1 UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST POLICY FOR THE MANAGEMENT OF ASBESTOS APPROVED BY: UHL H&S Committee and UHL H&S Committee TRUST REF: B27/2005 DATE APPROVED: March 2008 ORIGINATOR: Glyn Lambley - Senior Statutory Compliance Manager REVIEW DATE: March 2010

2 CONTENTS Section Title 1.0 Asbestos Policy Statement 2.0 Scope 3.0 Definitions 4.0 Organisational Responsibilities 5.0 Arrangements 6.0 Asbestos Labelling 7.0 Monitoring the Condition of Asbestos Materials in Known and Accessible Locations 8.0 Purchasing of Asbestos and Asbestos Products 9.0 Research 10.0 Contractor Procurement 11.0 Encountering Asbestos During Maintenance Work 12.0 Procedure for Uncontrolled Fibre Release 13.0 Training 14.0 Asbestos Removal 15.0 Asbestos Work by Licensed Contractors 16.0 Notification of work with asbestos 17.0 Disposal Arrangements 18.0 General Contractors 19.0 Audit of Asbestos left in-situ 20.0 Monitor and Review of Asbestos Management Arrangements 21.0 Associated Policies and Documents APPENDIX I Flowchart guidance for suspected asbestos Page 15

3 Summary of the Main Changes Arising from the March 2008 Review; 2.0 Scope amended to reflect the consolidation of Asbestos Regulations 3.0 Definitions New Asbestos control limits 4.0 Organisational Responsibilities Nominated Manager Appointment 8.0 Prohibitions statement 12.0 Procedure for Uncontrolled Fibre Release Guidance on personal exposure Asbestos Removal Added Guidance 16.0 Notification of work with Asbestos 18.0 General Contractors Responsibilities of all UHL Project Managers and General Managers 21.0 Revised Guidance and UHL Contact points for Asbestos. Appendix I Flowchart - discovered or damaged materials that could contain asbestos, including suspected personal exposure to asbestos.

4 1.0 Asbestos Policy Statement The objective of the Policy is to provide guidance to ensure that all appropriate steps are taken to comply with their Duty to Manage Asbestos within the University Hospitals of Leicester (UHL), NHS Trust and to comply with asbestos related legislation, approved codes of practice, guidance and relevant standards. In particular it will seek to prevent exposure, or where this is not reasonably practicable, to minimise the exposure of all persons. 2.0 Scope This Policy applies to all UHL premises and to all employees and contractors involved in the construction, management, design, upgrading, refurbishment, extension, maintenance and operation of plant, equipment, buildings and services. The Control of Asbestos Regulations 2006 came into force on 13 November 2006 (Asbestos Regulations - SI 2006/2739). These Regulations bring together the three previous sets of Regulations covering the prohibition of asbestos, the control of asbestos at work and asbestos licensing. The Regulations require mandatory training for anyone liable to be exposed to asbestos fibres at work (regulation 10). This includes maintenance workers and others who may come into contact with or who may disturb asbestos (eg cable installers) as well as those involved in asbestos removal work. When work with asbestos or work which may disturb asbestos is being carried out, the Asbestos Regulations require employers and the self-employed to prevent exposure to asbestos fibres. Where this is not reasonably practicable, they must make sure that exposure is kept as low as reasonably practicable by first considering measures other than the use of respiratory protective equipment. The spread of asbestos must be prevented or contained. The Regulations specify the work methods and controls that should be used to prevent exposure and spread. 3.0 Definitions Worker exposure must be below the airborne exposure limit (Control Limit). The Asbestos Regulations have a single Control Limit for all types of asbestos of 0.1 fibres per cm 3.

