1 Numerical Modeling of Dam Failure Phenomenon Using Software and Finite Difference Method Somaye Soleymani 1, Hamidreza Golkar* 2, Hamzee Yazd 3, Mojtaba Tavousi 4 1 Department of water engineering, Ferdows Branch, Islamic Azad University, Ferdows, Iran; 2 Department of Planning, Regional Water Company of Khorasan Razavi, Mashhad, iran 3 Department of water engineering, Ferdows Branch, Islamic Azad University, Ferdows, Iran 4 Department of water engineering, Ferdows Branch, Islamic Azad University, Ferdows, Iran Received 19 July 2015, Revised 12 Nov 2015, Accepted 15 Nov 2015 * Corresponding Author. [email protected] Abstract Dams are of manmade engineering structures that are directly related to water and its destructive forces. Despite all remarkable advantages of these structures, they exposed to threat of destruction and failure. This causes increasing risk potential at dam downstream. This paper studied possible failure phenomenon of Bidvaz dam, Esfarayen, through Mike 11 software and using definite difference method by the help of aerial photographs, topographical maps and AutoCAD and global mapper software. Moreover, regarding the crack (breach) created in the aforementioned dam, the break and failure place is the balance of the created breach. The research results and peak discharge of dam failure following 3 hours and 34 minutes and 26 seconds of dam failure seen around Esfarayen city. Furthermore, level of peak discharge of dam failure in city surrounding was m 3 /s indicating the 2.47% reduction in failure peak discharge from dam to city area. This percentage seems reasonable according to the high steep river as well as river low width resulted by flood plains. Keywords: Dam failure, peak discharge, numerical modeling, Mike 11 software 1. Introduction According to large financial and life damages of dam failure, this phenomenon considered as one of the most devastating disasters. In spite of all advantages of dams in flood controlling, fisheries, supplying of drinking water and agriculture, power generation, and increased quality of water resources, they are exposed to threat, destruction and failure like all manmade structures. This increased risk potential at dams downstream. Studies show that dam failure can create larger discharge even heavier than the predictable raining at dams downstream. Predicting the flood wave (flood water) resulted from dam failure and the time of approaching to the site downstream is of critical hydraulic issues. In this research, according to reports of instrumentations and expert observing of dam downstream, an approximate one meter deposition seen at upstream dam roof, which increasingly intensified up to where the issue of Bidvaz dam failure turned into a critical, strategic issue. Therefore, this paper studies failure phenomenon of this dam and the resulted flood zoning and its consequences. Several solutions of dam failure introduced and a numerical model presented through finite difference method. The numerical model numerically solves unsteady streams equations in one-dimension. The research seeks for achieving the objectives such as studying failure phenomenon of Bidvaz Dam, Esfarayen, and its consequences, studying flood depth, velocity, and maximum discharge at the entrance of Esfarayen city. Thus, the following questions raised to meet the aforementioned goals: where is the hole (crack) placed and at which level it occurred? What is the maximum discharge crossing failure section? When the peak discharge 3143
2 resulted from dam failure approaches to Esfarayen and in what volume? What is the maximum water depth around Esfarayen city and what is the width of the 25-year flow in this area? 2. Research history and related works In general, damages caused by dam failure flood are not only limited to flood depth, but also depend on other factors such as flow rate. One proper methods of considering speed parameter is using risk matrix method. Du plessis (2000), Adriaans (2001), Stephenson (2002), Ross (2003), Fatorrelli et al (2003), and Vrouwenvelder et al (2003) studied the effect of flow rate on dam failure consequences [2]. They suggested various risk matrices by integrating speed parameter with any parameters of flood depth, probability of dam failure and or the percentage of flood damages. Wood et al [7] experimentally and numerically studied dam failure flows in canals with 90 degree bend. She conducted this study with 2-dimensional equations (SWE). Aureli et al [8] experimentally and numerically evaluated hydrodynamic force and load imposing on dam and resulting in to failure through using two- and three-dimensional mathematical models. Kocaman et al [9], in a study, investigated dam failure caused by effective shocking waves on a vertical wall through empirical testing and CFD simulation based on VOF. Abbasi and Ismaili [10], in modeling dam hydraulic failure resulted from sudden flood by Fluent software, examined dam failure phenomenon in one-dimension condition and two states of flood and failure and failure with no flood through using Fluent software. Studies demonstrated that the effect of applied network on results is much more important than time step. Bani hashemi et al [11], in the 2-dimension dam failure model based on Fred and Mac Cormac, showed that combining the two methods of Fred and Mac Cormac with second order accuracy and adding artificial viscosity is able to model dam gradual failure and resolving of shock flow despite its simplicity. Abareshi et al [12], in risks of Taragh dam failure, studied Taragh concrete dam failure in the vicinity of Mashhad city by using MIKE 11 software in which areas at the risk of flooding identified by combining flood speed and depth maps through risk matrix; further, each area risk rate determined, too. Toufani and Ahmadi [13], in numerical modeling of dam gradual failure, presented modeling method of dam gradual erosion by an initial gap on the crown to start the erosion. Finally, model results compared with the results of a laboratory sample and a field test. The provided charts represent a relatively good consistence. Seiyfi zade et al [14] studied PolRud dam failure caused by passing and flood routing in downstream through using BREACH GUI model. Flood routing performed using HEC-RAS model in order to determine dam failure effects. Mohammadnezad et al [15] simulated dam failure and the resulted wave diffusion through using limited volume numerical method in right two dimensions. Montazeri naming et al [16], in simulating the wave of Maronik Dam failure, introduced a one and two-dimension numerical model for simulating dam failure flooding. Godariz et al [17] presented function of earth dam failure risk analysis due to body overflow regarding uncertainty of some input parameters. Numerical models are known as one of the strong means of evaluating dam failure flood. Now, there are various models of studying dam failure phenomenon. Table 1 shows developed numerical models of dam failure around the world. 2.1.Studying findings of dam failure, following results obtained: The highest dam failures belonged to small dams. The highest failures belonged to the new constructed dams. It is interesting that 70% of dam failures occurred within the first ten years of utilization. The major failure actor in concrete dams was foundation. 3144
