1 Massachusetts Institute of Technology Department of Facilities Building NE49 Travis Wanat Senior Project Manager MIT.nano, Building 12 Weekly construction update: May 04,, 2015 MIT.nano project updates will be issued on a weekly basis throughout ut the duration of the project and will provide a two-week week look ahead outlining projected activities. For each of these activities we will note any associated effects, including noise, dust, vibration, or odors. There may be occasions when the construction activities will cause inconvenience e to your research, teaching, studies, or work. Our goal is to provide you with timely information to help you plan and manage your daily activities during the construction. MIT.nano - 2 week look ahead - May 05, 2015 Effects ACTIVITY 1 Bldg. 8 Basement - MEP relocation and install for new infrastructure 2 Bldg. 8 Site work - Prepare existing entrance for install of new tel-data backbone 3 Bldg Basement fire alarm tie-in 4 Bldg Demolition and removal of existing slab and underground piping 5 Bldg Basement fire alarm tie-in / installation of roof hydrants for fire protection Int/Ext n/a 6 Bldg. 16 Ramp - Backfill new electrical ductbank / install rebar and place concrete 7Bldg Install brick in at south elevation 8 Demo remove existing site utilities / install new site utilities - electrical / tel-data 9 Form and place concrete for electrical duct bank 10Install / test / flush new 30" CHW Main 11 Backfill 30" CHW pipe under Bldg Backfill 30" CHW pipe south of Bldg Install site utility structures / demo and removal of existing electrical ductbank 14 Installation of new Bldg. 26 areaway Interior / Work Mon TueWed WedThu Fri Sat SunMonTue TueWedThu Fri Sat Sun Mon TueWedThu Fri Exterior Zone Interior n/a Exterior B Interior n/a Exterior B Int/Ext A Exterior F Exterior A Exterior B Exterior C Exterior D Exterior E Exterior F Exterior G Noise Dust Vibration Odor Please note: schedule is subject to change depending on weather and material delivery. Definitions / Abbreviations: FA - Fire Alarm FP - Fire Protection MEPFP - Mechanical, Electrical, Plumbing, Fire Protection MH - Manhole SOE - Support of Excavation SS - Sanitary Sewer SD - Storm Drain DW - Domestic Water Legend: High Moderate Low
2 W31 W32 W20 W15 W QR 7A QR I QR A C 4 6 6B W11 N16 QR F QR C QR E QR D QR B QR G [ 100 Feet MIT.nano Work Zones Basemap: Facility Information Systems (2014)
3 Extended Work Hours The bldg. 12 demolition work will be extended to Saturdays and additional 2nd shift. Saturday work will start on 3/28 and second shift work will start the week of 4/6. This extended schedule is expected to continue until the end of May early July. 1st shift 6:00am to 3:00pm 2nd shift 3:00pm to 11:00pm MIT.nano Tool Talk Seminar Series Session No. 02 Slurry wall / pre-trenching Join us for an informal lunch-time gathering to view and learn about construction techniques over the course of the MIT.nano building construction. More details to follow regarding date, time, and location. Lunch will be provided. Building 12 Demolition View from roof of Bldg. 39 on 4/6/15 View from roof of Bldg. 16 on 4/6/15 Massachusetts Institute of Technology MIT.nano weekly construction update, May 04, 2015 pg. 2
4 Installation of secant piles in work zone A Excavation for 30 CHW main at Bldg. 39 underpass 30 CHW main installation at Vassar Street Massachusetts Institute of Technology MIT.nano weekly construction update, May 04, 2015 pg. 3
5 Expansion of electrical manhole in work zone F/A New electrical duct bank in work zone B Fire protection reroute in Bldg. 8 basement to enable new tel-data closet Massachusetts Institute of Technology MIT.nano weekly construction update, May 04, 2015 pg. 4
6 Learn more Follow news about MIT.nano at: MIT.nano WEEKLY CONSTRUCTION FORECAST Subscribe to weekly construction activity forecasts for the MIT.nano project by ing or view forecasts at Contacts If you have issues or concerns please Should there be an issue needing immediate attention during normal construction hours, please call Travis Wanat at Thank you in advance for your cooperation. Regards, Travis Wanat On behalf of the MIT.nano team Massachusetts Institute of Technology MIT.nano weekly construction update, May 04, 2015 pg. 5
OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003
OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved Electrical Contractor
More informationSECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
More informationREQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update
REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS MEETING DATE: March 16, 2011 SUBJECT: PRESENTER: ATTACHMENTS: Construction Management Update David Berry Yes 1. Construction Management
More informationSAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT
SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer
More informationSeattle Public Schools Building Excellence IV Projects Under Construction
Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee
More informationTable of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
More informationDesign and Construction Design Phase Deliverables
Design and Construction Design Phase Deliverables Notes: 1. The Architect or Engineer of record shall submit this document along with the deliverables for the project at the end of each design phase for
More informationSchedule B to By-law 33-2009
Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to
More informationPresentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals
Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional
More informationMONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5
Rendering Provided by McKissick Associates MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5 Additions and Alterations to Williamsport Area Middle School Williamsport Area School District 17 July 2012 Geo-Thermal
More informationTO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM
GB2 OFFICE OF THE PRESIDENT TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: For the Meeting of May 15, 2013 ACTION ITEM APPROVAL OF THE BUDGET AND APPROVAL OF DESIGN FOLLOWING ACTION PURSUANT TO
More informationSchool Construction Authority Architecture & Engineering
SCOPING GUIDELINES 1.0 GENERAL GUIDELINES 2.0 BUILDING ENVELOPE SCOPING GUIDELINES 3.0 CATEGORIES AND COMPONENTS: The Flood Elimination/Below Grade Capital Category may include some or all of the following
More informationBUILDING PERMITS. Santa Rosa County Building Inspection
BUILDING PERMITS Calculation Based on Under Roof Area New Construction First 5,000 sq. ft. Each additional hundred sq. ft. up to 10,000 sq. ft. Each additional hundred sq. ft. up to 25,000 sq. ft. Each
More informationMULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3
TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete
More informationHEANEY General Contracting, Inc.
HEANEY General Contracting, Inc. March 26, 2016 AAPS BID NO. 16-019-665 ADDENDUM NO. 03- PROJECT: DESCRIPTION: Ann Arbor Public Schools Mitchell Expansion Phase I Bid Pkg. 3 (MEP) Building Addition and
More informationGOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline
GOUVEIA ENGINEERING Pre-Bid Conference Meeting Minutes City of Los Banos Henry Miller Area Storm Drain and L Street Waterline Conference held at Intersection of West I Street and L Street, in Los Banos
More informationCity of St. Charles Basement Finish or Remodel
City of St. Charles Basement Finish or Remodel Building & Code Enforcement Division 2 East Main Street St. Charles IL 60174 630.377.4406 (Office) 630.443.4638 (Fax) http://www.stcharlesil.gov Please direct
More informationA Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES
A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners
More informationBuilding Condition Assessment Report
C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses
More informationVillage of Airmont APPLICATION FOR BUILDING PERMIT INSTRUCTIONS
Village of Airmont BUILDING AND ZONING DEPARTMENT 251 CHERRY LANE, AIRMONT, NEW YORK Mailing Address: P.O. BOX 578, TALLMAN, NEW YORK 10982 Telephone: 845-369-8813 Fax: 845-357-8307 Website: www.airmont.org
More informationThe Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE
The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519
More informationOPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY
Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic
More informationHow To Build A Backwater Valve
Photos by: Bobby Thompson, Jeff Napier Illustrations: Rudy Martinez Bobby Thompson July 16, 2009 Presented by Jeff Napier A Backwater Valve is a one way valve that is installed on a building sewer to prevent
More informationOccupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School
Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The
More informationScheduling Basics. Critique & Create. Training 12/16/09
Scheduling Basics Critique & Create Training 12/16/09 Table of Contents-Scheduling Page 2 Introduction: Goals of the Scheduling Training 4 Scheduling Terminology 5-8 Chapter 1: How to Critique A Schedule:
More informationA Homeowner s Guide to Building Permits
A Homeowner s Guide to Building Permits Building Division City of London 300 Dufferin Ave. P.O. Box 5035 London, ON N6A 4L9 Table of Contents What is a Building?... 3 Planning Your Project... 3 When is
More informationMILWAUKEE CITY HALL FOUNDATION RESTORATION. Project Update November 12, 2014
MILWAUKEE CITY HALL FOUNDATION RESTORATION Project Update November 12, 2014 Milwaukee City Hall Building History/Fast Facts - City Hall is a masonry and iron superstructure - Originally constructed from
More informationEstimating Database Checklist
Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to
More informationBuilding Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County
Building Permit Application Packet The purpose of Building Codes is to establish the minimum requirements to safe guard the public health, safety and general welfare through structural strength, means
More informationAll substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
More informationSingle Family Residential Building Permit Questions & Answers
Single Family Residential Building Permit Questions & Answers Prepared by Dept. of Public Works Revised 07/01/13 200 East Park Street Edwardsville, IL 62025 (618) 692-7535 (618) 692-7505(Fax) Hours: Monday
More informationBUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS
BUILDING BROCHURE BUILDING/PLUMBING PERMIT APPLICATION REQUIREMENTS To ALTER, ADD TO, MOVE or CONSTRUCT a NEW HOME, CARPORT, GARAGE, SUNDECK, or other Building or Structure within the Regional District
More information2.4 Hardcopy submittals shall be provided at adequate size so that all notes are readable.