5 A Control Limit is a maximum concentration of asbestos fibres in the air (averaged over any continuous 4 hour period) that must not be exceeded. In addition, short term exposures must be strictly controlled and worker exposure should not exceed 0.6 fibres per cm 3 of air averaged over any continuous 10 minute period using respiratory protective equipment if exposure cannot be reduced sufficiently using other means. "adequate" means adequate having regard only to the nature and degree of exposure to asbestos and "adequately" shall be construed accordingly; "appointed doctor, means a registered medical practitioner appointed for the time being in writing by the Executive for the purpose of these Regulations; "approved" means approved for the time being in writing by the Health and Safety Commission or the Executive as the case may be; "asbestos" means the following minerals; crocidolite, amosite, chrysotile, fibrous actinolite, fibrous anthophyllite or fibrous tremolite or any mixture containing any of those minerals; "control limit" means one of the following concentrations of asbestos in the atmosphere when measured or calculated by the reference method described in Annex I to Council Directive 83/477/EEC or by a method giving equivalent results to that reference method approved by the Health and Safety Commission: "control measure" means a measure taken to prevent or reduce exposure to asbestos (including the provision of systems of work and supervision, the cleaning of workplaces, premises, plant and equipment, the provision and use of engineering controls and personal protective equipment); "personal protective equipment" means all equipment (including clothing) which is intended to be worn or held by a person at work and which protects that person against one or more risks to his health, and any addition or accessory designed to meet that objective; 4.0 Organisational Responsibilities Where asbestos is found on UHL premises, the primary Management responsibility rests with the Facilities Department. The Facilities Department will maintain an up-to-date Asbestos Register for each site, listing the location, type and condition of asbestos identified. A nominated Manager, with line management responsibility (e.g. Building Maintenance Manager/Engineering Maintenance Manager) shall be appointed for each UHL site to co-ordinate the management of asbestos and maintain and update the site Asbestos Register.

6 5.0 Arrangements Asbestos must be dealt with on a priority basis, based upon the risk presented by the material. This shall take into account the potential for fibre release, and the condition of the material, its location and the likelihood of the material being damaged or disturbed. Asbestos listed in the Asbestos Register will be assigned a risk classification in order to prioritise the risk. Progressive removal, or substitution of asbestos materials will take place on a priority basis in areas where they are likely to be regularly worked on, disturbed or receive damage. Asbestos materials which are not considered to be creating a significant risk may be left in-situ to be considered for removal as part of a planned programme for removal. Asbestos materials will be sealed in accordance with best practice. Whenever they receive minor damage they will be resealed or removed if the damage is considered to be significant. When buildings are shut down for major refurbishment, or a change of occupancy, the possibility of more extensive replacement programmes should be considered. Any areas where an asbestos survey has not been carried out will be subject to a precautionary approach. This will entail assuming that all materials contain asbestos, unless there is strong evidence to indicate that they do not. 6.0 Asbestos Labelling This applies where asbestos has been assessed as satisfactory to leave intact i.e. it does not require removal. Where reasonably practicable, these areas should be labelled. 7.0 Monitoring the Condition of Asbestos Materials in Known and Accessible Locations The Facilities Department will ensure that a system for the visual monitoring of asbestos is put in place and maintained. All staff have a duty to report any damage to asbestos materials or to materials suspected of containing asbestos to their Manager.

7 8.0 Purchasing of Asbestos and Asbestos Products In accordance with the regulations prohibiting the supply, import and use of asbestos and asbestos based products, the UHL will not purchase any such products or materials. 9.0 Research An exception in relation to the use of asbestos for the purposes of research is permitted. Such use is subject to the UHL Local Rules and project approval relating to carcinogens Contractor Procurement The UHL Control of Contractors Policy provides the framework for procuring contractors. All contractors should be engaged through the Facilities Department in order to provide the required Professional and Technical interface and to ensure that asbestos issues are taken into consideration at the earliest stage. Contractors work activities that may unexpectedly encounter asbestos include: Lighting Electrical wiring installations Security systems IMT installations Installation of scientific/medical equipment and associated pipe work Ventilation ducting Demolition Installation of windows, curtains and blinds 11.0 Encountering Asbestos During Maintenance Work a. The area in which staff, or contractors are working should be checked against the Asbestos Register. If any hidden material or dust which is suspected to contain asbestos is uncovered work must stop and be reported immediately to a Supervisor. b. For work which will involve asbestos materials, a risk assessment must be carried out and a method of work proposed and accepted by the responsible UHL manager, prior to starting work.