3 Table 1: Dam failure numerical models Raw Model Owner 1 DAM BRK USA/National weather service 2 SMPDBK USA/National weather service 3 BOSS DAMBRK BOSS International 4 HAESTED DAMBRK HAESTED METHOD 5 UKDAMBRK Binnie&Partner 6 DWAFDAMBRK Department of water affair and forestry Pretoria 7 HEC Program USA-COE 8 LATIS Tams 9 DBK1 IWHR-China 10 DBK2 IWRH-china 11 TVDDAM Royal Institute of technology-stockholm 12 RUBAR3 Cemagref 13 RUBAR20 Cemagref 14 CASTOR Cemagref 15 SOBEK Delft hydraulics 16 DELFT2D Delft hydraulics 17 DYX10 Reiter consulting engineers 18 DYNET ANU-Reiter 19 RECAS Enel centro di ricerca idraulica 20 DYNET ANU rieter 21 MIKE DHI 22 FLORIS ETH zurich 23 TELEMAC EDF In earthen (Embankment) and rockfilldams, the first failure factor was dams overflow, erosion of dam body, and weak foundations. Dam overflow along with internal erosion reported as the major failure factor in building dams. Saint-Venant equations and MIKE numerical model One-dimension equations of unsteady flow in open channels referred as equations. The equations consisted of two individual equations of continuity and momentum. Almost important phenomena of hydraulic flow in waterways have unsteady flow. In such condition, the flow depth or speed changes in term of tome. Flow condition at flood time is one instances of unsteady flow. Gradual, unsteady flows well stated by flow one-dimension differential equations in the form of Saint-Venant. The equations are as follows. Q A ql x t 2 1 v v v y g t x 2g x S f 0 (1-3) The following questions answered by the aid of Mike software: in which areas the flood occurred and what is water balance exceed level at flooding? What are long-term environmental effects of changes in pollution load? 3145
4 Where sediments deposit in the river and how are the river general morphological changes? What is the maximum pollutants concentration in some particular points following urban or industrial pollutants entrance? Of the existing models of Mike software, hydrodynamic model (HD) module as the main core of software is the basis of almost other modules including flood prediction (FF), diffusion and transfer (AD), water quality (WQ) and sediment transfer (ST). MIKE 11 hydrodynamic module implicitly solves continuity and momentum equations by using numerical method of Abbott-Ionescu and finite difference method in unsteady state and conducts the calculations of unsteady flow at estuaries, lakes, and reservoirs. Solving Saint-Venant equations by finite differences method requires all unknown of a selected time step determined in the previous time step. Unsteady mode equations may not be solved for the first time step and must be identified with primary requirements for the model. Flow characteristics measured according to the provided border conditions and based on the permanent flow equations. The estimations are later used as the primary requirements. It suggested that if the information is not adequate, the primary requirements of initiating the calculations assigned to the program itself. Two internal and external border conditions are defined in MIKE 11. Internal border conditions are indeed internal nodes and the start and end points of any river branches. Further, the points with hydraulic structures or lateral flow also defined as an internal border point. In addition to internal border points, external borders also selected for network measurements. These points are indeed system input and output points, which can be in one of the following forms: Fixed h or Q values h(x0,t) = h Q(x0,t)=Q h and Q values changing with time h(x0,t) = h(t) Q(x0,t)=Q(t) The relation between h an Q like height- hydraulic conductivitycurve Where Q and h are the known values of h and Q h=f(q) or Q=h(x0,t) 2.2.Introducing understudied area and dam Bidvaz Dam is located at 19 km of northeast of Esfarayen City at the longitude of 57 and 37 and northern latitude of 37 and 05. The dam is accessed through the main road connecting Esfarayen City to Ardoghan village. The nearest village to dam site is Denj village situated at about one km of dam axis around dam reservoir area. Figures 1 and 2 illustrate understudied area. Figure 1: Dam site and understudied area 3146
5 Figure 2: Dam site and understudied area In term of river system, waterway path at the dam site axis originated from Shah Jahan Mountains in eastern Alborz mountain range; it initially flows in eastern-western direction and redirected along west south-east north once it joined to Parchin branch. It receives water flow of several sub branches and enters into dam axis passing Ardoghan, Denj and Hassan Abad Ab Pakhsh; finally, it entered to Esfarayen City and ended to downstream in Jovin River. Table 2 illustrates general characteristics of catchment area at dam axis site. Table 2: Dam catchment area characteristics at dam axis site River name Bidvaz Basin (km 2 ) 518 Basin area (km 2 ) 117 Equivalent rectangle length (km) 47.6 Equivalent rectangle width (km) 10.9 Basin average slope 3.75 Basin maximum height (m) 3084 Basin minimum height (m) 1300 Basin average height (m) 2117 The main channel length (km) 57.5 The constructed dam consists of various and heterogeneous sectors. The non-permeable section of dam main body is composed of an upstream-oriented clay core. The materials used here has low permeability around 10-7 Cm/sec placed at the 20 cm Shotcrete layer implemented on stone floor and modified alluvial deposit. The clay core at 1533 level (balance) has 5 m width and rightlycontinues up to 1519 level with 1 horizontal to 10 right slope. The width of clay core at this level is 7.8 m. At this level, the upstream slope of clay core of 1 horizontal to 1.4 right and downstream slope of 1 horizontal to 1.2 right extends up to stone or alluvial foundation level in any section. The maximum sectional width of clay core on alluvium equals The clay core utmost height from river bed disregarding screen heightis 61 m. Due to unavailable adequate materials in the vicinity, the wide clay core excluded. However, designing inclined core and concentrating on filter granular designing, diameter as well as the recommended materials for the core, defensive predictions determined against the crack of different factors. The materials used in dam clay core were supplied by fine-grain materials in Denj village located at least 1 km from dam site. The amount of materials passing sieve 200 is in the range of 50-98% and the amount of clay grains at diameter less than mm is within 18-20%. Material fluidity limit is from 20 to 38 and the pasty factor is in the range of Experiments of preset sources demonstrate the divergence feature of these materials. Table 3 shows dam general characteristics and Figure 3 represents dam main components. 3147
