1 Case Study: Canary Wharf Crossrail Station, London England Modelling Consultants: Freeform 3D Ltd. Canary Wharf Crossrail Station Project Cost - 500M Schedule completion: 2015 Canary Wharf will be one of the largest Crossrail stations. Construction of the Crossrail project began at North Dock in Canary Wharf in May marks the halfway point for the Crossrail project, where the organisation moves from major tunnelling work to station fitouts. Crossrail services through central London start operating in 2018 when it will add 10% more capacity to London s rail network. The station and proposed retail and park areas will be six stories high. The station design incorporates two parts - a huge 256 meter long station box sitting directly below a proposed over-site development. The over-site development includes plans for 100,000 square feet of retail space and a roof-top park and community facility, semicovered by an elegant timber lattice roof. Building the new railway involves constructing eight new stations in central London and Docklands and upgrading many existing stations. Stretching from Maidenhead and Heathrow in the west, across to Shenfield and Abbey Wood in the east, the new railway will cover over 100km of track including 21km of new twin-bore rail tunnel. The proposed roof will be made of translucent materials, letting the local community see, and encouraging them to visit the new green space, shops, restaurants and facilities within.

2 Freeform 3D Ltd. was engaged to build and develop a full 4D model of the station, retail spaces and connections to existing buildings on the estate. We also attended site and programme coordination meetings, using the 4D model to review the works and develop the programme. 'The Crossrail Station model built for Canary Wharf Contractors Ltd. is our most ambitious and detailed model to date. With all internal activities within the station and retail box fully modelled, Synchro PRO is proving to be a powerful tool for managing and navigating the complex programme of works. The model has been filtered to allow for exploding by floor level in order to communicate the floor-to-floor dependencies. Hoist locations, stairs, escalators, mole holes and service risers are all represented. The project also plugs in to a number of properties on the estate, these have all been modelled in Synchro PRO to assist in minimising disruption and optimising the sequence. The interface with the Crossrail works has been fully realised and explored, increasing the understanding of the programme within the wider project team.' James Bowles, Freeform.

3 Specific programme issues discovered and resolved using Synchro PRO:- During the building and maintenance of the model, a series of opportunities, clashes and unforeseen situations were discovered. Sometimes these were found during the modelling process, but most often it was the modelling workshops and co-ordination meetings on site where the discovery occurred. The workshops were arranged so that the project team could explore various construction options in real time, the model having been built in such a way to allow for this process. A few of these are highlighted on the following pages, with a full list available on request. Inter-floor dependencies. The most common clashes occurred where activities that spanned two or more floors. During the development of the programme in one floor, dependencies not seen within and between the floor detail programmes were highlighted in the model. The model allowed the team to resolve these issues in advance of the works, causing minimal or no disruption.

4 Level -4 Ceiling / Escalator working zones clash. Updated durations and working zones from the escalator contractor were reflected in the model, highlighting the need for re-planning the spacial interface between these trades. Clearance for Tunnel Boring Machines. The phasing of the structural works at level -6 were reflected in the model, whereby a series of leave-downs and omissions allowed the passing of the Tunnel Boring Machines through the station box. No particular clashes were discovered in this area, but as another method of checking the sequence, the model proved useful. Impact of shove frames to floors above. Following synchronising of the model to the latest interface programme between the Crossrail and Canary Wharf works, a pair of rooms above the TBM temporary steelwork were shown as being impacted by the works. This was then passed on to the specialist contractors to help better plan the works in these areas.

5 Mobile crane locations at ground floor. As the steel, ETFE roof and façade contractors developed and issued their detailed logistics information, the model was updated to suit. Clearances for cranes, pick up points and lifting radii were overlaid on the original master model. A series of minor adjustments were highlighted by the model that were then reflected in the project s logistics 2D plans. Pick-up points for escalators. After synchronising the model to reflect the current demolition of the marine deck, it was discovered that the original locations for the escalator unloading would no longer work. Following this, new unloading points and new routes were identified through the building for the delivery and installation of the escalators. Hoists and access for the ETFE roof. Co-ordination between internal loading of materials and the progress of the ETFE roof was possible using the model to combine programme and logistics information between trades. Leaving out a group of ETFE pillows and timber members to allow material delivery to the park level was co-ordinated within the model.

