, MPM) 9 UCPath HRMS UCSF EDW UCSF CRM Enterprise Data Warehouse Contains financial, human resources and other administrative data Single integrated repository for data from HR Technology Hub Customer Relationship Management Ticketing System Case Management System Knowledge Management Collateral Imaging & Document Management Portal Mobile Apps Telephony

10 OFCCP conciliation agreement Review period: November 1, 2010 to October 31, 2011 Conciliation agreement June 2014 No findings of discrimination Technical violations related to failure to collect and maintain employment records and to perform accurate analysis to determine whether/where impediments to equal employment opportunity exist Remedies include implementing recordkeeping and applicant tracking procedures and monitoring/evaluating selection rates in employment processes to identify disparities Report to OFCCP August 1, 2015 for period of June 30, 2014 to July 1, 2015 Process change implementation Senior management endorses business process changes Comprehensive stakeholder outreach, communication and training efforts will begin in December and be ongoing as changes are implemented 10

11

UCPath Project Status Report

UCPath Project Status Report UCPath Project Status Report Report Date September 20, 2013 Program Directors Mark Cianca Sabu Varguese Executive Sponsors Nathan Brostrom Peter Taylor Project Summary The project s near-term priorities

More information

HR Service Delivery: Campus Initiatives

HR Service Delivery: Campus Initiatives HR Service Delivery: Campus Initiatives David Odato, UCSF Jeannine Raymond, UCB Ramona Agrela, UCI Karen Hull, UCD Facilitated by: Scott Bolman, Mercer University of California Human Resources December

More information

Government of Canada Transformation of Pay Administration Initiative. Presentation to Financial Management Institute

Government of Canada Transformation of Pay Administration Initiative. Presentation to Financial Management Institute Government of Canada Transformation of Pay Administration Initiative Presentation to Financial Management Institute Presented By: Brigitte Fortin, Associate Assistant Deputy Minister Accounting, Banking

More information

SUMMARY PROFESSIONAL EXPERIENCE. IBM Canada, Senior Business Transformation Consultant

SUMMARY PROFESSIONAL EXPERIENCE. IBM Canada, Senior Business Transformation Consultant Doreen Funk, MA 191 Discovery Ridge Blvd SW, Calgary Cell: 587-434- 0811 E- mail: dorfunk@hotmail.com SUMMARY Senior management consultant with 20 years of experience in applying strategies and implementing

More information

FEEDBACK from Higher Learning Commission Review - October 2015

FEEDBACK from Higher Learning Commission Review - October 2015 FEEDBACK from Higher Learning Commission Review - October 2015 Title SARS - Early Alert and Scheduling System Category 1-Helping Students Learn Timeline 1: CURRENT PROJECT STATUS SUMMARY General Project

More information

One IT Governance. Maggie Jesse, Tim Shie. Romy Bolton

One IT Governance. Maggie Jesse, Tim Shie. Romy Bolton Project Name: Project Team Leads: Project Manager: One IT Governance Maggie Jesse, Tim Shie Romy Bolton TeamDynamix Project Number: 241126 Project Overview Governance refers to the mechanisms, processes

More information

HR Transformation Update. HR Community Town Hall June 18, 2013

HR Transformation Update. HR Community Town Hall June 18, 2013 HR Transformation Update HR Community Town Hall June 18, 2013 1 Today s agenda Review HR Transformation initiative Discuss results of HR Online Survey Review guiding principles and HR Vision Share leading

More information

Leadership Performance and Development Plan

Leadership Performance and Development Plan Leadership Performance and Development Plan Overview February 2015 Leadership Performance & Development Plan The Leadership Performance and Development Form is a tool for leaders, in collaboration with

More information

Summary of FY16 FAS Initiatives - March 31, 2016

Summary of FY16 FAS Initiatives - March 31, 2016 I. Create an exceptional campus physical infrastructure and space management program with the lowest total cost of ownership a. Ensure physical development is in concert with Long Range Development Plan

More information

Explore the Possibilities

Explore the Possibilities Explore the Possibilities 2013 HR Service Delivery Forum Best Practices in Data Management: Creating a Sustainable and Robust Repository for Reporting and Insights 2013 Towers Watson. All rights reserved.

