A COMPARISON BETWEEN STATIC LOAD TEST AND HIGH STRAIN DYNAMIC TEST ON BORED PILES

Size: px
Start display at page:

Download "A COMPARISON BETWEEN STATIC LOAD TEST AND HIGH STRAIN DYNAMIC TEST ON BORED PILES"

Transcription

1 A COMPARISON BETWEEN STATIC LOAD TEST AND HIGH STRAIN DYNAMIC TEST ON BORED PILES MICHAEL ANGELO A/L AROKIASAMY UNIVERSITI TEKNOLOGI MALAYSIA

2 PSZ 19:16 (Pind.1/97) UNIVERSITI TEKNOLOGI MALAYSIA BORANG PENGESAHAN STATUS TESIS JUDUL: A COMPARISON BETWEEN STATIC LOAD TEST AND HIGH STRAIN DYNAMIC TEST ON BORED PILES SESI PENGAJIAN: 2005/06 Saya MICHAEL ANGELO A/L AROKIASAMY (HURUF BESAR) Mengaku membenarkan tesis (PSM/Sarjana/Doktor Falsafah)* ini disimpan di perpustakaan Universiti Teknologi Malaysia dengan syarat-syarat kegunaan seperti berikut:- 1. Tesis adalah hakmilik Universiti Teknologi Malaysia. 2. Perpustakaan Universiti Teknologi Malaysia dibenarkan membuat salinan untuk tujuan pengajian sahaja. 3. Perpustakaan dibenarkan membuat salinan tesis ini sebagai bahan pertukaran antara institusi pengajian tinggi. 4. **Sila tandakan ( ) SULIT TERHAD (Mengandungi maklumat berdarjah keselamatan atau kepentingan Malaysia seperti yang termaktub di dalam AKTA RAHSIA RASMI 1972) (Mengandungi maklumat TERHAD yang telah ditentukan oleh organisasi/badan dimana penyelidikan dijalankan TIDAK TERHAD Disahkan oleh (TANDATANGAN PENULIS) (TANDATANGAN PENYELIA) Alamat Tetap: No 35, E2/5A Lorong Ria, Dr. Nurly Gofar Taman Timur, Teluk Intan, Perak. Tarikh : 19 May 2006 Tarikh : 19 May 2006 CATATAN: * Potong yang tidak berkenaan. ** Jika tesis ini SULIT atau TERHAD, sila lampirkan surat daripada pihak berkuasa /organisasi berkenaan dengan menyatakan sekali sebab dan tempoh tesis ini perlu dikelaskan sebagai SULIT atau TERHAD.

3 A COMPARISON BETWEEN STATIC LOAD TEST AND HIGH STRAIN DYNAMIC TEST ON BORED PILES MICHAEL ANGELO A/L AROKIASAMY A thesis submitted in fulfillment of the Requirements for the award of the degree of Master of Engineering (Civil Geotechnic) Faculty of Civil Engineering University Technology Malaysia MAY 2006

4 ii I declare that this project report is the result of my own research except as cited in references. This report has not been accepted for any degree and is not concurrently submitted in candidature of any degree. Signature : Name of Candidate: MICHAEL ANGELO S/O AROKIASAMY Date : 19 May 2006

5 iii I hereby declare that I have read this report and in my opinion this report is sufficient in terms of scope and quality for the award of Master of Engineering (Civil-Geotechnics). Signature :. Name of Supervisor : Dr. Nurly Gofar Date : 19 May, 2006

6 iv DEDICATION For my dearest mother and dad (Mariamah & Arokiasamy) My success is your gift and prayers To my beloved brother, sister and relations Everyone and friends whom are the best Success of mine is success of all of yours

7 v ACKNOWLEDGEMENT I would like to thank God for giving me enough knowledge and time to conclude this program. All the help rendered by the lecturers and friend are appreciated. They have contributed towards the completion of this study. The time spent in doing this program gives memories that would last for ages. I would like to also express and record my gratitude towards my lecturer cum supervisor Dr. Nurly Gofar, for the time she allocated and all her guidance in preparation of this thesis.

8 vi ABSTRACT Piles are both statically and dynamically tested to obtain the capacity and to verify design. Both the test will provide results that may vary base on the method applied in conducting the test. It is therefore, necessary to compare the results of a static load test with dynamic load test. Many comparison studies are conducted worldwide, but most of it is for displacement pile. Therefore, the results of the test are compared for replacement piles. The piles are tested statically prior to dynamic test. The test results shows that a good agreement have achieved between both the test with plus minus 2mm at working load in terms of settlement. Comparatively the settlement predicted in dynamic load test is smaller compared to static load test. In terms of total capacity, the Davisson s method gives the lowest value compared to other methods. The Davisson s method is used to compare the results because it is more conservative. The comparison shows that the piles are within 20% relative to the capacity obtained through Davisson s method. Since the static test was conducted prior to dynamic test, the capacity obtained from dynamic test is higher due to the pile undergone elastic compression during static load test and also due to soil setup. The shaft distribution show that large shaft distribution obtained on long piles. They are comparable with the dynamic test taking into account the time factor.

9 vii ABSTRAK Cerucuk biasanya diuji secara static dan dinamik untuk menentukan beban tanggungan dan juga untuk mengesahkan rekabentuk. Kedua-dua ujian akan menghasilkan keputusan yang berlainan berdasarkan kaedah yang digunakan untuk melaksanakan ujian. Oleh demikian, ia adalah penting untuk memperoleh suatu hubungan diantara ujian static dan ujian dinamik beban cerucuk. Banyak kajian yang dijalankan di merata dunia, tetapi kajian-kajian ini tertumpu pada driven pile. Oleh yang demikian, kajian ini adalah tertumpu terhadap bored pile. Cerucuk-cerucuk ini diuji secara static terdahulu sebelum menjalankan ujian dinamik. Keputusan adalah memuaskan bagi bebanan kerja dengan ±2mm. Secara ringkas boleh dikatakan bahawa keputusan yang diperolehi pada bebanan ujian adalah lebih rendah bagi ujian dinamik berbanding ujian statik. Dari sudut bebanan muktamad pula, kaedah Davisson memberi nilai yang paling minima berbanding kaedah-kaedah yang lain. Nilai ini adalah pada had yang rendah, oleh itu ia digunakan bagi tujuan kajian. Keputusan menggunakan kaedah ini memberikan keputusan bahawa nilai ujian dinamik adalah dalam 20% nilai yang diperoleh. Ini adalah kerana ujian static dijalankan dahulu sebelum ujian dinamik dan ini mengakibatan cerucuk mengalami terikan mampatan dan jugan masa perantaran mengakibatkan tanah pulih semula keadaan asalnya. Dari segi bebanan sisi cerucuk, didapati bebanan sisi menguasai nisbah yang lebih banyak bagi cerucuk panjang. Keputusannya dapat dipersamakan dengan ujian dinamik jika masa perantaraan diambil kira.

10 viii TABLE OF CONTENTS CHAPTER TITLE PAGE DECLARATION DEDICATION ACKNOWLEDGEMENTS ABSTRACT ABSTRAK TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES LIST OF SYMBOLS LIST OF APPENDICES ii iv v vi vii viii xi xii xiv xvi 1 INTRODUCTION Background 1

11 ix 1.2 Problem Statement 1.3 Objectives 1.4 Scope LITERATURE REVIEW Bored Pile Types of Bored Pile Construction Procedures Dry Method Casing Method Wet Method Techniques and Equipment Boring by Mechanical Auger Boring by Percussion or Grab-type Rig Boring by Continuous Flight Auger Drilling Under-reammed Bored Piles 2.2 Load Test Static Load Test (Maintain Load Test) Test Equipment and Instruments Test Procedures High Strain Dynamic Test Correlation Studies METHODOLOGY Introduction 3.2 Data Collection 3.3 Data Analysis and Results 3.4 Summary DATA ANALYSIS AND DISCUSSION Data Description 35

12 x 4.2 Analysis of field data 4.3 Analysis of Static Load Test Data 4.4 Analysis of PDA test data 4.5 Comparison between Static Load Test and Pile Driving Analyzer CONCLUSION AND RECOMMENDATION FOR FUTURE STUDY Conclusion Recommendations for Future Study 54 REFERENCES 55 Appendices A-E 58 97

13 xi LIST OF TABLES TABLE NO. TITLE PAGE 4.1 Relationship between SPT, N value and weathering grade Subsoil classification (Komoo and Morgana, 1988) Pile details Date and time interval between tests Maximum load implied during static load test Pile settlement Pile capacity for static load test using various methods Pile capacity Shaft and end bearing contributions 51

14 xii LIST OF FIGURES FIGURE NO. TITLE PAGE 2.1 Bore hole created by dry method of construction Process of dry method Bore hole created by casing method Process of casing method Bore hole created by wet method Process of wet method Auger a) spiral auger b) bucket auger c) rock auger d) earth auger Percussion drilling equipment Continuous flight auger machinery Belling tool Under reamed bored pile 19

15 xiii 2.12 Static load test in progress Test equipments a) 30 tonne steel ram with hydraulic release b) pile driving analyzer c) accelerometer d) transducer Flow chart of the study Instrumented bore pile schematic diagram Typical comparison of methods for Pile Pile soil model CAPWAP method iteration program 49

