1 Sewer Manhole Rehab Jack Keys Inspection Services & Collection System Supervisor Southern Clinton County Municipal Utilities Authority
2 What You Need To Start Your Manhole Rehabilitation Program As-Built drawings with specific manhole ID numbers Follow your Confined Space Program when entering manholes Digital Camera for documentation Checklist for manhole defects to categorize all aspects of the manhole Develop list of available contractors who can perform rehab where needed Historical data from upstream areas to help prioritize the manhole rehab Hydrogen sulfide levels if corrosion is evident Vendors who can supply you with what products you will need for the repairs Budget an annual amount of repairs and stick to it, be realistic Maintain an annual contact with your local road commission or DPW so you can stave off future problems like buried manholes from road projects Update your records whenever you rehab your system NAASCO has standards for manhole rehab if your facility needs them
3 So Let s Begin What We Have Discovered Since Investigating Our Manhole Structures
4 Manhole underwater in wetlands without inflow dish. We discovered vandals took it out and threw it over the hillside.
5
6 Note the fine sand washing in under the casting Inflows under casting washing out fine particulates
7 No adjustment ring or cement used when casting was set, we discovered this one during the last 100-year rain event
8 Sometimes a casting is discovered missing...
9 ... that is until you look in the manhole. This storm manhole was made too wide for the casting and over time erosion allowed it to collapse into itself.
10 Note Narrow Throat In Channel.
11 Low Discharge Invert.
12 Note Improper Flow Channel That. Allows Solids To Accumulate
13 High pressure gas main installed through a storm manhole. Why? Note corrosion on side of gas piping. This was removed once we informed the gas company of this situation.
14 Buried Manhole Structures This is why GIS mapping is so important. You need to keep track of all of your structures so they do not get buried like this one did. Roadways get updated annually.
15 A landscaper only bumped the casting while backfilling, of course we didn t find out until a 100- year storm event.
16 . Typical Manhole Adjustment 1980
17 These adjustment bricks were discovered leaking during a 100-year storm event.
18 Manhole Defects Improper Adjustments
19 It wasn t enough to use cement blocks from a house that was torn down, but they used broken cement and asphalt for adjustments also.
20 Let s see, mix Portland Cement with sand and gravel, except in this case the forgot the cement.
21 Manhole exposure to the elements
22 Lined Interceptor With The. Casting Broken Off - Vandals
23 . Vandalism
24 Pipe Stub Blown Into Manhole From High Groundwater Table A 4-foot 8-inch PVC Pipe Pushed Back Into MH Washing Over a Yard of Gravel Into Flow Channel
25 Interceptor showing H2S corrosion
26 Time will wear down a manhole and casting, hydrogen sulfide gas will destroy it 5-times faster
27 Excellent reason to follow confined space entry procedures when entering a manhole - This manhole to be Rehabbed In 2014
28 Severe H2S corrosion in a manhole. That is not a bar stretched across the base of the manhole, but the bottom O -Ring.
29 8-Year Old Precast Manhole
30 This is what a concrete manhole looks like after 8 years of H2S attack of ppm 8-year old manhole with H2S levels of 100-1,200 ppm replaced with a ConShield Manhole
31 ConShield Manhole We ran into a problem when we replaced our original structure with this H2S impervious manhole was installed. We discovered our ferric chloride (odor control) had a design flaw that would overfeed at times, which caused the formation of hydrochloric acid.
32 H2S Corrosion 10-Year Old Manhole H2S Readings from as low as 10 ppm to a high of over 600 ppm
33 8-Year Old Manhole / 6-Inch Forcemain 18,000 gpd
34 ph of concrete measured at 0.5 Thiobacillus Bacteria Thriving at flow line. High BOD, Ammonia, FOG.
