1 Indian Journal of Geo-Marine Sciences Vol. 43 (7), July 2014, pp Effect of barrages on water level in estuaries S S Chavan *, M D Sawant, Prabhat Chandra & T Nagendra Central Water and Power Research Station, Khadakwasla, Pune-24, India *[ sudheer_chavan@rediff.com] Received 12 August 2013; revised 25 November 2013 Barrage is to utilize the fresh water on the u/s side of barrage and also to prevent the mixing of saline water during nonmonsoon by fully closing the gates. During the monsoon season, the salinity of the water in Valvanta River becomes very low of about less than 5 ppt due to the predominant effect of River discharges. These types of studies are very vital for the water harnessing projects particularly on Western Ghats where the short estuaries drain into the sea without the water being utilized much. In the present study, is an attempt to predict the changes in the hydrodynamic conditions in the downstream side of barrage at Virdi by using the 1-D model HEC RAS for different operational and tidal conditions. [Keywords: Barrage, Tidal reflection, Submergence, Water level, Current] Introduction The west coast of India is subjected to rainfalls and fresh water discharges during the southwest monsoon from June to September and the salinity mixing process in this region show seasonal effects. Unlike east flowing Rivers in the Deccan area, the west flowing Rivers in the western ghat region are characterized by very short lengths, say within 100 km and are estuarine in most of their reaches. Due to the change in the pattern of rain and reduction in the rainfall, the River flow reduces in the lean seasons and almost goes dry. The saline water intrusion takes place into the estuarine Rivers which further restricts the use of water by cultivators during the lean months and thus causing water shortage and result in restriction of development activities.it has been noticed thatsince the last decade, there has been consistent increase in the usage of the River water for irrigation and domestic purpose mainly due to the increase in the area under cultivation, increase in the demand of drinking water and increase in industrial demand for water. In order to arrest intrusion of saline water into the River and for storing fresh water in the upstream which would be used for agriculture, industry and domestic purpose, the construction of barrages/bandharas have been proposed in Western Ghats and Goa region. Materials and Methods The integrated estuarine system of the Mandovi Zuari-Cumbarjua canal is prominent in Goa state. A barrage with gates is under construction at Virdi on Valvanta River, a tributary of Mandovi estuary in Goa state. This barrage is located at about 6.0 km upstream from the River confluence with Mandovi River and the confluence is located at about 13 km u/s of the Mandoviestuary mouth (Fig. 1). The proposed barrage is of open type with width of m across the Riverand has 4 nos. of openings of size 8.50 m 4.0 m to allow for the flood discharges.the hydraulic conditions in the integrated system of Mandovi Zuari Cumbarjua canal have their effects on the hydrodynamics of the Valvanta River which is a tributary of Mandovi River. In present paper, the case study of barrage construction at Virdi across Valvanta River has been presented to estimate the likely effects of rise in the Fig.1 Index plan
2 CHAVAN et al.: EFFECT OF BARRAGES ON WATER LEVEL IN ESTUARIES 1365 water levels and change in flow conditions by the analysis of hydraulic, hydrographic and hydrologic data of prototype and using suitable 1-D mathematical modeling technique. Physical and hydraulic features of Mandovi estuary Mandovi Zuari Cumbarjuais major estuarine system in Goa on the west coast of India (Fig. 1) which provided excellent sites for not only major port development at Mormugao but also many sites for fisheries harbour development and ship yards so also for inland navigation for iron ore export. At the confluence of the Mandovi estuary with the Arabian Sea, an embayment of Aguada bay exists with a width of 3.2 km at the entrance of estuary and further upstream, a shallow sandy bar exists. The width of the bay reduces to about 600 m near Tejo point with depths of about 7 m to 8 m. Further upstream, the width of the River channel is about 400 to 500 m and the depths are about 3 to 4 m for a reach of about 50 km. The total length of Mandovi estuary is about 70 km. The tidal currents are m/s in most of the reaches. The salinity mixing in the Mandovi estuary is influenced by the action of tidal flow and fresh water discharges while the influence of waves on the mixing process is marginal.the tidal prism in the Mandovi estuary is estimated to be about 30 mm 3. Prototype data in respect of currents, salinity, tides were collected by CWPRS in July and September of 1981 in the Mandovi River, Goa so as to cover two different rates of upland River discharges. The available prototype data on velocity and water level were used for calibration of 1D mathematical model in the present study. Tides Tides in the estuary are semidiurnal with pronounced diurnal inequality having considerable difference in the tidal ranges and the elevation of low waters and high waters in the successive tidal cycles 1. The spring tidal range at Mandovi is about 2.4 m. typical tide observed at Mormugao is shown in Fig. 2. Hydrologic Data The estuarine system is situated in a coastal region which receives most of the rainfall during southwest monsoon season only. The fresh water discharges in the Rivers are significant during southwest monsoon period (June to September) only. The fresh water discharge data for the Mandovi River pertains to year 1971, 1977 and 1978 which have been collected on the Rivers Madei and Candepar (by the southern gauging division of CWC). The data on other tributaries of the Mandovi River are not readily available. The variation of the River discharge is spasmodic and it is found that the River discharge rises to a very large magnitude and falls again within a couple of days. The hydrograph of Mandovi River based on the available data are shown in Fig. 3. The spasmodic variation of River discharge in the Mandovi River is evident from the nature of hydrograph. The maximum discharge in Mandovi River during the observation period was 4463 m 3 /s which occurred on Hydrographic Data Water Resources Department, Goa furnished plan, L-profile and cross-sections of Valvanta River on 4.5 km downstream of Virdi Barrage. The hydrographic survey charts (scale 1:2500) of Mandovi River, Zuari River and Cumbarjua canal were available at CWPRS. These hydrographic surveys were carried out by Minor Ports Survey Organization (Government of India) from 2000 to The cross-section data used in model studies is prepared by digitizing these hydrographic charts and numbers of cross-sections are decided based on depth variations. About 94 cross-sections were taken in Mandovi River, 57 cross-sections in Zuari River, Fig. 2 Typical tide as observed at Mormugao Hydrograph of Year 1971 Hydrograph of Year Hydrograph of Year 1978 Fig. 3 Hydrograph in Mandovi River during 1971, 1977 and 1978