6 Table 3: Dam general characteristics Dam reservoir total volume m 3 Dead volume m 3 Useful volume m 3 Water level normal balance 1530 m from sea level Maximum level of sedimentation from sea Annual average inflow to the level reservoir m 3 Average flow of middle sub-basin m 3 Drinking water m 3 Water allocated to water rights m 3 Net cultivated area 4900 hec Average annual water supply in agriculture m 3 Average evaporation losses of lake surface m m mmmmmm mm 1 1m Figure 3: Dam main elements (components) According to conducted experiments, soil mechanical features are as follows: C uu = 0.4 Kg/cm 2 uu = 0 C cu = 0.4 Kg/cm 2 uu = 21 C = 0.4 Kg/cm 2 uu = 22 The relationships of surface-volume- height in dam reservoir are provided in Table 4 regarding conducted studies. Table 4: Data of surface-volume-height curve in dam reservoir Sea level (m) Prior to sedimentation Surface (Hec) )Volume (million m 3 ) \
7 2.3. Dam failure numerical modeling through MIKE 11 software The data required in numerical model includes the geometry of waterways network and rivers in plan, crosssections features, border conditions and hydrodynamic data. Plan of river geometry applied by using satellite images and the digital file received from Aster satellite images and scrutinized by data of field mapping in this area. Figure 4 shows the digital file used in this area for determining river course. The model required data provided as follows: - Preparing and collecting required data and statistics including maps, aerial images, digital files, and hydrologic information of dam catchment basin - Studying reports of dam phases 1 and 2 - Providing geometry of basin related waterways and rivers network in plan using satellite images and the digital file received from Aster satellite images and scrutinized by data of field mapping in this area (Figure 5). - Characterizing cross-sections: cross-sections offered based on filed mapping file in understudied area. Totally, 1334 cross sections entered in numerical model in understudied area. Figure 6 represents some created cross sections in software context. - Characterizing border conditions: in border condition at the entrance, the constant flow rate of 100 m 3 /s used with dam failure onset. In n output boundary condition, the riverdischarge-scale curve used given the steady flow at this cross section and according to numerical model capabilities. Figure 7 shows the used dischargescale curve at downstream output border condition of Esfarayen City. - Providing hydrodynamic data - Applying MIKE 11 software and inputting data to software - Creating basic files: RIVER NETWORK, CROSS SECTIONS, SIMULATION, BONDARY CONDITION, NEW HYDRODYNAMIC MODULDE OF MIKE ZERO software - Data required in numerical model include geometry of waterways network and rivers in plan, characteristics of cross sections, border conditions and hydrodynamic data. Figure 4: Digital file of dam area and downstream by USGS Figure 5 represents the geometrical plan of waterways network modeled in MIKE software. 3149
8 [meter] Standard - ssss.res [meter] Figure 5: Waterway network and topography lines in understudied area Figure 6: Cross section at m distance from sample dam site Figure 7: Cross section at distance of m from sample dam site 3150
9 تراز J. Mater. Environ. Sci. 6 (11) (2015) Soleymani et al. Figure 8: Cross section at m distance from sample dam site In input boundary condition, the steady flow rate of 100 m 3 /s was used along with dam failure onset. In output boundary condition, river discharge-scale curve was used assuming the steady flow rate at this cross section and according to the used numerical model potentials. Figure 9 shows the discharge-scale curve used at model output boundary condition in downstream of Esfarayen city. 1195; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; ; 1158 Discharge m3/s Figure 9: Discharge-scale curve at downstream section 3151
10 3. Results and discussion Failure phenomenon modeling requires determining primary characteristics of tube formation in earthen dam body. In this regard, and according to lack of such information, different numerical scenarios with variable initial pipe diameter created and implemented. Figure 10 illustrates changes in peak discharge against pipe different initial diameter at the beginning of dam failure phenomenon. initial diameter, 0.4; initial diameter, 0.6; Initial diameter initial diameter, 0.8; initial diameter, 1.0; initial diameter, 5.0 initial initial diameter, 10.0; diameter, 20.0, Figure 10: Studying the effect of various pipe diameters in determining maximum discharge of dam failure Failure initial diameter measured based on trial and error. To do this, average width of gap was firstly measured based on equation 1; then, the model implemented in gap initial widths; and finally, gap width and average width are measured. Bavg = K0Vw^0.32hb^0.19 (1) Where, Bavg is the gap average width (m), Cb is the function of reservoir storage, and K 0 is the flyover factor, S is the tank volume (m 3 ), tf is the time of gap development (hour), Vw gap high volume at the time of complete development (m 3 ), hd dam height (m), hw is gap high height at the time of canal development (m). As seen in the figure, pipe increased initial diameter reduces the maximum peak discharge, which is attributed to the pipe ability in transferring more charge during failure phenomenon in the pipe larger initial diameters at the earthen dam body. Moreover, increasing pipe diameter up to 5 m higher has no effect on reducing flow peak discharge. It further assumes that the initial diameter of the pipe created in the body of earthen dam is 0.8 m and modeling scenarios conducted by this initial diameter. Figure 11 shows flow extending along understudied area influenced by dam failure with the initial pipe diameter of 0.8 m. Figure 12 represents changes in water surface on dam axis in various times. As seen in the figure, water level reduces due to dam failure; furthermore, the level of 1530 selected as the normal level and it is assumed that this tank level has head potential at dam failure in upstream. Figure 13 shows hydrographic changes of dam failure in different sections at about 2 km distances in 21-km range from dam downstream. As seen in the picture, dam failure maximum discharge at first section is m 3 /s and m 3 /s at the last section in km distances. This indicates that river capacity in reducing peak discharge is 17.2%. 3152
