1 Specialty Products Inc. s Synergy Series Ultra Bond III Polyurea and the LPG TM Proportioner: Revolutionizing Concrete Rehabilitation Rehabbing 25 manholes for the City of Montrose, Colorado could have been a real nightmare, but with SPI s Ultra Bond III polyurea coating and portable LPG TM proportioner, the job went smoothly, says Eddie Kelley of Airtight Foam Solutions. In fact, it was pretty much flawless. This is high praise indeed because as anyone in the industry knows, manhole rehabilitation is one of the most challenging jobs out there. Tight spaces, limited access, advanced concrete degradation, and in most cases, an unforgiving schedule are just a few of the challenges that coating contractors face when embarking on a manhole rehab project. However, as Kelley testifies, it IS possible to have a relatively painless job when using SPI s Synergy Series LPG proportioner and Ultra Bond III polyurea. Together, these two innovative technologies are invaluable when relining concrete manholes. Merciless Conditions The waste water treatment process produces significant sulfur reducing bacteria (SRB) growth and hydrogen sulfide gas (H2S). These two factors can cause significant concrete damage as they break down the concrete s silica and calcium. Over time, exposure to these harsh conditions break down the concrete to such a degree that one of two things must be done the manhole must be replaced or relined. Manhole replacement involves digging up the existing manhole and completely replacing all its components. This process is both expensive and labor intensive, therefore, not a viable option for most wastewater districts. Recoating the manhole is the option chosen by the majority of municipalities. The right protective coating will shield the concrete from decay caused by the bacteria, extending the service life of the manhole structure. The proper coating system will also have enough elongation to handle thermal concrete expansion and contraction from annual freeze/thaw cycles. Eliminating Steps and Saving Money
2 Although the recoating option is not as cost prohibitive or labor intensive as the replacement of a manhole structure, it is still a daunting task. That is until the invention of SPI s Synergy Series chemistries and the LPG TM proportioner. These two technologies address the many challenges of manhole rehabilitation, making the process much more manageable, and ultimately, saving time and money for wastewater districts. Using the LPG TM proportioner, Ultra Bond III can be applied directly onto the porous concrete substrate, says Chas Weatherford, of SPI. There is minimal prep work other than removal of damaged concrete by pressure washing and abrasive blasting. No primer is required. Up until the advent of the Synergy Series chemistries and the LPG TM proportioner, coating concrete was a tough challenge for the polyurea industry. Polyurea applied through traditional high pressure, high heat, plural component equipment typically experiences blow holes. These blow holes are caused by air that is trapped within the pores (bug holes) and capillaries of the concrete. The air expands from the heated product as it is applied; pressure builds and pushes the trapped warm air through the surface of the freshly applied coating, potentially creating hundreds of pinholes per square foot. Preventing and/or repairing pinholes is extremely labor intensive. In an attempt to avoid pinholes, the concrete needs to be base coated using another material such as a plasticized mortar or urethane foam in order to fill surface irregularities and act as a buffer layer between the concrete and polyurea. If any pinholes occur once the polyurea is applied, caulk must be used to fill each pinhole and the coating must be resprayed over the affected areas. These blow holes are like mini-moon craters, says Dan Helton, President of SPI. There can be hundreds per square foot and they take a lot of time and money to repair. It is not feasible to coat a manhole with polyurea without the Synergy Series chemistry and the LPG TM proportioner. This entire labor intensive and cost prohibitive nightmare is averted by the Synergy Series chemistries and the LPG TM proportioner technologies. The Ultra Bond III TM polyurea is applied at a low temperature, approximately 90 Fahrenheit. This low temperature virtually eliminates moon craters caused by the blow holes. In addition, the product is air-nucleated. This adds body to the coating which bridges the capillaries and surface irregularities. The end result is a smooth, monolithic surface that is free of defects, says Helton. Weatherford concurs. Applying Ultra Bond TM III with the LPG TM machine creates a monolithic polyurea liner that is free of blow holes or pinholes. Another important advantage with using the Synergy Series LPG equipment and chemistries is this technology eliminates the need to use polyurethane spray foam as a base coat over the manhole concrete surface. Spray foam is often used as a base coat to help prevent issues with bug holes and pinholes. This added step and increase in product/labor cost can now be avoided. A Tight Squeeze
