HEANEY General Contracting, Inc.

Size: px
Start display at page:

Download "HEANEY General Contracting, Inc."

Transcription

1 HEANEY General Contracting, Inc. March 26, 2016 AAPS BID NO ADDENDUM NO. 03- PROJECT: DESCRIPTION: Ann Arbor Public Schools Mitchell Expansion Phase I Bid Pkg. 3 (MEP) Building Addition and Renovationsconcrete footings, foundations, flatwork The work clarified or revised by this Addendum shall be the same as required by the complete set of Contract Documents. All incidentals required in connection with the Work of this Addendum shall be Included in the Scope of Work even if not specially specified. All bidders are responsible to review the Addendum and to acknowledge receipt of this Addendum on the space provided on the Bid Proposal Form. The following items are included in Addendum No. 3 for Mitchell Expansion Phase I Bid Pkg.3 (MEP): I. TEXT/WRITE UPS - The following text/write ups have been added to the Bid documents via this addendum: HGC Addendum No. 3, dated (This document); II. SPECIFICATIONS: Section HVAC and Section Electrical have been reissued with add items/clarifications in bold Carpenter Road Ypsilanti, MI 48197

2 HEANEY General Contracting, Inc. Mitchell Expansion Phase I- Bid Pkg. 3(MEP) HGC Addendum No The bid date/time remains the same. All bids are due no later than 2PM on March 31, Bids must be received at the AAPS Administration Building located at 2555 S State Street, Ann Arbor, MI A bid bond is required, in the amount of 5% of the contractors bid. If the bid amount is less than $50, a certified check in the amount of 5% of the bid is acceptable. 3. It is reiterated that all bid envelopes must indicate the bid category and must include the AAPS Familial Affidavit and Iran Economic Sanctions Act form. 4. THERE IS NO ADDENDUM NO. 1 or ADDENDUM NO. 2 FOR THIS BID PACKAGE. 5. The project does not require prevailing wages. 6. ALL BIDDERS ARE ENCOURAGED TO PROVIDE VOLUNTARY ALTERNATES. 7. Bid Category HVAC: Items #20, 21, 22 have been added to the bid category description. (attached) 8. Bid Category Plumbing: Item #24 has been added to the bid category description.(attached) 9. Bid Category Electrical: Items #14,15 have been amended. The new information is in bold print. Items #22, 23, 24 have been added. End HGC Addendum No Carpenter Road Ypsilanti, MI 48197

3 Mitchell Expansion Phase I Bid Pkg. 3 SECTION SCOPE OF WORK- BID CATEGORY DESCRIPTION SPECIFIC NOTES BID CATEGORY Plumbing BID CATEGORY BASE SPECIFICATIONS: Division 00/01 Administrative Specifications Common Work Results for Plumbing Sleeves and Sleeve Seals for Plumbing Piping General-Duty Valves for Plumbing Piping Hangers and Supports for Plumbing Piping and Equipment Identification for Plumbing Piping and Equipment Plumbing Piping Insulation Domestic Water Piping Domestic Water Piping Specialties Sanitary Waste and Vent Piping Sanitary Waste Piping Specialties Facility Storm Drainage Piping Storm Drainage Piping Specialties RELATED SECTIONS: DIV HVAC DIV Electrical Joint Sealants Work To Be Included By This Contractor (Furnish and install, U.O.N.): 1. Provide necessary labor to complete the project on a Fast Track basis. It is anticipated that Footings will commence on or about April 6, 2016 and all work for the project must be complete by August 16, Include the costs to work all Saturdays, if the construction schedule mandates, from April 15, 2016 to August 31, Provide all safety equipment as required by OSHA and MIOSHA to perform the work of this bid category including required fall protection equipment/barriers. 4. Perform all caulking, if required, for the work of this bid category only. 5. Perform all fire stopping, if required, for the work of this bid category only. 6. Perform daily cleanup of the work of this bid category and dispose of the debris in on site dumpsters provided by the Construction Manager or remove off site as required by all governing bodies, codes, regulations, etc. 7. Perform all excavation and backfill for all work of this bid category. 8. This contractor will layout and mark all concrete slabs in the existing building that need to be sawcut and removed (by others). This contractor will do all excavation and backfill/compaction underneath the removed slab area to complete the work of this bid category and return the area to a condition ready to re-pour the areas(by others). 9. All domestic water piping inside the additions and existing building. 10. All sanitary and storm piping. 11. All water, sanitary, and storm piping shall be extended to 5 outside the building by the bid category where connections are necessary to NEW exterior underground piping. 12. All water, sanitary and storm piping that needs to be connected to existing structures or pipe outside of the building will be performed by this bid category. 13. All rain conductor piping. 14. All roof sumps/drains and floor drains 15. All valves, gauges, meters, necessary for all work of this bid category. 16. All gas piping and fittings, etc INSTRUCTIONS TO BIDDERS

