1 IMPROVING HEALTH FACILITY INFRASTRUCTURE (IHFI) Electrical Infrastructure Rehabilitation HUEH Hospital Emergency Ward Port-au-Prince, Haiti Case Study December 2012
2 INTRODUCTION Built in 1918, the 540-bed HUEH is the largest teaching hospital in Haiti 2
3 Reconstruction After the 2010 earthquake, the USAID/Haiti dedicated funds to support reconstruction efforts. In 2012, reconstruction work at HUEH hospital focused on: - the emergency ward, - the maternity ward, - the surgical ward, and - the power plant. 3 3
4 Administration 2 nd floor Emergency ward 1 st floor Emergency ward and administration building Main entrance of the hospital Main entrance of the hospital
5 Main entrance Emergency ward operational section (1 st floor) Emergency ward non-operational section because of water infiltration from the roof 5
6 ACTIVITIES Rewiring circuits, improving lighting and ventilation, ensuring safe wiring 6
7 Summary of activities At HUEH Emergency Ward IHFI renovated 21,000 ft 2 of space, installing: 150 electrical outlets 160 fluorescent fixtures 60 ceiling fans 3 new air conditioning units 10 air conditioning units repaired As-built drawings for all installations. 7
8 Summary of activities (continued) At HUEH Emergency Ward, IHFI renovated: Exhaust fan Entrance 1/Waiting area Entrance 2/Ambulance entrance Triage room Intensive care unit Pharmacy Internal medicine area Orthopedics area Corridors 8
9 Exhaust fan repair (4 x4 ) This fan is mounted on top of a vertical exhaust chimney and aspirates the hot air from near the ceiling of the emergency ward, facilitating the cooling of the floor by convection. IHFI completed the repair in April
10 Waiting room area BEFORE AFTER Another USAID contractor renovated and installed a roof above the waiting room 10
11 Waiting room area (continued) BEFORE AFTER IHFI installed ceiling fans and lamps on the new roof in the waiting room area 11
12 Triage room BEFORE Water damage in the triage room before USAID s intervention 12
13 Triage room DURING IHFI removed damaged circuits and equipment, rewired the electrical distribution, and installed new ceiling fans, lamps and outlets 13
14 Triage room AFTER Triage room functioning after the renovation 14
15 Triage room Distribution Panel BEFORE DURING AFTER IHFI built a new line from the main distribution panel and installed a new distribution panel in the triage room 15
16 Main distribution panels BEFORE The panels needed to be rewired and lacked protective covers The panels were located in a crowded room, limiting accessibility and causing a fire hazard due to water leaks in the wall. 16
17 Main distribution panels AFTER The distribution panels were rewired and covered. The room was cleaned and the water leak repaired. 17
18 Orthopedics room BEFORE AFTER IHFI removed damaged circuits and equipment, rewired, built new circuits and installed new ceiling fans, outlets and lamps 18
19 Summary Collaboration between IHFI, USAID Reconstruction Project and HUEH Installation by Haitian contractors Completion: October 2012 Time elapsed: 4 months Total cost: approximately $75k IHFI contributions: Design Project management Electrical construction supervision Quality control and commissioning. 19
20 Conclusions High-impact low-cost interventions were effective, and are expected to be replicated in the rest of HUEH and other hospitals. Use of locally procured, readily available electrical components reduces time to completion and facilitates future maintenance and expansion efforts. Simplified distribution designs allow for expansion by using surface mounted components. Safer and more comfortable emergency ward for the patients. 20
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Robert C. Burns, AIA, LEED AP Principal Director of Historic Architecture 804. 648. 5040, ext. 1107
More informationshopinkelowna.com/mr--electric---home- Electrician-West-Kelowna/648681.htm
shopinkelowna.com/mr--electric---home- Electrician-West-Kelowna/.htm Website Visibility: by Search Engine % Keyword Rankings: Summary Search engine Keywords Moved Up/Down - - Keyword Rankings Keyword Affordable
More informationPrint Shop/Mail Room
Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were
More informationMechanical, Plumbing, and Fire Protection Conditions
Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred
More informationSAVE ENERGY AT HOME INSULATE AND AIR SEAL
SAVE ENERGY AT HOME INSULATE AND AIR SEAL Check the roof insulation level and add insulation to maintain minimum R-38 (6 of blown cellulose or equal). Use R-19 between frame or R-10 rigid insulation for
More informationWhen is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
More informationTENDER FOR TECHNICAL BUILDING MAINTENANCE SERVICES TERMS OF REFERENCE. April 2013 OVERALL PURPOSE
ANNEX 3 EUROPEAN UNION DELEGATION TO GEORGIA ADMINISTRATION TENDER FOR TECHNICAL BUILDING MAINTENANCE SERVICES TERMS OF REFERENCE April 2013 OVERALL PURPOSE Offices of the EU Delegation The Contractor
More informationBUNKER HILL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationU.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!
