1 Traffic Management Plan For University Arms Hotel, Cambridge Prepared By: James Batterbee Number: M1342 / Rev B Date: 29 th August 2014

2 CONTENTS: (1) INTRODUCTION (2) VEHICLE ACCESS & EGRESS AND PEDESTRIAN CONTROLS (3) VEHICLE LOADING/UNLOADING AND SECURING OF LOADS (4) VEHICLE MOVEMENT (5) SIGNAGE (6) DISTRIBUTION (7) DETAILED APPENDICES

3 1. INTRODUCTION General Description of the Project The site is located within the city centre, with roads on both West / North elevations (Regent Street / Park Terrace), together with a pedestrian & cycle route along Regent Street into Parkers Piece (park amenity). Redevelopment of the University Arms Hotel with the works comprising of: Asbestos removal and demolition of part of the hotel adjacent to Regent Street / Park Terrace. New build on the footprint of the demolished area from new basement to roof level. Asbestos removal, part demolition, façade retention, new fourth floor / roof, major refurbishment and fit-out of the 1870 s and 1920 s elements to back of house and public areas with a total of 192 guest rooms together with complete new installation of building services. The works will include internal car parking and external hard landscaping. Strategy Overview This Traffic Management Plan has been formulated in accordance with conditions 15 and 24 of planning permission 14/0897/S73, main logistic principle areas of concern being: o Movement and control of muck away lorries (all loading and unloading should be undertaken off the adopted highway). o Contractor parking, both demolition and construction phases, all such parking should be within the curtilage of the site and not on street. o Movements and control of all deliveries (all loading and unloading should be undertaken off the adopted public highway). o Control of dust, mud and debris onto the public highway. o Contractors access / egress arrangements for vehicles, plant and personnel, including the location of construction traffic routes to and from site. o Working within permitted hours / delivery times for Construction and Demolition activities. o Screening and hoarding details. o Access and protection arrangements around the site for pedestrians, cyclists and other road users. o Strategy for interference with public highways, including permanent and temporary realignment, diversions and road closures. Early discussions with the County Highways and Cambridge City Council Parks Authority have been undertaken to ascertain the construction methodology associated with this development.

4 All works must be planned to minimise the impact and disruption to existing occupiers of nearby buildings, visitors and residents. Whilst construction activities audible at the extremes of the site boundary may only take place between the hours of 08:00 18:00hrs Monday to Friday and 08:00 13:00hrs on Saturday, as controlled by condition 15 of the planning permission. Our delivery times and preferred routes strategy has been developed in discussions with County Highways and due to their requirements, we are proposing construction hours outside of those prescribed by planning condition 15 (c). These being as follows: o Articulated vehicles must be unloaded and away from Regent Street entrance prior to 06:50am. o Some works may be allowed on a Sunday to avoid disruption to the traffic system i.e. road closures possible on a Sunday to Park Terrace and the corner of Regent Street / Parkers Piece. o No restrictions been advised for rigid vehicle deliveries / collections. We have discussed the requirement to maintain segregation and safe passage for pedestrians and cyclists of Cambridge with the highways team and City Council officers as part of the pre-construction planning. All pedestrians will have their right of way maintained with limited interaction with the construction process. Segregation has been implemented as part of the general strategy. The proposed traffic route has been developed in conjunction with the County Highways for deliveries to / from the site and is summarised as follows: Vehicles to site: o Articulated vehicles are to travel through Emmanuel Street (permitted prior to 06:30am), turn left into St Andrew s Street and turn into site for unloading. o Rigid vehicles are to travel up Regent Street and turn right into site for unloading and distribution. Vehicles from site: o Articulated vehicles will leave the site and travel down through Regents Street. o Rigid vehicles will leave having turned round in the site, travel down Park Terrace and turn right into Parkside. For vehicle routes into site please refer to drawing number SK002 (appendix 2 of this document).

5 A temporary crossover modification is required to provide vehicle access and egress to and from site. This will be positioned on the existing footway on Regent Street, together with a pedestrianised access point adjacent to the former pavilion (East elevation). There will be no on site car parking permitted and MCL will primarily promote the use of the Park & Ride service in to and out of Cambridge, see drawing number SK001 (appendix 1 of this document). Should this not plausible due to opening times, then there are other 24/7 multi storey car parks available within the proximity of the city centre site. 2. ACCESS AND EGRESS 2.1 VEHICLE ACCESS: All vehicles en-route will enter site via the entrance off Regent Street, which will be controlled by a gateman. On arrival the vehicle will then be traffic marshalled through the site. The procedure for vehicle movements thereafter is as follows: (i) All drivers will report to the site gateman or a member of McL logistic staff who will discuss and explain the Traffic Management Plan to the driver of the vehicle, ensuring that he is aware of the traffic routes. (ii) Contact will then be made with the relevant sub-contractor on site via phone, advising them of the delivery (maximum 10 minute waiting time permitted). (iv) Prior to delivery a member of McL staff will determine availability of space within the site area and either allow/disallow the vehicle entry to the site area in advance of a delivery being made. (v) Only when instructed by the McL staff will the vehicle be allowed to enter the site and proceed through the site, where he will be guided through the site area utilising the designated traffic routes, by the Sub-contractor s Banksman. For detailed vehicle / pedestrian routes please refer to drawing numbers SK003 and SK004 (appendices 3 and 4 of this document). 2.2 VEHICLE EGRESS: Having loaded or unloaded the vehicle, the following procedure will apply: (i) The driver will ensure that the load is secure (if applicable). This will be achieved using ropes, straps, netting or canvas tarpaulins. The gateman will ensure this procedure is executed prior to allowing the driver to leave the site. (ii) The gateman / traffic marshal will temporarily stop immediate traffic, pedestrians and cyclists on Regents Street when vehicles leave and enter the site entrance.