16 xiv LIST OF SYMBOLS A - Cross section Area of the pile c - Wavespeed E - Modulus of Elasticity of the pile material or strain gauge reading F m - Force measured F c - Force calculated ј c - Empirical correlation factor (Case method damping factor) L - Distance along the pile between two telltale anchor plates ΔL - Difference in movement between two telltale rods Q - Quake Q ra - Load in the pile midway between two anchor plates or load in the pile at the location of the strain gauge

17 xv R shaft - Shaft Resistance R toe - Toe Resistance R u - Ultimate resistance in the soil springs Δt - Travel time v m - Velocity measured Z - Pile impedance Ρ - Mass density

18 xvi LIST OF APPENDICES APPENDIX TITLE PAGE A Results of Analysis Pile 1 58 B Results of Analysis Pile 2 66 C Results of Analysis Pile 3 74 D Results of Analysis Pile 4 82 E Results of Analysis Pile 5 90

19 CHAPTER 1 INTRODUCTION 1.1 Background Foundation is an essential part of a structure because it transmit load from the structure to the soil below it. The foundation can be classified into shallow foundation and deep foundation. Shallow foundations such as individual footings, combined footings, and raft foundation are used when the supporting soil is found at shallow depth. While, deep foundations such as caissons and piles are required when the depth of supporting soil is significant or building is placed on soft compressible soil. Deep foundation is also required if construction is subjected to horizontal load or moment. Piles are mainly classified into two categories; displacement piles and replacement piles. Displacement piles consist of reinforced piles, pre-stressed piles, steel-h piles, whereas replacement piles consist of bored piles, and cast in-placepiles. All these piles are designated to a particular situation or site based on location and type of structure, ground condition and durability.

20 2 Piles are designed based on the load that is transferred from the structure to the piles; thus the type, size and length of piles are determined accordingly. However, load test should be conducted to verify the design capacity. Piles that are not properly designed, would pose danger to the structure. Inadequate load or large settlement would cause severe damage to the structure and its occupants. There are several alternatives to load test, i.e.: maintained load test (MLT), high strain dynamic test (PDA), statnamic test and Osterberg Cell load testing. All the mentioned tests are rigorously being carried out in Malaysia. These tests would provide the engineer with the load and the corresponding settlement. It actually enables the engineer in decision making as to resume work or to make changes to the selected design criteria. Of the four, the most viable and the most common as being practiced in the industry are the Static Load Test and the High Strain Dynamic Testing. Maintained load test or static load test is commonly known in construction industry. It uses hydraulic jacking system against a kentledge or against a beam restraint by anchor piles. The load is measured by the reading of pressure gauge on the hydraulic jack. At present the load is measured directly by a load cell interposed between the pile head and jack or between the jack and platform to get an accurate and reliable measurement. This test is also known as conventional test. It requires proper setup, manpower, machinery and longer duration to maintain the load. High strain dynamic test or dynamic pile testing is conducted using two to four sets of sensors known as accelerometer and transducer attached to the pile. The basis for this testing is wave mechanics. The test requires sensors, pile driving analyzer and the pile driving system. On every impact of the driving system/ram, the sensors capture the impact force and velocity. The captured signals of strain and acceleration were conditioned and possessed by the pile driving analyzer to produce plots of force and velocity versus time. The ability to accurately predict static capacity for dynamic pile testing has resulted in many studies and has been the focus

21 3 of dynamic pile tests on many project sites. Standard practice requires performing signal matching on the data to more accurately determine capacity from the dynamic tests. CAPWAP (Case Pile Wave Analysis Program) analysis is the most used program to evaluation capacity from high strain dynamic testing data. Previous studies have demonstrated generally good correlation of CAPWAP signal matching results on dynamically re-striked tests with that of static load tests. Since, the usage of static load test and high strain dynamic test is rapid and almost conducted in every site, comparisons between the two tests for bored pile is attempted in this project paper. 1.2 Problem Statement There are many studies conducted on the comparison between high strain dynamic testing and CAPWAP analysis, and static load test in Malaysia, but most of it was made for the displacement piles. I, in this project study however, will focus on replacement piles (bored piles). Comparison is made between the static load test results and the CAPWAP signal matching result on dynamic re-strike test. Furthermore, an attempt is made to compare the results obtained from the maintain load test and the high strain dynamic test and CAPWAP analysis.

22 4 1.3 Objectives The objective of conducting this study is to compare the results obtained in static load tests with that of high strain dynamic tests and CAPWAP analysis in terms of: 1) The load transfer mechanism through pile; 2) The load and the corresponding settlement of the pile; and 3) The total bearing capacity of the pile. 1.4 Scope In this project paper special attention is provided to the bored piles. The bored piles are vertically tested with both static load test and high strain dynamic test. The data for this paper is obtained from real time projects conducted in construction industry. In this case, the piles are fully instrumented for measurements of stress and displacement. Static load test are conducted prior to the dynamic test. The static load test is conducted using kentledge with load cell, whereas; the dynamic test is conducted using a drop hammer. The subject of this study is not the accuracy, but relative comparison between static load test and high strain dynamic test to evaluate the capacity and load transfer mechanisms within the piles.

23 CHAPTER 2 LITERATURE REVIEW 2.1 Bored Pile A bored pile is a deep foundation that is constructed by placing fluid concrete in a drilled hole. The bored piles are designed based on geotechnical engineering properties of subsoil condition obtained from the soil investigation at proposed site for foundation designs. In soil investigation work, in-situ test are conducted and disturbed and undisturbed soil samples are collected for laboratory testing, and also to determine ground water level at the site. In a project site, piles are selected for a foundation based on loads to be imposed, site subsurface materials, lateral capacity and also cost. In many projects, bored pile has proven cost effective, especially in urban areas and large construction.

24 6 Bored piles have many advantages compared to the displacement pile. When the piles are properly analyzed, designed and constructed, the advantages range from reliability, economy and versatile. Reliability in terms of shaft that can be located easily, soil/rock can be inspected during construction and integrity can be assessed. It is understood that bored piles have high resistance to lateral loads. Piles driven into clay soils may produce ground heaving and cause driven piles to move laterally. This does not occur in bored piles. Furthermore, the surface over which the base of the bored pile is constructed can be visually inspected. In terms of economy, a single bored pile can be used instead of a group of piles and the pile cap. The construction of bored piles generally utilizes mobile equipment, which under proper soil conditions, may prove to be more economical than methods of constructing pile foundations. Bored piles are also versatile. Depth and diameter of piles can are easily varied. Constructing bored piles in deposits of dense sand and gravel is easier than driving piles. Furthermore, the base of bored pile can be enlarged to provide greater resistance to the uplifting load. Areas where driving piles can pose danger to the adjacent structures due to vibration can be avoided by using bored pile.

25 Types of Bored Piles Bored piles are classified according to the ways in which they are designed to transfer the structural load to the substratum. The pile can be cased with pipe when required. For such piles, the resistance to the applied load may develop from end bearing and also from side friction at the shaft perimeter and soil interface. A belled bored pile consists of a straight pile with a bell at the base, which rests on good bearing soil. The bell can be constructed in the shape of a dome or it can be angled. For the majority of bored piles, the entire load-carrying capacity is assigned to the end bearing only. However, under certain circumstances, the endbearing capacity and the side friction are taken into account Construction Procedures The most common construction procedure used involves drilling. There are three major types of construction methods; the dry methods, the casing methods and the wet methods Dry Method This method is employed in soils and rocks that are above the water table as shown in Figure 2.1. The soils are normally strong and not easily collapsible when the hole is drilled to its full depth.

26 8 Dry hole no water content Figure 2.1 Bore hole created by dry method of construction Construction in the dry method uses drilling tools to bore the hole. Spoilt of the hole is dumped nearby or are exported to dumping yard. Concrete is then poured into the hole and if there be any requirements for the reinforcement, then a rebar cage is placed in the upper portion of the pile. Concreting is continued till the required level. The process of the dry method is shown in Figure 2.2 shows Casing Method The casing method is employed in soils and rocks, which are easily caving or collapsible soils when the borehole is excavated as shown in Figure 2.3. The

27 9 construction method is almost the same as the dry method but requires an introduction of slurry during drilling when collapsible soils are encountered. Figure 2.2 Process of dry method Casing introduction into the hole Figure 2.3 Bore Hole created by casing method

28 10 The drilling is continued past the collapsible soil layer into a more stable soil layer. Casing is then introduced into the hole and the slurry is pumped out of the hole. A smaller drill that passes through the casing is then used to drill further into the soil. If there be any need for reinforcement, a rebar cage is introduced to the full length of the pile. Concreting work starts and the casing is retrieved from the hole gradually. Concreting is completed when the concrete fill up to the required level. The Figure 2.4 shows the process of the wet method. Figure 2.4 Process of casing method

29 Wet Method This method is employed in a very soft soil condition as in the Figure 2.5. This method is sometimes referred to as slurry displacement method. Slurry is used to keep the borehole open during the entire depth of excavation. Construction of a bored pile using this method starts with excavation by drilling with the slurry in the hole. The entire depth is drilled with slurry. If needed, reinforcement is introduced in the hole. Concreting starts by placing a tremie pipe to the bottom of the borehole. As concreting progresses, the slurry is slowly displaced to the ground surface where it is collected. Concreting completes when the finish level is reached. Figure 2.6 shows the process of the wet method. Introduction of Slurry into the hole Figure 2.5 Bore hole created by wet method

30 12 Figure 2.6 Process of wet method Techniques and Equipment In a construction of a drilled shaft, more than one method can be employed in accordance to the site requirement. No matter which method is employed, the boring equipments are normally the same but require minimal adjustment for the required work. Generally, the boring is carried out by mechanical auger, percussion/grab type rig or continuous flight auger. The under reaming of the shaft if required is done by using belly bucket.