More information

Review of the Information and Communication Technology Services, Systems & Infrastructure of the Division of Information Services 2012

Review of the Information and Communication Technology Services, Systems & Infrastructure of the Division of Information Services 2012 Review of the Information and Communication Technology Services, Systems & Infrastructure of the Division of Information Services 2012 Implementation Plan General Comments: The Information Services division

More information

Organizational Development Plan

Organizational Development Plan Commonwealth of Massachusetts Consolidation Planning Project Plan Version 11.0 05/03/2009 Revision History The table below serves to track the key revisions made to this document for change control purposes.

More information

Using SAP Master Data Technologies to Enable Key Business Capabilities in Johnson & Johnson Consumer

Using SAP Master Data Technologies to Enable Key Business Capabilities in Johnson & Johnson Consumer Using SAP Master Data Technologies to Enable Key Business Capabilities in Johnson & Johnson Consumer Terry Bouziotis: Director, IT Enterprise Master Data Management JJHCS Bob Delp: Sr. MDM Program Manager

More information

Division of Human Resources. Strategic Plan For a Culture of Excellence

Division of Human Resources. Strategic Plan For a Culture of Excellence Division of Human Resources Strategic Plan For a Culture of Excellence TABLE OF CONTENTS INTRODUCTION... 2 DEPARTMENTAL MISSION STATEMENT ALIGNMENT... 4 HUMAN RESOURCES STRATEGIC DIRECTIONS... 5 HR STRATEGIC

More information

Embracing EPA as a High-Performing Organization Fiscal Year 2016 Action Plan

Embracing EPA as a High-Performing Organization Fiscal Year 2016 Action Plan Embracing EPA as a High-Performing Organization Fiscal Year 2016 Action Plan Maintain and attract EPA s diverse and engaged workforce of the future with a more collaborative work environment. Modernize

More information

CSG UCLA Enterprise Service Bus (ESB)

CSG UCLA Enterprise Service Bus (ESB) CSG UCLA Enterprise Service Bus (ESB) May 28, 2013 Draft Information Technology Services Enterprise Service Bus (ESB) The UCLA Enterprise Service Bus (ESB) is an application middleware solution designed

More information

FY13 Information Technology Operational Plan

FY13 Information Technology Operational Plan 1a: Work toward building a modern data center and providing data services that support campus units and the strategic goals of the University. Create a technical and financial plan for a data center Q1-

More information

Enterprise Resource Planning Presentation to the Joint Legislative Oversight Committee on Information Technology.

Enterprise Resource Planning Presentation to the Joint Legislative Oversight Committee on Information Technology. Enterprise Resource Planning Presentation to the Joint Legislative Oversight Committee on Information Technology December 18, 2014 Enterprise Resource Planning (ERP) definition ERP is a business system

More information

Customers and Corporate Services Directorate (Corporate Support) Plan 2015-16

Customers and Corporate Services Directorate (Corporate Support) Plan 2015-16 Appendix 2 Action Plan Due Date Status Customers and Corporate Services Directorate (Corporate Support) Plan 2015-16 CS1027 ICT Improvement Programme 31 January 2016 Objectives: CORPORATE SERVICES: ICT

More information

4/1/2009. Short-termterm

4/1/2009. Short-termterm Hi, my name is Susan ITIL in the Workplace The Practical Application of a Best Practice Framework Susan Ryan April 3, 2009 IT industry worker for over 25 years ITIL v2 Manager Certified itsmf Minnesota

More information

Managed Solution. for Staffing Industry

Managed Solution. for Staffing Industry Managed Solution for Staffing Industry Abstract As staffing industries are being challenged with revenue growth, the focus area for them is to reduce their back office costs continually, streamline the

More information

Why are PMO s are Needed on Large Projects?

Why are PMO s are Needed on Large Projects? Why are PMO s are Needed on Large Projects? Keeps Project Manager focused on: Priority risks Priority issues Stakeholder alignment Technical challenges Ensures administrative tasks are completed: Projects

More information

The Thinking Approach LEAN CONCEPTS. 2012-2013, IL Holdings, LLC All rights reserved 1

The Thinking Approach LEAN CONCEPTS. 2012-2013, IL Holdings, LLC All rights reserved 1 The Thinking Approach LEAN CONCEPTS All rights reserved 1 Basic Thinking to Manage the Journey MANAGEMENT TACTICS OF A LEAN TRANSFORMATION All rights reserved 2 LEAN MANAGEMENT Two key questions What is

More information

A Vision for the U.S. Credentialing Marketplace December 1, 2015. #CTIcred Follow CTI on Twitter and Facebook