3 The LPG TM proportioner also has another important advantage. Unlike traditional plural component proportioners, it is lightweight and portable. By definition, manholes are confined spaces and many of them are in areas with limited access. SPI s Synergy Series LPG TM weighs less than 80 lbs. and can be transported in the back of a pick-up truck. This portability allows applicators to place the machine near the actual spray site, even if it s hard to access. In addition, the LPG TM only requires a standard wall outlet (110 V) for power, making it even more convenient for hard to reach spray sites. LPG TM and Synergy Chemistry in Action The best way to demonstrate just how well Ultra Bond TM III and the LPG TM work together out in the field is to revisit the City of Montrose manhole rehabilitation project. The City of Montrose, Colorado Public Works Utilities Division had 25 manholes that needed a new protective lining due to concrete degradation. The manholes have been in service for approximately 25 years. According to Weatherford, the city decided that recoating the manholes was more cost advantageous than the replacement of the sewer infrastructure. This is where Kelley of Airtight Foam Solutions comes into play. We got the contract and were initially going to spray polyurethane foam over the concrete and then coat with polyurea. After running into several pre-job issues, we talked with SPI and they suggested using the Ultra Bond TM III material, without the use of spray foam, and applying it with the LPG TM proportioner, says Kelley. We were happy to use this innovative technology, especially since it saved so much time and money. According to Kelley, many of the manholes were in pretty bad shape. The concrete was badly deteriorated due to the hydrogen sulfide gas and high moisture content. In addition, some of the manholes had an epoxy coating that had been applied a few years before. The epoxy coating did not hold up well under the harsh conditions present in the manhole structure or the annual weather cycle. Kelley states that in some manholes, he and his crew had to use a hand trowel to remove 1 to 1 ½ inches of damaged concrete prior to pressure washing and abrasive blasting the manhole structure. The application of Ultra Bond TM III would significantly extend the service life of the manholes, as it is specifically designed to endure exposure to severe chemical and weather conditions. Live Sewer, Big Challenge To add to the challenges of this particular job, the sewer main was to remain live during the entire process yet another reason why an expedited coatings process was essential. Gas monitors were used at all times during all prep and spray work to ensure the safety of Kelley and his crew. In addition, the
4 crew wore all of the proper safety gear, including Tyvek suits, rubber gloves, a fresh air hood and OSHA compliant harnesses. Also, since the sewer lines were running, Kelley had to engineer a system to keep the debris and overspray from falling into the line. We built wood benches around the invert. It was a tri-fold contraption that was lowered into the manhole structure with a tri-pod and winch and then unfolded. A canvas tarp was on top of the wood, allowing us to catch all the debris, says Kelley. Once the containment apparatus was in place, the crew removed all damaged concrete and then pressure washed and abrasive blasted the manhole. Thanks to the Synergy Series chemistry and the LPG TM, the manhole was ready for the polyurea application without the need for primers, mortars or foam. Ready Aim Spray Prior to the application of the Ultra Bond TM III, Kelley and his crew used a 400,000 BTU ducted heater to pump heat into the manhole. This dry, hot air took the moisture out of the manhole structure and raised the temperature to about 90 degrees Fahrenheit inside the manhole, says Kelley. The heat duct was removed from the manhole and the crew then applied an average of 120 mils of Synergy Series - Ultra Bond III polyurea to the concrete substrate. According to Weatherford, the Airtight Foam Solutions applicator was able to adjust the product output using controls at the Lock-n- Load gun. This enabled him to adjust the spray pattern diameter and output as needed to properly coat different surface areas within the manhole structure. Once the polyurea application was completed, the heating duct was once again used to pump heat into the manhole. The duct remained there for one hour in order to expedite the front-end curing of the product. The return to service was immediate; the sewer was live the entire time and there was no disruption of the wastewater system. Kelley is quick to point out that the portability of the LPG TM proportioner was a huge part of the success of the City of Montrose job. Nearly half of the manholes were difficult to access. There was no way that I could have gotten my 36-foot goose neck trailer anywhere close to some of them. We were able to put the LPG TM into a smaller truck and had no problems getting to any of the manhole locations, says Kelley. With the Ultra Bond TM III and LPG TM Synergy Series technology, Kelley and his crew were able to prep and spray all 25 manholes in 14 days, an impressive feat to say the least. The application equipment was simple to use and not having to apply another material prior to the polyurea saved an unbelievable amount of time and money, says Kelley. The Solution for Failing Infrastructure
5 SPI has been manufacturing polyurea protective coatings and using traditional equipment within the wastewater industry since Years of accumulated knowledge helped SPI to identify the need for a coatings technology breakthrough, namely the teaming of Synergy Series chemistries and the LPG TM proportioner. With these two innovative technologies, SPI provided a protective coating solution to extend the service life of the existing manholes and save the City of Montrose and its tax payers a substantial amount of money. As the wastewater infrastructure in the U.S. continues to age, more and more municipalities will face the same dilemma as the City of Montrose manhole replacement or rehabilitation. SPI s Synergy Series chemistries and the LPG TM offer the best and most cost-effective solution for the rehabilitation of the wastewater infrastructure. For more information regarding SPI s Synergy Series chemistries and the LPG TM proportioner, please contact Specialty Products Inc. at (800) or info@specialty-products.com.
SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES
1.00 PART 1 GENERAL 1.01 SCOPE A. It is the intent of this contract to install a 100% solids epoxy monolithic coating to the walls, benches and inverts of all manholes and the specified surfaces of other
More informationRehabilitation of an Aging Concrete Reservoir Adit Tower
Rehabilitation of an Aging Concrete Reservoir Adit Tower Raymond S. Tombaugh, Senior Coatings Consultant KTA-Tator, Inc. and Mongkol Mahavongtrakul, P.E. Corrosion Control Contract Manager San Francisco
More informationSTAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM
STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.
More informationSECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
More informationTECHNICAL REQUIREMENTS AND SPECIFICATIONS
TECHNICAL REQUIREMENTS AND SPECIFICATIONS REHABILITATION OF CONCRETE AND MASONRY MANHOLES OR UNDERGROUND VAULTS WITH A PROTECTIVE COATING (As Provided by Raven Lining Systems) FOREWORD This specification
More informationGigaCrete Specification PlasterMax
GigaCrete Inc. 6775 Speedway Blvd. Suite M105 Las Vegas, NV 89115 Ph (702) 643-6363 Fax (702) 643 1453 www.gigacrete.com GigaCrete Specification PlasterMax PlasterMax : Fire Rated Plaster for Direct Application
More informationMainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology
2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)
More informationREVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC
REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS
More informationDocument Library TS Data Sheet 08609. 3M Windo-Weld Super Fast Urethane. Data Sheet. Public
Document Library TS Data Sheet 08609 Public Rev:3 Effective: 09/14/2007 Status: Active 3M Windo-Weld Super Fast Urethane Data Sheet 3M Part No.(s) 3M Part Descriptor(s) 08609 3M Windo-Weld Super Fast Urethane
More informationIndustrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems.
Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Aging pipeline infrastructure and industry s inability to evaluate and inspect has left many engineers and plant managers
More informationRECOATING AND RENEWING SPF ROOFING SYSTEMS
RECOATING AND RENEWING SPF ROOFING SYSTEMS Procedures, Regional Differences and type of coating systems Bruce Schenke Premium Spray Products REASONS TO RECOAT/RENEW Add a new coating layer to renew the
More informationSection 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
More informationStandard Method for Sampling and Analysis of. of Chlorine Containing Bleaches. Soap Products
GUIDE SPECIFICATION FOR GENERAL CLEANING AND REMOVAL OF MOLD AND MILDEW ON EXTERIOR INSULATED AND FINISH SYSTEMS AND STUCCO DIVISION 07240 and DIVISION 09240 8/05 PART I: GENERAL 1.01 DESCRIPTION AND SCOPE
More informationTHE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs
THE BIG FIX: San Diego s Sewer Renewal Program By Steve Gibbs Public works administration would be easy if infrastructure lasted forever. It does not. Roads, bridges and sewers eventually wear out. Even
More information07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM
07 21 19 STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 7819 Broadview Road Cleveland, OH 44131 800-522-4522 February, 2011 SPEC NOTE: This guide specification is intended for use when specifying
More informationSPECIAL SPECIFICATION STRUCTURE (MANHOLE) REHABILITATION. 100.1 Description
100.1 Description This Item shall govern approved methods and materials for the coating and rehabilitation of deteriorated brick and concrete structures by spray-application of a monolithic 100% solids,
More informationHYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS
HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS Shiwei William Guan, Ph.D. Vice President, R&D and International Business Madison Chemical Industries Inc. 490
More informationSEWER CLEANING, INSPECTION AND ASSESSMENT
3.1 OVERVIEW Chapter 3 SEWER CLEANING, INSPECTION AND ASSESSMENT Preventive maintenance protects the investment of the sanitary sewer collection system infrastructure. Higher frequency cleaning of gravity
More informationWaste Collection Systems
Waste Collection Systems System Maintenance and Repair Maintenance and Repair Training Objectives To gain an understanding of: System Maintenance and Repair vocabulary System Maintenance and Repair techniques
More informationG VYCOR DECK PROTECTOR. For longer lasting decks, install Grace Vycor Deck Protector. It s an easy add-on to your deck projects.