4 Mitchell Expansion Phase I Bid Pkg All insulation required for the piping of this bid category.(including under sink insulation kits where required) 18. All pipe designations required by the specifications for the work of this bid category. 19. All testing required by the specifications for the work of this bid category. 20. All plumbing fixtures pursuant to the schedules on P3.1 including the emergency eye wash, emergency shower and electric water coolers.(elec. Connection by others) 21. All sleeves, penetrations of new or existing walls to complete the work of this bid category. 22. All excavation/backfill and coring of existing footings to complete the work of this bid category. 23. THIS BID CATEGORY SHALL INCLUDE AN ALLOWANCE OF $15, IN THE BASE BID TO BE USED AT THE DISCRETION OF THE CONSTRUCTION MANAGER FOR ADDITIONAL WORK. 24. This contractor shall include all saw-cutting, removals and replacement of concrete necessary for the work of this contract. Electric saws must be used on building interiors and existing surfaces must be protected. EXCLUSIONS 1. HVAC units/equipment by others 2. Electrical connection to water cooler by others 3. Hydronic piping system by others 4. Steam/condensate piping system by others END OF SECTION INSTRUCTIONS TO BIDDERS

5 Mitchell Expansion Phase I Bid Pkg. 3 SECTION SCOPE OF WORK- BID CATEGORY DESCRIPTION SPECIFIC NOTES BID CATEGORY HVAC BID CATEGORY BASE SPECIFICATIONS: Division 00/01 Administrative Specifications Hangers and Supports for HVAC Piping and Equipment Identification for HVAC Piping and Equipment Testing, Adjusting, and Balancing for HVAC Duct Insulation HVAC Piping and Insulation Instrumentation and Control for HVAC Sequence of Operations for HVAC Controls Facility Natural Gas Piping Hydronic Piping Hydronic Piping Specialties Metal Ducts Air Duct Accessories HVAC Power Ventilators Diffusers, Registers, and Grilles Unit Ventilators Finned-Tube Radiation Heaters RELATED SECTIONS: DIV Plumbing DIV Electrical Joint Sealants Work To Be Included By This Contractor (Furnish and install, U.O.N.): 1. Provide necessary labor to complete the work on a fast track basis as directed by the Construction Manager. It is anticipated that footings will commence on or about April 6, 2016 and this project must be completed by August 31, Include costs to work all Saturdays from May 1, 2016 to August 31, 2016 if the project schedule mandates. 3. Provide all safety equipment as required by OSHA and MIOSHA to perform the work of this bid category including required fall protection equipment/barriers. 4. Perform all caulking, if required, for the work of this bid category only. 5. Perform all fire stopping, if required, for the work of this bid category only. 6. Perform daily cleanup of the work of this bid category and dispose of the debris in on site dumpsters provided by the Construction Manager or remove off site as required by all governing bodies, codes, regulations, etc. 7. This contractor will perform all layout for penetrations thru new walls and floors in advance of their construction and in coordination with other trades. 8. All sleeves through walls or floors necessary for the work of this bid category. 9. All hydronic piping, insulation,fittings and accessories will be performed by this bid category 10. All HVAC equipment noted on schedules located on M4.0 including all air handling units, unit ventilators, electric radiant heat, relief air hoods, hot water coils. 11. All ceiling fans located in the gymnasium including protective cages 12. All duct insulation. 13. All piping insulation for the piping of this bid category. 14. All identification, testing, balancing for all equipment/piping/ductwork of this bid category. INSTRUCTIONS TO BIDDERS