31 Boring by Mechanical Auger The large spiral auger or bucket auger rotary drilling machines are developed for the installation of large diameter bored piles. These machines are capable of drilling in wide range of soil and also weak rocks using different type of auger as in the Figure 2.7. In cases where there is a potential cave in, a length of casing is placed into the drilled hole by means of a crane or by the mast of the machine. The casing would provide a seal against water entry. A smaller size drill plate is then used inside the casing for the lower part of the hole. Boring by mechanical auger under water or bentonite slurry can cause some loosening of the soil at pile base level. If a higher base resistance is required, then the soil needs to be compacted by injection pressure. A flat circular steel plate is suspended from the bottom of the reinforcing cage, and a thin flexible steel sheet is attached to the bottom of the plate. After concreting the pile, grout is injected around the bottom few meters of the shaft to lock the shaft to the surrounding soil. After a hardening period grout is then injected at high pressure to fill the space between the steel plate and the steel sheet. This forces the sheet down and compresses the underlying soil. Resistance to uplift of the pile at this stage is provided by grout injections around the pile shaft.

32 14 (a) (b) (c) (d) Figure 2.7 Auger a) Spiral auger b) bucket auger c) rock auger d) earth auger

33 Boring by Percussion or Grab-type Rig In ground where mechanical auger drilling is impossible (in water-bearing sands or gravels, stony or boulder clays, or very soft clays and silts), a conventional cable percussion boring rigs are used as shown in Figure 2.8. Figure 2.8 Percussion drilling equipment In these type of boring, the casing is given a continuous semi-rotary motion to keep it sinking as the borehole is advanced. The casing may be with welded joints and left in position, or with bolted joints and withdrawn while the shaft is concreted. A problem in drilling of bored piles in granular soils, either by cable percussion rigs in the case of small diameter piles, or grabbing rigs for the larger diameters, is the risk of excessive removal of soil during drilling. This is expected to

34 16 happen when drilling by cable percussion methods since the soil is drawn up into the shell or baler by a sucking action. Water is required to induce the flow of soil into the drilling tool and if natural ground water is not present it must be poured into the pile borehole. Violent raising and lowering of the shell can cause flow of soil from the surrounding ground with the risk of settlement of any adjacent structures. It is possible to minimize the risk of loss of ground by driving the casing ahead of the boring, but this can make it impossible to withdraw the casing after concreting the pile shaft since driving the casing cause the soil to tighten around it. If there are services or buildings around the piling area than it is best to use rotary-auger drilling method under bentonite slurry or a continuous flight auger Boring by Continuous Flight Auger Drilling Continuous Flight Auger drilling machine is made of spiral auger throughout the stem as in Figure 2.9. The auger can be withdrawn after drilling to the required depth in a stable ground and the pile is concreted by feeding a flexible pressure hose to the bottom of the unlined hole and withdrawing it as sand-cement mortar is pumped down. In cases of unstable ground, the flight auger is provided with a hollow central stem closed by a plug at the bottom. During drilling, the walls of the borehole are supported at all times by the soil rising within the flights. When the required depth is reached, concrete is injected down the hollow stem, which pushes out the bottom plug and the pile is concreted by raising the auger with or without rotation.

35 17 Figure 2.9 Continuous flight auger machineries During concreting, the auger is rotated for a number of revolutions before raising it to ensure that the concrete has completely filled the bottom of the hole. After removing the auger, reinforcing cage is pushed down the shaft, while the concrete in the shaft is still in the form of fluid. The use of continuous flight auger rig avoids many of the problems of drilling and concreting piles experienced when using conventional power augers. However, continuous flight auger piles operation must be monitored closely during construction Under-reammed Bored Piles An under-reammed pile (also known as a belled shaft) is one with an enlarged base. The under-reams are made with special equipments and techniques. The equipment used showed in the Figure 2.10 below. The larger the base of underreammed pile, the higher their end bearing capacity.

36 18 Figure 2.10 Belling Tool However, the displacement required to mobilize the full end bearing is typically on the order of 10% of the base diameter, which may be more than the structure can tolerate. Under-reammed piles also have greater uplift capacities due to bearing between the ceiling of the under-ream and the soil above as is in Figure The construction of under-reammed pile can be hazardous to the workmen. The bottom of the under ream must be cleaned of loose soil before placing concrete. This task is typically done by hand. Thus, under-reammed shafts are not as common as they once were.

37 19 Figure 2.11 Under reamed bored pile 2.2 Load Test Pile load test are executed in two alternative ways based on site investigation, laboratory soil testing and desk study: 1) Test pile piles are tested to failure. This test is done during the preliminary design stage. Load test is then carried out to refine and finalize the design of the pile foundation. 2) Test on working pile piles are tested to two times the design load (working load). This test is done in areas where previous experience

38 20 is available. Pile load test are then carried out on randomly selected actual piles to check the pile design capacities. The equipment and the procedures for these two alternatives are essentially similar. Generally there are two types of testing performed in most part of the world: the static load test and the high strain dynamic test Static Load Test (Maintained Load Test) The most accurate way to determine the load capacity is to install a full-size prototype pile at the site of the proposed production piles and load it to failure. However, load tests also are much more expensive, and thus must be used more judiciously. Varieties of equipment and procedures have been used to conduct load tests. The differences in the equipment and procedures can influence the results and become the point of debate among engineers. Therefore, there is no single correct capacity for most piles. Nevertheless, engineers judge the accuracy of all other methods by comparing them to full-scale load tests Test Equipment and Instruments Test equipments and instruments consist of load application arrangements and the instruments to measure the resulting movements or deformations. Stacking

39 21 large weight on top of the pile as imposed load, posed danger because it is difficult to place large weights without creating excessive eccentricities that can cause them to collapse. As an alternative, a hydraulic jack is used to provide the test load. This system is more stable and less prone to collapse. Figure 2.12 shows the actual setup of static load test using hydraulic jack performed on a bored pile. Figure 2.12 Static load test in progress Traditionally, engineers have measured the applied load by calibrating the hydraulic jack and monitoring the pressure of the hydraulic fluid during the test. However, even when done carefully, this method is subject to errors. Therefore, load cells (an instrument that measures force) are developed. The load cell is placed between the jack and the pile and is used to measure the applied load. Displacement is another measurement that is very important in conducting load test besides the capacity. The displacement is measured by utilizing dial gauges mounted on the reference beams. Surveyor s level can also be used as a cross reference to the measured records of displacement.

40 22 Another measurement employed in load test is the incremental strain measurement along the pile length to determine the distribution of load transfer from pile to the soil. These provide information on pile tip movements or deflections along the pile. In order to obtain this measurement, a pile needs to be instrumented prior to installation. Instruments that can be used are the strain rods (or telltales) and the electric strain gauges (or vibrating wire strain gauges). Telltales or strain rods (vibrating wire extensometer) normally consist of polyvinyl chloride (PVC) tubing extended to steel end plates embedded inside a concrete pile or welded on the steel pile or housed in sonic logging pipe at various locations along the pile length. Inside the sonic logging pipe tubing, a stainless steel/graphite/fiberglass rod is installed extending from the end plate to the top of the pile. Both the tubing and the steel rod extend to the top of pile. The steel rod must be allowed to move freely in the tube. The movement of the top of the telltale or strain rod relative to the top of the test pile is measured with a dial gauge or the measurement of the vibrating wire extensometer is logged using a data logger. Normally, telltale readings are referenced to the top of the pile. By noting the location of the specific telltale rod anchor plate and by measuring the relative movement of the individual rod, elastic shortening of pile at that location can be obtained. At present, data recoded by the data logger can give the elastic shortening of the pile without having to measure the top measurements. With this information, the load in the pile at the midpoint between two telltale anchor plates separated by a distance L can be obtained by the following relationship:

41 23 AΔLE Q ra = L where Q ra A ΔL E L = load in the pile midway between two anchor plates = cross section area of the pile = difference in movement between two telltale rods = modulus of elasticity of the pile material = distance along the pile between the two telltale anchor plates Electric strain gauges or vibrating wire strain gauge can be mounted along the pile length at various locations before the pile is installed. In bored piles, these gauges can be tied up with the reinforcing bars and wires can be brought up through a casing just like the vibrating wire extensometer. Since these gauges are temperature sensitive, additional temperature-compensating gauges should be used for each strain gauge. The strain ε can be determined directly by noting the changes in the strain gauge reading from the unstrained to any desired load. At present the measurements are data logged using a data logger. The load at the point will then be calculated by the following relationship: Q ra =AEε where Q ra A E ε = load in the pile at the location of the strain gauge = cross section area of the pile = modulus of elasticity of the pile material = strain gauge reading

