1 1. SoS From: Martin Bellamy Pensions IS Director Date: 16 February 2007 Copy:Janet Grossman Acting Chief Executive Permanent Secretary Ministers Special Advisors ET PSMT See attached list Use of the Customer Information System as a shared, cross-government asset Issue: Action: Timing: Use of CIS as a shared, cross-government asset To note the current position, agree in principle to the way forward and approve the next steps In advance of the Ministerial Steering Group meeting on 21 February Summary This submission recommends that you agree in principle to the way forward and approve the next phase of the work on the feasibility study into the use of the Customer Information System (CIS) as a shared, cross-government asset: in support of the Home Office Identity Scheme and the National Identity Register (NIR); by Her Majesty s Revenue and Customs (HMRC) as their customer data master; and by other Government Departments (OGDs), Local Authorities and public bodies as a source of identity data. The existing CIS programme has no funding or headcount cover to enable it to undertake any work beyond the currently approved scope. This recommendation is therefore subject to formal confirmation that sufficient new funding and headcount can be provided to undertake both the next stage of feasibility, and the investment and ongoing operational costs involved in providing the services thereafter. Our discussions with the Home Office and HMRC have assumed the principle that the additional costs incurred by DWP in supporting the other departments will be fully reimbursed by the Home Office and HMRC We need to ensure there is clear cross-department

2 agreement both on the principle and mechanism of providing DWP with the funding and headcount for work undertaken, and on the scale of the costs involved before the next phase commences. The submission states the position to date and explains that there are a number of risks and issues to overcome before we can take the work forward. This is pioneering activity and therefore there are no precedents for us to follow. The significance of the work and the level of investment required mean that a commitment now is effectively irreversible. However, the submission also explains the positive benefits to DWP of continuing with this work. Background 1. XXXXXXXXXXXX submission of 30 October 2006 (copy attached) explained that a joint team of DWP and Identity and Passport Service (IPS) officials were to carry out a feasibility study into the wider use of CIS in support of the Home Office Identity Scheme and the NIR. In addition we have been working with HMRC officials concerning the use of CIS as their customer data master. 2. XXXXXXXXXXXX further submission of 6 December 2006 (copy also attached) said that so far the feasibility study had not discovered any issues that would prevent this use of CIS. However, work was ongoing to evaluate in depth any risks involved and determine the costs and benefits across DWP, IPS and wider Government and Local Authorities before we could recommend with confidence this use of CIS. 3. The review has been a broad study and has looked at whether there are any major reasons why we should not permit the use of CIS in this way. We are conscious that there is more detailed work to do but want to update you on progress so far and secure your agreement to the work continuing, pending a further submission in which we will finalise the position. 4. Ministers from DWP (James Plaskitt), HMRC (Dawn Primarolo) and Home Office (Liam Byrne and Joan Ryan) are due to meet on 21 February to receive the report from the feasibility study. Current involvement of Other Government Departments (OGDs) 5. As well as DWP and the Northern Ireland Social Security Agency, CIS already services a number of OGDs. These include HMRC and the Home Office (the two main Commissioners), the Driver and Vehicle Licensing Agency (DVLA), the Department for Constitutional Affairs and the Legal Services Commission. CIS also services the 409 English, Welsh, Scottish and Northern Irish Local Authorities and their staff working from home.

3 HMRC s position 6. HMRC are intending to use CIS as their master source of customer information. Their specific requirements include: extending the current CIS on-line tracing facility to a greater number of users; expanding the current customer base to include people without a National Insurance number; and data cleansing and improving the quality of the data held on the system. The Home Office s position 7. The Home Office has asked that CIS be used to support its Identity Scheme and the NIR. The NIR is made up of three key data items, biographic, biometric and information security. IPS approached DWP last year and asked for assistance in determining whether CIS and its surrounding infrastructure could be used to deliver the biographical element of NIR. XXXXXXXXXXXXXX 8. XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXX. Advantages 9. There are advantages to DWP, OGDs and Local Authorities in using CIS as a shared cross-government asset: Cost sharing 10. If we are able to share the future costs of CIS it will be more cost efficient for all Departments, including DWP, rather than individual Departments proceeding in isolation. However, the infrastructure needed to support all users is likely to be more expensive and the total operating costs could be high. Data quality improvement 11. The Gold Standard identity verification of the NIR and greater usage by non-benefit related activity will improve the quality of personal data held by DWP. Earlier notification of changes from HMRC sources will also benefit DWP as we have a shared customer base.

4 Cross-Government co-operation 12. The Varney report 1 on transforming the delivery of public services looked in particular at how the channels through which services are delivered can be made more responsive to the needs of citizens and businesses. Sir David Varney said there are opportunities to deliver better public services through joining up service provision across the public sector. 13. Using CIS as a shared cross-government asset puts DWP in the lead in the Transformational Government Strategy and cross-government cooperation. Sharing CIS supports some of the Government s most important strategic goals such as joined-up Government and the re-use of assets. It allows the release of efficiencies across the system and supports delivery that is more focused on customer needs. Risks 14. Moving to a shared service is not risk free, but we believe it is appropriate to recommend going ahead with the next phase. The main risks concern the level of resources required to do the work and the intense pressure the Department is under to meet the headcount challenge from March 08. We also need to ensure that by acceding to requests from OGDs we do not allow DWP s future requirements to take second place, for example enhancements to support the Customer Insight and DWP MyAccounts capabilities described in the Business Strategy. 15. A full list of the main risks involved is at Annex B. The Commercial Approach 16. The Department is running a competition through its UNITY framework agreement to identify a supplier capable of delivering Employment and Support Allowance (ESA) and a range of future DWP requirements including CIS. This approach is consistent with EU Procurement Regulations and Public Procurement Guidelines. The Request for Proposal was issued on 2nd February 2007 and the Department is expecting to select a supplier by June The operation of CIS is currently contracted to EDS. Extending the scope of operations to include other departments may create some risk of procurement challenge, which is likely to increase the wider the use of CIS. This risk is currently being investigated. Funding and budgetary approval 17. The existing CIS programme has no funding or headcount cover to enable it to undertake any work beyond the currently approved scope. Our discussions with the Home Office and HMRC have assumed the principle that the additional costs incurred by DWP in supporting the other departments will 1 Service Transformation: a Better Service For Citizens and Businesses, a Better Deal for Taxpayers, published on

