1 The Maintenance of Long Span Bridges Barry Colford Chief Engineer & Bridgemaster Forth Road Bridge Heriot-Watt Industry Day Sustainable Development Infrastructure Solutions and Challenges 26 February 2013

2

3 Akashi Kaikyo, Japan

4 The relationship between design, construction and maintenance Good design must take account not of only safe and cost effective construction but also safe and cost effective future maintenance. If we fail to do this then we face the prospect of retrofitting expensive monitoring and perhaps replacement of the structure or structural elements.

5

6

7

8 Inspections 8

9 The Main Cable

10 Cable construction Cable comprises wires in 37 strands (4.98mm dia.) Cables constructed using aerial spinning techniques Cable diameter 600mm Wire specification Tons/sq.in ( N/mm 2 )

11 Cable construction Traditional corrosion protection: galvanising on each wire, compaction, red lead paste, wire wrapping and painting. Cable has been regularly inspected externally and repainted

12 Forth Road Bridge Cable Investigation Load changes during life of bridge Dead Load Main Span 152 kn/m 158 kn/m Side Span 204 kn/m 211 kn/m Live Load Carriageway 15.5 kn/m 27.5 kn/m Footway 4.5 kn/m 0.3 kn/m

13 Background to inspection FETA have been involved in early ICSBOC conferences and workshops & had awareness of emerging problems with some US suspension bridges FETA aware of NCHRP Guidelines and recommendation to carry out first inspection at 30 years Forth Road Bridge was approaching 40 years and although there were no outward signs of internal corrosion, the decision was taken to undertake an internal inspection

14 Internal Inspections First Inspection 2004/5-40 years since opening Second Inspection 2007/8 - limited benchmarking for dehumidification Third Inspection 2012 post dehumidification limited by funding

15 Forth Road Bridge Cable Investigation Site work access platform High Level Low Level

16 Forth Road Bridge Cable Investigation Site work access platform

17 Costs First Main Cable Internal Inspection 2004 Total cost = million for 10 No panels. Cost/panel approx. 237K Third Main Cable Internal Inspection 2012 Estimated cost = million for 8 No panels. Cost/panel approx. 475K

18 Wedging for inspection

19 Inspection Findings

20

21 Wire Corrosion Stages Stage 1 Stage 2 Stage 3 Stage 4

22 Forth Road Bridge Cable Investigation Broken wires

23 Panel 1 ( E) broken wires

24

25 Forth Road Bridge Cable Investigation Internal inspection method Compaction Rewrapping

26 Conclusions A good external inspection and maintenance regime was not sufficient to prevent deterioration A good external condition doesn t mean it is good on the inside Widely varying levels of corrosion in different areas were difficult to explain Need to rely on new research and development such as dehumidification to prolong cable life and future inspection and acoustic monitoring.

27 Acoustic monitoring Internal inspection only looked at a small proportion of wires. No guarantee that the worst deterioration has been found. Rate of deterioration is uncertain. Acoustic monitoring can provide information on the whole cable, and over a long time period.

28 Acoustic monitoring installation

29 Oil the cable? Extensively used in US as means to prolong life of cable Appears to have a number of drawbacks: Expensive as it requires full length cable opening Leakage at low points Will slowly dry out making reoiling a challenge Lack of evidence of long term success

30 Main Cable Dehumidification 30

31 Main Cable Dehumidification

32 System Layout Injection sleeve Exhaust Sleeve Dehumidification Plant Room / Plenum chamber Objectives of Cable dehumidification System Introduce dry air into the cable to remove moisture and to maintain a level of condition that will suppress further corrosion Improve air tightness of the main cables and prevent moisture ingress Installation without closing the bridge to traffic, i.e. minimum inconvenience to bridge users Plant designed to provide economy of operation Remote web-based control and monitoring systems to record key data from a safe distance

33 Installed with minimum inconvenience to bridge users An airtight cable is achieved through the application of a proprietary wrapping material which is expected to have a long service life with virtually no maintenance It is necessary to access the entire length of both cables but given the large daily traffic flows, only limited overnight carriageway closures are available A sophisticated platform has been developed that, once installed on the cable, is able to move along the cable from panel to panel. It provides a well contained and safe workplace

34 Web based control and monitoring system It is possible to monitor all the vital information regarding the system s functionality as well as adjust settings remotely from the website or central computer Air condition is monitored at injection, exhaust and intermediate monitoring points Trend / historic logging and monitoring is provided Monitors and reports faults and indicates conditions when maintenance is required, e.g. when air filters need to be changed Allows remote integration and adjustment via WEB based system Weekly analysis reports are provided indicating progress of the drying process Secure user access system requires different levels of authorisation for monitoring and control Alarm notification by and text messaging Sophisticated self learning component control