6 Mitchell Expansion Phase I Bid Pkg All steam and condensate piping, insulation, equipment, fittings, valves, identification, testing, balancing required for a complete steam/condensate system pursuant to the documents 16. All temperature controls. 17. All HVAC demolition required in the existing building 18. All diffusers, grilles and registers 19. INCLUDE A $20, ALLLOWANCE IN THE BASE BID TO BE USED FOR ADDITIONAL WORK AT THE DISCRETION OF THE CONSTRUCTION MANAGER. 20. This contractor shall remove and reinstall all existing ceiling tile in the existing building required for the work of this contract. 21. This contractor shall lay out and coordinate all penetrations of existing masonry, drywall, and plaster walls. Cutting and patching will be done by others but this trade will take care to lay out penetrations to facilitate the least amount of cutting and patching necessary. 22. This contractor shall include all saw-cutting, removals and replacement of concrete necessary for the work of this contract. Electric saws must be used on building interiors and existing surfaces must be protected. EXCLUSIONS 1. All gas piping. 2. Cutting/patching of existing walls for sleeves required by the work of this bid category. END OF SECTION INSTRUCTIONS TO BIDDERS

7 Mitchell Expansion Phase I Bid Pkg. 3 SECTION SCOPE OF WORK- BID CATEGORY DESCRIPTION SPECIFIC NOTES BID CATEGORY Electrical BID CATEGORY BASE SPECIFICATIONS: Division 00/01 Administrative Specifications BID CATEGORY BASE SPECIFICATIONS: Division 00/01 Administrative Specifications Basic Electrical Requirements Basic Materials & Methods Minor Electrical Demolition Low-Voltage Electrical Power Conductors and Cables Grounding and Bonding for Electrical Systems Hangers and Supports for Electrical Systems Raceways and Boxes for Electrical Systems Cable Trays for Electrical Systems Identification for Electrical Systems Lighting Control Devices Panelboards Wiring Devices Overcurrent Protective Devices Combination Motor Starters Interior Lighting Fire Alarm System RELATED SECTIONS: DIV Plumbing DIV HVAC Joint Sealants Work To Be Included By This Contractor (Furnish and install, U.O.N.): 1. Provide necessary labor to complete the work on a fast track basis as directed by the Construction Manager. It is anticipated that footings will commence on or about April 6 and all work for this project must be substantially complete by August 31, Include costs to work all Saturdays from May 15, 2016 to August 31, 2016 if the project schedule mandates 3. Provide all safety equipment as required by OSHA and MIOSHA to perform the work of this bid category including required fall protection equipment/barriers. 4. Perform all caulking, if required, for the work of this bid category only. 5. Perform all fire stopping, if required, for the work of this bid category only. 6. Perform daily cleanup of the work of this bid category and dispose of the debris in on site dumpsters provided by the Construction Manager or remove off site as required by all governing bodies, codes, regulations, etc. 7. This contractor will perform all layout for penetrations thru new walls and floors in advance of their construction and in coordination with other trades. 8. All sleeves through walls or floors, foundations necessary for the work of this bid category. 9. All excavation/backfill of all underground conduit necessary for the work of this bid category, all excavation and coring of existing foundations and subsequent backfill/compaction necessary to complete the work of this bid category. 10. All lighting, light fixtures, lighting control devices 11. All conduit, wire, boxes, fittings, necessary for all the work of this bid category. 12. All conduit, boxes, cable tray, wiremold and miscellaneous as sundries required by the drawings and specifications for Owner s low voltage (Technology, security, etc) requirements. INSTRUCTIONS TO BIDDERS