35 OdaLogger Meter for Hydrogen Sulfide Gas
36 SCCMUUA OdaLogger In The Field WE TRY TO MAINTAIN THE ODALOGGERS AT HALF THE DISTANCE TO THE BOTTOM
37 SCCMUA Homemade Meter Hangers
38
39
40
41 OdaLogger FM Discharge Lift Station Flow Basins H2S Avg. H2S Maxium Daily Flows* FM Size- Length Flow Type New/Old/Mi xed H2S can be detected by the public around 7 ppm. The Threshold Level Value is set at 10 ppm. Worker health level 100 ppm Over 300 Immediately Dangerous to Life & Health LS# ppm 141 ppm mgd 6" - 2,066' HDPE New LS# ppm 67 ppm mgd 4" - 631' HDPE New LS# ppm 90 ppm mgdmetered 8" - 6,940 HDPE New LS# ppm 59 ppm mgd 4" - 1,250' HDPE New LS# ppm 2 ppm mgd 4" - 336' HDPE New LS# ppm 7 ppm mgd 4" - 50' HDPE New LS# ppm 92 ppm mgd 8" - 1,581' HDPE New-Joint MH 203
42 Wastewater LS & FM Field Sample Results Location: ph Temp C Field D.O. Dissolved Sulfides LS # LS # LS # LS # LS # LS # Ammonia Nitrogen: 5-Day BOD Lab Sample Results Total Suspended Solids Total Kjeldahl Nitrogen 33.5 mg/l 143 mg/l 172 mg/l 43 mg/l 22.6 mg/l 166 mg/l 228 mg/l 39 mg/l 18.2 mg/l 259 mg/l 98 mg/l 48 mg/l 30.8 mg/l 255 mg/l 120 mg/l 46 mg/l 38.8 mg/l 251 mg/l 122 mg/l 58 mg/l 26.4 mg/l 204 mg/l 128 mg/l 46 mg/l 26.3 mg/l 489 mg/l 180 mg/l 59 mg/l 30.9 mg/l 243 mg/l 63 mg/l 51 mg/l 40.9 mg/l 1,197 mg/l 98 mg/l 60 mg/l 52.8 mg/l 246 mg/l 278 mg/l 69 mg/l 37.0 mg/l 170 mg/l 60 mg/l 52 mg/l 39.5 mg/l 216 mg/l 124 mg/l 56 mg/l
43 CHEMets Sulfide Testing
44
45 ph Papers
46
47 This was the standard design for an external manhole drop pipe connection. Over time it separated and fractured the encased drop pipe.
48
49 Manhole without a flow channel or bench, discovered when performing annual cleaning and televising. Repaired by Lennon Sand & Gravel 2011
50 . Another Interceptor With An Improper Flow Channel
51 Not how you bring pipes together in a manhole structure.
52 Pipe Installed Lower Than Downstream Pipe
53
54
55
56 Polycrete Manhole Even A New Manhole Can Leak As Shown Here, That Is Why Inspecting Everything Is Critical
57 Always inspect your manhole structures. A crack today will cost you hundreds of dollars later between rehab and infiltration costs.
58 Past & Present Do Not Let 1 Problem Stop Your Investigation, Keep Looking All Around
59 Rehab Methods Solutions Rehab Techniques Better Ideas
60 No-Flow In-Flow Dish in use We installed several hundred in key storm flow areas, as well as major intersection and around gas stations to stop any spilled petroleum products into the sewers. Our record is 3 for 3 on gas spills; and 2 for 2 in wetlands to prevent flooding into our manholes. Inexpensive, easy to install. Average life is about years depending on traffic conditions.
61 Broken Casting Rebuilt Using a 3-M 2-Part Epoxy
62 . Manhole Demo Testing a Joint Sealer
63 Oakum to quiet down those rattling covers USA Bluebook
64
65 After injecting SealGuard to stop leaks
66 New MH Liner Installed Into Existing Major Intersection Instead of Excavation USA, Inc.
67 How Manhole Insert Liners Work
68 1995 FIBERLINERS INSTALLATION.
69 FiberLine Lined Manhole
70 PRELIMENARY MANHOLE PREP FOR LINING.
71 FINAL PRODUCT STILL. WORKING AFTER 18 YEARS
72 PANELS WERE USED FOR THE BENCHES
73 How to replace old/missing Internal Drop Pipes for residential or commercial properties. We use these as a last resort always preferring the traditional wye connections.