5 be fully reimbursed by the Home Office and HMRC however we are yet to obtain formal confirmation that this principle is fully supported by the other departments. Additionally we need to achieve consensus on the scale of costs that DWP is likely to need to incur. It will also be necessary to agree a delegated spending authorisation process to DWP to enable the pace of decision making needed to achieve desired timescales. Governance 18. We propose joint governance in a Commissioner-Provider model where IPS, HMRC and DWP are Commissioners of CIS development and DWP is the Provider. We are currently developing the fit with existing DWP governance arrangements but expect these to remain the standard with escalation where necessary to the proposed governing bodies. This will ensure the safeguarding of DWP interests. Technical and Security 19. CIS was designed to be expansible but we need to procure the appropriate extra hardware infrastructure, make the necessary software changes to increase its capacity to the level required and understand the capacity milestones. There is also an issue over Data Centre suitability and the Department is currently considering its Data Centre strategy. At present this is just an intention, not a firm plan or commitment but a decision to go ahead with CIS will make it a imperative. Organisational capability to deliver a shared service 20. The proposed use of CIS will require DWP, in many respects, to perform the role of an IT services company. This will require the development of new capabilities in order to support other departments effectively. Additionally, to achieve this cross-government service we are investigating ways of increasing our system development capacity and upgrading our operational capability. Next steps 21. These are the broad activities for the coming months. More detail is provided in Annex C. The next phase will require a significant increase in DWP and Supplier resources working on behalf of other departments. Feb Mar Mar/Apr/May May/Jun/Jul Jul/Aug/Sep Aug/Sep Sep Ministerial approval Confirm governance arrangements Supplier selection and project start up Analysis and planning High-level design Preparation of plan and business case, mobilisation of the next phase Further ministerial meeting to approve moving into build stage.

6 Summary 22. The work completed to date by our teams has proved valuable in demonstrating that there are no apparent showstoppers, but there is clearly a way to go before all parties have a full understanding and everything is in place to facilitate success. There are many risks involved and this work takes DWP into new territory that is pioneering for Government, setting up the first cross-government shared service of its kind. Initiating the next phase will require a significant increase in DWP resources on this initiative. We need to ensure there is clear cross-department agreement both on the principles of providing DWP with the funding and headcount for work undertaken and on the likely scale of the costs involved before the next phase commences. 23. The significance of CIS in the Home Office and the resourcing and major level of investment required means that we can only go into the next phase of development if we are sure we have sufficient flexibility around budget and headcount. If we commit, our decision is effectively irreversible; we cannot then decide not to support Home Office and IPS requirements. Recommendation 24. Subject to agreement from the other departments on the principle and mechanisms to provide the funding and headcount needed for the work we will undertake on their behalf, we recommend that you agree to the proposed way forward and approve the next stage of the work as outlined in this submission. Martin Bellamy Pensions IS Director Trevelyan House 30 Great Peter Street London SW1P 2BY

7 COPY LIST Ministers ET PSMT PSD Board CIS PSC XXXXXXXXXXXX Xxxxxxxxxxxxx David Blair xxxxxxxxxxxxxxxxxx Bryan Horrocks xxxxxxxxxxx xxxxxxxxxxxx Larry McCaffery xxxxxxxxx xxxxxxxxxx xxxxxxxxxx xxxxxxxxxxxx Steve Riley

8 ANNEX A XXXXXXX XX XXXXXXXX XXXXXXX XXXXXX xxx xxxxxxxx xxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxx xxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxx. Xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxx xxxxxxx Xxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxx xxxxxxxx. Xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxx. Xxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxx xxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxxxxxxxxx. Xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx xxxxxxxxxxxxxxxxxxxx.

9 ANNEX B MAIN RISKS Opportunity costs of proceeding by extending the use of CIS across Government we have less capacity to meet DWP s own wish list and the routine series of change requests. We need to prioritise DWP s work with that of the other organisations involved. Reputational risks to DWP including scheme design and security of the system. Resourcing The Department is under intense pressure to meet the March 08 headcount target. CIS is a seriously challenging project and will need considerably greater resources than we currently have. It also needs us to expend our energy on the work rather than the budget and headcount issues. However, as of today there is no means of giving DWP extra headcount for this and the current assumption is that, without this work, the CIS project disbands in March 08. Timing IPS is looking for their requirements to be included in the release at the end of 2008 but the issues we encounter with our own development programme, any contractual issues that may arise plus the availability of IPS and HMRC resources may affect the timing of how we proceed with CIS. The requirements phase of the project is during and we cannot delay this aspect if we are to meet our scheduled releases. We have to proceed now. The Commissioner-Provider model moves us from a position where we have total control of our data to one where we share the control with other users. In principle this should not present any obstacles but there is a risk that the Commissioners will not be able to act cohesively and the ability of DWP to run a functional development organisation could be impeded. This work is leading the way for DWP to perform the role of an IT services company but the Department does not have the required capabilities to do this at present. We will need to build these quickly and there is a risk that we will not be able to build a complete set of capabilities in the required time. There is a possibility of decreased data security and quality. We do not believe this will be the case but allowing shared use of our data opens up access to a large user community in various locations. The intention is that the system will be secure but the risk increases with an increased user capacity. The complexity of what remains on the original CIS programme, for example the decommissioning of legacy systems. The programme is already five months behind schedule and, although we are doing all we can to prevent this slipping further, the delays have worsened over the past 2 months. The operation of CIS is currently contracted to EDS. Extending the scope of operations to include other departments may create some risk of procurement challenge, which is likely to increase the wider the use of CIS. This risk is currently being investigated.

10 ANNEX C FURTHER DETAIL ON NEXT STEPS Detailed areas of work 1. Planning the implementation stage including production of a consolidated project plan across all DWP work streams, the business case, and funding and headcount requirements. 2. Building stakeholder support across DWP, securing headcount and developing project organisation and capabilities. 3. Developing the joint governance structure in a Commissioner-Provider model, to include a Memorandum of Understanding and definition of the relationship with the existing DWP escalation bodies Investment Committee and Change Delivery Committee. 4. Business architecture Scheme design and how this fits with DWP business architecture Discussion with all DWP businesses and other business stakeholders on the effect on their processes 5. Defining precise requirements and high level design and integrating the design authorities. 6. Developing a strategy for development capacity including joining up design teams in DWP with OGDs and re-engineering the test services currently provided to DWP under the EDS TREDSS contract to make them suitable for cross-government use and long term support. 7. Understanding the organisational implications for the Pensions IS/IT Directorate and building new capabilities in relationship management, product management and service management. 8. Establishing cross-organisational service delivery management, including establishment of support arrangements with monitoring and escalation paths suitable for all stakeholders and ensuring that our data centres are up to standard for cross-government service. 9. Supplier management including selecting and confirming the supplier and establishing the contractual and working arrangements to minimise the potential for delay or poor quality work, at the same time ensuring that our commercial footprint is broad enough for future needs. 10. Establishing a funding regime including provision for feasibility funding, arrangements for funds transfer, reporting and reconciliation and arrangements for joint responses to audit bodies.