6 With enough time and some hindsight, all of the above, and all of the other discoveries we make using 4D models, are possible to identify and resolve using traditional (2D) means. However, time and hindsight are expensive and inefficient. By centralising information from all specialist contractors in a 4D environment, the ability to identify and resolve issues happens proactively, efficiently and in an environment where there is flexibility to respond in a cost effective, safe and well planned way. This is the value of 4D modelling and the power of Synchro PRO. Freeform 3D Ltd. provides market leading 4D modelling services for various parties within the construction industry. Our involvement ranges from feasibility studies and pre-construction, space planning on live projects, and postcompletion analysis i.e. actual vs planned models in cases of delay and disruption. Our background is engineering and construction, and as such our models have a functionality in which we take pride and are of high value to the project team. For further information please contact us on the below details. Freeform 3D Ltd james@freeform3d.co.uk [+44]

Crossrail Property Impact Study

Crossrail Property Impact Study Executive Summary Crossrail Property Impact Study October 2012 gva.co.uk Crossrail Property Impact Study 2012 Executive Summary Executive Summary The Crossrail Vision Farringdon Crossrail Station, Eastern

More information

CROSSRAIL The Midtown Business Club. Ian Lindsay Land and Property Director

CROSSRAIL The Midtown Business Club. Ian Lindsay Land and Property Director CROSSRAIL The Midtown Business Club Ian Lindsay Land and Property Director Crossrail Header here enabling max London 30 characters to grow High Capacity Metro Railway 14.8bn cost 42bn net benefit 118 km

More information

Chapter 13 Route Window C11 Isle of Dogs station. Transport for London

Chapter 13 Route Window C11 Isle of Dogs station. Transport for London Chapter 13 Route Window C11 Isle of Dogs station ISLE OF DOGS STATION 13 Route Window C11 Isle of Dogs station Introduction 13.1 The Crossrail Line lies completely in tunnel through this section, just

More information

MAIDENHEAD REGENERATION

MAIDENHEAD REGENERATION MAIDENHEAD REGENERATION A BRIGHT FUTURE Maidenhead has a bright future as a centre for business, commerce, culture and leisure. Sitting in the heart of the Thames Valley, convenient to London and Heathrow,

More information

Creating London s next financial district Asian Business Port

Creating London s next financial district Asian Business Port Royal Albert Dock Creating London s next financial district Asian Business Port Royal Albert Dock INTRODUCTION ABP London has signed an agreement with the Mayor of London, to transform the Royal Albert

More information

Automated Container Handling in Port Terminals

Automated Container Handling in Port Terminals Automated Container Handling in Port Terminals Overview. Shipping containers revolutionized the movement of goods, driving change and efficiency throughout the global supply chain. The next revolution

More information

Industrial TELECOMS: PROGRAMME MANAGEMENT SERVICES

Industrial TELECOMS: PROGRAMME MANAGEMENT SERVICES Industrial TELECOMS: PROGRAMME MANAGEMENT SERVICES AECOM IS ONE OF THE LARGEST AND MOST EXPERIENCED PROGRAMME MANAGEMENT FIRMS IN THE WORLD As one of the largest programme management firms in the world,

More information

Intelligent Infrastructure Monitoring

Intelligent Infrastructure Monitoring Intelligent Infrastructure Monitoring Smart, streamlined and highly configurable, Asset Fit enables you to manage the condition of your assets dependably and cost-effectively now and long into the future.

More information

INFORMATION MANAGEMENT TECHNICAL KNOWLEDGE & GIS and Information Management on Crossrail C122 Bored Tunnels contract.

INFORMATION MANAGEMENT TECHNICAL KNOWLEDGE & GIS and Information Management on Crossrail C122 Bored Tunnels contract. GIS and Information Management on 93 Richard Budden Principal Geospatial Consultant Atkins Middle East Abstract The implementation of Geographical Information Systems (GIS) technology on large infrastructure

More information

CROSSRAIL MOVING LONDON FORWARD. Simon Bennett

CROSSRAIL MOVING LONDON FORWARD. Simon Bennett CROSSRAIL MOVING LONDON FORWARD Simon Bennett Introduction Europe s largest infrastructure project 14.8bn funding 38 stations 9 new stations 42 km new tunnels 8 million cubic metres of spoil 140 main works

More information

Cody Park One of Ark s high integrity data centre campus sites

Cody Park One of Ark s high integrity data centre campus sites UKC COMMERCIAL Cody Park One of Ark s high integrity data centre campus sites Ark is a privately held company that design, build, operate and finance third party data centre solutions tailored to meet

More information

Data Transparency - CRL Employees 58,200-149,999 - Data at 31 March 2014

Data Transparency - CRL Employees 58,200-149,999 - Data at 31 March 2014 3rd Party Agreements This post is critical to managing the risk to the Delivery of Crossrail arising from Third Party interfaces. The central purpose is to put in place the commercial agreements necessary

More information

Fourth Generation Modular Construction

Fourth Generation Modular Construction Allianz Global Corporate & Specialty Fourth Generation Modular Construction Marine Insurance Challenges: A technical report. 1 2 3 4 Foreword by Ron Johnson Modular Construction Trends Challenges and common

More information

225 MARSH WALL LONDON E14 9FW Offices To Let On Flexible Terms

225 MARSH WALL LONDON E14 9FW Offices To Let On Flexible Terms LONDON E14 9FW Offices To Let On Flexible Terms LOCATION 225 Marsh Wall occupies a prominent location on the north side of Marsh Wall, to the east of its junction with Limeharbour. South Quay DLR station

More information

Why build the Silvertown Tunnel?