42 Test Procedures There are two categories of load tests: controlled stress tests and controlled strain tests. The former uses predetermined loads (the independent variable) and measured movements (the dependent variable), while the latter uses movement as independent variable and load as dependent variable. Controlled stress tests are the slow maintained load test and quick maintained load test. In slow maintained load test, the pile is loaded in eight equal increments (i.e. 25%, 50%, 75%, 100%, 125%, 150% 175% and 200%) to two times of the design load. The load is maintained under each increment until the rate of settlement is acceptably small. At two times the design load, the load is maintained for 24 hours. After the required holding time, the loading is removed in decrement of 25% with 1 hour between decrements. After one cycle of the load, the pile is reloaded to test load in increments of 50% of the design load, allowing 20 minutes between load increments. Then the load is increased in increments of 10% of design load until failure, allowing 20 minutes between load increments. This method is commonly considered as the ASTM Standard test method and is generally used for site investigation prior to installing contract piles and writing specifications. The disadvantage of this test is that it is time consuming. In quick maintained test the procedure is almost the same as slow maintained test except that each load increment is held for a predetermined time interval regardless of the rate of pile movement at the end of that interval. Pile is loaded in 20 increments to three times of the design load (i.e. each increment is 15% of the

43 25 design load). Each load increment is maintained for 5 minutes with readings taken every 2.5 minutes until the test load has been reached. After 5 minutes interval, the full load is removed in four equal decrements with 5 minutes between decrements. The advantage of this test is that it is fast and economical. The method represents a more nearly undrained condition. This method cannot be used for settlement estimation because it is a quick method. Controlled strain test is the constant rate of penetration test, which presses the pile into the ground at a constant rate. As the test progresses, the load and settlements are measured to develop a load-settlement curve. In this test, the pile head is forced to settle at typically 0.01 to 0.05 in/min (0.25 to 1.25 mm/min) for clays and 0.03 to 0.10 in/min (0.75 to 2.5 mm/min) for sands. The force required to achieve the penetration rate is recorded. The test is carried out to a total penetration of 2 to 3 in. (50 to 75 mm). The advantage of this test method is that the test is very fast and economical. This method can be employed for friction piles but less practical for the end bearing piles because of high force requirements to cause penetration through hard bearing stratum High Strain Dynamic Test High strain dynamic test is a powerful tool to access pile driving, which may supplement or replace static testing. This test is conducted in a fraction of time

44 26 unlike the static load test. This test is based on the dynamic method of analysis. Actual field test is performed on pile by measuring strain and acceleration records under impact of a falling mass. Wave equation analysis program (WEAP) is utilized to design the weight, drop height and cushion of the hammer apparatus to assure a successful test. The pile driving analyzer and the CAPWAP methods are used for data acquisition and analysis. Testing results yield information regarding pile static bearing capacity, structural integrity, and pile-soil load transfer and pile load-movement relationship. High strain dynamic test is conducted using; a pair of strain transducers mounted near the top of the pile, a pair of accelerometers mounted also near the top of the pile and the a pile driving analyzer also known as PDA (pile driving analyzer) as shown in Figure The pile driving analyzer monitors the output from the strain transducers and accelerometers as the pile is being driven, and evaluates the data as follows: 1) The strain data combined with the modulus of elasticity and cross section area of the pile, gives the axial force in the pile; 2) The acceleration data integrated with time produces the particle velocity of the waves traveling through the pile; 3) The acceleration data, double integrated with time produces the pile set per blow.

45 27 (a) (b) (c) (d) Figure 2.13 Test Equipments a) 30 tonne steel ram with hydraulic release b) Pile Driving Analyser c) accelerometer d) transducer Using the above data, the PDA computes the Case method capacity and displays the results immediately. Case method analysis is an analytical technique for determining the static pile capacity from wave trace data. The Case method computations include an empirical correlation factor, j c that can be determined from an on-site pile load test. It is also possible to use the Case method without an on-site pile load test by using j c values from other similar soils. This approach is less accurate, but still very

46 28 valuable. The PDA can also store the field data on a floppy disk to provide input for a CAPWAP analysis. The Case method, while useful, is a simplification of the true dynamics of pile driving. The empirically obtained damping factor, j c calibrates the analysis, so the final results are no better than the engineer s ability to select the proper value. In contrast, a wave equation analysis utilizes a much more precise numerical model, but suffers from weak estimates of the actual energy delivered by the hammer. Fortunately, the strengths and the weaknesses of these two methods are complimentary, so we can combine them to form an improved analysis called CAPWAP (Case Pile Wave Analysis Program). It is a rigorous numerical method for a comprehensive analysis of pile and soil behavior under hammer impacts and also under static loading conditions. The analysis is done in an iterative environment using measured force and acceleration in a wave equation type analysis employing signal matching technique that produces values of R u (the ultimate resistance in the soil springs ), q (the quake), and j c (the Case method damping factor). CAPWAP analyses are not a substitute for pile load tests. However, they may reduce the required number of tests Correlation Studies During the past decade, high-strain dynamic testing of bored piles has enjoyed widespread acceptance around the world. Discuss here are some of the case histories of dynamic and static test results.

47 29 Case 1: Jianren and Shihong (1992). A study was conducted on drilled piles for a 257m high tower span crossing the Yangtze River in Tai Sheng Quan Nanking, China where test shaft consisted of two each 800 and 1500mm diameter with corresponding lengths of 30 and 60m. Subsurface conditions at the site consisted of clay, sand and gravel layers over highly weathered sandstone. Project specifications required that comparisons between dynamic and static load test results be made in a Class A prediction manner. The hammer used for the dynamic testing had a weight of 12 tons with drop heights up to 1 and 2.5m for the 800 and 1500mm diameter shafts respectively. Comparison of dynamic and static was performed within the same time frame indicated that the two methods produced capacity values that were within 2.6% relative to each other. Case 2: Seidel and Rausche (1984). A static and dynamic test program was initiated on drilled shafts for the West Gate Freeway in Melbourne, Australia after questions were raised regarding the shafts bearing capacity and serviceability. Twelve shafts ranging in size between 1100 and 1500mm diameter and 35 to 64m in lengths were dynamically tested. Nine shafts were socketed into mudstone and the remaining three into basalt. Six of the shafts socketed into the mudstone were also statically tested. A hammer with a weight of 20 tons and drop heights between 1.6 and 2.5m was used for the dynamic tests. Dynamic and static tests were done totally independently and results were compared in a Class A prediction fashion. Dynamic activation of static pile resistance forces exceeded 3000 tons for some 1500mm diameter shafts. Direct correlation of ultimate pile capacities was not possible since maximum values were not usually reached during the static tests. Skin friction predictions from dynamic tests and values obtained from instrumented shafts under static tests were remarkably similar. Pile head load-movement relationships obtained from both testing methods was comparable. Case 3: Chambers and Morgano (2004). A 457 mm diameter auger-cast pile was drilled to a depth of 19.8 m on a site in Owensboro, Kentucky. The pile was tested dynamically to evaluate the static load capacity with further analysis by signal matching software, CAPWAP. The test was carried out using a 3 tons ram. Four

48 30 days later, the pile was tested statically using four reaction piles. The test results from the static load test compares well with the computed static load deflection determined from CAPWAP analysis. Based on Case 1 and 2, a reduction on time and cost was anticipated in the project with the use of high strain dynamic testing as a complimentary to the existing static load test. Likins and Rausche (1980) concluded that statistical evaluation of previous studies and the current compilation of results showed the CAPWAP analysis of dynamic pile testing data for re-strikes to be very reliable in determination of ultimate capacity of both driven piles and cast-in-situ piles (e.g. drilled shafts and auger-cast-cfa piles). Accuracy is slightly better for driven piles than for cast-insitu piles. Comparison of CAPWAP results with static load tests on the same piles shows excellent agreement.

49 CHAPTER 3 METHODOLOGY 3.1 Introduction The study was conducted on five data from 3 sites. The data was grouped in high strain dynamic testing and CAPWAP analysis, and static results. All the data was analyzed separately. High strain dynamic test and CAPWAP analysis results from the each of the data were reviewed in terms of shaft distribution and pile load-settlement. Similarly the same procedures were employed to instrumented static load test results. The output of the high strain dynamic test and CAPWAP analysis, and the static load test analysis was compared to obtain a relationship. The results were compared based on the pile load settlement, shaft friction and load bearing capacity. A conclusion is made for the results obtained. Suggestion and improvement is outlined based on the comparison as in Figure 3.1.

50 32 Bored Piles Stage 1 Data Collection Data of High Strain Dynamic Test & CAPWAP analysis Data of Static Load Test Pile Load - Settlement Pile Load - Settlement Shaft Distribution Stage 2 Data Analysis & Results Shaft Distribution Load Bearing Capacity Relationship Stage 3 - Summary Conclusion & Suggestion Figure 3.1 Flow Chart of the Study 3.2 Data Collection The first stage of this study included identification of sites that used bored pile as foundation for the structure. The data required was from instrumented bored piles that were statically and dynamically load tested. The results were made sure to be complete for comparison purpose.