A Vision for the U.S. Credentialing Marketplace December 1, 2015. #CTIcred Follow CTI on Twitter and Facebook A Vision for the U.S. Credentialing Marketplace December 1, 2015 #CTIcred Follow CTI on Twitter and Facebook CTI Project Leadership CTI is led by: With support from: Executive Committee provides strategic

More information

FLSA Test Date. Jay Kenton

FLSA Test Date. Jay Kenton Human Resource Office Use Only Approved Job Family Effective Date Overtime Eligible FLSA Test Date YES NO Employee Supervisor Jay Kenton Department Working Title HRIS Position Number Supervisor Title President's

More information

Sound Transit Internal Audit Report - No. 2014-3

Sound Transit Internal Audit Report - No. 2014-3 Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management

More information

Avature Social Onboarding Solution. Get Engaged to Talent

Avature Social Onboarding Solution. Get Engaged to Talent Get Engaged to Talent V8 Fully engage new and transitioning employees and speed up time-to-productivity with an enterprise social onboarding solution that lets you streamline, automate, track, and coordinate

More information

Selecting. CRM: Selecting, Customizing, and Utilizing for Effectiveness. Traversing Your Course. It s About the Indicators. Key Performance Indicators

Selecting. CRM: Selecting, Customizing, and Utilizing for Effectiveness. Traversing Your Course. It s About the Indicators. Key Performance Indicators CRM: Selecting, Customizing, and Utilizing for Effectiveness March 10, 2014 Laurie Slater, MBA, Partner, Corporate Health Group (CHG) lslater@corporatehealthgroup.com, 813 428 5107 Stephanie Boreale, Director

More information

Charting the Future FY 2016 Work Plan. Gantt Charts. February, 2016

Charting the Future FY 2016 Work Plan. Gantt Charts. February, 2016 Charting the Future FY 2016 Work Plan Gantt Charts February, 2016 1 Overview The Gantt charts will be reviewed and updated on a quarterly basis Significant changes to tasks or milestones that affect progress

More information

Strategic Goals. 1. Information Technology Infrastructure in support of University Strategic Goals

Strategic Goals. 1. Information Technology Infrastructure in support of University Strategic Goals Strategic Goals 1. Information Technology Infrastructure in support of University Strategic Goals a. Work toward building a modern data center and providing data services that support campus units and

More information

Oracle EBS Release 12.2 from A to Z. Real Experience of a Technical Upgrade

Oracle EBS Release 12.2 from A to Z. Real Experience of a Technical Upgrade Oracle EBS Release 12.2 from A to Z. Real Experience of a Technical Upgrade Presentador: Gustavo Gonzalez, CTO gfgonzalez@itconvergence.com @ggonza4itc Presenter Gustavo González IT Convergence, Chief

More information

UCPath Change Management Strategy for UC San Diego. July 2013

UCPath Change Management Strategy for UC San Diego. July 2013 UCPath Change Management Strategy for UC San Diego July 2013 Overview Background Key Components Approach & Methodology Change Network Framework For Action Challenges Resources & Tools Summary Table of

More information

As SOA momentum is picking up in the

As SOA momentum is picking up in the SETLabs Briefings VOL 5 NO 1 Jan - Mar 2007 SOA Technology Competency Center By Shreyas Kamat Organizational need to manage SOA transformation effectively has bolstered the growth of SOA TCC concept As

More information

Organizational Design Toolkit

Organizational Design Toolkit Organizational Design Toolkit We provide below highlights of the approach to developing/confirming the preferred service delivery model and organizational structure for an organization. The key steps are:

More information

Process Validation Workshops. Overview Session

Process Validation Workshops. Overview Session Process Validation Workshops Overview Session 2 Session Objectives: Prepare staff for participating in a Process Validation Workshop Clarify the Purpose of Process Validation Workshops Clarify Expected

More information

OA Council Open Meeting May 26, 2016. Human Resources: Strengthening OA Employment Practices

OA Council Open Meeting May 26, 2016. Human Resources: Strengthening OA Employment Practices OA Council Open Meeting May 26, 2016 Human Resources: Strengthening OA Employment Practices 2015: A Look Back Key Achievements: Built relationships with key employment groups Strengthened HR Leadership

More information

Application Overhaul. Key Initiative Overview

Application Overhaul. Key Initiative Overview Scott D. Nelson Research Managing Vice President This overview provides a high-level description of the Application Overhaul Key Initiative. IT leaders can use this guide to understand how to develop an