74 Another Good Method For Sealing MH Joints Gator Wrap by Sealing Systems, Inc.
75 . CRETEX WRAP External Joint Sealer Which Can Be Use For Round, Arched, Elliptical, And Culvert Pipe
76 PEACEMAKER BRAND ODOR CONTROL ROOF VENT FILTERS.
77 Odor Canister on Roof Vent
78 At large lift stations we have installed 12 Carbon Cannisters to help control odors.
79 We use 4 & 6 odor canisters on Air Relief Manholes & at smaller lift stations with success to control sewer gases.
80 Bay Products Air Lift Station
81 Vortex manhole insert being installed Installed by Zito Construction / C2AE Municipal Engineer
82 Flows go down around the main shaft pulling air down the center column and injecting it in the bottom sump
83 Our Vortex Manhole Works Even With All 3 Pumps On IPEX
84 Do you have days where it seems that you are drowning in your work?
85 10-Year Old Raven AquaPlex Hand Applied Epoxy We Contracted With Plummer s Environmental Services To Apply This Product To Over 420 Manholes. This Was A Successful I/I Reduction Program In The LS102 Flow Basin.
86 Internal Chimney Seal
87 Double Chimney Liner
88 SPECIAL CHIMNEY LINER FINAL PRODUCT THIS WAS INSTALLED AT THE DEWITT MEIJERS WHERE THEY WOULD PILE UP SNOW FROM THE PARKING LOT.
89 UGT Adjustment Ring
90 UGT Adjustment Rings / Grades & Final Product - Installed In 2005
91 External Casting/Adjustment Ring Seal Sealing Systems Incorporated
92 Cretex External Seal
93 Raising up buried manholes along roadways step one take it down to good structure or cone section LadTech Rings
94 Installing grout rope along the bottom of the ring s to seal the rings for I/I seal
95 Step two install rings to needed grade
96 Setting Final Grade Before Replacing Casting LadTech Manhole Adjusting HDPE Rings
97 Ease of use, carring 8 of adjustment all at once.
98 Final product with little restoration needed
99 Cementious Spray on Liner
100
101 FLEXSEAL INSTALLED IN SCCMUA PARKING LOT.
102 Polycrete Manhole Structure 2005
103 Polycrete Adjustment Rings
104 flowline for manhole from the outside.
105 Flow channel & bench as seen from inside structure
106 2012 Joint Sewer Rehabilitation Project in DeWitt Charter Township. H2S Corrosion resistant manholes.
107 Spray-On Epoxy Repairs.
108 Sealing Lift Station Wet Well to Prevent Future Corrosion Issues E.T. MacKenzie Companies
109 We used the epoxy spray liner on our valve/by-pass vault
110 And we also used it in our meter vault to protect it from any possible future corrosion
111 Close-Up View of Raven Spray Liner As Applied to LS#102 FM MH Before Rehabilitation After Rehabilitation Applied by Plummer s Environmental Services
112
113
114 Concrete Plug for Manhole Rehabilitation
115 Corrosion in concrete pipes with H2S exposure From American Society of Civil Engineers (ASCE), Manual 92, page 26, manhole inspection H2S ppm 1 concrete pipe 2 concrete pipe 0.1 ppm 70 years 200 years 1 ppm 45 years 90 years 10 ppm 10 years 20 years 20 ppm 5 years 10 years
116
117
118 DeWitt Meijer's Demo This area is the designated snow piling area for their parking lot.
119 . Sealed Chimney To Prevent I/I
120 . Final Manhole Product
121 Two Forcemains Causing H2S Corrosion In MH
122 Quadex Spray-On Cementious Lining.
123 . Finished Manhole Product
124 Sherwin. Williams Epoxy Lined Manhole 2012
125 Directional boring project along Airport Road into new Polycrete Manhole USA performed Open Trench / Directional Boring / Pipe Bursting / CIPP Lining / Manhole Replacement / Manhole Monolithic Liner all on this same project in 2005.
126 CIPP through existing manhole structure 2005
127 Sorry Norton, Our Game Style Has Changed.
128 How about a grilled cheese sandwich using Colby Longhorn Cheese and thin sliced Pepperoni, ½ tsp of raw sugar on cheese side next to the Sour Dough Bread, with a Famous Dave s Sweet N Hot Pickle Slice.