35 Media hype The main cable dehumidification has attracted considerable media attention, including coverage in the national press, international engineering press and national television From The Sunday Times January 29, 2006 Giant hair dryers to save Forth bridge Jason Allardyce ANTI-CORROSION devices which operate like giant hair dryers could be fitted to the suspension cables of the Forth Road Bridge to extend its life. Ministers believe dehumidification equipment could make the crossing safe for several more years and, at 12m, would prove to be a cost-effective option. While they believe that total replacement may be inevitable, after engineers discovered severe corrosion on some of the wires inside the 4km-long suspension cables, they are concerned that this is likely to cost at least 600m. It blows warm air into the cables of bridges, extracting moisture which causes rust and corrosion. The cables would be wrapped in neoprene, the material used in wetsuits, to make the process more effective. Study into Forth bridge dry-out A study into the possibility of installing a drying-out system for suspension cables on the Forth Road Bridge is expected to get the go ahead. It follows a report which warned the bridge could be shut to all traffic in under 14 years unless action was taken. Consultants are to look into fitting 12m de-humidification equipment, which would pump dry air onto the wet cables. The Forth Estuary Transport Association (Feta) is set to appoint engineers Faber Maunsell later this month. Excellent track record "The team Faber Maunsell has put together to carry out this study brings together the very best in experience across the world in dealing with similar situations. "They have an excellent track record in understanding the complex issues involved in tackling corrosion in suspension bridges and, most importantly, providing the right solutions."

36 Third internal inspection 2012/13 Appears to demonstrate that the rate of deterioration of cable strength has been reduced and the factor of safety against failure of the cables has not materially diminished. This is giving strong comfort that the newly installed dehumidification system is retarding the corrosion of the bridge wires. Existing cracks may eventually lead to the wire fractures but the rate of breakages is expected to slow significantly. This should result in a further slowing down of deterioration of the cables and lead to a reduction in the loss of magnitude in the factor of safety. It will be important for the future resilience of the cables that the dehumidification system is maintained and the existing acoustic monitoring system is augmented. Future inspection and monitoring is essential

37 Cable FOS Cable Factor of Safety Year

38 Cable replacement/augmentation study Need to plan in case cable dehumidification is not effective Major technical issues to be resolved, including: Main towers and saddles already strengthened Concerns over existing anchorages New anchorages required Stiffening truss is theoretically overstressed Effects on cross Forth traffic flows

39 Main Cable Anchorages

40 Main Cable Anchorages

41

42 Main Cable Anchorages

43

44

45

46 Main Cable Anchorages Stage 2 Excavation Superficial deposits Area to be excavated MAIN CABLE ANCHORAGES

47 Main Cable Anchorages Stage 2 Exposure of Ducts Exposed ducts/strands MAIN CABLE ANCHORAGES

48

49

50 Main Cable Anchorages Stage 3 Exposure of tendons Visual inspection and X-ray Removal of ducts Removal of grout Visual inspection MsS survey MAIN CABLE ANCHORAGES

51

52

53

Main Cable Corrosion Protection by Dehumidification Experience, Optimization and New Development

Main Cable Corrosion Protection by Dehumidification Experience, Optimization and New Development Main Cable Corrosion Protection by Dehumidification Experience, Optimization and New Development Matthew L. Bloomstine Chief Project Manager, COWI A/S, Denmark, mlb@cowi.dk ABSTRACT: Corrosion of main

More information

MAINTENANCE AND INSPECTION OF BRIDGE STAY CABLE SYSTEMS

MAINTENANCE AND INSPECTION OF BRIDGE STAY CABLE SYSTEMS MAINTENANCE AND INSPECTION OF BRIDGE STAY CABLE SYSTEMS Workshop on Wind-Induced Vibrations St. Louis, Missouri April, 2006 By Habib Tabatabai University of Wisconsin-Milwaukee Introduction This work is

More information

Corrosion Control of the Severn Bridge Main Suspension Cables

Corrosion Control of the Severn Bridge Main Suspension Cables Corrosion Control of the Severn Bridge Main Suspension Cables Paul Lambert, Mott MacDonald, Altrincham, UK Jeffrey Fisher, Mott MacDonald, Croydon, UK The Severn Bridge (see Figure 1) is a 988m span suspension

More information

Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning. May 7th 2013: Dominique Deschamps

Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning. May 7th 2013: Dominique Deschamps Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning May 7th 2013: Dominique Deschamps Scope of the paper Presentation of the project Cause of cracks

More information

Stay Cable Replacement of the Luling Bridge

Stay Cable Replacement of the Luling Bridge Stay Cable Replacement of the Luling Bridge Armin Mehrabi, Bridge Engineering Solutions, PC 2009 Louisiana Transportation Engineering Conference February 8-11, 2009, Baton Rouge, LA Lower Anchorage Upper

More information

University of Missouri Hospitals and Clinics. Structural Repair and Protection of Post-tensioned Parking Garage

University of Missouri Hospitals and Clinics. Structural Repair and Protection of Post-tensioned Parking Garage University of Missouri Hospitals and Clinics Structural Repair and Protection of Post-tensioned Parking Garage 1 University of Missouri Project The University of Missouri Health Care Patient and Visitor

More information

Expert Report. History of the development of water level control in steam- and hot water boilers

