1 STATOIL GOVERNING DOCUMENT Plant operation, maintenance and modification (OMM) Technical and professional requirement, TR0054, Final Ver. 3.02, Publisher: Chief engineer OMM

2 1 Objective, target group and warrant Objective Warrant General Principles Requirements and Routines in connection with Inquiry/Bid Supplier Final LCI Overview User Manual Manufacturing Records Code Data Book ( Revisjonsbok ) Mechanical Completion Dossier/Commissioning Dossier Supplier Index data / Database information Supplier drawings / CAD files Documentation for dispatch, receipt, storage and installation Supplementary LCI requirements documents Engineering Numbering System (ENS) LCI Requirements - Reference (TR0056) Digital Formats and Database File Transfer (TR0057) Quality Control Review and acceptance of documentation As-built updating Additional information Definitions and abbreviations Changes from previous version References...10 App A SIRL - Supplier Information Requirement List A.1 Use of requirements table...11 A.2 Supplier Information Requirement List (SIRL)...12 App B Required information by equipment type B.1 How to use this table...19 B.2 Requirements table...20 App C Supplier Standard User Manual App D Manufacturer Standard (Catalogue) documentation in Company Equipment Catalogue D.1 General...26 D.2 Requirements to suppliers of standard equipment...26 D.3 Financial Issues...28 App E Supplier LCI Quality Control Check list App F SMIR - Supplier Master Information Register Page 2 of 30

3 1 Objective, target group and warrant 1.1 Objective This purpose of this document is to identify requirements for delivery of Life Cycle Information (LCI) from equipment and material suppliers. The requirements are based on the Norwegian standard NS5820. This specification is to be used by equipment and material suppliers. Note: Where the Purchaser has contracted/delegated a total design responsibility (e.g. electrical design) to a company, then that company shall be regarded as a Sub-contractor, not a Supplier, and therefore adhere to TR0053, LCI requirements - General. 1.2 Warrant Project Development (AR05) (Statoil group/all locations/on- and offshore) Operation, maintenance and modification (AR12) (Statoil group/all locations/on- and offshore) Beste Praksis for Teknisk informasjon (WR0462) (Statoil group/all locations/on- and offshore) Publication and follow-up This document is published and updated by the process owner for operations and maintenance (TEK PE D&V). Dispensations and non-conformances shall be handled in accordance with Dispensations, improvements and non-conformances (WR0011) (Statoil group/all locations/on- and offshore). 2 General Principles 1. Life Cycle Information shall be provided in accordance with this document and, where relevant, standards listed under References. In case of conflict between referenced standards and this document, the latter shall apply. The supplier shall request clarification from the Purchaser in cases of uncertainty or conflicts between standards. 2. The requirements in this document and the above standards shall also apply fully to any sub-suppliers. The supplier shall incorporate details of sub-supplier scope within their own document and engineering indexes. 3. Supplier warranties shall be deemed to cover information deliverables. 4. Early access to information: Purchaser and Company's project and operations organisations require access to supplier information at an early stage for interface engineering purposes, factory acceptance testing, installation, commissioning, start-up and to facilitate preparation for operations activities. Supplier shall make information available in accordance with the early requirement dates listed in the SMIR. In addition, the Purchaser reserves the right to call for any documentation/information at any stage of preparation. 5. Final and approved issue of SPIR with related documents shall be available minimum 8 weeks prior to delivery of equipment. For spares with delivery time exceeding 4 weeks, the availability of SPIR shall be 4 weeks + no. of weeks delivery time, prior to delivery of equipment. 6. All supplier LCI shall be completed and accepted by Purchaser before close out of the purchase order. 7. In order to reduce costly and unnecessary duplication of information, standard "catalogue" equipment shall be documented in Company Standard Equipment Catalogue (hereafter referred to as CEC) database instead of in the User Manual (ref. App D). Information already available in the CEC shall not be re-delivered. 8. The Supplier shall deliver as-built documentation/information included in the User Manual in digital format. This shall be considered by all parties as the "original". 9. For a specific purchase order the list of LCI in App A shall be reduced to that relevant and strictly required for the supplier s scope of delivery. Page 3 of 30

4 3 Requirements and Routines in connection with Inquiry/Bid The requirements in this specification shall be included in the requisition document in each inquiry in order to identify information required from the Supplier. The bidder shall review the requirements, and in conjunction with the Purchasers Package Engineer, use the Supplier Information Requirement List (SIRL) given in A.2 to mark-off/identify relevant documentation and indexes to be included in the Supplier's LCI. The resulting documentation/indexes shall be identified and registered in a Supplier Master Information Register (SMIR) in the format provided by the Purchaser. The SMIR shall be accepted by the Purchaser prior to order placement. Refer to TR0056, section 3.1 Bid documentation for detail requirements. 4 Supplier Final LCI Overview The extent of Supplier LCI deliverables will be highly dependant on the type of supplied equipment/material, and care should be taken to customize the list of required information to the individual order (ref. A.2). Some guidelines are given in this chapter. The table below provides a high level overview of "Final" Supplier LCI deliverables. Deliverable Remark User Manual Compiled document, ref Manufacturing Record Book (MRB) Code Data Book ( Revisjonsbok ) Copies of selected documents to be included in User Manual section 11. The complete MRB is normally retained by Supplier, unless for Cranes and Lifting Equipment, Sea fastening for SPS, Pipelines and as otherwise specified in TR1043. Only applicable for existing onshore plants in Norway when specified in the purchase order. Replaces the MRB for equipment under the jurisdiction of the former Directorate for Fire and Electrical Safety (DBE), ref. 4.3 Mech. Completion Dossiers Where relevant according to SMIR, ref. 4.4 Index Information Specific project tool for gathering of index data may apply, ref D CAD drawings Documentation for Despatch, receipt, storage and installation Selected drawings as indicated on SMIR. Documentation to be made available for purchaser or recipient of equipment, ref Requirements to retained information are described in TR0056, section 12 Retained information. 4.1 User Manual When the Supplier s scope of work includes the delivery of complete equipment unit(s) consisting of individual tagged components or otherwise includes project specific design, a User Manual shall be prepared in accordance with A.2. Page 4 of 30

5 The User Manual structure given in App. A.2 is based on NS5820, second edition April 1994, modified/adjusted to suit Company requirements. The User Manual shall, in an organized manner, give all relevant information for handling, installation, operation and maintenance of the equipment. In order to achieve an overall reduction of duplicated information and to facilitate efficient handling/updating of information in operations phases, the following important principles shall be emphasised with respect to the Supplier User Manual: The User Manual shall be delivered as a compiled document, i.e. the digital version of the manual will not contain sub-documents, but include links or references to these documents and drawings. The User Manual section of App A.2 contains a listing of sub-documents to be included in the User Manual. Individual document/drawing (sub-documents) linked or referred from the User Manual shall have separate document numbers (ENS) and descriptive and unambiguous titles. Documentation of "catalogue" equipment shall be available in Company Equipment Catalogue (hereafter referred to as CEC) instead of in the User Manual (ref. App D for details). Documentation for standard equipment from Company framework agreements will often pre-exist in the CEC. Supplier shall reference this information instead of duplicating the information in the User Manual. For standard equipment not included in the CEC, Supplier shall submit required information to Company, who will make the information available for referencing. Where the entire scope of supplied equipment is limited to supplier standard (catalogue) equipment only, the Supplier s standard documentation should be used if it complies with the intentions of the NS5820 standard. Further clarifications and conditions related to this principle are provided in App B. Adoption of a Supplier standard User Manual is dependant on written confirmation/acceptance from the Purchaser before Purchase Order or Call-off Order placement. Suppliers shall verify that the entire scope of the purchase order, including any sub-supplier information, is documented either directly in the User Manual, or in the case of standard equipment information, as outlined in App D. Specific requirements for Subsea are detailed in TR0056, section 3.9 User Manual covering Subsea Production Systems (SPS). 4.2 Manufacturing Records The MRB represents the Supplier's compilation of verifying documents and drawings required to demonstrate that the equipment or material is in compliance with all Company and authoritative regulations. The MRB is not applicable for: Standard catalogue equipment if the verifying documentation is included in the (standard) User Manual Equipment where delivery of a Code Data Book ( Revisjonsbok ) has been specified, ref Requirements related to structure/content of Manufacturing Records and verifying documentation/ information are given in TR0056 section 3.24 Manufacturing Record Book. The complete and original set of manufacturing records shall be retained by the Supplier on behalf of Company and held for a minimum period of 10 years from the commencement of the guarantee period. Ownership of retained information/documentation shall be vested in Company. Detail requirements are given in TR0056 section 12 Retained information. Page 5 of 30

