Asbestos Survey Report

Size: px
Start display at page:

Download "Asbestos Survey Report"

Transcription

1 0340 Asbestos Survey Report Sunnyside Court Avondale Road Southport PR9 0NU Client Contact: Gary Rostron The Regenda Group Regenda House Enterprise Business Park Northgate Close Horwich, Bolton BL6 6PQ Life Environmental Services Ltd Contact: Ian McMillan Life Environmental Services Ltd 4 Duckett s Wharf South Street Bishop s Stortford Hertfordshire CM23 3AR Tel: Tel: Fax: Fax: N SURVEY REPORT ver1 March 2009 Page 1 of 36

2 CONTENTS Executive Summary Introduction / Objectives Desk Top Review Survey Results General Caveat Recommendations APPENDICES Appendix 1 - Survey Data Sheets Appendix 2 - Asbestos Register Appendix 3 - Non Asbestos Materials Register Appendix 4 - Areas of No Access Appendix 5 - Plans Appendix 6 - Analysis Certificates N SURVEY REPORT ver1 March 2009 Page 2 of 36

3 EXECUTIVE SUMMARY Asbestos materials were identified within the site. Asbestos Containing Materials identified or presumed to be present are recorded in the Survey Data Sheets and the Asbestos Register within this report. Asbestos Containing Materials have been identified which are in good condition, A management policy and plan need to be implemented to manage these materials safely. The materials require labelling and the condition of these materials re-inspected at 6 monthly intervals Building Floor Location Communal Areas 2 Loft (001) Please contact Ian McMillan of Life Environmental Services Ltd for advice in dealing with any asbestos in poor, unsealed or damaged condition or for assistance in developing your management plan, and scheduling re-inspections. N SURVEY REPORT ver1 March 2009 Page 3 of 36

4 INTRODUCTION / OBJECTIVES (Site overview) Life Environmental Services Ltd received an order of confirmation to undertake a Type 2 asbestos survey. This order has been accepted on the basis of the original quotation including survey methodology document and our terms and conditions of business. The order relates to an asbestos survey of: Sunnyside Court Avondale Road Southport PR9 0NU This survey was carried out in accordance with documented in house procedures, which are based on the HSE Guidance document MDHS 100. Type 2 Standard Sampling, Identification and Assessment Survey The purpose of the survey is to locate, as far as reasonably practicable, the presence and extent of any suspect ACM s in the building and assess their condition. Representative samples from each type of suspect ACM found are collected and analysed for the presence of asbestos to confirm or refute the surveyor s judgement. If the material sampled is found to contain asbestos, other similar homogeneous materials used in the same way in the building can be strongly presumed to contain asbestos. Less homogeneous materials will require a greater number of samples. The number should be sufficient for the surveyor to make an assessment of whether asbestos is or is not present. Sampling may take place simultaneously with the survey, or as in the case of some larger surveys, can be carried out as a separate exercise. N SURVEY REPORT ver1 March 2009 Page 4 of 36

5 DESK-TOP REVIEW AND SURVEY PLANNING Details of information requested by Life Environmental Services Ltd to carry out the desk-top review in accordance with the MDHS 100 are recorded on our pre-survey questionnaire, along with details of all the information that were provided by Gary Rostron on behalf of the client. The Information provided was assessed during the desktop review and a method statement and risk assessment were produced for the survey of: Sunnyside Court Avondale Road Southport PR9 0NU. Where information was provided regarding the presence of known or presumed asbestos materials then this has been validated during the course of the survey, and recorded within this report. In order for a building occupier to meet their duties under regulation 4 of the Control of Asbestos Regulations 2006 they must implement a management policy and plan for known or presumed Asbestos Containing Materials. This survey report can be used as a basis to start developing a management plan and prioritise actions but in itself does not constitute a management plan as required under the Control of Asbestos Regulations Further guidance on the implementation of asbestos management plans can be found in the HSE Guidance document HSG 227 a comprehensive guide to Managing Asbestos in premises, or by contacting Life Environmental Services Ltd., for further specific advice. N SURVEY REPORT ver1 March 2009 Page 5 of 36

6 SURVEY RESULTS The results of the survey inspections and sampling undertaken are recorded on the enclosed Survey Data Sheets (appendix 1), Asbestos Register (appendix 2) and Non-Asbestos Material Register (appendix 3). Where asbestos containing material have been identified or presumed to be present then a Material Assessment Algorithm has been calculated as detailed in MDHS 100 and reproduced in the table below: MATERIAL ASSESSMENT ALGORITHM Sample Variable Score Examples of Score 1 Asbestos reinforced composites (plastics, resins, mastics, roofing felts, vinyl floor tiles, semi rigid paint or decorative finishes, asbestos cement, etc). Product type (or debris from product). 2 Asbestos insulating board, millboards, other low-density insulation boards, asbestos textiles, gaskets, ropes and woven textiles, asbestos paper and felt. 3 Thermal insulation (e.g.: pipe and boiler lagging) sprayed asbestos, loose asbestos, asbestos mattresses and packing. 0 Good condition: no visible damage. Extent of damage/deterioration. 1 Low damage: a few scratches or surface marks; broken edges on boards, tiles, etc. 2 Medium damage: significant breakage of materials or several small areas where material has been damaged revealing loose asbestos fibre. 3 High damage or delamination of materials, sprays and thermal insulation. Visible asbestos debris. 0 Composite materials containing asbestos: reinforced plastics, resins, and vinyl tiles. Surface Treatment 1 Enclosed sprays and lagging, AIB (with exposed face painted or encapsulated), unsealed cement sheets, etc. 2 Unsealed AIB, or encapsulated lagging and sprays. 3 Unsealed lagging and sprays. 1 Chrysotile. Asbestos type 2 Amphibole asbestos excluding Crocidolite. 3 Crocidolite. N SURVEY REPORT ver1 March 2009 Page 6 of 36

7 SURVEY RESULTS (continued) For each of the four variables given by the table on the previous page a score is allocated. The four scores are added together to give a material assessment score of between 2 and 12 Materials with assessment scores of 10 or more should be regarded as high risk with a high potential to release fibres if disturbed. Materials with assessment scores of between 7 and 9 should be regarded as medium risk and having medium potential to release fibres if disturbed. Materials with assessment scores of between 5 and 6 should be regarded as low risk and having low potential to release fibres if disturbed. Materials with assessment scores of 4 and below should be regarded as being very low risk and having very low potential to release fibres if disturbed. The Next Inspection date on the survey data sheets is the target date for the next inspection of the Asbestos Containing Material by Life Environmental Services Ltd. The Action Date on the Asbestos Register is the target date for the duty holder(s) to carry out the surveyors recommendation prior to the next re-inspection being carried out by Life Environmental Services Ltd. N SURVEY REPORT ver1 March 2009 Page 7 of 36

