1 Massachusetts Institute of Technology Department of Facilities Building NE49 Travis Wanat Senior Project Manager MIT.nano, Building 12 Weekly construction update: May 04,, 2015 MIT.nano project updates will be issued on a weekly basis throughout ut the duration of the project and will provide a two-week week look ahead outlining projected activities. For each of these activities we will note any associated effects, including noise, dust, vibration, or odors. There may be occasions when the construction activities will cause inconvenience e to your research, teaching, studies, or work. Our goal is to provide you with timely information to help you plan and manage your daily activities during the construction. MIT.nano - 2 week look ahead - May 05, 2015 Effects ACTIVITY 1 Bldg. 8 Basement - MEP relocation and install for new infrastructure 2 Bldg. 8 Site work - Prepare existing entrance for install of new tel-data backbone 3 Bldg Basement fire alarm tie-in 4 Bldg Demolition and removal of existing slab and underground piping 5 Bldg Basement fire alarm tie-in / installation of roof hydrants for fire protection Int/Ext n/a 6 Bldg. 16 Ramp - Backfill new electrical ductbank / install rebar and place concrete 7Bldg Install brick in at south elevation 8 Demo remove existing site utilities / install new site utilities - electrical / tel-data 9 Form and place concrete for electrical duct bank 10Install / test / flush new 30" CHW Main 11 Backfill 30" CHW pipe under Bldg Backfill 30" CHW pipe south of Bldg Install site utility structures / demo and removal of existing electrical ductbank 14 Installation of new Bldg. 26 areaway Interior / Work Mon TueWed WedThu Fri Sat SunMonTue TueWedThu Fri Sat Sun Mon TueWedThu Fri Exterior Zone Interior n/a Exterior B Interior n/a Exterior B Int/Ext A Exterior F Exterior A Exterior B Exterior C Exterior D Exterior E Exterior F Exterior G Noise Dust Vibration Odor Please note: schedule is subject to change depending on weather and material delivery. Definitions / Abbreviations: FA - Fire Alarm FP - Fire Protection MEPFP - Mechanical, Electrical, Plumbing, Fire Protection MH - Manhole SOE - Support of Excavation SS - Sanitary Sewer SD - Storm Drain DW - Domestic Water Legend: High Moderate Low

2 W31 W32 W20 W15 W QR 7A QR I QR A C 4 6 6B W11 N16 QR F QR C QR E QR D QR B QR G [ 100 Feet MIT.nano Work Zones Basemap: Facility Information Systems (2014)

3 Extended Work Hours The bldg. 12 demolition work will be extended to Saturdays and additional 2nd shift. Saturday work will start on 3/28 and second shift work will start the week of 4/6. This extended schedule is expected to continue until the end of May early July. 1st shift 6:00am to 3:00pm 2nd shift 3:00pm to 11:00pm MIT.nano Tool Talk Seminar Series Session No. 02 Slurry wall / pre-trenching Join us for an informal lunch-time gathering to view and learn about construction techniques over the course of the MIT.nano building construction. More details to follow regarding date, time, and location. Lunch will be provided. Building 12 Demolition View from roof of Bldg. 39 on 4/6/15 View from roof of Bldg. 16 on 4/6/15 Massachusetts Institute of Technology MIT.nano weekly construction update, May 04, 2015 pg. 2

4 Installation of secant piles in work zone A Excavation for 30 CHW main at Bldg. 39 underpass 30 CHW main installation at Vassar Street Massachusetts Institute of Technology MIT.nano weekly construction update, May 04, 2015 pg. 3

5 Expansion of electrical manhole in work zone F/A New electrical duct bank in work zone B Fire protection reroute in Bldg. 8 basement to enable new tel-data closet Massachusetts Institute of Technology MIT.nano weekly construction update, May 04, 2015 pg. 4