Sewer Pipe & Manhole Rehab. Jack Keys Collection System & Inspection Services Supervisor Southern Clinton County Municipal Utilities Authority
Sewer Pipe & Manhole Rehab Jack Keys Collection System & Inspection Services Supervisor Southern Clinton County Municipal Utilities Authority Past & Present There Are Times It Feels Like This 10 DIP WITH
More informationSewer Rehabilitation Design Requirements
Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared
More informationFY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation
644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING
More informationStorm Sewer Trenchless Upgrade Alternatives and Recommendations
Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for
More informationFY08 SEWER POINT REPAIRS BID TABULATION
6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "
More informationSPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)
SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer
More informationLetty Arvide-Gomar, PE
Letty Arvide-Gomar, PE Outline DIP History and Applications Corrosion Issues Internal Cleaning Technologies Rehabilitation Options DIP History and Applications Corrosion Issues Internal Cleaning Technologies
More informationREVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC
REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS
More informationSpecial Specification 7021 Water Main and Sewer Line Replacements
Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,
More information32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.
SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and
More informationMainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology
2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)
More informationDIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL
DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant
More informationSECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.
SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings
More informationWaste Collection Systems
Waste Collection Systems System Maintenance and Repair Maintenance and Repair Training Objectives To gain an understanding of: System Maintenance and Repair vocabulary System Maintenance and Repair techniques
More informationSection 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationSection 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
More informationCITY OF DAYTON DEPARTMENT OF WATER 42-INCH SANITARY SEWER REHABILITATION
CITY OF DAYTON DEPARTMENT OF WATER 42-INCH SANITARY SEWER REHABILITATION 42-INCH SANITARY SEWER REHABILITATION WHAT WE WILL DISCUSS TODAY: Project Justification & Evolution (high level/not a chemistry
More informationPipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?
Pipe Bursting Case Study at Zeeland, MI Collections Seminar September 6, 2012 By: Brian Hannon, PE and John Racek, PE Presentation Agenda What is Pipe Bursting? History of Pipe Bursting Types of Pipe Bursting
More informationCollection Systems Technology Fact Sheet Sewers, Conventional Gravity
United States Environmental Protection Agency Collection Systems Technology Fact Sheet Sewers, Conventional Gravity DESCRIPTION Sewers are hydraulic conveyance structures that carry wastewater to a treatment
More informationCONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES
North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper C-4-04 CONSTRUCTION OF NON-CIRCULAR SEWER REHABILITATION PROJECTS IN LOS ANGELES Brad Jenson
More informationSummary 7/11/2012. Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort
Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort June 25, 2012 Thomas Gossiaux, PE (AECOM) Matt Raysin, PE (GCDC-WWS) Dave Barnas, PE (AECOM) Ed Tharp, PE (AECOM) Summary
More informationWastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
More informationSECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
More informationFY15 Gravity Sewer and Manhole Rehabilitation
Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE
More informationSECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationAIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
More informationSECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES
1.00 PART 1 GENERAL 1.01 SCOPE A. It is the intent of this contract to install a 100% solids epoxy monolithic coating to the walls, benches and inverts of all manholes and the specified surfaces of other
More informationExhibit A. Rules and Regulations for House Connections and Sewer Extensions
The purpose of this application example is to provide assistance to small and medium sized rural communities in the drafting of documents necessary for the efficient operation of water, wastewater, and
More informationprovided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies:
ASSET MANAGEMENT STRATEGY BRIDGES AND LARGE CULVERTS (>3m Span) Inventory Anticipated Asset Life Cycle Fifteen (15) bridges and eleven (11) large culverts with a span greater than 3m (refer to PSAB 3150
More informationSEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER
Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating
More informationPROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY
PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced
More informationAffordable Asset Management Making Use of the Data You Have: An Owner s Perspective
Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective An Owner Operator s Approach for Asset Management on a Budget Lane Longley, City of St. Petersburg Presented by the April
More informationSECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
More informationecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems
ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,
More informationSewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority
Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority
More informationThe Manitoba Water Services Board SECTION 027030 Standard Construction Specifications September 2013 Page 1 of 21
September 2013 Page 1 of 21 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the construction of sewers including: the supply and installation of pipe, saddles, tees,
More informationDESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES
SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing
More informationSee Appendix A for additional information, or contact ASTM directly.