51 33 There were many data obtained but data that contains the static load test results alone is rejected during this stage of study. In the same manner, data that contains only the high strain dynamic load test results were rejected. 3.3 Data Analysis and Results The second stage of this study was to analysis the data that was obtained from the three sites. Based on the data, a plot on pile load settlement was tabulated and plotted. The pile load settlement was for both the data obtained from the static load test and the high strain dynamic load test. The results obtained were compared between each other. The data were also analyzed based on shaft distribution. The shaft distribution was obtained from the readings of the strain gauges at different levels for the static test, whereas for the high strain dynamic load test, results from CAPWAP were tabulated. The percentage of shaft distribution through the length of the pile in regards to the total capacity obtained was compared between each other. In static load test, we obtained a certain capacity. We also obtained certain capacity from the high strain dynamic load test. Both the capacities were compared using various methods available and plotted to get a comparison for all the five data that s available.

52 Summary The third and final stage of the study was to draw a conclusion based on the results of the analysis. It is understood that from previous study there has been good correlation between high strain dynamic test and static load test. It was verified in this stage for the piles in Malaysia. The result that was derived from the analysis was carefully studied based on the objectives. The closeness and the deviation between the results obtained were checked. If there seem to be deviation between the results, then the causes were identified. Suggestions were included to improve the quality of the tests and to refine the tests for better comparison in the future.

53 CHAPTER 4 DATA ANALYSIS AND DISCUSSION This chapter presents the data analysis on five instrumented bored piles. The descriptions of the piles are outlined in following section. All these piles were founded in two types of formation. Each formation has its own characteristic and influence on the pile and corresponding results. In Section 4.3, the static test data is analyzed using various methods available and a brief detail on the employment of the methods. CAPWAP (Case Pile Wave Analysis Program) is also discussed to analyze the dynamic test data in Section 4.4. Finally the results are compared between static load test and dynamic load test. 4.1 Data Description In a routine static load test, the measurements of load and settlement are taken at the pile head only. It is impossible to obtain the shaft friction values in different soil/rock layers. It is also difficult to estimate the contribution of shaft friction and end bearing accurately. Therefore, piles are instrumented with strain gauges and extensometer at appropriate depths along the pile. Figure 4.1 shows an example of the instrumented bore pile in a schematic diagram.

54 36 Figure 4.1 Instrumented Bore Pile Schematic Diagram Instrumentation is generally carried out on trial piles where the piles are loaded three times its estimated working load or preferably to failure to obtain maximum information. An instrumented pile will enables the evaluation of shaft resistance, end bearing resistance and the development of these resistances during static load test. The development of shaft and end bearing resistances represent the load transfer behavior of the pile system. The cost may be marginal to install

55 37 additional instruments to a normal static load, but the information obtained is beneficial for design verifications and optimization of pile lengths for a project of a big scale. In a pile dynamic (PDA) test, the pile force and velocity measurements are obtained by a set of strain gauges and accelerometers attached to the pile head. For the evaluation of the static pile capacity, relative soil distribution, and soil quake and damping characteristic, a more rigorous evaluation using the signal matching technique is utilized with computer software, e.g. Case Pile Wave Analysis Program (CAPWAP). 4.2 Analysis of field data The data used for this study are collected from five numbers of instrumented bored piles. Three of these piles were constructed using dry method of construction and the other two using wet method of construction. Each pile was statically and dynamically tested. Typically, the static load test was conducted prior to the PDA test on each pile. The data was obtained from construction site at three different sites. Based on the Geological Map of Selangor (Scale 1:63,360) and the borehole logs, the Site 1 is located in Kenny Hill Formation. A relationship is tabulated in Table 4.1 between the SPT (Standard Penetration Test), N value obtained from bore hole and the weathering grade of the rocks. Site 2 and Site 3 are located in Old Alluvium based on the Geological Map of Johor Bahru (Scale 1:63,360).

56 38 Kenny Hill Formation consists of monotonous sequence of interbedded clastic sedimentary rocks such as sandstones, siltstones, shale/mudstone. Frequently this formation is also referred to as meta-sedimentary with interbedded meta-arenite and meta-argillite, taking into account that the sedimentary rocks have been partly metamorphosed into quartzite and phyllite. Old Alluvium is consider to be of the pliestocene age that comprises of continental deposits of consolidated sand, clay and boulder beds of fluviate and shallow-marine origin. Holocene marine clays are nearly absent. Studies of these types of sediments, mainly from exposures were done by Kumar (1972) in Johor and Tai (1972) in Singapore. Their measurements of paleo-current directions show a south to eastward trending sediment transport. From this it was concluded that Straits of Johor did not exist at the time of deposition of the Older Alluvium (Bosch, 1988). In the drill holes data of the Public Works Department of Singapore, the base of the formation was found between 100m and 145m below sea-level, while the highest deposits were found at 45m above sea level. Table 4.1: Relationship between SPT, N Value and Weathering Grade Weathering Grade Ting (1979) SPT Komoo (1986) - SPT VI < V IV > III *CRR<70% *CRR-Core Recovery Rate Table 4.2 shows the subsoil classification based on the weathering grade. Based on the geological condition, Kenny Hill formation at Site 1 predominantly Grade IV material with SPT N value greater than 50. The subsoil exists at shallow depth, thus the pile length ranges from 7m to 12m. These piles can be categorized as short piles.

HOME AUTOMATION SYSTEM USING POWER LINE COMMUNICATION DARLENE BINTI MOHAMAD DOUGLAS

HOME AUTOMATION SYSTEM USING POWER LINE COMMUNICATION DARLENE BINTI MOHAMAD DOUGLAS HOME AUTOMATION SYSTEM USING POWER LINE COMMUNICATION DARLENE BINTI MOHAMAD DOUGLAS A report submitted as partial fulfillment of the requirements for the award of the Degree of Bachelor of Electrical Engineering

More information

UNIVERSITI TEKNIKAL MALAYSIA MELAKA FAKULTI TEKNOLOGI MAKLUMAT DAN KOMUNIKASI

UNIVERSITI TEKNIKAL MALAYSIA MELAKA FAKULTI TEKNOLOGI MAKLUMAT DAN KOMUNIKASI UNIVERSITI TEKNIKAL MALAYSIA MELAKA FAKULTI TEKNOLOGI MAKLUMAT DAN KOMUNIKASI SEMESTER 2 2013/2014 PROJEK SARJANA MUDA 1 (BITU ) BITD REPORT PROJECT TITLE: UTeM SPORT CARNIVAL EVENT MANAGEMENT SYSTEM PREPARED

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and

More information

Manpower Planning Utilizing Work Study at Data Storage Manufacturing Company

Manpower Planning Utilizing Work Study at Data Storage Manufacturing Company UNIVERSITI TEKNIKAL MALAYSIA MELAKA Manpower Planning Utilizing Work Study at Data Storage Manufacturing Company Thesis submitted in accordance with the partial requirement of the Universiti Teknikal Malaysia

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

SWAY REDUCTION ON GANTRY CRANE SYSTEM USING DELAYED FEEDBACK SIGNAL (DFS) NORASHID BIN IDRUS

SWAY REDUCTION ON GANTRY CRANE SYSTEM USING DELAYED FEEDBACK SIGNAL (DFS) NORASHID BIN IDRUS i SWAY REDUCTION ON GANTRY CRANE SYSTEM USING DELAYED FEEDBACK SIGNAL (DFS) NORASHID BIN IDRUS This report is submitted in partial fulfillment of the requirements for the award of Bachelor of Electronic

More information

SPA BEAUTY MANAGEMENT SYSTEM NAJIHAH BINTI RUSSLI

SPA BEAUTY MANAGEMENT SYSTEM NAJIHAH BINTI RUSSLI SPA BEAUTY MANAGEMENT SYSTEM NAJIHAH BINTI RUSSLI This report is submitted in partial fulfillment of the requirements for the Bachelor of Computer Science (Database Management) FACULTY OF INFORMATION AND

More information

LICENSE PLATE RECOGNITION OF MOVING VEHICLES. Siti Rahimah Binti Abd Rahim

LICENSE PLATE RECOGNITION OF MOVING VEHICLES. Siti Rahimah Binti Abd Rahim LICENSE PLATE RECOGNITION OF MOVING VEHICLES Siti Rahimah Binti Abd Rahim Bachelor of Engineering with Honors (Electronics & Computer Engineering) 2009/2010 UNIVERSITI MALAYSIA SARAWAK R13a BORANG PENGESAHAN

More information

DESIGN AND DEVELOPMENT OF MICRO HYDROPOWER FOR UNDERSERVED COMMUNITIES

DESIGN AND DEVELOPMENT OF MICRO HYDROPOWER FOR UNDERSERVED COMMUNITIES DESIGN AND DEVELOPMENT OF MICRO HYDROPOWER FOR UNDERSERVED COMMUNITIES Mohamad Ridhzan Bin Roslan Bachelor of Engineering with Honours (Electronics and Computer Engineering) 2009 UNIVERSITI MALAYSIA SARAWAK