6 Learn more Follow news about MIT.nano at: MIT.nano WEEKLY CONSTRUCTION FORECAST Subscribe to weekly construction activity forecasts for the MIT.nano project by ing or view forecasts at Contacts If you have issues or concerns please Should there be an issue needing immediate attention during normal construction hours, please call Travis Wanat at Thank you in advance for your cooperation. Regards, Travis Wanat On behalf of the MIT.nano team Massachusetts Institute of Technology MIT.nano weekly construction update, May 04, 2015 pg. 5

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved Electrical Contractor

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS MEETING DATE: March 16, 2011 SUBJECT: PRESENTER: ATTACHMENTS: Construction Management Update David Berry Yes 1. Construction Management

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

Seattle Public Schools Building Excellence IV Projects Under Construction

Seattle Public Schools Building Excellence IV Projects Under Construction Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

Design and Construction Design Phase Deliverables

Design and Construction Design Phase Deliverables Design and Construction Design Phase Deliverables Notes: 1. The Architect or Engineer of record shall submit this document along with the deliverables for the project at the end of each design phase for

More information

Schedule B to By-law 33-2009

Schedule B to By-law 33-2009 Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to

More information

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional

More information

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5 Rendering Provided by McKissick Associates MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5 Additions and Alterations to Williamsport Area Middle School Williamsport Area School District 17 July 2012 Geo-Thermal

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM GB2 OFFICE OF THE PRESIDENT TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: For the Meeting of May 15, 2013 ACTION ITEM APPROVAL OF THE BUDGET AND APPROVAL OF DESIGN FOLLOWING ACTION PURSUANT TO

More information

School Construction Authority Architecture & Engineering

School Construction Authority Architecture & Engineering SCOPING GUIDELINES 1.0 GENERAL GUIDELINES 2.0 BUILDING ENVELOPE SCOPING GUIDELINES 3.0 CATEGORIES AND COMPONENTS: The Flood Elimination/Below Grade Capital Category may include some or all of the following

More information

BUILDING PERMITS. Santa Rosa County Building Inspection

BUILDING PERMITS. Santa Rosa County Building Inspection BUILDING PERMITS Calculation Based on Under Roof Area New Construction First 5,000 sq. ft. Each additional hundred sq. ft. up to 10,000 sq. ft. Each additional hundred sq. ft. up to 25,000 sq. ft. Each

More information

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3 TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete

More information

HEANEY General Contracting, Inc.

HEANEY General Contracting, Inc. HEANEY General Contracting, Inc. March 26, 2016 AAPS BID NO. 16-019-665 ADDENDUM NO. 03- PROJECT: DESCRIPTION: Ann Arbor Public Schools Mitchell Expansion Phase I Bid Pkg. 3 (MEP) Building Addition and

More information

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline GOUVEIA ENGINEERING Pre-Bid Conference Meeting Minutes City of Los Banos Henry Miller Area Storm Drain and L Street Waterline Conference held at Intersection of West I Street and L Street, in Los Banos

More information

City of St. Charles Basement Finish or Remodel

City of St. Charles Basement Finish or Remodel City of St. Charles Basement Finish or Remodel Building & Code Enforcement Division 2 East Main Street St. Charles IL 60174 630.377.4406 (Office) 630.443.4638 (Fax) http://www.stcharlesil.gov Please direct

More information

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

Village of Airmont APPLICATION FOR BUILDING PERMIT INSTRUCTIONS

Village of Airmont APPLICATION FOR BUILDING PERMIT INSTRUCTIONS Village of Airmont BUILDING AND ZONING DEPARTMENT 251 CHERRY LANE, AIRMONT, NEW YORK Mailing Address: P.O. BOX 578, TALLMAN, NEW YORK 10982 Telephone: 845-369-8813 Fax: 845-357-8307 Website: www.airmont.org

More information

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

How To Build A Backwater Valve

How To Build A Backwater Valve Photos by: Bobby Thompson, Jeff Napier Illustrations: Rudy Martinez Bobby Thompson July 16, 2009 Presented by Jeff Napier A Backwater Valve is a one way valve that is installed on a building sewer to prevent