8 Mitchell Expansion Phase I Bid Pkg All fire alarm system work to provide a complete fire alarm system pursuant to the work of this bid category in the new additions and the existing building where indicated. 14. All work to provide a complete Clock system in the new additions and the existing building where indicated.(note: All clock system notes and specifications are on the electrical drawings. There are no specification sections) 15. All work to provide a complete PA system in the new addition.(note: All PA/speaker notes and specification sections are on electrical drawings. There are no specification sections) 16. All electrical demolition required in the additions and in the existing building. 17. All new service equipment and panels, starters, disconnects etc. as indicated on the schedules. NOTE: Disconnects/Starters that are specified to be provided as packaged with a mechanical unit will be provided by others) 18. All floor boxes. 19. This bid category to coordinate all under slab work with other trades and the construction manager to expedite the installation of floor slab. 20. Final electrical connection of equipment provided by others shown on the documents including, but not necessarily limited to, electric water cooler, unit ventilators, HVAC equipment 21. INCLUDE AN ALLOWANCE OF $20, IN THE BASE BID TO BE USED AT THE DISCRETION OF THE CONSTRUCTION MANAGER FOR WORK OF THIS BID CATEGORY. 22. This contractor shall remove and reinstall all existing ceiling tile in the existing building required for the work of this contract. 23. This contractor shall lay out and coordinate all penetrations of existing masonry, drywall, and plaster walls. Cutting and patching will be done by others but this trade will take care to lay out penetrations to facilitate the least amount of cutting and patching necessary. 24. This contractor shall include all saw-cutting, removals and replacement of concrete necessary for the work of this contract. Electric saws must be used on building interiors and existing surfaces must be protected. 25. EXCLUSIONS 1. Starters/Disconnects that are packaged with mechanical unit per specification 2. Electric water cooler fixture by others. Connection by this category. END OF SECTION INSTRUCTIONS TO BIDDERS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 ADDENDUM NO. 1 DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 RECEIPT DATE: March 17, 2015 at 2:30 p.m. OPENING DATE: March 18,

More information

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids

More information

ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK

ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK C H A P T E R 7 ESTIMATING PLUMBING, HEATING, VENTILATING, AND AIR CONDITIONING (HVAC), AND ELECTRICAL WORK OBJECTIVES After reading this chapter and completing the review questions, you should be able

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

KIEWIT CM/GC Enabling/Utilities

KIEWIT CM/GC Enabling/Utilities South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 john.todd@kiewit.com General

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

ST. MONICA FOOD PANTRY HOUSTON, TEXAS PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,

More information

MECHANICAL TRADE SCOPE OF WORK GUIDELINES

MECHANICAL TRADE SCOPE OF WORK GUIDELINES MECHANICAL TRADE SCOPE OF WORK GUIDELINES OTTAWA REGION 2009 Comprised of Piping Trade, Ventilation (HVAC) Trade, Fire Protection Trade Endorsed by the following organizations Ottawa Construction Association

More information

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW PRELIMINARY BUILDING REVIEW two sets of the following: Architectural/engineering design development drawings indicating size of the building,

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions

More information

Acumen Enterprises, Inc.

Acumen Enterprises, Inc. Hourly rates Discount w/o Rebate Electrician $78.00 10% $70.20 $70.73 HVAC Technician $78.00 10% $70.20 $70.73 Insulator $42.00 10% $37.80 $38.08 Sheet Metal Worker $74.00 10% $66.60 $67.10 Plumber/Pipefitter

More information

Estimating Database Checklist

Estimating Database Checklist Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to

More information

How To Get A Building Permit In Florida

How To Get A Building Permit In Florida MIAMI-DADE COUNTY BUILDING DEPARTMENT PERMIT EXEMPTIONS Please note that the exemptions listed in this section are from Florida Building Code requirements only. Other State and County regulatory departments

More information

Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com

Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Portland Area PO Box 665 West Linn, OR 97068 Ph: (503) 650-6957 Salem Area 5434 River Rd. N; #192 Keizer, OR 97303 Ph: (503) 362-5809

More information

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved Electrical Contractor

More information

SECTION 11 78 13 MORTUARY REFRIGERATORS

SECTION 11 78 13 MORTUARY REFRIGERATORS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 78 13 MORTUARY REFRIGERATORS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in

More information

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

2012 BIM Guidelines and Standards (Rev. 00) University at Albany A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested

More information

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General

BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General BUILDING PERMIT APPLICATION APPLICABLE TO CITY LIMITS AND ETJ CHAPTER 18, General Property Address: Property Owner: Lot: Block: Subdivision: Lot Size: Scope of Work: Note: Please attach copies of all general

More information

Scope of Work Class I Contractor s Licenses. Putnam County Ordinance 2004-13. Section 17. Types of Authorized Contractor Licenses.