For longer lasting decks, install Grace Vycor Deck Protector. It s an easy add-on to your deck projects. G VYCOR DECK PROTECTOR Self-Adhered Flashing NEW FROM THE MAKERS OF G Ice & Water Shield I Moisture
More informationGuidelines for Durable Driveways, Carports Patios, Walks, Garage Floors
Guidelines for Durable Driveways, Carports Patios, Walks, Garage Floors The Right Concrete Mix Placing and Finishing Joints Correctly Spaced Curing for Durability "Concrete durability is the ability to
More informationWaterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or
More informationEpoxy Floor Coating Problem Solving Guide
Table of Contents: Page: Troubleshooting Issue: 2. Color Differential 3. Fish Eye 4. Milky or Cloudy Coatings 5. Orange Peel 6. Peeling or Delamination 8. Delamination between Coats 9. Pinholes/Bubbling
More informationRAPTOR TRUCK BED LINER - BLACK
4 x 750ml RAPTOR base coating x L RAPTOR hardener TECHNICAL DATA SHEET & U-POL s RAPTOR Truck Bed Liner is a durable K polyurethane coating that provides surfaces with a protective barrier. RAPTOR Tintable
More informationExternal Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902
External Wrapping of Steel Riser Pipe Case Study HJ3 CS200902 Introduction Refineries process a wide variety of petroleum products. As part of the process, they rely on cooling towers, which recycle water
More informationCrack Sealing & Filling. Crack Sealing Why, Where, & How. 5 Benefits of Crack Sealing. Crack Sealing - Overview. Repair Many Types of Cracks
Crack Sealing Why, Where, & How Dennis Roberts Remac Asphalt Maintenance, Inc. Freeman, Virginia www.remacus.com 434-634-2111 Crack Sealing & Filling Crack repair treatments are an important part of all
More informationSecondary Containment Comparison ATI Ultra COAT vs HDPE
When choosing a secondary containment system it must be chosen based on its ability to withstand long term contact with the natural elements (weather), whatever the tanks hold (unrefined oil, fuels, acids,
More informationSection Four: Linings and Coatings
Section Four: Linings and Coatings SPIRALWELD PIPE The majority of steel water pipe furnished today is specified to be provided with both an interior lining and an exterior coating. AMERICAN offers a wide
More informationSee photo below showing this product being applied to a badly corroded floor.
SPECIALTY COATINGS, INC 805 Lehigh Ave. Union, NJ 07083 TEL 888-755-7361 FAX 888-755-6231 www.armorpoxy.com info@armorpoxy.com FLOOR REPAIR, LEVELING & PREP BULLETIN This bulletin has been prepared by
More informationCorporate Headquarters located in Davison, MI Family owned business with over 50 years industry experience Focus on value based, environmentally safe
Corporate Headquarters located in Davison, MI Family owned business with over 50 years industry experience Focus on value based, environmentally safe products for the infrastructure rehabilitation and
More informationPROVIDING SUPPORT TO THE CONSTRUCTION INDUSTRY BY SUPPLYING CURED IN PLACE PIPE (CIPP) LINING TO COVER DRAINS, SEWERS AND PIPELINES
PROVIDING SUPPORT TO THE CONSTRUCTION INDUSTRY BY SUPPLYING CURED IN PLACE PIPE (CIPP) LINING TO COVER DRAINS, SEWERS AND PIPELINES CLIENTS BENEFIT FROM LINING SUPPORT S SEWER AND PIPE CIPP LINING THAT
More informationINSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
More informationCHAPTER 3 MOISTURE TESTING
CHAPTER 3 MOISTURE TESTING Part I - Moisture Testing for Wood Subfloors A. Testing Requirements 1. Test for moisture at several locations in the room a minimum of 20 per 1,000 square feet and average the
More informationBuilding Owners Guide to a Duro-Last System!