More information

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The

More information

Scheduling Basics. Critique & Create. Training 12/16/09

Scheduling Basics. Critique & Create. Training 12/16/09 Scheduling Basics Critique & Create Training 12/16/09 Table of Contents-Scheduling Page 2 Introduction: Goals of the Scheduling Training 4 Scheduling Terminology 5-8 Chapter 1: How to Critique A Schedule:

More information

A Homeowner s Guide to Building Permits

A Homeowner s Guide to Building Permits A Homeowner s Guide to Building Permits Building Division City of London 300 Dufferin Ave. P.O. Box 5035 London, ON N6A 4L9 Table of Contents What is a Building?... 3 Planning Your Project... 3 When is

More information

MILWAUKEE CITY HALL FOUNDATION RESTORATION. Project Update November 12, 2014

MILWAUKEE CITY HALL FOUNDATION RESTORATION. Project Update November 12, 2014 MILWAUKEE CITY HALL FOUNDATION RESTORATION Project Update November 12, 2014 Milwaukee City Hall Building History/Fast Facts - City Hall is a masonry and iron superstructure - Originally constructed from

More information

Estimating Database Checklist

Estimating Database Checklist Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to

More information

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County Building Permit Application Packet The purpose of Building Codes is to establish the minimum requirements to safe guard the public health, safety and general welfare through structural strength, means

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

Single Family Residential Building Permit Questions & Answers

Single Family Residential Building Permit Questions & Answers Single Family Residential Building Permit Questions & Answers Prepared by Dept. of Public Works Revised 07/01/13 200 East Park Street Edwardsville, IL 62025 (618) 692-7535 (618) 692-7505(Fax) Hours: Monday

More information

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS

BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS BUILDING BROCHURE BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS To ALTER, ADD TO, MOVE or CONSTRUCT a NEW HOME, CARPORT, GARAGE, SUNDECK, or other Building or Structure within the Regional District

More information

2.4 Hardcopy submittals shall be provided at adequate size so that all notes are readable.

2.4 Hardcopy submittals shall be provided at adequate size so that all notes are readable. DESIGN EQUIEMENTS POJECT DELIVEABLES CHECKLISTS GENEAL INFOMATION 1.1 The following is a checklist to be used as a guide for the required deliverables for the Schematic Design phase. 1.2 Schematic Design

More information

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES 1. CALCULATION OF PERMIT FEES SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: Permit Fee

More information

NOTE: Unless otherwise specified, unit prices for the demolition of structures shall be for wet demolitions.

NOTE: Unless otherwise specified, unit prices for the demolition of structures shall be for wet demolitions. ATTACHMENT AA DETAILED SCOPE OF WORK Demolition & Removal Services for SR-7/US-441 from North of Fillmore Street to South of Stirling Road Hollywood, Broward County, Florida 1.0 Structures Structures are

More information

The minimum reinforcement for the stem wall is the placement of:

The minimum reinforcement for the stem wall is the placement of: PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20

More information

APPLICANT: ORANGE COUNTY, NEW YORK

APPLICANT: ORANGE COUNTY, NEW YORK Figure 1 Div 1 3 rd Flr Leakage in County Executives Office Figure 2 Div 1 3 rd Flr Location 067 approximately 2 SF of visible mold growth above entrance to Room 341 Figure 3 Div 1 3 rd Flr Location 067

More information

Development Services Guidelines

Development Services Guidelines Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look

More information

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding A Guide for California Developers of Com m ercial Property This guide consists of

More information

Exhibit C: Scope of Work and Schedule of Deliverables

Exhibit C: Scope of Work and Schedule of Deliverables Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza

More information

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

How To Install An Overhead Sewer

How To Install An Overhead Sewer Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage

More information

KIEWIT CM/GC Enabling/Utilities

KIEWIT CM/GC Enabling/Utilities South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 john.todd@kiewit.com General

More information

Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR)

Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR) Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR) Version 1.2 9/30/2010 Table of Contents IVR Instructions...3 Initial Entry Instructions...3 Permit Access Instructions