8 Maintenance work which may involve encounters with asbestos, includes: lagging on pipes and boilers insulation board in walls, on doors and ceilings asbestos cement for roof and walls covering pipes and tanks in some decorative plaster fire proofing in ducts and voids Insulation in electrical and telecommunication installations Insulation behind wall mounted heaters fire protection around window, skylight and door frames Gaskets, rope and seals plus many other applications where asbestos has been used as a primary agent, or as an additive to other substances (i.e. cement) Procedure for Uncontrolled Fibre Release Prior to starting planned asbestos works, the risk assessment should consider the risks arising from an uncontrolled release. This will include emergency procedures to contain the fibre release and will include how to close doors, windows and isolate ventilation systems to prevent the movement of the fibres. Where an incident occurs, which results in an uncontrolled release of asbestos into the work place at a concentration that is likely to exceed the appropriate control limit, e.g. removing pipe lagging subsequently revealed to be asbestos, the following procedures should be implemented: The affected area(s) should be immediately evacuated and steps taken to secure the area from re-entry of unauthorised persons. Any persons who may be contaminated with asbestos fibres should minimise disturbance to any fibres on their person/clothing to protect themselves and others from inhaling asbestos fibres. An Estates Manager or Estates worker with asbestos training, or a UHL H&S Advisor should be called immediately to advise what actions to take to mitigate the risk in the particular circumstances of the fibre release. The flowchart in Appendix I of this document lists the Health and Safety Executive s guidance for a suspected asbestos fibre release. The Facilities Department, or Switchboard must be notified as soon as possible. Steps should be taken to isolate other areas which may be affected (i.e. close doors/windows, isolate ventilation systems) The cause of the uncontrolled release should be established.

9 Specialist contractors will then be employed to thoroughly clean all visible debris and dust wearing appropriate personal protective equipment which will include suitable respiratory protection. Any necessary measures to seal damaged sources or remove the asbestos material will be taken in accordance with the UHL Special Waste Procedures. Air sampling is finally carried out to confirm that the remedial measures taken have been successful. Only when clearance has been given can people return Training Asbestos Awareness training courses will be provided to all Facilities staff who have involvement with asbestos works and those who have been identified by their Manager as being at risk of encountering asbestos (e.g. building/maintenance staff). The need for further training will be subject to constant review, and provided as appropriate Asbestos Removal Bulk, or high risk Asbestos removal and major work involving asbestos containing materials shall only be carried out by licensed contractors engaged through the Facilities Department, who shall be responsible for their supervision and ensuring that the work is carried out in accordance with the legal requirements and HSE codes of practice. Other Low Risk asbestos works may be carried out by experienced staff, subject to a suitable and sufficient risk assessment, method statement and a permit-to-work. Prior to the commencement of work by a licensed contractor, the Facilities Contract Manager shall notify the Facilities Statutory Compliance post holder, consult with the Department concerned, and ensure that arrangements for HSE notification, permits-to-work, environmental monitoring and clearance certificates are in place. Asbestos survey reports must be made available to the contractor by the responsible Facilities Contract Manager. They are to be checked beforehand to identify those jobs which may have an asbestos involvement. After the satisfactory completion of the works, the Contract Officer must ensure that all asbestos related information from the project is given to the Asbestos Register Nominated Person to ensure that the register is amended. Most asbestos removal work must be undertaken by a licensed contractor but any decision on whether particular work is licensable is based on the risk. Work is only exempt from licensing if: the exposure of employees to asbestos fibres is sporadic and of low intensity (but exposure cannot be considered to be sporadic and of low intensity if the concentration of asbestos in the air is liable to exceed 0.6

10 fibres per cm 3 measured over 10 minutes); and it is clear from the risk assessment that the exposure of any employee to asbestos will not exceed the control limit; and the work involves: short, non-continuous maintenance activities. Work can only be considered as short, non-continuous maintenance activities if any one person carries out work with these materials for less than one hour in a seven-day period. The total time spent by all workers on the work should not exceed a total of two hours. removal of materials in which the asbestos fibres are firmly linked in a matrix, Such materials include: asbestos cement; textured decorative coatings and paints which contain asbestos; articles of bitumen, plastic, resin or rubber which contain asbestos where their thermal or acoustic properties are incidental to their main purpose (eg vinyl floor tiles, electric cables, roofing felt) and other insulation products which may be used at high temperatures but have no insulation purposes, for example gaskets, washers, ropes and seals. encapsulation or sealing of asbestos-containing materials which are in good condition, or air monitoring and control, and the collection and analysis of samples to find out if a specific material contains asbestos. Under the Asbestos Regulations, anyone carrying out work on asbestos insulation, asbestos coating or asbestos insulating board (AIB) needs a licence issued by HSE unless they meet one of the exemptions above Licensed Asbestos Contractors Asbestos works presenting a significant risk should only permitted if they are carried out by Licensed Contractors. The work usually involves: Constructing and working within a temporary ventilated enclosure ("tent"). All air which leaves the enclosure is filtered through HEPA filters. Testing the "tent" for leaks before work can commence. Testing the air outside the "tent" for asbestos fibres during the work. Testing the air and conditions within the "tent" before it can be taken down. Testing the air and giving a "clearance certificate" after the tent has been taken down, before normal use of the area can resume. special safety provisions for workers within the "tent" and special disposal arrangements for the waste asbestos. arrangements whereby workers wear "dirty" workwear inside the tent and