Scope of Work Class I Contractor s Licenses. Putnam County Ordinance 2004-13. Section 17. Types of Authorized Contractor Licenses. Scope of Work Class I Contractor s Licenses Putnam County Ordinance 2004-13 Section 17. Types of Authorized Contractor Licenses. A. Class I Contractors: The Class I Contractors are listed in this subsection

More information

Home Inspection Report

Home Inspection Report 4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

Renovations for a New 18 Bed Gero-Psych Nursing Unit August 7, 2014 Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA 19007 Addendum No.

Renovations for a New 18 Bed Gero-Psych Nursing Unit August 7, 2014 Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA 19007 Addendum No. Charles H. Cross III, AIA, NCARB, LEED AP Charles Cross Architecture, PC Renovations for a New 18 Bed Gero-Psych Nursing Unit Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA 19007 Addendum

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

Gramercy Place Condo Association, Inc.

Gramercy Place Condo Association, Inc. Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is

More information

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition. DIVISION 15 MECHANICAL SECTION 15100 - PLUMBING PART 1 - GENERAL SCOPE Plumbing work includes all domestic water, gas, and sanitary sewer systems as shown on plans. Also all fixtures and equipment which

More information

In Partnership with. TDIndustries 13850 Diplomat Drive Dallas, Texas 75234 Phone: 1-972-888-6751 Fax: 1-972-888-9621 Website: TDIndustries.

In Partnership with. TDIndustries 13850 Diplomat Drive Dallas, Texas 75234 Phone: 1-972-888-6751 Fax: 1-972-888-9621 Website: TDIndustries. In Partnership with Schedule Contract #GS21F0118X Contract # TXMAS-12-03FAC0110 Schedule 03FAC Facilities Maintenance and Management Federal Supply Service Authorized Federal Supply Schedule Price List

More information

COMPREHENSIVE PROPERTY INSPECTIONS

COMPREHENSIVE PROPERTY INSPECTIONS COMPREHENSIVE PROPERTY INSPECTIONS Thank you for selecting CPI for your Deficiency Observation. A full home inspection was not performed on this property at the buyers request. This inspection is a limited

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

MECHANICAL PLAN REVIEW REQUIREMENTS

MECHANICAL PLAN REVIEW REQUIREMENTS 6. Accessibility provisions. 7. Description and details of proposed special occupancies such as a covered mall, high-rise, mezzanine, atrium, public garage, etc. 8. Adequate details to evaluate fire resistive

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

Solicitation Items Report

Solicitation Items Report Solicitation Items Report Solicitation 91036-12295-208 Title: M/R of Air Conditioning Units & Split A/C Units Estimated Total Value: Description: Delivery Terms: Free On Board Destination Payment Terms:

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

SECTION 807 PUMP STATION REHABILITATION

SECTION 807 PUMP STATION REHABILITATION SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but

More information

Gas Fired Water Heater Installation

Gas Fired Water Heater Installation Michigan Department of Energy, Labor & Economic Growth Bureau of Construction Codes P.O. Box 30254 Lansing, Michigan 48909 (517) 241-9302 Bureau of Construction Codes Technical Bulletin Publication Number

More information

TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015

TruexCullins Architecture Fairfield Center School Bid Documents Kitchen and Bathroom Renovation March 1, 2015 Fairfield Center School Kitchen and Bathroom Renovation Project Specifications Owner: Fairfield Center School, 57 Park Street, Fairfield VT 05455 Franklin Central Supervisory Union, 28 Catherine Street,