More information

TD AMERITRADE Park Omaha

TD AMERITRADE Park Omaha TD AMERITRADE Park Omaha November 19, 2009 Report No. 6 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment

More information

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General Property Address: Property Owner: Lot: Block: Subdivision: Lot Size: Scope of Work: Note: Please attach copies of all general

More information

A Guide for the Homeowner/Builder

A Guide for the Homeowner/Builder A Guide for the Homeowner/Builder To repair, alter, add to or construct a new home, carport, garage, sundeck or other work Plus other related information Table of Contents 1. Introduction... 1 2. Building

More information

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS Permit applicants shall submit three (3) COMPLETE SETS of plans and specifications with each application for a permit. Plans and specifications

More information

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement

More information

Basement Moisture Problems

Basement Moisture Problems Foundations Foundation Purpose The purpose of a foundation is to distribute the weight of a structure securely into the ground. Engineering data regarding soil, rock and water conditions are used to design

More information

What Causes Foundation Leaking?

What Causes Foundation Leaking? A home's foundation has the odds stacked against it from the day it's built. When a home is excavated to make room for the foundation walls, space is left between the outer edge of the foundation wall

More information

CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE. Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10

CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE. Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10 CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10 A. Access Control $5.25/$1000.00 valuation of project Electric (if applicable)

More information

HERNDON/MUNCEY, INC. Office: (281) 579-0515 INVESTIGATIVE PLUMBING

HERNDON/MUNCEY, INC. Office: (281) 579-0515 INVESTIGATIVE PLUMBING HERNDON/MUNCEY, INC. Office: (281) 579-0515 INVESTIGATIVE PLUMBING Fax: (281) 579-1960 August 23, 2013 INVOICE NO.: HR18297 Cheryl Hooten RE: Vladimir Gorshunin Nationwide Insurance One Nationwide Gateway

More information

National Archives and Record Administration

National Archives and Record Administration National Archives and Record Administration Installation of Self-Closing Flood Barriers and Loading Dock Turntable Removal and Structural Slab Repairs ! 2010 Baltimore Washington Chapter Outstanding Repair

More information

INSPECTION PROPERTY ADDRESS: Fort Bend County, Texas

INSPECTION PROPERTY ADDRESS: Fort Bend County, Texas 5006 Cherry Ridge Road Richmond, Texas 77406 281-342-9944 harris31@sbcglobal.net INSPECTION PROPERTY ADDRESS: INSPECTION PERFORMED FOR: XXXX Drive Fort Bend County, Texas Mr. and Mrs. New Construction

More information

Commercial Building Valuation Report

Commercial Building Valuation Report INSURED University of Houston - Victoria Effective Date: Expiration Date: Cost as of: 09/2010 BUILDING 1 217 - University Center 77901 Location Adjustments Climatic Region: High Wind Region: Seismic Zone:

More information

At the end of today s seminar you should be better. Recognize the causes of Sewer Lateral backup. Identify techniques to protect your home from

At the end of today s seminar you should be better. Recognize the causes of Sewer Lateral backup. Identify techniques to protect your home from Preventing Sewer Backups Presented by IAPMO Today s Objectives At the end of today s seminar you should be better able to: Recognize the causes of Sewer Lateral backup Identify techniques to protect tyour

More information

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS NMP 1.4 EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Index Purpose... 2 Application... 2 Referral Agency... 2 Associated Requirements... 2 Referenced Standards...2 Definitions...