3 1366 INDIAN J MAR SCI VOL 43 NO 7, JULY cross-sections in Cumbarjua canal and 45 cross-sections in Valvanta River. Surface water resources in Goa The Goa state has nine Rivers, of which six Rivers originate and flow exclusively within the state boundaries and do not have any interstate implications. However, Terekhol and Chapora Rivers originate in Maharashtra while Mandovi River originates in Karnataka state. All the Rivers except Sal in the south originates on western slopes and subsequently meanders over falls and rapids into the coastal plains (during young/initial) stage, from where they tend to become sluggish (during mature stage) and then ultimately joins estuary mouth and then into the sea (old stage). Out of the nine Rivers in the state, rough estimation reveals that basin-wise average runoff is of the tune of about 8436 Mcum. The entire water resource should not be mistaken as available for harnessing. As assessed by Central Water Commission (CWC), the water resource of Goa is 8570 mm 3. Many of these rivers are tidal prone up to a distance of km and utilizable part of the yield should necessarily be identified basin wise. The Valvanta River is originating from the Western Ghats in the border state of Maharashtra and Karnataka. The Valvanta River is one of the tributaries of Mandovi River and finally joins the Arabian Sea. 1- D mathematical model studies About the Model The 1D HEC-RAS software was developed by U.S. Army corps of Engineers, Hydrologic Engineering Centre (HEC), California, and U.S.A. This software allows one to perform one-dimensional steady flow, unsteady flow calculations. HEC-RAS is an integrated system of software designed for interactive use in a multi-tasking, multi-user network environment. The system is comprised of a graphic user interface (GUI), Table 1 Surface water resources in Goa Sr. No. Name of the River basin Length within the state Length within salinity zone Basin AreaSq.kms Average runoff (MCM) 1 Terekhol Chapora Baga Mandovi Zuari Sal Saleri Talpona Galgibag Total separate hydraulic analysis components, data storage and management capabilities, graphics and reporting facilities. The HEC-RAS system contains three dimensional hydraulic analysis components for: 1 Steady flow water surface profile computations 2 Unsteady flow simulation, and 3 Moveable boundary sediment transport computation A key element is that all three components use a common geometric data representation and common geometric and hydraulic computation routines. In addition to the three hydraulic analysis components, the system contains several hydraulic design features that can be involved once the basic water surface profiles are computed. Unsteady flow simulation HEC-RAS model simulates gradually varied flow and subcritical unsteady flow by continuity and momentum equations. The continuity equation describes conservation of mass for the onedimensional system and the momentum equation states that the rate of change of momentum is equal to the external forces acting on the system, and these equations are the basis for the unsteady flow solution within the software are described below. Continuity Equation Conservation of mass for a control volume states that the net rate of flow into the volume be equal to the rate of change of storage inside the volume. The final form of continuity equation is as follows: A Q q1 0 (1) t where, Q = Discharge q = lateral inflow per unit length 1
4 CHAVAN et al.: EFFECT OF BARRAGES ON WATER LEVEL IN ESTUARIES 1367 A = total cross sectional flow area x = distance along the channel t = time Momentum Equation Conservation of momentum for a control volume states that net rate of momentum entering the volume (momentum flux) plus the sum of all external forces acting on the volume is equal to the rate of accumulation of momentum. The final form of momentum equation is as follows: Q Q z v ga gas f t 0 (2) where, S f = slope of the energy grade line (friction slope) A i = wetted cross sectional area v = velocity through area z = water surface slope The most successful and accepted procedure for solving these one dimensional unsteady flow equations is the four-point implicit scheme, also known as box scheme. Under this scheme, space derivatives and function values are evaluated at an interior point. The Mandovi Zuari Cumbarjua canal system with tributaries like Madei, Candepar, Narora, and rogar, Mapuca, Sanguem and Valvanta are modelled with the help of 1-D mathematical model HEC RAS (version 4.0). The plan of Mandovi Zuari Cumbarjua canal estuarine system simulated1d HEC- RAS model is shown in Fig. 4. The prediction of water levels, velocities and discharges on upstream and downstream of a Barrage at Virdi with vertical lift gates (sluice gates) for different tidal phase s viz * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * 3.318* * * * * * * * * * * 2.918* * * 2.008* * * * * * * * * * 2.085* * * * * * Fig. 4 Plan of Mandovi Zuari Cumbarjua canal estuarine system simulated1d HEC-RAS mode * * spring and neap for non-monsoon season were determined under existing condition as well as for fully close gate condition. HEC-RAS 4.0 was selected for studies because it has the ability to model inline weirs and gated structures with radial gates or sluice gates and bridges. The available hydraulic data such as discharges, velocities, tide levels etc. collected in the field studies program by CWPRS during was used for simulation and calibration of the model. The various conditions studied are as below: Input parameters and boundary conditions Both upstream and downstream boundary conditions were given since the model was to perform a mixed flow regime calculation. Unsteady flow in terms of stage hydrograph (tide level in the sea) was given as downstream boundary condition and flow hydrographs were given as an upstream boundary condition. For non-monsoon existing condition, a steady flow of 10 cumecs was given as an upstream boundary condition for all rivers along with