Why build the Silvertown Tunnel? Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary

More information

King s Cross Construction News Winter/Spring 2010

King s Cross Construction News Winter/Spring 2010 King s Cross Construction News Winter/Spring 2010 www.constructionatkingscross.com Helpline 0800 328 8840 Issue 07 Network Rail s new concourse for King s Cross Station, being constructed by Taylor Woodrow,

More information

Specialist consultancy for the transport and logistics sector

Specialist consultancy for the transport and logistics sector Specialist consultancy for the transport and logistics sector Logistics Health and Safety Environmental auditing Strategy and business modelling Technical and engineering specifications Dangerous goods

More information

Welcome to the new way of working.

Welcome to the new way of working. Welcome to the new way of working. This is delivered to you by Cobweb. Enhancing productivity for today s modern SMB. Enhancing Productivity With Office 365 In A Modern Mobile SMB Workplace Today s SMB

More information

property owners Property insurance and rental protection

property owners Property insurance and rental protection property owners Property insurance and rental protection 1 Between 1990 and 2006 Ireland s property sector grew faster than that of any other developed economy. A period of intense growth in the Irish

More information

Only two floors remaining

Only two floors remaining Only two floors remaining 2,697-20,615 sq ft St Peter s Square www.stpetersstockport.com Stockport town centre s first grade A, BREEAM Excellent office building. TO LET Stockport 51,402 sq ft Full grade

More information

Linking housing markets. The effect of Crossrail on housing markets in London. Crossrail. London

Linking housing markets. The effect of Crossrail on housing markets in London. Crossrail. London Linking housing markets he effect of Crossrail on housing markets in London Crossrail London LINKING REPOR ILE HOUSING MARKES EX RESULS HERE Contents Crossrail _ 04 Summary _ 06 A Cataylst For Change _

More information

How To Increase Vehicle Height Of A Tunnel In Daugherd Port

How To Increase Vehicle Height Of A Tunnel In Daugherd Port Height of Dublin Port Tunnel Background Note The Dublin Port Tunnel 1. The Dublin Port Tunnel will run from the existing M1 Motorway at Santry to link with Dublin Port and the local road network. Construction

More information

Block C Borthwick Street, London, SE8 3JY

Block C Borthwick Street, London, SE8 3JY AVAILABLE SPACE Block C Borthwick Street, London, SE8 3JY The property will comprise a mixed use building of steel portal frame construction arranged over eight floors with ground floor office/medical

More information

Stair Towers Public Stair Towers Universal System Scaffold Loading Towers 750 Temporary Roofs and Containment

Stair Towers Public Stair Towers Universal System Scaffold Loading Towers 750 Temporary Roofs and Containment U K S Y S T E M S C A F F O L D Stair Towers Public Stair Towers Universal System Scaffold Loading Towers 750 Temporary Roofs and Containment Why you should use UK System Scaffold Hire UK SYSTEM SCAFFOLD

More information

CONTEMPORARY GEORGIAN FAÇADE HEADQUARTERS BUILDING GRADE A OFFICE SPACE 37,000 SQ FT

CONTEMPORARY GEORGIAN FAÇADE HEADQUARTERS BUILDING GRADE A OFFICE SPACE 37,000 SQ FT CONTEMPORARY GEORGIAN FAÇADE HEADQUARTERS BUILDING GRADE A OFFICE SPACE 37,000 SQ FT Fourteen St George Street is a contemporary 50,000 sq ft office building with an elegant Georgian façade. The property

More information

Newham, London. Local Economic Assessment. 2010 to 20279. Newham - Economic Development

Newham, London. Local Economic Assessment. 2010 to 20279. Newham - Economic Development Newham, London Local Economic Assessment Newham - Economic Development 2010 to 20279 8. 7BLooking Forward: Planned Investment And The Scale Of Opportunity Summary Newham has the potential to attract approximately

More information

Flatbed. Flatbed Consolidations Over Dimensional/Overweight

Flatbed. Flatbed Consolidations Over Dimensional/Overweight Flatbed Flatbed Consolidations Over Dimensional/Overweight Turn your toughest flatbed load into a tangible success. What would happen if you discovered thousands of pieces of flatbed equipment all in one

More information

SUPPLY CHAIN MANAGEMENT PROGRAMME

SUPPLY CHAIN MANAGEMENT PROGRAMME SUPPLY CHAIN MANAGEMENT PROGRAMME Transforming knowledge into action OVERVIEW Supply chain management is becoming increasingly important for organisations and, at the same time, more and more challenging

More information

SETTING UP A LONDON ENERGY COMPANY

SETTING UP A LONDON ENERGY COMPANY February 2016 SETTING UP A LONDON ENERGY COMPANY SUMMARY: London is ready for a renewable energy revolution, and could supply 20 per cent of its electricity from solar power alone. A Green Mayor will set