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

Residential Building Permits Information

Residential Building Permits Information City of Bonham Building Department 514 Chestnut St. Bonham, Texas 75418 OFFICE: (903) 583-7555 FAX: (903)583-5761 Residential Building Permits Information Application for Permits: To apply for a permit,

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY a guide to PREVENTING SEWER BACKUPS AND FLOODING Sewer backups and flooding can damage District homes and businesses. Sewer blockages are most commonly found

More information

Exhibit 4 Page 1 of 14 BOARD OF COUNTY COMMISSIONERS, BROWARD COUNTY, FLORIDA

Exhibit 4 Page 1 of 14 BOARD OF COUNTY COMMISSIONERS, BROWARD COUNTY, FLORIDA Page 1 of 14 BOARD OF COUNTY COMMISSIONERS, BROWARD COUNTY, FLORIDA CHANGE ORDER NO: 6 BOARD REGULAR Project: 1133 - Design-Build Services for US 1/FEC RR Structures for Expansion of Runway 9R Contract:

More information

Integrating Healthy Housing Considerations into Weatherization Inspections. Jim LaRue

Integrating Healthy Housing Considerations into Weatherization Inspections. Jim LaRue Cleveland Cuyahoga County Healthy House Project Training Integrating Healthy Housing Considerations into Weatherization Inspections Jim LaRue Joint inspections for housing health hazards Weatherization

More information

NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data.

NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data. NARRATIVE REPORT 1.0 BUILDING INFORMATION The original date of construction for Construction Management Engineering was not immediately available; the building has had no major renovations. Construction

More information

HOMEOWNER S PERMIT GUIDE

HOMEOWNER S PERMIT GUIDE HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448

More information

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES SEWER BACK-UP POLICY General Sewer back-ups are an unfortunate, but common problem in older communities. A sewer back-up can create a health or

More information

Sanitary Sewer Smoke Testing

Sanitary Sewer Smoke Testing Sanitary Sewer Smoke Testing Beginning March 31, 2014 The City of Brunswick will be conducting smoke testing on the City s sanitary sewer system beginning March 31, 2014. Smoke testing will occur over

More information

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET

PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET Name of Municipality or Sewer District Name of Project Original Township and Lot Number Name of Engineer of Firm Preparing Plans

More information

RULES AND REGULATIONS CONTRACTOR WORK

RULES AND REGULATIONS CONTRACTOR WORK RULES AND REGULATIONS CONTRACTOR WORK CARILLON 227 West Trade Street Suite 330 Charlotte, NC 28202 The following Rules and Regulations shall govern the operation of contractor work in the Building. For

More information

WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS

WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS 1) GENERAL GUIDELINES a) The following rules, regulations,

More information

C I T Y O F P E A R S A L L

C I T Y O F P E A R S A L L The Largest City Between San Antonio and Laredo COMMUNITY DEVELOPMENT C I T Y O F P E A R S A L L A Business-Friendly, Family-Oriented Community Building Department Application Information (Please read

More information

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

PARKVILLE HIGH SCHOOL LIMITED RENOVATION PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,

More information

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1 School Facilities Evaluation Project Page 1 Executive Summary In November 1999, Alberta Infrastructure, School Facilities Branch engaged Stephens Kozak Carr and Brown Architects to conduct evaluations

More information

DIVISION 22 PLUMBING. 22 30 00 PLUMBING EQUIPMENT 22 33 00 Domestic Water Heaters

DIVISION 22 PLUMBING. 22 30 00 PLUMBING EQUIPMENT 22 33 00 Domestic Water Heaters DIVISION 22 PLUMBING 22 00 00 PLUMBING 22 00 50 Design Criteria 22 01 00 General Requirements 22 05 00 Common Work Results 22 06 00 General Duty Valves 22 07 00 Insulation 22 08 00 Commissioning 22 10

More information

CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov

CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov Finishing a basement to make additional living space in a house is a popular construction project for many homeowners.