Building Owners Guide to a Duro-Last System Table of Contents Section 1: Introduction to Duro-Last Roofing Systems Section 2: Benefits of a Duro-Last Roofing System Section 3: Comparing a Duro-Last Roof
More informationColorado State University. Durrell Center Roof Repair
Colorado State University Durrell Center Roof Repair SPECIFICATION: POLYURETHANE FOAM ROOFING l.0 GENERAL REQUIREMENTS The successful application of a polyurethane foam roofing system is dependent upon
More informationUltraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation
Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation Dan Broderick Director of Pipeline Rehabilitation ACHEN-GARDNER ENGINEERING,
More informationVC 104+ Rigid Grade / Rigid Grade Imagine VC 104 Rigid Grade Commercial Customised
Page 1 of 6 instructions VC 104+ Rigid Grade / VC 104+ Rigid Grade Imagine / (for the rest of this document referred to as VC 104) can be applied to new and used trucks and trailers with painted rigid
More informationCoast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District
Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District Paul F. Wilson 1 and Robert J. Warren 2 1 1525 Faraday Ave, Suite 290, Carlsbad, California, USA 92008; e-mail: pwilson@pirnie.com.
More informationAdhesive Recommendation for Altro Flooring. Porous (absorbent) subfloors (most wood subfloors and some concrete)
Adhesive Recommendation for Altro Flooring Product Safety Sheet Flooring Smooth Sheet Flooring Porous (absorbent) subfloors (most wood subfloors and some concrete) Altrofix 30/31 (excessively heavy rolling
More informationOVERVIEW. 1 Intent:... 2. 2 Applicability:... 2. 3 Referenced Standards... 2. 5 Invert Repair Mortar... 3
PERMACAST CENTRIFUGALLY CAST CONCRETE PIPE (CCCP) OVERVIEW 1 Intent:... 2 2 Applicability:... 2 3 Referenced Standards... 2 5 Invert Repair Mortar... 3 6 Centrifugally Cast Concrete Pipe (CCCP)... 3 7
More informationINDUSTRIAL FLOORING INSTALLATION CHALLENGES. James C. Ziegler, ArmorSeal Product Manager Sherwin Williams Cincinnati, Ohio, USA
INDUSTRIAL FLOORING INSTALLATION CHALLENGES James C. Ziegler, ArmorSeal Product Manager Sherwin Williams Cincinnati, Ohio, USA Abstract: Specifier's and contractors not only need to properly evaluate the
More informationAvoiding Air Barrier Pitfalls
Avoiding Air Barrier Pitfalls Design & Durability November 2013 Air barriers, when correctly installed, help buildings achieve high levels of energy efficiency by decreasing heat loss. For example, great
More informationReflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES
Reflectex TM Reflective Concrete Interlayer Geotextile INSTALLATION GUIDELINES Page 1 Table of Contents WHAT IS REFLECTEX TM?... 2 STORAGE AND HANDLING... 3 SITE PREPARATION... 3 PREPARATION OF EXISTING
More informationThe AQUAFIN Approach to Concrete Repair
Concrete Repair Building Product Systems Waterproofing & Concrete Restoration Decorative Coatings Moisture Vapor Remediation & Flooring Injection Grouting The AQUAFIN Approach to Concrete Repair www.aquafin.net
More informationTroubleshooting Draft Problems in Chimneys
Troubleshooting Draft s in Chimneys Draft is the difference in pressure between the inside of the chimney and inside of the house. This is affected mostly (though not completely; see info on fans for example)
More information1.02 DESCRIPTION A. This Section specifies furnishing and installing Cast in Place Detectable/Tactile Warning Surface tiles where indicated.