11 Figure 11: Changes in water surface due to dam failure along understudied area 3153
12 Figure 12: Changes of water surface in tank site during dam failure time [m^3/s] Time Series Discharge Discharge BRANCH BRANCH BRANCH BRANCH BRANCH BRANCH BRANCH BRANCH BRANCH :00: :00:00 04:00:00 06:00:00 08:00:00 10:00:00 Figure 13: Chart of flood volume in different sections depending on time Figure 14 represents Esfarayen city position comparing Bidvaz Dam and understudied area. 3154
13 [meter] Standard - ssss.res Figure 14: Dam position to Esfarayen City [meter] Figure 15 shows hydrograph distribution of dam failure in different areas of Esfarayen City. As seen in figure, peak discharge of dam failure, in m chart at dam downstream, observed following 3 hours and 34 minutes and 26 seconds of dam failure in the surrounding of Esfarayen. Furthermore, the amount of peak discharge resulted by dam failure in urban area equals m 3 /s demonstrating 2.47% decrease in failure peak discharge from dam site to city surrounding. This percent interpreted according to river high slope as well as river low width resulted by flood plain. As figure of changes in water level of Esfarayen City at the km in dam downstream reveals that maximum water depth in Esfarayen resulted from dam failure is 8.01 m. It is impossible to widen sections width over dam failure in 1007 m due to topographical conditions. As last chart demonstrates, according to the area s topography conditions in downstream area of Esfarayen city, it is possible to higher enlarge flood flow in these areas. Figure 16 shows changes in water level at dam downstream caused by dam failure phenomenon. As seen in the figure, dam failure event initially reduces water level by mild rate; next, by turning speed reaches to 1495; then, the speed of water level reduction decreases. Figure 17 and 18 show the flooding area in dam downstream at different times. As clearly shows in the picture, river flooding area is largely influenced by river high slope in the upstream of Esfarayen city. [m^3/s] Time Series Discharge [meter] Time Series Water Level :00: :00:00 02:00:00 03:00:00 04:00:00 05:00:00 06:00:00 07:00:00 08:00:00 09:00:00 10:00:00 11:00:00 Changes in water depth over m from dam downstream in the area of Esfarayen 00:00: :00:00 02:00:00 03:00:00 04:00:00 05:00:00 06:00:00 07:00:00 08:00:00 09:00:00 10:00:00 11:00:00 Changes in water depth over m from dam downstream in the area of Esfarayen 3155
14 [meter] Time Series Water Level [meter] Time Series Flow Width :00: [meter] :00:00 02:00:00 03:00:00 04:00:00 05:00:00 06:00:00 07:00:00 08:00:00 09:00:00 10:00:00 11:00:00 Changes in water level at Esfarayen city downstream Time Series Flow Width :00: :00:00 02:00:00 03:00:00 04:00:00 05:00:00 06:00:00 07:00:00 08:00:00 09:00:00 10:00:00 11:00:00 Changes in flow width of dam downstream and in upstream in Esfarayen city [m^2] Time Series Flow Area :00: :00:00 02:00:00 03:00:00 04:00:00 05:00:00 06:00:00 07:00:00 08:00:00 09:00:00 10:00:00 11:00:00 Changes in flow width in the surrounding of Changes in flow surface at Esfarayen city Esfarayen city downstream Figure 15: Hydrograph distribution resulted from dam failure in different areas of Esfarayen city 00:00: :00:00 02:00:00 03:00:00 04:00:00 05:00:00 06:00:00 07:00:00 08:00:00 09:00:00 10:00:00 11:00:00 [meter] Time Series Water Level :00:00 01:00:00 02:00:00 03:00:00 04:00:00 05:00:00 06:00:00 07:00:00 08:00:00 09:00:00 10:00:00 11:00: Figure 16: Reduced underground water level in the area of Bidvaz Dam Figure 17: Distribution of flood area resulted from dam failure 1 hour and 47 minutes following dam failure onset Figure 18: Distribution of flooding area resulted from dam failure 7 hours and 9 minutes after dam failure 3156
15 Conclusion - The major part of dam failures occurred during the first to tenth years of utilization. Dams dewatering must be conducted in consistence with standards and instructions. - Proper utilization and installing warning systems is necessary at dams upstream and downstream. - The defect of Bidvaz dam caused by imperfect studies and designing. There are lots of such earthen dams emerged in the country, which are threatened by failure. Thus, earthen dams require more attention regarding international criteria at the time of designing and utilization in order to decrease the risk of destructing these structures. - The more the pipe maximum diameter in dam body, the larger decrease in dam failure maximum discharge. This may be related to the pipe ability in transferring more charge during failure phenomenon. Moreover, larger pipe diameter than 5 m has no effect on reducing flow peak discharge. - Dam failure maximum discharge at the first section is m 3 /s and m 3 /s at the last section in m of dam downstream demonstrating the river capacity in reducing 17.2% of peak discharge. - Peak discharge resulted from dam failure seen 3 hours, 34 minutes and 26 seconds following dam failure in the area of Esfarayen city. Further, dam failure peak discharge in city equals m 3 /s, which shows 2.47% reduction in failure peak discharge from dam site to city. This amount is interpretable according to the river high slope as well as its low width caused by flood plain. - Due to dam failure phenomenon, water level initially reduces in mild speed; next, the speed increases until the level approaches to 1495; then, the rate of water level reduction decreased. - Maximum water depth, caused by dam failure, in Esfarayen city is 8.01 m. Furthermore, according to seabed limitation and privacy maps, the 25-year flow at this section equals 27.5 m. - In Esfarayen city, the area of maximum flooding plain is almost 2 times more than its area in upstream, which is influenced by river topography. In addition, the flow wideness and distribution increases in downstream, too. Recommendations - Many instructive lessons learnt from the total failed dams, which each group related to effective factors. Applying the numbers of failed dams and analyzing failure effective factors can be good direction in dam construction management. - Economic and technical analyses should be in a way that implement according to schedule so that they are safe with flood through less risk. - According to the 380 m area of flood plain in the city, it recommended that appropriate land using such as parks, parking lots, or sport courts founded in order to maintain security level of downstream regions if any dam failure occurred. - Establishing a flood alarming system at downstream as well as constructing peak discharge reduction strap floors at upstream in Esfarayen city may be effective in decreasing peak discharge. - Regarding the identified problems of dam failure in the region, the primary priority at dam downstream is to create human security, which requires considering access levels in the area. - The crisis priority and navigation maneuver in the region based on different organizations convergence approach involved in flood issues with the suggested chart may lead to synergy and better crisis management. References 1. ICOLD, (1998),"Dam Break Flood Analysis, Review and recommendations". 2. Huang Y., (2008), "Appropriate Modeling For Integrated Flood Assessment", Ph.D.Thesis, Civil Engineering Department, University of Twente, The Netherlands. 3. Dam Failures Statistical Analysis Icold Bul.No Dncergok T., (2007), "The Role of Dam Safety in Dam-Break Induced Flo Management", International Congress River Basin Management, Antalya, Turkey, March. 3157