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

PLAN SUBMITTAL INFORMATION

PLAN SUBMITTAL INFORMATION PLAN SUBMITTAL INFORMATION APPLICATION FOR A BUILDING PERMIT Prior to drafting construction drawings, please check with the North Miami Beach Community Development Department concerning the following:

More information

Inspection Report Atlanta Strip Mall Commercial Building Property Address:

Inspection Report Atlanta Strip Mall Commercial Building Property Address: Page 1 of 25 Inspection Report Atlanta Strip Mall Property Address: Smyrna GA 30082 Page 2 of 25 South East Building Consultants Ray Thoroman Serving the entire State of Georgia 6 678-410-3005 Page 3 of

More information

CENTER FOR ENVIRONMENTAL HEALTH Emergency Response/Indoor Air Quality Program

CENTER FOR ENVIRONMENTAL HEALTH Emergency Response/Indoor Air Quality Program CENTER FOR ENVIRONMENTAL HEALTH Emergency Response/Indoor Air Quality Program Guidance Concerning Remediation and Prevention of Mold Growth and Water Damage in Public Schools/Buildings to Maintain Air

More information

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP 11044 1 VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 31 32 Geotechnical Data 00 70 00 General Conditions 00 73 00 Supplementary Conditions

More information

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT Presentation Synopsis Heating, Ventilating and Air Conditioning Building Condition Assessment Vancouver, B.C. Prepared for: EPIC Prepared by: Douglas Spratt, P.Eng Douglas Spratt & Associates Ltd. www.dspratt-associates.com

More information

Bid Package #: 2014-01-17

Bid Package #: 2014-01-17 Bid Solicitation Bid Package #: 2014-01-17 o HVAC o Plumbing TABLE OF CONTENTS DESCRIPTION PAGES SECTION 1: BID CRITERIA...2 Subsection I General Bid Criteria 2 Subsection II General Scope Criteria 3 Subsection

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

Water Leak 1: Intrusion Policy

Water Leak 1: Intrusion Policy Water Leak 1: Intrusion Policy {Non-Casualty) 1. Determine Source of Leak Roof Leak- 11 See roof leak" Pressured Pipe leak- 11 See pressured pipe leak" Water Intrusion- See 11 see Water Intrusion leak"

More information

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements

Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Charles County Government Planning and Growth Management P.O. Box 2150, La Plata, MD 20646 (301) 645-0692 Schedule

More information

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459 SECTION 15459 PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work

More information

UNDERSTANDING PROJECT DESIGN CRITERIA

UNDERSTANDING PROJECT DESIGN CRITERIA Chapter II Section 1 The design of each project must be divided into phases of development that Massport reviews periodically to ensure that the Consultant has achieved all of the project s goals and objectives,

More information

Construction Technologies Career Field Pathways and Course Structure

Construction Technologies Career Field Pathways and Course Structure Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry

More information

CHARLOTTE COUNTY Community Development Department

CHARLOTTE COUNTY Community Development Department CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50

More information

NOTICE TO CONTRACTORS

NOTICE TO CONTRACTORS NOTICE TO CONTRACTORS Notice is hereby given that San Luis Obispo County Community College District, ( District ) is accepting sealed Informal Bidding Prequalification Applications and Formal Bidding Prequalification

More information

SUMMARY REPORT THE BOTTOM LINE. Electrical. Report Number: 1860. Inspection Date: Saturday, February XX, XXXX

SUMMARY REPORT THE BOTTOM LINE. Electrical. Report Number: 1860. Inspection Date: Saturday, February XX, XXXX SUMMARY REPORT Report Number: 1860 Inspection Date: Saturday, February XX, XXXX Property Address: XX XXXXX XXX Toronto, ON XXX XZX Client Name: Xxxx Xxxxxxxxxxxxx Prepared by: Andrew Marioselva BSc,CHI

More information

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen

Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen Home Energy Evaluation Report for Fritz Kreiss and Catherine McQueen May 2008 Wisconsin Area PO BOX 115 Lake Geneva, WI 53147 CELL (414) 550-4765 Home Performance with ENERGY STAR Evaluation Report Customer