6 2.3 RULES: (i) (ii) (iii) (iv) (iv) (v) (vi) (vii) (viii) All vehicles entering site are to be regularly maintained vehicles. Obey all Safety and Traffic signage. Beware of pedestrians and site operatives at all times. This will be enhanced by the attendance of the McL gateman. Signage, perimeter hoarding, traffic barrier systems and a physical barrier will be erected to keep vehicles separate from site pedestrians. No parking directly outside the site is permitted. Beware of other vehicles on site. Be considerate and polite to all road users and pedestrians. Sub-Contractors are at all times to ensure that their Banksman accompanies moving / reversing vehicles. 5 mph speed limit to all vehicles on site. 3. VEHICLE LOADING, SECURING LOADS & VEHICLE UNLOADING 3.1 Vehicle loading / unloading Loading of vehicles will be via forklifts, Luffing jib crane, hiabs, loading lorries, i.e. muck away or imported material. All methods will be detailed in a specific method statement retained in the McL site office. All operatives associated with their use shall be duly trained and competent to do so, have undertaken a site induction and understand the risk and method statement associated. When using the crane, only loads that have been assessed and form part of the site lifting plan shall be permitted the use of the crane. 3.2 Securing loads All vehicles are to be checked prior to leaving the construction area in order to confirm the security of all loads. If and when necessary, loads will be secured using ropes, straps, netting or tarpaulins. 4. VEHICLE MOVEMENT A Banksman will, at all times, accompany all construction vehicles entering / leaving the site. He will guide every vehicle until such time they enter the construction area and assist the

7 vehicles in leaving the site. All vehicles shall be brought to a standstill and engines turned off when idle. 5. SIGNAGE The following signage will be deployed entering the site and within the grounds: (i) 5 mph speed limit (ii) Public communication boards (iii) No reversing without Banksman (iv) Caution moving traffic (v) No unauthorised plant past this point (vi) Restricted area signs (vii) Warning traffic crossing (viii) Keep clear (ix) No parking (x) Highway warnings leading up to the project along Regent Street / Park Terrace Parkers Piece for vehicles, pedestrians and bicycle users. 6. DISTRIBUTION This Method Statement will be issued to the following: (i) (ii) All contractors Initial Pre Start Health & Safety Workshop / Induction All suppliers 7. DETAILED APPENDICES Please see (attached as appendices) the following documentation: o Appendix 1 - drawing number SK001 park and ride services into Cambridge. o Appendix 2 - drawing number SK002 routes into site. o Appendix 3 - drawing number SK003 site logistics plan. o Appendix 4 - drawing number SK004 site access / egress strategy. o Appendix 5 - existing site photography 3 number slides. o Appendix 6 - construction methodology 4 number slides.

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Classroom Accommodation for Woolacombe Primary School Produced for and on behalf of Built Environments Team Devon County Council NPS South West

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Accommodation for SWDPLS Shinners Bridge Dartington Produced for and on behalf of Built Environments Team Devon County Council NPS South West Ltd

More information

Site Layout & Traffic Plan

Site Layout & Traffic Plan Location Site address: Norbury Manor Business Enterprise College, Kensington Avenue, Thornton Heath, Croydon CR7 8BT. The new block will be constructed on the existing hard play area. The construction

More information

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management

More information

Logo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details

Logo here. TRAFFIC MANAGEMENT PLAN Ref : xxxx Dated xxxxxx. Enter details. Delivery Address: Enter details Logo here Ref : xxxx Dated xxxxxx Mandatory H&S 905 Rev 1: xxxxx Page 1 of 1 Project: Project No: Date: Prepared by: Enter details Enter details Enter details Enter details Delivery Address: Enter details