More information

DSRIP HIT Phase 2 Update. March 13, 2015

DSRIP HIT Phase 2 Update. March 13, 2015 DSRIP HIT Phase 2 Update March 13, 2015 Agenda Introductions HIT Scope Update Original Scope of HIT Revised Scope Roll Played by Aspen Advisors Phase 2 Update Current State to Future State EMR Rollout

More information

MANAGING THE EMPLOYEE LIFECYCLE

MANAGING THE EMPLOYEE LIFECYCLE MANAGING THE EMPLOYEE LIFECYCLE Current Position Jose Laurel Experience & Expertise 16 years experience in management, operations, marketing and international commerce Prior to G&A, served as country manager

More information

Building for the future

Building for the future Building for the future Why predictive analytics matter now William Gaker Goals for today Growth and establishment of the people analytics field Best practices for building a people analytics function

More information

KPMG Digital Marketing case study WEC USA September 2012

KPMG Digital Marketing case study WEC USA September 2012 KPMG Digital Marketing case study WEC USA September 2012 2012 KPMG International Cooperative ( KPMG International ), a Swiss entity. Member firms of the KPMG network of independent firms are affiliated

More information

A SilkRoad TalentTalk Whitepaper. Talent Management in Higher Education The Way Forward

A SilkRoad TalentTalk Whitepaper. Talent Management in Higher Education The Way Forward A SilkRoad TalentTalk Whitepaper Talent Management in Higher Education The Way Forward 1 // Talent Management in Higher Education: The Way Forward Institutions of higher education face many challenges

More information

UCPath Project Status Report

UCPath Project Status Report UCPath Project Status Report Report Date August 23, 2013 Project Director Anthony Lo Anthony.Lo@ucop.edu Executive Sponsors Nathan Brostrom Peter Taylor Project Summary Tony Lo has resigned as Project

More information

Company A Project Plan

Company A Project Plan Company A Project Plan Project Name: Close Optimization Project Example Prepared By: David Done - Project Manager Title: John Doe -Project Manager Date: March 17, 2011 Project Plan Approval Signatures

More information

Enterprise Data Governance

Enterprise Data Governance Enterprise Aligning Quality With Your Program Presented by: Mark Allen Sr. Consultant, Enterprise WellPoint, Inc. (mark.allen@wellpoint.com) 1 Introduction: Mark Allen is a senior consultant and enterprise

More information

Transform HR into a Best-Run Business Best People and Talent: Gain a Trusted Partner in the Business Transformation Services Group

Transform HR into a Best-Run Business Best People and Talent: Gain a Trusted Partner in the Business Transformation Services Group SAP Services Transform HR into a Best-Run Business Best People and Talent: Gain a Trusted Partner in the Business Transformation Services Group A Journey Toward Optimum Results The Three Layers of HR Transformation

More information

Human Resources and Talent Development Plan

Human Resources and Talent Development Plan THE UNIVERSITY OF TOLEDO Human Resources and Talent Development Plan MEDICAL CENTER FY2016 Human Resources and Talent Development Processes Planning Each service of the hospital takes responsibility for

More information

OPTIMUS SBR PROCESS IMPROVEMENT. Streamline your outdated process for maximum efficiency. CHOICE TOOLS. PRECISION AIM. BOLD ATTITUDE.

OPTIMUS SBR PROCESS IMPROVEMENT. Streamline your outdated process for maximum efficiency. CHOICE TOOLS. PRECISION AIM. BOLD ATTITUDE. OPTIMUS SBR CHOICE TOOLS. PRECISION AIM. BOLD ATTITUDE. Streamline your outdated process for maximum efficiency. PROCESS IMPROVEMENT WHO WE ARE OPTIMUS SBR is a management consulting firm focused on supporting

More information

Human Resources Division Cornell University. Strategic Plan

Human Resources Division Cornell University. Strategic Plan Human Resources Division Cornell University Strategic Plan Executive Summary The HR function continues to provide critically important services to Cornell. However, we must continue to evolve in order

More information

TO MEMBERS OF THE COMMITTEE ON LONG RANGE PLANNING: DISCUSSION ITEM EXECUTIVE SUMMARY

TO MEMBERS OF THE COMMITTEE ON LONG RANGE PLANNING: DISCUSSION ITEM EXECUTIVE SUMMARY L3 Office of the President TO MEMBERS OF THE COMMITTEE ON LONG : For Meeting of July 22, 2015 UCPATH PROJECT UPDATE DISCUSSION ITEM EXECUTIVE SUMMARY UCPath was launched in 2010 as a systemwide UC strategic

More information

Identity & Access Management new complex so don t start?