8 GENERAL CAVEAT For safety reasons it is not possible to inspect internal areas of plant and machinery. Access to internal wall linings and general cavities was restricted to avoid excessive damage to surface finishes. Where areas have been designated as 'no access' or restricted access, unless further inspection/sampling proves otherwise, the presumption has been made that these structures/areas contain asbestos materials. It is presumed that asbestos may be present as integral linings associated with various access doors/hatches on site During the course of the survey it may not have been possible to access all areas of the site. Details of areas requiring further access are identified within the Data Sheets of this report. In accordance with MDHS 100, asbestos is presumed to be present within these areas and should be treated accordingly until further inspection and analysis of building fabric and services proves otherwise. It is recommended that further intrusive inspection and sampling be carried out where site refurbishment, maintenance, or similar may disturb Asbestos Containing Materials that have remained inaccessible during this survey, this should be a Type 3 survey as described in MDHS 100. Residual asbestos material may be present beneath re-lagged services and cannot be detected unless the re-lagging is systematically removed. Caution should therefore be taken when working on such materials for the potential presence of asbestos residue. Textured Coatings such as Artex may contain a trace quantity of Chrysotile asbestos. Due to this low asbestos content, applications of this product may be non-homogenous and may elicit both positive and negative samples. Where both positive and negative samples are obtained the client should presume that the textured coating contains Chrysotile throughout even though a non-detected result has been obtained. This report does not include investigations into land contamination associated with asbestos or any other contaminant. Due to the nature of asbestos surveys, Life Environmental Services Ltd will not accept any liability for claims arising out of pollution or contamination of any kind. N SURVEY REPORT ver1 March 2009 Page 8 of 36

9 RECOMMENDATIONS To comply with and ensure that the requirements of section 2 & 3 of the Health and Safety at Work Act (as amended) 1974, the Management of Health and Safety at Work Regulations 1999, the Control of Asbestos Regulations 2006 and the Control of Substances Hazardous to Health 2002 are met. The following recommendations should be implemented: Undertake suitable and sufficient Risk Assessments of identified asbestos containing materials against normal occupation and maintenance operations, in compliance with Regulations 3 of the Management of Health & Safety at Work Regulations 1999 and Regulation 6 of the Control of Asbestos Regulations The findings of the survey be brought to the attention of those persons who are likely to come in contact with asbestos, in compliance with Section 2 and 3 of the Health and Safety at Work Act (as amended) 1974 and Regulation 9 of the Control of Asbestos Regulations Implement an Asbestos Management Policy, Plan and review process in compliance Regulation 4 of the Control of Asbestos Regulations Instigate regular inspections, to record and update details of retained asbestos containing materials. During the course of the survey it may not have been possible to access all areas of the site. Details of areas requiring further access is identified within the Data Sheets of this report. In accordance with MDHS 100, asbestos is presumed to be present within these areas and should be treated accordingly until further inspection and analysis of building fabric and services proves otherwise. Where asbestos debris or asbestos in poor condition has been found it is recommended that access is restricted to these areas in accordance with Regulation 11 of the Control of Asbestos Regulations 2006, and that air monitoring is carried out within adjacent areas in order to assess airborne fibre levels. All identified asbestos to be appropriately labelled. Site specific recommendations in respect to the location and condition of asbestos materials identified during the course of this inspection are detailed in the Survey Data Sheets and Asbestos register. In considering the management of asbestos materials identified to date, these recommendations should be referred to and complied with. It is recommended that further intrusive investigations and sampling be carried out where any refurbishment, maintenance, or similar activity may expose asbestos materials that have remained inaccessible during this survey. This should be a type 3 survey as documented by MDHS 100. The findings of this report should not be solely relied upon in obtaining costs for proposed asbestos abatement work. Any proposed abatement/removal of the asbestos should be undertaken against a detailed specification. N SURVEY REPORT ver1 March 2009 Page 9 of 36

10 QUALITY ASSURANCE STATEMENT This Report has been compiled by the following authorised Lead Surveyor. Name Jason Ormrod Signed Date 27 October 2009 The contents of this Report have been checked by the following member of the Technical Management Team. Name Title Ian McMillan Project Manager Signed Date 27 October 2009 N SURVEY REPORT ver1 March 2009 Page 10 of 36

11 Appendix 1 Survey Data Sheets N SURVEY REPORT ver1 March 2009 Page 11 of 36

12 Lead Surveyor Jason Ormrod Building Communal Areas Survey Type Type 2 Floor First Floor Survey Date 22 September 2009 Room/Area Stairs Next Inspection Sample No 3 Level of Identification Sampled Laboratory Ref Description Item: Ceiling. Textured coating to ceiling Product Type Extent of Damage Surface Treatment Asbestos Type Amount Accessibility Decorative finishes NAD - No Asbestos Detected Algorithm Score 0 Score RECOMMENDATION No recommendation required N SURVEY REPORT ver1 March 2009 Page 12 of 36

13 Lead Surveyor Jason Ormrod Building Communal Areas Survey Type Type 2 Floor First Floor Survey Date 22 September 2009 Room/Area Stairs Next Inspection Sample No As 2 Level of Identification Strong Presumed Laboratory Ref Description Item: Floor. Visually consistent with sample number 2. Beige floor tiles Product Type Extent of Damage Surface Treatment Asbestos Type Amount Accessibility Floor tiles SP: NAD Algorithm Score 0 Score RECOMMENDATION No recommendation required N SURVEY REPORT ver1 March 2009 Page 13 of 36

14 Lead Surveyor Jason Ormrod Building Communal Areas Survey Type Type 2 Floor First Floor Survey Date 22 September 2009 Room/Area Corridor Next Inspection Sample No As 3 Level of Identification Strong Presumed Laboratory Ref Description Item: Ceiling. Visually consistent with sample number 3. Textured coating to ceiling Product Type Extent of Damage Surface Treatment Asbestos Type Amount Accessibility Decorative finishes SP: NAD Algorithm Score 0 Score RECOMMENDATION No recommendation required N SURVEY REPORT ver1 March 2009 Page 14 of 36

15 Lead Surveyor Jason Ormrod Building Communal Areas Survey Type Type 2 Floor First Floor Survey Date 22 September 2009 Room/Area Central Stairs Next Inspection Sample No As 2 Level of Identification Strong Presumed Laboratory Ref Description Item: Floor. Visually consistent with sample number 2. Beige floor tiles Product Type Extent of Damage Surface Treatment Asbestos Type Amount Accessibility Floor tiles SP: NAD Algorithm Score 0 Score RECOMMENDATION No recommendation required N SURVEY REPORT ver1 March 2009 Page 15 of 36

16 Lead Surveyor Jason Ormrod Building Communal Areas Survey Type Type 2 Floor First Floor Survey Date 22 September 2009 Room/Area Central Stairs Next Inspection Sample No As 3 Level of Identification Strong Presumed Laboratory Ref Description Item: Ceiling. Visually consistent with sample number 3. Textured coating to ceiling Product Type Extent of Damage Surface Treatment Asbestos Type Amount Accessibility Decorative finishes SP: NAD Algorithm Score 0 Score RECOMMENDATION No recommendation required N SURVEY REPORT ver1 March 2009 Page 16 of 36

17 Lead Surveyor Jason Ormrod Building Communal Areas Survey Type Type 2 Floor First Floor Survey Date 22 September 2009 Room/Area Stairs Next Inspection Sample No 4 Level of Identification Sampled Laboratory Ref Description Item: Ceiling. Textured coating to ceiling Product Type Extent of Damage Surface Treatment Asbestos Type Amount Accessibility Decorative finishes NAD - No Asbestos Detected Algorithm Score 0 Score RECOMMENDATION No recommendation required N SURVEY REPORT ver1 March 2009 Page 17 of 36

18 Lead Surveyor Jason Ormrod Building Communal Areas Survey Type Type 2 Floor First Floor Survey Date 22 September 2009 Room/Area Stairs Next Inspection Sample No As 2 Level of Identification Strong Presumed Laboratory Ref Description Item: Floor. Visually consistent with sample number 2. Beige floor tiles Product Type Extent of Damage Surface Treatment Asbestos Type Amount Accessibility Floor tiles SP: NAD Algorithm Score 0 Score RECOMMENDATION No recommendation required N SURVEY REPORT ver1 March 2009 Page 18 of 36

