1 Page 1 of 14 BOARD OF COUNTY COMMISSIONERS, BROWARD COUNTY, FLORIDA CHANGE ORDER NO: 6 BOARD REGULAR Project: Design-Build Services for US 1/FEC RR Structures for Expansion of Runway 9R Contract: N P1 Vend: TUTOR PERINI FORT LAUDERDALE-HOLLWOOD VENTURE Description of Changes, Reasons Therefore, and Cost and/or Time Changes For Each: Cost Basis: Negotiated Lump Sum Line Nbr.1 OTHER - Various Reasons $ Description : This Change Order to the Agreement No. N P1 with Tutor Perini Fort Lauderdale-Hollywood Venture, LLP (TPFLHV), for Design-Build Services for U.S. 1 / FEC RR Structures, for the Expansion of Runway 9R-27L at Fort Lauderdale-Hollywood International Airport, RFP No. N P1, addresses three (3) items: 1. Additional scope defined in sheets 1-7 is the quantity of embankment material (See Line Nbr.4). 2. Provides compensation for re-sequencing of the work due to impacts occurring subsequent to the time of the Design-Build RFP Submittal, including the establishment of new Contract Milestone dates (See Line Nbr.3). 3. Settlement of all specific known requests for changes, potential changes, Proposal Requests (PR's), Supplemental Instructions (SI's) and any other claims that have been submitted, and issues (see Line Nbr.2) that have or may not have been submitted to the County as of March 31, 2013, except for those items listed below: a. PCO 004 FDOT Requested Directional Sign along Griffin Rd.($150,000) b. PCO 016 East Perimeter Rd. Temporary Closure ($59,952) c. PCO 017 FAA 7460 Airspace Study ($17,686) d. PCO 018 R/W 9R-27L Closure ($238,991) e. PCO 019B Water Main & Sanitary Force Main (Package 5B)($1,318,628) f. PCO 020 FPL Ductbank Changes ($254,635) g. PCO 021 ATT Ductbank Changes ($97,840) h. PCO 022 XO & Fibernet Changes ($23,682) i. PCO 030 SFWMD Permit Mods ($97,699) j. PCO 032 U.S. 1 Temporary U-Turn ($89,538) k. PCO 033 Relocation AOA Gate 504 ($205,000) l. PCO 037 Pile Relaxation ($1,000,000) m. PCO 038 Broken Piles TW-3 Units 5, 6 & 7 (TBD) n. PCO 040 U.S. 1 Detour Additional Signage (TBD) o. PCO 041 Sanitary Sewer Tie-In Relocation ($220,000) p. PCO 042 Eliminate Water-Foam From Runway Structure Study ($30,000) q. PCO 043 Existing Overhead Sign Modifications ($111,373) r. PCO 049 FAA NAVAID Access ($300,000) s. PCO 050 Additional Tree Relocations ($75,000) t. PCO 051 Revised MOT NE 10 St. Extension ($1,100,000) u. PCO 055 Runway Structure Additional Fire Protection ($2,000,000) v. PCO 057 Contractor Field Office Relocation (TBD) w. PCO 0XX Failing Quality Assurance Testing Credit (TBD) x. PCO 0YY Utility Damages Caused by Contractor (TBD) BCAD staff, Runway CPM staff, and PMO staff have not fully reviewed, and do not necessarily agree, that the reserved items (PCO's) listed above should constitute a change to the contract documents; and will be evaluating the validity, cost and time impacts in accordance with the contract requirements. The listed amounts, if any, are values assigned by Contractor and not agreed to by COUNTY. By entering in to this Change Order COUNTY and Contractor do not waive any defenses it has or may have had under the contract documents with regard to any of the above listed items. 4/25/2013 This work does not impact the overall Contract Time. This work does impact the Milestones. The work shall be completed in accordance with the Contract Documents, the Notice-to-Proceed, this Change Order, an updated Purchase Order, and issuance of all required Broward County permits. In consideration of the County's payment of the Lump Sum Change Order amount of $18,000, and no COPY FOR: MINUTES, CONTRACTOR, PURCHASING, CONSULTANT, SUPERVISING AGENCY, BUDGET, DEPARTMENT Percentages may not total exactly, due to rounding Source: ContractsCentral
2 Page 2 of 14 BOARD OF COUNTY COMMISSIONERS, BROWARD COUNTY, FLORIDA CHANGE ORDER NO: 6 BOARD REGULAR Project: Design-Build Services for US 1/FEC RR Structures for Expansion of Runway 9R Contract: N P1 Vend: TUTOR PERINI FORT LAUDERDALE-HOLLWOOD VENTURE Description of Changes, Reasons Therefore, and Cost and/or Time Changes For Each: Cost Basis: Negotiated Lump Sum Reason : change to the Contract Time, the Contractor, TPFLHV, waives and releases any and all claims associated with the performance of the work described in this Change Order. This Change Order constitutes full accord and satisfaction of all claims for time and compensation associated with the Work authorized by this Change Order for County actions occurring prior to execution of this Change Order, except for those items 3.a. through 3.x. listed above. Re-Sequencing Work, Outstanding Issues, and Additional Ground Improvements