More information

37,005 SQ FT HEADQUARTERS OFFICE

37,005 SQ FT HEADQUARTERS OFFICE 37,005 SQ FT HEADQUARTERS OFFICE 02 INTRODUCTION OFFICE SPACE THAT S AS INDIV UAL AS YOUR BUSINESS id Maidenhead is a new landmark Grade A self-contained office building located on a premium Thames Valley

More information

Hitachi s Involvement in Nuclear Power Plant Construction in Japan

Hitachi s Involvement in Nuclear Power Plant Construction in Japan Hitachi s Involvement in Nuclear Power Plant Construction in Japan 48 Hitachi s Involvement in Nuclear Power Plant Construction in Japan Naoki Kajiyama Kenji Hamamura Koichi Murayama OVERVIEW: To protect

More information

JLT Specialty Limited is a member of the Jardine Lloyd Thompson Group of companies. Jardine Lloyd Thompson Group plc is an international group of

JLT Specialty Limited is a member of the Jardine Lloyd Thompson Group of companies. Jardine Lloyd Thompson Group plc is an international group of JLT Specialty Limited is a member of the Jardine Lloyd Thompson Group of companies. Jardine Lloyd Thompson Group plc is an international group of Risk Specialists and Employee Benefits Consultants. Listed

More information

Report of the Regeneration and Employment Scrutiny Commission s Review into Regeneration and Transport in Newham. April 2012

Report of the Regeneration and Employment Scrutiny Commission s Review into Regeneration and Transport in Newham. April 2012 Report of the Regeneration and Employment Scrutiny Commission s Review into Regeneration and Transport in Newham. April 2012 Chair of Commission: Councillor Ted Sparrowhawk 1 Contents Chair s Foreword...3

More information

NOVEMBER 2010 Photo 1 Floor fitout is now substantially completed up to level L34, and plantroom installations are also near completion. Internal Inspections and de-snagging are in progress up to level

More information

Transport and Logistics Management

Transport and Logistics Management Transport and Logistics Management MA/PGDip Greenwich Campus gre.ac.uk/business Why study this programme? Transport-related activities comprise the second largest global business sector (after construction)

More information

University Arms Hotel, Cambridge

University Arms Hotel, Cambridge Traffic Management Plan For University Arms Hotel, Cambridge Prepared By: James Batterbee Number: M1342 / Rev B Date: 29 th August 2014 CONTENTS: (1) INTRODUCTION (2) VEHICLE ACCESS & EGRESS AND PEDESTRIAN

More information

Chaudière Crossing Bridge Rehabilitation

Chaudière Crossing Bridge Rehabilitation Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation

More information

Changing the Face at the Busiest Airport in the World through Project Management

Changing the Face at the Busiest Airport in the World through Project Management Changing the Face at the Busiest Airport in the World through Project Management Refurbishing Heathrow Airport Terminal 1, On Time, On Budget, With No Disruptions to Travelling Public Background: Dated

More information

Connect Transform Locate

Connect Transform Locate A modern business space for modern business, located within an integrated transport hub. Up to 29,052 sq ft New Build Grade A BREEAM rated excellent Office accommodation. Wolverhampton. Making it happen

More information

Trivandi major project consultants

Trivandi major project consultants Trivandi major project consultants About Trivandi Trivandi is an international consultancy that provides strategic advice, project management and assurance on major venue and infrastructure projects in

More information

Development Opportunities at CEME Conceptual Design & Rationale for Commercial, Residential and Conferencing Facilities

Development Opportunities at CEME Conceptual Design & Rationale for Commercial, Residential and Conferencing Facilities Development Opportunities at CEME Conceptual Design & Rationale for Commercial, Residential and Conferencing Facilities CEME opened in 2003 with a focus on supporting regeneration and economic prosperity

More information

Howard Primary School Construction Management Plan

Howard Primary School Construction Management Plan 2.1 Introduction Howard Primary School Construction Management Plan The Howard Primary school project covers the construction of a new three storey block next to a live school and includes alterations

More information

TORONTO TRANSIT COMMISSION REPORT NO.