6 4.3 Code Data Book ( Revisjonsbok ) For existing onshore plants in Norway the contract or purchase order may specify that a Revisjonsbok shall replace the MRB for equipment under the jurisdiction of the former Directorate for Fire and Electrical Safety (DBE). Detail requirements are given in TR0056, section 3.25 Code data book ( Revisjonsbok ). 4.4 Mechanical Completion Dossier/Commissioning Dossier Applicable for equipment packages. MC and commissioning shall be documented by completion of Purchaser's standard forms either by direct on-line registration in Purchaser's system or by manual completion of Purchaser's forms as agreed with Supplier. The MC/Commissioning dossiers shall be prepared as separate volumes, not to be included in the MRB or in the Supplier User Manual. 4.5 Supplier Index data / Database information Suppliers shall supply all relevant index data in digital format. This will include, dependant on Supplier scope of delivery: Supplier Master Information Register (SMIR) / Document list Tag lists / Equipment indexes: Manufacturer, model, variant, CEC identifier and serial no (where relevant) Technical tag hierarchy (parent child relationship), ref TR0056, section 9 Technical hierarchy Data sheets SPIR information (Spare parts interchangeability Record) Cross-reference indexes (tag - equipment, tag - document, equipment - document, etc.), ref. TR0056, section 10.6 Cross-references Purchaser may provide specific tools for gathering of index data or for the complete scope of supplier information. Ref. to purchase order for details. 4.6 Supplier drawings / CAD files Drawings shall, where relevant, reference other Supplier, sub-supplier or Purchaser drawings. All tagged equipment on project/installation specific drawings shall be marked with the project's tag number. Note: Standard Manufacturer drawings covering standard equipment shall not include project tag numbers or other project / installation specific information. Supplier drawings shall be delivered as viewing files (Tiff or PDF. The Purchaser shall identify any drawings required in 2D CAD format on the SMIR. The prime criterion to be used in selection of 2D CAD files to be transferred is the need to maintain drawings during Operations. Ref. TR0057 for digital format requirement for viewing files and 2D CAD files. Note: Supplier shall provide as-built fabrication isometrics and tag location information to enable Purchaser to include details of Supplier s equipment package in the project s 3D CAD model in accordance with TR0056, chapter 6 3D CAD model. Page 6 of 30

7 4.7 Documentation for dispatch, receipt, storage and installation Reference is made to NS5820, second edition, A summary of the required documentation follows: For purchaser, prior to delivery: Documentation for preservation, packing and transportation method. For recipient, prior to delivery: Procedure for receiving inspection, guidelines for lifting and handling, requirements for storage and preservation, procedures and necessary documentation for installation. At delivery: packing lists, instructions for unpacking, completed forms for mechanical completion as relevant, preservation log if specified in order, certificates for temporary lifting equipment. Ref. also Supplementary LCI requirements documents Company s basis LCI requirements have been structured so that requirements applicable to Engineering contractors, Fabrication contractors and Suppliers alike, have been gathered in "common" documents. The common specifications relevant to suppliers are summarised below, indicating main impact for suppliers: 5.1 Engineering Numbering System (ENS) Tag numbering All functional items subject to inspection and maintenance during operations shall be allocated a tag number in accordance with the project's Engineering Numberings System (ENS). The Purchaser shall issue all ENS tag numbers to the Supplier. To facilitate this, the Suppliers' tag indexes shall be submitted at an early stage after order placement. Ref. the project s ENS manual and TR0056, section 8 Tagging requirements Document numbering All project specific documents and drawings shall be coded with all relevant codes in accordance with the project s ENS. Individual documents/drawings shall be separately identified in the supplier's document index. Group registration of documents (e.g. data sheets) is not acceptable. Where drawings consist of more than one sheet, each sheet shall be coded and registered individually. Note: Manufacturer standard (catalogue) documentation and Manufacturing records/verifying documentation shall be numbered in accordance with Manufacturers internal document numbering systems. 5.2 LCI Requirements - Reference (TR0056) Contains detailed descriptions of content requirements to supplier information types and other information common to Engineering contractors, Fabrication contractors and Suppliers. 5.3 Digital Formats and Database File Transfer (TR0057) The document specifies general requirements and digital format requirements such as: Defining the digital LCI as the "original" Page 7 of 30

8 Language Viewing file formats (TIFF and PDF) Digital compilation of Supplier User Manuals Digital transfer methods When Supplier is required to deliver project design drawings or documents in native format, the following is also relevant: Document formats 2D CAD file formats and restrictions Symbol legend (Note 1) Drawing title block and document front sheet (Note 2) Notes: 1. Supplier s project specific design drawings shall be based on the CAD legends used by the Purchaser/Design Contractor or as otherwise specified in the Company framework agreement. 2. Use of standard project drawing title blocks/front sheets does not apply to standard Manufacturer documentation, which shall be prepared using Manufacturers own documentation standards and document numbering. 6 Quality Control Supplier shall perform basic quality control of the content and digital formats of supplied LCI. The checklist in App E should be used as a basis. Any errors and omissions detected by Purchaser/Company shall be reported back to the Supplier for rectification within an agreed time limit at no cost to Purchaser. 7 Review and acceptance of documentation Purchaser will assign a review acceptance code to documents/information submitted for review and acceptance. The codes to be assigned documentation/information shall be in accordance with NS5820, i.e.: Code 1 Code 2 Code 3 Code 4 Accepted Accepted with comments incorporated. Revise and resubmit Not accepted. Revise and resubmit For information only In addition, the following code will be used: Code 5 Provisional Acceptance - Interface information frozen *) *) Interface information: information required to enable the Purchaser to complete the detailed engineering of all systems, connections, foundations, which concern or depend upon the information given in the reviewed document. Examples are: Interface connection with loads in Piping Connection drawings, logic interface towards control system found on P&IDs, Cause & Effect charts and Functional Descriptions. Purchaser's acceptance of Supplier documents does not constitute approval in the sense that Purchaser assumes responsibility for the correctness of the content, conformance with stated requirements, nor does it constitute permission to deviate from order requirements. Such permission can only be effected through a Purchase Variation Order. The Purchaser reserves the right to require that accepted (code 1) documentation be corrected for errors and omissions. Page 8 of 30

9 8 As-built updating The Supplier shall together with Purchaser implement quality routines to ensure that the digital information delivered reflects final as-built status of the delivery at take-over by Operations. The as-built status shall include all changes made during on-site installation, hook-up and commissioning. All digital LCI shall all be updated to reflect a consistent as-built status. Any required updating of LCI after delivery (due to subsequent changes during installation, hook-up and commissioning, etc.) shall be re-delivered to Purchaser in digital format, together with a formal confirmation that all as-built changes have been consistently implemented. As a general rule, as-built updating by the supplier shall use the same format and tolerances as used to create the document/drawing. No hand written changes to electronically produced LCI shall be made. Where no changes have occurred since the last formal issue, documents and drawings do not require to be reissued to state that they are as-built. Status flags shall be set in the supplier document indexes to indicate that documents/drawings reflect the as-built status at handover to operations. The User Manual shall be certified by the supplier as being as-built. 9 Additional information 9.1 Definitions and abbreviations CEC identifier Company Company Equipment Catalogue (CEC) Contractor Design drawing/document ENS Information LCI Model MRB Native format Operations Package The unique number used to identify an item in the Company Equipment Catalogue (CEC). Where SAP Material Master is used as master for the CEC, the SAP Material no. is used as CEC identifier. Statoil ASA System independent term for Company s application(s) documenting standard equipment. For projects where Company is/will be the plant operator, Company s SAP Material Master database is the master database for the CEC. Provider of one of the following services directly to Company: Engineering (E), Procurement (P), Construction (C), Installation (I) and Hook-up (H). Drawing/document developed specifically for the project. Contrary to manufacturer s standard equipment information, design drawings and documents describe project specific design. Engineering Numbering System. Defines how tagged equipment and LCI drawings and documents are to be coded and numbered to obtain a uniform structure. Information in the form of drawings, documents, indexes, databases, CAD-files, 3D models etc. Life Cycle Information: Information required by the Company for engineering, preparation for operations, start-up, operation, maintenance, repair, modification and decommissioning of a plant. LCI includes both information submitted to the Company and retained by the Supplier on behalf of the Company. LCI includes what has previously been termed Documentation for Operations (DFO). Normally the first part of the manufacturer s ordering code, and it identifies the product at a general level (whereas the exact equipment's configuration is generally identified by the more detailed "variant" or part number). Manufacturing Record Book is a collection of verifying documents and drawings required to document that the equipment or material is in compliance with all Company and authoritative regulations. The original file format used to produce and update the drawing/document. The organisation responsible for operating the plant after start-up. The complete and functional assembly of a supplier s scope of delivery (not bulk or single equipment). A package can be skid or stick built. Page 9 of 30

10 Part number SIRL SMIR Standard equipment Standard equipment information Supplier Variant Viewing format The original manufacturer s ordering code of a part or equipment. This is identical to the model number or the variant number (when the model may be delivered in various configurations). Supplier Information Requirement List Supplier Master Information Register Manufacturer s standard equipment/unit typically ordered from manufacturer s catalogue. Examples are junction boxes, light fittings, instruments, electric motors, etc. Standard equipment is identified with a unique type/model identification built up by the manufacturer. Manufacturer s information (including documents, drawings, datasheet, parts list etc.) for the product, independent of the system/functional location where the product is being installed. The information shall not include any plant/project specific identification/information. Organization that provides a product, e.g. producer, distributor, retailer or vendor of a product. The scope delivered by a supplier is normally defined in a purchase order or framework agreement. A unique identification of a standard equipment item defining it s exact configuration. The variant number will consist of the model number and relevant ordering codes defining the equipment configuration/options. Digital image format produced from the native drawing/document format and prepared for online browsing in a viewing tool. 9.2 Changes from previous version 9.3 References LCI Requirements General (TR0053) (Statoil group/all locations/on- and offshore) LCI Requirements Reference (TR0056) (Statoil group/all locations/on- and offshore) LCI Requirements - Digital Formats and Database File transfer (TR0057) (Statoil group/all locations/onand offshore) LCI Requirements - Project/plant specific amendments (TR1043) (Statoil group/all locations/on- and offshore) < project specific > Engineering Numbering System Norsk standard NS5820, Supplier's documentation of equipment Page 10 of 30