19 Lead Surveyor Jason Ormrod Building Communal Areas Survey Type Type 2 Floor First Floor Survey Date 22 September 2009 Room/Area Corridor Next Inspection Sample No As 4 Level of Identification Strong Presumed Laboratory Ref Description Item: Ceiling. Visually consistent with sample number 4. Textured coating to ceiling Product Type Extent of Damage Surface Treatment Asbestos Type Amount Accessibility Decorative finishes SP: NAD Algorithm Score 0 Score RECOMMENDATION No recommendation required N SURVEY REPORT ver1 March 2009 Page 19 of 36

20 Lead Surveyor Jason Ormrod Building Communal Areas Survey Type Type 2 Floor First Floor Survey Date 22 September 2009 Room/Area Entrance Next Inspection Sample No As 2 Level of Identification Strong Presumed Laboratory Ref Description Item: Floor. Visually consistent with sample number 2. Beige floor tiles Product Type Extent of Damage Surface Treatment Asbestos Type Amount Accessibility Floor tiles SP: NAD Algorithm Score 0 Score RECOMMENDATION No recommendation required N SURVEY REPORT ver1 March 2009 Page 20 of 36

21 Lead Surveyor Jason Ormrod Building Communal Areas Survey Type Type 2 Floor First Floor Survey Date 22 September 2009 Room/Area Entrance Next Inspection Sample No As 4 Level of Identification Strong Presumed Laboratory Ref Description Item: Ceiling. Visually consistent with sample number 4. Textured coating to ceiling Product Type Extent of Damage Surface Treatment Asbestos Type Amount Accessibility Decorative finishes SP: NAD Algorithm Score 0 Score RECOMMENDATION No recommendation required N SURVEY REPORT ver1 March 2009 Page 21 of 36

22 Lead Surveyor Jason Ormrod Building Communal Areas Survey Type Type 2 Floor Second Floor Survey Date 22 September 2009 Room/Area Loft Next Inspection 22 March 2010 Sample No Level of Identification Presumed Laboratory Ref Description Item: Fire Break. Limited access within loft area accessed from the hatch only, boarding used as fire break caution should be exercised. Score Product Type Asbestos insulating board 2 Extent of Damage Low Damage 1 Surface Treatment Unsealed AIB, encapsulated spray, textiles, & T.I. 2 Asbestos Type Amount Accessibility Throughout Area Usually inaccessible Algorithm Score 12 RECOMMENDATION Label & manage Presumed Asbestos is scored 12 (worst case) until sampled /inspected N SURVEY REPORT ver1 March 2009 Page 22 of 36

23 Lead Surveyor Jason Ormrod Building Communal Areas Survey Type Type 2 Floor Second Floor Survey Date 22 September 2009 Room/Area Corridor Next Inspection Sample No 1 Level of Identification Sampled Laboratory Ref Description Item: Ceiling. Textured coating to ceiling Product Type Extent of Damage Surface Treatment Asbestos Type Amount Accessibility Decorative finishes NAD - No Asbestos Detected Algorithm Score 0 Score RECOMMENDATION No recommendation required N SURVEY REPORT ver1 March 2009 Page 23 of 36

24 Lead Surveyor Jason Ormrod Building Communal Areas Survey Type Type 2 Floor Second Floor Survey Date 22 September 2009 Room/Area Central Stairs Next Inspection Sample No 2 Level of Identification Sampled Laboratory Ref Description Item: Floor. Beige floor tiles Product Type Extent of Damage Surface Treatment Asbestos Type Amount Accessibility Floor tiles NAD - No Asbestos Detected Algorithm Score 0 Score RECOMMENDATION No recommendation required N SURVEY REPORT ver1 March 2009 Page 24 of 36

25 Lead Surveyor Jason Ormrod Building Communal Areas Survey Type Type 2 Floor Second Floor Survey Date 22 September 2009 Room/Area Central Stairs Next Inspection Sample No As 1 Level of Identification Strong Presumed Laboratory Ref Description Item: Ceiling. Visually consistent with sample number 1. Textured coating to ceiling Product Type Extent of Damage Surface Treatment Asbestos Type Amount Accessibility Decorative finishes SP: NAD Algorithm Score 0 Score RECOMMENDATION No recommendation required N SURVEY REPORT ver1 March 2009 Page 25 of 36

26 Lead Surveyor Jason Ormrod Building Communal Areas Survey Type Type 2 Floor Second Floor Survey Date 22 September 2009 Room/Area Stairs Next Inspection Sample No As 1 Level of Identification Strong Presumed Laboratory Ref Description Item: Ceiling. Visually consistent with sample number 1. Textured coating to ceiling Product Type Extent of Damage Surface Treatment Asbestos Type Amount Accessibility Decorative finishes SP: NAD Algorithm Score 0 Score RECOMMENDATION No recommendation required N SURVEY REPORT ver1 March 2009 Page 26 of 36

27 Lead Surveyor Jason Ormrod Building Communal Areas Survey Type Type 2 Floor Second Floor Survey Date 22 September 2009 Room/Area Stairs Next Inspection Sample No As 2 Level of Identification Strong Presumed Laboratory Ref Description Item: Floor. Visually consistent with sample number 2. Beige floor tiles Product Type Extent of Damage Surface Treatment Asbestos Type Amount Accessibility Floor tiles SP: NAD Algorithm Score 0 Score RECOMMENDATION No recommendation required N SURVEY REPORT ver1 March 2009 Page 27 of 36

28 Appendix 2 Asbestos Register N SURVEY REPORT ver1 March 2009 Page 28 of 36

29 Asbestos Register Building Floor Room/Area Sample Product Type Identification LM/SM Algorithm Recommendations Action Date Communal Loft Asbestos insulating Throughout 12 Label & manage 22 March 2010 Areas board Area N SURVEY REPORT ver1 March 2009 Page 29 of 36

30 Appendix 3 Non-Asbestos Materials Register N SURVEY REPORT ver1 March 2009 Page 30 of 36

31 Non-Asbestos Materials Register Building Floor Room/Area Item Material Communal Areas Stairs Ceiling Decorative finishes Communal Areas Stairs Floor Floor tiles Communal Areas Stairs Wall Brick Communal Areas Corridor Ceiling Decorative finishes Communal Areas Corridor Floor Concrete Communal Areas Corridor Wall Brick Communal Areas Central Stairs Ceiling Decorative finishes Communal Areas Central Stairs Floor Concrete Communal Areas Central Stairs Wall Brick Communal Areas Central Stairs Floor Floor tiles Communal Areas Stairs Ceiling Decorative finishes Communal Areas Stairs Floor Floor tiles Communal Areas Stairs Wall Brick Communal Areas Corridor Floor Concrete Communal Areas Corridor Wall Brick Communal Areas Corridor Ceiling Decorative finishes Communal Areas Entrance Wall Brick Communal Areas Entrance Floor Floor tiles Communal Areas Entrance Ceiling Decorative finishes Communal Areas Entrance Floor Concrete Communal Areas Loft Roof Roofing felt/bitumen Communal Areas Loft Ceiling MMMF insulation Insulation Communal Areas Loft Wall Brick Communal Areas Corridor Floor Concrete Communal Areas Corridor Ceiling Decorative finishes Communal Areas Corridor Wall Brick Communal Areas Central Stairs Floor Concrete Communal Areas Central Stairs Stair Rubber Nosing Strip Communal Areas Central Stairs Wall Brick Communal Areas Central Stairs Floor Floor tiles Communal Areas Central Stairs Ceiling Decorative finishes Communal Areas Stairs Wall Brick Communal Areas Stairs Ceiling Decorative finishes Communal Areas Stairs Floor Floor tiles N SURVEY REPORT ver1 March 2009 Page 31 of 36