Cause : Unforeseen Conditions Line Nbr.2 OTHER - Re-Sequencing Work $2,000, Description : Reason : Re-Sequencing of the work due to impacts occurring subsequent to the time of the Design-Build RFP Submittal. This includes the establishment of new Contract Milestone dates and revisions to the current Milestones Dates. Delete existing agreement EXHIBIT "B" and replace with EXHIBIT "B" WP 303 DESIGN-BUILD MILESTONE SCHEDULE REVISED dated March 19, 2013, attached hereto and made a part hereof, providing the revised Milestones and Liquidated Damages that BCAD and TPFLHV have mutually acknowledged, agreed and accepted. Re-Sequencing of work due to impacts occurring subsequent to the Design-Build RFP Issuance Cause : Re-Sequencing COPY FOR: MINUTES, CONTRACTOR, PURCHASING, CONSULTANT, SUPERVISING AGENCY, BUDGET, DEPARTMENT 4/25/2013 Percentages may not total exactly, due to rounding Source: ContractsCentral
3 Page 3 of 14 BOARD OF COUNTY COMMISSIONERS, BROWARD COUNTY, FLORIDA CHANGE ORDER NO: 6 BOARD REGULAR Project: Design-Build Services for US 1/FEC RR Structures for Expansion of Runway 9R Contract: N P1 Vend: TUTOR PERINI FORT LAUDERDALE-HOLLWOOD VENTURE Description of Changes, Reasons Therefore, and Cost and/or Time Changes For Each: Cost Basis: Negotiated Lump Sum Line Nbr.3 OTHER - Cost Adjustment $1,000, Description : Settlement of all specific known requests for changes, potential changes, PR's, SI's, and issues that have not been submitted to the County as of March 31, 2013 (except 3.a. through 3.x. listed in line Nbr. 1) identified as, but not necessarily limited to: PCO No. 001A - NE 10th Street extension delay. PCO No Field office delay in occupancy (previous delay only). PCO No. 009 Personnel ID badging. PCO No Mangroves at Ramp G. PCO No Runway/Taxiway tunnel smoke analysis. PCO No Building Department permit acquisition & processing. PCO No Fire hydrant water source RFI 017. PCO No UPS monitoring RFI 020. PCO No Lancaster Building foundation demolition & removal. PCO No Removal of mangroves at 7th Avenue. PCO No Roadway sign structure at braided ramp and Griffin Road (engineering/design only). PCO No Use of 24" water main for life safety (CREDIT). PCO No Requested modifications to fire suppression system (unknown final cost NOT TO EXCEED $50,000.00). PCO No Increased scope related to BCAD communication duct bank. PCO No Impacts associated with the installation of FEC's spur track. PCO No Elimination of tunnel shelf within the runway structure cells. PCO No Damaged communication line at bent 2. PCO No Hydrocarbon detection. PCO No Accommodate additional conduit for centerline lights in deck slab. PCO No Potential delay due to generator selection process. PCO No Relocate fuel tank at utility building. PCO No NE 10th Street Lighting PCO No Guardrail at MSE Wall PCO No Johnson Controls, Inc. supplier for Mechanical Controls PCO No Deletion of Pumps in Containment Tank PCO No Gate 502 AOA Security Gate PCO NO CCD 007 Taxi Lot Entrance Relocation PCO No Design of Airport Gateway PCO No Traffic Modeling of US-1 Reason : Settlement of Contractor Issues Cause : Settlement of Contractor Issues COPY FOR: MINUTES, CONTRACTOR, PURCHASING, CONSULTANT, SUPERVISING AGENCY, BUDGET, DEPARTMENT 4/25/2013 Percentages may not total exactly, due to rounding Source: ContractsCentral
4 Page 4 of 14 BOARD OF COUNTY COMMISSIONERS, BROWARD COUNTY, FLORIDA CHANGE ORDER NO: 6 BOARD REGULAR Project: Design-Build Services for US 1/FEC RR Structures for Expansion of Runway 9R Contract: N P1 Vend: TUTOR PERINI FORT LAUDERDALE-HOLLWOOD VENTURE Description of Changes, Reasons Therefore, and Cost and/or Time Changes For Each: Cost Basis: Negotiated Lump Sum Line Nbr.4 OTHER - Additional Area of Ground Improvement $15,000, Description : Reason : Additional quantity of embankment material, and the placement of additional embankment material from onsite and off-site sources. The area this additional embankment is to be placed and the location of the on-site material is shown on the attached sheets, Change Order No. 6 Sheets 01 through 07, dated April 14, Additional Scope of Work Cause : Additional Scope of Work Total Change Order $18,000, Notes : 4/25/2013 This Change Order (#6) does not include costs for MSE Walls that will be added. The MSE Wall Scope of Work will be adjusted separately, and in conjunction with the MSE Walls that will be deleted from the Odebrecht-CFE Joint Venture Contract. PURCHASING INFORMATION PO : SC AVC Folder : RX : AVC Original Award : Approved Amendments : 0 Approved COs : 5 Previous Revised : $179,868, $0.00 $10,488, $190,356, Days 0 Days 0 Days 964 Days This REGULAR Change Order: New Revised Contract: INCREASE $18,000, $208,356, NO TIME CHANGE 964 Days COPY FOR: MINUTES, CONTRACTOR, PURCHASING, CONSULTANT, SUPERVISING AGENCY, BUDGET, DEPARTMENT 4/25/2013 Percentages may not total exactly, due to rounding Source: ContractsCentral