their tributaries. For monsoon July average discharge existing condition as well as with sluice gates, corresponding steady discharges of different rivers were given as upstream boundary condition. Similarly peak hydrographs were given as an upstream boundary condition for monsoon peak discharge existing condition as well with sluice gates condition. The model was simulated for 4 days with computational interval of 30 seconds with output interval of 15 minutes. Calibration of model The water levels and their respective time lags were observed at different locations were matching with prototype data observed at locations in Mandovi river, Zuari river and Cumbarjua canal. The comparison of observed water levels in meters and time lag in minutes in HEC-RAS model and the same in the prototype for existing condition (without barrage) is given in Table 2. The model results are validated with the data collected in Mandovi estuary during field studies conducted by CWPRS in Spring tide non-monsoon under existing condition The model was run for 48 hours for non-monsoon season under existing condition with spring tide. The bed level of 100 m in the model corresponds to chart datum. The plot of water level vs. channel distance
5 1368 INDIAN J MAR SCI VOL 43 NO 7, JULY 2014 Table 2 Calibration of Hec-Ras model Location LW Prototype LW Hec-Ras HW Prototype HW Hec-Ras Lag(m) Lag Lag(m) Lag(m) Panjim Jetty Confluence of Mandovi and to to to Cumbarjua canal to D/s of confluence of Tonca and Cumbarjua canal -0.1 to to to Near d/s end of Cumbarjual canal to to to Elevation (m) mandov i riv er Plan: v irdi-report-nm-spring-existing valvanti 1 Legend EG Max WS WS Max WS Crit Max WS Ground Elevation (m) mandov i riv er Plan: n-m spring with barrage at Virdi cross-sectiion at Virdi barrage Station (m) Legend EG Max WS WS Max WS Ground Bank Sta Main Channel Distance (m) Fig. 5 Longitudinal profile of Valvanta River for spring tide non-monsoon (existing condition) has been shown in Fig. 5. It is observed from Fig. 5 that the maximum water level is well below average bank level (+6.0 m) of Valvanta River. The maximum velocity in Valvanta River was observed to be about 0.8 m/s.the systematic variations in water levels were found in Valvanta River as per tidal phase due to insignificant discharges in non- monsoon. Neap tide non-monsoonunder existing condition The model was run for 48 hours simulation period of prototype under non-monsoon and existing condition with neap tide. It is observed that the maximum water surface level in Valvanta River was not exceeding 2.0 m above C.D. which is well below average bank level (+6.0 m). The maximum velocity was found to be about 0.58 m/s in Valvanta River. The systematic variation in water levels is found as per tidal phase due to insignificant discharge in non-monsoon. Spring tide non-monsoon with a Barrage at Virdi Fig. 6 Cross-section of Valvanta River for spring at Virdi Barrage (Gates fully closed) (Gates fully closed) The HEC-RAS model 2 was run for 48 hours simulation period of prototype under non-monsoon spring tide condition with a Barrage at Virdi (Gates fully closed). The cross section of the Valvanta River with fully closed gate condition is shown in Fig. 6. The longitudinal profile of Valvanta River for maximum water surface is given in Fig. 7. It is observed that the maximum water surface in the downstream of the barrage is not exceeding 2.2 m above C.D and the maximum water surface in the upstream of the barrage is not exceeding 3.0 m above C.D. The maximum water levels in Valvanta River was not exceeding average bank level (+6.0 m) both on upstream and downstream of the barrage. The maximum velocity in Valvanta Riveris found to be 1.0 m/s at about 3 km downstream of Virdi barrage and maximum velocity is about 0.9 m/s in the upstream reaches of the barrage. Results and Discussions The HEC RAS 1 D Mathematical model was utilized to assess the water levels and velocity conditions as a result of construction of gated barrage at Virdi in Valvanta River. It was observed during the studies that there is no significant effect on the water level and velocities in the downstream region of the barrage due to fully closure of the gates in
6 CHAVAN et al.: EFFECT OF BARRAGES ON WATER LEVEL IN ESTUARIES 1369 Elevation (m) mandov i riv er Plan: n-m spring with barrage at Virdi valvanti Main Channel Distance (m) Legend EG Max WS WS Max WS Crit Max WS Ground Fig. 7 Longitudinal profile of Valvanta River for spring tide non-monsoon with barrage nonmonsoon season. The water levels would remain below the existing bank levels in the downstream region of Virdi barrage after full closure of the gates. It is observed that the water levels with proposed barrage at Virdi will be marginally higher than the existing condition and the same trend was observed for the velocities. The tidal range also reduces considerably from the mouth of the Mandovi estuary upto the location of Virdi barrage in Valvanta River due to steeper gradients in upstream reaches of Valvanta River. The tidal excursion from inlet of Mandovi estuary is estimated to be about 27 km. The salinity values are also not likely to be modified in the downstream region of the barrage due to full closure of the gates. In the upstream region, the salinity conditions will be modified gradually after the closure of the gates during nonmonsoon season. Conclusions Abundant fresh water flows available in estuaries on Western Ghats which presently drained into Arabian Sea, can be harnessed effectively by constructing barrages with controlling gates. The 1D mathematical model is a very effective tool in the analysis of the tidal regime and change in water levels in estuaries in order to assess the primary viability. The detailed hydraulic studies are required to be supported adequately with prototype data on bathymetry, rainfall, velocity, salinity and sediment etc. The proposed construction of barrageat Virdi across the Valvanta River would not adverselyaffectthe hydraulic conditions in respect of water levels and velocities in upstream and downstream regions for the fully closed gate condition during the nonmonsoon season. Acknowledgements The authors are thankful to Dr. I. D. Gupta, Director, CWPRS, for his kind permission to publish this paper. References 1 Sundar, D. and Shetye, S. R., Tides in the Mandovi and Zuari estuaries, Goa, west coast of India. Journal of Earth System Sciences, (5): Brunner, G. W., 2010, HEC-RAS River Anaylsis System - Hydraulic reference manual, U.S.Army Corps of Engineers, 411 p.