More information

ATTACHMENT AA DETAILED SCOPE OF WORK

ATTACHMENT AA DETAILED SCOPE OF WORK 1.0 Structures ATTACHMENT AA DETAILED SCOPE OF WORK Districtwide Right of Way Demolition and Removal Services ITB-DOT-14/15-4022TB Structures are buildings, including attached improvements, which could

More information

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES

SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with

More information

This report presents the findings and recommendations of the assessment of energy use and

This report presents the findings and recommendations of the assessment of energy use and This report presents the findings and recommendations of the assessment of energy use and environmental stewardship of Arlington Street Church, Boston, MA. As stewards of the earth it is important that

More information

Element Z General Design Requirements Standards and Other Requirements

Element Z General Design Requirements Standards and Other Requirements Design Phase Deliverables PART 1 - GENERAL 1.01 OVERVIEW A. The Table identified in Part 2 of this document summarizes AE deliverables and minimum level of information to be depicted on construction documents

More information

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED

More information

Knock Down Rebuild. Building Process Building process - knock down rebuild 1

Knock Down Rebuild. Building Process Building process - knock down rebuild 1 Knock Down Rebuild Building Process Building process - knock down rebuild 1 Building Process Your action Our action REMINDER Pre site Step 1 New Home Selection Congratulations. This marks the start of

More information

Home Inspection Report

Home Inspection Report 4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:

More information

APPLICATION FOR NEW CONSTRUCTION

APPLICATION FOR NEW CONSTRUCTION CITY OF ELKINS 401 DAVIS AVE ELKINS WV 26241 Date Pd: Receipt #: Session #: PHIL ISNER BLDG INSPECTOR / CODE ENFORCEMENT OFFICER 304-636-1414 Ext 1431 APP. DATE APPLICATION FOR NEW CONSTRUCTION APPLICANT

More information

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION

REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION RESIDENTIAL: REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION 2 COMPLETE SETS OF PRINTS WITH ENGINEERS STAMP ON FOUNDATION PLAN INCLUDING ELECTRICAL, PLUMBING, ETC. SITE PLAN SHOWING HOUSE LOCATION

More information

The City of Basehor, Kansas

The City of Basehor, Kansas The City of Basehor, Kansas Residential and Miscellaneous Permits This list provides general information regarding permit requirements for various residential construction and maintenance activities. The

More information

Sewer Backup Protection Grant Program. Guidelines, materials and frequently asked questions

Sewer Backup Protection Grant Program. Guidelines, materials and frequently asked questions Sewer Backup Protection Grant Program Guidelines, materials and frequently asked questions SEWER BACKUP PROTECTION GRANT PROGRAM GUIDELINES I. WHAT IS IT? The Village of Oak Park Sewer Backup Protection

More information

Building Permits: When are they required?

Building Permits: When are they required? Building Permits: When are they required? Generally, you need to obtain a building permit from the City whenever you construct, enlarge, alter, repair, move, remove, improve, convert, or demolish a building

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

Section I - General. Page 1 of 5

Section I - General. Page 1 of 5 Section I - General City of Olivette Residential Sanitary Sewer Lateral Repair Program Policy & Procedures 1200 North Price Road, Olivette, MO 63132 P 314-993-0252 F 314-994-9862 A. The Owner of a single-family

More information

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating

More information

Gramercy Place Condo Association, Inc.

Gramercy Place Condo Association, Inc. Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is

More information

State of Connecticut Department of Public Health RADON PROGRAM

State of Connecticut Department of Public Health RADON PROGRAM State of Connecticut Department of Public Health RADON PROGRAM Scope The Connecticut Department of Public Health (DPH) Radon Program is providing this information for contractors who decide to build radon

More information

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA 30548 LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room.

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA 30548 LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room. 1.d 2.d 3.d 4.d 1.d 2.d 3.d 4.d REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE STAIR & INFILL WALL C.1 REMOVE DOOR &

More information

PLAN SUBMITTAL INFORMATION

PLAN SUBMITTAL INFORMATION PLAN SUBMITTAL INFORMATION APPLICATION FOR A BUILDING PERMIT Prior to drafting construction drawings, please check with the North Miami Beach Community Development Department concerning the following:

More information

BUILDING MOVE PROCESS INSIDE CITY LIMITS

BUILDING MOVE PROCESS INSIDE CITY LIMITS To move a building from outside or within the City to a site within City limits, the following STEPS must be taken before the move can take place: 1. A written request to relocate a dwelling must be provided

More information

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit

More information