11 App A SIRL - Supplier Information Requirement List A.1 Use of requirements table The SIRL identifies the total list of information/documentation types that may be relevant for the supplier scope of delivery. For a specific framework agreements or purchase order: The list shall be reduced to that relevant and strictly required. The format requirements shall be verified, e.g. for larger equipment packages the delivery of selected drawing types in 2D CAD format may be required The Document type column shall be completed in accordance with the project s ENS. The SIRL shall not be used for Sub-contractors, i.e. where Purchaser has contracted/delegated a total design responsibility (e.g. electrical design) to a company, ref Explanation of columns: Column description Document Type Required Information TR0056 reference User Manual section MRB section Format To be issued with bid Requirement applicable to Comment To be completed by Company/Purchaser for each project. Document/drawing type codes in accordance with Engineering Numbering System (ENS). As changes to the ENS may occur, refer to the latest ENS revision for correct Document Type code Description of information to be produced Reference to section for note/detail requirements in TR0056 The section no. in the User manual where this document type belongs or is referred to (ref. NS5820) The section no. in the MRB where this document type belongs. Note that a document type may be included in both User Manual (handover) and MRB (normally retained). Indicates the format(s) required for handover to Operations. D - Database format (Excel, Gathering tool, etc.) according to Purchaser's requirements T - Text format C - 2D CAD V - Viewing format (Adobe PDF preferred for documents, TIF preferred for drawings) Note: Refer to TR0057 for details of accepted digital formats The document type should be included with the bid (digital version is optional). The document type should normally be included for this type of Purchase Order (guideline only). Ref. to instructions at top of this chapter. Page 11 of 30

12 A.2 Supplier Information Requirement List (SIRL) Requirement applicable to Document Type Required Information TR0056 ref. User Manual section MRB section Format To be issued with Bid Untagged Bulk Piping Valves Tagged Bulk (E/I/T disciplines) Equipment (single item) Equipment (complete package) BID DOCUMENTATION Supplier Master Information Register - (SMIR) X X X X X X Interface information X X X X X Design and operation information X X X X X Data considering installation, operation and maintenance X X X X X X List of "commercial exceptions/clarifications to inquiry documents" X X X X X X List of "technical exceptions/clarifications to inquiry documents" X X X X X X Reference List X X X X X Production Plan X X X X X Quality Plan X X X X X List of proposed sub-suppliers X X X X X X Additional bid information as required by Purchaser X X X X X USER MANUAL (note 3) User Manual (main document) 3.8 V X X X X Introduction Document Index 2.2 D X X X X Contents list for complete User Manual V X X X X Supplier/sub-supplier contacts list V X X X X Main Data Warranty conditions and guarantee V X X X X Page 12 of 30

13 Requirement applicable to Document Type Required Information TR0056 ref. User Manual section MRB section Format To be issued with Bid Untagged Bulk Piping Valves Tagged Bulk (E/I/T disciplines) Equipment (single item) Equipment (complete package) Performance data V X X X X Restrictions in use, notices, Data for Health, environment, explosion loads V X X X X Main connections, requirements on connected systems, weight and outline dim. etc V X X X X X Technical Description including (as relevant) Technical and functional descriptions V X X X X X Calculations, curves and tables V X X X X X X Technical reports and other relevant design documents V X X X X Preparation/Installation including (as relevant) Installation/hook-up procedures, commissioning and start-up procedures V X X X X Procedures for handling, storage, transport and receiving, unpacking, lifting details etc V X X X X Operating Instructions including (as relevant) Start, normal operation, stop, emergency stop V X X X X Disturbance of operation V X X X X Corrective measures V X X X X Hazards and protective measures V X X X X Operator qualifications and training, etc V X X X X Maintenance Instructions including (as relevant) Routine Inspection, periodic maintenance V X X X X Troubleshooting guide V X X X X Lubrication charts/schedules V X X X X Repairs, modifications, component lists X X X X Material/equipment handling, storage & preservation V X X X X Index Data (Tag, parts, SPIR etc.) Tag List - Main Equipment tags D X X X X Page 13 of 30

14 Requirement applicable to Document Type Required Information TR0056 ref. User Manual section MRB section Format To be issued with Bid Untagged Bulk Piping Valves Tagged Bulk (E/I/T disciplines) Equipment (single item) Equipment (complete package) Tag Tag (technical hierarchy) 2.6 D X Tag - Document 2.6 D X X X X Main equipment index 2.6 D X X Telecom index 2.6 D X X Instrument index (instrument, fire & gas, HVAC) 2.6 D X X X Junction box index (instrument, telecom. and electrical) 2.6 D X X X Electrical index 2.6 D X X Cable index 2.6 D X X Heat Tracing index/heat required 2.6 D X Line index 2.6 D X Special item list 2.6 D X Manual valve index 2.6 D X Blind list 2.6 D X Pipe support index 2.6 D X Untagged item list 2.6 D X Lubrication index 2.6 D X X X Consumption data 2.6 D X X X X Weight index 2.6 D X X X X Loop information (for necessary loading to Contractor system) 2.6 D X Spare Parts Interchangeability Register Index (SPIR) 2.20 D X X X X Data sheets Data sheets not registered in digital format or in CEC V X X X Process data sheets for Supplier procured equipment (supplier design criteria) 2.19 D X X Instrument data sheets 2.19 D X X Page 14 of 30

15 Requirement applicable to Document Type Required Information TR0056 ref. User Manual section MRB section Format To be issued with Bid Untagged Bulk Piping Valves Tagged Bulk (E/I/T disciplines) Equipment (single item) Equipment (complete package) Electrical equipment data sheets 2.19 D X X Main Equipment data sheets 2.19 D X X X HSE data sheets 2.19 V X X X X Weight data sheets V X X X X Special Item data sheets V X Drawings and Diagrams P&ID C X D&ID V X Logic Diagram V X Cause and Effect V X Functional diagram/block diagram V X Termination diagram for external connection V X X X Single line diagram, overall and earthing V X Installation drawings for instrument (Pneumatic/hydraulic Hook-up) V X X Loop information/diagrams V X Circuit diagram V X Wiring diagram V X General arrangement V X X X X X Layout drawings V X X Detail/cross sectional drawing with parts list V X X X X Foundation drawings V X X X X X Pipe connections V X X X X X Pipe/ducting support drawings V X Piping Isometrics V X Page 15 of 30

16 Requirement applicable to Document Type Required Information TR0056 ref. User Manual section MRB section Format To be issued with Bid Untagged Bulk Piping Valves Tagged Bulk (E/I/T disciplines) Equipment (single item) Equipment (complete package) Heat Tracing Isometrics V X Inspection drawings/reports (vessels, tanks etc.) V X X Additional Detail drawings as required by Purchaser V X X X X Manufacturer standard documentation Standard documentation - replacing section 2-9 as applicable 10 Standard documents, ref. App C 10 V X X X X MANUFACTURING RECORD BOOK (note 4 and 0) Introduction and MRB index V X X X X X Certificates List of certificates V X X X X X Certificates of conformance V X X X X X Documentation for CE marking V X X X X Warranty surveyor Certificate of approval X X X X Type Cert. s/ex Certificates/Product Cert. s. issued by third party X X X X Certificates needed for re-certification of equipment V X X X Material certificates X X X X X Calibration certificates 2 X X X X Lifting certificates V X X Weight certificates 11 2 V X X X X Balancing certificates X X Pressure test certificates V X X X X Mechanical completion certificates X X X X Test Procedures and Reports Page 16 of 30

17 Requirement applicable to Document Type Required Information TR0056 ref. User Manual section MRB section Format To be issued with Bid Untagged Bulk Piping Valves Tagged Bulk (E/I/T disciplines) Equipment (single item) Equipment (complete package) Non conformance reports V X X X X Final test/acceptance with customer representative 3 X X X X Third party verification reports V X X X X Final inspection, preservation, packing and dispatch 3 X X X X Testing/acceptance after installation 3 X X X X Material testing and control 3 X X X Photos of equipment/inspections V X X X X Manufacturing procedures and reports 3 X X X X Performance / functional test procedures and reports V X X X Material traceability, weld and NDE Material traceability list X X X X Weld Summary Index and NDE log V X X X NDE drawings, sketches and other NDE doc X X X Welding procedures 11 4 V X X Painting procedure 11 4 V X X X X Calculations, curves and tables Analysis, tests, calculations, curves and tables X X X Telecommunication test report(s), FAT reports, Vendor reports, MC&C reports V X X X Mechanical/structural calculations and analyses X X X Instrument calculations (safety and relief valves) V X X OTHER DOCUMENTATION Documentation for dispatch and receipt 3.13 X X X X Mechanical Completion / Commissioning Dossier 3.39 X X X X Notes: Page 17 of 30

18 3. User Manual structure not required for untagged bulk. Relevant information types to be delivered as separate documents only. 4. MRB not required for untagged bulk. Relevant information types to be replaced by separate documents only (Manufacturing Records). All documents and drawings marked with MRB section no. shall be retained by supplier for 10 years, ref. TR0056, section 12 Retained information. Page 18 of 30

19 App B Required information by equipment type B.1 How to use this table This Appendix lists the documents (as applicable) required to install, operate and maintain single equipment items. In addition index data (ref. 4.5) and MRB (as applicable) shall be delivered Complete equipment package: The User Manual for the complete package shall contain (or reference) the documents listed for each of the different equipment types (model/variant) included in the package. Single equipment or model/variant: The documents listed shall be delivered as separate documents, included in the Supplier s standard documentation or in a User Manual. Page 19 of 30