5 Page 5 of 14
6 BOARD OF COUNTY COMMISSIONERS, BROWARD COUNTY, FLORIDA CHANGE ORDER NO: 6 BOARD REGULAR Exhibit 4 Page 6 of 14 Project: Design-Build Services for US 1/FEC RR Structures for Expansion of Runway 9R Contract: N P1 Vend: TUTOR PERINI FORT LAUDERDALE-HOLLWOOD VENTURE Description of Changes, Reasons Therefore, and Cost and/or Time Changes For Each: Cost Basis: Negotiated Lump Sum AMOUNT TIME ORIGINAL CONTRACT $179,868, PREV APPROVED CHANGE ORDERS $10,488, THIS CHANGE ORDER NO. 6 $18,000, REVISED CONTRACT AMOUNT $208,356, PENDING CHANGE ORDERS $18,000, Current - Apprvd CO - This CO = Remaining Admin Allowance Board Allowance Total Allowance INCREASE CONTRACT AMOUNT BY $18,000, NO CHANGE IN CONTRACT PERIOD COPY FOR: MINUTES, CONTRACTOR, PURCHASING, CONSULTANT, SUPERVISING AGENCY, BUDGET, DEPARTMENT 4/25/2013 Percentages may not total exactly, due to rounding Source: ContractsCentral - A Service Of The Purchasing Division
7 Page 7 of March 14 19, 2013 EXHIBIT "B" WP 303 DESIGN-BUILD MILESTONE SCHEDULE REVISED DELETE ADD TPFLHV AGREEMENT DATED OCTOBER 25, 2011, EXIBIT "B" DESIGN-BUILD MILESTONE SCHEDULE IN ITS ENTIRELY TPFLHV AGREEMENT DATED OCTOBER 25, 2011, NEW EXHIBIT "B" TITLED DESIGN- BUILD MILESTONE SCHEDULE REVISED DATED MARCH 19,2013 Component Original Date Revised Date per C.O. No. 6 Liquidated Damages (per Calendar Day) First Notice to Proceed November 2, 2011 November 2, 2011 N/A Construction Notice to Proceed January 2, 2012 January 2, 2012 N/A West Component Completion June 1, 2013 June 1, 2013 $50, East Wedge Component Completion August 1, 2013 October 30, 2013 $50, East Approach Slab Component Completion October 1, 2013 February 22, 2014 $50, West Wedge Component Completion February 1, 2014 July 1, 2013 $50, Runway Deck Component Completion February 22, 2014 February 22, 2014 $50, Work Area 2C N/A January 31, 2014 $50, Substantial Completion February 22, 2014 February 22, 2014 $30, Final Completion June 23, 2014 June 23, 2014 $4, H:\Global Settlement\WP 303_TPFLHV_Global\WP 303_TPFLHV_CO6_Exhibit_B_ajm_ xlsx
8 Page 8 of 14
9 Page 9 of 14
10 Page 10 of 14
11 Page 11 of 14
12 Page 12 of 14
13 Page 13 of 14
14 Page 14 of 14
Chapter 22. Lump Sum Project Guidelines
Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11
More informationAGREEMENT between BROWARD COUNTY and Cummings-Balfour Beatty, A Joint Venture for CONSTRUCTION MANAGER AT RISK SERVICES TERMINAL 4 GATE REPLACEMENT - WESTERN EXPANSION at the Fort Lauderdale-Hollywood
More informationInvestigation of the November 2, 2013 collapse of concrete beams at Fort Lauderdale-Hollywood Airport runway project
Investigation of the November 2, 2013 collapse of concrete beams at Fort Lauderdale-Hollywood Airport runway project U.S. Department of Labor Occupational Safety and Health Administration Directorate of
More informationExhibit 1 to Part 3 Project-Specific Terms
Exhibit 1 to Part 3 Project-Specific Terms (Date of Standard Exhibit 1 to Part 3: May 2014) Part 3 (2013 Lump Sum Agreement Between Department and Design-Builder), Part 4 (2013 General Conditions of Contract
More informationSTANDARD AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR LUMP SUM CONSTRUCTION
STANDARD AGREEMENT BETWEEN OWNER AND CONTRACTOR FOR LUMP SUM CONSTRUCTION THIS AGREEMENT made as of day of June In the year 2010 Between the Owner: (name, address, phone number) Boulder Housing Partners
More informationSECTION EIGHT BONDING REQUIREMENTS
SECTION EIGHT BONDING REQUIREMENTS 8-00 BONDING REQUIREMENTS 8-01 No building permit for any construction in the subdivision shall be issued nor any lot within the subdivision conveyed until a bond has
More informationExhibit 1 to Part 3 Project-Specific Terms
Exhibit 1 to Part 3 Project-Specific Terms (Date of Standard Exhibit 1 to Part 3: July 2013) This Exhibit 1 to Part 3 (2013 Lump Sum Design-Build Agreement Between Department and Design-Builder) contains
More informationAGREEMENT. between BROWARD COUNTY. and. Turner Construction Company. for CONSTRUCTION MANAGEMENT SERVICES FOR VARIOUS AIRPORT PROJECTS (TBD)
AGREEMENT between BROWARD COUNTY and Turner Construction Company for CONSTRUCTION MANAGEMENT SERVICES FOR VARIOUS AIRPORT PROJECTS (TBD) IN BROWARD COUNTY, FLORIDA RLI # 20071014-0-AV-01A INDEX ARTICLE
More informationThe total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016.