More information

General Information on Starting a Restaurant Business in Alabama

General Information on Starting a Restaurant Business in Alabama General Information on Starting a Restaurant Business in Alabama This information is intended to give a general idea and overview of Health Department construction requirements for starting a retail food

More information

QUOTATION FOR EXAMPLE BATHROOM RENOVATION

QUOTATION FOR EXAMPLE BATHROOM RENOVATION QUOTATION FOR EXAMPLE BATHROOM RENOVATION Prepared For: PEGASUS Client 99 Washington St Melrose, MA 02176 Quotation valid for 90 from: 12/21/10 PEGASUS Design-To-Build is pleased to have the opportunity

More information

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive Warranties Time Limits for Reporting Manufacturer s

More information

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners

More information

APPENDIX E: CAPITAL NEEDS SUMMARY

APPENDIX E: CAPITAL NEEDS SUMMARY APPENDIX E: CAPITAL NEEDS SUMMARY Building A Foundation Hall Building to be replaced ARCHITECTURAL Roof Repair North Structural Wall Repair Flooring Repairs Ceiling Repairs Lighting Repairs Lighting Repairs

More information

Inspecton Report. Property Address:

Inspecton Report. Property Address: Inspecton Report Provided by: National Home Inspections Inspector: Bob Smith 456 S Main Denver, CO 46312 (645) 423-3242 bob@nationalhomeinspections.com www.nationalhomeservices.com Property Address: 873

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715, 4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.

More information

Does Wall Township require an inspection by the building department on resale of a home?

Does Wall Township require an inspection by the building department on resale of a home? Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,

More information

HEATING VENTING AND AIR CONDITIONING (HVAC) SUBCONTRACTING SERVICES FOR THE MACON COUNTY HOUSING DEPARTMENT

HEATING VENTING AND AIR CONDITIONING (HVAC) SUBCONTRACTING SERVICES FOR THE MACON COUNTY HOUSING DEPARTMENT REQUEST FOR PROPOSALS RFP#03 4004p HEATING VENTING AND AIR CONDITIONING (HVAC) SUBCONTRACTING SERVICES FOR THE MACON COUNTY HOUSING DEPARTMENT ISSUE DATE: MAY 31, 2013 ISSUING DEPARTMENT: MACON COUNTY

More information

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled

More information

Seattle Public Schools Building Excellence IV Projects Under Construction

Seattle Public Schools Building Excellence IV Projects Under Construction Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee

More information

Lee, Here are the questions from bidders received between August 17, 2015 and August 24, 2015 followed by our responses.

Lee, Here are the questions from bidders received between August 17, 2015 and August 24, 2015 followed by our responses. Lee Householder Project Homes 88 Carnation Street Richmond, VA 2325 Re: William Byrd Renovation, Addendum 01 August 24, 2015 Lee, Here are the questions from bidders received between August 17, 2015 and

More information

Thermal Imaging for Home Inspectors

Thermal Imaging for Home Inspectors Thermal Imaging for Home Inspectors Structural member placement The gabled end of a cathedral ceiling. Note the studs and the ceiling joists with blocking. What is that glow in the upper right hand corner?

More information

Integrated Solar Radiant Systems

Integrated Solar Radiant Systems Integrated Solar Radiant Systems William Shady PE President Topics Radiant heating Indoor air quality Radiant Cooling Project Photos Questions and answers The goal for our clients Healthy Comfort Why Radiant

More information

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015 Stage 1 DA.01 Fencing and cameras deployed Baseline - 3-5 years for Stage 1 for purposes of this study costs are described for a 3 year period $45,000 $0 Stage 1 DA.02 Secure all building doors and access

More information

How to Prevent Liquid Damage Property Losses

How to Prevent Liquid Damage Property Losses 1. The leading cause of property losses is from liquid damage. A review of Zurich North America claims data highlights the problem. 2. Water damage originates from a number of sources: Domestic water lines

More information

Asbestos Procedures. Asbestos Products

Asbestos Procedures. Asbestos Products Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see Appendix A for a list of known asbestos containing materials located on the Olympia