CAST IN PLACE DETECTABLE/TACTILE WARNING SURFACE TILE PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Special Conditions and Division 1 Specifications
More informationATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING
ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,
More informationRECOMMENDATIONS FOR REPAIR OF SPRAY POLYURETHANE FOAM (SPF) ROOF SYSTEMS DUE TO HAIL AND WIND DRIVEN DAMAGE
RECOMMENDATIONS FOR REPAIR OF SPRAY POLYURETHANE FOAM (SPF) ROOF SYSTEMS DUE TO HAIL AND WIND DRIVEN DAMAGE RECOMMENDED DESIGN CONSIDERATIONS AND GUIDE SPECIFICATIONS Spray Polyurethane Foam Alliance Copyright
More informationCODE NOTES. Insulation Requirements in Commercial Buildings for Mechanical and Service Hot-Water Piping
BUILDING TECHNOLOGIES PROGRAM Insulation Requirements in Commercial Buildings for Mechanical and Service Hot-Water Piping The intent of the pipe insulation requirements is to reduce temperature changes
More informationHEB 38 BLANCO AND WEST AVENUE FLUID APPLIED EPDM RUBBER ROOF RECOVERY SYSTEM APPLICATION
HEB 38 BLANCO AND WEST AVENUE FLUID APPLIED EPDM RUBBER ROOF RECOVERY SYSTEM APPLICATION David Marut TEST CASE REPORT July 1, 2014 Case Study Pro Guard EPDM Super Coat Liquid Rubber Membrane Roof System
More informationLetty Arvide-Gomar, PE
Letty Arvide-Gomar, PE Outline DIP History and Applications Corrosion Issues Internal Cleaning Technologies Rehabilitation Options DIP History and Applications Corrosion Issues Internal Cleaning Technologies
More informationSewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
More informationRehabilitation or Replacement? That Is The Question
Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections
More informationSPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
More informationScotch-Weld TM. Epoxy Adhesive 1838 B/A Green 1838 B/A Tan 1838-L B/A Translucent. Technical Data February, 2016. Product Description
3 Scotch-Weld TM 1838 1838 1838-L Technical Data February, 2016 Description 3M TM Scotch-Weld TM s 1838 and are controlled flow products; Scotch-Weld 1838-L is flowable. These epoxy adhesives are two-part,
More informationSTUCCOMAX Installation Specifications Exterior One-Coat Stucco over EPS Foam, PU Foams, Exterior Gypsum Board, MgO Board and Cement Block
STUCCOMAX Installation Specifications Exterior One-Coat Stucco over EPS Foam, PU Foams, Exterior Gypsum Board, MgO Board and Cement Block Description Uses Advantages StuccoMax is a truly green NON Portland
More informationHow to Install GoBoard:
How to Install GoBoard: A Step-by-Step Guide Durable, Ultra-Lightweight, Waterproof Tile Backer Board Introducing GoBoard Every tiling project requires a durable, waterproof surface under the tile, called
More informationG VYCOR DECK PROTECTOR
G VYCOR DECK PROTECTOR Self-Adhered Flashing Contractor s Guide DECKS AND DETAIL AREAS For longer lasting decks, install Grace Vycor Deck Protector. FROM THE MAKERS OF G Ice & Water Shield What Self-Adhered
More informationSewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority
More informationVinyl Composition Tile Installation System
Vinyl Composition Tile Installation System Product Gauge Size Vinyl No-Wax (Dry Back) Urethane No-Wax (Dry Back) 0.045" (1.1 mm) 0.080" (2.0 mm) IMPERIAL TEXTURE 0.094" (2.4 mm) STONETEX ChromaSpin COMPANION
More informationCrescent Valley High School Roof Investigation
Crescent Valley High School Roof Investigation Project: Corvallis School District Crescent Valley High School Roof Date: July 26, 2011 Report By: Rowell Brokaw Architects: Mark Young, AIA, Chris Andrejko
More informationSECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS
SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...
More informationHow to repair your existing low slope flat roof.