Identity & Access Management new complex so don t start? IT Advisory Identity & Access Management new complex so don t start? Ing. John A.M. Hermans RE Associate Partner March 2009 ADVISORY Agenda 1 KPMG s view on IAM 2 KPMG s IAM Survey 2008 3 Best approach

More information

AUSTIN INDEPENDENT SCHOOL DISTRICT OFFICE OF INFORMATION TECHNOLOGY EXECUTIVE SUMMARY

AUSTIN INDEPENDENT SCHOOL DISTRICT OFFICE OF INFORMATION TECHNOLOGY EXECUTIVE SUMMARY AUSTIN INDEPENDENT SCHOOL DISTRICT OFFICE OF INFORMATION TECHNOLOGY EXECUTIVE SUMMARY Technology is all about people. The most powerful network on earth is not a network of cables and boxes; it is the

More information

GLOSSARY. Last Modified: 1/21/15

GLOSSARY. Last Modified: 1/21/15 GLOSSARY Last Modified: 1/21/15 Absence Management Absence Management is a module in UCPath Online where UC leave administrators will be able to plan and manage absence events (including extended leaves)

More information

Patent Public Advisory Committee Quarterly Meeting. IT Update. John Owens II. Chief Information Officer. Debbie Stephens

Patent Public Advisory Committee Quarterly Meeting. IT Update. John Owens II. Chief Information Officer. Debbie Stephens Patent Public Advisory Committee Quarterly Meeting IT Update John Owens II Chief Information Officer Debbie Stephens Associate Commissioner for Patent Information Management David Landrith PE2E Portfolio

More information

Process Efficiencies with Kinetic Request

Process Efficiencies with Kinetic Request Process Efficiencies with Kinetic Request An executive view of the benefits and financial impact of enterprise request management Overview Kinetic Request, coupled with Kinetic Task, is an enterprise request

More information

Employee Onboarding. Susan Ward, PhD. Human Resources Association of Central Connecticut February 27, 2014. Presented by

Employee Onboarding. Susan Ward, PhD. Human Resources Association of Central Connecticut February 27, 2014. Presented by Employee Onboarding Presented by Susan Ward, PhD Human Resources Association of Central Connecticut February 27, 2014 Tonight s Discussion Why invest in Onboarding Onboarding vs. Orientation What to consider

More information

Department of Labor Customer Service Plan 2011. Department of Labor. Customer Service Plan 2011

Department of Labor Customer Service Plan 2011. Department of Labor. Customer Service Plan 2011 Department of Labor Customer Service Plan 2011 October 24, 2011 1 Table of Contents EXECUTIVE SUMMARY... 3 SIGNATURE INITIATIVE... 6 SERVICE 1: DEFENDING WORKPLACE RIGHTS BY PROVIDING WORKERS AND FEDERAL

More information

IR Best Practice & the Tools Needed to Achieve it

IR Best Practice & the Tools Needed to Achieve it IR Best Practice & the Tools Needed to Achieve it Belgrade March 2011 Andrew Crockett Senior Specialist Corporate Services Thomson Reuters INTRODUCING THOMSON REUTERS We provide intelligent information

More information

Information Management CoE A Pragmatic Approach

Information Management CoE A Pragmatic Approach Information Management CoE A Pragmatic Approach Peter LePine- Practice Director Tom Lovell - Data Governance Specialist Information Management & Business Intelligence Practice Information Management &

More information

Human Capital Management Mapping a Blueprint to the Cloud. June 25 th, 2 3pm EST

Human Capital Management Mapping a Blueprint to the Cloud. June 25 th, 2 3pm EST Human Capital Management Mapping a Blueprint to the Cloud June 25 th, 2 3pm EST Today s Presenters Stacey Harris VP Research & Analytics @StaceyHarrisHR www.linkedin.com/in/staceyharris/ Richard George

More information

Professionals Responsible for Campus Turnaround Plan Development: Name:

Professionals Responsible for Campus Turnaround Plan Development: Name: Date of Board Grades Served: 6 8 Approval: 5/23/2016 Consecutive School Years Rated Academically Unacceptable/Improvement Required: Dr. Terrence Eaton Ron Gonzales Jonathan Smith Dr. Velma Wilson Diane

More information

PMO Starter Kit. White Paper

PMO Starter Kit. White Paper PMO Starter Kit White Paper January 2011 TABLE OF CONTENTS 1. ABOUT THE PMO STARTER KIT...3 2. INTRODUCTION TO THE PMO STARTER KIT WHITE PAPER...3 3. PMO DEVELOPMENT ROADMAP...4 4. PLAN PHASE...5 4.1 CREATE

More information

Business Transformation Services Transform your processes. Transform your business.