16 5. Vrouwenvelder A., Van der Veen, A., Stuyt, L.C.P.M and Reinders, J.E.A., (2003),"Methodology for Flood Damage Evaluation", Delft Cluster Seminar: The Role of Flood Impact Assessment in Flood Defense Policies, IHE, Delft, The Netherlands. 6. Fread D.L., and J.M. Lewis, 1998, "NWS FLDWAV Model: The Replacement of DAMBRK for Dam- Break Flood Prediction," Hydrologic Research Laboratory, National Weather Service (NWS), NOAA Silver spring, marylnd Wood A., K.Wang, 2015, "Modeling dam-break flows in channels with 90 degree bend usingan alternating-direction implicit based curvilinear hydrodynamic solver," Computers & Fluids 114 (2015) Aureli F., S.Dazzi, A.Maranzoni, P.Mignosa, R.Vacondio, "Experimental and numerical evaluation of the force due to the impactof a dam-break wave on a structure," Advances in Water Resources 76 (2015) Kocaman S., H.Cagatay, "Investigation of dam-break induced shock waves impact on a vertical wall," Journal of Hydrology, Volume 525, June 2015, Pages Esmaili, K., and Abbasi, B. Modeling of Dam Hydraulic Failure caused by sudden flood through Fluent software. Fifth national conference of Civil Engineering, 4-6 May 2010, Ferdowsi University of Mashhad, Mashhad, Iran. 11. Bani hashemi et al. 2-dimension dam failure model by Fred and Mac Cormac approach. 4 th national conference of Civil Engineering, May 2008, University of Tehran, Iran. 12. Abareshi, M., Hosseini, S.M., and Jafarzade, M.R. Studying the risks of Taragh dam failure. Fifth national conference of Civil Engineering, 4-6 May 2010, Ferdowsi University of Mashhad, Mashhad, Iran. 13. Toufani and Ahmadi. Numerical modeling of dam gradual failure. 6 th national conference of Civil Engineering, April Semnan University, Iran. 14. Seiyfizade et al. Studying Polroud dam failure caused by passing and flood routing at downstream. Research journal of watershed management, fall and winter Sciences and Natural Resources University, Sari. 15. Mohammad nejad et al. Dam failure and its resulting wave propagation through using finite volume numerical method. Quarterly of Environment and Civil Engineering, 2014, University of Tabriz. 16. Montazeri naming et al. Simulation of the wave caused by dam failure through 1- and 2-dimension models; case study: Maroon Dam. 4 th National Conference of Civil Engineering, University of Tehran, Tehran. 17. Godarzi et al. Analyzing risk and uncertainty of earthen dam; case study: Doroudzan Dam in Fars province. Iran water research journal, fall and winter 2013, Shahr e- Kurd University. (2015) ;
Simulating Sedimentation Model in Balarood Dam Reservoir Using CCHE2D Software
Bulletin of Environment, Pharmacology and Life Sciences Bull. Env. Pharmacol. Life Sci., Vol 4 [1] December 2014: 67-72 2014 Academy for Environment and Life Sciences, India Online ISSN 2277-1808 Journal
USSD Workshop on Dam Break Analysis Applied to Tailings Dams
USSD Workshop on Dam Break Analysis Applied to Tailings Dams Antecedents Newtonian / non-newtonian flows Available models that allow the simulation of non- Newtonian flows (tailings) Other models used
Numerical Investigation of Angle and Geometric of L-Shape Groin on the Flow and Erosion Regime at River Bends
World Applied Sciences Journal 15 (2): 279-284, 2011 ISSN 1818-4952 IDOSI Publications, 2011 Numerical Investigation of Angle and Geometric of L-Shape Groin on the Flow and Erosion Regime at River Bends
Dam-break flood plain model by WMS
2011 2nd International Conference on Environmental Engineering and Applications IPCBEE vol.17 (2011) (2011) IACSIT Press, Singapore Dam-break flood plain model by WMS Mahdi Moharrampour 1+, Amin Khodabandeshahraki
Effect of Changes in the Hydraulic Conditions on the Velocity Distribution around a L-Shaped Spur Dike at the River Bend Using Flow-3D model
Technical Journal of Engineering and Applied Sciences Available online at www.tjeas.com 2013 TJEAS Journal-2013-3-16/1862-1868 ISSN 2051-0853 2013 TJEAS Effect of Changes in the Hydraulic Conditions on
NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN)
NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN) *Reza Naghmehkhan Dahande 1 and Ahmad Taheri 2 1 Department of Civil Engineering-Water Management, Islamic Azad
2D Modeling of Urban Flood Vulnerable Areas
2D Modeling of Urban Flood Vulnerable Areas Sameer Dhalla, P.Eng. Dilnesaw Chekol, Ph.D. A.D. Latornell Conservation Symposium November 22, 2013 Outline 1. Toronto and Region 2. Evolution of Flood Management
MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING
1 MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING This note is intended as a general guideline to setting up a standard MIKE 21 model for applications
CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow
CHAPTER 9 CHANNELS APPENDIX A Hydraulic Design Equations for Open Channel Flow SEPTEMBER 2009 CHAPTER 9 APPENDIX A Hydraulic Design Equations for Open Channel Flow Introduction The Equations presented
Employing Appropriate Software for Dam break Analysis and Flood Line rendering
Employing Appropriate Software for Dam break Analysis and Flood Line rendering 1. Background The specialist field of Dam Safety has been developing in SA since about the 80 s. This has led to a well-developed
Emergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
FLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM
FLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM Dr. Murat Ali HATİPOĞLU Fatih KESKİN Kemal SEYREK State Hydraulics Works (DSI), Investigation and Planning Department
SIMULATION OF SEDIMENT TRANSPORT AND CHANNEL MORPHOLOGY CHANGE IN LARGE RIVER SYSTEMS. Stephen H. Scott 1 and Yafei Jia 2
US-CHINA WORKSHOP ON ADVANCED COMPUTATIONAL MODELLING IN HYDROSCIENCE & ENGINEERING September 19-21, Oxford, Mississippi, USA SIMULATION OF SEDIMENT TRANSPORT AND CHANNEL MORPHOLOGY CHANGE IN LARGE RIVER
Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs
US Army Corps of Engineers Hydrologic Engineering Center Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs October 1966 Approved for Public Release. Distribution Unlimited.