20 B.2 Requirements table The table below consists of two parts: B.2.1 Requirements table, part 1... continues in part 2... Required Information Document type Mechanical / Process Filter Turbine, Expander Compressor Mechanical/hydraulic gear Blower Fan (incl. HVAC fan) Diesel Engine, Hydraulic motor Pump Flare, Heating, Burning, Boiling equip. Condenser Heat exchanger, Cooler Vessel, column (pressurized) Tank, Container (atmospheric) Separator Coalescher Pig launcher/receiver Lifting equipment, Crane, Winch Manual valve Architectural Kitchen & Laundry equipment Sanitary equipment Door Drilling Equipment HVAC equipment Misc. marine equipment Safety, escape & fire fighting equip. Subsea equipment Electrical Switchgear, distribution boards Electric Motor Generator Main Data Performance data X X X X X X X X Restrictions in use, notices, Data for Health, Environment and Safety, explosion loads X X X X X X X X X X Main connections, requirem. on connected systems, weight and outline dim., etc. X X X X X X X X X X X X X X X X X X X X Technical Description Technical and functional descriptions X X X X X X X X X X X X X X X X X X X X X X Calculations, curves and tables and illustrations X X X X X X X X X X Preparation/Installation Installation/removal/hook-up procedures, commissioning and start-up procedures X X X X X X X X X X X X X X X X X X X X Page 20 of 30

21 Document type Required Information Mechanical / Process Filter Turbine, Expander Compressor Mechanical/hydraulic gear Blower Fan (incl. HVAC fan) Diesel Engine, Hydraulic motor Pump Flare, Heating, Burning, Boiling equip. Condenser Heat exchanger, Cooler Vessel, column (pressurized) Tank, Container (atmospheric) Separator Coalescher Pig launcher/receiver Lifting equipment, Crane, Winch Manual valve Architectural Kitchen & Laundry equipment Sanitary equipment Door Drilling Equipment HVAC equipment Misc. marine equipment Safety, escape & fire fighting equip. Subsea equipment Electrical Switchgear, distribution boards Electric Motor Generator... continues in part 2... Proc. for handling, storage, transport and receiving, unpacking, lifting details (note 3) X X X X X X X X X X X X X X X X X Operating Instructions X X X X X X X X X X X X X X X X X X X X X X X X X Maintenance Instructions Maintenance instructions, scope and limitations X X X X X X X X X X X X X X X X X X X X X Routine Inspection, periodic maintenance X X X X X X X X X X X X X X X X Test and inspection procedure X X X X X X X X X X X X X X X X Troubleshooting diagram X X X X X X X X X Lubrication charts/schedules X X X X X X X X X X X X X X Material/equipment handling, storage & preservation X X X X X X X X X X X X X X X X X X X Part list / Spare Parts Interchangeability Register Index (SPIR) X X X X X X X X X X X X X X X X X X X X X Data sheets X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Drawings and Diagrams Termination diagram for external connection X X X X X Installation drawings for instrument (pneum./hydr. Hook-up) Circuit diagram X X X X X X X Wiring diagram X X X X General arrangement X X X X X X X X X X X X X X X X X X X X X X X X X Page 21 of 30

22 Document type Mechanical / Process Required Information Filter Turbine, Expander Compressor Mechanical/hydraulic gear Blower Fan (incl. HVAC fan) Diesel Engine, Hydraulic motor Pump Flare, Heating, Burning, Boiling equip. Condenser Heat exchanger, Cooler Vessel, column (pressurized) Tank, Container (atmospheric) Separator Coalescher Pig launcher/receiver Lifting equipment, Crane, Winch Manual valve Architectural Kitchen & Laundry equipment Sanitary equipment Door Drilling Equipment HVAC equipment Misc. marine equipment Safety, escape & fire fighting equip. Subsea equipment Electrical Switchgear, distribution boards Electric Motor Generator... continues in part 2... Detail/cross sectional drawing with parts list X X X X X X X X X X X X X X X X X X X X X Other Certificates X X X X X X X X Notes: se below part 2 of the table B.2.2 Requirements table, part 2... continues from part 1... Transformer Resistor, Reactor etc. Battery Rectifier, Inverter Electrical field equipment Instrumentation Panel, Cabinet, Console (incl. Electrical, Telecom) Power Supply Hydraulic Power Unit Computer equipment Valve Fire damper Field Instrument Flow meter Relay Instrument valve assembly Thermowell Orifice Fire & Gas Fire & Gas detectors Addressable Unit Telecom Antenna Control Unit Outlet Power Supply Loudspeaker Closed circuit TV, Camera Environment Monitoring Sensor Radar Other Telecom field equipment Other Telecom main equipment Main Data Performance data X X X X X Page 22 of 30

23 ... continues from part 1... Transformer Resistor, Reactor etc. Battery Rectifier, Inverter Electrical field equipment Instrumentation Panel, Cabinet, Console (incl. Electrical, Telecom) Power Supply Hydraulic Power Unit Computer equipment Valve Fire damper Field Instrument Flow meter Relay Instrument valve assembly Thermowell Orifice Fire & Gas Fire & Gas detectors Addressable Unit Telecom Antenna Control Unit Outlet Power Supply Loudspeaker Closed circuit TV, Camera Environment Monitoring Sensor Radar Other Telecom field equipment Other Telecom main equipment Restrictions in use, notices, Data for Health, Environment and Safety, explosion loads Main connections, requirem. on connected systems, weight and outline dim., etc. X X X X X X X Technical Description Technical and functional descriptions X X X X X X X X X X X X X X X X X X X X X X X X X X X X Calculations, curves and tables and illustrations X X X X X Preparation/Installation Installation/removal/hook-up procedures, X X X X X X X X X X X X X commissioning and start-up procedures X X X X X X X X X X Proc. for handling, storage, transport and receiving, unpacking, lifting details (note 3) X X X X X X Operating Instructions X X X X X X X X X X X X X X X X X X X X Maintenance Instructions Maintenance instructions, scope and X X X limitations X X X X X X X X X X Routine Inspection, periodic maintenance X X X X X Test and inspection procedure X X X Troubleshooting diagram X X X X X X X Lubrication charts/schedules X Material/equipment handling, storage & X X X X preservation X X Page 23 of 30

24 ... continues from part 1... Transformer Resistor, Reactor etc. Battery Rectifier, Inverter Electrical field equipment Instrumentation Panel, Cabinet, Console (incl. Electrical, Telecom) Power Supply Hydraulic Power Unit Computer equipment Valve Fire damper Field Instrument Flow meter Relay Instrument valve assembly Thermowell Orifice Fire & Gas Fire & Gas detectors Addressable Unit Telecom Antenna Control Unit Outlet Power Supply Loudspeaker Closed circuit TV, Camera Environment Monitoring Sensor Radar Other Telecom field equipment Other Telecom main equipment Part list / Spare Parts Interchangeability X X X X X X X X X Register Index (SPIR) X X X X X X X X X Data sheets X X X X X X X X X X X X X X X X X X X X X X X X X X X X Drawings and Diagrams Termination diagram for external connection X X X X X X X X X X X X X X X X X X X Installation drawings for instrument (pneum./hydr. Hook-up) X Circuit diagram (where applicable) X X X Wiring diagram X X X X X X X X X X X X X General arrangement X X X X X X X X X X X X X X X X X X X Detail/cross sectional drawing with parts list X X X X X X X X X X X X X Other Certificates X X X X Notes: 1. Where Supplier s standard information is already available in the CEC, no additional delivery of this information is required. 2. As the listed equipment types may cover a range of different equipment and sizes, the required document types are not always applicable 3. Lifting and transportation procedures required when weight > 100 kg Page 24 of 30

25 App C Supplier Standard User Manual Where the entire scope of supplied equipment is limited to supplier standard (catalogue) equipment only, NS5820 allows for delivery of the User Manual based solely on Supplier's own standard documentation, where this exists and complies with the intentions of the NS5820 standard. The following provides further clarifications and conditions related to this principle. NS5820 states: "If the scope and design of the equipment is the supplier's standard, and complete standard documentation is available at the time of the bid, this shall be accepted as a complete basis for the customer's engineering, operation and maintenance. A condition for accepting standard documentation is that it complies with the intentions of this standard, i.e. that: Brochures, catalogues, data sheets and product drawings give sufficient information about performance, function, consumption, main dimensions weight and materials The user manual covers all connections, handling, installation, preparation, operation, maintenance, special tools and spare parts in a comprehensive manner In addition it is necessary to emphasise that a Supplier Standard user manual may only be accepted as the sole delivery provided that: There is no need for any project/installation/system or tag specific documentation whatsoever. Purchaser agrees that Supplier Standard User Manual can constitute sole documentation delivery, and that this is confirmed/accepted in writing, either in connection with inquiry or at a later stage. Other relevant requirements stipulated in this specification are met, i.e. bid requirements/documentation, manufacturing documentation, quality control etc. (whereas requirements to index data, review and acceptance of documentation, as-built updating, 2D CAD will typically be greatly reduced or non-applicable). For equipment not to be replaced in operations as a complete unit, the requirement for detail/cross sectional drawings with parts list provided as separate document/file still apply. Where the scope of delivery involves specially tailored equipment, system/package design, tag or system specific documents, data sheets or drawings, or where Purchaser does not agree to use of a Supplier Standard documentation, then a traditional User Manual shall be delivered in accordance with all relevant requirements of this specification, and any "standard" documentation shall be handled as otherwise described in this specification (e.g. use section 10 to refer to standard documentation in the Company Equipment Catalogue (CEC). Delivery Requirements - Supplier Standard User Manual As a general rule, the Supplier will be required to ensure that the Standard User Manual is made digitally available in the CEC as outlined in App D. Where this is the case, no User Manual will be required as a Final LCI delivery. If however a deviation to the requirement of documenting the User Manual in the CEC is granted, then a traditional delivery of the Supplier Standard User manual will be required. Page 25 of 30