More information

THIS PAGE INTENTIONALLY LEFT BLANK

THIS PAGE INTENTIONALLY LEFT BLANK THIS PAGE INTENTIONALLY LEFT BLANK Construction Traffic Management Plan 2 Contents 1. Introduction... 4 1.1 Conditions of Consent... 4 2. Goals of the CTMP... 6 2.1 Objectives... 6 2.2 Predicted Construction

More information

Howard Primary School Construction Management Plan

Howard Primary School Construction Management Plan 2.1 Introduction Howard Primary School Construction Management Plan The Howard Primary school project covers the construction of a new three storey block next to a live school and includes alterations

More information

Construction Management Statement. Introduction. Contents

Construction Management Statement. Introduction. Contents Construction Management Statement Project Name Dee Point Primary School Introduction On all Morgan Sindall projects, the safety and welfare of all is of paramount importance. This document concentrates

More information

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status

More information

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS

Rockhampton Office Brisbane Office Tarong Site. Barron Gorge Hydro PS Kareeya Hydro PS Mica Creek PS Business Procedure Traffic Management Document Number OHS-PROC-130 This document applies to the following sites: All Sites Rockhampton Office Brisbane Office Tarong Site Barron Gorge Hydro PS Kareeya Hydro

More information

Proposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011 Rev A

Proposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011 Rev A Proposed Sports Hall at Oldfield School Kelston Road Bath BA1 9AB Construction Management Plan June 2011 Rev A CONTENTS 1.0 Introduction 2.0 Site Location 3.0 Proposed Development 4.0 Construction Management

More information

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI CoP 44.0 Traffic Management and Logistics Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13

CONSTRUCTION TRAFFIC MANAGEMENT PLAN Issue 2, V5, 11/11/13 Note: Please refer to the end of this document for guidance notes about completing this form Q1. What is the full postal address of the site? Your response Q2. Planning reference and revision number (if

More information

Proposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011

Proposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011 Proposed Sports Hall at Oldfield School Kelston Road Bath BA1 9AB Construction Management Plan June 2011 CONTENTS 1.0 Introduction 2.0 Site Location 3.0 Proposed Development 4.0 Construction Management

More information

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention

More information

DELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners

DELIVERY & SERVICING PLAN. REDWOOD PARTNERSHIP Consulting Engineers Transportation Planners Redwood Partnership Transportation Limited Maritime House Basin Road North Portslade Brighton BN41 1WR T: 01273 414515 F: 01273 376824 E: consult@redwoodpartnership.co.uk www.redwoodpartnership.co.uk REDWOOD

More information

North Camden Town Neighbourhood Forum. 1. The meeting was organised as a drop-in session to accommodate all attendees on different schedules.

North Camden Town Neighbourhood Forum. 1. The meeting was organised as a drop-in session to accommodate all attendees on different schedules. Camden Road Construction Liaison Meeting Tuesday 12 th May 2015, 5pm - 7pm The Irish Centre, Camden Square Attendees: Local representatives (LR) Anne Holt (AH) Polly Holt (PH) Gill Scott (GS) James Demos

More information

CONSTRUCTION MANAGEMENT PLAN

CONSTRUCTION MANAGEMENT PLAN CONSTRUCTION MANAGEMENT PLAN for CHILDRENS CENTRE, PRIMARY CLASSROOM & REPLACEMENT PRESCHOOL AT CLYST ST MARY PRIMARY SCHOOL EXETER, DEVON EX5 1BG REVISION A 7 May 2010 1 P a g e Mansell have been appointed

More information

Construction Management Plan Template

Construction Management Plan Template Plan Template Planning Permit Number:... Date Planning Permit Issued:... Approval Stamp (Office Use only): Standard Plan Template Project details Company Operational Details.. Directors Name Company Name

More information

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014

LT McGuinness Site 10 Development, Wellington Waterfront. Construction Traffic Management Plan. 7 October 2014 LT McGuinness Site 10 Development, Wellington Waterfront Construction Traffic Management Plan 7 October 2014 TDG Ref: 12950 141007 ltm ctmp final report.docx LT McGuinness Site 10 Development, Wellington

More information

Traffic Management Issue 1.0 Revision: v2 October 2014

Traffic Management Issue 1.0 Revision: v2 October 2014 Disclaimer IMPORTANT: The information in this guide is of a general nature, and should not be relied upon as individual professional advice. If necessary, legal advice should be obtained from a legal practitioner

More information

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan

Triton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12

CONSTRUCTION TRAFFIC MANAGEMENT PLAN V11, 26/09/12 If the project you are constructing was subject to planning permission and a condition requiring a Construction Traffic Management Plan (CTMP) was applied to the planning consent, this condition will need

More information

RAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON

RAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON RAEBURN GARAGE, 118 RAEBURN AVENUE, SURBITON DELIVERY AND SERVICING PLAN August 2015 Introduction This Delivery and Servicing Plan (DSP) has been prepared in relation to the proposed redevelopment of Raeburn