11 "clean" workwear outside Notification of work with asbestos This regulation applies to work at the premises of the employer in which an employee is or is liable to be exposed to asbestos unless - the extent of that exposure neither exceeds nor is liable to exceed the action level; or the work is work to which the Asbestos (Licensing) Regulations 1983 apply. An employer shall not carry out work for the first time unless he has notified the enforcing authority at least 14 days before commencing that work using form FOD ASB 5. Where an employer has notified work and there is a material change in that work which might affect the particulars so notified (including the cessation of the work), the employer shall forthwith notify the enforcing authority of that change Disposal Arrangements Licensed contractors carrying out work which generates asbestos waste or contaminated articles will be responsible for the collection, secure storage and disposal of the waste. All asbestos waste generated, including used protective clothing must be double bagged, clearly identified and securely stored. Labelling of packaged and unpackaged products containing asbestos must include one of the following methods of hazard identification: an adhesive label firmly affixed to the product or its packaging, a tie-on label firmly attached to the product or its packaging, or direct printing onto the product or its packaging, as the case may be General Contractors Contractors engaged by the Facilities Department to carry out other work in the proximity of asbestos must also be informed of the location of asbestos materials so as to prevent inadvertent contact. Where asbestos cannot be confirmed, or urgent reactive work is required, there should always be the presumption that materials contain asbestos, unless there is strong evidence to suggest it does not. All UHL Project Managers and General Managers must ensure that no intrusive works (including drilling, or inserting screws/nails) are carried out on the fabric of the buildings or building services without the permission of the Facilities Department.

12 19.0 Audit of Asbestos left in-situ A written asbestos management action plan must be produced and where asbestos materials are to be left in place: Those affected are informed of its condition and location Regular checks are carried out to assess its condition (at least annual, or as appropriate) Review and revise the action plan, as appropriate The Statutory Compliance Post Holder for each site shall ensure that an annual, or as appropriate, schedule of audit is put into place to measure performance against this policy and the site asbestos action plan. A main (annual) audit should be carried out each year Monitor and Review of Asbestos Management Arrangements The results of the asbestos audit should be forwarded to the Nominated Asbestos Duty Holder on site (the Line Manager who has the designated management function for managing asbestos on the site), the Head of Facilities and the Statutory Compliance post holder, in order to monitor and review performance and formulate asbestos management strategy for the site Associated Policies and Documents UHL Control of Contractors Policy DMS Document No: References

13 Control of Asbestos Regulations 2006 Work with Materials Containing Asbestos ACOP and Guidance 2006 The Management of Asbestos in non-domestic premises, HSE publication. Health and Safety at Work etc Act 1974 (c. 37) Safety representatives and safety committees L87 A guide to the Health and Safety (Consultation with Employees) Regulations Consulting employees on health and safety: A guide to the law Leaflet INDG232 HSE Books 1996 Construction (Design and Management) Regulations 2007 Asbestos: The analysts' guide for sampling, analysis and clearance procedures HSG248 Asbestos essentials task manual: Task guidance sheets for the building maintenance and allied trades HSG210 Surveying, sampling and assessment of asbestos-containing materials MDHS100 Management of health and safety at work. Management of Health and Safety at Work Regulations Approved Code of Practice and guidance L21 Asbestos: The licensed contractors' guide HSG247 Working with asbestos cement HSG189/2 HSE Books 1999 Health and safety in roof work HSG33 (Second edition) HSE Books 1998 Control of substances hazardous to health (Fifth edition). The Control of Substances Hazardous to Health Regulations 2002 (as amended). Approved Code of Practice and guidance L5 (Fifth edition) HSE Books 2005 PAS 60-1: 2004 Equipment used in the controlled removal of asbestos containing materials. Controlled wetting of asbestos-containing materials Fit testing of respiratory protective equipment face pieces OC 282/28 PAS 60-3: 2004 Equipment used in the controlled removal of asbestos containing materials. Operation, cleaning and maintenance of class H vacuum cleaners. Code of practice British Standards Institution PAS 60-2: 2004 Equipment used in the controlled removal of asbestos containing materials. Negative Pressure Units. Specification British Standards Institution BS EN ISO : 2004 Protective clothing for use against solid particulates. Performance requirements for chemical protective clothing providing protection to the full body against airborne solid particulates (type 5 clothing) British Standards Institution BS EN ISO/IEC 17020: 2004 General criteria for the operation of various types of bodies performing inspection British Standards Institution BS EN ISO/IEC 17025: 2005 General requirements for the competence of testing and calibration laboratories British Standards Institution Safe work in confined spaces.