7.1 MANAGED FIREWALL SERVICES (MFS) (L.34.1.6; C.2.10.1)

7.1 MANAGED FIREWALL SERVICES (MFS) (L.34.1.6; C.2.10.1) 7.1 MANAGED FIREWALL SERVICES (MFS) (L.34.1.6; C.2.10.1) The offeror shall describe the means by which the requirements for Security Services specified in Section C.2 Technical Requirements will be satisfied.

More information

FTS NETWORX Enterprise TQC-JTB-05-0002

FTS NETWORX Enterprise TQC-JTB-05-0002 7 DISASTER RECOVERY The Sprint promise to our customers is to deliver the broadest choice and flexibility of communication products and services so they can do what they want and better. Sprint understands,

More information

5.2.2 Voice Over Internet Protocol Transport Services (VOIPTS) (L.34.1.4; C.2.7.8)

5.2.2 Voice Over Internet Protocol Transport Services (VOIPTS) (L.34.1.4; C.2.7.8) 5.2.2 Voice Over Internet Protocol Transport Services (VOIPTS) (L.34.1.4; C.2.7.8) The offeror shall describe the means by which the requirements for Transport/IP/Optical Services specified in Section

More information

7.6 VULNERABILITY SCANNING SERVICE (VSS) (L.34.1.6.4; C.2.10.3) 7.6.1 Satisfying the Service Requirements (L.34.1.6.4 (c))

7.6 VULNERABILITY SCANNING SERVICE (VSS) (L.34.1.6.4; C.2.10.3) 7.6.1 Satisfying the Service Requirements (L.34.1.6.4 (c)) 7.6 VULNERABILITY SCANNING SERVICE (VSS) (L.34.1.6.4; C.2.10.3) The offeror shall describe each of the optional Security Services offered. Table L.34.1-8 shows the Security Services that shall be optional

More information

Pension Taxation Issues. 2. This paper deals with a number of topical issues in the general area of pension taxation.

Pension Taxation Issues. 2. This paper deals with a number of topical issues in the general area of pension taxation. TSG 10/23 Pension Taxation Issues Introduction 1. Over half of people in employment are covered by supplementary or private pension arrangements, including close to 850,000 private and public sector employees

More information

7.5.1 Satisfying the Service Requirements (L.34.1.6.4 (c))

7.5.1 Satisfying the Service Requirements (L.34.1.6.4 (c)) 7.5 MANAGED E-AUTHENTICATION SERVICE (MEAS) (L.34.1.6.4; C.2.10.6) The offeror shall describe each of the optional Security Services offered. Table L.34.1-8 shows the Security Services that shall be optional

More information

ROSS PHILO EXECUTIVE VICE PRESIDENT AND CHIEF INFORMATION OFFICER

ROSS PHILO EXECUTIVE VICE PRESIDENT AND CHIEF INFORMATION OFFICER March 24, 2010 ROSS PHILO EXECUTIVE VICE PRESIDENT AND CHIEF INFORMATION OFFICER CHARLES L. MCGANN MANAGER, CORPORATE INFORMATION SECURITY SUBJECT: Audit Report Windows Access Controls at the Information

More information

Capital Investment in Health Report of the Department of Health. Overview and Priorities

Capital Investment in Health Report of the Department of Health. Overview and Priorities Capital Investment in Health Report of the Department of Health Overview and Priorities Introduction The attached report, which can be read in conjunction with the HSE Capital Plan 2011-2015 1, seeks to

More information

6.3 VIDEO TELECONFERENCING SERVICES (VTS) (L.34.1.5.4; C.2.8.1) 6.3.1 Satisfying the Service Requirements (L.34.1.5.4 (c))

6.3 VIDEO TELECONFERENCING SERVICES (VTS) (L.34.1.5.4; C.2.8.1) 6.3.1 Satisfying the Service Requirements (L.34.1.5.4 (c)) 6.3 VIDEO TELECONFERENCING SERVICES (VTS) (L.34.1.5.4; C.2.8.1) The offeror shall describe each of the optional Management and Applications Services offered. Table L.34.1-6 shows the Management and Applications

More information

SUBJECT: Audit Report Disaster Recovery Capabilities of the Enterprise Payment Switch (Report Number IS-AR-09-009)

SUBJECT: Audit Report Disaster Recovery Capabilities of the Enterprise Payment Switch (Report Number IS-AR-09-009) July 30, 2009 ROSS PHILO VICE PRESIDENT, CHIEF INFORMATION OFFICER ROBERT J. PEDERSEN TREASURER SUBJECT: Audit Report Disaster Recovery Capabilities of the (Report Number ) This report presents the results

More information

PAUL VOGEL MANAGING DIRECTOR, GLOBAL BUSINESS AND SENIOR VICE PRESIDENT

PAUL VOGEL MANAGING DIRECTOR, GLOBAL BUSINESS AND SENIOR VICE PRESIDENT February 12, 2008 GEORGE W. WRIGHT ACTING VICE PRESIDENT, CHIEF TECHNOLOGY OFFICER SUSAN M. PLONKEY VICE PRESIDENT, CUSTOMER SERVICE PAUL VOGEL MANAGING DIRECTOR, GLOBAL BUSINESS AND SENIOR VICE PRESIDENT

More information

HALLOWEEN SPOOKTACULAR STUDENT WORKSHEET MASTERS AND ANSWER KEYS

HALLOWEEN SPOOKTACULAR STUDENT WORKSHEET MASTERS AND ANSWER KEYS HALLOWEEN SPOOKTACULAR STUDENT WORKSHEET MASTERS AND ANSWER KEYS Dear Assembly Coordinator and Teachers, The following pages contain student worksheet masters and answer keys. They are to be used in conjunction

More information

UnitedHealthcare India Claims Document Submission-Self Service Tool

UnitedHealthcare India Claims Document Submission-Self Service Tool UnitedHealthcare India Claims Document Submission-Self Service Tool Any use, copying or distribution without written permission from UnitedHealth Group is prohibited. 1 Overview (Please click on the link