32 Appendix 4 Areas of No Access N SURVEY REPORT ver1 March 2009 Page 32 of 36

33 Areas of No Access Building Location Communal Areas Loft Fire Break (Location: 001) N SURVEY REPORT ver1 March 2009 Page 33 of 36

34 Appendix 5 Plans N SURVEY REPORT ver1 March 2009 Page 34 of 36

35

36

37

38 Appendix 6 Analysis Certificates N SURVEY REPORT ver1 March 2009 Page 35 of 36

39 BULK SAMPLE ANALYSIS TEST CERTIFICATE No: N Client Contact: Gary Rostron The Regenda Group Regenda House Enterprise Business Park Northgate Close Horwich, Bolton BL6 6PQ Life Environmental Services Ltd Contact: Ian McMillan Life Environmental Services Ltd 4 Duckett s Wharf South Street Bishop s Stortford Hertfordshire CM23 3AR Tel: Tel: Fax: Fax: Site: Sunnyside Court Avondale Road Southport PR9 0NU Date Sampled/Received: 22 September 2009 sample taken by Jason Ormrod No. Item Material Location/Comments Asbestos Result 1 Ceiling Decorative Corridor NAD finishes 2 Floor Floor tiles Central Stairs NAD 3 Ceiling Decorative finishes 4 Ceiling Decorative finishes Stairs Stairs NAD NAD Analysts Name: Dom Lee Signature: Analysts Name: Khem Nath Dhakal Signature: Test Date: 02 October 2009 TEST NOTES: 1.Samples submitted for examination have been analysed to determine the presence of asbestos fibres using the methods documented in the HSG248 The Analyst Guide For Sampling Analysis and Clearance Procedures & in house procedures in section 11 of the Quality Manual. 2. Samples in this test report have been analysed at our Bishop Stortford Laboratory. 3. This test report shall not be reproduced or copied without the written approval of Life Environmental Services Limited. 4. Opinion and interpretations are outside the scope of accreditation and are not included within this test report 5. Samples taken by Life Environmental Services Ltd are in accordance with the HSG 248 The Analyst Guide For Sampling Analysis and Clearance Procedures and MDHS Where a sample taken by a client is considered too small it will be marked thus ~ 7. Life Environmental Services Ltd are not responsible for sampling errors where they have not taken the sample. TEST CERTIFICATES ISSUED UNDER HEAD OFFICE UKAS ACCREDITATION No Page 36 of Life Environmental Services Ltd Master Document- BULKS Report ver1 March 2009 M:\Tracker\Documents\Project Files\N\N( )\N-01240\N Survey Report.doc

ASBESTOS SAMPLING REPORT. Urban Design. Louisa Ryland House Sampling to Ceiling in Room 201 44 Newhall Street Birmingham B3 3PL

ASBESTOS SAMPLING REPORT. Urban Design. Louisa Ryland House Sampling to Ceiling in Room 201 44 Newhall Street Birmingham B3 3PL ASBESTOS SAMPLING REPORT Urban Design Louisa Ryland House Sampling to Ceiling in Room 01 44 Newhall Street Birmingham B PL TECHNICAL REPORT: 09H/56 150 Phoenix House Valepits Road Garretts Green Birmingham

More information

ASBESTOS MANAGEMENT SURVEY REPORT

ASBESTOS MANAGEMENT SURVEY REPORT ASBESTOS MANAGEMENT SURVEY REPORT for THE MORAY COUNCIL of B3239-1140002 Produced by ESG Asbestos Ltd, a wholly owned subsidiary of ESG Bretby Business Park, Ashby Road, Bretby, Burton upon Trent, Staffordshire

More information

Summary of the main steps in managing asbestos (from HSG264) Find out if ACMs present: Check plans/ drawings. Carry out survey (2)

Summary of the main steps in managing asbestos (from HSG264) Find out if ACMs present: Check plans/ drawings. Carry out survey (2) Asbestos The University s asbestos management procedure follows the stages set out in guidance provided by the HSE (HSG64), as follows. (The numbers in the boxes below refer to the subsequent sections

More information

Detailed Survey Inspection Reports & Photographs. Material Assessment Algorithm & Asbestos Register

Detailed Survey Inspection Reports & Photographs. Material Assessment Algorithm & Asbestos Register HSE/S/137/01 CONTENTS Section 1.0 Section 2.0 Section 3.0 Section 4.0 Survey Report Details Survey Types Limitations and Restrictions Materials ssessment lgorithm Section 5.0 Section 6.0 Detailed Survey

More information

Policy on Asbestos Safety

Policy on Asbestos Safety Policy on Asbestos Safety November Index. Aims and Objectives. Policy Reference. Asbestos Safety Policy Statement 4. Responsibilities 5. Asbestos Register 6. Asbestos Survey 7. Staff Asbestos Training

More information

WYG Asbestos Demolition Survey Report

WYG Asbestos Demolition Survey Report Rossendale Borough Council The WYG Asbestos Demolition Survey Report November 2 www.wyg.com creative minds safe hands Document Control Project: Client: Job Number: File Origin: The,, Asbestos Demolition

More information

AsbestosSurveyingNationwide www.asbestossurveyingnationwide.co.uk

AsbestosSurveyingNationwide www.asbestossurveyingnationwide.co.uk AsbestosSurveyingNationwide www.asbestossurveyingnationwide.co.uk Mencap Office, 4 Mount Folly Square, Bodmin, Cornwall. PL31 2DG. Management Survey and Asbestos Register January 2011 (Two of the samples

More information

H2 Opening Statement Asbestos

H2 Opening Statement Asbestos H2 Opening Statement Asbestos Every year there are thousands of asbestos related deaths. Asbestos fibres accumulate in the lungs, therefore several diseases can occur, among these are two main types of

More information

BEDFORD DESIGN GROUP REPORT NUMBER 61892 ASBESTOS SURVEY AT: ALL HALLOWS CAR PARK GREENHILL BEDFORD

BEDFORD DESIGN GROUP REPORT NUMBER 61892 ASBESTOS SURVEY AT: ALL HALLOWS CAR PARK GREENHILL BEDFORD BEDFORD DESIGN GROUP REPORT NUMBER ASBESTOS SURVEY AT: ALL HALLOWS CAR PARK GREENHILL BEDFORD CARRIED OUT BY: VINTEC LABORATORIES LTD SURVEY DATE: 08-01-2009 PREPARED BY: JAMES BROTHERTON CHECKED BY: ANDREW

More information

The Newcastle upon Tyne Hospitals NHS Foundation Trust. Asbestos Management Policy and Action Plan

The Newcastle upon Tyne Hospitals NHS Foundation Trust. Asbestos Management Policy and Action Plan The Newcastle upon Tyne Hospitals NHS Foundation Trust Asbestos Management Policy Action Plan Version No.:.3 Effective From: 24 August 205 Expiry Date: 24 August 208 Date Ratified: August 205 Ratified

More information

LEGISLATIVE GUIDANCE NOTES Refurbishment/Demolition

LEGISLATIVE GUIDANCE NOTES Refurbishment/Demolition LEGISLATIVE GUIDANCE NOTES Refurbishment/Demolition 1 INDEX QM78 SECTION 1 RECOMMENDATIONS SECTION 2 METHOD OF RISK ASSESSMENT SECTION 3 DEFINITION OF TERMS SECTION 4 LEGISLATION, CODES OF PRACTICE AND