Expert Report. History of the development of water level control in steam- and hot water boilers Expert Report Dipl.-Ing. Jochen Loos Dipl.-Wirtschaftsing. (FH), Dipl.-Informationswirt (FH) Markus Tuffner, Bosch Industriekessel GmbH History of the development of water level control in steam- and hot

More information

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE A.Rito Proponte, Lda, Lisbon, Portugal J. Appleton A2P Consult, Lda, Lisbon, Portugal ABSTRACT: The Figueira da Foz Bridge includes a 405 m long cable stayed

More information

September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections

More information

White rust on galvanized and galvanized pre-painted steel. Technical Information

White rust on galvanized and galvanized pre-painted steel. Technical Information Technical Information White rust on galvanised steel Prevention It is easier to prevent white rust than to cure it! Reasonable precautions to protect steel during both transport and storage can considerably

More information

Monitoring of Natural Hazards With the ImpactSentinel Alarming System An Intelligent Solution

Monitoring of Natural Hazards With the ImpactSentinel Alarming System An Intelligent Solution Monitoring of Natural Hazards With the ImpactSentinel Alarming System An Intelligent Solution ImpactSentinel Natural Hazard Sensors und Systems hazard signalization in protection fences overstress, shock

More information

Preventative Maintenance Plan. Guide. The Simple, Smart Way To Properly Care For Home Systems And Appliances.

Preventative Maintenance Plan. Guide. The Simple, Smart Way To Properly Care For Home Systems And Appliances. Preventative Maintenance Plan Guide The Simple, Smart Way To Properly Care For Home Systems And Appliances. Protect. Prevent. Preserve. Prolong. What AHS Preventative Maintenance Plans Can Do For Your

More information

Wire Damage on Ships Cranes

Wire Damage on Ships Cranes 13.12.2005 Wire Damage on Ships Cranes (Capt. Dipl.-Ing. U. Kreitz,) On board sea-going vessels, rotation-resistant wire ropes with compacted strands are preferable for use in respect to ships cranes with

More information

High Capacity Hot Air Dryer

High Capacity Hot Air Dryer High Capacity Hot Air Dryer MADE IN AUSTRIA autumn 2015 www.zimmer-austria.com page 1 Hot air dryer type: Compact HC The modular construction of the high efficiency and powerful hot air nozzle dryer is

More information

ASHULIA APPARELS LTD. Client Summary Report

ASHULIA APPARELS LTD. Client Summary Report Revision : Issue 1 Date: 18 March 2014 ASHULIA APPARELS LTD Samad Mansion, Sec # 6, Block # kha, Road No# 1, Plot #14, Shenpara Parbata, Mirpur, Dhaka (23.8065N,90.3683E) 4th March 2014 Client Summary

More information

How to Prevent Liquid Damage Property Losses

How to Prevent Liquid Damage Property Losses 1. The leading cause of property losses is from liquid damage. A review of Zurich North America claims data highlights the problem. 2. Water damage originates from a number of sources: Domestic water lines

More information

Doc.No. NDP 192U-02. Electric Pump Controller CE-124P. Instruction Manual

Doc.No. NDP 192U-02. Electric Pump Controller CE-124P. Instruction Manual Doc.No. NDP 192U-02 Electric Pump Controller CE-124P Instruction Manual 1. Parts Name and Function 1) POWER LED Indicate that CE-124P is powered up. 2) START/STOP KEY (SELECTOR KEY) Used to start and stop

More information

San Francisco Oakland Bay Bridge East Span Seismic Safety Project

San Francisco Oakland Bay Bridge East Span Seismic Safety Project San Francisco Oakland Bay Bridge East Span Seismic Safety Project Presented To: Society of American Military Engineers May 16, 2013 Brian Maroney, P.E. Dr. Engr. Karen Wang, P.E. Pier E9 Following the

More information

TABLE OF CONTENTS. SECTION 1 General Information: Pg 2 Description of Operation

TABLE OF CONTENTS. SECTION 1 General Information: Pg 2 Description of Operation GTRDD SERIES HEATLESS DRYER INSTALLATION, OPERATION & MAINTENANCE MANUAL TABLE OF CONTENTS SECTION 1 General Information: Pg 2 Description of Operation SECTION 2 Safety Instructions: Pg 3 Installation

More information

COMPETENCY ANALYSIS PROFILE. Rodworker 452A. (All unshaded skill sets must be demonstrated/ completed) Lift equipment and materials

COMPETENCY ANALYSIS PROFILE. Rodworker 452A. (All unshaded skill sets must be demonstrated/ completed) Lift equipment and materials COMPETENCY ANALYSIS PROFILE Rodworker 452A (All unshaded skill sets must be demonstrated/ completed) PROTECT SELF AND OTHERS Wear personal protective (PPE) Lift and Apply housekeeping rules Interpret warning

More information

Maintenance of drilling fluids jet mud mixer. Jet mud mixer is used to make and mix drilling fluid to change the

Maintenance of drilling fluids jet mud mixer. Jet mud mixer is used to make and mix drilling fluid to change the High capacity drilling mud solids control equipment manufacturer- http://www.china-kosun.com/ Maintenance of drilling fluids jet mud mixer Jet mud mixer is used to make and mix drilling fluid to change