DEFINITIONS Wherever used in these specification guidelines, the following words and terms have the meanings indicated. AREAWAY: A paved surface, serving as an entry area to a basement or subsurface portion
More informationSECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS
SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and
More informationSpecifications for Residential Property Owners Connection to New Public Sewer
Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the
More informationWork Practice: Wastewater Collection System Maintenance Plan Potential Safety Hazards
Potential Safety Hazards Required items Potential PPE None Additional References - Collection System Related Work Practices & Forms Jet Truck Cleaning Work Practice (Do not drive on peoples driveway) CDL
More informationBefore H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe
Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationSIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS
SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS Introduction City of Tacoma property owners are responsible for the construction, maintenance and repair of private side sewers, which connect
More informationTABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth
TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20
More informationSECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
More informationWorking together to improve beach water quality. Fixing our. public and private. sewers
Working together to improve beach water quality Fixing our public and private sewers May 2004 FIND FIX DECIDE Narrow Neck Beach on a summer day As part of Project CARE, our long-term project to improve
More informationSeptic Tank to Cistern Conversions. Saving Water & Saving Money
Florida Keys Aqueduct Authority 1100 Kennedy Drive Key West, Florida 33040 Septic Tank to Cistern Conversions Saving Water & Saving Money One of the benefits of connecting to the Central Wastewater System
More information53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
More informationSECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD
SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials
More informationSECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
More informationInstallation of Large Diameter Buried Pipes
Installation of Large Diameter Buried Pipes Sullivan (Sully) Curran P. E., Executive Director I. Introduction and Scope There is an ongoing need to provide designers, specifiers, engineers, consultants
More informationWaste Management. Infrastructure Rehabilitation in the U.S. Virgin Islands
Waste Management Infrastructure Rehabilitation in the U.S. Virgin Islands The United States Virgin Islands is a group of islands in the Caribbean that are an insular area of the United States. The islands
More informationPresented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E.
Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E. Engineer-City of Westlake City of Westlake Facts Founded
More informationWastewater Collection and Treatment Systems For Small Cities
Page 1 of 13 FISCAL SUSTAINABILITY PLAN For the, Wastewater Collection and Treatment System This plan outlines a (FSP) for the City of Small Town, County of Xxxxx, State of Kansas, as required by the Kansas
More informationCLEANING, INSPECTION, AND TESTING OF SEWERS
CLEANING, INSPECTION, AND TESTING OF SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Cleaning, Inspecting, and Testing Sanitary Sewers B. Cleaning, Inspecting, and Testing Storm Sewers C. Cleaning and
More informationDIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST
DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST CERTIFICATION 1. Did the engineer submit a certificate of completion utilizing the appropriate page of the issued
More informationRehabilitation or Replacement? That Is The Question
Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections
More informationCoast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District
Coast Trunk Sewer Rehabilitation Project for the Orange County Sanitation District Paul F. Wilson 1 and Robert J. Warren 2 1 1525 Faraday Ave, Suite 290, Carlsbad, California, USA 92008; e-mail: pwilson@pirnie.com.
More informationSANITARY SEWER SYSTEM ASSESSMENT
SANITARY SEWER SYSTEM ASSESSMENT What is this tool? The Sanitary Sewer System Assessment is a form that helps your utility identify and document all of the components in your utility s sanitary sewer system.
More informationSEWER CLEANING, INSPECTION AND ASSESSMENT
3.1 OVERVIEW Chapter 3 SEWER CLEANING, INSPECTION AND ASSESSMENT Preventive maintenance protects the investment of the sanitary sewer collection system infrastructure. Higher frequency cleaning of gravity
More informationINTRODUCTION. WASTEWATER MANAGEMENT PLAN MAY 2009 Metropolitan North Georgia Water Planning District 7-1
INTRODUCTION There are approximately 16,000 miles of sewers and more than 450,000 manholes within the Metro Water District. Sewers and manholes within the Metro Water District range in age from new to
More informationMIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.
MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade
More informationCOMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY
COMBINED SEWER OVERFLOW OPERATIONAL AND MAINTENANCE PLAN SUMMARY Revised: April 2014 Village of Wilmette, Illinois NPDES CSO Permit No. ILM580012 Chapter 1 Introduction This Operational and Maintenance
More informationAfter the Flush. Safe disposal of our wastewater is a valued and complex, not-for-profit municipal service.
After the Flush Published: July 14, 2011 Sewage or wastewater is something we rarely think or talk about. The wastewater from our toilets, showers, washing machines and dishwashers quickly departs our
More informationDEPARTMENT OF ENVIRONMENTAL QUALITY
PROJECT IDENTIFICATION DEPARTMENT OF ENVIRONMENTAL QUALITY City of Burton Sanitary Sewer Collection System Improvements State Revolving Fund (SRF) Environmental Assessment April 2015 Applicant: Authorized
More informationSECTION G SEWERS (STORM, SANITARY AND FDC)
G-1 GENERAL SECTION G SEWERS (STORM, SANITARY AND FDC) The Consulting Engineer is to monitor all specified pipe and granular materials, pipe slopes and run lengths and ensure the outlined criteria below
More informationRepairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses
Repairs Made With Under Pressure Installations Can Offer Reduced Risks And Expenses They also give the community a built-in re-entry system for future monitoring and repair. BY BRETT HANES According to
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS
ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located
More informationA CASE STUDY IN INFILTRATION REDUCTION THROUGH TRENCHLESS TECHNOLOGY
A CASE STUDY IN INFILTRATION REDUCTION THROUGH TRENCHLESS TECHNOLOGY SOUTH PALOS TOWNSHIP SANITARY DISTRICT COOK COUNTY, ILLINOIS March 1999 By: Aaron E. Fundich, P.E. Robinson Engineering, Ltd. and Larry
More informationBeechmont Park Project
Beechmont Park Project Foundation Drain Project Why pre -1972 homes are chosen in your neighborhood? Results of pilot study in your area showed the majority of homes built prior to 1972 within your neighborhood
More informationSEWER LINE CLEANING, DEBRIS AND GREASE REMOVAL, DEBRIS AND GREASE DISPOSAL
SEWER LINE CLEANING, DEBRIS AND GREASE REMOVAL, DEBRIS AND GREASE DISPOSAL This contract shall consist of cleaning, debris and grease disposal, of 7048 (+/-) feet of sewer pipe in accordance with the bid
More informationChecklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System
Checklist for plans to Construct, Alter or Repair An Individual Subsurface Sewage Disposal System An application for the construction or alteration of an individual subsurface sewage disposal system shall
More informationSan Antonio, TX July 28, 2011
Rehabilitation of a Deteriorated 60 RCP Wastewater Interceptor Using Competing Trenchless Technologies Bruce Cole, PE Corey Anderson, EIT TAWWA/WEAT Summer Seminar San Antonio, TX July 28, 2011 Wendy Martinez,
More informationRULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS
BAY AREA AIR QUALITY MANAGEMENT DISTRICT RULE 8-8 - ORGANIC COMPOUNDS - WASTEWATER COLLECTION AND SEPARATION SYSTEMS (ADOPTED: January 17, 1979) (AMENDED: November 1, 1989; October 6, 1993; June 15, 1994;
More informationCHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
More informationTerry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson Engineering
DON T JUST REHAB IT, RENEW IT! WATERFORD TOWNSHIP, MICHIGAN IMPROVEMENTS TO A 3.0 MGD SEWAGE PUMPING STATION Terry Biederman, PE- Director of Public Works Greg Gucwa, PE- Principal Johnson and Anderson
More informationATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING
ATTACHMENT 3: SPECIFICATION FOR SEWER CLEANING 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, material and supplies, insurance, accessories, tools, transportation,
More informationCHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
More informationUNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS
U UNDERGROUND INFRASTRUCTURE SPECIALISTS TABLE OF CONTENTS 3. COMPANY PROFILE A growing company excelling in the fields of infrastructure repair and maintenance. 6. MANDREL TESTING Individually approved
More informationSECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. 1.01 Testing - General
SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL 1.01 Testing - General Testing shall be of the type and frequency described in each section and summarized in Item 1 of this section. In addition to
More informationSan Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS
ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by
More informationSECTION 7- STORM SEWER
SECTION 7- STORM SEWER 7.1. STORM SEWERS.... 7-1 7.2. SUMP DRAINS... 7-3 7.3. CATCH BASINS... 7-3 7.4. MANHOLES... 7-4 7.5. STORM SEWER CALCULATIONS... 7-4 7.6. CULVERTS AND BRIDGES... 7-5 7.7. OPEN CHANNELS...