More information

IVA Funds New IRA Account Application

IVA Funds New IRA Account Application PLEASE PRINT ALL ITEMS CLEARLY IVA Funds New IRA Account Application This form may be used to open a new Traditional IRA, Rollover IRA, Roth IRA, or SEP IRA in accordance with the Custodial Account Adoption

More information

NEXT. Tools of the Participant Portal: Scientific Reports & Deliverables

NEXT. Tools of the Participant Portal: Scientific Reports & Deliverables NEXT Tools of the Participant Portal: Scientific Reports & Deliverables Scientific Reporting and Deliverables: Terminology Scientific Reporting: Standardised format & always due at the end of Reporting

More information

Review of VAT on Property Summary

Review of VAT on Property Summary Review of VAT on Property Summary TSG 06/18 1. This paper deals with the current system of applying VAT to property transactions and the various proposals for change arising from a Revenue review of VAT

More information

9 TROUBLE AND COMPLAINT HANDLING

9 TROUBLE AND COMPLAINT HANDLING 9 TROUBLE AND COMPLAINT HANDLING The offeror shall describe its organization, resources, strategies, practices, policies, processes, procedures, tools, systems, reports and any other relevant capabilities

More information

3.2 Program Management (L.30.2.3.2; C.7; G.1.3)

3.2 Program Management (L.30.2.3.2; C.7; G.1.3) 3.2 Program Management (L.30.2.3.2; C.7; G.1.3) Verizon, as a full-service telecommunications integrator, is the logical choice to continue serving and expanding the growing WITS customer base due to its

More information

Highlands and Islands Broadband Pathfinder Project - Background

Highlands and Islands Broadband Pathfinder Project - Background ITEM: 22(a) PAGE: 1 REPORT TO: The Moray Council on 5 July, 2006 SUBJECT: BY: Highlands and Islands Broadband Pathfinder Project - Background Chief Executive 1. Reason for Report 1.1 The Pathfinder Broadband

More information

Objectives for today. Cloud Computing i det offentlige UK Public Sector G-Cloud, Applications Store & Data Centre Strategy

Objectives for today. Cloud Computing i det offentlige UK Public Sector G-Cloud, Applications Store & Data Centre Strategy Cloud Computing i det offentlige UK Public Sector G-Cloud, Applications Store & Data Centre Strategy This is not just about technology. The main area of change, thus the major challenge, is how we as leaders

More information

Off-Site Contingency Plan REDACTED VERSION

Off-Site Contingency Plan REDACTED VERSION Hunterston B Nuclear Power Station and Hunterston A Decommissioning Site Off-Site Contingency Plan Prepared by Ayrshire Civil Contingencies Team on behalf of North Ayrshire Council For the West of Scotland

More information

RIAS. Scottish Conditions of Appointment of an Architect Small Project Version ASP/2005 (November 2011 revision)

RIAS. Scottish Conditions of Appointment of an Architect Small Project Version ASP/2005 (November 2011 revision) Scottish Conditions of Appointment of an Architect Small Project Version ASP/2005 (November 2011 revision) RIAS The Royal Incorporation of Architects in Scotland Thank you for choosing to use this form

More information

PROJECT AGREEMENT FOR THE PLANNING AND DESIGN OF THE COMMON REGISTRY SOLUTIONS

PROJECT AGREEMENT FOR THE PLANNING AND DESIGN OF THE COMMON REGISTRY SOLUTIONS PROJECT AGREEMENT FOR THE PLANNING AND DESIGN OF THE COMMON REGISTRY SOLUTIONS Council of Australian Governments An agreement between the Commonwealth of Australia and the States and Territories, being

More information

communication and action-planning toolkit using surveys to achieve change in organisations

communication and action-planning toolkit using surveys to achieve change in organisations communication and action-planning toolkit using surveys to achieve change in organisations www.voiceproject.com.au Voice Project Pty Ltd, ABN 90 089 506 801 Sydney Melbourne P: +61 2 8875 2800, E: sydney@voiceproject.com.au

More information

An example of a CPD submission by an independent statistical consultant

An example of a CPD submission by an independent statistical consultant An example of a CPD submission by an independent statistical consultant Commentary The attached submission was made by a CSci registrant who was selected for audit as part of the CSci revalidation process

More information

Technology in Business Fast Stream Graduate Programme

Technology in Business Fast Stream Graduate Programme Technology in Business Fast Stream Graduate Programme 02 Contents Welcome p.03 What is the Technology in Business Fast Stream? p.04 What are we looking for? p.06 Your Fast Stream career path p.08 Profiles

More information

PROJECT MANAGEMENT FRAMEWORK

PROJECT MANAGEMENT FRAMEWORK PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to

More information

Agreement for the provision of IT Management Services and IT Services

Agreement for the provision of IT Management Services and IT Services Board Date: 26 March 2015 Item 16: Agreement for the provision of IT Management Services and IT Services This paper will be considered in public 1 Summary 1.1 This paper asks the Board to approve extended

More information

January 20, 2009 GEORGE W. WRIGHT VICE PRESIDENT, INFORMATION TECHNOLOGY OPERATIONS

January 20, 2009 GEORGE W. WRIGHT VICE PRESIDENT, INFORMATION TECHNOLOGY OPERATIONS January 20, 2009 GEORGE W. WRIGHT VICE PRESIDENT, INFORMATION TECHNOLOGY OPERATIONS SUBJECT: Audit Report Service Continuity at the Information Technology and (Report Number ) This report presents the

More information

THOMAS G. DAY SENIOR VICE PRESIDENT, INTELLIGENT MAIL AND ADDRESS QUALITY PRITHA N. MEHRA VICE PRESIDENT, BUSINESS MAIL ENTRY AND PAYMENT TECHNOLOGIES

THOMAS G. DAY SENIOR VICE PRESIDENT, INTELLIGENT MAIL AND ADDRESS QUALITY PRITHA N. MEHRA VICE PRESIDENT, BUSINESS MAIL ENTRY AND PAYMENT TECHNOLOGIES March 31, 2009 THOMAS G. DAY SENIOR VICE PRESIDENT, INTELLIGENT MAIL AND ADDRESS QUALITY PRITHA N. MEHRA VICE PRESIDENT, BUSINESS MAIL ENTRY AND PAYMENT TECHNOLOGIES GEORGE W. WRIGHT VICE PRESIDENT, INFORMATION

More information

Local Support Services Framework

Local Support Services Framework Local Support Services Framework DRAFT Overarching Partnership Agreement between the Department for Work And Pensions, the Convention of Scottish Local Authorities and Scottish Government January 2014