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN CLIENT: LONDON UNDERGROUND LIMITED CONTRACT REF: TLL 7917 NORTHERN LINE EXTENSION MAIN WORKS CONTRACT TRAFFIC MANAGEMENT PLAN Issue and Revision Control Distribution and revision control is managed through

More information

GENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT

GENERAL GUIDE FOR WORKPLACE TRAFFIC MANAGEMENT 1 This General Guide provides information on how to manage traffic risks at a workplace. It is supported by specific guidance material on traffic management for shopping centres, construction workplaces,

More information

Construction Management Plan pro forma v2.0

Construction Management Plan pro forma v2.0 Construction Management Plan pro forma v2.0 Regents Park Estate By; Lovell Partnership Limited 4th Draft issued on 23 Dec 2015 following comments from Camden Officers Contents Internal review sheet 3 Introduction

More information

Construction Management Plan (CMP) Application

Construction Management Plan (CMP) Application About this form Principal Contractor (Applicant) Applicant Details (Person lodging application and main contact for CMP) DA and Site Details Development Consent for Works you are carrying out Construction

More information

CONTRACTOR SAFETY MANAGEMENT PROCEDURE

CONTRACTOR SAFETY MANAGEMENT PROCEDURE CONTRACTOR SAFETY MANAGEMENT PROCEDURE Version 1.0 TRIM file number Short description Relevant to Authority Responsible officer Responsible office Date introduced July 20, 2015 Date(s) modified June 11,

More information

Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard

Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard UNIVERSITY COLLEGE LONDON Engineering, Maintenance & Infrastructure

More information

Construction Site Set Up Requirements

Construction Site Set Up Requirements Process Code Number Revision COP A 035 B Document Title Construction Site Set Up Requirements B 1/11/10 SRC SAT DH Final A 1/10/10 SRC MI Draft comment Rev. Date Prepared Reviewed Approved Detail/Comment

More information

Development Layout Design

Development Layout Design Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose

More information

OUTLINE TENDER STAGE METHOD STATEMENT Removal of Asbestos Cement Roof & demolition of Building At Highbury Roundhouse. Ronald Road. London.

OUTLINE TENDER STAGE METHOD STATEMENT Removal of Asbestos Cement Roof & demolition of Building At Highbury Roundhouse. Ronald Road. London. OUTLINE TENDER STAGE METHOD STATEMENT Removal of Asbestos Cement Roof & demolition of Building At Highbury Roundhouse. Ronald Road. London. N5 1XB Document Control Revision No. Date Approved Signature

More information

The Delivery Hub health, safety and environment Raising the bar 20 Transport and logistics management

The Delivery Hub health, safety and environment Raising the bar 20 Transport and logistics management Safe roads, reliable journeys, informed travellers The Delivery Hub health, safety and environment Raising the bar 20 Transport and logistics management Version I - November 2013 An executive agency of

More information

THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015

THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015 THE ROYAL BOROUGH OF KENSINGTON AND CHELSEA PLANNING APPLICATIONS COMMITTEE 16/06/2015 REPORT BY THE EXECUTIVE DIRECTOR, PLANNING AND BOROUGH DEVELOPMENT Application: /PP/15/02000 Agenda Item: N34 Address:

More information

Demolition & Construction Management Plan

Demolition & Construction Management Plan Demolition & Construction Management Plan 72 76 Cadogan lane SW1 Demolition & Construction Management Plan Issue Date: March 2013 Contents: 1.0 Introduction 1.1 Objectives of the Plan 1.2 Project Overview

More information

Construction Phase Traffic Management Plan

Construction Phase Traffic Management Plan Construction Phase Traffic Management Plan The Construction Phase Traffic Management Plan is in connection with the application for the development of a single Wind Turbine and Ancillary Works on land

More information

Repton Primary School. Traffic Management Plan

Repton Primary School. Traffic Management Plan Repton Primary School Traffic Management Plan Headteacher: Mrs H Wallis Signature: H Wallis Date: 26 th June 2015 Chair of Governors: Mrs L Eaton Signature: L Eaton Date: 26 th June 2015 8 th June 2015

More information

Managing Public Use of Freeway Emergency Access Gates and Median Crossovers

Managing Public Use of Freeway Emergency Access Gates and Median Crossovers Managing Public Use of Freeway Emergency Access Gates and Median Crossovers Operational Instruction Transport Services Division TRAFFIC MANAGEMENT Operational Instructions Managing Public Use of Freeway

More information

abcde Buckinghamshire County Council Report to: Development Control Committee AGENDA ITEM 8 Date 9 April 2002

abcde Buckinghamshire County Council Report to: Development Control Committee AGENDA ITEM 8 Date 9 April 2002 abcde Report to: Buckinghamshire County Council Development Control Committee AGENDA ITEM 8 Date 9 April 2002 Title Author Electoral Divisions Affected Recommendation Resources Appraisal Proposed Demolition