TORONTO TRANSIT COMMISSION REPORT NO. Revised: March/13 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: July 23, 2014 SUBJECT: TORONTO-YORK SPADINA SUBWAY EXTENSION PROJECT AUXILIARY EQUIPMENT ACTION ITEM RECOMMENDATION It is recommended

More information

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6e ACTION ITEM Date of Meeting January 12, 2016

PORT OF SEATTLE MEMORANDUM. COMMISSION AGENDA Item No. 6e ACTION ITEM Date of Meeting January 12, 2016 PORT OF SEATTLE MEMORANDUM COMMISSION AGENDA Item No. 6e ACTION ITEM Date of Meeting January 12, 2016 DATE: TO: FROM: Dave McFadden, Managing Director, Economic Development Tim Leonard, Capital Project

More information

Diskeeper boosts Oracle, IIS and Apache servers to ensure maximum real-time data performance and reliability at EDF Energy Networks

Diskeeper boosts Oracle, IIS and Apache servers to ensure maximum real-time data performance and reliability at EDF Energy Networks Diskeeper boosts Oracle, IIS and Apache servers to ensure maximum real-time data performance and reliability at EDF Energy Networks Diskeeper Corporation Europe - EDF Energy Networks Case Study Background

More information

Network Demand Management Case Study Exchange Hotel, Townsville June 2011

Network Demand Management Case Study Exchange Hotel, Townsville June 2011 Network Demand Management Case Study Exchange Hotel, Townsville June 2011 Network Demand Management Case Study Exchange Hotel, Townsville Key challenge Owners of the Exchange Hotel wanted to refurbish

More information

Oklahoma Methodist Manor

Oklahoma Methodist Manor Oklahoma Methodist Manor 5201 East Terrace Drive, Suite 300 Madison, Wisconsin 53718 (608) 354-0900 www.horizondbm.com Case Study Project: Oklahoma Methodist Manor ( OMM ) 4134 East 31 st Street Tulsa,

More information

Cylon energy Solution

Cylon energy Solution Cylon energy Solution REAL INFORMATION, REAL CONTROL, REAL SAVINGS ABOUT CYLON CONTROLS Cylon is a pioneer and a recognised international leader in the development of smart energy management systems for

More information

TRACES: REVEAL THE PERFORMANCE OF YOUR MISSION CRITICAL NETWORK

TRACES: REVEAL THE PERFORMANCE OF YOUR MISSION CRITICAL NETWORK TRACES: REVEAL THE PERFORMANCE OF YOUR MISSION CRITICAL NETWORK THE NEED FOR COST- EFFICIENT NETWORK MEASUREMENT Your people face demanding situations every day. To complete their missions and safeguard

More information

London Bridge Quarter is an extraordinary project.

London Bridge Quarter is an extraordinary project. An introduction to London Bridge Quarter is an extraordinary project. This booklet is an introduction to what makes up this amazing place a mixed use vertical city that provides a wide-range of amenities

More information

Dublin Airport Terminal 2. Ian Taylor 20 November 2007

Dublin Airport Terminal 2. Ian Taylor 20 November 2007 Dublin Airport Terminal 2 Ian Taylor 20 November 2007 Ian Taylor Director, Arup (Ove Arup and Partners Ltd) Fellow of the ICE Civil Engineer 25+ years experience of large multi-disciplinary projects Hong

More information

Customer Stories: Haulage. 1505006N_CustomerStory_ Haulage_r1

Customer Stories: Haulage. 1505006N_CustomerStory_ Haulage_r1 Customer Stories: Haulage PMS International Ltd Being able to run Paragon s routing and scheduling software in conjunction with Navman s tracking service saves us a lot of admin time and ensures that all

More information

Budget and Performance Committee Meeting 16 April 2013

Budget and Performance Committee Meeting 16 April 2013 Appendix 4 John Biggs AM Chair of the Budget and Performance Committee London Assembly City Hall The Queen s Walk London SE1 2AA 8 November 2013 Transport for London Commercial Development 5 th Floor 84

More information

30 Churchill Place: Orientation guide for staff EMA/151278/2015 Page 1/11

30 Churchill Place: Orientation guide for staff EMA/151278/2015 Page 1/11 30 Churchill Place: Orientation guide for staff EMA/151278/2015 Page 1/11 Table of contents 1. The European Medicines Agency (EMA)... 3 2. Where we are... 3 3. Important forms to complete... 3 3.1. Declaration-of-interests

More information

TOTAL CAPABILITY IN SCAFFOLDING & ACCESS SYSTEMS REACHING NEW HEIGHTS OF INNOVATION & SAFETY

TOTAL CAPABILITY IN SCAFFOLDING & ACCESS SYSTEMS REACHING NEW HEIGHTS OF INNOVATION & SAFETY TOTAL CAPABILITY IN SCAFFOLDING & ACCESS SYSTEMS REACHING NEW HEIGHTS OF INNOVATION & SAFETY PYEROY SCAFFOLDING SERVICES TOTAL ACCESS SOLUTIONS The Pyeroy Group is a leading and long established supplier

More information

Programmes. Unit 3: P lanning construction work processes and efficient use of resources in construction and the built environment.

Programmes. Unit 3: P lanning construction work processes and efficient use of resources in construction and the built environment. Unit : P lanning construction work processes and efficient use of resources in construction and the. Links This topic links to: HNC in Construction and the Built Environment Unit : LO; HNC Unit 15: LO.