Business Transformation Services Transform your processes. Transform your business. Business Transformation Services Transform your processes. Transform your business. Do your processes help you achieve your business goals? Or are your processes actually starting to limit these goals?

More information

HR Business Consulting Optimizing your HR service delivery

HR Business Consulting Optimizing your HR service delivery HR Business Consulting Optimizing your HR service delivery NorthgateArinso Business Consulting provides HR executives with unique insight to optimize the cost of HR service delivery, improve employee engagement,

More information

UCPath Project Status Report

UCPath Project Status Report UCPath Project Status Report Report Date May 17, 2013 Project Director Anthony Lo Executive Nathan Brostrom Anthony.Lo@ucop.edu Sponsors Peter Taylor Project Summary Scope Schedule Budget Resources Implementation

More information

Wilhelmenia Ravenell IT Manager Eli Lilly and Company

Wilhelmenia Ravenell IT Manager Eli Lilly and Company Wilhelmenia Ravenell IT Manager Eli Lilly and Company Agenda Introductions The Service Management Framework Keys of a successful Service management transformation Why transform? ROI and the customer experience

More information

Analytic-Driven Quality Keys Success in Risk-Based Contracts. Ross Gustafson, Vice President Allina Performance Resources, Health Catalyst

Analytic-Driven Quality Keys Success in Risk-Based Contracts. Ross Gustafson, Vice President Allina Performance Resources, Health Catalyst Analytic-Driven Quality Keys Success in Risk-Based Contracts March 2 nd, 2016 Ross Gustafson, Vice President Allina Performance Resources, Health Catalyst Brian Rice, Vice President Network/ACO Integration,

More information

PINK ELEPHANT THOUGHT LEADERSHIP WHITE PAPER DEVELOPING AN IT SERVICE MANAGEMENT TRAINING STRATEGY & PLAN

PINK ELEPHANT THOUGHT LEADERSHIP WHITE PAPER DEVELOPING AN IT SERVICE MANAGEMENT TRAINING STRATEGY & PLAN PINK ELEPHANT THOUGHT LEADERSHIP WHITE PAPER DEVELOPING AN IT SERVICE MANAGEMENT TRAINING STRATEGY & PLAN Executive Summary Developing and implementing an overall IT Service Management (ITSM) training

More information

2015 Business Plan and Budget. Office of the Chief Operating Officer. Budget Sub-Committee February 17, 2015

2015 Business Plan and Budget. Office of the Chief Operating Officer. Budget Sub-Committee February 17, 2015 2015 Business Plan and Budget Office of the Chief Operating Officer Budget Sub-Committee February 17, 2015 1 Organizational Structure Department Overview: The Office of the Chief Operating Officer supports

More information

June 25, 2013. Ministry of Health Security enhancement roadmap

June 25, 2013. Ministry of Health Security enhancement roadmap June 25, 2013 Ministry of Health Security enhancement roadmap Table of contents Enhancement roadmap overview... 1 Introduction... 1 Objectives and scope... 1 Approach... 2 Summary of recommended enhancement

More information

Shared Services in NSW Are we going fast enough?

Shared Services in NSW Are we going fast enough? Shared in NSW Are we going fast enough? 0 29 March 2012 hosted by About this presentation This presentation was developed for the Institute of Public Administration Australia (IPAA) Special Interest Group

More information

PNMsoft Sequence Ticketing Solution (PSTS)

PNMsoft Sequence Ticketing Solution (PSTS) PNMsoft Sequence Ticketing Solution (PSTS) PNMsoft Sequence Ticketing Solution (PSTS) is a software solution built on an industry leading Business Process Management platform. It enables organizations

More information

Director, Office of Health IT and e Health; State Government HIT Coordinator. Deputy Director, Office of Health IT and e Health

Director, Office of Health IT and e Health; State Government HIT Coordinator. Deputy Director, Office of Health IT and e Health Assignment Location: Minnesota Department of Health St. Paul, Minnesota Primary Mentor: Secondary Mentor: Martin LaVenture, PhD, MPH, FACMI Director, Office of Health IT and e Health; State Government