U.S. Department of Housing and Urban Development Office of Public and Indian Housing A Good Place to Live! Introduction Having a good place to live is important. Through your Public Housing Agency (or
More informationBUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207
BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 SELF EVALUATION CHECKLIST FOR RESIDENTIAL AND MULTI-FAMILY DWELLING INSPECTIONS The attached checklist
More informationI NI NP R Inspected Items
6/ /07 The Inspection of the property listed above must be performed in compliance with the rules of TREC. The inspection is of conditions which are present and visible at the time of the inspection, and
More informationSITE INSPECTION CHECKLIST
SITE INSPECTION CHECKLIST Numerous steps are required in determining that a site is suitable for the installation of a solar system. The inspection procedures and their proper chronology are outlined below.
More informationWater Leak 1: Intrusion Policy
Water Leak 1: Intrusion Policy {Non-Casualty) 1. Determine Source of Leak Roof Leak- 11 See roof leak" Pressured Pipe leak- 11 See pressured pipe leak" Water Intrusion- See 11 see Water Intrusion leak"
More informationElectrical Safety Tips. Help us keep you safe
Electrical Safety Tips Help us keep you safe To help you stay safe when using electricity, ActewAGL has compiled these electrical safety tips. For natural gas safety tips please see ActewAGL s natural
More informationHOUSING QUALITY STANDARDS (HQS)
HOUSING QUALITY STANDARDS (HQS) HQS INSPECTIONS Part II Site Inspections 24 CFR 982.401 & 405 1si Rev. 4-20-06 General Conditions All doors and windows accessible to the outside, must have a workable lock.
More informationHow To Design An Hvac Design For A Stick Built Home
LEGALETT HVAC DESIGN FEE SCHEDULE (revised April 17, 2012) Background In the past Legalett has simply supplied warm floors for comfortable living. However, 2012 Building Code changes in Ontario make it
More informationThe Association of Electrical and Medical Imaging Equipment Manufacturers Arc Fault Circuit Interrupter
Arc Fault Circuit Interrupter SUCCESS STORIES AFCIs avert potential disaster in South Carolina I would like to take the time and thank you for the Arc Fault breaker, your product saved our lives and our
More informationCOMPREHENSIVE PROPERTY INSPECTIONS
COMPREHENSIVE PROPERTY INSPECTIONS Thank you for selecting CPI for your Deficiency Observation. A full home inspection was not performed on this property at the buyers request. This inspection is a limited
More informationORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables
More informationPreventing Ice Dams on Roofs
Preventing Ice Dams on Roofs Facility Manager November/December 2005 When a roof leaks, facility managers inevitably receive complaints from building occupants. If it is winter, ice dams are often the
More informationA Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES
A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners
More informationInspecting to a higher standard.
Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com
More informationEXPRESS PERMITS (No Plan Check Required)
EXPRESS PERMITS (No Plan Check Required) Following are the lists of different types of construction for which an express permit can be issued. Express permits can be issued where work does not require
More informationBATHROOM HEATER. User's Manual. Page 2...A515 Page 9...A716
BATHROOM HEATER User's Manual Page 2...A515 Page 9...A716 BATHROOM HEATER User's Manual A515 SAVE THESE INSTRUCTIONS AND READ ALL INSTRUCTIONS BEFORE USING THE HEATER. Dear customers, Thank you for selecting
More informationCrawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com
Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Portland Area PO Box 665 West Linn, OR 97068 Ph: (503) 650-6957 Salem Area 5434 River Rd. N; #192 Keizer, OR 97303 Ph: (503) 362-5809
More informationHAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA
INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationSPECIAL APPLICATIONS
Page 1 SPECIAL APPLICATIONS The protection of microelectronics clean rooms using aspirating smoke detection systems requires special consideration. The physical configuration of the room(s) and the direction
More informationASTFFL2 - SQA Unit Code H54D 04 Assess and estimate work required to limit damage to structures post fire
Assess and estimate work required to limit damage to structures post Overview 1 Confirm extent and nature of damage caused to structures by 2 Carry out risk assessments to confirm premises are safe to
More informationReport for. Dick and Jane Homeowner. 1234 Lovers Lane, Houston, Texas 77000
Report for Dick and Jane Homeowner 1234 Lovers Lane, Houston, Texas 77000 March 17, 2004 I NI NP R Inspection Item I. STRUCTURAL SYSTEMS o o o A. Foundations (If all crawl space areas are not inspected,
More informationIECC Compliance Guide for Homes in Virginia
IECC Compliance Guide for Homes in Virginia Amended Version of 2012 International Energy Conservation Code July 14, 2014 Climate Zone Since the entire state of Virginia falls in the IECC Climate Zone 4,
More informationPROPERTY INSPECTION REPORT
(850) 297-1998 1716 Monticello Dr Tallahassee, Florida 32303 PROPERTY INSPECTION REPORT THIS INSPECTION IS A DETAILED LISTING OF AREAS VISUALLY INSPECTED AT:, Tallahassee FL Client Tallahassee, FL 32304
More informationHOMEOWNER S PERMIT GUIDE
HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448
More informationElectrical Contractors. and the. New Jersey. Rehabilitation Code
Electrical Contractors and the New Jersey Rehabilitation Code Alan Chech Electrical Seminars 609-890-7072 www.alanchech.com Information is based on the presently adopted electrical subcode NEC 2005. Current
More information2 electrical. electrical. 2010 PulteGroup, Inc. All Rights Reserved.
2 12 2010 PulteGroup, Inc. All Rights Reserved. circuit breakers Circuit breakers protect your home s system from power failure. The wiring in your home is protected by circuit breakers. Circuit breakers,
More informationAttachment #23 Health Safety Table. Client Education Inform issue and document. How to clean & maintain gutters. How to adjust sprinklers
Exterior Visual Health & Safety Issue Allowable Action Site Drainage Exterior grade does not slope 2% within the first 10' Site drainage causing bulk moisture in crawl space or basement Repairs to existing
More informationRepair Project for April 7, 2009
Repair Project for April 7, 2009 Scope of the Project HVAC Upgrades Roof Replacement Window Replacement/Exterior Openings Science Lab Renovations New Fire Alarm/Electrical AAB (accessibility) Upgrades
More informationUniversity of Northern Iowa Facilities Services
University of Northern Iowa Facilities Services February 2013 Page 1 Table of Contents: 3 General Service Information 3 Maintenance Services 4 Non-Maintenance Services 5 Area Maintenance Program 6 Carpentry
More informationHome Energy Evaluation Report for Fritz Kreiss and Catherine McQueen
Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen May 2008 Wisconsin Area PO BOX 115 Lake Geneva, WI 53147 CELL (414) 550-4765 Home Performance with ENERGY STAR Evaluation Report Customer
More informationKITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS
St. Louis County Department of Public Works Division of Code Enforcement KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS This guideline is intended to provide the homeowner/contractor with the
More informationPROPERTY INSPECTION OR ASSESSMENT OF DAMAGES
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792
More informationbout your house before you start Renovating Your Bathroom
A bout your house CE 28e before you start Renovating Your Bathroom Inadequate lighting Water-wasting showerhead Renovating your bathroom is a great way to add value to your home both for your family s
More informationPage 1 of 6 COMPLIANCE CHECKLIST. > Long Term Care Facility - Nursing Unit
COMPLIANCE CHECKLIST Page 1 of 6 > Long Term Care Facility - Nursing Unit The following checklist is for plan review of new long-term care facilities and new additions to existing long-term care facilities.