More information

PROJECT COST ESTIMATES & FEASIBILITIES

PROJECT COST ESTIMATES & FEASIBILITIES PROJECT COST ESTIMATES & FEASIBILITIES Project Cost and budget management Project success elements Scope meet the scope defined for the project Budget It is within established budget Programme It is designed

More information

Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document

Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document Cuyahoga County s Clean Ohio Revitalization Fund Round 5 Application Great Lakes Shipyard Expansion Project Attachment A1 Application Summary Document A1-1 ATTACHMENT A1 Great Lakes Shipyard Expansion

More information

Queen Elizabeth Olympic Park

Queen Elizabeth Olympic Park Queen Elizabeth Olympic Park London s New Horizon London s most exciting development opportunity in a generation 1 7 4 2 5 8 3 6 9 Image courtesy of Rail images 9 8 5 7 2 6 4 1. Canary Wharf 2. London

More information

MELBOURNE METRO RAIL NEWSLETTER

MELBOURNE METRO RAIL NEWSLETTER Commercial Rd MELBOURNE METRO RAIL NEWSLETTER SHAPING MELBOURNE S RAIL FUTURE Welcome to the first edition of Melbourne Metro Rail News. This newsletter will keep you up-to-date on progress of the Melbourne

More information

Appendix 1: Asbestos Register 5 High Wycombe Campus 5 Windsor House 6 Brook Street 6 Hughenden Student Village 6 Missenden Abbey 6 Uxbridge Campus 6

Appendix 1: Asbestos Register 5 High Wycombe Campus 5 Windsor House 6 Brook Street 6 Hughenden Student Village 6 Missenden Abbey 6 Uxbridge Campus 6 Policy Policy Contents General Statement 2 Assessment 2 A Written Plan 2 Control of Access to -containing Materials 2 Monitoring and Maintenance 2 -related Emergencies 3 Arrangements for Controlling Work

More information

Neil Taylor Programme Manager Royal Borough of Kingston

Neil Taylor Programme Manager Royal Borough of Kingston Neil Taylor Programme Manager Royal Borough of Kingston James Berry MP for Kingston and Surbiton Greg Hughes Chair, kingstonfirst Opportunity Area Planning Framework Eric Owens Group Manager

More information

The Impact of Crossrail

The Impact of Crossrail Prepared by the City of London Corporation The Impact of Crossrail Secondary research briefing paper This paper brings together a range of secondary sources which assess the likely impact of Crossrail.

More information

1 London Road Brentwood 65,500 sq ft

1 London Road Brentwood 65,500 sq ft 1 London Road Brentwood 65,500 sq ft Exceptional offices at exceptional value 1 London Rd, totalling 157,750 sq ft, offers some of the best office space to the east of London. It is available on outstandingly

More information

Water Damage on Construction Sites. A guide to loss prevention

Water Damage on Construction Sites. A guide to loss prevention Water Damage on Construction Sites A guide to loss prevention Water damage is the second most frequent cause of loss during building projects and represents a large percentage of Construction All Risk

More information

2015/2016 Your guide to Business Rates

2015/2016 Your guide to Business Rates 2015/2016 Your guide to Business Rates Introduction from Jules Pipe Explanatory notes Jules Pipe Mayor of Hackney Dear business owner, This booklet gives you information about Business Rates for Hackney

More information

JPMC Conference 14 January 2014. East End of Oxford Street The Opportunity

JPMC Conference 14 January 2014. East End of Oxford Street The Opportunity JPMC Conference 14 January 2014 East End of Oxford Street The Opportunity East End of Oxford Street Agenda Introduction Toby Courtauld, Chief Executive Drivers of Change - Infrastructure - Building Stock

More information

www.denhamconstruction.co.uk

www.denhamconstruction.co.uk www.denhamconstruction.co.uk Denham Electrical & Building Services Ltd is a national company based in Essex. We offer a variety of services from design, installation, servicing and maintenance carried

More information

Y063202QBE0114A - PL Y063202QBE0114A - EL FI0522414 & FI0522514 & FI0522714 - PI. Date for Renewal: 1 September 2015

Y063202QBE0114A - PL Y063202QBE0114A - EL FI0522414 & FI0522514 & FI0522714 - PI. Date for Renewal: 1 September 2015 & Insurance Details Policy Summary Insurance Type: Contractors All Risks Public Liability Employers Liability Professional Indemnity Policy Numbers: Insurance Company: 025443012014 - CAR Y063202QBE0114A

More information

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP 30 x45 bay provides maximum tenant flexibility and increases leasing marketability By David E. Eckmann AIA, S.E. P.E. SURGING DEMANDS FOR RENTABLE OFFICE

More information

Highways asset management. Our European capabilities and experience

Highways asset management. Our European capabilities and experience Highways asset management Our European capabilities and experience Lifecycle asset management Our specialist asset management and whole life costing services maximise asset portfolio value, create lasting