More information

CSA Z317-13-12 Infection Control during Construction, Renovation and Maintenance of Health Care Facilities Overview and Case Studies

CSA Z317-13-12 Infection Control during Construction, Renovation and Maintenance of Health Care Facilities Overview and Case Studies CSA Z317-13-12 Infection Control during Construction, Renovation and Maintenance of Health Care Facilities Overview and Case Studies Grant Rogers, BSc. Principal 1 North West Environmental Group Industrial

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

Fifteen years experience of design, production and assembling of prestressed Bridge decks in Timber

Fifteen years experience of design, production and assembling of prestressed Bridge decks in Timber Fifteen years experience of design, production and assembling of pre-stressed Bridge decks in Timber P. Jacobsson 1 Fifteen years experience of design, production and assembling of prestressed Bridge decks

More information

Permits to Dig / Permits to Excavate / Permits to work near underground services

Permits to Dig / Permits to Excavate / Permits to work near underground services Permits to Dig / Permits to Excavate / Permits to work near underground services Aim and purpose The aim of this guidance is to identify what should be included in a permit to excavate / dig and additional

More information

SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS

SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS The equipment requirements of this section apply to the IUB Campus. The IUPUI Campus has a preferred vendor agreement for fire alarm systems. Contact Pat

More information

SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT)

SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT) SPECIFICATION TECHNICAL AIR-CONDITIONING UNITS SINGLE AND SPLIT (DUCTED) (AIR COOLED PACKAGED UNIT) MAINTENANCE TYPE: STATUTORY 1.0 SCOPE OF SERVICES The Contractor shall provide maintenance Services for

More information

ICM Project Underground Infrastructure and Cable

ICM Project Underground Infrastructure and Cable EB 0 00 Tab Schedule B ( pages) ICM Project Underground Infrastructure and Cable Handwell Replacement Segment (THESL) EB 0 00 Tab Schedule B I EXECUTIVE SUMMARY. Project Description 0 The handwell replacement

More information

Isover HVAC Application Handbook Installing fire protection insulation to metal ductwork

Isover HVAC Application Handbook Installing fire protection insulation to metal ductwork Isover HVAC Application Handbook Installing fire protection insulation to metal ductwork HVAC - Fire protection of metal ductwork Fire protection Thermal insulation Isover ULTIMATE TM Protect - Fire protection

More information

1.2 Advantages and Types of Prestressing

1.2 Advantages and Types of Prestressing 1.2 Advantages and Types of Prestressing This section covers the following topics. Definitions Advantages of Prestressing Limitations of Prestressing Types of Prestressing 1.2.1 Definitions The terms commonly

More information

INTERNATIONAL TELECOMMUNICATION UNION #/.3425#4)/. ).34!,,!4)/.!.$ 02/4%#4)/. /& #!",%3!.$ /4(%2 %,%-%.43 /& /543)$% 0,!.43

INTERNATIONAL TELECOMMUNICATION UNION #/.3425#4)/. ).34!,,!4)/.!.$ 02/4%#4)/. /& #!,%3!.$ /4(%2 %,%-%.43 /& /543)$% 0,!.43 INTERNATIONAL TELECOMMUNICATION UNION )454, TELECOMMUNICATION STANDARDIZATION SECTOR OF ITU #/.3425#4)/. ).34!,,!4)/.!.$ 02/4%#4)/. /& #!",%3!.$ /4(%2 %,%-%.43 /& /543)$% 0,!.43 /04)#!, &)"2% #!",%3 &/2

More information

STANDARD OPERATING INSTRUCTION. Safe Handling and Removal of Asbestos Cement Pipes Procedure

STANDARD OPERATING INSTRUCTION. Safe Handling and Removal of Asbestos Cement Pipes Procedure STANDARD OPERATING INSTRUCTION Safe Handling and Removal of Asbestos Cement Pipes Procedure 1 July 2012 Title System Reference Number Approved By Safe Handling and Removal of Asbestos Cement Pipes People

More information

BROKEN VANE REPLACEMENT VT SERIES

BROKEN VANE REPLACEMENT VT SERIES BROKEN VANE REPLACEMENT VT SERIES VT 3.10 UP TO VT 3.40 VT 4.10 UP TO VT 4.40 VT VACUUM PUMP DT PRESSURE BLOWER Vacuum Pumps Compressors Becker Vacuum Pumps are leaders in their field in dependability

More information

AMPSEAL* Automotive Plug Connector and Header Assembly

AMPSEAL* Automotive Plug Connector and Header Assembly AMPSEAL* Automotive Plug Connector and Header Assembly Application Specification 24 SEP 97 Rev E All dimensions are given in millimeters unless otherwise specified. All dimensional tolerances are +0.2

More information

Management, Rehabilitation and Strengthening of Long-span Bridges

Management, Rehabilitation and Strengthening of Long-span Bridges Management, Rehabilitation and Strengthening of Long-span Bridges Contents 4 Structural Assessment, Refurbishment and Strengthening 6 End to End Asset Management 7 Management of Cable Stayed Bridges 8