More information

311 - CRM - CitiStat Initiative Framework

311 - CRM - CitiStat Initiative Framework 311 - CRM - CitiStat Initiative Framework January 2004 EXECUTIVE SUMMARY For the past few years, Mayor Newsom has led the City and County of San Francisco (City) in customer service and technology initiatives

More information

A. Background/Rationale. 2.6 Developing Web Infrastructure Services

A. Background/Rationale. 2.6 Developing Web Infrastructure Services 2.6 Developing Web Infrastructure Services Major Issue: As of the summer of 2010, 10 years will have passed since CU-Boulder last made a significant investment in campus wide, generally available web hardware

More information

2010 Hiring Reform Action Plan

2010 Hiring Reform Action Plan Agency/Component: Nuclear Regulatory Commission Section 1 (a) (1) Eliminate any requirement that applicants respond to essay-style questions when submitting their initial application materials for any

More information

Building the Bullet-Proof MDM Program

Building the Bullet-Proof MDM Program Building the Bullet-Proof MDM Program Evan Levy Partner, Baseline Consulting www.baseline-consulting.com Copyright 2007, Baseline Consulting. All rights reserved. 1 Agenda Understanding the critical components

More information

New England States Collaborative Insurance Exchange Systems

New England States Collaborative Insurance Exchange Systems New England States Collaborative Insurance Exchange Systems Project Baseline Review Presentation to Interstate Collaborative Steering Committee May 18, 2011 5/4/2011 1 PROJECT SUMMARY The overall goal

More information

OPERATIONAL ANALYSIS STATUS REPORT JUNE 2015

OPERATIONAL ANALYSIS STATUS REPORT JUNE 2015 & OPERATIONAL ANALYSIS STATUS REPORT JUNE 2015 PROJECT SUMMARY In late 2013, the Indy Chamber, under the guidance of our member businesses, released a comprehensive Operational Analysis of the Indianapolis

More information

THE ANALYTICS HUB LEVERAGING A SHARED SERVICES MODEL TO UNLOCK BIG DATA. Thomas Roland Managing Director. David Roggen Director CONTENTS

THE ANALYTICS HUB LEVERAGING A SHARED SERVICES MODEL TO UNLOCK BIG DATA. Thomas Roland Managing Director. David Roggen Director CONTENTS THE ANALYTICS HUB LEVERAGING A SHARED SERVICES MODEL TO UNLOCK BIG DATA David Roggen Director Thomas Roland Managing Director CONTENTS Shared Services Today 2 What Is an Analytics Hub? 3 Analytics Hub

More information

Organizational Structure and Policies

Organizational Structure and Policies Organizational Structure and Policies I. Introduction The purpose of this document is to describe the organizational structure and development process for the Stewardship Index for Specialty Crops. The

More information

2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE #11

2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE #11 2016 2019 CITY OF LONDON STRATEGIC MULTI-YEAR BUDGET ADDITIONAL INVESTMENTS BUSINESS CASE #11 STRATEGIC AREA OF FOCUS: LEADING IN PUBLIC SERVICE SUB-PRIORITY: EXCELLENT SERVICE DELIVERY STRATEGY: DELIVER

More information

Structuring Information Management (IM) around a Service Centric Framework. Date: 6th May 2015. www.inl.gov. Ian Mckirdy

Structuring Information Management (IM) around a Service Centric Framework. Date: 6th May 2015. www.inl.gov. Ian Mckirdy Structuring Information Management (IM) around a Service Centric Framework Date: 6th May 2015 www.inl.gov Ian Mckirdy Information Management (IM) Service Management Approach to Service Portfolio and Service

More information

SIM Delivery System Reform Subcommittee. Recommendations on Streamlining Care Coordination across SIM Initiatives

SIM Delivery System Reform Subcommittee. Recommendations on Streamlining Care Coordination across SIM Initiatives SIM Delivery System Reform Subcommittee Recommendations on Streamlining Care Coordination across SIM Initiatives Following is a collection of recommendations for the SIM Steering Committee to streamline

More information

Where is Your Print Strategy? An IDC interactive document, sponsored by HP

Where is Your Print Strategy? An IDC interactive document, sponsored by HP Where is Your Print Strategy? An IDC interactive document, sponsored by HP Where is Your Print Strategy? Organizations have the opportunity to reduce costs, increase productivity, increase security and

More information

Business Process Optimization (BPO) Report Payroll Operations Assessment. Presented by: Roberta L. Gordon January 30, 2014