More information

Ian Parry, Deputy Leader and Cabinet Member for Strategy, Finance and Corporate Issues said,

Ian Parry, Deputy Leader and Cabinet Member for Strategy, Finance and Corporate Issues said, Cabinet Meeting on Wednesday 16 December 2015 Support Services Service and System Replacement Ian Parry, Deputy Leader and Cabinet Member for Strategy, Finance and Corporate Issues said, As a well-run

More information

HIGHLANDS AND ISLANDS PATHFINDER BROADBAND PROCUREMENT: APPOINTMENT OF PREFERRED SUPPLIER

HIGHLANDS AND ISLANDS PATHFINDER BROADBAND PROCUREMENT: APPOINTMENT OF PREFERRED SUPPLIER ARGYLL AND BUTE COUNCIL STRATEGIC POLICY COMMITTEE CHIEF EXECUTIVE 20 JULY 2006 HIGHLANDS AND ISLANDS PATHFINDER BROADBAND PROCUREMENT: APPOINTMENT OF PREFERRED SUPPLIER 1 SUMMARY This report updates the

More information

Appendix D Programme Stream 6 CRM Procurement. Programme Stream 6 Remodelling of Customer Services Programme CRM Procurement

Appendix D Programme Stream 6 CRM Procurement. Programme Stream 6 Remodelling of Customer Services Programme CRM Procurement Programme Stream 6 Remodelling of Customer Services Programme CRM Procurement Recommendations That the Executive note CRM procurement will be put out to tender in 2010/11 and note the proposed phasing

More information

John A Manzoni Chief Executive of the Civil Service. Email chief.executive@cabinetoffice.gov.uk

John A Manzoni Chief Executive of the Civil Service. Email chief.executive@cabinetoffice.gov.uk John A Manzoni Chief Executive of the Civil Service Email chief.executive@cabinetoffice.gov.uk 70 Whitehall London SW1A 2AS Telephone +44 (0) 20 7271 8822 Web www.cabinetoffice.gov.uk Paul Chinn Cabinet

More information

Documentation for data centre migrations

Documentation for data centre migrations Documentation for data centre migrations Data centre migrations are part of the normal life cycle of a typical enterprise. As organisations expand, many reach a point where maintaining multiple, distributed

More information

How to find your R&S Reports

How to find your R&S Reports How to find your R&S Reports 1) Go to www.tmhp.com and click providers in the header. 2) Click Go to TexMedConnect in the upper right corner. 3) Enter your User name and Password. Click OK. Version 2012

More information

Framework Agreement between the Department of Health and the NHS Trust Development Authority. Annex C: Finance and Accounting

Framework Agreement between the Department of Health and the NHS Trust Development Authority. Annex C: Finance and Accounting Framework Agreement between the Department of Health and the NHS Trust Development Authority Annex C: Finance and Accounting 2014 1. The Framework Agreement sets out the governance and accountability arrangements

More information

Displaying a CAODC Service Rig Electronic Tour Sheet

Displaying a CAODC Service Rig Electronic Tour Sheet Displaying a CAODC Service Rig Electronic Tour Sheet V1.4.0 A displayed or printed Service Rig Electronic Tour Sheet is divided into the individual sections as defined below. Each section can have independent

More information

NATIONAL IDENTITY SCHEME DELIVERY PLAN 2008

NATIONAL IDENTITY SCHEME DELIVERY PLAN 2008 2 Contents Foreword by the Rt Hon Jacqui Smith MP, Home Secretary Executive Summary 6 1. What we have achieved 9 Foreign nationals 9 Passport integrity improvements 10 Identity checking services expansion

More information

GOVERNANCE AND ACCOUNTILIBILITY FRAMEWORK 2012-2013

GOVERNANCE AND ACCOUNTILIBILITY FRAMEWORK 2012-2013 Schedule 4.1 STANDING ORDERS FOR THE WELSH HEALTH SPECIALISED SERVICES COMMITTEE See separate document: Schedule 4.1 This Schedule forms part of, and shall have effect as if incorporated in the Local Health

More information

Entrepreneurs Programme - Business Growth Grants

Entrepreneurs Programme - Business Growth Grants Entrepreneurs Programme - Business Growth Grants Version: 15 July 2015 Contents 1 Purpose of this guide... 4 2 Programme overview... 4 2.1 Business Management overview... 4 3 Business Growth Grant... 5

More information

Improving the operation of the Construction Industry Scheme

Improving the operation of the Construction Industry Scheme Improving the operation of the Construction Industry Scheme Who is likely to be affected? Businesses and individuals who are subcontractors or contractors participating in the scheme. Also commercial third

More information

INSTRUCTIONS FOR FILING FERC FORM NO. 73 OIL PIPELINE SERVICE LIFE DATA

INSTRUCTIONS FOR FILING FERC FORM NO. 73 OIL PIPELINE SERVICE LIFE DATA Form Approved OMB No. 1902-0019 (Expires 05/31/2017) INSTRUCTIONS FOR FILING FERC FORM NO. 73 OIL PIPELINE SERVICE LIFE DATA Title 18, U.S.C. 1001 makes it a crime for any person knowingly and willingly

More information

Audit of Payroll Distribution System California Institute of Technology Pasadena, California National Science Foundation Office of Inspector General

Audit of Payroll Distribution System California Institute of Technology Pasadena, California National Science Foundation Office of Inspector General Audit of Payroll Distribution System California Institute of Technology Pasadena, California National Science Foundation Office of Inspector General March 30, 2007 OIG 07-01-013 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX

More information

Australian Government Cloud Computing Policy

Australian Government Cloud Computing Policy Australian Government Cloud Computing Policy Maximising the Value of Cloud VERSION 2.1 JULY 2013 AGIMO is part of the Department of Finance and Deregulation Contents Foreword 3 Introduction 4 Policy 5

More information

Australian Government Cloud Computing Policy

Australian Government Cloud Computing Policy Australian Government Cloud Computing Policy Maximising the Value of Cloud VERSION 2.0 MAY 2013 AGIMO is part of the Department of Finance and Deregulation Contents Foreword 3 Introduction 4 Australian

More information

Application Information Pack CRM Project Manager

Application Information Pack CRM Project Manager Application Information Pack CRM Project Manager Introduction to Girlguiding Thank you for your interest in the role of CRM Project Manager. This document provides information relating to the above vacancy