More informationDRAFT Document valid at the date shown on the page header. DETE Facilities Design Standards and Guidelines. General Index. Planning Guidelines
DETE Facilities Design Standards and Guidelines General Index P D S R Planning Guidelines Design Guidelines Standards Reference Documents DRAFT Document valid at the date shown on the page header. * Documents
More informationAPPENDIX E: CAPITAL NEEDS SUMMARY
APPENDIX E: CAPITAL NEEDS SUMMARY Building A Foundation Hall Building to be replaced ARCHITECTURAL Roof Repair North Structural Wall Repair Flooring Repairs Ceiling Repairs Lighting Repairs Lighting Repairs
More informationBuilding Condition Assessment Report
C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses
More informationElectrical. This section applies to the design and installation of building power distribution systems.
Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions
More informationBOMA BESt Assessment Overview
BOMA BESt Assessment Overview BOMA Building Environmental Standards OFFICE Module August 2013 The Voice of the Commercial Real Estate Industry in Canada The Building Owners and Managers Association of
More informationELIGIBLE REPAIR PROJECT PARAMETERS
THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building
More informationFacility Assessment for. 11801 East Main Street, Huntley, IL
Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested
More informationCSE 265: System and Network Administration
CSE 265: System and Network Administration Data Centers Desirable features Planning Hardware Maintenance Facebook Oregon Data Center (2012) Desirable features of a data center Desirable features of a data
More informationA12 A18 DISPLAY CABINET INTERIOR ELEVATION SECTION - BIDDING. PLOTTED: Feb 13, 2008-8:33am 0028-070011-A1.2 DESIGN BY: - DRAWN BY: - PROJ.
P M M4 K G 00280700A.2 PLOTTED: Feb 3, 08 8:33am DISPLAY CABINET A2 INTERIOR ELEVATION A8 SECTION DESIGN BY: DRAWN BY: PROJ. MANAGER: VHCALE: NTS ADD 3 2.3.08 00280700 A.2 46479 US 4 Houghton, Michigan
More informationUSER S MANUAL HSC-24A
AIRREX AIR CONDITIONER USER S MANUAL HSC-24A Thank you for purchasing an AIRREX AIR CONDITIONER. BEFORE operation please read this user s manual carefully. Keep this manual readily available. It is ESSENTIAL
More informationR432. Health, Health Systems Improvement, Licensing. R432-5. Nursing Facility Construction. R432-5-1. Legal Authority. R432-5-2. Purpose.
R432. Health, Health Systems Improvement, Licensing. R432-5. Nursing Facility Construction. R432-5-1. Legal Authority. This rule is promulgated pursuant to Title 26, Chapter 21. R432-5-2. Purpose. The
More informationBuilding Condition Assessment Report
Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.
More informationPROPERTY INSPECTION OR ASSESSMENT OF DAMAGES
PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: Somewhere, FL CLIENT: GAIA GC ID No: 2015000 DATE: 12/31/2015 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792 FLORIDA
More informationAIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries
AIR CONDITIONING EFFICIENCY F8 Energy eco-efficiency opportunities in Queensland Foundries Hot tips and cool ideas to save energy and money! Air conditioning units or systems are often used by foundries
More informationIMPORTANT SAFETY INSTRUCTIONS WARNING READ AND SAVE THESE OPERATING AND SAFETY INSTRUCTIONS BEFORE USING THIS HEATER.