More information

The Tomato Plant Company Ltd. Method Statement and Risk Assessment Loads requiring lifting

The Tomato Plant Company Ltd. Method Statement and Risk Assessment Loads requiring lifting The Tomato Plant Company Ltd Method Statement and Risk Assessment Loads requiring lifting Generic method statement & risk assessment for the removal of portable accommodation units and/or shipping containers

More information

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder

More information

BROKEN HILL OPERATIONS Rasp Mine Project Traffic Management Plan

BROKEN HILL OPERATIONS Rasp Mine Project Traffic Management Plan BROKEN HILL OPERATIONS Document History and Status Revision Date issued Reviewed by Approved by Date approved Revision type A 31-Mar-11 SKK TC 31-Mar-11 Issued for information B 18-July-11 SW GT 18-July-11

More information

Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction

Devonport EfW CHP Facility. CEMP Proposal for Non Destructive Testing Activities. 1. Introduction Devonport EfW CHP Facility CEMP Proposal for Non Destructive Testing Activities. 1. Introduction This application is issued in compliance with the principles of the approved Construction Environmental

More information

Physical Security Assessment Form

Physical Security Assessment Form Physical Security Assessment Form Security Self-Assessment T Wake 10 February 2012 Security Assessment Contents Facility / Site Security Assessment Form... 3 Identification Details... 3 Facility Details...

More information

Workplace Transport Safety Reversing Vehicles Information Sheet What are the dangers associated with reversing vehicles? Why is reversing a problem?

Workplace Transport Safety Reversing Vehicles Information Sheet What are the dangers associated with reversing vehicles? Why is reversing a problem? Workplace Transport Safety Reversing Vehicles Information Sheet This information sheet aims to raise awareness of the dangers caused by reversing vehicles in the workplace. It provides basic information,

More information

TRAFFIC MANAGEMENT IN WORKPLACES

TRAFFIC MANAGEMENT IN WORKPLACES TRAFFIC MANAGEMENT IN WORKPLACES Code of Practice TABLE OF CONTENTS FOREWORD... 3 SCOPE AND APPLICATION... 3 1. INTRODUCTION... 4 1.1 The meaning of key terms... 4 1.2 Who has health and safety duties

More information

Pollution & Noise from Demolition & Construction Sites

Pollution & Noise from Demolition & Construction Sites CONTROL OF Pollution & Noise from Demolition & Construction Sites N oi se Co ns tru ct io n MAY 2008 THE LONDON BOROUGH 3 CONTENTS Part 1 Introduction Page 1. Background 4 2. Purpose of the code 5 3.

More information

Application No: 5/11/9004 District: South Lakeland

Application No: 5/11/9004 District: South Lakeland DEVELOPMENT CONTROL AND REGULATION COMMITTEE 20 July 2011 A Report by the Assistant Director - Planning & Sustainability Application No: 5/11/9004 District: South Lakeland Applicant: United Utilities Clearwater

More information

Rawdon Investments Limited & Aldi Stores Limited Former Barkers Nursery, Clitheroe Servicing Management Plan

Rawdon Investments Limited & Aldi Stores Limited Former Barkers Nursery, Clitheroe Servicing Management Plan Rawdon Investments Limited & Aldi Stores Limited Former Barkers Nursery, Clitheroe Servicing Management Plan Technical Note No. 6 Project: Former Barkers Nursery, Clitheroe Planning Application 3/2014/0890

More information

Port Traffic Management Plan

Port Traffic Management Plan 0. Contents Section Topic 1 Introduction 2 Objectives 3 Responsibilities 4 Speed Limits 5 Signage 6 Traffic Flows 7 Maintenance 8 Key Control for Emergency Gates 9 North Wall Access 10 Review Procedure

More information

Palmer Street/Great Barr Street, (former MacDermid warehouse), Digbeth, Birmingham, B9 4AY

Palmer Street/Great Barr Street, (former MacDermid warehouse), Digbeth, Birmingham, B9 4AY Committee Date: 23/01/2014 Application Number: 2013/09236/PA Accepted: 16/12/2013 Application Type: Full Planning Target Date: 17/03/2014 Ward: Nechells Palmer Street/Great Barr Street, (former MacDermid

More information

WELCOME. www.firstbase-haslemere.london

WELCOME. www.firstbase-haslemere.london Aerial view of the existing site Welcome to the second public exhibition on our ideas for the future of the Haslemere Industrial Estate. We held our first public exhibition in June where we set out our

More information

Development Management Report

Development Management Report Committee and Date Central Planning Committee 5 th April 2012 Item 13 Public Development Management Report Responsible Officer: Stuart Thomas email: stuart.thomas@shropshire.gov.uk Tel: 01743 252665 Fax:

More information

Report to Planning applications committee Item Date 6 March 2014 Head of planning services

Report to Planning applications committee Item Date 6 March 2014 Head of planning services Report to Planning applications committee Item Date 6 March 2014 Report of Head of planning services 4(7) Subject 13/02051/F Former Wellesley First School Wellesley Avenue North Norwich NR1 4NT Description:

More information

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area

More information

Madras College Site Traffic Management Plan (South Street) August 2015

Madras College Site Traffic Management Plan (South Street) August 2015 Madras College Site Traffic Management Plan (South Street) August 2015 South Street, St. Andrews, KY16 9EJ Kilrymont Road, St. Andrews, KY16 8DE Telephone (01334) 659402 Telephone (01334) 659401 Email

More information

This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy.