More information

Communication Capability Review: Department for Business, Innovation & Skills

Communication Capability Review: Department for Business, Innovation & Skills Communication Capability Review: Department for Business, Innovation & Skills 1 1 Management summary 1.1 The Communication Capability Review of the Department for Business, Innovation and Skills (BIS)

More information

Firefighter fitness standards and assessment

Firefighter fitness standards and assessment Firefighter fitness standards and assessment Consultation response December 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with

More information

Business Operations. Module Db. Capita s Combined Offer for Business & Enforcement Operations delivers many overarching benefits for TfL:

Business Operations. Module Db. Capita s Combined Offer for Business & Enforcement Operations delivers many overarching benefits for TfL: Module Db Technical Solution Capita s Combined Offer for Business & Enforcement Operations delivers many overarching benefits for TfL: Cost is reduced through greater economies of scale, removal of duplication

More information

Internal Audit Monitoring Report. Audit Report status Assurance. Payroll Final Limited

Internal Audit Monitoring Report. Audit Report status Assurance. Payroll Final Limited Appendix 1 Internal Audit Monitoring Report Audit Report status Assurance Payroll Final Limited The Payroll system was reviewed to seek assurance that processes and procedures are operating effectively

More information

" ANNEX 4. 4. European research infrastructures (including e-infrastructures).."

 ANNEX 4. 4. European research infrastructures (including e-infrastructures).. EN ANNEX 4 " ANNEX 4 HORIZON 2020 WORK PROGRAMME 2016 2017 4..." This draft text is submitted to the Horizon 2020 Programme Committee as the basis for an exchange of views. The text is still subject to

More information

RESOURCES MANAGEMENT FINANCE AND PURCHASING, STAFF, FACILITIES, ENVIRONMENTAL MANAGEMENT AND LEARNING AND RESEARCH INFORMATION SERVICES

RESOURCES MANAGEMENT FINANCE AND PURCHASING, STAFF, FACILITIES, ENVIRONMENTAL MANAGEMENT AND LEARNING AND RESEARCH INFORMATION SERVICES RESOURCES MANAGEMENT FINANCE AND PURCHASING, STAFF, FACILITIES, ENVIRONMENTAL MANAGEMENT AND LEARNING AND RESEARCH INFORMATION SERVICES Records about: Retention period Rationale Sector Function: Financial

More information

Performance Management 2012/ 13: Quarter 4

Performance Management 2012/ 13: Quarter 4 Performance Management 2012/ 13: Quarter 4 Policy and Resources Committee Chief Executive Director of Finance and Corporate Resources Director of Social and Community Services Director of Technical Services

More information

EDUCATION PPP PROJECTS Pre-FINANCIAL CLOSE KEY STAGE REVIEW SCOTTISH EXECUTIVE FINANCIAL PARTNERSHIPS UNIT

EDUCATION PPP PROJECTS Pre-FINANCIAL CLOSE KEY STAGE REVIEW SCOTTISH EXECUTIVE FINANCIAL PARTNERSHIPS UNIT Twinning PPP CZ: Annex 4 to Component 2 fact-finding report EDUCATION PPP PROJECTS Pre-FINANCIAL CLOSE KEY STAGE REVIEW SCOTTISH EXECUTIVE FINANCIAL PARTNERSHIPS UNIT June 2006 Pre-FC Education KSR June

More information

Information Systems and Services Joint Forces Command/ISS HQ, Chief of Staff Secretariat, Bldg 405, MOD Corsham, Westwells Road, CORSHAM, SN13 9NR

Information Systems and Services Joint Forces Command/ISS HQ, Chief of Staff Secretariat, Bldg 405, MOD Corsham, Westwells Road, CORSHAM, SN13 9NR Information Systems and Services Joint Forces Command/ISS HQ, Chief of Staff Secretariat, Bldg 405, MOD Corsham, Westwells Road, CORSHAM, SN13 9NR XXXXXXXXX XXXXXXXXXX XXXXXXXXXXXXXXX XXXXXX XXXXXXXXXXXXXXXXXXX

More information

CABINET. 24 April 2012. Title: Term Contract for Maintenance, Repair and Minor Works on Security and Protection Systems

CABINET. 24 April 2012. Title: Term Contract for Maintenance, Repair and Minor Works on Security and Protection Systems CABINET 24 April 2012 Title: Term Contract for Maintenance, Repair and Minor Works on Security and Protection Systems Report of the Cabinet Member for Finance and Education Open Report Wards Affected:

More information

UNITED KINGDOM DEBT MANAGEMENT OFFICE. Executive Agency Framework Document

UNITED KINGDOM DEBT MANAGEMENT OFFICE. Executive Agency Framework Document UNITED KINGDOM DEBT MANAGEMENT OFFICE Executive Agency Framework Document April 2005 UNITED KINGDOM DEBT MANAGEMENT OFFICE Executive Agency Framework Document April 2005 FOREWORD BY THE FINANCIAL SECRETARY

More information

Business Cases: A Summary Of Strategic & Cost Effective Project Management

Business Cases: A Summary Of Strategic & Cost Effective Project Management Page 75 Agenda Item 10 Report to: Strategy and Resources Committee Date: 14 December 2015 Report title: Report from: Ward/Areas affected: Strategic Business Case for sharing HR services with Royal Borough

More information

Efficiency and reform in government corporate functions through shared service centres

Efficiency and reform in government corporate functions through shared service centres REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 1790 SESSION 2010 2012 7 MARCH 2012 Cross government Efficiency and reform in government corporate functions through shared service centres 4 Key facts

More information

EXPLANATORY MEMORANDUM TO THE DATA RETENTION (EC DIRECTIVE) REGULATIONS 2007. 2007 No. 2199

EXPLANATORY MEMORANDUM TO THE DATA RETENTION (EC DIRECTIVE) REGULATIONS 2007. 2007 No. 2199 EXPLANATORY MEMORANDUM TO THE DATA RETENTION (EC DIRECTIVE) REGULATIONS 2007 2007 No. 2199 1. This explanatory memorandum has been prepared by the Home Office and is laid before Parliament by Command of

More information

Corporate Credit Card Policy and Procedures

Corporate Credit Card Policy and Procedures PROCUREMENT & PAYMENT SERVICES CORPORATE FINANCE FINANCE CHIEF EXECUTIVES Corporate Credit Card Policy and Procedures Version Control Version: 3 Date of Last Update: 11/08/14 PURPOSE/BACKGROUND To set

More information

Guidance for Higher Education Providers: Criteria and Process for applying for University Title and University College Title

Guidance for Higher Education Providers: Criteria and Process for applying for University Title and University College Title UNIVERSITY TITLE AND UNIVERSITY COLLEGE TITLE Guidance for Higher Education Providers: Criteria and Process for applying for University Title and University College Title SEPTEMBER 2015 Contents Process

More information

ORDER FORM. Part 1 - Order Form

ORDER FORM. Part 1 - Order Form ORDER FORM Part 1 - Order Form This Order Form is issued subject to the provisions of the framework agreement entered into between the Authority and the Supplier on 27/01/2010 ("Framework Agreement").