DESIGN EQUIEMENTS POJECT DELIVEABLES CHECKLISTS GENEAL INFOMATION 1.1 The following is a checklist to be used as a guide for the required deliverables for the Schematic Design phase. 1.2 Schematic Design
More informationSCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES
1. CALCULATION OF PERMIT FEES SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: Permit Fee
More informationNOTE: Unless otherwise specified, unit prices for the demolition of structures shall be for wet demolitions.
ATTACHMENT AA DETAILED SCOPE OF WORK Demolition & Removal Services for SR-7/US-441 from North of Fillmore Street to South of Stirling Road Hollywood, Broward County, Florida 1.0 Structures Structures are
More informationThe minimum reinforcement for the stem wall is the placement of:
PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20
More informationAPPLICANT: ORANGE COUNTY, NEW YORK
Figure 1 Div 1 3 rd Flr Leakage in County Executives Office Figure 2 Div 1 3 rd Flr Location 067 approximately 2 SF of visible mold growth above entrance to Room 341 Figure 3 Div 1 3 rd Flr Location 067
More informationDevelopment Services Guidelines
Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look
More informationAT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding
AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding A Guide for California Developers of Com m ercial Property This guide consists of
More informationExhibit C: Scope of Work and Schedule of Deliverables
Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza
More informationSECTION 02530 STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. Description Storm drainage structure construction shall include, but not necessarily be limited to, furnishing and installing or
More information3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.
The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:
More informationHow To Install An Overhead Sewer
Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage
More informationKIEWIT CM/GC Enabling/Utilities
South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 john.todd@kiewit.com General
More informationAccela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR)
Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR) Version 1.2 9/30/2010 Table of Contents IVR Instructions...3 Initial Entry Instructions...3 Permit Access Instructions
More informationTD AMERITRADE Park Omaha
TD AMERITRADE Park Omaha November 19, 2009 Report No. 6 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment
More informationBUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General
BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General Property Address: Property Owner: Lot: Block: Subdivision: Lot Size: Scope of Work: Note: Please attach copies of all general
More informationA Guide for the Homeowner/Builder
A Guide for the Homeowner/Builder To repair, alter, add to or construct a new home, carport, garage, sundeck or other work Plus other related information Table of Contents 1. Introduction... 1 2. Building
More informationCOMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS
COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS Permit applicants shall submit three (3) COMPLETE SETS of plans and specifications with each application for a permit. Plans and specifications
More informationSchematic Design: Quality Management Phase Checklist Project Phase Checklist Series
Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement
More informationBasement Moisture Problems
Foundations Foundation Purpose The purpose of a foundation is to distribute the weight of a structure securely into the ground. Engineering data regarding soil, rock and water conditions are used to design
More informationWhat Causes Foundation Leaking?