This document must be read in conjunction with the Permit to Work and Service Interruption Notice policy. UNIVERSITY OF HERTFORDSHIRE HIGHER EDUCATION CORPORATION SITE RULES FOR CONTRACTORS The University s Site Rules for Contractors are issued on the authority of the Director of Estates, Hospitality and Contract

More information

THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST

THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST THE LEONARDO BUILDING crawley business quarter gatwick THE LOWEST COST PER WORK STATION IN THE SOUTH-EAST THE LEONARDO BUILDING - Designed to meet BREEAM Excellent 2011 & EPC B Rating GATWICK AIRPORT proposed

More information

05 AREA/SITE SPECIFIC GUIDELINES

05 AREA/SITE SPECIFIC GUIDELINES 05 AREA/SITE SPECIFIC GUIDELINES Site 1 - Glass Yard The leisure centre that is currently located on this site should move to a more central location in the town centre close to the existing public squares.

More information

Chapter 13 Route Window C11 Isle of Dogs station. Transport for London

Chapter 13 Route Window C11 Isle of Dogs station. Transport for London Chapter 13 Route Window C11 Isle of Dogs station ISLE OF DOGS STATION 13 Route Window C11 Isle of Dogs station Introduction 13.1 The Crossrail Line lies completely in tunnel through this section, just

More information

23 February 2015. Enfield Intermodal Logistics Centre

23 February 2015. Enfield Intermodal Logistics Centre Enfield Intermodal Logistics Centre Overarching Operational Traffic Management Plan February 2015 Table of Contents 1. Introduction... 2 2. Purpose of the Plan... 2 3. Objective of the Plan... 3 4. Road

More information

The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan

The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603. Framework Residential Travel Plan The Northumberland Estates Proposed Residential Development, Prudhoe Town Centre D/I/D/63558/603 Framework Residential Travel Plan September 2013 CONTROL SHEET CLIENT: PROJECT TITLE: REPORT TITLE: THE

More information

19-27 Young Street Development Kensington

19-27 Young Street Development Kensington 19-27 Young Street Development Kensington Construction Management Plan Resident Update Draft 2nd October 2013 υ Introduction An initial construction management meeting took place on Tuesday 10 th September

More information

AAGSC Traffic Management Plan Template

AAGSC Traffic Management Plan Template AAGSC Traffic Management Plan Template Table of Contents 1.0 Overview Page 2.0 Objectives of the Traffic Management Plan 3.0 Traffic Management Safety Principals 4.0 Document Control 5.0 Pedestrian Management

More information

TORONTO MUNICIPAL CODE CHAPTER 886, FOOTPATHS, PEDESTRIAN WAYS, BICYCLE PATHS, BICYCLE LANES AND CYCLE TRACKS. Chapter 886

TORONTO MUNICIPAL CODE CHAPTER 886, FOOTPATHS, PEDESTRIAN WAYS, BICYCLE PATHS, BICYCLE LANES AND CYCLE TRACKS. Chapter 886 Chapter 886 FOOTPATHS, PEDESTRIAN WAYS, BICYCLE PATHS, BICYCLE LANES AND CYCLE TRACKS 1 886-1. Definitions. 886-2. Paths established. 886-3. Vehicles excluded; exceptions. 886-4. Pedestrian ways established.

More information

Manchester City Council List Item 10 Planning and Highways Committee 15 March 2012

Manchester City Council List Item 10 Planning and Highways Committee 15 March 2012 Application Number 097574/FO/2011/N1 Date of Appln 30th Jan 2012 Committee Date 15 th March 2012 Ward Cheetham Ward Proposal Location Applicant Agent Retrospective Application for the continued use of

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

How To Prevent Accidents At Work

How To Prevent Accidents At Work 2 Preventing vehicle accidents Construction work is considered to be one of the most hazardous industrial activities in the EU. The rate of injury in the construction industry is higher than in other industries.