Business Process Optimization (BPO) Report Payroll Operations Assessment. Presented by: Roberta L. Gordon January 30, 2014 Business Process Optimization (BPO) Report Payroll Operations Assessment Presented by: Roberta L. Gordon January 30, 2014 Today s Objective & Agenda Close the Loop Project & Guiding Principle Reminder

More information

Fortune 500 Medical Devices Company Addresses Unique Device Identification

Fortune 500 Medical Devices Company Addresses Unique Device Identification Fortune 500 Medical Devices Company Addresses Unique Device Identification New FDA regulation was driver for new data governance and technology strategies that could be leveraged for enterprise-wide benefit

More information

CODE: E.003 Financial Services BUDGET AND BUSINESS PLANNING POLICY. 1.2 The essential activities covered by this policy include:

CODE: E.003 Financial Services BUDGET AND BUSINESS PLANNING POLICY. 1.2 The essential activities covered by this policy include: BUDGET AND BUSINESS PLANNING POLICY CONTENTS 1.1 Budget and business planning is undertaken to support strategic planning and decision-making and to serve accountability by enabling administration to plan

More information

NEO: New Employee Onboarding Building a Strong Foundation at OSU. Staff Training: March 20, 2015

NEO: New Employee Onboarding Building a Strong Foundation at OSU. Staff Training: March 20, 2015 NEO: New Employee Onboarding Building a Strong Foundation at OSU Staff Training: March 20, 2015 Agenda Introductions Expectations Background Information Essential Notice & Welcome Email Welcome Video Workflows

More information

How To Improve Your Business

How To Improve Your Business Information Technology Software Services Council Committee May 7, 2013 Technology Software Presentation Identify stakeholder software demands. Challenges (requirements) and vision (outcomes). Timeline

More information

Umoja Realisation Workshop Cluster 3

Umoja Realisation Workshop Cluster 3 Umoja Realisation Workshop Cluster 3 Nairobi, 24-28 February 2014 4.8 UMOJA BUSINESS INTELLIGENCE OVERVIEW Agenda Introduction to BI Reporting in Umoja: ECC, SRM, and BI Available tools and technologies

More information

IT AS A SERVICE BROKER

IT AS A SERVICE BROKER IT AS A SERVICE BROKER MIT Sloan CIO Symposium May 21, 2014 Thomas P. Roloff Senior Vice President EMC Global Services twitter: @TRoloff 1 Why Transformation? Business is Changing Faster Than IT Business

More information

Actionable Knowledge from Refined Data with Microsoft Business Intelligence

Actionable Knowledge from Refined Data with Microsoft Business Intelligence Actionable Knowledge from Refined Data with Microsoft Business Intelligence John Schlitt - Business Manager Automation COE, Nalco Copyright 2010, OSIsoft LLC. All rights Reserved. Nalco Company World s

More information

New Customer Service Unit

New Customer Service Unit New Customer Service Unit Goals - Functions LCPM workflow LCPM -Meeting 02/03/2007 Zurich (CH) New Customer Relations unit: I. General - Rationales II. III. Services mgt workflow within an NREN IV. Preliminary

More information

BSBMKG609 Develop a marketing plan

BSBMKG609 Develop a marketing plan BSBMKG609 Develop a marketing plan Release: 1 BSBMKG609 Develop a marketing plan Modification History Release Release 1 Comments This version first released with BSB Business Services Training Package

More information

Fusion CRM Overview, Strategy, Roadmap

Fusion CRM Overview, Strategy, Roadmap Fusion CRM Overview, Strategy, Roadmap Presenter Date 1 The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into

More information

HR Optimization in the Public Sector. kpmg.com

HR Optimization in the Public Sector. kpmg.com HR Optimization in the Public Sector kpmg.com A Journey of Good Sense and Good Results... 3 Key Findings... 4 Key Research Summary... 4 Evolution Of The Shared Services Journey For HR... 5 Driving HR Optimization

More information

Human Resources 2014 2015 REORGANIZATION 1

Human Resources 2014 2015 REORGANIZATION 1 Human Resources 2014 2015 REORGANIZATION 1 Table of Contents I. Our Focus 3 II. How We Get There 4 III. Organizational Charts 5-9 IV. Summary of Reorganization 10-13 V. Buckets of Work for 2014-2015 13

More information

Final. North Carolina Procurement Transformation. Governance Model March 11, 2011

Final. North Carolina Procurement Transformation. Governance Model March 11, 2011 North Carolina Procurement Transformation Governance Model March 11, 2011 Executive Summary Design Approach Process Governance Model Overview Recommended Governance Structure Recommended Governance Processes

More information