More information

Vibixa Ltd, Vibixa Ltd, Kingsditch Lane, Cheltenham, GL51 9FG

Vibixa Ltd, Vibixa Ltd, Kingsditch Lane, Cheltenham, GL51 9FG Based on a Management Survey Site Address: Site Code: Survey : Survey Ref: Updated: Register Ref: Prepared For: Prepared By: Vibixa Ltd, Kingsditch Lane, Cheltenham, GL51 9FG J38033 20 th to 23 rd May

More information

Policy for the Management of Asbestos in the Workplace

Policy for the Management of Asbestos in the Workplace Southwark Council Management of Asbestos in the Workplace November 2011 Page 1 of 15 CONTENTS 1. INTRODUCTION... 3 2. POLICY STATEMENT... 3 3. ASBESTOS RISK CLASSIFICATION SCHEME... 5 4. SAMPLING OF ASBESTOS

More information

Asbestos Update on Regulations, Risks, Management and Obligations

Asbestos Update on Regulations, Risks, Management and Obligations Asbestos Update on Regulations, Risks, Management and Obligations Steve Shutler BSc(Hons), CMCIEH, CMIOSH, CoC (Asbestos) SB Asbestos Management Ltd 5 Reasons to take asbestos seriously CAR 2012 Legislation

More information

Asbestos Policy and Guidance

Asbestos Policy and Guidance Asbestos Policy and Guidance CONTENTS SECTION 1 - GENERAL INFORMATION AND COUNCIL POLICY 1.0 Introduction 2.0 Background 3.0 Legislation 4.0 Policy 5.0 Responsibilities 6.0 Premises leased by the Council

More information

Property Services information sheet - number 3. Asbestos. December 2008 rev 1. You may have materials that contain asbestos in your house.

Property Services information sheet - number 3. Asbestos. December 2008 rev 1. You may have materials that contain asbestos in your house. Property Services information sheet - number 3 Asbestos December 2008 rev 1 You may have materials that contain asbestos in your house. A. What is asbestos B. What do you do if you have asbestos in your

More information

Asbestos: Notifiable Non-Licensed Work. A Minor Change or a Significant Challenge

Asbestos: Notifiable Non-Licensed Work. A Minor Change or a Significant Challenge Asbestos: Notifiable Non-Licensed Work A Minor Change or a Significant Challenge John Evans B.Sc., CMIOSH, FRSPH, MIOA, PGCE Technical Director Santia Asbestos Management Limited The Control of Asbestos

More information

Asbestos Policy & Procedure

Asbestos Policy & Procedure Asbestos Policy & Procedure 1. Purpose & Introduction This policy and procedure sets out Octavia s commitment and approach to ensuring, so far as reasonably practicable, that residents, contractors and

More information

Management of Asbestos. Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division

Management of Asbestos. Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division Management of Asbestos Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division Getting it Wrong! Asbestos What is it? With the Naked Eye! Naturally occurring silicates

More information

Policy on the Management of Asbestos

Policy on the Management of Asbestos WISHAW AND DISTRICT HOUSING ASSOCIATION Policy on the Management of Asbestos As with all the Association s policies and procedures, this document, where required, may be able to be translated into other

More information

ASBESTOS MANAGEMENT POLICY

ASBESTOS MANAGEMENT POLICY ASBESTOS MANAGEMENT POLICY Published : 4th Revision December 2014 1 Table of Contents INTRODUCTION... 3 DUTY TO MANAGE ASBESTOS... 3 DUTIES OF CAMPUS SERVICES... 3 1.0 POLICY OBJECTIVES... 5 2.0 RESPONSIBILITIES...

More information

ASBESTOS MATERIALS IN SCHOOLS

ASBESTOS MATERIALS IN SCHOOLS CODE OF PRACTICE FOR MANAGEMENT OF ASBESTOS MATERIALS IN SCHOOLS CONTENTS 1. Introduction 1.1 Scope 1.2 The OPW Health and Safety Unit 2 Background 2.1 General Information 2.2 Main Risks 2.3 Main Risk

More information

Author G Morton July 2015. Newcastle University Asbestos Management Plan 2015

Author G Morton July 2015. Newcastle University Asbestos Management Plan 2015 Newcastle University Asbestos Management Plan 2015 1 Contents 1.0 Introduction 2.0 Asbestos Management Duty Holder Responsibilities 2.1 Asbestos Manager (Head of Maintenance) 2.2 University Asbestos Survey

More information

ASBESTOS CONTAINING MATERIALS POLICY

ASBESTOS CONTAINING MATERIALS POLICY ASBESTOS CONTAINING MATERIALS POLICY Document Control Version 3 Ratified by Risk Management Sub Group Date Ratified 19 December 2012 Name of Originator/Author Head of Estates and Facilities Name of Responsible

More information

The Control of Asbestos Regulations 2006

The Control of Asbestos Regulations 2006 The Control of Asbestos Regulations 2006 A guide for safety representatives Asbestos has been the main cause of occupational ill health from about 1950 onwards and is still the greatest single work-related

More information

Asbestos - Frequently Asked Questions

Asbestos - Frequently Asked Questions Asbestos - Frequently Asked Questions 1. What is asbestos? Asbestos is the name given to a group of fibrous minerals which occur naturally in the earth. These are grouped into two mineral types known as

More information

ASBESTOS MANAGEMENT POLICY AND GUIDANCE

ASBESTOS MANAGEMENT POLICY AND GUIDANCE ASBESTOS MANAGEMENT POLICY AND GUIDANCE Belvoir High School Policy and Procedures Date approved 08/10/2013 Signed by Chair of Governors (Mr B Lovegrove Date approved 08/10/2013 Signed by Executive Principal

More information

Control of Asbestos. Blue crocidolite Brown amosite White chrysotile

Control of Asbestos. Blue crocidolite Brown amosite White chrysotile Control of Asbestos Asbestos has been the main cause of occupational ill health from about 1950 onwards and is still the greatest single work related cause of death from ill health. Past exposure is now

More information

Northwards Housing. Asbestos Management Plan. October 2014

Northwards Housing. Asbestos Management Plan. October 2014 rthwards Housing Asbestos Management Plan October 2014 Last Review October 2014 Reviewed by Simon Roffey Issued by Larry Patrick Next Review Due October 2015 1 Table of Content Section Content 1.0 Purpose

More information

Managing asbestos in buildings:

Managing asbestos in buildings: Managing asbestos in buildings: A brief guide Who is this guidance for? This guidance is for, anyone who is responsible for maintenance and repairs in a building, which may contain asbestos. The duty to

More information

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN Revision Date Nature of Revision Prepared by Approved by 0.2 Jul 2013 Initial draft for comment Jon Fahie 0.3 Sep

More information

KEEP ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET THIS GUIDE

KEEP ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET THIS GUIDE KEEP THIS GUIDE ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET Asbestos could be in the house or building you are working on right now. Left alone, it isn t dangerous. However, once disturbed, tiny

More information

Asbestos Containing Materials Survey And Register Moil Shopping Centre

Asbestos Containing Materials Survey And Register Moil Shopping Centre Asbestos Survey and Register Asbestos Containing Materials Survey And Register Moil Shopping Centre Property Name: Moil Shopping Centre Property Address: 8 Moil Cres. Darwin, NT Prepared for: John Nicolakis

More information

Report to Cabinet Item 25 June 2014

Report to Cabinet Item 25 June 2014 Report to Cabinet Item 25 June 2014 Report of Deputy Chief executive (operations) 12 Subject Asbestos Management Policy Purpose To consider the council s Asbestos Management Policy. Recommendation To approve

More information

Asbestos awareness. University of Brighton 2016

Asbestos awareness. University of Brighton 2016 Asbestos awareness University of Brighton 2016 What is asbestos? Asbestos is a naturally occurring mineral which has been in use for over 2,000 years. It was named by the Greeks, meaning is inextinguishable.