More information

Department of Markets and Consumer Protection. Code of Practice for Deconstruction and Construction Sites. Seventh Edition May 2013

Department of Markets and Consumer Protection. Code of Practice for Deconstruction and Construction Sites. Seventh Edition May 2013 Department of Markets and Consumer Protection Code of Practice for Deconstruction and Construction Sites Seventh Edition May 2013 Department of Markets and Consumer Protection City of London PO Box 270

More information

Appendix G West Australia

Appendix G West Australia Appendix G West Australia 1 Classifications and Wages Rates (FURTHER DISCUSSION AND AMENDMENT REQUIRED) 1.1 Classifications 1.1.1 The following classifications in this Part shall apply to Employees engaged

More information

Victoria Government Gazette

Victoria Government Gazette Victoria Government Gazette No. S 351 Tuesday 31 August 2010 By Authority of Victorian Government Printer ROAD MANAGEMENT ACT 2004 CODE OF PRACTICE WORKSITE SAFETY TRAFFIC MANAGEMENT SPECIAL 2 S 351 31

More information

APPLICATION & RULES FOR OWNERS, CONTRACTORS, MOVERS

APPLICATION & RULES FOR OWNERS, CONTRACTORS, MOVERS THE STRATFORD AT PELICAN BAY CONDOMINIUM ASSOCIATION, INC. Remodeling, Renovating, Altering, Repairing and Moving APPLICATION & RULES FOR OWNERS, CONTRACTORS, MOVERS 5601 TURTLE BAY DR. NAPLES, FL 34108

More information

Construction Management Plan

Construction Management Plan Prepared by Expertise Building & (EBCPL) Construction Management Plan GAP BLUFF PRECINCT OFFICERS MESS THE ARMOURY GAP BLUFF COTTAGE CAMP COVE PRECINCT CONSTABLE S COTTAGE 33 CLIFF STREET GREEN POINT COTTAGE

More information

North-South 400 kv Interconnection Development

North-South 400 kv Interconnection Development North-South 400 kv Interconnection Development (TMP) February 2015 TOBIN CONSULTING ENGINEERS REPORT PROJECT: North-South 400 kv Interconnection Development CLIENT: COMPANY: EirGrid plc The Oval 160 Shelbourne

More information

5.1 Parking Policy 1. INTRODUCTION

5.1 Parking Policy 1. INTRODUCTION 5.1 Parking Policy 1. INTRODUCTION This policy consolidates the City s parking requirements and outlines its approach to the provision of off-street parking facilities for non-residential and residential

More information

(12 April 2011) 1 Scope... 1. 2 Definitions... 1. 3 Access to the University Precinct... 1

(12 April 2011) 1 Scope... 1. 2 Definitions... 1. 3 Access to the University Precinct... 1 and services on the University Precinct (12 April 2011) Contents 1 Scope... 1 2 Definitions... 1 3 Access to the University Precinct... 1 3.1 General... 1 3.2 ID Cards... 2 3.3 Hours of access... 4 3.4

More information

Framework Servicing Management Plan

Framework Servicing Management Plan Framework Servicing Management Plan 66-74 Notting Hill Gate Stranton Properties Ltd September 2014 DOCUMENT CONTROL Project Centre has prepared this report in accordance with the instructions from Stranton

More information

WELCOME TO OUR EXHIBITION

WELCOME TO OUR EXHIBITION WELCOME TO OUR EXHIBITION The purpose of the exhibition is to provide you with the opportunity to view our proposals and give feedback prior to the submission of a planning application to the London Borough

More information

Alphington sewer replacement

Alphington sewer replacement Alphington sewer replacement Frequently asked questions We understand you might have some questions for us so here are a few to provide you with more information. You are also welcome to call us on 1800

More information

Car Parking Management Policy Document 2013 Edition

Car Parking Management Policy Document 2013 Edition Car Parking Management Policy Document 2013 Edition Green Travel Plan Choose a better way Contents 1. Vehicle Parking Policy 2. Permits 2.1 Allocation of permits 2.1.1 Parking spaces 2.1.2 Mobility Impairment

More information

Claughton Medical Centre Travel Plan

Claughton Medical Centre Travel Plan Claughton Medical Centre Travel Plan June 2011 1 Contents Page 1. Introduction 2 2. Objectives 3 3. Targets 5 4. Site Audit 6 5. Travel Survey 11 6. Marketing strategy 13 7. Monitoring and review 15 8.

More information

HS2 Phase One Planning Forum Highways Sub-group. Meeting #2 November 2014

HS2 Phase One Planning Forum Highways Sub-group. Meeting #2 November 2014 HS2 Phase One Planning Forum Highways Sub-group Meeting #2 November 2014 Agenda Schedules 4 part 1 Highways Accesses Schedule 16 Road traffic routes Schedule 16 Mud control measures Schedule 24 Lorry ban

More information

Traffic Management Plan - Depot Procedure

Traffic Management Plan - Depot Procedure Traffic Management Plan - Depot Procedure Date: 1/8/13 Version: TMPDPGWT001 Status: Approved 1. Purpose This procedure outlines the traffic management plan which must be followed for the Depots. 2. Scope