More information

Diagnostics for Mobile Homes: HVAC

Diagnostics for Mobile Homes: HVAC Diagnostics for Mobile Homes: HVAC Adam Harris NYSWDA Wade Thompson - IWTC Objectives Identify different types of HVAC used in mobile homes Provide an overview of duct systems Demonstrate various tests

More information

FIRST STOP SAFETY 1 PAT-IT. Portable Appliance Tester. User Manual. Issue 1.6

FIRST STOP SAFETY 1 PAT-IT. Portable Appliance Tester. User Manual. Issue 1.6 FIRST STOP 1 PAT-IT Portable Appliance Tester User Manual Issue 1.6 First Stop Safety 11 Glaisdale Road Northminster Business Park Upper Poppleton York YO26 6QT t: 01904 791050 f: 01904 780054 e: info@firststopsafety.co.uk

More information

FIRE SAFETY RECORD OF TESTS LOGBOOK

FIRE SAFETY RECORD OF TESTS LOGBOOK FIRE SAFETY RECORD OF TESTS LOGBOOK PREMISES ADDRESS: Responsible person AN INTRODUCTION TO YOUR LOG BOOK The Regulatory Reform (Fire Safety) Order 2005 requires the responsible person for a premises to

More information

Extract of the White paper Reduce energy costs in compressed air systems by up to 60%

Extract of the White paper Reduce energy costs in compressed air systems by up to 60% Extract of the White paper Reduce energy costs in compressed air systems by up to 60% How can potential energy savings be identified? There are various measures for realising potential savings in compressed

More information

WHAT IS INFRARED (IR) THERMOGRAPHY

WHAT IS INFRARED (IR) THERMOGRAPHY WHAT IS INFRARED (IR) THERMOGRAPHY IR Thermography is the technique of producing pictures called from the invisible thermal radiation that objects emit. This is a non-contact means of identifying electrical

More information

Underwriters Laboratories Testing Information

Underwriters Laboratories Testing Information Underwriters Laboratories Testing Information R-8078 Underwriters Laboratories Inc. R-13173 Classified Spray Fiber Surface burning characteristics applied to inorganic reinforced cement board with a maximum

More information

Meeting the Challenge of Pipeline Emergency Repair

Meeting the Challenge of Pipeline Emergency Repair Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider

More information

How to Save a Wet Cell Phone www.wikihow.com

How to Save a Wet Cell Phone www.wikihow.com How to Save a Wet Cell Phone www.wikihow.com Have you ever accidentally dropped your cell phone in the sink, or even worse... the toilet? Did you leave it in your pocket and run it through the washing

More information

6 Ceiling fans! Although they only use about as. 8 Redecorate. Hang lighter colored curtains

6 Ceiling fans! Although they only use about as. 8 Redecorate. Hang lighter colored curtains Shut all exterior doors and windows tightly when the air conditioning is on. Maximize 1 your savings by switching off kitchen and 9 bath exhaust fans. Keep an eye on your AC filters. Change or 2 10 clean

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description

Model F822 thru F834 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description Worldwide Contacts www.tyco-fire.com Model F thru F3 Mulsifyre Directional Spray Nozzles, Open, High Velocity General Description The Mulsifyre Nozzles are open (nonautomatic) nozzles and they are designed

More information

ACTIVE. www.edgecaraudio.com

ACTIVE. www.edgecaraudio.com ACTIVE www.edgecaraudio.com INTRODUCTION This instruction manual is for your safety and must be adhered to at all times. Please read and ensure that you fully understand the installation and set up procedures

More information

WSSC Ad-Hoc Committee on Large Diameter Water Mains. August 2, 2013

WSSC Ad-Hoc Committee on Large Diameter Water Mains. August 2, 2013 WSSC Ad-Hoc Committee on Large Diameter Water Mains August 2, 2013 Purpose: To Gain an Understanding of WSSC s Current Approach to PCCP Inspections, Monitoring and Repair/Replacement 2 PCCP Management

More information

cairn HMO Tenant Information Property Address: Letting: 0141 270 7878 Maintenance: 0141 270 7856

cairn HMO Tenant Information Property Address: Letting: 0141 270 7878 Maintenance: 0141 270 7856 cairn HMO Tenant Information Property Address: Letting: 0141 270 7878 Maintenance: 0141 270 7856 1 1. Use of communal areas In most properties you share the common stair and door entry systems with your

More information

System Tel 0845 121 4008 (Telephones) Ltd Fax 0845 121 4009 Email technical@bellsystem.co.uk Web www.bellsystem.co.uk

System Tel 0845 121 4008 (Telephones) Ltd Fax 0845 121 4009 Email technical@bellsystem.co.uk Web www.bellsystem.co.uk Troubleshooting Guide Audio Door Entry Systems (single entrance) (9nn, VRKn or BLn series) Most systems use the 801 phone, 801P on systems above 20 flats. Twisted-pair cable must be used (CW1308 telephone

More information

Flood damaged vehicle repairs

Flood damaged vehicle repairs Flood damaged vehicle repairs This is a guide to the type of repairs a flood affected vehicle is likely to require. It also outlines the possible longer term effects inundation can have on a motor vehicle.