26 App D Manufacturer Standard (Catalogue) documentation in Company Equipment Catalogue D.1 General In order to reduce costly and unnecessary duplication of information, Standard "Catalogue" equipment shall be documented in Company Equipment Catalogue (CEC) A substantial amount of standard equipment information already exists in this catalogue (various makes of valves, instruments, motors, cables, loudspeakers, electrical fittings, junction boxes, safety equipment, etc.). The CEC will be made available on the Internet to all parties in the project. For the Supplier this implies that: Information for standard equipment already available and with sufficient quality in the CEC shall not be delivered Information for standard equipment not available in the CEC shall be submitted to Company for registration in the catalogue Standard equipment information shall not be included in the User Manual, but a reference to the equipment in the CEC shall be made (CEC identifier and manufacturer model/variant/part no.) Tag index information shall cross-reference the installed standard equipment The following general principles will ensure a more efficient handling of Supplier Standard Equipment information: Suppliers and manufacturers shall propose to use manufacturer s own standard equipment information where possible. Use of manufacturer s own standard identification and numbering systems, for both document and equipment identification. Delivery of information in electronic formats. Information in the CEC to be established as early as possible in the project. D.2 Requirements to suppliers of standard equipment Supplier shall verify that required standard equipment information already exists in the CEC with sufficient quality, or submit the relevant information for registration in the catalogue. Supplier has completed his delivery of standard information for a product (model) when the requirements described in this appendix are fulfilled and the final result is verified as it appears in the CEC. Where the Supplier purchases standard equipment from a Company Framework Agreement Supplier, then the Supplier shall be responsible for ensuring that the Framework Agreement Supplier submits, or has already submitted, all necessary documentation to the CEC. Manufacturer Standard information shall be delivered in English language where available. D.2.1 Required standard equipment information Standard equipment shall be sufficiently documented at either the model or the variant level (see Error! Reference source not found. for definitions). Required standard equipment information consists of: Page 26 of 30

27 5. Manufacturers part no. The part no. shall uniquely identify the equipment, i.e. in sufficient detail to allow re-ordering of equipment and associated spare parts. A unique model/variant number will typically consist of Model number + ordering codes describing relevant options/configurations for the variant. 6. Relevant documents and drawings Required documentation for each equipment type is listed in App. B.2. Manufacturer documentation shall be delivered according to Manufacturer s own layout, structure and internal document numbering. Standard equipment documents shall not include tag specific or project specific elements or references whatsoever. 7. Equipment data sheet A standard equipment (or component) data sheet in electronic format shall be supplied for each unique standard equipment item. The data sheet shall cover technical information of the standard product, independent of the system or functional location where equipment is installed, i.e. shall describe the physical characteristics for the equipment itself, e.g. body material, size of connections, physical dimensions, etc. Company provided standard data sheet form for the relevant equipment classification should be used. If the data sheet form for the relevant equipment is not available in the CEC, the supplier shall seek assistance from Company. When agreed in advance with Company, uploading of traditional document data sheet files (native or scanned format) may be permitted. The information covered by this data sheet should be in accordance with the Norsok standard or equivalent. D.2.2 Cross-reference information Supplier is responsible for providing cross-references between project tag number and correct standard equipment identifier (CEC identifier and manufacturer/model/variant), and serial number when traceability to the individual equipment item is required. This responsibility also includes assistance related to any subsequent updates of cross-reference information based on subsequent changes during installation, hookup and commissioning. In some cases this cross-reference will also constitute the only necessary LCI deliverable from the supplier, i.e. if all relevant information is already present in the CEC, then the only outstanding information required is the cross-reference between the tag number where the equipment is installed and the CEC identifier for model/variant supplied. If the parts list is not included in the relevant General Arrangement / Cross-sectional drawing, a crossreference from the parts list to the drawing shall be delivered. When the project provides a specific tool for gathering of supplier information, this tool shall be used for providing the cross-references. D.2.3 Information Formats & Quality Documents and separate drawings shall be delivered as one (1) file per document/drawing unless otherwise agreed. Cross-sectional drawing incl. parts list shall always be delivered as a separate document/file. Ref. to 5.3 and TR0057, Digital Formats and Database File Transfer, for detaild format requirements. Documentation shall be of good quality with maximum legibility. Scanned images shall be checked before submittal for proper image quality, skewness and completeness. D.2.4 Submittal of Standard Equipment information to the CEC Standard Equipment information shall be submitted to the Company in one of the following manners: Page 27 of 30

PROJECT DESIGN DELIVERABLES SEQUENCE (PDD)

PROJECT DESIGN DELIVERABLES SEQUENCE (PDD) PROJECT DESIGN DELIVERABLES SEQUENCE (PDD) INTRODUCTION There are several reasons which lead to delay in project completion, out of all, one main reason is delay in deliverable processing i.e., submission

More information

GUIDELINES FOR AUGUST 1995

GUIDELINES FOR AUGUST 1995 GUIDELINES FOR ELECTRICAL ENGINEERING SERVICES AUGUST 1995 PUBLISHED BY: PROFESSIONAL ENGINEERS AND GEOSCIENTISTS OF NEWFOUNDLAND & LABRADOR (PEGNL) P.O. Box 21207, St. John's, NL A1A 5B2 Telephone: (709)

More information

Building Commissioning 17900-1

Building Commissioning 17900-1 SECTION 17900 BUILDING COMMISSIONING PART 1 - GENERAL 1.01 WORK DESCRIPTION: A. General: 1. The Commissioning process is a joint team effort to ensure that all mechanical equipment, controls, and systems

More information

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES 1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction

More information

Owner-User Pressure Equipment Integrity Management Requirements

Owner-User Pressure Equipment Integrity Management Requirements the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management

More information

Step to the future Life Cycle Information

Step to the future Life Cycle Information Step to the future Life Cycle Information LCI Leader Marianne Kalvenes/Mona Nøstvold Classification: Open STEP projects improving our efficiency End-to-end well delivery Standard well design, equipment

More information

Engineering Procurement Construction Quality Plan

Engineering Procurement Construction Quality Plan Engineering Procurement Construction Quality Plan Index 1 Introduction... 4 1.1 Project Background... 4 1.2 Document Purpose... 4 1.3 Change Control... 4 1.4 Contract... 4 1.5 Quality system... 4 1.6 Distribution...

More information

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)

More information

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 PART 1 - GENERAL 1.01 WORK INCLUDED FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 A. Provide a complete fully addressable, power limited, fire detection and evacuation system. The system shall be connected

More information

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project. DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 08 02 PART 1 GENERAL 1.01 AUTHORITY (CxA) A. The Commissioning Authority (CxA) has been contracted or will be contracted directly

More information

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F

MEDFORD FABRICATION CSC, INC. Quality System Manual. Date of issue: 03/25/2010 Revision : F MEDFORD FABRICATION CSC, INC Quality System Manual Date of issue: 03/25/2010 Revision : F Table of Contents System Description 1.0 Introduction 2.0 Company Quality Policy 3.0 Organization Charts 4.0 Quality

More information

HANDOVER OF DISTRIBUTION NETWORK ASSETS (ELECTRICITY & WATER)

HANDOVER OF DISTRIBUTION NETWORK ASSETS (ELECTRICITY & WATER) Procedure # Page 1 of 19 HANDOVER OF DISTRIBUTION NETWORK ASSETS (ELECTRICITY & WATER) Prepared by: Asset Information Department Manager Reviewed by: Asset Management Director Endorsed by: Executive Operations

More information

Elements Elements describe the essential outcomes. 1. Prepare to diagnose and repair air conditioning and HVAC system

Elements Elements describe the essential outcomes. 1. Prepare to diagnose and repair air conditioning and HVAC system AURETU004 Application Competency Field Unit Sector Elements Elements describe the essential outcomes. 1. Prepare to diagnose and repair air conditioning and HVAC system 2. Diagnose air conditioning and

More information

VENDOR PREQUALIFICATION QUESTIONNAIRE

VENDOR PREQUALIFICATION QUESTIONNAIRE FM/PR/PM11/03 VENDOR PREQUALIFICATION Project. Doc. : LOCATION: Page. : 1 of 9 Company Name: Company Address: 1. Invitation to Pre qualify Pyramid E&C hereby invites your company to participate in a pre

More information

& Start-up Directory

& Start-up Directory & Start-up Directory INTEGRATED SERVICE SOLUTIONS Index C H A P T E R 1 INTRODUCTION 4 C H A P T E R 2 COMMISSIONING & START UP SERVICE 5 2.1 Standard Implementation Path 6 2.2 The Home Office Phase 7

More information

Statement of Work. 3.0 Details of Service Pre Start-up. - 1 - Cooling Start-up Service. Installation Service. Table of Contents. 1.0 Executive Summary