THERMAWAVE CERAMIC HEATER Model HZ-850 Series Model HZ-860 Series IMPORTANT SAFETY INSTRUCTIONS WARNING READ AND SAVE THESE OPERATING AND SAFETY INSTRUCTIONS BEFORE USING THIS HEATER. Warning Failure to
More informationhealthy homes assessment
healthy homes assessment Date of Inspection: Inspector s Name: Agency: Address of Property: Resident s Name: Phone Number: Primary Reason for Visit: Asthma Lead Poisoning Voluntary Referral Other: GENERAL
More informationFacilities Operations Customer Service Standards WORK ORDER PRIORITIES
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system
More informationSurgical Emergency Outpatient Surgical Treatment/Diagnostic Nursing Patient Support Services Medical Offices General Support Services Assisted Living
Surgical Emergency Outpatient Surgical Treatment/Diagnostic Nursing Patient Support Services Medical Offices General Support Services Assisted Living York State College Pittsburgh www.ba-inc.com Barton
More informationInspection Tech. (330) 310-6559 http://www.inspectiontech.us a_westerburg@inspectiontech.us Inspected By: Aaron Westerburg
Inspection Tech (330) 310-6559 http://www.inspectiontech.us a_westerburg@inspectiontech.us Inspected By: Aaron Westerburg Inspection Tech Home Inspection Report Prepared For: Mr. & Mrs. Homebuyer Property
More informationPresentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals
Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional
More informationBefore You Start an Energy Efficiency Retrofit The Building Envelope
ABOUT YOUR HOUSE Before You Start an Energy Efficiency Retrofit The Building Envelope The building envelope is the outer layer of the building that separates the indoor living space from the outdoor environment,
More informationPROPERTY INSPECTION REPORT
Whisper Computer Solutions, Inc. P.O. Box 690502 San Antonio, TX 78269-0502 Phone: (210)681-6325 Fax: (210)681-6325 Email: support@whispersolutions.com PROPERTY INSPECTION REPORT Prepared For: Concerning:,
More information19 Ellis Park Road, Toronto
19 Ellis Park Road, Toronto Inspection Report September 9, 2015 19 Ellis Park Road, Toronto Inspection Report Overall Condition: This is a solidly built older double-brick home that is in fairly original
More informationHousing Quality Standards Inspection Checklist
Housing Quality Standards Inspection Checklist To prevent delays, the R.T.A. must be complete and upon submission the unit must be in move in condition or an inspection will not be conducted. A Fair Housing
More informationDepartment: Manager: Safety Coordinator: Date:
SAFETY and staff, regardless of hiring status or job position 1 1. Can staff name their department safety coordinator? 2. Is the Department Safety Binder current? 3. Do slip/trip hazards exist? 4. How
More information2640 Fountain View Drive Houston, Texas 77057 713.260.0600 P 713.260.0547 TTY www.housingforhouston.com OCCUPANCY TECHNICIAN: PHONE NUMBER:
HOUSING CHOICE VOUCHER PROGRAM A PROPERTY OWNER S GUIDE TO HCVP LEASE-UP OCCUPANCY TECHNICIAN: PHONE NUMBER: Property Manager: Thank you for your interest in leasing to a Housing Choice Voucher Program
More informationBY-LAW CONCERNING THE SANITATION AND MAINTENANCE OF DWELLING UNITS
CITY OF MONTRÉAL BY-LAW 03-096 BY-LAW CONCERNING THE SANITATION AND MAINTENANCE OF DWELLING UNITS As the municipal administration seeks to ensure that all Montrealers benefit from acceptable housing conditions;
More informationBoard Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities
Board Seminar Facilities School Year 2012-2013 Submitted by Joseph L. Lisa-Director of Facilities High School Installed new fence for Pre-K activities by weight room. Installed new rails and side walks
More informationA guide to understanding and maintaining your home s electrical system. A publication presented by the Electrical Safety Foundation International
A guide to understanding and maintaining your home s electrical system A publication presented by the Electrical Safety Foundation International What s Inside? Everything you need to know Should You Do-It-Yourself?
More informationSECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK
SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions
More informationAll work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.
DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,
More informationHome Inspection Report
4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:
More informationVision Home Inspection
Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the
More informationAmmonia Detection System Codes and Design Specifications
Ammonia Detection System Codes and Design Specifications December 28, 2015 Revision 5 920 N Trade Winds Pkwy Columbia, MO 65201 Ammonia detection system codes and design specifications Following is a discussion
More informationPATTERSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationPortable Air Conditioner
Portable Air Conditioner Owner's Manual Model:3 in 1 12,000 Btu/h Series 3 Please read this owner s manual carefully before operation and retain it for future reference. CONTENTS 1. SUMMARY...1 2. PORTABLE
More information2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT
Presentation Synopsis Heating, Ventilating and Air Conditioning Building Condition Assessment Vancouver, B.C. Prepared for: EPIC Prepared by: Douglas Spratt, P.Eng Douglas Spratt & Associates Ltd. www.dspratt-associates.com
More informationChignecto-Central Regional School Board. Highland Consolidated Middle School. Indoor Air Quality Issues Mechanical Systems
Chignecto-Central Regional School Board Highland Consolidated Middle School Mechanical Systems Prepared by: Neil Van Rossum, P.Eng. CJ MacLellan & Associates Antigonish, Nova Scotia November 2012 CJM File:
More informationAcumen Enterprises, Inc.