How to repair your existing low slope flat roof. Recycled Rubber Roofing is not a "Roof Coating." It is a liquid emulsion used as the underlayment of a new or retrofit, built-up roofing system. One of
More informationRoof Inspection. Summary Report
Phone: (561) 866 9956 www.real-estate-inspections.com Roof Inspection Summary Report Subject Property File Number: 05-15-RF-002 Inspector: Craig Milliken, PE CPM Real Estate Inspections, Inc. Date of Inspection:
More informationDivision 9. SignaFlor Pad and Pour Flooring System
Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions
More informationCold Weather Concrete Practices
Cold Weather Concrete Practices The Information below is an outline of common practice for residential foundation placement and winter construction utilize Edmonton and surrounding Area. Conditions in
More informationConstruction. 3-part thixotropic epoxy patching mortar. Product Description. Tests
Product Data Sheet Edition 05/12/2014 Identification no: 020204030010000044 Sikadur -41 CF Rapid 3-part thixotropic epoxy patching mortar Construction Product Description Uses Characteristics / Advantages
More informationPIPE REHABILITATION. Industrial Wastewater Municipal Wastewater Drinking Water Pressure Pipes
PIPE REHABILITATION Industrial Wastewater Municipal Wastewater Drinking Water Pressure Pipes About Us An HDPE after mechanical insertion into an egg-shaped brick work sewer sized 1400 x 2100 mm (or 56
More informationSTANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. 1. Structure Earthwork: 02200
STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES PART 1 - GENERAL A. Description This section includes materials, testing, and installation of precast concrete
More informationWastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
More informationSC2000 CEMENT BONDING PROCEDURES
Pg.1 SC2000 CEMENT BONDING PROCEDURES Widely recognized as the world s finest cold vulcanizing cement REMA SC2000 is the solution to your industrial bonding problems. By using REMA UTR20 hardener with
More informationResurfacing Concrete. Page 1 of 5
Resurfacing Concrete Materials List QUIKRETE Concrete Resurfacer (No. 1131) (see calculator on page 5 for quantity needed) QUIKRETE Concrete and Stucco Wash (No. 8601) QUIKRETE Concrete Sealer (No. 8800)
More informationCORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS
AN ERGONARMOR COMPANY TECHNICAL INFORMATION SPECIFICATION FOR INSTALLATION 07/11 SUPERSEDES 04/00 PAGE 1 OF 6 CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS 1. SCOPE 1.1 This specification
More informationInstallation System. Existing Resilient Sheet Floors
Vinyl Composition Tile Installation System Product Adhesive/Full Spread Adhesive/Tile-On Comment Imperial Texture MultiColor RAVE Stonetex Companion Square Feature Tile/Strips ARTEFFECTS SAFETY ZONE Vinyl
More informationSeptic Tank to Cistern Conversions. Saving Water & Saving Money
Florida Keys Aqueduct Authority 1100 Kennedy Drive Key West, Florida 33040 Septic Tank to Cistern Conversions Saving Water & Saving Money One of the benefits of connecting to the Central Wastewater System
More informationMost agencies think about cleaning because of debris in the line.
Most agencies think about cleaning because of debris in the line. If we have an effective cleaning program there should not be a lot of debris in the line after the line is cleaned and tv d for acceptance.
More information*Trademark of The Dow Chemical Company A business unit of The Dow Chemical Company and its subsidiaries Copyright 2003 The Dow Chemical Company.
Dow Chemical is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members.
More informationBiological Drain Maintenance Systems
Biological Drain Maintenance Systems 2007 NCH Corporation HISTORY OF DRAINS MODERN SEWAGE SYSTEM Septic tanks were introduced; effluent water was largely untreated causing pollution of streams and rivers.
More informationUsing StrongPIPE Hybrid FRP for PCCP Rehab in Miami-Dade System
Using StrongPIPE Hybrid FRP for PCCP Rehab in Miami-Dade System Luis Aguiar Miami-Dade Water & Sewer Department Anna Pridmore, PhD Structural Technologies PROJECT BACKGROUND Miami-Dade Water & Sewer Department
More informationBenefits of Preventative Maintenance Pavement Sealers
Pavement Coatings Technology Council WWW.PAVEMENTCOUNCIL.ORG Benefits of Preventative Maintenance Pavement Sealers Introduction Pavement Sealers have been used successfully for around 60 years. Recently,
More informationZero (VOC) Structural Epoxy Rehabilitation of Steel and Concrete Tanks, Pipes and Structures
Zero (VOC) Structural Epoxy Rehabilitation of Steel and Concrete Tanks, Pipes and Structures Danny R. Warren Warren Environmental, Inc. P.O. Box 1206 Carver, MA 02330 ABSTRACT The effects of time and environmental
More information3 Scotch-Weld TM. Urethane Adhesives 3532 B/A 3535 B/A 3549 B/A. Technical Data March, 2002