Public Notice of Application for Authority to Impose and Use Passenger Facility Charges (PFCs) at EWR, LGA, JFK and SWF and Amendment to Approved PFC Applications at EWR, LGA, and JFK The Port Authority
More informationTD AMERITRADE Park Omaha
TD AMERITRADE Park Omaha November 19, 2009 Report No. 6 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment
More informationREQUEST FOR PROPOSALS (RFP) - Construction Management Services. Germantown School District Office
REQUEST FOR PROPOSALS (RFP) - Construction Management Services From: Germantown School District Project: Germantown School District Addition & Renovations to Rockfield Elementary School N132 W18473 Rockfield
More informationCSC-DIVISION 1-MASTER SECTIONS Description
CSC-DIVISION 1-MASTER SECTIONS Description 01 11 00 Summary of Work by Consultant 01 12 00 Multiple Contract Summary by Consultant 01 14 00 Work Restrictions see below 01 21 00 Allowances by Consultant
More informationCroton E.S. - BUDGET
Croton E.S. BUDGET Cooling Tower Replacement Description Budget COMMENTS Design Criteria Professional N/A Design 8,260.00 TLC Engineering GMP 121,571.63 Doug Wilson Enterprises, Inc. Total 129,831.63 0.00
More informationEXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT. BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309
EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT FOUR 1.0 SCOPE OF
More informationPROJECT MANAGEMENT HANDBOOK, PART 1 - ISSUES COMMON TO ALL PROJECT MANAGERS
CHAPTER 11 - Project Continuity Contents Introduction... 2 Phase Hand-Offs... 3 Project Feedback... 9 Project Management Team Approach... 10 Page 1 of 15 Introduction A primary objective of all Project
More informationAV Parking System Review
Exhibit 1 AV Parking System Review May 6, 2011 Report No. 11-01 Office of the County Auditor Evan A. Lukic, CPA County Auditor Table of Contents Contents EXECUTIVE SUMMARY... 3 OBJECTIVES, SCOPE AND PROCEDURES...
More informationDesign Deliverables Checklist
S a n i tary Sewer Overflow (SSO) Control a n d Wastewater Facilities Program Deliverables Checklist City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared by:
More informationDepartment of Facilities Building NE49
Massachusetts Institute of Technology Department of Facilities Building NE49 Travis Wanat Senior Project Manager MIT.nano, Building 12 Weekly construction update: May 04,, 2015 MIT.nano project updates
More informationCONSTRUCTION CONTRACT TERMINOLOGY
PAGE 1 ALLOWANCE - in bidding, an amount budgeted for an item for which no exact dollar amount if available; a contingency for unforeseen costs; the classification of connected parts or members according
More informationSTANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGN- BUILDER - LUMP SUM
DC STANDARD FORM OF AGREEMENT BETWEEN OWNER AND DESIGN- BUILDER - LUMP SUM Document No. 525 Second Edition, 2010 Design-Build Institute of America Washington, Design-Build Institute of America - Contract
More informationREQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Appendix 1 Project Information. PS-0748-A Page 1 5/4/2016 Appendix 1
REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES (PS-0748-A) Project Information PS-0748-A Page 1 5/4/2016 Table of Contents Project Budget Worksheet Program Plan Project Location (Site Plan) Scope of Services
More informationBUSINESS USE PERMIT APPLICATION
BUSINESS USE PERMIT APPLICATION Instructions and Information for Business Use Permits and Temporary Certificates of Occupancy are included at the end of this application. Planning and Development Services
More informationCorrected Form: Revised Attachment 7B Cost Proposal Distribution Exhibits A1 and A2 Attached
ADDENDUM #1 RFP: 500 16 Design Build Maintenance & Operations Complex The following changes to the Request for Proposal and clarifications are provided based on questions received and must be added/considered
More informationDEFINITIONS AND IDENTIFICATIONS
Bn\QWARD I~ el"s COUNTY - AGREEMENT BETWEEN BROWARD COUNTY AND RICONDO AND ASSOCIATES, INC. FOR CONSULTANT SERVICES FOR AIRPORT PLANNING CONSULTANT SERVICES RLI/RFP # R1277902Pl This is an Agreement ("Agreement")
More informationExhibit C: Scope of Work and Schedule of Deliverables
Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza
More informationS-1 (1803) PROGRESS SCHEDULES-CRITICAL PATH METHOD (CPM) The provisions of MnDOT 1803 are deleted and replaced with these Special Provisions.