The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin
The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin Dr.Phattaporn Mekpruksawong 1, Thana Suwattana 2 and Narong Meepayoong 3 1 Senior Civil Engineer, Office of Project Management,
More informationEnvironmental Data Management Programs
Hydrologic Engineering Centre (HEC) Software CD Collection of programs, developed by the U.S. Army Corps of Engineers Environmental Data Management Programs Name: HEC-DSS Package Purpose: Data Storage
More informationAppendix 4-C. Open Channel Theory
4-C-1 Appendix 4-C Open Channel Theory 4-C-2 Appendix 4.C - Table of Contents 4.C.1 Open Channel Flow Theory 4-C-3 4.C.2 Concepts 4-C-3 4.C.2.1 Specific Energy 4-C-3 4.C.2.2 Velocity Distribution Coefficient
More informationCHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow
CHAPTER 9 CHANNELS APPENDIX A Hydraulic Design Equations for Open Channel Flow SEPTEMBER 2009 CHAPTER 9 APPENDIX A Hydraulic Design Equations for Open Channel Flow Introduction The Equations presented
More informationFLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM
FLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM Dr. Murat Ali HATİPOĞLU Fatih KESKİN Kemal SEYREK State Hydraulics Works (DSI), Investigation and Planning Department
More informationHow To Understand And Understand The Flood Risk Of Hoang Long River In Phuon Vietnam
FLOOD HAZARD AND RISK ASSESSMENT OF HOANG LONG RIVER BASIN, VIETNAM VU Thanh Tu 1, Tawatchai TINGSANCHALI 2 1 Water Resources University, Assistant Professor, 175 Tay Son Street, Dong Da District, Hanoi,
More information2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT
2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT Open channel flow is defined as flow in any channel where the liquid flows with a free surface. Open channel flow is not under pressure; gravity is the
More informationPerforming a Steady Flow Analysis
C H A P T E R 7 Performing a Steady Flow Analysis This chapter discusses how to calculate steady flow water surface profiles. The chapter is divided into two parts. The first part discusses how to enter
More informationEvaluation of Open Channel Flow Equations. Introduction :
Evaluation of Open Channel Flow Equations Introduction : Most common hydraulic equations for open channels relate the section averaged mean velocity (V) to hydraulic radius (R) and hydraulic gradient (S).
More informationSIMULATION OF SEDIMENT TRANSPORT AND CHANNEL MORPHOLOGY CHANGE IN LARGE RIVER SYSTEMS. Stephen H. Scott 1 and Yafei Jia 2
US-CHINA WORKSHOP ON ADVANCED COMPUTATIONAL MODELLING IN HYDROSCIENCE & ENGINEERING September 19-21, Oxford, Mississippi, USA SIMULATION OF SEDIMENT TRANSPORT AND CHANNEL MORPHOLOGY CHANGE IN LARGE RIVER
More informationMIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING
1 MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING This note is intended as a general guideline to setting up a standard MIKE 21 model for applications
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.