More information

Part B1: Business case developing the business case

Part B1: Business case developing the business case Overview Part A: Strategic assessment Part B1: Business case developing the business case Part B2: Business case procurement options Part B3: Business case funding and financing options Part C: Project

More information

Central Hosting. Case Study

Central Hosting. Case Study Central Hosting Case Study October, 2014 Central Hosting Case Study Background An Chéim was originally set up to procure, distribute and implement key MIS systems (hardware and software) for the Institutes

More information

I N C O N F I D E N C E

I N C O N F I D E N C E I N C O N F I D E N C E Cabinet Office CO (10) 2 Circular 1 August 2010 Intended for All Ministers All Chief Executives Speaker of the House General Manager, Parliamentary Service Controller and Auditor-General

More information

Records Disposal Schedule Anti-Discrimination Services Northern Territory Anti-Discrimination Commission

Records Disposal Schedule Anti-Discrimination Services Northern Territory Anti-Discrimination Commission Records disposal schedule Records Disposal Schedule Anti-Discrimination Services Northern Territory Anti-Discrimination Commission Disposal Schedule No. 2015/12 August 2015 NT Archives Service For information

More information

Achieving efficiencies in public transport delivery: The role of Local Integrated Transport Services (LITS)

Achieving efficiencies in public transport delivery: The role of Local Integrated Transport Services (LITS) Research and Information Service Paper 80/12 27 Apr 2012 NIAR 250-12 Des McKibbin Achieving efficiencies in public transport delivery: The role of Local Integrated Transport Services (LITS) 1 Overview

More information

Measures to Improve Accessibility of Public Websites in Europe

Measures to Improve Accessibility of Public Websites in Europe Measures to Improve Accessibility of Public Websites in Europe Executive Summary Centre for Excellence in Universal Design Research supported by: 1 Authors of this report This report was compiled and edited

More information

Achieving Strategy with IT projects through Business Process Change

Achieving Strategy with IT projects through Business Process Change Achieving Strategy with IT projects through Business Process Change Presented by Alex Attard October 2008 Incorporating ICT into the Regional Development Agenda: Using e-government Systems as the Driver

More information

FLORIDA DEPARTMENT OF EDUCATION OFFICE OF STUDENT FINANCIAL ASSISTANCE (OSFA) FEDERAL FAMILY EDUCATION LOAN PROGRAM LENDER ALERT JANUARY 2002

FLORIDA DEPARTMENT OF EDUCATION OFFICE OF STUDENT FINANCIAL ASSISTANCE (OSFA) FEDERAL FAMILY EDUCATION LOAN PROGRAM LENDER ALERT JANUARY 2002 FLORIDA DEPARTMENT OF EDUCATION OFFICE OF STUDENT FINANCIAL ASSISTANCE (OSFA) FEDERAL FAMILY EDUCATION LOAN PROGRAM LENDER ALERT JANUARY 2002 TERMINATED INSTITUTIONS The following educational institutions,

More information

CABINET - 26 JULY 2011 REPORT OF THE DIRECTOR OF CORPORATE RESOURCES EAST MIDLANDS SHARED SERVICES: PROCUREMENT OF MANAGED HOSTING SERVICE

CABINET - 26 JULY 2011 REPORT OF THE DIRECTOR OF CORPORATE RESOURCES EAST MIDLANDS SHARED SERVICES: PROCUREMENT OF MANAGED HOSTING SERVICE N CABINET - 26 JULY 2011 REPORT OF THE DIRECTOR OF CORPORATE RESOURCES EAST MIDLANDS SHARED SERVICES: PROCUREMENT OF MANAGED HOSTING SERVICE Purpose 1. The purpose of the report is to: advise Cabinet of

More information

TAFE TEACHERS AND RELATED EMPLOYEES ENTERPRISE AGREEMENT 2013. Statements of duties for proposed new roles

TAFE TEACHERS AND RELATED EMPLOYEES ENTERPRISE AGREEMENT 2013. Statements of duties for proposed new roles TAFE TEACHERS AND RELATED EMPLOYEES ENTERPRISE AGREEMENT 2013 Statements of duties for proposed new roles Education Support Officer Assessor Head Teacher Band 3 POSITION INFORMATION Education Support Officer

More information

CABINET 9 th February 2006. Report of the Director of Partnerships and Customer Services

CABINET 9 th February 2006. Report of the Director of Partnerships and Customer Services CABINET 9 th February 2006 Report of the Director of Partnerships and Customer Services ITEM 11 CRM DEVELOPMENT Purpose of the Report To seek approval to the replacement for the Council s Customer Relationship

More information

Purchasing and Managing Software Licences

Purchasing and Managing Software Licences Purchasing and Managing Software Licences REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 579 Session 2002-2003: 1 May 2003 LONDON: The Stationery Office 8.25 Ordered by the House of Commons to be printed

More information

Job Description. Industry business analyst. Salary Band: Purpose of Job

Job Description. Industry business analyst. Salary Band: Purpose of Job Job Description Job Title: Industry business analyst Division/Company: Industry Policy/Payments UK Reporting To: Director of Industry Policy Salary and: C Purpose of Job To provide thought leadership and

More information

Agencies and Public Bodies Team Public Bodies: A Guide for Departments

Agencies and Public Bodies Team Public Bodies: A Guide for Departments Agencies and Public Bodies Team Public Bodies: A Guide for Departments Chapter 7: Financial Management Planning, Funding and Control Chapter 7: Financial Management - Planning, Funding and Control FINANCIAL

More information

The Information Commissioner s Office response to HM Treasury s Call for Evidence on Data Sharing and Open Data in Banking

The Information Commissioner s Office response to HM Treasury s Call for Evidence on Data Sharing and Open Data in Banking The Information Commissioner s Office response to HM Treasury s Call for Evidence on Data Sharing and Open Data in Banking The Information Commissioner has responsibility for promoting and enforcing the