More information

Application No : 13/01609/FULL1 Ward: Cray Valley East. Applicant : Honda (UK) Ltd Objections : YES

Application No : 13/01609/FULL1 Ward: Cray Valley East. Applicant : Honda (UK) Ltd Objections : YES SECTION 2 Applications meriting special consideration Application No : 13/01609/FULL1 Ward: Cray Valley East Address : 222 Cray Avenue Orpington BR5 3PZ OS Grid Ref: E: 546876 N: 167893 Applicant : Honda

More information

KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005. YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156

KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005. YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156 APPENDIX C KINGSTON TOWN PLANNING SUB-COMMITTEE 23 MARCH 2005 YELLOW BOX STORAGE 163-165, LONDON ROAD AND 50, GORDON ROAD, Application Number: 05/12156 REPORT BY HEAD OF PLANNING AND DEVELOPMENT SUMMARY

More information

2 February 2016. - Loss of public car park in landuse terms. - Effect on local residential amenity and local highways network.

2 February 2016. - Loss of public car park in landuse terms. - Effect on local residential amenity and local highways network. CITY OF WESTMINSTER PLANNING APPLICATIONS COMMITTEE Report of Director of Planning Subject of Report Proposal Agent On behalf of Date 2 February 2016 Classification For General Release Ward(s) involved

More information

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020

More information

Welcome and Introduction

Welcome and Introduction Welcome and Introduction Aerial view of the site Thank you for taking the time to attend our public exhibition. On this and the following boards we will show you the site location, introduce the key members

More information

Site Traffic Management Plan

Site Traffic Management Plan Masterton Primary School Aberdour Road Dunfermline Fife KY11 8HY Telephone: 01383 602455 Email: masterton.enquiries@fife.gov.uk Head Teacher: Mr Stephen Humphries Site Traffic Management Plan Date December

More information

Enbridge Class Location Change Management Plan. 1.1 Additional Information for Identified Changed Class Locations

Enbridge Class Location Change Management Plan. 1.1 Additional Information for Identified Changed Class Locations Information Request No. 1-1.1 Additional Information for Identified Changed Class Locations Reference: i. (A70936) Preamble: ii. Canadian Standards Association (CSA) Z662-15, Oil and Gas Pipeline Systems

More information

1327 Stratford Road, Hall Green, Birmingham, B28 9HH

1327 Stratford Road, Hall Green, Birmingham, B28 9HH Committee Date: 08/01/2015 Application Number: 2014/03089/PA Accepted: 19/06/2014 Application Type: Full Planning Target Date: 14/08/2014 Ward: Hall Green 1327 Stratford Road, Hall Green, Birmingham, B28

More information

On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers

On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers FOR SALE On the instruction of Ros Goode & Roland Morgan, Joint Fixed Charge Receivers Land at Teville Gate, Teville Road, Worthing, West Sussex BN11 1AZ ibrochure - www.cbre-ibrochure.co.uk/worthing ENTER

More information

Environmental Management System

Environmental Management System Environmental Management System Heron Island Research Station (HIRS) Environmental Noise Program 1. Scope The Environmental Noise Program is limited to the following noise sources: Machinery owned by the

More information

Guidance Notes for Activities on the Public Highway Within the Borough Of Reading

Guidance Notes for Activities on the Public Highway Within the Borough Of Reading Guidance Notes for Activities on the Public Highway Within the Borough Of Reading 2 nd Edition (Minor Amendments) January 2014 INTRODUCTION The following notes outline the basic requirements of Reading

More information

8 DELIVERING THE MOVEMENT FRAMEWORK

8 DELIVERING THE MOVEMENT FRAMEWORK 8 DELIVERING THE MOVEMENT FRAMEWORK Introduction 8.1 The purpose of this section of the design code is to orchestrate the delivery of essential road infrastructure highlighted in the masterplan and movement

More information

Information Sheet. What is a Workplace Transport Risk Assessment?

Information Sheet. What is a Workplace Transport Risk Assessment? Workplace Transport Safety Risk Assessment Information Sheet This information sheet provides basic information on conducting a workplace transport risk assessment. The information is aimed at employers,

More information

METHOD STATEMENT CRANE HIRE PROVIDING A CONTRACT LIFT SERVICE IN COMPLIANCE WITH BS7121 PARTS 1 & 3 AND LOLER REGULATIONS

METHOD STATEMENT CRANE HIRE PROVIDING A CONTRACT LIFT SERVICE IN COMPLIANCE WITH BS7121 PARTS 1 & 3 AND LOLER REGULATIONS METHOD STATEMENT CRANE HIRE PROVIDING A CONTRACT LIFT SERVICE IN COMPLIANCE WITH BS7121 PARTS 1 & 3 AND LOLER REGULATIONS CLIENT: Elliott Group CONTACT: Maurice Kennett SITE: Lympstone Church Ring School,

More information