More information

Asbestos Policy and Management Plan 2013-16

Asbestos Policy and Management Plan 2013-16 Policy reviewed by Thomas Eggar Solicitors, January 2013 Equality Assessment completed January 2013 Policy reviewed by the Health and Safety Committee, February 2013 Policy reviewed and adopted by the

More information

Specimen Company The Roadway England trtrtrtr ASBESTOS REPORT AND REGISTER FOR. Some where House xxxxxxxx

Specimen Company The Roadway England trtrtrtr ASBESTOS REPORT AND REGISTER FOR. Some where House xxxxxxxx 42 Haslucks Croft, Shirley, Solihull, B90 2EQ (t) 0121 249 1281 (m) 07814 203 977 www.veritas-consulting.co.uk Specimen Company The Roadway England trtrtrtr ASBESTOS REPORT AND REGISTER FOR Some where

More information

HAVEBURY HOUSING PARTNERSHIP

HAVEBURY HOUSING PARTNERSHIP HS028 HAVEBURY HOUSING PARTNERSHIP POLICY ASBESTOS MANAGEMENT Controlling Authority Director of Resources Policy No. HS028 Issue No. 3 Status Final Date November 2013 Review Date: November 2016 Equality

More information

Beech Housing Association Asbestos Management Policy

Beech Housing Association Asbestos Management Policy Beech Housing Association Asbestos Management Policy Policy Statement The aim of this document is to define a policy for the control and management of the risk of exposure to asbestos within the dwellings

More information

Asbestos Management Program

Asbestos Management Program Asbestos Management Program Facilities and Operations Revision #4: February 17, 2012 Page IMPORTANT Asbestos related incidents must be reported IMMEDIATELY to your supervisor Emergency Contacts During

More information

Asbestos at work guide

Asbestos at work guide Asbestos at work guide Contents Introduction.... 2 Frequently asked questions.... 4 The Control of Asbestos Regulations 2006... 5 Types of asbestos survey.... 7 1 Introduction This document provides a

More information

STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE

STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE BCD.26 STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE DATE: March 2015 Copyright Reserved TESTING, ASSESSMENT AND WORK WITH ASBESTOS CONTAINING MATERIALS (ACM S) REFERENCE This Directive deals

More information

Managing Asbestos Policy

Managing Asbestos Policy Managing Asbestos Policy Liverpool Mutual Homes Page 1 of 16 Table of Contents 1. MANAGEMENT INFORMATION 2. POLICY STATEMENT 3. POLICY AIMS AND KEY OBJECTIVES 4. INTRODUCTION 5. DETAIL 6. LINKS TO LMH

More information

Asbestos Awareness Training Requirements

Asbestos Awareness Training Requirements Asbestos Awareness Training Requirements Guidance Note 3 Jan 14 1 Introduction This Guidance Note gives practical information about asbestos awareness training. Sample wording for a tool box talk briefing

More information

ASBESTOS AWARENESS. Steve Adamthwaite PEHO City of York Council

ASBESTOS AWARENESS. Steve Adamthwaite PEHO City of York Council ASBESTOS AWARENESS Steve Adamthwaite PEHO City of York Council ASBESTOS AWARENESS WHAT IS ASBESTOS? WHERE DOES IT COME FROM? WHY IS ASBESTOS CONSIDERED TO BE POTENTIALLY DANGEROUS? WHERE COULD WE POSSIBLY

More information

Policy for the Management of Asbestos in Buildings

Policy for the Management of Asbestos in Buildings in Buildings Health and Safety Services 1 A1. Introduction If asbestos fibres enter the lungs they can cause cancer or incurable disease. Consequently the University is committed to ensure that all reasonably

More information

managing asbestos in church buildings

managing asbestos in church buildings managing asbestos in church buildings A joint briefing paper produced by Church Growth Trust and Stewardship April 2013 Briefing Paper 1 Lamb s Passage, London EC1Y 8AB t: 020 8502 5600 e: enquiries@stewardship.org.uk

More information

Asbestos Management Procedure

Asbestos Management Procedure Asbestos Management Procedure Reference: HS/021/2010 Version No: 2.0 Issue Date: July 2010 Document Control Document Ref: HS/021/2010 Date Created: Jan 2010 Version: 2 Date Modified: Revision due December

More information

Asbestos awareness for Craftsman. Presented by Bob Miller & Andrew Knight

Asbestos awareness for Craftsman. Presented by Bob Miller & Andrew Knight Asbestos awareness for Craftsman Presented by Bob Miller & Andrew Knight What do you know about asbestos? Outline four things you know about asbestos. What could be asbestos here? What is asbestos? Asbestos

More information

Bield Housing and Care POLICY, PROCEDURES. and MANAGEMENT PLAN ASBESTOS CONTAINING MATERIALS

Bield Housing and Care POLICY, PROCEDURES. and MANAGEMENT PLAN ASBESTOS CONTAINING MATERIALS Bield Housing and Care POLICY, PROCEDURES and MANAGEMENT PLAN for ASBESTOS CONTAINING MATERIALS Approved on: 24 April 2014 By Health & Safety Management Group Implementation date: 1 June 2014 Review Date

More information

MAIDENHEAD AND DISTRICT HOUSING ASSOCIATION TITLE: PAGE:

MAIDENHEAD AND DISTRICT HOUSING ASSOCIATION TITLE: PAGE: TITLE: PAGE: 1 OF 23 Maidenhead and District Housing Association Asbestos Policy and Management Page 1 of 23 TITLE: PAGE: 2 OF 23 FOREWORD This document details the system for the management of health

More information

Manage buildings? You must manage asbestos. Manage buildings? You must manage asbestos. Why manage asbestos?

Manage buildings? You must manage asbestos. Manage buildings? You must manage asbestos. Why manage asbestos? Manage buildings? You must manage asbestos Why manage asbestos? Manage buildings? You must manage asbestos Asbestos must be properly managed to prevent people dying from asbestos diseases in the future.

More information

e a Advice on non-licensed work with asbestos ssentials Why is asbestos a problem? Introduction to Asbestos essentials task sheets Non-licensed tasks

e a Advice on non-licensed work with asbestos ssentials Why is asbestos a problem? Introduction to Asbestos essentials task sheets Non-licensed tasks e a sbestos ssentials Non-licensed tasks Some trades likely to disturb asbestos Anyone who works on the fabric of a building, may be at risk of disturbing asbestos. This includes: electricians, joiners,

More information

Asbestos Management Plan

Asbestos Management Plan Health and Safety Services Asbestos Management Plan Policy, Organisation and Arrangements Sean Callaghan Issue number 3 April 2014 Issue Date Nature of revision Prepared by Approved by 2 April 2013 First

More information

Facilities Management. Facilities Management Asbestos Policy & Management Plan

Facilities Management. Facilities Management Asbestos Policy & Management Plan Facilities Management Facilities Management Asbestos Policy & Management Plan PP&T code FM00174 Version 1.0 Last updated 01 Feb 12 Review Date 08 Aug 13 Owner Unit Approved by Mike Eastwood Facilities

More information

UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST POLICY FOR THE MANAGEMENT OF ASBESTOS

UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST POLICY FOR THE MANAGEMENT OF ASBESTOS UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST POLICY FOR THE MANAGEMENT OF ASBESTOS APPROVED BY: UHL H&S Committee and UHL H&S Committee TRUST REF: B27/2005 DATE APPROVED: March 2008 ORIGINATOR: Glyn Lambley

More information

Accommodation Officers Information Booklet. Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy

Accommodation Officers Information Booklet. Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy Accommodation Officers Information Booklet Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy This Guideline has been produced solely for use by State Authorities that come within

More information

Asbestos Awareness Syllabus (Category A)

Asbestos Awareness Syllabus (Category A) Asbestos Awareness Syllabus (Category A) Introduction This syllabus sets out the guidance issued by the UK Asbestos Training Association (UKATA) for the provision of asbestos awareness training as contained

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN ASBESTOS MANAGEMENT PLAN PREPARED BY: Scott Gregory: Estates - Property Services DATE: 18/04/2014 STATUS: Draft ISSUE: 2014 (02) September 2014 NEXT REVISION DATE: April 2014 Contents 1.0 Introduction

More information

ASBESTOS in state and local government

ASBESTOS in state and local government ASBESTOS in state and local government Inspection campaign In 2013/14, WorkSafe WA is conducting a proactive inspection campaign focusing on the management of asbestos in state and local government buildings.

More information

AHERA 3-Year Asbestos Re-Inspection

AHERA 3-Year Asbestos Re-Inspection AHERA 3-Year Asbestos Re-Inspection Denver 940 Fillmore Street Denver, Colorado 80206 Report Date: November 20, 2013 OEI Project No. 13.159 Prepared For: John Lewis Denver 940 Fillmore Street Denver, CO

More information

How To Manage Asbestos At A University

How To Manage Asbestos At A University DIVISION OF FACILITIES MANAGEMENT Locked Bag 588 Boorooma Street Wagga Wagga NSW 2678 Australia Tel: +61 2 6933 2286 Fax: +61 2 6933 2180 www.csu.edu.au/division/facilitiesm ABN: 83 878 708 551 Asbestos

More information

Asbestos in your home. Information on living with Asbestos

Asbestos in your home. Information on living with Asbestos Asbestos in your home Information on living with Asbestos Why I have I got this leaflet? You have received this leaflet as Slough Borough Council have identified, through an inspection process, that you

More information

If you own, occupy, manage or have responsibilities for

If you own, occupy, manage or have responsibilities for Who is this guidance for? If you own, occupy, manage or have responsibilities for non-domestic premises which may contain asbestos, you will either have: a legal duty to manage the risk from this material;

More information

UKATA. Certificate in Asbestos Awareness. Category A

UKATA. Certificate in Asbestos Awareness. Category A UKATA Certificate in Asbestos Awareness Category A Page 1 of 7 Introduction This syllabus sets out the guidance issued by the United Kingdom Asbestos Awareness Association (UKATA) for the provision of

More information

Asbestos Policy. Planning, Performance Management and Support Services. Legacy Causeway Asbestos Policy (Ref: CHSST/04/211)

Asbestos Policy. Planning, Performance Management and Support Services. Legacy Causeway Asbestos Policy (Ref: CHSST/04/211) Asbestos Policy Reference Number: NHSCT/09/192 Responsible Directorate: Planning, Performance Management and Support Services Replaces (if appropriate): Legacy Causeway Asbestos Policy (Ref: CHSST/04/211)

More information

Asbestos Management Plan. April 2011

Asbestos Management Plan. April 2011 Reviewed by: Approved by: Health & Safety Management Committee Management Board -. R3. Part 1: Introduction Part 2: Policy Part 3: Organisation and Responsibilities Part 4: Procedures Appendices: 1 Management

More information

FREEPHONE: 0800 059 9112 EMAIL: admin@a1demolitionukltd.com. Asbestos Awareness. Toolbox Talk

FREEPHONE: 0800 059 9112 EMAIL: admin@a1demolitionukltd.com. Asbestos Awareness. Toolbox Talk FREEPHONE: 0800 059 9112 EMAIL: admin@a1demolitionukltd.com Asbestos Awareness Toolbox Talk ASBESTOS AWARENESS Why is it a Problem Asbestos was extensively used as a building material in the UK from the

More information

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy ASBESTOS POLICY Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy This is a controlled document. It should not be altered in any way without the express permission of the author or their representative.

More information

ASBESTOS POLICY AND MANAGEMENT PLAN

ASBESTOS POLICY AND MANAGEMENT PLAN ASBESTOS POLICY AND MANAGEMENT PLAN 1. INTRODUCTION 1.1. The Control of Asbestos at Work Regulations 2006 requires employers to prevent the exposure of their employees to asbestos, or where this is not

More information

Part 2. Overview. Risk management. Workplace health and safety legislation. How should asbestos exposure be managed? Identifying asbestos hazards

Part 2. Overview. Risk management. Workplace health and safety legislation. How should asbestos exposure be managed? Identifying asbestos hazards Part 2. Overview Risk management Workplace health and safety legislation How should asbestos exposure be managed? identify hazards assess risk decide on control measures implement control measures monitor

More information

Control Provisions under the Air Pollution Control Ordinance

Control Provisions under the Air Pollution Control Ordinance ProPECC PN 2/97 ENVIRONMENTAL PROTECTION DEPARTMENT PRACTICE NOTE FOR PROFESSIONAL PERSONS Handlin of Asbestos Containin Materials in Buildins Introduction Asbestos is a generic name given to a group of

More information

Management Consultancy Training. Asbestos Materials. Residential Guide

Management Consultancy Training. Asbestos Materials. Residential Guide Asbestos Materials Residential Guide This guide highlights some of the more common asbestos containing materials (ACMs) in low occupancy residential buildings, their uses and likely locations. The guide

More information

The Management of Asbestos containing Materials

The Management of Asbestos containing Materials The Management of Asbestos containing Materials Status Owner Approval by University Court Draft Head of Estates and Building 1 Purpose... 1 2 Scope... 3 3 Principles... 4 4 Procedure... 5 5 Accountabilities...

More information

Edition 004:Management Survey

Edition 004:Management Survey Home Site asbestos SURVEY REPORT Edition 004:Management Survey Home Site a WARNING CONTAINS ASBESTOS Breathing asbestos dust is dangerous to health St. Helens Council Follow safety instructions Controlled

More information

RSPH Level 3 Certificate in Asbestos Project Management. February 2013. 10 Guided Learning Hours 2 Prior Learning Hours

RSPH Level 3 Certificate in Asbestos Project Management. February 2013. 10 Guided Learning Hours 2 Prior Learning Hours RSPH Level 3 Certificate in Asbestos Project Management February 2013 10 Guided Learning Hours 2 Prior Learning Hours Description The Control of Asbestos Regulations impose duties on every person who has,

More information

POLICY Contents. 1.0 Introduction Statement

POLICY Contents. 1.0 Introduction Statement POLICY Contents 1.0 Introduction Statement 2.0 Legal Responsibility 2.1 Asbestos Management Hierarchy 2.2 Duty Holders Responsibility 2.3 Employees Responsibility 3.0 Asbestos Management Procedure 4.0

More information

Asbestos Management Plan. Policy Owner: Head of Repairs Policy Author: Alan Assheton Date adopted: Review Date: Purpose

Asbestos Management Plan. Policy Owner: Head of Repairs Policy Author: Alan Assheton Date adopted: Review Date: Purpose Asbestos Management Plan Policy Owner: Head of Repairs Policy Author: Alan Assheton Date adopted: Review Date: Purpose The Health and Safety at Work etc Act 1974 places a duty on employers to take all

More information

Efficiently Maintaining Commercial Buildings. Asbestos Awareness

Efficiently Maintaining Commercial Buildings. Asbestos Awareness Efficiently Maintaining Commercial Buildings Asbestos Awareness What are the risks? Asbestos was used extensively between the 1950s and 1980s in both domestic and commercial buildings and although its

More information

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW August 2006 NSW Department of Commerce Parsons Brinckerhoff Australia Pty Limited ACN 078 004 798 and Parsons

More information

Asbestos Management POLICY

Asbestos Management POLICY Asbestos Management POLICY All Asbestos Containment Material (ACM) removal activities shall comply with applicable federal, state, and local regulations. Areas of responsibility of Facilities Management

More information

Asbestos Policy. Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust. November 2007. All Staff.