More information2D Modeling of Urban Flood Vulnerable Areas
2D Modeling of Urban Flood Vulnerable Areas Sameer Dhalla, P.Eng. Dilnesaw Chekol, Ph.D. A.D. Latornell Conservation Symposium November 22, 2013 Outline 1. Toronto and Region 2. Evolution of Flood Management
More informationHEC-RAS. River Analysis System. Applications Guide. Version 4.1 January 2010. US Army Corps of Engineers Hydrologic Engineering Center CPD-70
US Army Corps of Engineers Hydrologic Engineering Center HEC-RAS HEC-RAS River Analysis System Applications Guide Version 4.1 January 2010 Approved for Public Release. Distribution Unlimited CPD-70 REPORT
More informationExercise (4): Open Channel Flow - Gradually Varied Flow
Exercise 4: Open Channel Flow - Gradually Varied Flow 1 A wide channel consists of three long reaches and has two gates located midway of the first and last reaches. The bed slopes for the three reaches
More informationUSING DETAILED 2D URBAN FLOODPLAIN MODELLING TO INFORM DEVELOPMENT PLANNING IN MISSISSAUGA, ON
22nd Canadian Hydrotechnical Conference 22e Conférence canadienne d hydrotechnique Water for Sustainable Development : Coping with Climate and Environmental Changes L eau pour le développement durable:
More informationChapter 13 OPEN-CHANNEL FLOW
Fluid Mechanics: Fundamentals and Applications, 2nd Edition Yunus A. Cengel, John M. Cimbala McGraw-Hill, 2010 Lecture slides by Mehmet Kanoglu Copyright The McGraw-Hill Companies, Inc. Permission required
More informationHEC-RAS River Analysis System
Table of Contents US Army Corps of Engineers Hydrologic Engineering Center HEC-RAS River Analysis System Hydraulic Reference Manual Version 4.1 January 010 Approved for Public Release. Distribution Unlimited
More informationSTATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DRAINAGE HANDBOOK OPEN CHANNEL. OFFICE OF DESIGN, DRAINAGE SECTION November 2009 TALLAHASSEE, FLORIDA
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DRAINAGE HANDBOOK OPEN CHANNEL OFFICE OF DESIGN, DRAINAGE SECTION TALLAHASSEE, FLORIDA Table of Contents Open Channel Handbook Chapter 1 Introduction... 1
More informationCEE 370 Fall 2015. Laboratory #3 Open Channel Flow
CEE 70 Fall 015 Laboratory # Open Channel Flow Objective: The objective of this experiment is to measure the flow of fluid through open channels using a V-notch weir and a hydraulic jump. Introduction:
More informationebb current, the velocity alternately increasing and decreasing without coming to
Slack water (slack tide): The state of a tidal current when its velocity is near zero, especially the moment when a reversing current changes its direction and its velocity is zero. The term is also applied
More informationModule 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur
Module 3 Irrigation Engineering Principles Lesson 9 Regulating Structures for Canal Flows Instructional objectives On completion of this lesson, the student shall be able to learn: 1. The necessity of
More informationModelling of Urban Flooding in Dhaka City
Modelling of Urban Flooding in Dhaka City Chusit Apirumanekul*, Ole Mark* *Water Engineering & Management, Asian Inst. of Technology, PO Box 4, Klong Luang, Pathumthani 12120, Thailand Abstract Flooding
More informationTopic 8: Open Channel Flow
3.1 Course Number: CE 365K Course Title: Hydraulic Engineering Design Course Instructor: R.J. Charbeneau Subject: Open Channel Hydraulics Topics Covered: 8. Open Channel Flow and Manning Equation 9. Energy,
More informationTechnical Standards and Guidelines for Planning and Design DRAFT VOLUME FLOOD CONTROL
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS JAPAN INTERNATIONAL COOPERATION AGENCY Technical Standards and Guidelines for Planning and Design DRAFT VOLUME FLOOD CONTROL MARCH 2002 Project for the Enhancement
More informationEmploying Appropriate Software for Dam break Analysis and Flood Line rendering
Employing Appropriate Software for Dam break Analysis and Flood Line rendering 1. Background The specialist field of Dam Safety has been developing in SA since about the 80 s. This has led to a well-developed
More informationDANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT
DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT By: Conor C. Shea Stream Habitat Assessment and Restoration Program U.S. Fish and Wildlife Service CBFO-S07-01 Prepared in
More informationWILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10
WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta
More informationField Data Recovery in Tidal System Using Artificial Neural Networks (ANNs)
Field Data Recovery in Tidal System Using Artificial Neural Networks (ANNs) by Bernard B. Hsieh and Thad C. Pratt PURPOSE: The field data collection program consumes a major portion of a modeling budget.
More informationColumbia River Project Water Use Plan. Monitoring Program Terms of Reference
Columbia River Project Water Use Plan Revelstoke Flow Management Plan Monitoring Program Terms of Reference CLBMON-15a Middle Columbia River Physical Habitat Monitoring Revision January 29, 2015 Monitoring
More informationOpen Channel Flow 2F-2. A. Introduction. B. Definitions. Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow
Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow 2F-2 Open Channel Flow A. Introduction The beginning of any channel design or modification is to understand the hydraulics of the stream. The
More informationChapter 9. Steady Flow in Open channels
Chapter 9 Steady Flow in Open channels Objectives Be able to define uniform open channel flow Solve uniform open channel flow using the Manning Equation 9.1 Uniform Flow in Open Channel Open-channel flows
More informationUSSD Workshop on Dam Break Analysis Applied to Tailings Dams
USSD Workshop on Dam Break Analysis Applied to Tailings Dams Antecedents Newtonian / non-newtonian flows Available models that allow the simulation of non- Newtonian flows (tailings) Other models used
More informationROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND
ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning
More informationLecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used:
Lecture 24 Flumes & Channel Transitions I. General Characteristics of Flumes Flumes are often used: 1. Along contours of steep slopes where minimal excavation is desired 2. On flat terrain where it is
More informationLecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978)
Lecture 22 Example Culvert Design Much of the following is based on the USBR technical publication Design of Small Canal Structures (1978) I. An Example Culvert Design Design a concrete culvert using the
More informationAPPLICATION OF GIS AND REMOTE SENSING IN IRRIGATION NETWORKS MANAGEMENT
Tenth International Water Technology Conference, IWTC10 2006, Alexandria, Egypt 21 APPLICATION OF GIS AND REMOTE SENSING IN IRRIGATION NETWORKS MANAGEMENT Sherif M. El-Sayed Researcher, Hydraulics Research
More informationExperiment (13): Flow channel
Introduction: An open channel is a duct in which the liquid flows with a free surface exposed to atmospheric pressure. Along the length of the duct, the pressure at the surface is therefore constant and
More informationHydraulics Prof. A. K. Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati. Module No. # 02 Uniform Flow Lecture No.