More information

Site Inspection Report

Site Inspection Report Site Inspection Report Project Title: 1 Canada Square Location: 1 Canada Square, Canary Wharf, London Date of Inspection: 16/05/12 System / Products: TBA (suggested flame free application) Attendees: G

More information

ISLE OF MAN FIRE & RESCUE SERVICE FIRE PRECAUTIONS LOGBOOK. Website www.iomfire.com

ISLE OF MAN FIRE & RESCUE SERVICE FIRE PRECAUTIONS LOGBOOK. Website www.iomfire.com ISLE OF MAN FIRE & RESCUE SERVICE FIRE PRECAUTIONS LOGBOOK Website www.iomfire.com ADDRESS OF PREMISES FIRE CERTIFICATE No. (where applicable).. LOCATION OF LOG BOOK. CONTENTS OF LOG BOOK Useful telephone

More information

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final

More information

Technical Guide 08/15/14

Technical Guide 08/15/14 Technical Guide 08/15/14 1 Table of Contents Contact information.3 Identifying your system..4-8 Model Number Serial number location Parts of your fuel system..9-14 Fuel pump diagram Wire harness schematics

More information

The AQUAFIN Approach to Concrete Repair

The AQUAFIN Approach to Concrete Repair Concrete Repair Building Product Systems Waterproofing & Concrete Restoration Decorative Coatings Moisture Vapor Remediation & Flooring Injection Grouting The AQUAFIN Approach to Concrete Repair www.aquafin.net

More information

THE GAS UTILITIES S AND THE JAPAN GAS ASSOCIATION S EFFORTS TO IMPROVE SAFETY

THE GAS UTILITIES S AND THE JAPAN GAS ASSOCIATION S EFFORTS TO IMPROVE SAFETY THE GAS UTILITIES S AND THE JAPAN GAS ASSOCIATION S EFFORTS TO IMPROVE SAFETY Kunihiro Hara Assistant Manager of Safety Technology Sec.,Gas Technology Dept., The Japan Gas Association 1. City Gas Safety

More information

Building Cables and Wires

Building Cables and Wires Building Cables and Wires 4 Introduction alfanar is equipped with state-of-the-art manufacturing facilities such as latest machineries, instrumentation, quality control and testing laboratory, etc., for

More information

Chapter 2 Basis of design and materials

Chapter 2 Basis of design and materials Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural

More information

Single Phase UPS Management, Maintenance, and Lifecycle

Single Phase UPS Management, Maintenance, and Lifecycle Single Phase UPS Management, Maintenance, and Lifecycle White Paper 210 Revision 0 by Justin Solis Executive summary How long will my battery last? and what is the best practice for maintaining my UPS?

More information

NI-ZN BATTERY SPECIFICATION

NI-ZN BATTERY SPECIFICATION NI-ZN BATTERY SPECIFICATION 252000 Model Name: AA2500mWh(Ni-Zn) Issued Date: Sept. 2010 NICKEL ZINC BATTERY SPECIFICATION 1.APPLICATION The applicable range: This specification is available only for the

More information

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis DNA project managers planners architects engineers David Nairne + Associates Ltd Suite 250 171 W Esplanade North Vancouver British Columbia Canada V7M 3J9 T 604 984 3503 F 604 984 0627 E dna@ davidnairne.com

More information

INSPECTION PROPERTY ADDRESS: Fort Bend County, Texas

INSPECTION PROPERTY ADDRESS: Fort Bend County, Texas 5006 Cherry Ridge Road Richmond, Texas 77406 281-342-9944 harris31@sbcglobal.net INSPECTION PROPERTY ADDRESS: INSPECTION PERFORMED FOR: XXXX Drive Fort Bend County, Texas Mr. and Mrs. New Construction

More information

APC APPLICATION NOTE #112

APC APPLICATION NOTE #112 #112 Best Practices for Deploying the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC100 and ACSC101) is a self-contained air conditioner for server rooms and wiring closets.

More information

ASTACEA4 Inspect complex/central air conditioning systems

ASTACEA4 Inspect complex/central air conditioning systems Overview This Unit covers the competences required to inspect complex/central air conditioning systems as defined by the CIBSE TM 44 Figure 1.1: Summary of system types and their component parts. The air

More information

User Instruction Manual Vertical Lifelines and Vertical Lifeline Subsystems

User Instruction Manual Vertical Lifelines and Vertical Lifeline Subsystems Instructions for the following series products: User Instruction Manual Vertical Lifelines and Vertical Lifeline Subsystems Vertical Lifelines Vertical Lifeline Subsystems (See back pages for specific

More information

HP Hardware Support Onsite 6-Hour Call-to-Repair Service HP Customer Support Contractual Services Package

HP Hardware Support Onsite 6-Hour Call-to-Repair Service HP Customer Support Contractual Services Package HP Hardware Support Onsite 6-Hour Call-to-Repair Service HP Customer Support Contractual Services Package Our team of support specialists will quickly begin troubleshooting your system to ensure the hardware