More information

Saffron Square (Keats) Unit 6.05 apt 36

Saffron Square (Keats) Unit 6.05 apt 36 Saffron Square (Keats) Unit 6.05 apt 36 Saffron Square is an exciting new landmark situated in the heart of Croydon. A new and stylish building in Croydon offers 1, 2 and 3 bedroom apartments in this secure

More information

GREATER LINCOLN AREA MAJOR INFRASTRUCTURE PROJECTS

GREATER LINCOLN AREA MAJOR INFRASTRUCTURE PROJECTS GREATER LINCOLN AREA MAJOR INFRASTRUCTURE PROJECTS COMMUNICATIONS PLAN 1 2 LINCOLN MAJOR SCHEMES COMMUNICATION PLAN Scope This document sets out the aims, roles and responsibilities of Lincolnshire County

More information

Fujitsu in rail ticketing Getting you on the right track to business growth

Fujitsu in rail ticketing Getting you on the right track to business growth Fujitsu in rail ticketing Getting you on the right track to business growth To be the best, partner with the best As rail companies increasingly compete with car and air travel for passengers, it is vital

More information

LOGISTICS FACILITY UNITS AVAILABLE FROM 17,500 TO 130,000 SQ FT NEW BUILD PLANNING APPROVED

LOGISTICS FACILITY UNITS AVAILABLE FROM 17,500 TO 130,000 SQ FT NEW BUILD PLANNING APPROVED NEW BUILD LOGISTICS FACILITY UNITS AVAILABLE FROM 17,500 TO 130,000 SQ FT PLANNING APPROVED NEW BUILD LOGISTICS FACILITY UNITS AVAILABLE FROM 17,500 TO 130,000 SQ FT Located at Airport City Manchester

More information

TGRWA. Structural Engineers. Tylk Gustafson Reckers Wilson Andrews, LLC

TGRWA. Structural Engineers. Tylk Gustafson Reckers Wilson Andrews, LLC Tylk Gustafson Reckers Wilson Andrews, LLC 600 West Van Buren Street Suite 900 Chicago, Illinois 60607 Phone 312.341.0055 Fax 312.341.9966 www.tgrwa.com Tylk Gustafson Reckers Wilson Andrews, LLC was formed

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management

More information

New Providence Wharf, London, E14 Price: 449,888 Tenure: Leasehold Lease 999 from 2004

New Providence Wharf, London, E14 Price: 449,888 Tenure: Leasehold Lease 999 from 2004 New Providence Wharf, London, E14 Price: 449,888 Tenure: Leasehold Lease 999 from 2004 Two bedroom apartment Two Bathrooms Approx 880 sq ft Stunning Views Sixth Floor Balcony Leisure Facilities Valet Parking

More information

Specialist Lifting Solutions

Specialist Lifting Solutions Specialist Lifting Solutions Lifting you where others can t www.selectcranes.com Service and Experience with Accreditation At Select Specialist Lifting Services we provide a complete service for your project

More information

Brewhouse Yard, St John Street, London EC1

Brewhouse Yard, St John Street, London EC1 1 Brewhouse Yard, St John Street, London EC1 Single Let Office Investment 2 Investment Summary Long leasehold with a share of the Freehold. Prime Clerkenwell location situated approximately five minutes

More information

The Software Experts. Software Asset Management Services & Solutions

The Software Experts. Software Asset Management Services & Solutions The Software Experts Software Asset Management Services & Solutions one WORLD CLASS SOFTWARE ASSET MANAGEMENT Make Optimised IT Simple Simplify the management of IT assets and minimise financial, legal

More information

Architecture Design Engineering Urbanism Sustainability Lighting Acoustics. Strategic Consultancy by BDP

Architecture Design Engineering Urbanism Sustainability Lighting Acoustics. Strategic Consultancy by BDP Architecture Design Engineering Urbanism Sustainability Lighting Acoustics Strategic Consultancy by BDP About BDP BDP is a major international, interdisciplinary practice of architects, designers, engineers

More information

Landmark office space to let 19th floor 16,410 sq ft (1,523.82 sq m)

Landmark office space to let 19th floor 16,410 sq ft (1,523.82 sq m) Landmark office space to let 19th floor 16,410 sq ft (1,523.82 sq m) Grade A office accommodation available on the 19th floor 16,410 sq ft (1,523.82 sq m). The centrepiece office tower, located in the

More information

Transport for London. Projects and Planning Panel. The Future of London s Ticketing Technology

Transport for London. Projects and Planning Panel. The Future of London s Ticketing Technology Agenda Item 4 Transport for London Projects and Planning Panel Subject: The Future of London s Ticketing Technology Date: 26 February 2014 1 Purpose 1.1 The panel requested an update on the future of London's