Hydrologic Engineering Techniques for Regional Water Resources Planning
US Army Corps of Engineers Hydrologic Engineering Center Hydrologic Engineering Techniques for Regional Water Resources Planning October 1969 Approved for Public Release. Distribution Unlimited. TP-17
Using HEC-RAS for Dam Break Studies
Using HEC-RAS for Dam Break Studies August 2014 Approved for Public Release. Distribution Unlimited. TD-39 REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 The public reporting burden for this
Lecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used:
Lecture 24 Flumes & Channel Transitions I. General Characteristics of Flumes Flumes are often used: 1. Along contours of steep slopes where minimal excavation is desired 2. On flat terrain where it is
Appendix 4-C. Open Channel Theory
4-C-1 Appendix 4-C Open Channel Theory 4-C-2 Appendix 4.C - Table of Contents 4.C.1 Open Channel Flow Theory 4-C-3 4.C.2 Concepts 4-C-3 4.C.2.1 Specific Energy 4-C-3 4.C.2.2 Velocity Distribution Coefficient
SIMULATION TIGRIS RIVER FLOOD WAVE IN MOSUL CITY DUE TO A HYPOTHETICAL MOSUL DAM BREAK
SIMULATION TIGRIS RIVER FLOOD WAVE IN MOSUL CITY DUE TO A HYPOTHETICAL MOSUL DAM BREAK Thair M. Al-Taiee 1 and Anass M. M. Rasheed 2 1 Assist. Prof., Research Center for Dams and Water Resources, Mosul
Exercise (4): Open Channel Flow - Gradually Varied Flow
Exercise 4: Open Channel Flow - Gradually Varied Flow 1 A wide channel consists of three long reaches and has two gates located midway of the first and last reaches. The bed slopes for the three reaches
SIMPLIFIED INUNDATION MAPS FOR EMERGENCY ACTION PLANS. National Dam Safety Review Board Emergency Action Plan Workgroup
SIMPLIFIED INUNDATION MAPS FOR EMERGENCY ACTION PLANS National Dam Safety Review Board Emergency Action Plan Workgroup EXECUTIVE SUMMARY Development of Emergency Action Plans (EAPs) for all high and significant
AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA
AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA GÁBOR KEVE 1, GÉZA HAJNAL 2, KATALIN BENE 3, PÉTER TORMA 4 EXTRAPOLATING
The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin
The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin Dr.Phattaporn Mekpruksawong 1, Thana Suwattana 2 and Narong Meepayoong 3 1 Senior Civil Engineer, Office of Project Management,
Catchment Scale Processes and River Restoration. Dr Jenny Mant [email protected]. The River Restoration Centre therrc.co.uk
Catchment Scale Processes and River Restoration Dr Jenny Mant [email protected] The River Restoration Centre therrc.co.uk 3 Main Catchment Elements Hydrology Energy associated with the flow of water affects
Interactive comment on A simple 2-D inundation model for incorporating flood damage in urban drainage planning by A. Pathirana et al.
Hydrol. Earth Syst. Sci. Discuss., 5, C2756 C2764, 2010 www.hydrol-earth-syst-sci-discuss.net/5/c2756/2010/ Author(s) 2010. This work is distributed under the Creative Commons Attribute 3.0 License. Hydrology
Integrated Water and Sediment Management of Yellow River
Keeping Health Life of Yellow River: Integrated Water and Sediment Management of Yellow River Shang Hongqi Yellow River Conservancy Commission 18 March 2009 Istanbul, Turkey Outline: I. Yellow River Characteristic
FLOW CONDITIONER DESIGN FOR IMPROVING OPEN CHANNEL FLOW MEASUREMENT ACCURACY FROM A SONTEK ARGONAUT-SW
FLOW CONDITIONER DESIGN FOR IMPROVING OPEN CHANNEL FLOW MEASUREMENT ACCURACY FROM A SONTEK ARGONAUT-SW Daniel J. Howes, P.E. 1 Charles M. Burt, Ph.D., P.E. 2 Brett F. Sanders, Ph.D. 3 ABSTRACT Acoustic
Backwater Rise and Drag Characteristics of Bridge Piers under Subcritical
European Water 36: 7-35, 11. 11 E.W. Publications Backwater Rise and Drag Characteristics of Bridge Piers under Subcritical Flow Conditions C.R. Suribabu *, R.M. Sabarish, R. Narasimhan and A.R. Chandhru
URBAN DRAINAGE CRITERIA
URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities
Sediment Entry Investigation at the 30 Degree Water Intake Installed at a Trapezoidal Channel
World Applied Sciences Journal (): 82-88, 200 ISSN 88-4952 IDOSI Publications, 200 Sediment Entry Investigation at the 30 Degree Water Intake Installed at a Trapezoidal Channel 2 2 Mehdi Karami Moghadam,
STATE OF COLORADO DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES GUIDELINES FOR DAM BREACH ANALYSIS
STATE OF COLORADO DEPARTMENT OF NATURAL RESOURCES DIVISION OF WATER RESOURCES OFFICE OF THE STATE ENGINEER DAM SAFETY BRANCH GUIDELINES FOR DAM BREACH ANALYSIS February 10, 2010 Telephone (303) 866-3581
Evaluation of Open Channel Flow Equations. Introduction :
Evaluation of Open Channel Flow Equations Introduction : Most common hydraulic equations for open channels relate the section averaged mean velocity (V) to hydraulic radius (R) and hydraulic gradient (S).
What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation)
OPEN CHANNEL FLOW 1 3 Question What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation) Typical open channel shapes Figure
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Environmental Data Management Programs
Hydrologic Engineering Centre (HEC) Software CD Collection of programs, developed by the U.S. Army Corps of Engineers Environmental Data Management Programs Name: HEC-DSS Package Purpose: Data Storage
Quality Assurance Reviews of Hydraulic Models Developed for the Central Valley Floodplain Evaluation and Delineation Program
Quality Assurance Reviews of Hydraulic Models Developed for the Central Valley Floodplain Evaluation and Delineation Program Techniques Applied and Lessons Learned Seth Ahrens, P.E., CFM Selena Forman,
Flood Zone Investigation by using Satellite and Aerial Imagery
Flood Zone Investigation by using Satellite and Aerial Imagery Younes Daneshbod Islamic Azad University-Arsanjan branch Daneshgah Boulevard, Islamid Azad University, Arsnjan, Iran Email: [email protected]
ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND
ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning
Shooks Run Drainage Study Basic Terminology
Shooks Run Drainage Study Basic Terminology PREPARED FOR: PREPARED BY: City of Colorado Springs CH2M DATE: April 9, 2015 Introduction This document is intended to provide an introduction to Colorado Springs
How To Understand And Understand The Flood Risk Of Hoang Long River In Phuon Vietnam
FLOOD HAZARD AND RISK ASSESSMENT OF HOANG LONG RIVER BASIN, VIETNAM VU Thanh Tu 1, Tawatchai TINGSANCHALI 2 1 Water Resources University, Assistant Professor, 175 Tay Son Street, Dong Da District, Hanoi,
10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management
40 slide sample of Presentation Please contact [email protected] if you would like the complete presentation Key Principles to Current Stormwater Management Distributed Control Measures Integrated
Optimizing the hydraulic designing of pressurized irrigation network on the lands of village Era by using the computerized model WaterGems
Optimizing the hydraulic designing of pressurized irrigation network on the lands of village Era by using the computerized model WaterGems Ali Ghadami Firouzabadi 1 and Majid Arabfard 2 1. Ali Ghadami
THE UNIVERSITY OF TRINIDAD & TOBAGO
THE UNIVERSITY OF TRINIDAD & TOBAGO FINAL ASSESSMENT/EXAMINATIONS APRIL 2014 Course Code and Title: Programme: Date and Time: Duration: HYDRAULICS FLUD2006 BASc. Civil Engineering Wednesday 16 th April,
The Hydrologic Cycle. precipitation evaporation condensation transpiration infiltration surface runoff transport groundwater water table.