More information

Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load

Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load Nature of Services The company has a long history of performance of tests of piles and pile groups under a variety

More information

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

Step 11 Static Load Testing

Step 11 Static Load Testing Step 11 Static Load Testing Test loading is the most definitive method of determining load capacity of a pile. Testing a pile to failure provides valuable information to the design engineer and is recommended

More information

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:! In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible

More information

KWANG SING ENGINEERING PTE LTD

KWANG SING ENGINEERING PTE LTD KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters

More information

TN. MOHD FAKHRUZZAMAN B. TN ISMAIL

TN. MOHD FAKHRUZZAMAN B. TN ISMAIL Automated Timetable Scheduling System for FTMK Direct Entry Student (ATSS) TN. MOHD FAKHRUZZAMAN B. TN ISMAIL This report is submitted in partial fulfillment of the requirements for the Bachelor of Computer

More information

DESIGNING A PEPPER HARVESTER END EFFECTOR TIONG ING HO. This project is submitted in partial fulfillment of

DESIGNING A PEPPER HARVESTER END EFFECTOR TIONG ING HO. This project is submitted in partial fulfillment of DESIGNING A PEPPER HARVESTER END EFFECTOR TIONG ING HO This project is submitted in partial fulfillment of the requirements for the degree of Bachelor of Engineering with Honours (Mechanical and Manufacturing

More information

Dynamic Pile Analysis Using CAPWAP and Multiple Sensors Camilo Alvarez 1, Brian Zuckerman 2, and John Lemke 3

Dynamic Pile Analysis Using CAPWAP and Multiple Sensors Camilo Alvarez 1, Brian Zuckerman 2, and John Lemke 3 Dynamic Pile Analysis Using CAPWAP and Multiple Sensors Camilo Alvarez 1, Brian Zuckerman 2, and John Lemke 3 1 GRL Engineers, Inc. Los Angeles, California. (661) 259-2977 2 Berkel & Company. San Francisco,

More information

METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE. Prepared by

METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE. Prepared by METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE Prepared by Infratech ASTM CO., LTD. Contents Chapter Description Page Contents...... 1 List of Appendix. 1 1. Introduction.. 2 2. Test Method..2 3.

More information

CONTROL HOME APPLIANCES VIA INTERNET (CoHAVI) SOFTWARE DEVELOPMENT SHIRRENE A/P NAI SOWAT

CONTROL HOME APPLIANCES VIA INTERNET (CoHAVI) SOFTWARE DEVELOPMENT SHIRRENE A/P NAI SOWAT i CONTROL HOME APPLIANCES VIA INTERNET (CoHAVI) SOFTWARE DEVELOPMENT SHIRRENE A/P NAI SOWAT This report is submitted in partial fulfillment of the requirements for the award of Bachelor of Electronic Engineering

More information

SMART SHOES CHARGER TAN CHEE CHIAN

SMART SHOES CHARGER TAN CHEE CHIAN SMART SHOES CHARGER TAN CHEE CHIAN This report is submitted in partial fulfillment of the requirements for the award of Bachelor of Electronic (Industrial Electronics) With Honours Faculty of Electronic

More information

The advantages and disadvantages of dynamic load testing and statnamic load testing

The advantages and disadvantages of dynamic load testing and statnamic load testing The advantages and disadvantages of dynamic load testing and statnamic load testing P.Middendorp & G.J.J. van Ginneken TNO Profound R.J. van Foeken TNO Building and Construction Research ABSTRACT: Pile

More information

Design and Construction of Auger Cast Piles

Design and Construction of Auger Cast Piles Design and Construction of Auger Cast Piles 101 th Annual Road School 2015 3/11/2015 Malek Smadi, Ph.D., P.E. Principal Engineer - GEOTILL - Fishers, IN msmadi@geotill.com - www.geotill.com CONTENTS 1.

More information

PROVA DINAMICA SU PALI IN ALTERNATIVA ALLA PROVA STATICA. Pile Dynamic Load test as alternative to Static Load test

PROVA DINAMICA SU PALI IN ALTERNATIVA ALLA PROVA STATICA. Pile Dynamic Load test as alternative to Static Load test PROVA DINAMICA SU PALI IN ALTERNATIVA ALLA PROVA STATICA Pile Dynamic Load test as alternative to Static Load test Gorazd Strnisa, B.Sc.Civ.Eng. SLP d.o.o. Ljubljana ABSTRACT Pile Dynamic test is test

More information

Dead load (kentledge) A structure over the test pile. Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell)

Dead load (kentledge) A structure over the test pile. Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell) Introduction Fugro LOADTEST Overview STATIC LOAD TESTING O-cell Bi-directional testing State of the art Dr Melvin England Fugro LOADTEST Static load tests Previous/existing technology Developments O-cell

More information

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located

More information

PILE TESTING SPECIFICATION

PILE TESTING SPECIFICATION PILE TESTING SPECIFICATION 1.0 GENERAL This specification deals with the testing of a pile by the application of an axial load or force. It covers vertical and raking piles tested in compression (i.e.

More information

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Cambridge City Council - East Cambridgeshire District Council - Fenland District Council, Huntingdonshire

More information

ALLOWABLE LOADS ON A SINGLE PILE

ALLOWABLE LOADS ON A SINGLE PILE C H A P T E R 5 ALLOWABLE LOADS ON A SINGLE PILE Section I. BASICS 5-1. Considerations. For safe, economical pile foundations in military construction, it is necessary to determine the allowable load capacity

More information

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long

More information

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration

More information

PDCA Driven-Pile Terms and Definitions

PDCA Driven-Pile Terms and Definitions PDCA Driven-Pile Terms and Definitions This document is available for free download at piledrivers.org. Preferred terms are descriptively defined. Potentially synonymous (but not preferred) terms are identified

More information

GUIDELINE FOR HAND HELD SHEAR VANE TEST

GUIDELINE FOR HAND HELD SHEAR VANE TEST GUIDELINE FOR HAND HELD SHEAR VANE TEST NZ GEOTECHNICAL SOCIETY INC August 2001 CONTENTS Page 1.0 Introduction 2 2.0 Background 2 3.0 Recommended Practice 3 4.0 Undrained Shear Strength 3 5.0 Particular

More information

How To Design A Foundation

How To Design A Foundation The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION Instructor : Dr. Jehad Hamad Definition The process of determining the layers of natural

More information

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives Lecture 4 : In-situ tests [ Section 4.1: Penetrometer Tests ] Objectives In this section you will learn the following Penetrometer Tests Standard penetration test Static cone penetration test Dynamic cone

More information

** Jika tesis ini SlJL17' atau TERI IAD, sila lampirkan surat daripada pihak berkuasa. BORANG PENGESAHAN STATUS TESIS

** Jika tesis ini SlJL17' atau TERI IAD, sila lampirkan surat daripada pihak berkuasa. BORANG PENGESAHAN STATUS TESIS BORANG PENGESAHAN STATUS TESIS JUDUI,: RFID BASED STUDENT ATTENDANCE SYSTEM SESl PENGAJIAN: 2-200812009 Saya ZULLIZAH BINTI SAMSURY mengaku membenarkan tesis (PSM) ini disimpan di Perpustakan Fakulti Teknologi

More information

DYNAMIC TESTING OF MICROPILES. COMPARISON OF STATIC AND DYNAMIC TEST RESULTS

DYNAMIC TESTING OF MICROPILES. COMPARISON OF STATIC AND DYNAMIC TEST RESULTS DYNAMIC TESTING OF MICROPILES. COMPARISON OF STATIC AND DYNAMIC TEST RESULTS D. Carlos Oteo 1, D. José Luis Arcos 2, D. Rafael Gil 3, D. Carlos Fdez. Tadeo 4 ABSTRACT Micropiles are used for many applications,

More information

PRODUCTIVITY IMPROVEMENT VIA SIMULATION METHOD (MANUFACTURING INDUSTRY) HASBULLAH BIN MAT ISA

PRODUCTIVITY IMPROVEMENT VIA SIMULATION METHOD (MANUFACTURING INDUSTRY) HASBULLAH BIN MAT ISA PRODUCTIVITY IMPROVEMENT VIA SIMULATION METHOD (MANUFACTURING INDUSTRY) HASBULLAH BIN MAT ISA Thesis submitted in fulfillment of the requirements for the award of the degree of Bachelor of Mechanical Engineering

More information

HOME ALARM SYSTEM USING DETECTOR SENSOR MD KHAIRUL AMRI B MD ZAIN

HOME ALARM SYSTEM USING DETECTOR SENSOR MD KHAIRUL AMRI B MD ZAIN HOME ALARM SYSTEM USING DETECTOR SENSOR MD KHAIRUL AMRI B MD ZAIN This report is submitted in partial fulfillment of the requirements for the award of Bachelor of Electronic Engineering (Industrial Electronics)

More information

CIVL451. Soil Exploration and Characterization

CIVL451. Soil Exploration and Characterization CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