14 Confined Spaces Regulations Approved Code of Practice, Regulations and guidance L101 HSE Books 1997 Carriage of Dangerous Goods and Use of Transportable Pressure Equipment Regulations 2004 SI 2004 No 568 The Stationery Office For more information go to the HSE Asbestos Microsite: University Hospitals of Leicester, NHS Trust Emergency Contact Arrangements: Facilities Helpdesk (GGH & LGH) Serco Helpdesk (LRI) Duty Manager, available through Main Switchboard for out of hours (all sites) APPENDIX I (Extract from HSE Guidance note ref: em 1)

15 RPE = Respiratory Protective Equipment PPE = Personal Protective Equipment

Policy for the Management of Asbestos in the Workplace

Policy for the Management of Asbestos in the Workplace Southwark Council Management of Asbestos in the Workplace November 2011 Page 1 of 15 CONTENTS 1. INTRODUCTION... 3 2. POLICY STATEMENT... 3 3. ASBESTOS RISK CLASSIFICATION SCHEME... 5 4. SAMPLING OF ASBESTOS

More information

ASBESTOS MANAGEMENT POLICY

ASBESTOS MANAGEMENT POLICY Community Health Service ASBESTOS MANAGEMENT POLICY UNCONTROLLED COPY ONCE PRINTED. For CURRENT version check NHS Leicester City or LCCHS INTRANET. Reference Title: HS004 Asbestos Management Policy Version

More information

The Management of Asbestos containing Materials

The Management of Asbestos containing Materials The Management of Asbestos containing Materials Status Owner Approval by University Court Draft Head of Estates and Building 1 Purpose... 1 2 Scope... 3 3 Principles... 4 4 Procedure... 5 5 Accountabilities...

More information

Asbestos: Notifiable Non-Licensed Work. A Minor Change or a Significant Challenge

Asbestos: Notifiable Non-Licensed Work. A Minor Change or a Significant Challenge Asbestos: Notifiable Non-Licensed Work A Minor Change or a Significant Challenge John Evans B.Sc., CMIOSH, FRSPH, MIOA, PGCE Technical Director Santia Asbestos Management Limited The Control of Asbestos

More information

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN Revision Date Nature of Revision Prepared by Approved by 0.2 Jul 2013 Initial draft for comment Jon Fahie 0.3 Sep

More information

Policy for the Management of Asbestos

Policy for the Management of Asbestos CARDIFF AND VALE NHS TRUST YMDDIRIEDOLAETH GIG CAERDYDD A R FRO Policy for the Management of Asbestos Author Keith Jones Estate Controls Assurance Officer / Environmental Management Co-ordinator Policy

More information

ASBESTOS CONTAINING MATERIALS POLICY

ASBESTOS CONTAINING MATERIALS POLICY ASBESTOS CONTAINING MATERIALS POLICY Document Control Version 3 Ratified by Risk Management Sub Group Date Ratified 19 December 2012 Name of Originator/Author Head of Estates and Facilities Name of Responsible

More information

Control of Asbestos. Blue crocidolite Brown amosite White chrysotile

Control of Asbestos. Blue crocidolite Brown amosite White chrysotile Control of Asbestos Asbestos has been the main cause of occupational ill health from about 1950 onwards and is still the greatest single work related cause of death from ill health. Past exposure is now

More information

2012 No. 632 HEALTH AND SAFETY. The Control of Asbestos Regulations 2012

2012 No. 632 HEALTH AND SAFETY. The Control of Asbestos Regulations 2012 STATUTORY INSTRUMENTS 2012 No. 632 HEALTH AND SAFETY The Control of Asbestos Regulations 2012 Made - - - - 27th February 2012 Laid before Parliament 5th March 2012 Coming into force - - 6th April 2012