More information

CANI Financial Policy and Procedures

CANI Financial Policy and Procedures CANI Financial Policy and Procedures Policy CANI Council is conscious of the need to ensure that all funds received by the organisation are used in accordance with the aims and objectives of CANI; that

More information

INFORMATION GOVERNANCE POLICY

INFORMATION GOVERNANCE POLICY INFORMATION GOVERNANCE POLICY Issued by: Senior Information Risk Owner Policy Classification: Policy No: POLIG001 Information Governance Issue No: 1 Date Issued: 18/11/2013 Page No: 1 of 16 Review Date:

More information

Upgrade of Exchange Environment Request for Proposal

Upgrade of Exchange Environment Request for Proposal Upgrade of Exchange Environment Request for Proposal August 2014 Contents 1. Introduction... 4 1.1. Purpose of document... 4 1.2. Why this document is being issued... 4 1.3. Overview... 4 1.4. Introduction

More information

Entrepreneurs Programme - Business Evaluation. Version: 3

Entrepreneurs Programme - Business Evaluation. Version: 3 Entrepreneurs Programme - Business Evaluation Version: 3 20 October 2015 Contents 1 Purpose of this guide... 4 2 Programme overview... 4 2.1 Business Management overview... 4 3 Business Evaluations...

More information

Services for professional procurement. Be better informed, make better decisions. Trading House Qualification System (THQS) www.achilles.

Services for professional procurement. Be better informed, make better decisions. Trading House Qualification System (THQS) www.achilles. Services for professional procurement. Be better informed, make better decisions. Trading House Qualification System (THQS) www.achilles.com Improving supply chain management Increasing globalisation has

More information

Project Risk Analysis toolkit

Project Risk Analysis toolkit Risk Analysis toolkit MMU has a corporate Risk Management framework that describes the standard for risk management within the university. However projects are different from business as usual activities,

More information

Report. by the Comptroller and Auditor General. Ministry of Defence. Army 2020

Report. by the Comptroller and Auditor General. Ministry of Defence. Army 2020 Report by the Comptroller and Auditor General Ministry of Defence Army 2020 HC 263 SESSION 2014-15 11 JUNE 2014 4 Key facts Army 2020 Key facts 82,500 trained regular Army personnel planned in December

More information

2015 EDUCATION PAYROLL LIMITED STATEMENT OF INTENT

2015 EDUCATION PAYROLL LIMITED STATEMENT OF INTENT 2015 EDUCATION PAYROLL LIMITED STATEMENT OF INTENT Published in August 2015 Education Payroll Limited 2015 EDUCATION PAYROLL LIMITED STATEMENT OF INTENT CONTENTS Foreword 3 Who We Are 4 What We Do 5 How

More information

SUBJECT: Audit Report Postal Service s Employee Benefit Programs (Report Number HM AR 07 003)

SUBJECT: Audit Report Postal Service s Employee Benefit Programs (Report Number HM AR 07 003) September 24, 2007 ANTHONY J. VEGLIANTE EXECUTIVE VICE PRESIDENT AND CHIEF HUMAN RESOURCES OFFICER SUBJECT: Audit Report Postal Service s Employee Benefit Programs (Report Number ) This report presents

More information

Aberdeen City Council

Aberdeen City Council Aberdeen City Council Audit of housing benefit Risk assessment report Prepared for Aberdeen City Council July 2015 Audit Scotland is a statutory body set up in April 2000 under the Public Finance and Accountability

More information

Chapter 6 Implementation Planning

Chapter 6 Implementation Planning Chapter 6 Planning Planning- Division into Work Packages The following are the recommended Work Packages Overall Change Programme Work Package 1 E-Cabinet Model Work Package 2 Security Policy Design Work

More information

Assessment of compliance with the Code of Practice for Official Statistics

Assessment of compliance with the Code of Practice for Official Statistics Assessment of compliance with the Code of Practice for Official Statistics Statistics on National Insurance Number Allocations to Adult Overseas Nationals Entering the UK (produced by the Department for

More information

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management Retained Fire Fighters Union Introduction to PRINCE2 Project Management PRINCE2 PRINCE stands for: PRojects IN Controlled Environments and is a structured method which can be applied to any size or type

More information

City of York Council Public Health 2014/15 Internal Audit Report

City of York Council Public Health 2014/15 Internal Audit Report City of York Council Public Health 2014/15 Internal Audit Report Business Unit: Communities & Neighbourhoods Responsible Officer: Interim Director of Public Health Service Manager: Public Health Consultants

More information

FoI Review - A Key Analysis of the Cost Drivers

FoI Review - A Key Analysis of the Cost Drivers Independent Review of the impact of the Freedom of Information Act A REPORT PREPARED FOR THE DEPARTMENT FOR CONSTITUTIONAL AFFAIRS October 2006 Frontier Economics Ltd, London. i Frontier Economics October

More information

The Transport Business Cases

The Transport Business Cases Do not remove this if sending to pagerunnerr Page Title The Transport Business Cases January 2013 1 Contents Introduction... 3 1. The Transport Business Case... 4 Phase One preparing the Strategic Business

More information

This Report is provided for: Decision Endorsement Assurance Information

This Report is provided for: Decision Endorsement Assurance Information Agenda item 12 Enclosure PAPER G Report to: Author: Presented by: SUBJECT: Trust Board 24 November 2014 John McIlveen, Trust Secretary John McIlveen, Trust Secretary Well-Led Framework for Governance reviews

More information

Prepared by: CACI Digital Services Date issued: March 2014. CACI Managed Cloud Hosting Overview

Prepared by: CACI Digital Services Date issued: March 2014. CACI Managed Cloud Hosting Overview Prepared by: CACI Digital Services Date issued: March 2014 Overview Document Control This section details document control in terms of its distribution, configuration management, amendment history and

More information

Guide For Using The Good MPF Employer Award Logo

Guide For Using The Good MPF Employer Award Logo Guide For Using The Good MPF Employer Award Logo Contents 1. Preface 2. General Guidelines P.2 P.3 3. Logo Usage a. Minimum Size and Clear Space b. Full Colour Logo c. Black, Reversed, Single Colour and

More information

ISA Work Programme SECTION I

ISA Work Programme SECTION I ISA Work Programme SECTION I TABLE OF CONTENTS INTRODUCTION...4 1. THE CONTEXT...4 1.1. The need for the ISA programme...4 1.2. The political context...4 2. THE ISA PROGRAMME...5 3. THE EUROPEAN INTEROPERABILITY

More information