3 Scotch-Weld TM Technical Data March, 2002 Product Description 3M TM Scotch-Weld TM 3532 B/A, 3535 B/A and 3549 B/A are two-component, polyurethane adhesives which cure at room temperature or with heat
More informationA Glossary of HVAC Terms:
Since 1979 TACL A537C Doctor COOL & P rofessor HEA T The Team For All Seasons TM A Glossary of HVAC Terms: Confused by the many terms and acronyms surrounding your indoor comfort system? Don t be! This
More informationSEE HOW TO MAKE LIME PLASTER WHY USE LIME? PATTI STOUTER, BUILD SIMPLE INC. FEBRUARY 2013
SEE HOW TO MAKE LIME PLASTER PATTI STOUTER, BUILD SIMPLE INC. FEBRUARY 2013 WHY USE LIME? Lime plaster forms a light, clean, and durable surface that is resistant to weather and mold. A thin layer attaches
More informationPLANNING CAREFUL NORTH VANCOUVER PIPE BURST REQUIRES
WATER & SEWER REHAB TECHNOLOGIES NORTH VANCOUVER PIPE BURST REQUIRES CAREFUL PLANNING Close proximity to storage silos, poor ground conditions and clogged storm sewer pipe puts trenchless contractor to
More informationARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials
ARDEX GUIDE SPECIFICATION ARDEX Exterior Concrete Repair & Resurfacing Polymer-Modified, Cement-Based, Patch & Horizontal Overlay Materials SECTION 03 92 50 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings,
More informationSeptember 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901
September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections
More informationPeel & Seal Self-Stick Roofing Solutions
Peel & Seal Self-Stick Roofing Solutions Ideal for Low Slope Applications Waterproof and Weatherproof Energy Efficient Tough and Durable Versatile, Effective Sealing Around Protrusions Perfect for Vents,
More informationCut Cost Not Roots! Eliminating SSOs With Chemical Root Control
Cut Cost Not Roots! Eliminating SSOs With Chemical Root Control How maintenance issues become political issues Chemical Root Control Roots entering a wastewater conveyance system is the number one contributing
More information53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
More informationRead and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS
AC TOPSEAL SELF-ADHERED, GRANULAR SURFACED, SINGLE PLY, LOW SLOPE ROLLED ROOFING 3 X 33.3 = 100 SQ. FT. 10 YEAR MATERIAL LIMITED WARRANTY For Use on Porches / Sheds / Utility Buildings / Accessory Buildings
More informationBEST PRACTICE GUIDE. Fibrelime Premixed Universal Plaster and Render
BEST PRACTICE GUIDE Fibrelime Premixed Universal Plaster and Render Contents: Fibrelime description Fibrelime suitability Preparation before application Application Aftercare Painting General Recommended
More informationCellar Tech Containment Well Cellar Systems www.cellartech.com
Sealed Well Cellars are protected by US patent 7637692, 7987904, 8127837, and 8256505. Additional US patents pending. Basic Containment Well Cellar Sealed Well Cellars are protected by US patent 7637692,
More informationHigh Performance Coating Systems THIOKOL. P r i m a r y a n d S e c o n d a r y C o n t a i n m e n t
THIOKOL High Performance Coating Systems FNEC 2515 RLP 2378+ P r i m a r y a n d S e c o n d a r y C o n t a i n m e n t The name THIOKOL has long been synonymous with elastomeric polysulfide based coatings
More informationDetermining the Right Molding Process for Part Design
Determining the Right Molding Process for Part Design How RIM Molding Advantages Compare with Traditional Production Technologies Page 2 Introduction This White Paper details the part production processes
More informationHow to Install Hardwood Flooring Over a Sub Floor
How to Install Hardwood Flooring Over a Sub Floor Installation Preparation Instructions Read the entire instructions before starting your project. 1) INSPECT EACH PLANK (see fig. a) Wood is a natural product
More informationSIKA BRIDGE DECK WATERPROOFING SYSTEM SIKALASTIC -851 BRIDGE DECK WATERPROOFING SYSTEM
H A P A S Sika Services AG Speckstrasse 22 8330 Pfäffikon Switzerland Tel: +49 (0)711 8009-0 Fax: +49 (0)711 8009-1251 e-mail: uebelhoer.dirk@de.sika.com website: www.sika.com SIKA BRIDGE DECK WATERPROOFING
More informationSMOOTHMOVE INSTRUCTIONS FURNITURE VAN EPOXY FLOOR FINISH KIT VOC-FREE - NO SOLVENT GENERAL INFORMATION KEY 87269AB
SMOOTHMOVE INSTRUCTIONS FURNITURE VAN EPOXY FLOOR FINISH KIT VOC-FREE - NO SOLVENT GENERAL INFORMATION KEY 87269AB YOU ARE NOW GETTING READY TO USE SOLVENT FREE AND 100% SOLIDS HIGH GLOSS SMOOTHMOVE FOR
More informationPROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY
PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced
More informationCost Estimation for Materials and Installation of Hot Water Piping Insulation
Cost Estimation for Materials and Installation of Hot Water Piping Insulation Prepared for Pacific Northwest National Laboratory Under Contract Number: 18O9O2 By Gary Klein, Managing Partner Affiliated
More information