More information

Control of Asbestos Policy

Control of Asbestos Policy Control of Asbestos Policy Version Number: V1D Name of originator/author: Estates Manager 0161 277 1235 Name of responsible committee: Estates and Facilities Committee Name of executive lead: Director

More information

Asbestos Policy and Management Plan 2013-16

Asbestos Policy and Management Plan 2013-16 Policy reviewed by Thomas Eggar Solicitors, January 2013 Equality Assessment completed January 2013 Policy reviewed by the Health and Safety Committee, February 2013 Policy reviewed and adopted by the

More information

Policy on the Management of Asbestos

Policy on the Management of Asbestos WISHAW AND DISTRICT HOUSING ASSOCIATION Policy on the Management of Asbestos As with all the Association s policies and procedures, this document, where required, may be able to be translated into other

More information

ASBESTOS MANAGEMENT POLICY

ASBESTOS MANAGEMENT POLICY ASBESTOS MANAGEMENT POLICY Published : 4th Revision December 2014 1 Table of Contents INTRODUCTION... 3 DUTY TO MANAGE ASBESTOS... 3 DUTIES OF CAMPUS SERVICES... 3 1.0 POLICY OBJECTIVES... 5 2.0 RESPONSIBILITIES...

More information

RSPH Level 3 Certificate in Asbestos Project Management. February 2013. 10 Guided Learning Hours 2 Prior Learning Hours

RSPH Level 3 Certificate in Asbestos Project Management. February 2013. 10 Guided Learning Hours 2 Prior Learning Hours RSPH Level 3 Certificate in Asbestos Project Management February 2013 10 Guided Learning Hours 2 Prior Learning Hours Description The Control of Asbestos Regulations impose duties on every person who has,

More information

Asbestos Management Policy (Version 3)

Asbestos Management Policy (Version 3) Asbestos Management Policy (Version 3) Contents Page Introduction 3 College Policy Statement for Asbestos Management 3 Objectives (of this Policy and Procedure) 3 Application of Policy 4 Licensed Asbestos

More information

Asbestos Policy. Planning, Performance Management and Support Services. Legacy Causeway Asbestos Policy (Ref: CHSST/04/211)

Asbestos Policy. Planning, Performance Management and Support Services. Legacy Causeway Asbestos Policy (Ref: CHSST/04/211) Asbestos Policy Reference Number: NHSCT/09/192 Responsible Directorate: Planning, Performance Management and Support Services Replaces (if appropriate): Legacy Causeway Asbestos Policy (Ref: CHSST/04/211)

More information

Summary of the main steps in managing asbestos (from HSG264) Find out if ACMs present: Check plans/ drawings. Carry out survey (2)

Summary of the main steps in managing asbestos (from HSG264) Find out if ACMs present: Check plans/ drawings. Carry out survey (2) Asbestos The University s asbestos management procedure follows the stages set out in guidance provided by the HSE (HSG64), as follows. (The numbers in the boxes below refer to the subsequent sections

More information

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS MANAGEMENT PROGRAM ASBESTOS MANAGEMENT PROGRAM Prepared By: Triumvirate Environmental Program Approval Developed: August 2011 Updated: June 2015 Associate Vice President of Public Safety & Administrative Services Date Associate

More information

The Control of Asbestos Regulations 2006

The Control of Asbestos Regulations 2006 The Control of Asbestos Regulations 2006 A guide for safety representatives Asbestos has been the main cause of occupational ill health from about 1950 onwards and is still the greatest single work-related

More information

Review Date 01/09/2015 Director of Estates and Facilities Expiry Date 11/09/2016 Withdrawn Date

Review Date 01/09/2015 Director of Estates and Facilities Expiry Date 11/09/2016 Withdrawn Date Policy No: RM78 Version: 1.0 Name of Policy: Corporate Asbestos Management Policy, Organisational Arrangements and Procedures Policy Effective From: 24/10/2013 Date Ratified 12/09/2013 Ratified Health

More information

How To Manage Asbestos At A University

How To Manage Asbestos At A University DIVISION OF FACILITIES MANAGEMENT Locked Bag 588 Boorooma Street Wagga Wagga NSW 2678 Australia Tel: +61 2 6933 2286 Fax: +61 2 6933 2180 www.csu.edu.au/division/facilitiesm ABN: 83 878 708 551 Asbestos