Hourly rates Discount w/o Rebate Electrician $78.00 10% $70.20 $70.73 HVAC Technician $78.00 10% $70.20 $70.73 Insulator $42.00 10% $37.80 $38.08 Sheet Metal Worker $74.00 10% $66.60 $67.10 Plumber/Pipefitter
More informationALUMINUM ELECTRICAL WIRING
ALUMINUM ELECTRICAL WIRING prepared by Fire Prevention and Investigation Division Denver Fire Department Department of Safety and Electrical Inspections Section Denver Building Inspection Division Community
More informationORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation
More informationElement D Services Plumbing
Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.
More informationCHARLOTTE COUNTY Community Development Department
CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50
More informationHeating, Ventilation, Air Conditioning and Refrigeration (HVACR)
Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) I. Demonstrate safety skills in typical HVACR work situations to NATE Core Installer Knowledge Areas for Technician Excellence for Safety
More informationQuestions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project
Questions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project The Watergate Community is currently in the process with the fire suppression and interior renovations
More informationHow To Handle An Emergency At A Strata Corporation
24 HOUR ANSWERING SERVICE The regular office hours at our firm are 9:00 am to 5:00 pm Monday to Friday. After these regular hours, the same telephone number is answered by a Telephone Answering Service,
More informationExterior Condition Report
Scope of Work for Property Located at: 3918-20 West Cherry Street Date: 3/10/2014 Property is: Single Family Duplex Below is the minimum requirement to meet health and safety issues. The City of Milwaukee,
More informationELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1
KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1
More informationJuly 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following:
ADDENDUM NO. 2 TO REQUEST FOR QUALIFICATIONS FOR NEW DEVELOPMENT OF OAKLAND UNIFIED SCHOOL DISTRICT PROPERTIES, INCLUDING THE PARCELS HOUSING THE PAUL ROBESON ADMINISTRATION BUILDING AND DEWEY HIGH SCHOOL
More informationTENANT AND LANDLORD REPAIR RESPONSIBILITIES
TENANT AND LANDLORD REPAIR RESPONSIBILITIES REPAIR LANDLORD TENANT Notifying Repairs Any alteration or improvement you have carried out to the property Permission required Water damage caused by push-on
More informationCONDITION OF QUALITY ITEMS
CONDITION OF QUALITY ITEMS FOUNDATION Always look for moisture problems and any bulges or irregularities in the walls. Lines on the walls or floors may indicate water problems. Have these been cured? If
More informationD Sample Notices to Property Owners, Sample Affidavits, and Other Material
D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully
More informationADDENDUM No. 2. RFP No. 14-15/27, Oakland Maintenance Center Facility Management Services
Purchasing Department 530 Water Street Oakland, CA 94607 March 6, 2015 ADDENDUM No. 2 RFP No. 14-15/27, Oakland Maintenance Center Facility Management Services This Addendum modifies the original RFP Documents
More informationSAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT
SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer
More informationREQUIREMENT 5. Light Switches, Electrical Outlets, Thermostats, and Other Environmental Controls in Accessible Locations
Chapter Five: REQUIREMENT 5 Light Switches, Electrical Outlets, Thermostats, and Other Environmental Controls in Accessible Locations 5...covered multifamily dwellings with a building entrance on an accessible
More informationVideoconferencing Room Guide
Videoconferencing Room Guide IVN RoomGuide.doc Page 1 Introduction This guide will serve as a tool to plan the design and implementation of a videoconference room. The information in this guide should
More informationAll substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
More information