Statement of Work. 3.0 Details of Service Pre Start-up. - 1 - Cooling Start-up Service. Installation Service. Table of Contents. 1.0 Executive Summary Installation Service Statement of Work - 1 - Cooling Start-up Service Cooling Start-up Service Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features & Benefits 3.0 Details

More information

ENGINEERING SPECIFICATION. Engineering Specification SAPPHIRE 42 Bar

ENGINEERING SPECIFICATION. Engineering Specification SAPPHIRE 42 Bar Engineering Specification SAPPHIRE 42 Bar PART 1 GENERAL 1.1 DESCRIPTION OF WORK This specification outlines the requirements for a "Total Flood" SAPPHIRE Clean Agent Fire Suppression System. The work

More information

Sample Company SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES

Sample Company SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES A. The Owner will contract separately and directly for the majority of the commissioning work

More information

Fire Alarm Systems Certification

Fire Alarm Systems Certification Fire Alarm Systems Certification The skills and knowledge listed under each task are suggestive of those involved in that task, but are not intended to constitute an exhaustive listing. 2.1 Submittal Preparation

More information

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q0.000. Date: Title. Revision: QUALITY MANUAL PROCEDURE Q0.000. 29 September 2014

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q0.000. Date: Title. Revision: QUALITY MANUAL PROCEDURE Q0.000. 29 September 2014 Title: Quality Manual Uncontrolled if Hardcopy CCD MARINE LTD th Date: 29 September 2014 Doc Ref: Q0.000 Issued By: Sarah Leighton Rev No: 2 Title Revision: Date: QUALITY MANUAL PROCEDURE Q0.000 2 29 September

More information

The Piping System Model a New Life Cycle Document. Elements of the Piping System Model

The Piping System Model a New Life Cycle Document. Elements of the Piping System Model Piping System Model as a Life Cycle Document White Paper Introduction When designing piping systems, a variety of documents are created providing the details necessary to design, purchase, build, and test

More information

H.V.A.C. Design Plumbing Design

H.V.A.C. Design Plumbing Design H.V.A.C. Design H.V.A.C. Design Mira Costa College Arts Complex CP Upgrade 1. PART 1 GENERAL 1.1. DESCRIPTION SECTION 23 09 00 HVAC INSTRUMENTATION AND CONTROL 2. PART 2 - PRODUCTS 2.1. Materials

More information

BASE CONSTRUCTION INC

BASE CONSTRUCTION INC BASE CONSTRUCTION INC 14252 CULVER DRIVE A-630 IRVINE,CA 92604-0326 OFFICE:949 387-3471 Shop 714 994 9563 CELL:949 735-5292 FAX:949 786-8753 QUALITY ASSURANCE and QUALITY CONTROL MANUAL 1 TABLE OF CONTENTS

More information

ENGINEERING SPECIFICATIONS

ENGINEERING SPECIFICATIONS ENGINEERING SPECIFICATIONS FM-200 CLEAN-AGENT FIRE SUPPRESSION SYSTEM with PYRO-CHEM DETECTION/RELEASE SYSTEM March 2001 SECTION 1 - GENERAL I. SCOPE This specification outlines the requirements for a

More information

Energy Design Resources Commissioning Plan Outline Template

Energy Design Resources Commissioning Plan Outline Template IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended

More information

Mechanical Installation

Mechanical Installation Page -1-1. INTRODUCTION AND PURPOSE 1.1. This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed in conjunction with the manufacturer s

More information

VERIFICATION OF LIFTING APPLIANCES FOR THE OIL AND GAS INDUSTRY

VERIFICATION OF LIFTING APPLIANCES FOR THE OIL AND GAS INDUSTRY OFFSHORE SERVICE SPECIFICATION DNV-OSS-308 VERIFICATION OF LIFTING APPLIANCES FOR THE OIL AND GAS INDUSTRY JUNE 2005 Since issued in print (June 2005), this booklet has been amended, latest in October

More information

JUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES

JUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES JUBILEE TECHNICAL TRAINING CENTRE TAKORADI POLYTECHNIC 2015 TRAINING PROGRAMMES Main Courses Duration: 26 weeks 1. NVQ Level 2 Performing Process Operation in Replicating Environment 2. NVQ Level 2 Performing

More information

Join the UK Nuclear Renaissance. Procurement & Quality Process

Join the UK Nuclear Renaissance. Procurement & Quality Process Join the UK Nuclear Renaissance Procurement & Quality Process 1 AREVA NP UK Supplier Day, March 16th Birmingham EPR is a trademark of the AREVA Group 1 The Process: AREVA Supply Chain Strategy Didier David

More information

THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING

THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING THE DELTON GROUP MANPOWER TRAINING CONSULTANCY SHORT COURSE PROGRAMME TOPICS LISTING Delton Short Course Programmes English Language Technical English Language English Language for the Oil Industry Oil

More information

GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL

GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL Issue Number: 1 Issue Date: 12/9/14 1 of 19 Contents Revision Summary... 4 1.0 Introduction... 5 2.0 Supplier Quality System Requirements... 6 3.0

More information

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual

Specialties Manufacturing. Talladega Castings & Machine Co., Inc. ISO 9001:2008. Quality Manual Specialties Manufacturing Talladega Castings & Machine Co., Inc. ISO 9001:2008 This document is the property of TMS and may not be reproduced, wholly, or in part, without the express consent of TMS. Rev.

More information

PRIME CONSULTANT SERVICES

PRIME CONSULTANT SERVICES GUIDELINES FOR Professional Engineers providing PRIME CONSULTANT SERVICES 1.0 INTRODUCTION 1.1 PURPOSE OF GUIDELINES The "Guidelines for Professional Engineers providing Prime Consultant Services" have

More information

Materials Management:

Materials Management: Materials Management: Damodara U. Kini, P.E. OFTEN OVERLOOKED AS A COST SOLUTION, SUCCESSFULLY MANAGING MATERIALS CAN LEAD TO GREATER SAVINGS. Damodara U. Kini is procurement manager at Raytheon, Engineers

More information

CalMod Design-Build Electrification Services

CalMod Design-Build Electrification Services SECTION 28 16 00 INTRUSION DETECTION SYSTEM PART 1 - GENERAL 1.1 DESCRIPTION A. This section describes the detailed technical requirements for the Intrusion Detection System (IDS), where the Contractor

More information

Quality Assurance Manual. QAM-2013-Rev2

Quality Assurance Manual. QAM-2013-Rev2 QAM-2013-Rev2 President s Policy and Authorization of Quality Control The management system for the Steel Structural Fabrication of Pinnacle Industrial Services entrusted through furnishing high quality

More information

Training for Operations and Maintenance

Training for Operations and Maintenance Oil and Gas Training and Competency Development Training for Operations and Maintenance Developing technical skills and building practical experience for E&P teams and professionals Training that meets

More information

Goliat Barrier Management

Goliat Barrier Management Goliat Barrier Management ESRA Norge; March 25, 2015 www.eninorge.com Eni: Ole Rekdal Safetec: Helene Ness Hansen PL 229 Goliat Location and Partnership License awarded in 1997 Present licensees Eni Norge

More information

6500m HOV Project Stage 1: A-4500 HOV

6500m HOV Project Stage 1: A-4500 HOV 6500m HOV Project Stage 1: A-4500 HOV Systems Engineering, Integration & Testing Plan Document Control No.: 0000000 01-November-2009 WOODS HOLE OCEANOGRAPHIC INSTITUTION WOODS HOLE, MA 02543 Document Control

More information

SLC Standards Leadership Council

SLC Standards Leadership Council SLC Standards Leadership Council Putting the Focus on Facilities Asset Lifecycle Grant Hartwright 2015-03-19 Copyright 2015 Noah Consulting LLC. All Rights Reserved. Page 1 Putting the Focus on Facilities

More information

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet. INTRODUCTION This document describes an inspection system broken down into four separate levels. When Inspection Level IV is invoked, this system meets the requirements of former MIL-I-45208A. The primary

More information

On-Site Risk Management Audit Checklist for Program Level 3 Process

On-Site Risk Management Audit Checklist for Program Level 3 Process On-Site Risk Management Audit Checklist for Program Level 3 Process Auditor name: Date: I. Facility Information: Facility name: Facility location: County: Contact name: RMP Facility I.D. Phone Number:

More information

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management

JOHN HART GENERATING STATION REPLACEMENT PROJECT. Schedule 9. Quality Management JOHN HART GENERATING STATION REPLACEMENT PROJECT Schedule 9 Quality Management SCHEDULE 9 QUALITY MANAGEMENT TABLE OF CONTENTS 1. QUALITY MANAGEMENT SYSTEM... 1 1.1 Quality Management System...1 1.2 Project

More information

COMMISSIONING OF FIRE ALARM SYSTEMS

COMMISSIONING OF FIRE ALARM SYSTEMS COMMISSIONING OF FIRE ALARM SYSTEMS OWNER FURNISHED The owner directly contracts an independent third party commissioning agent for this project. This Commissioning Plan has been included for reference

More information

Electrical Engineering

Electrical Engineering Electrical Engineering Trust our people. R eady is a professional engineering firm with highlyqualified electrical and controls personnel focused on providing solutions to meet your specific needs. Ready

More information

Security Systems Intrusion Alarm

Security Systems Intrusion Alarm Dufferin-Peel Catholic District School Board STANDARD TEXT GUIDELINE FOR Security Systems for SECONDARY AND ELEMENTARY SCHOOLS Prepared by the Plant Department With Assistance from Vision Dynamics Formatted

More information

SYLLABUS For BASIC TRADE COURSE (360 Hours) On REFRIGERATION AND AIR CONDITIONING

SYLLABUS For BASIC TRADE COURSE (360 Hours) On REFRIGERATION AND AIR CONDITIONING SYLLABUS For BASIC TRADE COURSE (360 Hours) On REFRIGERATION AND AIR CONDITIONING INDEX 1. Introduction 3 2. Objectives 3 3. Employment Opportunity 4 4. Course Structure 4 5. Entry Qualification 4 6. List

More information

SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS

SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS SECTION 16721 FIRE ALARM AND DETECTION SYSTEMS The equipment requirements of this section apply to the IUB Campus. The IUPUI Campus has a preferred vendor agreement for fire alarm systems. Contact Pat

More information

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division

Quality Assurance Requirements. For. Pratt & Whitney/Space Propulsion, Chemical Systems Division Quality Assurance Requirements For Pratt & Whitney/Space Propulsion, FORM 06.13.02.02 (REV. 6) Page 1 of 14 Table of Contents SECTION I QUALITY SYSTEMS REQUIREMENTS... 5 1. QUALITY ASSURANCE PROGRAM...