Hydraulics Prof. A. K. Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati Module No. # 02 Uniform Flow Lecture No. # 04 Computation of Uniform Flow (Part 02) Welcome to this
More informationIndex-Velocity Rating Development (Calibration) for H-ADCP Real-Time Discharge Monitoring in Open Channels
Index-Velocity Rating Development (Calibration) for H-ADCP Real-Time Discharge Monitoring in Open Channels Hening Huang Teledyne RD Instruments, Inc., 14020 Stowe Drive, Poway, CA. 92064, USA (Tel: 858-842-2600,
More informationFloodplain Hydraulics! Hydrology and Floodplain Analysis Dr. Philip Bedient
Floodplain Hydraulics! Hydrology and Floodplain Analysis Dr. Philip Bedient Open Channel Flow 1. Uniform flow - Manning s Eqn in a prismatic channel - Q, V, y, A, P, B, S and roughness are all constant
More informationBroad Crested Weirs. I. Introduction
Lecture 9 Broad Crested Weirs I. Introduction The broad-crested weir is an open-channel flow measurement device which combines hydraulic characteristics of both weirs and flumes Sometimes the name ramp
More informationCHAPTER 3 STORM DRAINAGE SYSTEMS
CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next
More informationMethods for Determination of Safe Yield and Compensation Water from Storage Reservoirs
US Army Corps of Engineers Hydrologic Engineering Center Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs October 1966 Approved for Public Release. Distribution Unlimited.
More informationIntegrated Water and Sediment Management of Yellow River
Keeping Health Life of Yellow River: Integrated Water and Sediment Management of Yellow River Shang Hongqi Yellow River Conservancy Commission 18 March 2009 Istanbul, Turkey Outline: I. Yellow River Characteristic
More informationAZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA
AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA GÁBOR KEVE 1, GÉZA HAJNAL 2, KATALIN BENE 3, PÉTER TORMA 4 EXTRAPOLATING
More informationOpen Channel Flow. M. Siavashi. School of Mechanical Engineering Iran University of Science and Technology
M. Siavashi School of Mechanical Engineering Iran University of Science and Technology W ebpage: webpages.iust.ac.ir/msiavashi Email: msiavashi@iust.ac.ir Landline: +98 21 77240391 Fall 2013 Introduction
More informationOpen channel flow Basic principle
Open channel flow Basic principle INTRODUCTION Flow in rivers, irrigation canals, drainage ditches and aqueducts are some examples for open channel flow. These flows occur with a free surface and the pressure
More informationCHAPTER - VI FLOOD DAMAGES
CHAPTER - VI FLOOD DAMAGES 6.1 General Generally flood is defined as an unusually high stage in a river normally the level at which the river overflows its banks and inundates the adjoining area. In other
More informationTENNESSEE GAS PIPELINE COMPANY, L.L.C.
TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,
More informationEmergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
More informationWater Security in Iraq
Water Security in Iraq Dr. Hassan Janabi Ambassador Permanent Representative of Iraq To the UN Food and Agriculture Organization (FAO) And other Rome-based UN Agencies (WFP & IFAD) Introduction: Iraq is
More informationNUMERICAL MODELLING OF BRINE DISPERSION IN SHALLOW COASTAL WATERS
International Journal of Civil Engineering and Technology (IJCIET) Volume 7, Issue 3, May June 2016, pp. 316 328, Article ID: IJCIET_07_03_031 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=7&itype=3
More informationWhat is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation)
OPEN CHANNEL FLOW 1 3 Question What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation) Typical open channel shapes Figure
More informationFor the purposes of this article the Shannon can conveniently be divided into five sections:
Volume 29 Number 3 Autumn Inland Waterways News Table of Contents Shannon Water Level Management Robert Cullen The water levels along the Shannon River and its lakes are the subject of much discussion,
More informationHydrologic Engineering Techniques for Regional Water Resources Planning
US Army Corps of Engineers Hydrologic Engineering Center Hydrologic Engineering Techniques for Regional Water Resources Planning October 1969 Approved for Public Release. Distribution Unlimited. TP-17
More informationPackage rivr. October 16, 2015
Type Package Package rivr October 16, 2015 Title Steady and Unsteady Open-Channel Flow Computation Version 1.1 Date 2015-10-15 Author Michael C Koohafkan [aut, cre] Maintainer Michael C Koohafkan
More informationThe Hydrologic Engineering Center Training Course on
The Hydrologic Engineering Center Training Course on SEDIMENT TRANSPORT ANALYSIS WITH HEC-RAS Davis, California Course Objectives This course is intended to prepare engineers to perform studies using various
More informationChapter 12 - HYDROLOGICAL MEASUREMENTS
Water Quality Monitoring - A Practical Guide to the Design and Implementation of Freshwater Quality Studies and Monitoring Programmes Edited by Jamie Bartram and Richard Ballance Published on behalf of
More informationNAJAFGARH DRAIN-SAMPLING AND ANALYSIS
Dr. Anamika Paul* Preeti Jain* Kartikey Handa* NAJAFGARH DRAIN-SAMPLING AND ANALYSIS Abstract: Over the past years, due to rapid industrialization and advanced agricultural activities environmental deterioration
More informationALL GROUND-WATER HYDROLOGY WORK IS MODELING. A Model is a representation of a system.