More information

REPAIRS, MODIFICATIONS, AND STRENGTHENING WITH POST-TENSIONING

REPAIRS, MODIFICATIONS, AND STRENGTHENING WITH POST-TENSIONING TECHNICAL PAPER REPAIRS, MODIFICATIONS, AND STRENGTHENING WITH POST-TENSIONING LARRY KRAUSER ABSTRACT Post-tensioning can be used for repairs, modification and strengthening of reinforced concrete and

More information

Before You Start an Energy Efficiency Retrofit The Building Envelope

Before You Start an Energy Efficiency Retrofit The Building Envelope ABOUT YOUR HOUSE Before You Start an Energy Efficiency Retrofit The Building Envelope The building envelope is the outer layer of the building that separates the indoor living space from the outdoor environment,

More information

10 tips for getting more reliability from your air-conditioning system [reliability]

10 tips for getting more reliability from your air-conditioning system [reliability] 10 tips for getting more reliability from your air-conditioning system [reliability] A guide for installers, specifiers, contractors and architects February 2010 10 tips for getting more reliability from

More information

SFS SYS 13 (SQA Unit Code - H4GR 04) Maintain the performance of electronic security systems

SFS SYS 13 (SQA Unit Code - H4GR 04) Maintain the performance of electronic security systems Maintain the performance of electronic security systems Overview This NOS sets out the skills, knowledge and understanding for you to maintain the operational performance of electronic security systems,

More information

Failure to comply with the following cautions and warnings could cause equipment damage and personal injury.

Failure to comply with the following cautions and warnings could cause equipment damage and personal injury. 1.0 IMPORTANT RECEIVING INSTRUCTIONS Visually inspect all components for shipping damage. Shipping Damage is not covered by warranty. If shipping damage is found, notify carrier at once. The carrier is

More information

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major

More information

APPENDIX 2-3 PCAPP EDS INSPECTION LOG SHEETS

APPENDIX 2-3 PCAPP EDS INSPECTION LOG SHEETS APPENDIX 2-3 PCAPP EDS INSPECTION LOG SHEETS Pueblo Chemical Depot Pueblo Chemical Depot (This page intentionally left blank.) PCAPP EDS Daily (When in Use) Operational Inspection Checklist EXAMPLE Inspected

More information

FIRE DETECTION AND ALARM SYSTEMS

FIRE DETECTION AND ALARM SYSTEMS HMO Information Sheet No 1 FIRE DETECTION AND ALARM SYSTEMS 1. Introduction When a property is in multiple occupation, the risk of fire breaking out is greater than in an ordinary single family home. Some

More information

FY15 Gravity Sewer and Manhole Rehabilitation

FY15 Gravity Sewer and Manhole Rehabilitation Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE

More information

Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)

Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17) 17 Engine-Lubrication (Page GR-17) Lubrication system components, removing and installing Oil filter housing, disassembling and assembling Oil pan, removing and installing Oil pressure and oil pressure

More information

SELECTION, APPLICATION AND MAINTENANCE

SELECTION, APPLICATION AND MAINTENANCE DIESEL PROTECTION SYSTEMS Automatic Diesel Engine Shut Down System for Safe Area Applications SELECTION, APPLICATION AND MAINTENANCE Series 300 Series 310 SYSTEM DESCRIPTION Suitable for attended engine

More information

CATALYST Frequently Asked Questions

CATALYST Frequently Asked Questions CATALYST Frequently Asked Questions Q: What is the CATALYST Efficiency Enhancing Controller (EEC)? A: The CATALYST is a retrofit technology for single-zone, constant-volume, roof top packaged HVAC systems.

More information

ECOCIAT. Domestic hot water heat recovery unit

ECOCIAT. Domestic hot water heat recovery unit Heat recovery unit Domestic hot water High energy efficiency with R410A Compact and quiet Scroll compressors Brazed-plate heat exchangers Heating Heat recovery ENVIRONMENTALLY HFC R410A PROTECTION DE FRIENDLY

More information

New Wiring Technology for Cost-effective Construction of FTTH Networks Using Free Branch Cable

New Wiring Technology for Cost-effective Construction of FTTH Networks Using Free Branch Cable INFORMATION & COMMUNICATIONS New Wiring Technology for Cost-effective Construction of FTTH Networks Using Free Branch Cable Kenichiro OHTSUKA*, Hiroshi MIYANO, Katsuyuki AIHARA, Masahiro HAMADA, Keiju

More information

BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION

BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION GENERAL Rehabilitation of culverts with pipe liners is one of several methods available for extending the life of an existing culvert. It is often cost

More information

Risk - Based Inspection Frequencies

Risk - Based Inspection Frequencies Risk - Based Inspection Frequencies Glenn A. Washer, PhD University of Missouri Columbia, MO April 23, 2013 Northwest Bridge Inspector s Conference 1 NCHRP 12-82 Developing Reliability Based Bridge Inspection