More information

IMPROVING SERVICE REUSABILITY USING ENTERPRISE SERVICE BUS AND BUSINESS PROCESS EXECUTION LANGUAGE AKO ABUBAKR JAAFAR

IMPROVING SERVICE REUSABILITY USING ENTERPRISE SERVICE BUS AND BUSINESS PROCESS EXECUTION LANGUAGE AKO ABUBAKR JAAFAR IMPROVING SERVICE REUSABILITY USING ENTERPRISE SERVICE BUS AND BUSINESS PROCESS EXECUTION LANGUAGE AKO ABUBAKR JAAFAR A project report submitted in partial fulfillment of the requirements for the award

More information

Dynamic Load Testing of Helical Piles

Dynamic Load Testing of Helical Piles Dynamic Load Testing of Helical Piles ANNUAL KANSAS CITY SPECIALTY SEMINAR 2014 JANUARY 10, 2014 Jorge Beim JWB Consulting LLC Pile Dynamics, Inc. Main Topics Brief description of the Dynamic Load Test

More information

vulcanhammer.net This document downloaded from

vulcanhammer.net This document downloaded from This document downloaded from vulcanhammer.net since 1997, your source for engineering information for the deep foundation and marine construction industries, and the historical site for Vulcan Iron Works

More information

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR If you listen to the hype, it sounds like there must be 20 or 30 different types of piers out there. Company A says they have an

More information

c. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc.

c. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc. Design Manual Chapter 6 - Geotechnical 6B - Subsurface Exploration Program 6B-2 Testing A. General Information Several testing methods can be used to measure soil engineering properties. The advantages,

More information

Comparison Between Dynamic and Static Pile Load Testing

Comparison Between Dynamic and Static Pile Load Testing Comparison Between Dynamic and Static Pile Load Testing Dr. Mohamed A. Osman Partner Engineering Services & Design (ESD)-Khartoum, Sudan e-mail: drmao@hotmail.com Dr. Elfatih Mohamed Ali Ahmed Partner

More information

TABLE OF CONTENTS. SUPERVISOR S DECLARATION ii STUDENT S DECLARATION iii DEDICATION ACKNOWLEDGEMENTS v ABSTRACT LIST OF TABLES

TABLE OF CONTENTS. SUPERVISOR S DECLARATION ii STUDENT S DECLARATION iii DEDICATION ACKNOWLEDGEMENTS v ABSTRACT LIST OF TABLES ACKNOWLEDGEMENT I would like to express my gratitude and appreciation to all those who gave me the possibility to complete this report. A special thanks to our final year project coordinator, Mr. Zamri,

More information

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur

Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Geotechnical Measurements and Explorations Prof. Nihar Ranjan Patra Department of Civil Engineering Indian Institute of Technology, Kanpur Lecture No. # 13 (Refer Slide Time: 00:18) So last class, it was

More information

APPENDIX A PRESSUREMETER TEST INTERPRETATION

APPENDIX A PRESSUREMETER TEST INTERPRETATION APPENDIX A PRESSUREMETER TEST INTERPRETATION PRESSUREMETER TEST INTERPRETATION Description of test The pressuremeter test, discussed in great detail by Martin (1977), Baguelin et al. (1978), Barksdale

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

GSM BASED HOME SECURITY SYSTEM CHENG KAR LOCK

GSM BASED HOME SECURITY SYSTEM CHENG KAR LOCK i GSM BASED HOME SECURITY SYSTEM CHENG KAR LOCK This report is submitted in partial of the requirement for the award of Bachelor of Electronic Engineering (Telecommunication Electronics) With Honours Faculty

More information

BUTE Department of Construction Management and Technology

BUTE Department of Construction Management and Technology BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):

More information

An Automatic Kunzelstab Penetration Test

An Automatic Kunzelstab Penetration Test An Automatic Kunzelstab Penetration Test Yongyuth Sirisriphet 1, Kitidech Santichaianant 2 1 Graduated student: Faculty of Industrial Education in and Technology. King Mongkut's University of Technology

More information

GLOBAL SYSTEM FOR MOBILE COMMUNICATION (GSM) KIT FOR VEHICLE S ALARM SYSTEM NIK MOHD KHAIRULFAHMI BIN NIK MAT

GLOBAL SYSTEM FOR MOBILE COMMUNICATION (GSM) KIT FOR VEHICLE S ALARM SYSTEM NIK MOHD KHAIRULFAHMI BIN NIK MAT GLOBAL SYSTEM FOR MOBILE COMMUNICATION (GSM) KIT FOR VEHICLE S ALARM SYSTEM NIK MOHD KHAIRULFAHMI BIN NIK MAT This report is submitted in partial fulfillment of requirements for the award of Bachelor of

More information

PILE FOUNDATIONS FM 5-134

PILE FOUNDATIONS FM 5-134 C H A P T E R 6 PILE FOUNDATIONS Section I. GROUP BEHAVIOR 6-1. Group action. Piles are most effective when combined in groups or clusters. Combining piles in a group complicates analysis since the characteristics

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com

More information

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode INDIRECT METHODS SOUNDING OR PENETRATION TESTS STANDARD PENETRATION TEST (SPT) Reference can be made to IS 2131 1981 for details on SPT. It is a field edtest to estimate e the penetration e resistance

More information

CARLOS FERNANDEZ TADEO & ASOCIADOS, S.L. Range of Services

CARLOS FERNANDEZ TADEO & ASOCIADOS, S.L. Range of Services 1 CARLOS FERNANDEZ TADEO & ASOCIADOS, S.L. Range of Services Pile and deep foundations testing Geotechnical testing equipment supplier Geotechnical software supplier Geotechnical consulting Web page: www.fernandeztadeo.com

More information

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,

More information

Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns

Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns 1. Introduction 1.1 Scope of Work The Asian Disaster Preparedness Centre (ADPC) is implementing the project Seismic Hazard and Vulnerability Mapping for Rangamati, Bandarban and Khagrachari Municipality.

More information

CEEN 162 - Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests

CEEN 162 - Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests PURPOSE: The parameters of the shear strength relationship provide a means of evaluating the load carrying capacity of soils, stability of slopes, and pile capacity. The direct shear test is one of the

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

Important Points: Timing: Timing Evaluation Methodology Example Immediate First announcement of building damage

Important Points: Timing: Timing Evaluation Methodology Example Immediate First announcement of building damage 3.3. Evaluation of Building Foundation Damage Basic Terminology: Damage: Destruction, deformation, inclination and settlement of a building foundation caused by an earthquake. Damage grade: Degree of danger

More information

Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2

Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2 Validation of Cable Bolt Support Design in Weak Rock Using SMART Instruments and Phase 2 W.F. Bawden, Chair Lassonde Mineral Engineering Program, U. of Toronto, Canada J.D. Tod, Senior Engineer, Mine Design

More information

Method Statement for Static Load Testing (Compression) for Micropiles

Method Statement for Static Load Testing (Compression) for Micropiles Method Statement for Static Load Testing (Compression) for Micropiles 1. INTRODUCTION This vertical compression pile maintained load test is usually carried out to ensure the structural and geotechnical

More information

ONLINE HELPDESK FOR MAYBANK ACCOUNT PAYABLE SYSTEM (MAPS) SHOBINI D/ RAMAN NAIR UNIVERSITI TEKNOLOGI MALAYSIA

ONLINE HELPDESK FOR MAYBANK ACCOUNT PAYABLE SYSTEM (MAPS) SHOBINI D/ RAMAN NAIR UNIVERSITI TEKNOLOGI MALAYSIA ONLINE HELPDESK FOR MAYBANK ACCOUNT PAYABLE SYSTEM (MAPS) SHOBINI D/ RAMAN NAIR UNIVERSITI TEKNOLOGI MALAYSIA UNIVERSITI TEKNOLOGI MALAYSIA PSZ19:16(Pind.1/97) BORANG PENGESAHAN STATUS TESIS JUDUL : ONLINE

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

UNIVERSITI TUN HUSSEIN ONN MALAYSIA PENGESAHAN STATUS LAPORAN PROJEK SARJANA

UNIVERSITI TUN HUSSEIN ONN MALAYSIA PENGESAHAN STATUS LAPORAN PROJEK SARJANA 30000002103440' UNIVERSITI TUN HUSSEIN ONN MALAYSIA PENGESAHAN STATUS LAPORAN PROJEK SARJANA MODELING OF ELECTROMAGNETIC WAVE PENETRATION IN A HUMAN HEAD DUE TO EMISSIONS FROM CELLULAR PHONE SESI PENGAJIAN

More information

GLOSSARY OF TERMINOLOGY

GLOSSARY OF TERMINOLOGY GLOSSARY OF TERMINOLOGY AUTHORIZED PILE LENGTHS - (a.k.a. Authorized Pile Lengths letter) Official letter stating Engineer's recommended length of concrete piles to be cast for construction of foundation.