More information

The transition imperative: from project to operations

The transition imperative: from project to operations The transition imperative: from project to operations Dr Andy Davies* Breakfast Seminar, Friday 17 th June 2011 BI, Norwegian Business School * Innovation and Entrepreneurship Group Imperial College Business

More information

TECHNICAL & ENGINEERING INSURANCE ACE TECHNICAL LINES

TECHNICAL & ENGINEERING INSURANCE ACE TECHNICAL LINES TECHNICAL & ENGINEERING INSURANCE ACE TECHNICAL LINES Companies today are looking for an insurer who can cater for their whole range of technical or engineering insurance requirements, from machinery breakdown,

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

Newtown and Holland Middle Schools Construction Project Bid Review

Newtown and Holland Middle Schools Construction Project Bid Review Newtown and Holland Middle Schools Construction Project Bid Review *Includes clarifications requested at 30MAR16 FACCOM Meeting (italicized) Facilities Committee Meeting March 30, 2016 (Updated March 31,

More information

Scope of EN 1090-1 Clarification Document

Scope of EN 1090-1 Clarification Document Scope of EN 1090-1 Clarification Document This document has been submitted to the European Commission as the UK view on the scope of EN 1090-1. After discussions, including with the European Technical

More information

Six top tips for travel managers to create savings in 2015

Six top tips for travel managers to create savings in 2015 Six top tips for travel managers to create savings in 2015 E-Guide 2 Introduction Savings remain a key focal point for Travel Managers in 2015 and through regular reviews and analysis, using management

More information

Scheduling Estimating Module

Scheduling Estimating Module Scheduling Estimating Module INDEX 2 SCHEDULING AND ESTIMATING MODULE 2.1 Overview 43 Scheduling 2.2 Introduction to Scheduling 43 2.3 Project Delivery Participants and Coordination 44 2.4 Project Phases

More information

Rapid Answer. World class business telephone answering services Never miss a sale, enquiry or chance to manage your reputation ever again!

Rapid Answer. World class business telephone answering services Never miss a sale, enquiry or chance to manage your reputation ever again! Rapid Answer World class business telephone answering services Never miss a sale, enquiry or chance to manage your reputation ever again! Rapid Answer provides reliable, affordable, all day and year round

More information

BOND BESPOKE SERVICES ADVISER APPLICATION PACK

BOND BESPOKE SERVICES ADVISER APPLICATION PACK BOND BESPOKE SERVICES ADVISER APPLICATION PACK Letter to candidates from Michael Ashe, Head of Effectiveness & Learning Thank you for your interest in our Bespoke Services Adviser position (maternity cover)

More information

Construction insurance. Product overview

Construction insurance. Product overview Construction insurance Product overview Global construction output is forecast to increase from 5.2tn in 2014 to 9.3tn in 2025.* In the UK, the sector contributes almost 90bn to the UK economy and employs

More information

TIM ANKER Commercial Properties (435) 575 5630 tanker@comre.com

TIM ANKER Commercial Properties (435) 575 5630 tanker@comre.com , UTAH OFFICE & RETAIL SPACE FOR LEASE 374,000 sf approved mixed-use PHASE I: 34,000 SF OFFICE WITH 1,800 SF DELI FILM STUDIOS TM PROPERTY FEATURES ENTERTAINMENT DEAL MAKING CENTER Park City Film Studios

More information

New Zealand BIM Handbook Appendix D - BIM Uses definitions July 2014. A guide to enabling BIM on building projects

New Zealand BIM Handbook Appendix D - BIM Uses definitions July 2014. A guide to enabling BIM on building projects New Zealand BIM Handbook Appendix D - BIM Uses definitions July 2014 A guide to enabling BIM on building projects Appendix D BIM USES DEFINITIONS CONTENTS BIM Uses 2 Existing Condition Modelling... 4 Cost

More information

Documentation for data centre migrations

Documentation for data centre migrations Documentation for data centre migrations Data centre migrations are part of the normal life cycle of a typical enterprise. As organisations expand, many reach a point where maintaining multiple, distributed

More information

INTEGRA CONTRACTS LIMITED CODE OF CONDUCT CORPORATE GOVERNANCE & SOCIAL RESPONSIBILITY POLICY

INTEGRA CONTRACTS LIMITED CODE OF CONDUCT CORPORATE GOVERNANCE & SOCIAL RESPONSIBILITY POLICY INTEGRA CONTRACTS LIMITED INTEGRA CONTRACTS LIMITED CODE OF CONDUCT CORPORATE GOVERNANCE & SOCIAL RESPONSIBILITY POLICY An integrated approach to managing resources March 2015 CORPORATE SOCIAL RESPONSIBILITY

More information

A print infrastructure that guarantees efficiency, productivity and cost savings.

A print infrastructure that guarantees efficiency, productivity and cost savings. A print infrastructure that guarantees efficiency, productivity and cost savings. Managed Print Services you can A Canon Managed Print Service genuinely manages your print environment to deliver significant

More information