S-1 (1803) PROGRESS SCHEDULES-CRITICAL PATH METHOD (CPM) The provisions of MnDOT 1803 are deleted and replaced with these Special Provisions. 1803.1 All SCHEDULES A General Requirements This section contains
More informationNational Archives and Record Administration
National Archives and Record Administration Installation of Self-Closing Flood Barriers and Loading Dock Turntable Removal and Structural Slab Repairs ! 2010 Baltimore Washington Chapter Outstanding Repair
More informationAttachment F. Campus Capital Needs Sales Surtax Funded Detail Report
Facility Attachment F Campus Capital Needs Sales Surtax Funded Detail Report Facilities Services 2700 Judge Fran Jamieson Way Viera, Florida 32940-6601 Condition Code Estimate Bayside High 2.30 $2,567,194
More informationDeveloping Critical Path Method Scheduling (CPM)
Developing Critical Path Method Scheduling (CPM) Pretest 1. An activity which is on critical path has a planned duration of 5 days. What is the total float for the activity? a. 0 b. 1 c. 2 d. 3 Pretest
More informationSacramento Municipal Utility District Headquarters Building and Site Rehabilitation Project March, 2015
Addendum 1: Changes to the Draft IS/MND Text and Figures Introduction This summary presents minor corrections and revisions made to the Draft IS/MND initiated by the public, staff and/or consultants based
More informationPN 107-01/16/2009 - CRITICAL PATH METHOD PROGRESS SCHEDULE
PN 107-01/16/2009 - CRITICAL PATH METHOD PROGRESS SCHEDULE A. General. The progress schedule required for this project is the critical path method schedule (CPM schedule). The Contractor shall designate
More informationCSX RAILROAD U. S. F O R E S T S E R V I C E O S C E O L A N A T I O N A L F O R E S T FLORIDA POWER & LIGHT OVERHEAD ELECTRIC LINE
FLORIDA POWER & LIGHT OVERHEAD ELECTRIC LINE EXISTING OVERHEAD ELECTRIC C:\Projects\Columbia County\End Users\Project Mongoose\, ELEC, smoore, May 09, 2014-12:28:43pm FLORIDA POWER & LIGHT OVERHEAD TRANSMISSION
More informationFLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR
FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration
More information[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices
[Project Name] NZTA Contract No. [Contract Number] Schedule of Prices Schedule of Prices SP1
More informationSpecial Event Permit Application Guidelines and Instructions
Special Event Permit Application Guidelines and Instructions The City of Peoria is a city that celebrates special events. From parades to fireworks and concerts, Peoria is proud to host numerous events
More informationStatewide Scheduling Engineers Meeting August 8-9, 2006 Turkey Lake Plaza
Statewide Scheduling Engineers Meeting August 8-9, 2006 Turkey Lake Plaza Attendees: Richard Massey(SCO), Brenda Haygood(D-2), Jimmy Miller(D-3), Robert McCracken(PBS&J-D-3), Abel Sierra(D-5), Luis Lopez(D-6),
More informationReview of Janitorial Services Contract at the Fort Lauderdale-Hollywood International Airport (RLI # 20070522-0-AV-2)
Review of Janitorial Services Contract at the Fort Lauderdale-Hollywood International Airport (RLI # 20070522-0-AV-2) March 23, 2011 Report No. 11-04 Evan A. Lukic, CPA County Auditor Table of Contents
More informationMATERIALS: The Contractor shall provide the latest version of Primavera SureTrak software.
DESCRIPTION: '108-01, Start and Progress of Work, is hereby amended to require that the Contractor furnish and participate in a computerized CPM (critical path method) network scheduling system. The purpose
More informationAIA Document A141 TM - 2004 Standard From of Agreement Between Owner and Design- Builder
AIA Document A141 TM - 2004 Standard From of Agreement Between Owner and Design- Builder AGREEMENT made as of the day of in the year of (In words, indicate day, month and year) BETWEEN the Owner: (Name,
More informationCity of Cincinnati Streetcar Project
City of Cincinnati Streetcar Project Project Analysis December 18, 2013 kpmg.com Table of Contents Section Slides Scope of Work 2 Approach 3 Exclusions 4 Executive Summary 5 Budget Summary 6 Design Vendor:
More informationBond Program Standard Operating Procedures
Los Angeles Community College District Bond Program Standard Operating s Volume III Construction Version Review 3 Issuance Date LACCD Program Management Office 515 S. Flower Street, Suite 900 Los Angeles,
More informationSection 10.8 AUGER CAST PILES
Section 10.8 AUGER CAST PILES 10.8.1 Purpose To establish a procedure for approval of Contractor's Auger Cast Pile Installation Plan, inspection and approval of mixing, pumping and demonstration of cement
More informationSchedule of Prices. Project Name Contract No. Contract Number
Schedule of Prices Project Name Contract No. Contract Number C3-LS-BP-Issue 2 SP Page 1 Printed 1 March 2011 >: 1. When preparing the schedule
More informationEXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR. Orange County. Financial Project ID(s): 437156-2-62-01
EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR Orlando South Interchange Ramp Improvements Orange County Financial Project ID(s): 437156-2-62-01 TABLE OF CONTENTS 1.0 PURPOSE...
More informationAPPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
More informationConstruction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows:
Construction Permit Application Instructions Instructions for completing Construction Permit Applications and Technical Sections are as follows: UCC-F100, Construction Permit Application pg. 1. Applicant
More informationMONROE SCHOOL BOARD LEASING CORP. QUALIFIED SCHOOL CONSTRUCTION BONDS CORPORATE RESOLUTION
MONROE SCHOOL BOARD LEASING CORP. QUALIFIED SCHOOL CONSTRUCTION BONDS CORPORATE RESOLUTION A RESOLUTION OF THE BOARD OF DIRECTORS OF THE MONROE SCHOOL BOARD LEASING CORP. AUTHORIZING THE LEASE-PURCHASE
More informationPricing of Construction Contract Change Order Documentation
The contract language contained in this Exhibit will supplement and take precedence over all other change order pricing contract provisions in the Contract Documents provided by the Owner, Design-Builder
More informationRetaining Wall Replacement at the Currituck County Veterans Memorial Park
CONTRACT DOCUMENTS FOR Retaining Wall Replacement at the Currituck County Veterans Memorial Park Coinjock, NC May 24, 2016 NOTICE TO BIDDERS Bids will be received until 4:00 pm on June 17, 2016 at the
More informationSTAFF REPORT ACTION REQUIRED
STAFF REPORT ACTION REQUIRED Procurement Authorization Scarborough Subway Extension Project Management Services Contract FE85-3 Date: February 25, 2015 To: From: TTC Board Chief Executive Officer Summary
More informationBest Practices and Trends in Design-Build and Construction Management at-risk from The Municipal Water and Wastewater Design-Build Handbook
Best Practices and Trends in Design-Build and Construction Management at-risk from The Municipal Water and Wastewater Design-Build Handbook Water Design-Build Council March 31, 2011 Kansas City, MO Presentation
More informationMULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3
TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete
More informationSAN FRANCISCO AIRPORT COMMISSION MINUTES
SAN FRANCISCO AIRPORT COMMISSION MINUTES July 19, 2011 9:00 A.M. Room 400 - City Hall #1 Dr. Carlton B. Goodlett Place (400 Van Ness Avenue) City and County of San Francisco EDWIN M. LEE, MAYOR COMMISSIONERS
More informationAn Oracle White Paper April 2009. Change Management Best Practices for the Engineering and Construction Industry
An Oracle White Paper April 2009 Change Management Best Practices for the Engineering and Construction Industry Introduction... 1 Understanding Project Changes... 2 Directed Changes... 2 Constructive Changes...
More informationSEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS
UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line
More informationNOTE: Unless otherwise specified, unit prices for the demolition of structures shall be for wet demolitions.
ATTACHMENT AA DETAILED SCOPE OF WORK Demolition & Removal Services for SR-7/US-441 from North of Fillmore Street to South of Stirling Road Hollywood, Broward County, Florida 1.0 Structures Structures are
More informationPreserve the Tax-Exempt Status of Municipal Bonds
The, and its members, support the preservation of the existing tax-exempt status of municipal bonds. Specifically, FAC supports legislative provisions that: Uphold the tax-exempt status of municipal bonds.
More informationAttachment 5 Electrical Engineering
A. Phase 1, Preliminary Design: The CONSULTANT shall: Attachment 5 Electrical Engineering 1. Ascertain the requirements for each project through a meeting with the Capital Projects Division Manager or
More informationMASTER PLAN DRAFT RECOMMENDED PLAN
MASTER PLAN DRAFT RECOMMENDED PLAN City of Atlanta, Department of Aviation September 19, 2014 Draft Recommended Plan This document presents an overview of the findings and recommendations from the Master
More informationMEMORANDUM. 4201 E. Arkansas Ave., Room 262, Denver, CO 80222 P 303.757.9204 F 303.757.9656 www.coloradodot.info
4201 E. Arkansas Ave., Room 262 Denver, CO 80222 MEMORANDUM TO: TRANSPORTATION COMMISSION FROM: JOSH LAIPPLY, CHIEF ENGINEER SCOTT RICHRATH, CHIEF FINANCIAL OFFICER DATE: SEPTEMBER 17, 2014 SUBJECT: PROGRAM
More informationTAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST
TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST In order to provide a comprehensive plan review in a timely manner, and to insure the design and installation of fire alarm systems
More informationSCOPE OF SERVICES FOR CONSULTING ENGINEERING SERVICES PROJECT DEVELOPMENT AND ENVIRONMENTAL STUDY AND DESIGN
I-95 (SR 9) from I-10 to Georgia State Line- Managed Lane Study FIN No:435576-1-12-01 Federal Project #: TBD Duval and Nassau Counties, Florida SCOPE OF SERVICES FOR CONSULTING ENGINEERING SERVICES PROJECT
More informationTHE CORPORATION OF DELTA ENGINEERING CONSULTANT PROJECT PROCEDURAL MANUAL
THE CORPORATION OF DELTA ENGINEERING CONSULTANT PROJECT PROCEDURAL MANUAL OCTOBER, 2013 TABLE OF CONTENTS 1. CHECKLIST PAGE NO. 2. CHECKLIST DETAILS A. Design Path 3 B. Property Acquisition 6 C. Outside
More informationBUILDING MOVE PROCESS INSIDE CITY LIMITS
To move a building from outside or within the City to a site within City limits, the following STEPS must be taken before the move can take place: 1. A written request to relocate a dwelling must be provided
More informationRequest For Proposal. Furnish Schneider Business Park Signs Design Build Services. For the Cibolo Economic Development Corporation Cibolo, Texas