A home's foundation has the odds stacked against it from the day it's built. When a home is excavated to make room for the foundation walls, space is left between the outer edge of the foundation wall
More informationCITY OF PLANO BUILDING INSPECTION FEE SCHEDULE. Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10
CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10 A. Access Control $5.25/$1000.00 valuation of project Electric (if applicable)
More informationHERNDON/MUNCEY, INC. Office: (281) 579-0515 INVESTIGATIVE PLUMBING
HERNDON/MUNCEY, INC. Office: (281) 579-0515 INVESTIGATIVE PLUMBING Fax: (281) 579-1960 August 23, 2013 INVOICE NO.: HR18297 Cheryl Hooten RE: Vladimir Gorshunin Nationwide Insurance One Nationwide Gateway
More informationNational Archives and Record Administration
National Archives and Record Administration Installation of Self-Closing Flood Barriers and Loading Dock Turntable Removal and Structural Slab Repairs ! 2010 Baltimore Washington Chapter Outstanding Repair
More informationINSPECTION PROPERTY ADDRESS: Fort Bend County, Texas
5006 Cherry Ridge Road Richmond, Texas 77406 281-342-9944 harris31@sbcglobal.net INSPECTION PROPERTY ADDRESS: INSPECTION PERFORMED FOR: XXXX Drive Fort Bend County, Texas Mr. and Mrs. New Construction
More informationCommercial Building Valuation Report
INSURED University of Houston - Victoria Effective Date: Expiration Date: Cost as of: 09/2010 BUILDING 1 217 - University Center 77901 Location Adjustments Climatic Region: High Wind Region: Seismic Zone:
More informationAt the end of today s seminar you should be better. Recognize the causes of Sewer Lateral backup. Identify techniques to protect your home from
Preventing Sewer Backups Presented by IAPMO Today s Objectives At the end of today s seminar you should be better able to: Recognize the causes of Sewer Lateral backup Identify techniques to protect tyour
More informationEXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS
NMP 1.4 EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS Index Purpose... 2 Application... 2 Referral Agency... 2 Associated Requirements... 2 Referenced Standards...2 Definitions...
More informationWhen is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
More informationMTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS
Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT
More informationResidential Building Permits Information
City of Bonham Building Department 514 Chestnut St. Bonham, Texas 75418 OFFICE: (903) 583-7555 FAX: (903)583-5761 Residential Building Permits Information Application for Permits: To apply for a permit,
More informationDISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING
DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY a guide to PREVENTING SEWER BACKUPS AND FLOODING Sewer backups and flooding can damage District homes and businesses. Sewer blockages are most commonly found
More informationExhibit 4 Page 1 of 14 BOARD OF COUNTY COMMISSIONERS, BROWARD COUNTY, FLORIDA
Page 1 of 14 BOARD OF COUNTY COMMISSIONERS, BROWARD COUNTY, FLORIDA CHANGE ORDER NO: 6 BOARD REGULAR Project: 1133 - Design-Build Services for US 1/FEC RR Structures for Expansion of Runway 9R Contract:
More informationIntegrating Healthy Housing Considerations into Weatherization Inspections. Jim LaRue
Cleveland Cuyahoga County Healthy House Project Training Integrating Healthy Housing Considerations into Weatherization Inspections Jim LaRue Joint inspections for housing health hazards Weatherization
More informationNARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data.
NARRATIVE REPORT 1.0 BUILDING INFORMATION The original date of construction for Construction Management Engineering was not immediately available; the building has had no major renovations. Construction
More informationHOMEOWNER S PERMIT GUIDE
HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448
More informationVILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES
VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES SEWER BACK-UP POLICY General Sewer back-ups are an unfortunate, but common problem in older communities. A sewer back-up can create a health or
More informationSanitary Sewer Smoke Testing
Sanitary Sewer Smoke Testing Beginning March 31, 2014 The City of Brunswick will be conducting smoke testing on the City s sanitary sewer system beginning March 31, 2014. Smoke testing will occur over
More informationPART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET
PART 6 - STANDARD DESIGN AND CALCULATION FORMS 6.1 SANITARY SEWER DATA SHEET Name of Municipality or Sewer District Name of Project Original Township and Lot Number Name of Engineer of Firm Preparing Plans
More informationRULES AND REGULATIONS CONTRACTOR WORK
RULES AND REGULATIONS CONTRACTOR WORK CARILLON 227 West Trade Street Suite 330 Charlotte, NC 28202 The following Rules and Regulations shall govern the operation of contractor work in the Building. For
More informationWORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS
WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS 1) GENERAL GUIDELINES a) The following rules, regulations,
More informationC I T Y O F P E A R S A L L
The Largest City Between San Antonio and Laredo COMMUNITY DEVELOPMENT C I T Y O F P E A R S A L L A Business-Friendly, Family-Oriented Community Building Department Application Information (Please read
More informationPARKVILLE HIGH SCHOOL LIMITED RENOVATION
PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,
More informationLindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1
School Facilities Evaluation Project Page 1 Executive Summary In November 1999, Alberta Infrastructure, School Facilities Branch engaged Stephens Kozak Carr and Brown Architects to conduct evaluations
More informationDIVISION 22 PLUMBING. 22 30 00 PLUMBING EQUIPMENT 22 33 00 Domestic Water Heaters
DIVISION 22 PLUMBING 22 00 00 PLUMBING 22 00 50 Design Criteria 22 01 00 General Requirements 22 05 00 Common Work Results 22 06 00 General Duty Valves 22 07 00 Insulation 22 08 00 Commissioning 22 10
More informationCITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov
CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov Finishing a basement to make additional living space in a house is a popular construction project for many homeowners.