More information

Using Portable Spot Air Conditioners in Industrial Applications

Using Portable Spot Air Conditioners in Industrial Applications Using Portable Spot Air Conditioners in Industrial Applications Cooling People, Processes and Equipment In today s highly competitive manufacturing sector, companies are constantly looking for new ways

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

FTXS. Wall Mount Heat Pump or Cooling Only

FTXS. Wall Mount Heat Pump or Cooling Only FTXS Wall Mount Heat Pump or Cooling Only EXPERTISE AND INNOVATION Daikin s FTXS SkyAir systems feature streamlined, wall mounted indoor units paired with quietly compact outdoor units. Available in both

More information

PRODUCT SPECIFICATION

PRODUCT SPECIFICATION Lithium Ion LG 18650HE4 2500mAh BCY-PS-HE4-Rev0 2013-05-30 0 PRODUCT SPECIFICATION Rechargeable Lithium Ion Battery Model : 18650HE4 2500mAh LG Twin Towers 128, Yeoui-daero, Yeongdeungpo-gu, Seoul, Republic

More information

- 33 - This paper describes an instrumentation system concept which should be capable of early detection of a leak-before* break in main steam lines.

- 33 - This paper describes an instrumentation system concept which should be capable of early detection of a leak-before* break in main steam lines. - 33 - DETECTION OF LEAKS IN STEAM LINES BY DISTRIBUTED FIBRE-OPTIC TEMPERATURE SENSING (DTS) Author; Neil G.Craik, Nuclear Generation Consultant, Frederic ton, N.B., Canada ABSTRACT This paper describes

More information

Important Ontario Fire Code Information for Building Owners in the City of Windsor

Important Ontario Fire Code Information for Building Owners in the City of Windsor Important Ontario Fire Code Information for Building Owners in the City of Windsor This information is intended to be used a reference only. For a complete listing consult the Ontario Fire Code or contact

More information

COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23

COMMERCIAL REPORT / STOCK CONDITION SURVEY. Sydenham Hill Estate Sydenham Hill London SE 23 COMMERCIAL REPORT / STOCK CONDITION SURVEY For Sydenham Hill Estate Sydenham Hill London SE 23 Submission Prepared by Gas Advisory Services Limited Date: 4 th June 2013 Gas Advisory Services Limited Phoenix

More information

Elevator Malfunction Anyone Going Down?

Elevator Malfunction Anyone Going Down? Elevator Malfunction Anyone Going Down? Lessons Learned Volume 04 Issue 41 2004 USW Purpose Elevator Malfunction - Anyone Going Down? To conduct a small group lessons learned activity to share information

More information

ThermoSorb Desiccant Dryers

ThermoSorb Desiccant Dryers ThermoSorb Desiccant Dryers Sierra Why dry compressed air? Contamination reduces efficiency The air we breathe contains contamination in the form of water vapour and airborne particles. During the compression

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

New Vehicle Warranty

New Vehicle Warranty New Vehicle Warranty Useful Information: For information about our new cars, latest offers, owning a Škoda and to find your nearest retailer, please log onto www.skoda.co.uk Škoda Roadside Assistance:

More information

Auto-belay Cable Replacement Process

Auto-belay Cable Replacement Process Auto-belay Cable Replacement Process Version 2.00 WARNING: The air pressure in the auto-belay system is what causes the cable to be retracted when releasing the cable or climbing the wall with the cable

More information

TRITON CONTAINER INTERNATIONAL. Reefer Technical Bulletins. Version 4.0

TRITON CONTAINER INTERNATIONAL. Reefer Technical Bulletins. Version 4.0 TRITON CONTAINER INTERNATIONAL Version 4.0 February 2013 Table Of Contents (Hold Ctrl button and click on any item below to go directly to that section of the manual.) 1 INTRODUCTION... 3 2 REFRIGERATED

More information

Optimum proportions for the design of suspension bridge

Optimum proportions for the design of suspension bridge Journal of Civil Engineering (IEB), 34 (1) (26) 1-14 Optimum proportions for the design of suspension bridge Tanvir Manzur and Alamgir Habib Department of Civil Engineering Bangladesh University of Engineering

More information

section 5 machine guarding and lockout

section 5 machine guarding and lockout section machine guarding and lockout This section covers ways to physically protect people working in and around machinery. It includes information on: machinery guards lockout systems emergency stop confined

More information

Decree of the Ministry of the Environment on fire safety of ventilation systems

Decree of the Ministry of the Environment on fire safety of ventilation systems THE NATIONAL BUILDING CODE OF FINLAND MINISTRY OF THE ENVIRONMENT Housing and Building Department Decree of the Ministry of the Environment on fire safety of ventilation systems Adopted in Helsinki, 18

More information

Managing Asbestos* *Defined by Asbestos NESHAP 40 CFR 61, subp. M

Managing Asbestos* *Defined by Asbestos NESHAP 40 CFR 61, subp. M Managing Asbestos* *Defined by Asbestos NESHAP 40 CFR 61, subp. M Dilbert Comic (2006) Asbestos what is it? Fibrous mineral very strong, heat resistant, fire retardant Airborne hazard asbestos can be inhaled

More information