ALL GROUND-WATER HYDROLOGY WORK IS MODELING A Model is a representation of a system. Modeling begins when one formulates a concept of a hydrologic system, continues with application of, for example, Darcy's
More informationCharacteristics of storm surges in German estuaries
CLIMATE RESEARCH Vol. 18: 71 76, 2001 Published October 18 Clim Res Characteristics of storm surges in German estuaries Andreas Plüß*, Elisabeth Rudolph, Dirk Schrödter The Federal Waterways Engineering
More informationHydrologic Modeling using HEC-HMS
Hydrologic Modeling using HEC-HMS Prepared by Venkatesh Merwade School of Civil Engineering, Purdue University vmerwade@purdue.edu April 2012 Introduction The intent of this exercise is to introduce you
More informationGuide To Bridge Planning Tools
Guide To Bridge Planning Tools The following bridge planning and hydrotechnical analysis tools (Excel spreadsheets, some with associated databases and VBA code), and GIS data-sets are available from the
More informationWater Quality Modeling in Delaware s Inland Bays: Where Have We Been and Where Should We Go?
Water Quality Modeling in Delaware s Inland Bays: Where Have We Been and Where Should We Go? Damian C. Brady University of Maine Center for the Inland Bays Science and Technical Advisory Committee March
More informationOPEN-CHANNEL FLOW. Free surface. P atm
OPEN-CHANNEL FLOW Open-channel flow is a flow of liquid (basically water) in a conduit with a free surface. That is a surface on which pressure is equal to local atmospheric pressure. P atm Free surface
More informationEstimating Potential Reduction Flood Benefits of Restored Wetlands
Estimating Potential Reduction Flood Benefits of Restored Wetlands Kenneth W. Potter University of Wisconsin Introduction Throughout the summer of 1993 a recurring question was the impact of wetland drainage
More informationStorm Drainage Systems 11.9-1
Storm Drainage Systems 11.9-1 11.9 Gutter Flow Calculations 11.9.1 Introduction Gutter flow calculations are necessary in order to relate the quantity of flow (Q) in the curbed channel to the spread of
More informationHYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA
HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA James Chieh, Ph.D., P.E., Senior Hydraulic Engineer, USACE, Los Angeles, California, Shih.H.Chieh@usace.army.mil; Jay Pak,
More informationBackwater Rise and Drag Characteristics of Bridge Piers under Subcritical
European Water 36: 7-35, 11. 11 E.W. Publications Backwater Rise and Drag Characteristics of Bridge Piers under Subcritical Flow Conditions C.R. Suribabu *, R.M. Sabarish, R. Narasimhan and A.R. Chandhru
More informationWATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION
MULTI-DAM SYSTEMS AND THEIR OPERATION J.J. Cassidy Consulting Hydraulic and Hydrologic Engineer, Concord, California, USA Keywords: Dams, reservoirs, rivers, water storage, dam safety, floods, environment,
More informationEarth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.
Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust
More informationUNION COUNTY, FLORIDA AND INCORPORATED AREAS
UNION COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME COMMUNITY NUMBER LAKE BUTLER, CITY OF 120595 RAIFORD, TOWN OF 120593 UNION COUNTY 120422 (UNINCORPORATED AREAS) WORTHINGTON SPRINGS, CITY OF
More information1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year
Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities
More informationHydraulic Jumps and Non-uniform Open Channel Flow, Course #507. Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC 27560 www.pdhsite.
Hydraulic Jumps and Non-uniform Open Channel Flow, Course #507 Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC 27560 www.pdhsite.com Many examples of open channel flow can be approximated
More informationFlood Mitigation and Management in Bangkok Metropolitan Area
กร งเทพมหานคร Flood Mitigation and Management in Bangkok Metropolitan Area Present By Mr. Kriangkrai Phamornpol Department of Drainage and Sewerage Bangkok Metropolitan Administration 1 Flood Mitigation
More informationReal-time Ocean Forecasting Needs at NCEP National Weather Service
Real-time Ocean Forecasting Needs at NCEP National Weather Service D.B. Rao NCEP Environmental Modeling Center December, 2005 HYCOM Annual Meeting, Miami, FL COMMERCE ENVIRONMENT STATE/LOCAL PLANNING HEALTH
More informationTIDES. 1. Tides are the regular rise and fall of sea level that occurs either once a day (every 24.8 hours) or twice a day (every 12.4 hours).