More information

STRESS EFFECT STUDY ON 6 DIFFERENT PATTERN OF TYRES FOR SIZE 175/70 R13 SYAHRIL AZEEM ONG BIN HAJI MALIKI ONG. for the award of the degree of

STRESS EFFECT STUDY ON 6 DIFFERENT PATTERN OF TYRES FOR SIZE 175/70 R13 SYAHRIL AZEEM ONG BIN HAJI MALIKI ONG. for the award of the degree of STRESS EFFECT STUDY ON 6 DIFFERENT PATTERN OF TYRES FOR SIZE 175/70 R13 SYAHRIL AZEEM ONG BIN HAJI MALIKI ONG A report submitted in partial fulfilment of the requirements for the award of the degree of

More information

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION 1.1 Introduction The design and construction of foundations require a good knowledge of the mechanical behaviour of soils and of their spatial variability. Such information can be

More information

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED

More information

HOME SECURITY SYSTEM MUHAMAD HAFIZ BIN NORROSNAN

HOME SECURITY SYSTEM MUHAMAD HAFIZ BIN NORROSNAN i HOME SECURITY SYSTEM MUHAMAD HAFIZ BIN NORROSNAN This report is submitted in partial fulfillment of the requirements for the award of Bachelor of Electronic Engineering(Industrial Electronics) With Honours

More information

DESIGNING STRUCTURES IN EXPANSIVE CLAY

DESIGNING STRUCTURES IN EXPANSIVE CLAY DESIGNING STRUCTURES IN EXPANSIVE CLAY A GUIDE FOR A RCHITECTS AND E NGINEERS Table of Contents 1. Introduction Page 1 2. Common Foundation Systems Page 2 3. Drilled Piers Page 3 a. Skin Friction Piers

More information

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION ACCREDITATION SCHEME FOR INSPECTION BODIES TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION Technical Note SI 01: 3 February 2016 The SAC Accreditation

More information

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major

More information

Driven Concrete Pile Foundation Monitoring With Embedded Data Collector System

Driven Concrete Pile Foundation Monitoring With Embedded Data Collector System Driven Concrete Pile Foundation Monitoring With Embedded Data Collector System Rodrigo Herrera 1, P.E., Lawrence E. Jones 2, P.E., Peter Lai 3, P.E. 1 Florida Department of Transportation, Geotechnical

More information

Page B-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2014 LOAD TESTS

Page B-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2014 LOAD TESTS Page B-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2014 Appendix B CONTENTS STATIC (TIEBACKS)... B-3 STATIC AXIAL (COMPRESSION/TENSION)... B-6 STATIC (LATERAL)... B-9 CAPACITY VERIFICATION

More information

Anirudhan I.V. Geotechnical Solutions, Chennai

Anirudhan I.V. Geotechnical Solutions, Chennai Anirudhan I.V. Geotechnical Solutions, Chennai Often inadequate In some cases, excess In some cases, disoriented Bad investigation Once in a while good ones Depends on one type of investigation, often

More information

Pavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces.

Pavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces. Project No. 208-8719 January, 2009 Ref: 2-8719BR Anthony Hudson - Broadscale Geotechnical Investigation - Proposed Commercial Development - 52 Old Pacific Highway, Pimpama Page 32 iii) Pavements should

More information

SPAM FILTERING USING BAYESIAN TECHNIQUE BASED ON INDEPENDENT FEATURE SELECTION MASURAH BINTI MOHAMAD

SPAM FILTERING USING BAYESIAN TECHNIQUE BASED ON INDEPENDENT FEATURE SELECTION MASURAH BINTI MOHAMAD SPAM FILTERING USING BAYESIAN TECHNIQUE BASED ON INDEPENDENT FEATURE SELECTION MASURAH BINTI MOHAMAD A project report submitted in partial fulfillment of the requirements for the award of the degree of

More information

HELP DESK SYSTEM IZZAT HAFIFI BIN AHMAD ARIZA

HELP DESK SYSTEM IZZAT HAFIFI BIN AHMAD ARIZA HELP DESK SYSTEM IZZAT HAFIFI BIN AHMAD ARIZA A thesis submitted in fulfillment of the requirement for the awards of Bachelor of Computer Science (Computer Systems & Networking) with Honours Faculty of

More information

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore

More information

RECENT EXPERIENCES WITH BI-DIRECTIONAL STATIC LOAD TESTING

RECENT EXPERIENCES WITH BI-DIRECTIONAL STATIC LOAD TESTING RECENT EXPERIENCES WITH BI-DIRECTIONAL STATIC LOAD TESTING M. England BSc, MSc, PhD, MIC, P.F. Cheesman. Loadtest, 14 Scotts Avenue, Sunbury on Thames, TW16 7HZ, United Kingdom. Keywords: Bi-directional

More information

Kentucky Lake Bridge Pile Load Testing Overview Ohio Transportation Engineering Conference Columbus, Ohio 10/28/2015

Kentucky Lake Bridge Pile Load Testing Overview Ohio Transportation Engineering Conference Columbus, Ohio 10/28/2015 Kentucky Lake Bridge Pile Load Testing Overview Ohio Transportation Engineering Conference Columbus, Ohio 10/28/2015 Presented by: Jeff Dunlap, P.E. Terracon Consultants 1 Project Site Kentucky Official

More information

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples FOUNDATION DESIGN Proportioning elements for: Transfer of seismic forces Strength and stiffness Shallow and deep foundations Elastic and plastic analysis Foundation Design 14-1 Load Path and Transfer to

More information

JOB AGENT MANAGEMENT SYSTEM LU CHUN LING. A thesis submitted in partial fulfillment of. the requirements for the award of the degree of

JOB AGENT MANAGEMENT SYSTEM LU CHUN LING. A thesis submitted in partial fulfillment of. the requirements for the award of the degree of JOB AGENT MANAGEMENT SYSTEM LU CHUN LING A thesis submitted in partial fulfillment of the requirements for the award of the degree of Bachelor of Computer Sciences (Software Engineering) FACULTY OF COMPUTER

More information

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet

More information

A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil

A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil ISSN: 319-53 (An ISO 39: 00 Certified Organization) A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil Utpal Kumar Das Associate Professor, Department

More information

vulcanhammer.net Visit our companion site http://www.vulcanhammer.org

vulcanhammer.net Visit our companion site http://www.vulcanhammer.org this document downloaded from vulcanhammer.net Since 1997, your complete online resource for information geotecnical engineering and deep foundations: The Wave Equation Page for Piling Online books on

More information

California Department of Transportation Doyle Drive Test Program Contract No. 04A3362

California Department of Transportation Doyle Drive Test Program Contract No. 04A3362 California Department of Transportation Doyle Drive Test Program Deep Soil Mixing (DSM) /Cutter Soil Mixing (CSM) Testing Report By Malcolm Drilling Company, Inc. 3524 Breakwater Ave., Suite 108 Hayward,

More information

INTRODUCTION TO SOIL MODULI. Jean-Louis BRIAUD 1

INTRODUCTION TO SOIL MODULI. Jean-Louis BRIAUD 1 INTRODUCTION TO SOIL MODULI By Jean-Louis BRIAUD 1 The modulus of a soil is one of the most difficult soil parameters to estimate because it depends on so many factors. Therefore when one says for example:

More information

LIGHTNING AS A NEW RENEWABLE ENERGY SOURCE SARAVANA KUMAR A/L ARPUTHASAMY UNIVERSITI TEKNOLOGI MALAYSIA

LIGHTNING AS A NEW RENEWABLE ENERGY SOURCE SARAVANA KUMAR A/L ARPUTHASAMY UNIVERSITI TEKNOLOGI MALAYSIA LIGHTNING AS A NEW RENEWABLE ENERGY SOURCE SARAVANA KUMAR A/L ARPUTHASAMY UNIVERSITI TEKNOLOGI MALAYSIA LIGHTNING AS A NEW RENEWABLE ENERGY SOURCE SARAVANA KUMAR A/L ARPUTHASAMY A project report submitted

More information

Standard Test Method for Mechanical Cone Penetration Tests of Soil 1

Standard Test Method for Mechanical Cone Penetration Tests of Soil 1 Designation: D 3441 98 AMERICAN SOCIETY FOR TESTING AND MATERIALS 100 Barr Harbor Dr., West Conshohocken, PA 19428 Reprinted from the Annual Book of ASTM Standards. Copyright ASTM Standard Test Method

More information

Federation of Piling Specialists Testing Datasheet No 1

Federation of Piling Specialists Testing Datasheet No 1 Testing Datasheet No 1 Guidance for the Principal Contractor It is an essential requirement that the specialist testing contractor is allowed to work in a safe way and fully in accordance with their own

More information

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum Malaysian Civil Engineering Standard Method of Measurement (MyCESMM) CLASS D: SITE INVESTIGATION WORK Measurement covered under other classes: Excavation not carried out for the purpose of soil investigation

More information

SECTION 411 DRILLED PIERS

SECTION 411 DRILLED PIERS Section Payment will be made under: Pay Item Foundation Excavation Foundation Excavation for Bent No. at Station Foundation Excavation for End Bent No. at Station Pay Unit Cubic Yard Lump Sum Lump Sum

More information

NOTES on the CONE PENETROMETER TEST

NOTES on the CONE PENETROMETER TEST GE 441 Advanced Engineering Geology & Geotechnics Spring 2004 Introduction NOTES on the CONE PENETROMETER TEST The standardized cone-penetrometer test (CPT) involves pushing a 1.41-inch diameter 55 o to

More information