More information

PART 3 PROHIBITIONS AND RELATED PROVISIONS

PART 3 PROHIBITIONS AND RELATED PROVISIONS Legislation made under s. 58 and 81(2) of the Act. 1956-12 (LN. ) Commencement 1.3.2007 Amending enactments Relevant current provisions Commencement date LN. 2012/098 r. 3(2)(i) & (ii) 5.7.2012 EU Legislation/International

More information

ASBESTOS MATERIALS IN SCHOOLS

ASBESTOS MATERIALS IN SCHOOLS CODE OF PRACTICE FOR MANAGEMENT OF ASBESTOS MATERIALS IN SCHOOLS CONTENTS 1. Introduction 1.1 Scope 1.2 The OPW Health and Safety Unit 2 Background 2.1 General Information 2.2 Main Risks 2.3 Main Risk

More information

LEGISLATIVE GUIDANCE NOTES Refurbishment/Demolition

LEGISLATIVE GUIDANCE NOTES Refurbishment/Demolition LEGISLATIVE GUIDANCE NOTES Refurbishment/Demolition 1 INDEX QM78 SECTION 1 RECOMMENDATIONS SECTION 2 METHOD OF RISK ASSESSMENT SECTION 3 DEFINITION OF TERMS SECTION 4 LEGISLATION, CODES OF PRACTICE AND

More information

HAVEBURY HOUSING PARTNERSHIP

HAVEBURY HOUSING PARTNERSHIP HS028 HAVEBURY HOUSING PARTNERSHIP POLICY ASBESTOS MANAGEMENT Controlling Authority Director of Resources Policy No. HS028 Issue No. 3 Status Final Date November 2013 Review Date: November 2016 Equality

More information

POLICY Contents. 1.0 Introduction Statement

POLICY Contents. 1.0 Introduction Statement POLICY Contents 1.0 Introduction Statement 2.0 Legal Responsibility 2.1 Asbestos Management Hierarchy 2.2 Duty Holders Responsibility 2.3 Employees Responsibility 3.0 Asbestos Management Procedure 4.0

More information

Policy for the Management of Asbestos in Buildings

Policy for the Management of Asbestos in Buildings in Buildings Health and Safety Services 1 A1. Introduction If asbestos fibres enter the lungs they can cause cancer or incurable disease. Consequently the University is committed to ensure that all reasonably

More information

Management of Asbestos. Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division

Management of Asbestos. Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division Management of Asbestos Darren Arkins Senior Inspector Occupational Hygiene Unit Chemical Business Services Division Getting it Wrong! Asbestos What is it? With the Naked Eye! Naturally occurring silicates

More information

FREEPHONE: 0800 059 9112 EMAIL: admin@a1demolitionukltd.com. Asbestos Awareness. Toolbox Talk

FREEPHONE: 0800 059 9112 EMAIL: admin@a1demolitionukltd.com. Asbestos Awareness. Toolbox Talk FREEPHONE: 0800 059 9112 EMAIL: admin@a1demolitionukltd.com Asbestos Awareness Toolbox Talk ASBESTOS AWARENESS Why is it a Problem Asbestos was extensively used as a building material in the UK from the

More information

Asbestos Management Procedure

Asbestos Management Procedure Asbestos Management Procedure Reference: HS/021/2010 Version No: 2.0 Issue Date: July 2010 Document Control Document Ref: HS/021/2010 Date Created: Jan 2010 Version: 2 Date Modified: Revision due December

More information

Asbestos Policy & Procedure

Asbestos Policy & Procedure Asbestos Policy & Procedure 1. Purpose & Introduction This policy and procedure sets out Octavia s commitment and approach to ensuring, so far as reasonably practicable, that residents, contractors and

More information

e a Advice on non-licensed work with asbestos ssentials Why is asbestos a problem? Introduction to Asbestos essentials task sheets Non-licensed tasks

e a Advice on non-licensed work with asbestos ssentials Why is asbestos a problem? Introduction to Asbestos essentials task sheets Non-licensed tasks e a sbestos ssentials Non-licensed tasks Some trades likely to disturb asbestos Anyone who works on the fabric of a building, may be at risk of disturbing asbestos. This includes: electricians, joiners,

More information

Version: Date adopted: publication: Review date: September 2015. Expiry date: March 2016. Target audience: All staff

Version: Date adopted: publication: Review date: September 2015. Expiry date: March 2016. Target audience: All staff Asbestos Policy The Asbestos Policy provides guidance to ensure that all appropriate steps are taken to comply with the duty to manage asbestos and comply with asbestos related legislation, codes of practice