More information

Invitation to Bid FIRE ALARM & DETECTION SYSTEM

Invitation to Bid FIRE ALARM & DETECTION SYSTEM Invitation to Bid FIRE ALARM & DETECTION SYSTEM Responses to an Invitation to Bid will be received by the Purchasing Supervisor, Sumner County Board of Education, 1500 Airport Road, Gallatin, TN 37066

More information

Quality Assurance QUALITY ASSURANCE PLAN

Quality Assurance QUALITY ASSURANCE PLAN Revision 2 Page 1 of 40 QUALITY ASSURANCE PLAN PLAN APPROVALS: Jeff Shouse Signature on File DIRECTOR OF QUALITY ASSURANCE DIRECTOR OF QUALITY ASSURANCE (signature) DATE Rodney Baltzer Signature on File

More information

Unit LT01 Carry Out Routine Lift Truck Maintenance

Unit LT01 Carry Out Routine Lift Truck Maintenance Unit LT01 Carry Out Routine Lift Truck Maintenance UNIT OVERVIEW This unit is about conducting routine maintenance, adjustment and replacement activities as part of the periodic servicing of Lift Trucks.

More information

RECOMMENDED GUIDELINES FOR THE APPLICATION OF IEC 61508 AND IEC 61511 IN THE PETROLEUM ACTIVITIES ON THE NORWEGIAN CONTINENTAL SHELF

RECOMMENDED GUIDELINES FOR THE APPLICATION OF IEC 61508 AND IEC 61511 IN THE PETROLEUM ACTIVITIES ON THE NORWEGIAN CONTINENTAL SHELF RECOMMENDED GUIDELINES FOR THE APPLICATION OF IEC 61508 AND IEC 61511 IN THE PETROLEUM ACTIVITIES ON THE NORWEGIAN CONTINENTAL SHELF No.: 070 Date effective: 1.02.2001 Revision no.: 01 Date revised: NA

More information

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society (Rev.0 July 2009) (Rev.1 June 2012) (Rev.2 Oct 2013) (Rev.3 Jan 2015) (Rev.4 July 2015) (Rev.5 Jan 2016) Procedure for Transfer of Class TABLE OF CONTENTS Procedure for Transfer of Class Application Definitions

More information

ITS specification Handover and commissioning process (ITS-10-01)

ITS specification Handover and commissioning process (ITS-10-01) ITS specification Handover and commissioning process (ITS-10-01) NZ Transport Agency Effective from September 2011 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material

More information

MP Plumbing & Heating Ltd Quality Policy Manual THE QUALITY POLICY STATEMENT OF:

MP Plumbing & Heating Ltd Quality Policy Manual THE QUALITY POLICY STATEMENT OF: THE QUALITY POLICY STATEMENT OF: MP Plumbing & Heating Ltd Unit 8,The Metro Centre, Bridge Road, Orpington BR5 2BE Telephone: 01689 822188 Fax: 01689 897 733 E-Mail: info@mpplumbingheating.co.uk Web page:

More information

T146 Electro Mechanical Engineering Technician MTCU Code 51021 Program Learning Outcomes

T146 Electro Mechanical Engineering Technician MTCU Code 51021 Program Learning Outcomes T146 Electro Mechanical Engineering Technician MTCU Code 51021 Program Learning Outcomes Synopsis of the Vocational Learning Outcomes* The graduate has reliably demonstrated the ability to: 1. fabricate

More information

Engineering Procedure

Engineering Procedure Engineering Procedure Common Owner: Approved by: EPD 0017 DESIGN DOCUMENTATION AND RECORDS Version 2.1 Issued September 2012 Manager Engineering Standards and Configuration Neville Chen Authorised Natalie

More information

JOINT INTEGRITY MANAGEMENT SOLUTIONS

JOINT INTEGRITY MANAGEMENT SOLUTIONS JOINT INTEGRITY MANAGEMENT SOLUTIONS Joint Integrity Management Solutions Some 30 years after developing the technology behind hydraulic bolt tensioning, Hydratight continues to push the boundaries with

More information

APPLICATION FOR GAS WORK AUTHORISATION (MOTOR FUEL)

APPLICATION FOR GAS WORK AUTHORISATION (MOTOR FUEL) Applicant Details APPLICATION FOR GAS WORK AUTHORISATION (MOTOR FUEL) Petroleum and Gas (Production and Safety) Act and Regulation 2004 Corporation Application Details Do NOT complete if you are an Individual

More information

05-15-98 ELECTRICAL ENGINEERING ASSOCIATE, 7525

05-15-98 ELECTRICAL ENGINEERING ASSOCIATE, 7525 CITY OF LOS ANGELES CIVIL SERVICE COMMISSION CLASS SPECIFICATION POSTED JUNE 1999 05-15-98 ELECTRICAL ENGINEERING ASSOCIATE, 7525 Summary of Duties: Performs professional electrical engineering work in

More information

TfNSW Standard Requirements TSR T Technical Management

TfNSW Standard Requirements TSR T Technical Management Template Applicable to: Transport Projects Quality Management System Status: Division: Approved Transport Projects Version: 5.0 Desksite No.: 3455797_1 Date of issue: 1 July 2014 Effective date: 1 July

More information

John C. Stennis Space Center PREPARATION OF PROCUREMENT SPECIFICATIONS

John C. Stennis Space Center PREPARATION OF PROCUREMENT SPECIFICATIONS SSTD-8070-0003-CONFIG A JUNE 2016 National Aeronautics and Space Administration John C. Stennis Space Center Stennis Space Center, MS 39529-6000 John C. Stennis Space Center PREPARATION OF PROCUREMENT

More information

HAZARDOUS MATERIALS MANAGEMENT ISSUE 2

HAZARDOUS MATERIALS MANAGEMENT ISSUE 2 CONTENTS PAGE 1 AIM 2 2 APPLICATION 2 3 DEFINITIONS 2 4 REASON FOR INCLUSION 2 5 REQUIREMENTS 3 6 PLANT AND EQUIPMENT REQUIREMENTS 3 7 SYSTEM AND PROCEDURAL REQUIREMENTS 5 8 PEOPLE REQUIREMENTS 7 APPENDIX

More information

REQUIREMENTS FOR CERTIFICATION SCHEME FOR SERVICING QUALITY FOR CHILLERS AIR-CONDITIONING INSTALLATIONS GOVERNMENT BUILDINGS

REQUIREMENTS FOR CERTIFICATION SCHEME FOR SERVICING QUALITY FOR CHILLERS AIR-CONDITIONING INSTALLATIONS GOVERNMENT BUILDINGS REQUIREMENTS FOR CERTIFICATION SCHEME FOR SERVICING QUALITY FOR CHILLERS IN AIR-CONDITIONING INSTALLATIONS IN GOVERNMENT BUILDINGS OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION BUILDING SERVICES BRANCH

More information

REQUEST FOR BID. Server/Computer and VAV Controls with Backup Bid

REQUEST FOR BID. Server/Computer and VAV Controls with Backup Bid 1. INTRODUCTION REQUEST FOR BID Server/Computer and VAV Controls with Backup Bid The Northwest Arkansas Regional Airport Authority is seeking bids for the replacement of VAV box controllers, the shielded

More information

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) Part 1: Project-Specific Quality Plan Part 2: Company Quality Manual Part 3: Submittal Forms Part 4:

More information

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook Trainee:... Training Provider:... Year:... Trainee Contact no:... Competency Based Skill Training Logbook Introduction

More information

CONTRACTOR SAFETY AND ENVIRONMENTAL REQUIREMENTS

CONTRACTOR SAFETY AND ENVIRONMENTAL REQUIREMENTS CONTRACTOR SAFETY AND ENVIRONMENTAL REQUIREMENTS A. Purpose and Scope A.1 The purpose and scope of these requirements is to establish safety and environmental requirements for contractors to be able to

More information

NORSOK STANDARD COMMON REQUIREMENTS MECHANICAL COMPLETION AND COMMISSIONING

NORSOK STANDARD COMMON REQUIREMENTS MECHANICAL COMPLETION AND COMMISSIONING NORSOK STANDARD COMMON REQUIREMENTS MECHANICAL COMPLETION AND COMMISSIONING Rev. 1, May 1996 Rev. 1, May 1996 CONTENTS 1 FOREWORD 2 2 SCOPE 2 3 NORMATIVE REFERENCES 2 4 DEFINITIONS AND ABBREVIATIONS 2

More information

Essentials Welding QA/QC Plan Sample

Essentials Welding QA/QC Plan Sample Essentials Welding QA/QC Plan Sample Good for smaller projects and bid qualifications Has All the Essential Elements of a well-founded Quality Control Plan Contact: Ed Caldeira 410-451-8006 Pat [Pick the

More information

TRANSNET PIPELINES. TPL 25 Tarlton Commissioning Plan

TRANSNET PIPELINES. TPL 25 Tarlton Commissioning Plan TPL 25 Tarlton Commissioning Plan Issue Date: 03/07/2015 Revision No.: A Project No.: 11992 Date: 03/07/2015 Document Title: TPL25 Tarlton Commissioning Plan Author: Edward Standen Revision Number: A Checked

More information

Risk Engineering Guideline

Risk Engineering Guideline www.hdi.global HDI Risk Consulting Risk Engineering Guideline Impairment of fire protection systems Basic protection systems should not be impaired without adequate replace compensation with provisions.