TIDES What causes tides? How are tides predicted? 1. Tides are the regular rise and fall of sea level that occurs either once a day (every 24.8 hours) or twice a day (every 12.4 hours). Tides are waves
More informationHydrographic Survey of the Keith Lake-Salt Bayou System
Hydrographic Survey of the Keith Lake-Salt Bayou System April 2007 Survey Prepared by: The Texas Water Development Board December 2007 Texas Water Development Board J. Kevin Ward, Executive Administrator
More informationFLOW CONDITIONER DESIGN FOR IMPROVING OPEN CHANNEL FLOW MEASUREMENT ACCURACY FROM A SONTEK ARGONAUT-SW
FLOW CONDITIONER DESIGN FOR IMPROVING OPEN CHANNEL FLOW MEASUREMENT ACCURACY FROM A SONTEK ARGONAUT-SW Daniel J. Howes, P.E. 1 Charles M. Burt, Ph.D., P.E. 2 Brett F. Sanders, Ph.D. 3 ABSTRACT Acoustic
More informationRESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS
RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS by Hany Elwany, Ph.D. Scripps Institution of Oceanography Headwaters to Oceans Conference 25 October 2003 CE Ref #03-22 San Diego County Lagoons
More informationEFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA
EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA René Leclerc Geomorphologist Robert C. MacArthur, Ph.D., P.E. Principal Headwaters
More informationSimulating Sedimentation Model in Balarood Dam Reservoir Using CCHE2D Software
Bulletin of Environment, Pharmacology and Life Sciences Bull. Env. Pharmacol. Life Sci., Vol 4 [1] December 2014: 67-72 2014 Academy for Environment and Life Sciences, India Online ISSN 2277-1808 Journal
More informationFLOOD FORECASTING PRACTICE IN NORTHERN CALIFORNIA
FLOOD FORECASTING PRACTICE IN NORTHERN CALIFORNIA California Department of Water Resources Post Office Box 219000, Sacramento, California 95821 9000 USA By Maurice Roos, Chief Hydrologist ABSTRACT Although
More informationM6a: Open Channel Flow (Manning s Equation, Partially Flowing Pipes, and Specific Energy)
M6a: Open Channel Flow (, Partially Flowing Pipes, and Specific Energy) Steady Non-Uniform Flow in an Open Channel Robert Pitt University of Alabama and Shirley Clark Penn State - Harrisburg Continuity
More informationLecture 25 Design Example for a Channel Transition. I. Introduction
Lecture 5 Design Example for a Channel Transition I. Introduction This example will be for a transition from a trapezoidal canal section to a rectangular flume section The objective of the transition design
More informationWhat causes Tides? If tidal forces were based only on mass, the Sun should have a tidegenerating
What are Tides? Tides are very long-period waves that move through the oceans as a result of the gravitational attraction of the Moon and the Sun for the water in the oceans of the Earth. Tides start in
More informationDomestic Policy Framework on Adaptation to Climate Change in Water Resources: Case Study for India. Working Together to Respond to Climate Change
Domestic Policy Framework on Adaptation to Climate Change in Water Resources: Case Study for India Working Together to Respond to Climate Change WATER ACCOUNTING OF INDIA S TOTAL WATER RESOURCES Unutilizable
More information21. Channel flow III (8.10 8.11)
21. Channel flow III (8.10 8.11) 1. Hydraulic jump 2. Non-uniform flow section types 3. Step calculation of water surface 4. Flow measuring in channels 5. Examples E22, E24, and E25 1. Hydraulic jump Occurs
More informationFlow Through an Abrupt Constriction. 2D Hydrodynamic Model Performance and Influence of Spatial Resolution
Flow Through an Abrupt Constriction 2D Hydrodynamic Model Performance and Influence of Spatial Resolution Cathie Louise Barton BE (Civil) School of Environmental Engineering Faculty of Environmental Sciences
More informationTides and Water Levels
Tides and Water Levels What are Tides? Tides are one of the most reliable phenomena in the world. As the sun rises in the east and the stars come out at night, we are confident that the ocean waters will
More informationRuissellement du Bassin Précipitation Abstractions Hydrogramme Flux de Base. Superposition Routage
HEC-1 Leçon 11 This lesson will focus on how WMS can be used to develop HEC-1 modeling parameters and not on the fundamental hydrologic principles simulated by HEC-1. 1 Vue D Emsemble Utilisés Couramment
More informationContents. Figure Index. 1. Introduction 1. 2. Engineered solutions 4. 3. Conclusions 11
Contents 1. Introduction 1 1.1 Background 1 1.2 Overview 1 1.3 Objective of this discussion paper 3 2. Engineered solutions 4 2.1 River barriers 4 2.2 Flood gates 5 2.3 Levees and flood walls 5 2.4 Backflow
More informationAbaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts
LARS 2007 Catchment and Lake Research Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts Seleshi Bekele Awulachew International Water Management Institute Introduction
More informationTide - rhythmic oscillation of the ocean surface due to gravitational & centrifugal forces ( inertia ) between the Earth, Moon and Sun.
Chapter 4: The Changing Level of the Sea Tides Longer Scale Variations Influence on Beaches Tide - rhythmic oscillation of the ocean surface due to gravitational & centrifugal forces ( inertia ) between
More informationECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project
ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower
More informationCatchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk
Catchment Scale Processes and River Restoration Dr Jenny Mant Jenny@therrc.co.uk The River Restoration Centre therrc.co.uk 3 Main Catchment Elements Hydrology Energy associated with the flow of water affects
More informationHYDROGRAPH ROUTING. E. Input data needed for channel routing include the inflow hydrograph and the channel characteristics
HYDROGRAPH ROUTING. Introduction A. Two Types of Hydrograph Routing. Storage or Reservoir Routing. Channel Routing B. Reservoir Routing is used to determine the peak-flow attenuation that a hydrograph
More informationReport Tidal Power Generation Systems
The American University in Cairo Engineering Department ENGR 318 Spring 2001 Report Tidal Power Generation Systems Submitted to: Prof. Dr. Mahmoud Gilany By: Sherif Masoud Maher Amer Mohamed Samir Introduction
More informationWATER QUALITY MONITORING AND APPLICATION OF HYDROLOGICAL MODELING TOOLS AT A WASTEWATER IRRIGATION SITE IN NAM DINH, VIETNAM
WATER QUALITY MONITORING AND APPLICATION OF HYDROLOGICAL MODELING TOOLS AT A WASTEWATER IRRIGATION SITE IN NAM DINH, VIETNAM LeifBasherg (1) OlujZejlllJul Jessen (1) INTRODUCTION The current paper is the
More information