More information

Pre-Drywall Inspection Report

Pre-Drywall Inspection Report SM MEDALLION INSPECTIONS helping people make informed decisions Pre-Drywall Inspection Report 5657 Garden Valley Place Milton, Georgia 30024 Prepared for Betsy and Paul Dougherty January12, 2015 Medallion

More information

Nominal Life Expectancy for Building Components

Nominal Life Expectancy for Building Components Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes

More information

South Carolina Home Inspector Standards of Practice

South Carolina Home Inspector Standards of Practice South Carolina Home Inspector Standards of Practice The following Standards provide guidelines for the Residential Home Inspector and outline what the Residential Home Inspector should observe, identify,

More information

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823.

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823. ASBESTOS BUILDING INSPECTION REPORT for the City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823 at the City of East Lansing Waste Water Treatment Plant and Woodingham Pump Station

More information

BUILDING PERMIT SPECIFICATIONS

BUILDING PERMIT SPECIFICATIONS BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide

More information

STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE:

STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE: STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE: 61-30.801 Standards of Practice, General. (1) Home inspections performed to these Standards of Practice are intended to provide the client with information

More information

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space) COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.

More information

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

D Sample Notices to Property Owners, Sample Affidavits, and Other Material D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL 34471 (352) 629-8421; FAX: (352) 629-8264 BUILDING CODE GUIDELINES FOR ELECTRICAL INSPECTIONS Building Code compliance is the obligation of design professionals and/or contractors. Plan Review and Inspection Guidelines are intended to be used

More information

Element D Services Plumbing

Element D Services Plumbing PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5 Rendering Provided by McKissick Associates MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5 Additions and Alterations to Williamsport Area Middle School Williamsport Area School District 17 July 2012 Geo-Thermal

More information

Mechanical, Plumbing, and Fire Protection Conditions

Mechanical, Plumbing, and Fire Protection Conditions Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred

More information

Report for. Dick and Jane Homeowner. 1234 Lovers Lane, Houston, Texas 77000

Report for. Dick and Jane Homeowner. 1234 Lovers Lane, Houston, Texas 77000 Report for Dick and Jane Homeowner 1234 Lovers Lane, Houston, Texas 77000 March 17, 2004 I NI NP R Inspection Item I. STRUCTURAL SYSTEMS o o o A. Foundations (If all crawl space areas are not inspected,

More information

License Requirements for Persons Engaging in the Business of Inspection Practice:

License Requirements for Persons Engaging in the Business of Inspection Practice: SC Standards of Practice SOUTH CAROLINA RESIDENTIAL BUILDERS COMMISSION HOME INSPECTOR STANDARDS OF PRACTICE Adopted by the Residential Builders Commission May 13, 1998 PURPOSE: The purpose of a residential

More information

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER NOTICE TO PROPERTY OWNER Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. If your home or business is below

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities.

A. Accessible Fixture: Emergency plumbing fixture that can be approached, entered, and used by people with disabilities. SECTION 22 45 00 - (ADD#2) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power

More information

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)

More information

Inspection Report. Dream Home Inspections. www.timinspects.com. 415 Second Ave. Frisco CO 80443-1789 (970) 368-2668

Inspection Report. Dream Home Inspections. www.timinspects.com. 415 Second Ave. Frisco CO 80443-1789 (970) 368-2668 Inspection Report Property Address: 123 Dream Home Way Frisco, CO 80443 Prepared for: Inspector: Tim Nixon Tim Nixon Inspection date: 3/28/2014 1 of 9 General Information Property Information Address:

More information

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay Original HVAC Units: Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue Photo Essay One fan motor draws air from the lower section of the unit,

More information

2. What building projects are exempted? (permit not required)

2. What building projects are exempted? (permit not required) BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and

More information

Condensing Boiler Efficiency

Condensing Boiler Efficiency Condensing Boiler Efficiency Date: July 17, 2012 PRES E NT ED BY DO N L E O NA RDI LE O N A RD I I NC. HV AC T RAI N I N G & C ON SU LT IN G Concepts 1 The current state of evolution in boiler design 2

More information