More informationWauwatosa Lateral Rehabilitation Pilot Project. CSWEA Annual Meeting Madison, WI May 15, 2013
Wauwatosa Lateral Rehabilitation Pilot Project CSWEA Annual Meeting Madison, WI May 15, 2013 Overview Background Objectives Work Completed Testing Evaluation Conclusions 2 Milwaukee Metropolitan Sewerage
More informationZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022
ZIONSVILLE WASTEWATER DEPARTMENT 10-YEAR SEWER REHABILITATION REPORT 2013-2022 Town of Zionsville, Indiana December 19, 2012 PREPARED BY BEAM, LONGEST & NEFF, LLC. 8126 Castleton Road Indianapolis, Indiana
More informationPipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe
Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe As the Environmental Protection Agency tightens groundwater quality regulations, old leaking sewers lines made of pipe clay,
More informationSanitary Sewer Smoke Testing
Sanitary Sewer Smoke Testing Beginning March 31, 2014 The City of Brunswick will be conducting smoke testing on the City s sanitary sewer system beginning March 31, 2014. Smoke testing will occur over
More informationClose-Out Documents... 9
Water and Sanitary Sewer Service Connection Requirements Service Connection Requirements... 1 Application for Services... 2 Water Meter Application... 2 Wet Tap/Tie-in Connection Requirements... 3 Meter
More informationSANITARY SEWER BACKUP. Causes & Prevention
SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides
More informationSECTION 7 UNDERDRAIN SERVICE
SECTION 7 UNDERDRAIN SERVICE ARTICLE I USE OF THE PUBLIC UNDERDRAIN SYSTEM 7.100 The purpose of the District s underdrain system is to provide a method for conveying ground water from around building foundations
More informationSECTION 6 SANITARY SEWER MAIN 6.01 SCOPE
6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction
More informationMarch 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS
March 2006 CW 2140 - SEWER AND MANHOLE CLEANING TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions... 1 3. CONSTRUCTION METHODS... 1 3.1 High
More informationHow To Install An Overhead Sewer
Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage
More informationby Leonard Friesenhahn, P.E.
by Leonard Friesenhahn, P.E. of sight, out of mind is an adage your top administrators may apply to your campus Out wastewater collection system but as a facilities professional, you know how serious a
More informationBeacon Hill Sewer District Standard Specifications
Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions
More informationCity of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING
1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of testing wastewater and/or storm mains to ensure construction conforms to the proper line, grade, cross section and performance. 2.1 The
More informationDrain & Tank Cleaning
Drain & Tank Cleaning Our ever growing fleet of drain cleaning vehicles ranging from small vans to Hi-spec Jet-Vac units enable us to provide you with the right equipment at the right time. Services include:
More informationSECTION 810 SEWER LINE CLEANING
SECTION 810 SEWER LINE CLEANING I. GENERAL 1.1 DESCRIPTION OF WORK The work covered by this section consists of providing all labor, equipment, material and supplies and performing all operations required
More informationQuantifying Inflow and Infiltration via Dyed Water Flooding
Quantifying Inflow and Infiltration via Dyed Water Flooding Prepared by Anna Kesler, E.I.T. Catherine Morley, P.E. Overview Historical background to City of Elmhurst I/I issues What Is Dye Flooding? What
More information