More informationATTACHMENT AA DETAILED SCOPE OF WORK
1.0 Structures ATTACHMENT AA DETAILED SCOPE OF WORK Districtwide Right of Way Demolition and Removal Services ITB-DOT-14/15-4022TB Structures are buildings, including attached improvements, which could
More informationSECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
More informationThis report presents the findings and recommendations of the assessment of energy use and
This report presents the findings and recommendations of the assessment of energy use and environmental stewardship of Arlington Street Church, Boston, MA. As stewards of the earth it is important that
More informationElement Z General Design Requirements Standards and Other Requirements
Design Phase Deliverables PART 1 - GENERAL 1.01 OVERVIEW A. The Table identified in Part 2 of this document summarizes AE deliverables and minimum level of information to be depicted on construction documents
More informationEFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection
EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED
More informationKnock Down Rebuild. Building Process Building process - knock down rebuild 1
Knock Down Rebuild Building Process Building process - knock down rebuild 1 Building Process Your action Our action REMINDER Pre site Step 1 New Home Selection Congratulations. This marks the start of
More informationHome Inspection Report
4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:
More informationAPPLICATION FOR NEW CONSTRUCTION
CITY OF ELKINS 401 DAVIS AVE ELKINS WV 26241 Date Pd: Receipt #: Session #: PHIL ISNER BLDG INSPECTOR / CODE ENFORCEMENT OFFICER 304-636-1414 Ext 1431 APP. DATE APPLICATION FOR NEW CONSTRUCTION APPLICANT
More informationREQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION
RESIDENTIAL: REQUIREMENTS FOR SUBMITTING PLANS FOR NEW CONSTRUCTION 2 COMPLETE SETS OF PRINTS WITH ENGINEERS STAMP ON FOUNDATION PLAN INCLUDING ELECTRICAL, PLUMBING, ETC. SITE PLAN SHOWING HOUSE LOCATION
More informationThe City of Basehor, Kansas
The City of Basehor, Kansas Residential and Miscellaneous Permits This list provides general information regarding permit requirements for various residential construction and maintenance activities. The
More informationSewer Backup Protection Grant Program. Guidelines, materials and frequently asked questions
Sewer Backup Protection Grant Program Guidelines, materials and frequently asked questions SEWER BACKUP PROTECTION GRANT PROGRAM GUIDELINES I. WHAT IS IT? The Village of Oak Park Sewer Backup Protection
More informationBuilding Permits: When are they required?
Building Permits: When are they required? Generally, you need to obtain a building permit from the City whenever you construct, enlarge, alter, repair, move, remove, improve, convert, or demolish a building
More informationREVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N
PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N
More informationSECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
More informationHamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year
Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service
More informationSection I - General. Page 1 of 5
Section I - General City of Olivette Residential Sanitary Sewer Lateral Repair Program Policy & Procedures 1200 North Price Road, Olivette, MO 63132 P 314-993-0252 F 314-994-9862 A. The Owner of a single-family
More informationSEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER
Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating
More informationGramercy Place Condo Association, Inc.
Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is
More informationState of Connecticut Department of Public Health RADON PROGRAM
State of Connecticut Department of Public Health RADON PROGRAM Scope The Connecticut Department of Public Health (DPH) Radon Program is providing this information for contractors who decide to build radon
More informationBraselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA 30548 LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room.
1.d 2.d 3.d 4.d 1.d 2.d 3.d 4.d REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE STAIR & INFILL WALL C.1 REMOVE DOOR &
More informationPLAN SUBMITTAL INFORMATION
PLAN SUBMITTAL INFORMATION APPLICATION FOR A BUILDING PERMIT Prior to drafting construction drawings, please check with the North Miami Beach Community Development Department concerning the following:
More informationBUILDING MOVE PROCESS INSIDE CITY LIMITS
To move a building from outside or within the City to a site within City limits, the following STEPS must be taken before the move can take place: 1. A written request to relocate a dwelling must be provided
More informationSECTION 33 31 00.11 GRAVITY SANITARY SEWERS
SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit
More information