The Hydrologic Cycle Page 1 of 1 Name Directions: The hydrologic cycle consists of the processes that change and move water through the earth s system. Use the terms below to label the hydrologic cycle.
2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT
2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT Open channel flow is defined as flow in any channel where the liquid flows with a free surface. Open channel flow is not under pressure; gravity is the
STORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
Estimation of Adjacent Building Settlement During Drilling of Urban Tunnels
Estimation of Adjacent Building During Drilling of Urban Tunnels Shahram Pourakbar 1, Mohammad Azadi 2, Bujang B. K. Huat 1, Afshin Asadi 1 1 Department of Civil Engineering, University Putra Malaysia
Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes
Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological
DAM BREACH MODELING AN OVERVIEW OF ANALYSIS METHODS. Tony L. Wahl, Hydraulic Engineer, Bureau of Reclamation, Denver, CO, twahl@usbr.
DAM BREACH MODELING AN OVERVIEW OF ANALYSIS METHODS Tony L. Wahl, Hydraulic Engineer, Bureau of Reclamation, Denver, CO, [email protected] Abstract The two primary tasks in the analysis of a potential dam
Evaluation of Forest Road Network Planning According to Environmental Criteria
American-Eurasian J. Agric. & Environ. Sci., 9 (1): 91-97, 2010 ISSN 1818-6769 IDOSI Publications, 2010 Evaluation of Forest Road Network Planning According to Environmental Criteria Amir Hosian Firozan,
Impact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan
Impact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan H. S. M. Hilmi 1, M.Y. Mohamed 2, E. S. Ganawa 3 1 Faculty of agriculture, Alzaiem
USING DETAILED 2D URBAN FLOODPLAIN MODELLING TO INFORM DEVELOPMENT PLANNING IN MISSISSAUGA, ON
22nd Canadian Hydrotechnical Conference 22e Conférence canadienne d hydrotechnique Water for Sustainable Development : Coping with Climate and Environmental Changes L eau pour le développement durable:
Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts
LARS 2007 Catchment and Lake Research Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts Seleshi Bekele Awulachew International Water Management Institute Introduction
FLOOD FORECASTING PRACTICE IN NORTHERN CALIFORNIA
FLOOD FORECASTING PRACTICE IN NORTHERN CALIFORNIA California Department of Water Resources Post Office Box 219000, Sacramento, California 95821 9000 USA By Maurice Roos, Chief Hydrologist ABSTRACT Although
CITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
Open Channel Flow 2F-2. A. Introduction. B. Definitions. Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow
Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow 2F-2 Open Channel Flow A. Introduction The beginning of any channel design or modification is to understand the hydraulics of the stream. The
SUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
INDONESIA - LAW ON WATER RESOURCES,
Environment and Development Journal Law LEAD INDONESIA - LAW ON WATER RESOURCES, 2004 VOLUME 2/1 LEAD Journal (Law, Environment and Development Journal) is a peer-reviewed academic publication based in
Using CFD to improve the design of a circulating water channel
2-7 December 27 Using CFD to improve the design of a circulating water channel M.G. Pullinger and J.E. Sargison School of Engineering University of Tasmania, Hobart, TAS, 71 AUSTRALIA Abstract Computational
APPLICATION OF GIS AND REMOTE SENSING IN IRRIGATION NETWORKS MANAGEMENT
Tenth International Water Technology Conference, IWTC10 2006, Alexandria, Egypt 21 APPLICATION OF GIS AND REMOTE SENSING IN IRRIGATION NETWORKS MANAGEMENT Sherif M. El-Sayed Researcher, Hydraulics Research
Experiment (13): Flow channel
Introduction: An open channel is a duct in which the liquid flows with a free surface exposed to atmospheric pressure. Along the length of the duct, the pressure at the surface is therefore constant and
Topic 8: Open Channel Flow
3.1 Course Number: CE 365K Course Title: Hydraulic Engineering Design Course Instructor: R.J. Charbeneau Subject: Open Channel Hydraulics Topics Covered: 8. Open Channel Flow and Manning Equation 9. Energy,
Chapter 9. Steady Flow in Open channels
Chapter 9 Steady Flow in Open channels Objectives Be able to define uniform open channel flow Solve uniform open channel flow using the Manning Equation 9.1 Uniform Flow in Open Channel Open-channel flows
CHAPTER: 6 FLOW OF WATER THROUGH SOILS
CHAPTER: 6 FLOW OF WATER THROUGH SOILS CONTENTS: Introduction, hydraulic head and water flow, Darcy s equation, laboratory determination of coefficient of permeability, field determination of coefficient
Prattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM
A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM Giang Pham Hong, Michel Hotakhanh, Nga Pham Hong, Hoai Nam Nguyen, Abstract:Dams have been taken an important role in time and surface redistribution of water for
Effect of barrages on water level in estuaries
Indian Journal of Geo-Marine Sciences Vol. 43 (7), July 2014, pp. 1364-1369 Effect of barrages on water level in estuaries S S Chavan *, M D Sawant, Prabhat Chandra & T Nagendra Central Water and Power
Open channel flow Basic principle
Open channel flow Basic principle INTRODUCTION Flow in rivers, irrigation canals, drainage ditches and aqueducts are some examples for open channel flow. These flows occur with a free surface and the pressure
TENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
Basic Principles of Channel Design
United States Department of Agriculture Natural Resources Conservation Service Stream Restoration Design Chapter 7 Basic Principles of Channel Design Issued August 2007 Cover photo: Where modification
OPEN-CHANNEL FLOW. Free surface. P atm
OPEN-CHANNEL FLOW Open-channel flow is a flow of liquid (basically water) in a conduit with a free surface. That is a surface on which pressure is equal to local atmospheric pressure. P atm Free surface
CONTROL FLOODING AT LOW AREAS OF MARGINAL EXPRESSWAY TIETÊ RIVER IN THE CITY OF SAO PAULO, BRAZIL
CONTROL FLOODING AT LOW AREAS OF MARGINAL EXPRESSWAY TIETÊ RIVER IN THE CITY OF SAO PAULO, BRAZIL A. P. Canholi 1, W. D. Vichete¹ and J. T. Ishihara 1 1. Hidrostudio Engenharia, Rua Cardoso de Almeida,
Chapter 12 - HYDROLOGICAL MEASUREMENTS
Water Quality Monitoring - A Practical Guide to the Design and Implementation of Freshwater Quality Studies and Monitoring Programmes Edited by Jamie Bartram and Richard Ballance Published on behalf of
Management of flooding downstream of dams
Management of flooding downstream of dams Attachment to Victoria State Flood Emergency Plan Version 1.0 (6 February 2013) This plan is produced by the Victoria State Emergency Service and Department of
Open Channel Flow. M. Siavashi. School of Mechanical Engineering Iran University of Science and Technology
M. Siavashi School of Mechanical Engineering Iran University of Science and Technology W ebpage: webpages.iust.ac.ir/msiavashi Email: [email protected] Landline: +98 21 77240391 Fall 2013 Introduction
COMPARING DSS-WISE- LITE TO OTHER DAM BREACH SOFTWARE
National Dam Safety Program Technical Seminar No. 22 Dam Breach Modeling and Consequence Assessment National Emergency Training Center February 18-19, 2015 Emmitsburg, MD Brian Shane Cook, PE, LSIT formerly
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.
Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank
Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. Detention Ponds. CIVL 1112 Detention Ponds - Part 1 1/12
CIVL 1112 - Part 1 1/12 The water cycle, also known as the hydrologic cycle, describes the continuous movement of water on, above and below the surface of the Earth. The water cycle, also known as the
Lecture 4: Streamflow and Stream Gauging
Lecture 4: Streamflow and Stream Gauging Key Questions 1. What is stream discharge and what controls its magnitude? 2. What is a hydrograph? 3. Where is the velocity highest in a stream? 4. Where is the
IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure
IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure (December 2013) IUCN does not engage in projects which involve the design, construction or rehabilitation
Text and photos: Juha Siekkinen, Life+ Return of Rural Wetlands Cover drawing: Jari Kostet Maps and aerial photos: National Land Survey of Finland
Life+ Return of Rural Wetlands Pikku Nuoluanjärvi Wetlands, Liminka Text and photos: Juha Siekkinen, Life+ Return of Rural Wetlands Cover drawing: Jari Kostet Maps and aerial photos: National Land Survey
Stability Assessment of Chamshir Dam Based on DEM, South West Zagros
2015 2nd International Conference on Geological and Civil Engineering IPCBEE vol. 80 (2015) (2015) IACSIT Press, Singapore DOI: 10.7763/IPCBEE. 2015. V80. 13 Stability Assessment of Chamshir Dam Based
Chapter 13 OPEN-CHANNEL FLOW
Fluid Mechanics: Fundamentals and Applications, 2nd Edition Yunus A. Cengel, John M. Cimbala McGraw-Hill, 2010 Lecture slides by Mehmet Kanoglu Copyright The McGraw-Hill Companies, Inc. Permission required
Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness
3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component
2. THE TEORRETICAL OF GROUND PENETRATING RADAR:
Sixteenth International Water Technology Conference, IWTC 16 2012, Istanbul, Turkey 1 THE USE OF GROUND PENETRATING RADAR WITH A FREQUENCY 1GHZ TO DETECT WATER LEAKS FROM PIPELINES Alaa Ezzat Hasan Ministry
HYDRAULICS. H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long
HYDRAULICS H91.8D/C - Computerized Open Surface Tilting Flow Channel - 10, 12.5, 15 and 20 m long 1. General The series of channels H91.8D has been designed by Didacta Italia to study the hydrodynamic
Dr. Lidija Globevnik Luka Snoj, Neven Verdnik, Peter Muck. Meta Povž
The concept of ecological restoration of a sub-alpine river and its tributaries in Slovenia Suggestions for regulation of riverbed and reconstruction of hydrotechnical facilities Dr. Lidija Globevnik Luka
BEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA.
BEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA. Claus Brøgger 1 and Poul Jakobsen 2 The present paper presents measurements and results from a three year full scale Pilot Project with the
CEE 370 Fall 2015. Laboratory #3 Open Channel Flow
CEE 70 Fall 015 Laboratory # Open Channel Flow Objective: The objective of this experiment is to measure the flow of fluid through open channels using a V-notch weir and a hydraulic jump. Introduction:
Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978)
Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978) I. An Example Culvert Design Design a concrete culvert using the
Outlet stabilization structure
Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural
WEPP MODEL APPLICATIONS FOR EVALUATIONS OF BEST MANAGEMENT PRACTICES
WEPP MODEL APPLICATIONS FOR EVALUATIONS OF BEST MANAGEMENT PRACTICES D.C. FLANAGAN 1, W.J. ELLIOT 2, J.R. FRANKENBERGER 3, C. HUANG 4 1 USDA-Agricultural Research Service, National Soil Erosion Research
Risk and vulnerability assessment of the build environment in a dynamic changing society
Risk and vulnerability assessment of the build environment in a dynamic changing society Limnei Nie SINTEF Building and infrastructure, P.O.Box 124 Blindern, NO-0314 Oslo, Norway. [email protected]
Experiment 3 Pipe Friction
EML 316L Experiment 3 Pipe Friction Laboratory Manual Mechanical and Materials Engineering Department College of Engineering FLORIDA INTERNATIONAL UNIVERSITY Nomenclature Symbol Description Unit A cross-sectional
How To Model A Horseshoe Vortex
Comparison of CFD models for multiphase flow evolution in bridge scour processes A. Bayón-Barrachina, D. Valero, F.J. Vallès Morán, P. A. López-Jiménez Dept. of Hydraulic and Environmental Engineering
GIS in Wastewater Collection System Master Planning
Page 1 of 6 GIS in Wastewater Collection System Master Planning Brad Roeth, EIT Stanley Consultants, Inc. This paper presents the use of GIS in a wastewater collection system master plan. The master plan
Chapter 2. Derivation of the Equations of Open Channel Flow. 2.1 General Considerations
Chapter 2. Derivation of the Equations of Open Channel Flow 2.1 General Considerations Of interest is water flowing in a channel with a free surface, which is usually referred to as open channel flow.
ANALYSIS OF A ANTROPIC INFLUENCES IN A FLOODPLAN
ANALYSIS OF A ANTROPIC INFLUENCES IN A FLOODPLAN M.C.S. Pereira 1&2 ; J.R.S. Martins 1 ; R.M. Lucci 2 and L.F.O.L, Yazaki 2 1. Escola Politécnica da Universidade de São Paulo, Brazil 2. Fundação Centro