More information

APPLICATION PACKAGE FOR LISTING AS A WATER AND/OR WASTEWATER INFRASTRUCTURE PROVIDER FOR DESIGNERS, CONSTRUCTORS

APPLICATION PACKAGE FOR LISTING AS A WATER AND/OR WASTEWATER INFRASTRUCTURE PROVIDER FOR DESIGNERS, CONSTRUCTORS APPLICATION PACKAGE FOR LISTING AS A WATER AND/OR WASTEWATER INFRASTRUCTURE PROVIDER FOR DESIGNERS, CONSTRUCTORS (Major & minor works) TO THE MANAGING NEW DEVELOPMENTS PROCESS For information regarding

More information

Management System Manual 31.000.001E. NS-EN ISO 9001:2008 Quality Management System NS-EN ISO 14001:2004 Environmental Management System

Management System Manual 31.000.001E. NS-EN ISO 9001:2008 Quality Management System NS-EN ISO 14001:2004 Environmental Management System Document name Management System Manual Document number 31.000.001E Scope NS-EN ISO 9001:2008 Quality Management System NS-EN ISO 14001:2004 Environmental Management System D 15.01.15 Changed in acc. to

More information

DOCUMENTED PROCEDURE MANUAL

DOCUMENTED PROCEDURE MANUAL NAPIT REGISTERED INSTALLERS DOCUMENTED PROCEDURE MANUAL CONTENTS 1. INTRODUCTION 2. DEFINITIONS 3. RESPONSIBILITY FOR QUALITY 4. DOCUMENT AND DATA CONTROL 5. CUSTOMER ENQUIRIES AND QUOTATIONS 6. CONTRACTS

More information

Engineered Solutions

Engineered Solutions Engineered Solutions Long established partnerships bring together the world s leading instrumentation companies within BKW. Our manufacturing facility enables us to quickly adapt standard instruments to

More information

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled

More information

C. Burner management system to follow requirements of Industrial Risk Insurers (IRI).

C. Burner management system to follow requirements of Industrial Risk Insurers (IRI). SECTION 23 52 30 PART 1 - GENERAL 1.01 RELATED WORK A. Section 23 05 00: Common Work Results for HVAC B. Section 23 25 00: Chemical Water Treatment C. Section 23 51 23: Flue Piping 1.02 QUALITY ASSURANCE

More information

City of Dallas Specifications for Sewer Camera Maintenance & Repair Services with Parts BM1308

City of Dallas Specifications for Sewer Camera Maintenance & Repair Services with Parts BM1308 City of Dallas Specifications for Sewer Camera Maintenance & Repair Services with Parts BM1308 PURPOSE: The purpose for this specification is to establish a 36 month service contract for maintenance and

More information

Integrated management systems Ship operating companies

Integrated management systems Ship operating companies Integrated management systems Ship operating companies Safety, Quality, Environment and Occupational Health and Safety DNV Maritime Preamble Organisations of all kinds are increasingly concerned about

More information

Guide Specification SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY

Guide Specification SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. HVAC Commissioning description. 2. HVAC Commissioning responsibilities. 1.2 REFERENCES A. American Society

More information

Quality Management System

Quality Management System LH Sleightholme Ltd, Westfield Works, Helperthorpe, Malton, North Yorkshire YO17 8TQ Quality Management System MANUAL ISO 9001:2008 This Quality Management System Manual has been issued on the authority

More information

CEILING CASSETTE FAN COIL UNIT

CEILING CASSETTE FAN COIL UNIT CEILING CASSETTE FAN COIL UNIT Operation and Installation Manual MHCFC4W-04, 08, 12, 16 Four way ceiling cassette fan coil unit Please read this manual before using the fan coil unit. Installation and

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 23 Rev: 01 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 DEFINITIONS

More information

The Pennsylvania State University ------------- Physical Security Office. Intrusion Alarm. Performance Specification

The Pennsylvania State University ------------- Physical Security Office. Intrusion Alarm. Performance Specification The Pennsylvania State University ------------- Physical Security Office Intrusion Alarm Performance Specification By PHYSICAL SECURITY OFFICE Group (Access Controls & Electronic Security Programs) and

More information

Maintenance of Assets Records and Internal Audit

Maintenance of Assets Records and Internal Audit To all Secretaries to Ministries and Heads of Departments, Maintenance of Assets Records and Internal Audit 1. Safeguarding Public Assets is one of the primary responsibilities of the Chief Accounting

More information

University of Houston Master Construction Specifications Insert Project Name

University of Houston Master Construction Specifications Insert Project Name SECTION 21 22 13 - SAPPHIRE CLEAN-AGENT FIRE SUPPRESSION SYSTEM PART 1 GENERAL 1.1 RELATED DOCUMENTS A. The Conditions of the Contract and applicable requirements of Divisions 0 and 1 and this Section

More information

Domain A: Creating AV Solutions Task 3: Evaluate site environment (acoustics, lighting, seating, finishing, etc.)

Domain A: Creating AV Solutions Task 3: Evaluate site environment (acoustics, lighting, seating, finishing, etc.) CTS Examination: Job Task Analysis A detailed job task analysis is available on the CTS Exam Resource page of InfoComm s website. Visit www.infocomm.org/cts Task 1: Conduct site survey Conversions (metric

More information

COMMISSIONING OF HVAC SYSTEMS

COMMISSIONING OF HVAC SYSTEMS FORM CL-01 SYSTEMS / EQUIPMENT INCLUDED : SYSTEM STARTUP CHECKLIST I - PRE - STARTUP INSPECTION EQUIPMENT MOUNTING & SETTING CONTROL, INTERLOCK & POWER WIRING ALIGNMENT OF MOTORS & DRIVES PIPING, CONNECTIONS

More information

Commissioning Plan Preparation Guide. Version 2.0 (Replaces Project Test Plans Preparation Guide, Version 1.0, September 2012)

Commissioning Plan Preparation Guide. Version 2.0 (Replaces Project Test Plans Preparation Guide, Version 1.0, September 2012) Commissioning Plan Preparation Guide Version 2.0 (Replaces Project Test Plans Preparation Guide, Version 1.0, September 2012) September 2013 Commissioning Plan Preparation Guide Contents 1.0 Introduction...

More information

Helical Products Co., Inc.

Helical Products Co., Inc. Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance

More information

INSPECTION, TESTING AND MAINTENANCE OF FIRE PROTECTION SYSTEMS AND EQUIPMENT

INSPECTION, TESTING AND MAINTENANCE OF FIRE PROTECTION SYSTEMS AND EQUIPMENT CITY OF SPRING LAKE PARK Code Enforcement Department 1301 81 st Avenue NE Spring Lake Park MN 55432 Business Phone 763-784-6491 Fax 763-792-7257 INSPECTION, TESTING AND MAINTENANCE OF FIRE PROTECTION SYSTEMS

More information

Master Class. Electrical and Instrumentation (E &I) Engineering for Oil and Gas Facilities

Master Class. Electrical and Instrumentation (E &I) Engineering for Oil and Gas Facilities Master Class Electrical and Instrumentation (E &I) Engineering for Oil and Gas Facilities What you will learn: Skills and competencies in E&I oil and gas engineering Knowledge of the latest technologies

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 31 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 3 TYPES OF

More information

Designer Quality Control Plan Guidelines

Designer Quality Control Plan Guidelines Designer Quality Control Plan Guidelines Guidelines, as defined for this manual, are detailed minimum requirement to implement a Designer Quality Control Plan 7/9/2014 Quality Control Plan Acknowledgement

More information

POSITION STATEMENT THE ENGINEER AND THE ENGINEERING TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS. July 28, 2008

POSITION STATEMENT THE ENGINEER AND THE ENGINEERING TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS. July 28, 2008 SOCIETY OF FIRE PROTECTION ENGINEERS (SFPE) NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS (NSPE) NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES (NICET) POSITION STATEMENT THE ENGINEER AND

More information

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank This specification describes requirements for a Diesel Fuel Day Tank System consisting of one or more fuel tanks, an Electronic

More information

1.0 General. Inspection, Testing, and Maintenance 1 of 8

1.0 General. Inspection, Testing, and Maintenance 1 of 8 1.0 General 1.1 Scope This specifications covers the minimum requirements for the inspection, testing, and maintenance of the existing Notifier fire alarm systems at Bergen Community College (BCC) campus

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information