Request For Proposal Furnish Schneider Business Park Signs Design Build Services For the Cibolo Economic Development Corporation Cibolo, Texas The City of Cibolo, Texas Economic Development Corporation
More informationGeneral Utility Work Obligations
General Utility Work Obligations This Section addresses the Utility Company (or Utility Owner) requirements. It does not apply to existing stormwater facilities, irrigation ditches, Intelligent Transportation
More informationUnder Section: II Required Services: Under Section: III Leased Premises:
May 14, 2012 The following are submitted in response to questions and for clarification. Under Section: II Required Services: 4. Maintenance, repair, and servicing of aircraft: Please clarify that the
More informationLos Angeles Community College District PROGRAM MANAGEMENT SERVICES. Terri Mestas Program Director
Los Angeles Community College District PROGRAM MANAGEMENT SERVICES Terri Mestas Program Director CMAA Southern California Chapter February 13, 2015 1 LACCD Overview Established in 1969 Governed by seven-member
More informationPROJECT MANAGEMENT HANDBOOK, PART 2 - PHASE SPECIFIC PROJECT MANAGEMENT ISSUES
CHAPTER 5 - Construction Project Management Contents Introduction... 2 Construction Contract Management... 2 CEI Contracts... 3 Community Awareness Plan... 7 Alternative Contracting Methods... 8 Warranty
More informationPROFESSIONAL AND EXECUTIVE LIABILITY APPLICATION
PROFESSIONAL AND EXECUTIVE LIABILITY APPLICATION Form 98-001-A (01/07) ARCHITECTS AND ENGINEERS PROFESSIONAL AND EXECUTIVE LIABILITY APPLICATION THIS IS AN APPLICATION FOR CLAIMS-MADE COVERAGE. DEFENSE
More informationPENNSYLVANIA HOUSING FINANCE AGENCY COST CERTIFICATION GUIDE TAX CREDIT PROGRAM
PENNSYLVANIA HOUSING FINANCE AGENCY COST CERTIFICATION GUIDE TAX CREDIT PROGRAM NOTE: THIS IS NOT AN AUTHORITATIVE PRONOUNCEMENT ON THOSE COSTS THAT ARE TAX CREDIT ELIGIBLE AND INELIGIBLE. IT SERVES ONLY
More informationSpecial Inspection/Re Inspection, all Divisions $100.00 per hour, one hour minimum
Community Development Department 408 Spokane St. Post Falls, ID 83854 Ph: 208 773 8708 Fax: 208 773 2505 www.postfallsidaho.org BUILDING S Building Plan Check (Paid at Plan Submittal) Residential $150.00
More informationImproving Access in Florida International University Biscayne Bay Campus Executive Summary
EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared
More informationHunt Construction Group, Inc. LEVEL 1 DESIGN BUILD SPECIALTY CONTRACTOR PREQUALIFICATION DOCUMENTS FOR:
Hunt Construction Group, Inc. LEVEL 1 DESIGN BUILD SPECIALTY CONTRACTOR PREQUALIFICATION DOCUMENTS FOR: San Diego State University Basketball Practice Facility Project Number: 03400200 October 2013 San
More informationMEMORANDUM TO: FROM: SUBJECT:
rmill VALLEY] MEMORANDUM TO: FROM: SUBJECT: For many years, the City ofmill Valley has had a requirement that major new projects submit a "Construction Management Plan" prior to beginning work. One ofthe
More informationFirst Addendum RFP for Solar Photovoltaic Generating System RFP Depot Bid Number 0804-001
First Addendum RFP for Solar Photovoltaic Generating System RFP Depot Bid Number 0804-001 1. Section 18, Addenda and Interpretation, of the RFP is deleted in its entirety and replaced with the following:
More informationADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH
Hoyle, Tanner Project No. 093145 ADDENDUM NO. 1 Manchester Boston Regional Airport, City of Manchester, NH Construct Relocated Roadway Airport Service Rd. Outside Runway Object Free Area (ROFA); Construct
More informationCHAPTER 4. COMPLETING FORM HUD-92330, MORTGAGOR'S CERTIFICATE OF ACTUAL COST
CHAPTER 4. COMPLETING FORM HUD-92330, MORTGAGOR'S CERTIFICATE OF ACTUAL COST 4-1. GENERAL INFORMATION AND DESIRED FORMAT. A. Heading of Form. Self-explanatory. B. Columns A, B, and C in the body of the
More informationRESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE
RESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE Residential Course of Construction policies, also known as Builder s Risk, are designed to cover the property owner for potential loss while the property
More informationDelDOT Professional Services Procurement Manual. Chapter Contents. Chapter Six Progress Payment and Reporting Procedures 6.1 PROGRESS PAYMENTS...
Chapter Contents Chapter Six Progress Payment and Reporting Procedures 6.1 PROGRESS PAYMENTS... 6-1 6.1.1 Payment and Reporting Submission Contents... 6-1 6.1.2 Payment and Reporting Schedule... 6-1 6.1.3
More informationCovance Construction Management Staffing Plan Chandler, Arizona
INTRODUCTION: This Construction Management (CM) Staffing Plan has been prepared for Covance to identify the critical organizational structure necessary to successfully complete the Chandler project according
More informationSAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014
SAN DIEGO GAS & ELECTRIC COMPANY SOUTH BAY SUBSTATION RELOCATION PROJECT TRAFFIC MANAGEMENT PLAN SEPTEMBER 2014 Traffic Management Plan TABLE OF CONTENTS 1 INTRODUCTION... 1 2 OBJECTIVES... 1 3 APPLICABLE
More informationSeattle Public Schools The Office of Internal Audit
seaonly Seattle Public Schools The Office of Internal Audit Capital Internal Audit Report Issue Date: June 16, 2015 Introduction and Background Executive Summary This report contains the results of our
More informationSouth Florida East Coast Corridor (SFECC) Projects. February 7, 2012
Project Update to City of Ft. Lauderdale Central lbroward deast West ttransit it& South Florida East Coast Corridor (SFECC) Projects February 7, 2012 Transit Studies Building a network of premium transit.