Asbestos Policy. Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust. November 2007. All Staff. Appendix 1 Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust Asbestos Policy Approved by Date Review Date Target Audience Trust Board November 2007 November 2008 All

More information

Asbestos Surveys Service INSTRUCTIONS TO TENDERERS

Asbestos Surveys Service INSTRUCTIONS TO TENDERERS 1 Introduction 1.1 Background 1.1.1 Bracknell Forest Borough Council (BFBC or the Council) is located in central Berkshire, and was designated a New Town in 1949 but became a Unitary authority in April

More information

ASBESTOS WORKING WITH IN BUILDINGS. *Building maintenance. *Building repair. *Building refurbishment

ASBESTOS WORKING WITH IN BUILDINGS. *Building maintenance. *Building repair. *Building refurbishment WORKING WITH ASBESTOS IN BUILDINGS Essential advice for workers carrying out: *Building maintenance *Building repair *Building refurbishment *Building services Asbestos: The hidden killer! Are you at risk?

More information

DECEMBER2012 Asbestos Update Report For the Rapid Creek Business Village.

DECEMBER2012 Asbestos Update Report For the Rapid Creek Business Village. DECEMBER2012 Asbestos Update Report For the Rapid Creek Business Village Email: admin@iccaustcomau ICC Australia Pty Ltd Copyright in the Drawings, information and data recorded in this document ( The

More information

Re Inspection of Asbestos Containing Materials

Re Inspection of Asbestos Containing Materials Environmental www.bodycote.com www.healthsciences.bodycote.com Re Inspection of Asbestos Containing s Frog Firle Alfriston Polegate East Sussex BN26 5TT Report Number: W07-1749 Page 1 of 11 Client YHA

More information

WASTE ASBESTOS. Asbestos is often bonded into a matrix of cement or resins. Typical bonded asbestos products include -

WASTE ASBESTOS. Asbestos is often bonded into a matrix of cement or resins. Typical bonded asbestos products include - Page 1 of 5 Version No. 2 Date of issue: HAZARDOUS WASTE REGULATIONS (NI) 2005 HAZARDOUS WASTE GUIDANCE DOCUMENT Introduction WASTE ASBESTOS Hazardous waste is subject to the requirements of the European

More information

Control of Asbestos Policy

Control of Asbestos Policy Control of Asbestos Policy Version Number: V1D Name of originator/author: Estates Manager 0161 277 1235 Name of responsible committee: Estates and Facilities Committee Name of executive lead: Director

More information

ASBESTOS POLICY MANAGEMENT PLAN

ASBESTOS POLICY MANAGEMENT PLAN ASBESTOS POLICY & MANAGEMENT PLAN HS20 Version V2 Approved by: Health, Safety and Security Committee Date approved: March 2011 Ratified by: Hospital Executive Committee Date ratified 24 th April 2012 Document

More information

Asbestos Management Plan

Asbestos Management Plan Asbestos Management Plan Document title Asbestos Management Plan Document author and department Jonathan Latter Health and Safety Compliance Manager Approving body Responsible person and department Fiona

More information

Asbestos Management Policy

Asbestos Management Policy Central Bedfordshire Council www.centralbedfordshire.gov.uk Asbestos Management Policy The Housing Service Version 1.0 Directorate Social Care Health and Housing Service Housing Service Approved by Director

More information

ASBESTOS AWARENESS. Environmental Health And Safety. www.uoguelph.ca/ehs MAINTENANCE CONTRACTORS

ASBESTOS AWARENESS. Environmental Health And Safety. www.uoguelph.ca/ehs MAINTENANCE CONTRACTORS ASBESTOS AWARENESS MAINTENANCE CONTRACTORS Environmental Health And Safety www.uoguelph.ca/ehs March 2007 ASBESTOS AWARENESS AT THE UNIVERSITY OF GUELPH What is Asbestos? The term asbestos refers to a

More information

Policy for the Management of Asbestos in Council Premises (Corporate and Housing)

Policy for the Management of Asbestos in Council Premises (Corporate and Housing) Policy for the Management of Asbestos in Council Premises (Corporate and Housing) Page 1 of 14 1. Policy Statement 1.1 This policy is designed to provide a clear acknowledgement of the responsibilities

More information

Contents. 04 What is asbestos? 05 How we manage asbestos. 08 Are you at risk? 11 Things to remember

Contents. 04 What is asbestos? 05 How we manage asbestos. 08 Are you at risk? 11 Things to remember Asbestos advice This guide explains what asbestos is, why it might be a problem, where it might be found, how we survey your home for it and how to deal with asbestos. Asbestos advice If you would like

More information

Asbestos Policy Lead officer: Date agreed: Review date: Working together to deliver quality homes and a better environment for all

Asbestos Policy   Lead officer: Date agreed: Review date: Working together to deliver quality homes and a better environment for all Asbestos Policy Lead officer: Jeff Scott Date agreed: May 2013 Review date: May 2016 Working together to deliver quality homes and a better environment for all Page 1 of 11 Contents Page 1 Introduction

More information

SAFETY RESPONSIBILITIES AND ARRANGEMENTS IN RESPECT OF ASBESTOS MANAGEMENT (ASBESTOS MANAGEMENT PLAN)

SAFETY RESPONSIBILITIES AND ARRANGEMENTS IN RESPECT OF ASBESTOS MANAGEMENT (ASBESTOS MANAGEMENT PLAN) KING S COLLEGE LONDON Health, Safety & Environmental Protection Office SAFETY RESPONSIBILITIES AND ARRANGEMENTS IN RESPECT OF ASBESTOS MANAGEMENT (ASBESTOS MANAGEMENT PLAN) Issue Date: May 2012 Issue Number:

More information

Asbestos Management Plan

Asbestos Management Plan Harlow Council Asbestos Management Plan Version 4 Scope: This management plan applies to the management of all asbestos containing materials to properties under the ownership/management of Harlow Council

More information

ASBESTOS REGISTER NTB00340 DOI COMPLEX TENNANT CREEK NT

ASBESTOS REGISTER NTB00340 DOI COMPLEX TENNANT CREEK NT ASBESTOS REGISTER NTB00340 DOI COMPLEX TENNANT CREEK NT Prepared for: Department of Infrastructure PO Box 61, Palmerston NT 0831 Prepared by: AEC Environmental Pty Ltd Date: May 2013 Register No: NT0545a

More information

Review Date 01/09/2015 Director of Estates and Facilities Expiry Date 11/09/2016 Withdrawn Date

Review Date 01/09/2015 Director of Estates and Facilities Expiry Date 11/09/2016 Withdrawn Date Policy No: RM78 Version: 1.0 Name of Policy: Corporate Asbestos Management Policy, Organisational Arrangements and Procedures Policy Effective From: 24/10/2013 Date Ratified 12/09/2013 Ratified Health

More information