More information108-C-215 CRITICAL PATH METHOD SCHEDULE. (Revised 03-24-10)
CRITICAL PATH METHOD SCHEDULE (Revised 03-24-10) The Standard Specifications are revised as follows: SECTION 108, BEGIN LINE 177, INSERT AS FOLLOWS: 108.04.1 Critical Path Method Schedule (a) General Requirements
More informationINSURANCE REQUIREMENTS (A) This insert applies to the following State Contracts:
INSURANCE REQUIREMENTS (A) This insert applies to the following State Contracts: General Conditions of the Construction Contract Design/Bid/Build (SC-6.23), or Contractors Agreement Design/Bid/Build (SC-6.21),
More informationTHE RIGHT-OF-WAY ACQUISITION SECTION
THE RIGHT-OF-WAY ACQUISITION SECTION A SECTION OF THE ROADWAY PRODUCTION DIVISION PALM BEACH COUNTY ENGINEERING & PUBLIC WORKS DEPARTMENT WORKING WITH YOU TO HELP MEET OUR GROWING TRANSPORTATION NEEDS
More informationCUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS
CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS 2015 ENGINEERING DESIGN SERVICES AND CONSTRUCTION FORECAST CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS 2079 EAST 9 TH STREET, CLEVELAND, OH 44115 216-348-3800
More informationConstruction Management of Multiple Projects within a Large Scale Program. Tim Mentel, PMP RDM Rick Hines, P.E. RDM. Agenda
Construction Management of Multiple Projects within a Large Scale Program Tim Mentel, PMP RDM Rick Hines, P.E. RDM Agenda Overview of Port Columbus Airport (CMH) 10R/28L Replacement Program Planning the
More informationHartsfield-Jackson Atlanta International Airport s
Hartsfield-Jackson Atlanta International Airport s 2008-09 Closed Projects (Posted 1/6/2009) FC-3007000038C: MISCELLANEOUS BUILT-UP ROOF AND SINGLE PLY ROOF REPAIRS AT H-JAIA Furnish all labor, equipment,
More informationDELAWARE COUNTY DIVISION OF ENVIRONMENTAL SERVICES PREQUALIFICATION AND QUALIFICATIONS-BASED SELECTION PROCEDURE FOR PROFESSIONAL DESIGN SERVICES
DELAWARE COUNTY DIVISION OF ENVIRONMENTAL SERVICES PREQUALIFICATION AND QUALIFICATIONS-BASED SELECTION PROCEDURE FOR PROFESSIONAL DESIGN SERVICES Rev. Date 4/14/2014 TABLE OF CONTENTS: Article 1: Introduction
More informationMemorandum. Jeff Jasper, P.E. Director, Division of Design. Technical Support TEBM, Division of Construction. From: Jeremiah Littleton, P.E.
Memorandum To: Thru: Jeff Jasper, P.E. Director, Division of Design Rachel Mills, P.E. Technical Support TEBM, Division of Construction From: Jeremiah Littleton, P.E. Division of Construction Date: June
More information511 Tampa Bay. www.511tampabay.com WINNER. 2005 Best of ITS Award Best Public Private Partnership Awarded by ITS America on May 2, 2005
Tampa Bay SunGuide District Seven s Future in Intelligent Transportation Systems Presented at: FACERS June 22, 2005 Tampa, FL Tampa Bay SunGuide Freeway 511 System Management System Covers 750 miles of
More informationINMATE TELEPHONE SERVICE AGREEMENT
INMATE TELEPHONE SERVICE AGREEMENT This Agreement is made and entered into by and between FSH Communications, LLC ("FSH"), a Delaware corporation, and Stevens County Jail ("Space Provider') with a principal
More informationSTICKLEY AUDITORIUM RENOVATION Community and Stakeholder Presentation
STICKLEY AUDITORIUM RENOVATION Community and Stakeholder Presentation APRIL 30, 2014 SCHEMATIC DESIGN PROGRESS Code Study Analysis: key issues and resolutions Seating Analysis of sightlines, seating and
More informationOPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003
OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved Electrical Contractor
More informationWATER SUPPLY SYSTEMS FOR 150/5220-4B AAS-100 AIRCRAFT FIRE AND RESCUE PROTECTION
WATER SUPPLY SYSTEMS FOR 150/5220-4B AAS-100 AIRCRAFT FIRE AND RESCUE PROTECTION 1. PURPOSE. This Advisory Circular (AC) provides guidance for the selection of a water source and standards for the design
More informationWest Thornhill Stormwater Flood Remediation Phase 1 Construction. Community Information Meeting
West Thornhill Stormwater Flood Remediation Phase 1 Construction Community Information Meeting Thornhill C.C. May 7, 2014 Purpose To advise residents and businesses of 2014 and 2015 construction activities
More informationConstruction Management At-Risk
Oconee County Schools P.O. Box 146, 34 School Street Watkinsville, GA 30677 706-769-5130 706-769-3513 REQUEST FOR PROPOSALS ISSUE DATE: March 10, 2016 RFP REF: Construction Management At-Risk Construction
More informationPLAN SUBMITTAL INFORMATION
PLAN SUBMITTAL INFORMATION APPLICATION FOR A BUILDING PERMIT Prior to drafting construction drawings, please check with the North Miami Beach Community Development Department concerning the following:
More information