More information

2006 No. 2739 HEALTH AND SAFETY. The Control of Asbestos Regulations 2006

2006 No. 2739 HEALTH AND SAFETY. The Control of Asbestos Regulations 2006 STATUTORY INSTRUMENTS 2006 No. 2739 HEALTH AND SAFETY The Control of Asbestos Regulations 2006 Made - - - - 12th October 2006 Laid before Parliament 20th October 2006 Coming into force in accordance with

More information

Managing Asbestos Policy

Managing Asbestos Policy Managing Asbestos Policy Liverpool Mutual Homes Page 1 of 16 Table of Contents 1. MANAGEMENT INFORMATION 2. POLICY STATEMENT 3. POLICY AIMS AND KEY OBJECTIVES 4. INTRODUCTION 5. DETAIL 6. LINKS TO LMH

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN ASBESTOS MANAGEMENT PLAN PREPARED BY: Scott Gregory: Estates - Property Services DATE: 18/04/2014 STATUS: Draft ISSUE: 2014 (02) September 2014 NEXT REVISION DATE: April 2014 Contents 1.0 Introduction

More information

Asbestos Policy. Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust. November 2007. All Staff.

Asbestos Policy. Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust. November 2007. All Staff. Appendix 1 Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust Asbestos Policy Approved by Date Review Date Target Audience Trust Board November 2007 November 2008 All

More information

STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE

STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE BCD.26 STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE DATE: March 2015 Copyright Reserved TESTING, ASSESSMENT AND WORK WITH ASBESTOS CONTAINING MATERIALS (ACM S) REFERENCE This Directive deals

More information

WASTE ASBESTOS. Asbestos is often bonded into a matrix of cement or resins. Typical bonded asbestos products include -

WASTE ASBESTOS. Asbestos is often bonded into a matrix of cement or resins. Typical bonded asbestos products include - Page 1 of 5 Version No. 2 Date of issue: HAZARDOUS WASTE REGULATIONS (NI) 2005 HAZARDOUS WASTE GUIDANCE DOCUMENT Introduction WASTE ASBESTOS Hazardous waste is subject to the requirements of the European

More information

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT BCIT Safety Manual Contents 1. Purpose... 3 2. Definitions... 3 2.1 Asbestos... 3 2.2 Asbestos Containing Material (ACM)... 3 2.3 Friable Material... 3 2.4 Low Risk Work Activity... 3 2.5 Moderate Risk

More information

Asbestos - Frequently Asked Questions

Asbestos - Frequently Asked Questions Asbestos - Frequently Asked Questions 1. What is asbestos? Asbestos is the name given to a group of fibrous minerals which occur naturally in the earth. These are grouped into two mineral types known as

More information

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy ASBESTOS POLICY Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy This is a controlled document. It should not be altered in any way without the express permission of the author or their representative.

More information

REVISION 9 January 2015 ASBESTOS MANAGEMENT PLAN

REVISION 9 January 2015 ASBESTOS MANAGEMENT PLAN REVISION 9 January 2015 ASBESTOS MANAGEMENT PLAN ULSTER UNIVERSITY - ASBESTOS MANAGEMENT PLAN CONTENTS PAGE 1. Introduction 4 2. Background 4 2.1 Types of Asbestos 2.2 Hazards of Asbestos dust 2.3 Use

More information

IWU PHYSICAL PLANT SAFETY PROGRAM. Toxic and Hazardous Substances, Title 29 Code of Federal Regulations (CFR) Part 1910.1001, Subpart Z Asbestos

IWU PHYSICAL PLANT SAFETY PROGRAM. Toxic and Hazardous Substances, Title 29 Code of Federal Regulations (CFR) Part 1910.1001, Subpart Z Asbestos STANDARDS Toxic and Hazardous Substances, Title 29 Code of Federal Regulations (CFR) Part 1910.1001, Subpart Z Asbestos 1. INTRODUCTION IWU has a responsibility to provide a safe environment for students,

More information

How to Safely Remove Asbestos

How to Safely Remove Asbestos How to Safely Remove Asbestos Code of Practice December 2012 CP113 Workplace Standards Department of Justice This code of practice has been approved by the Tasmanian Minister for Workplace Relations under

More information

Accommodation Officers Information Booklet. Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy

Accommodation Officers Information Booklet. Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy Accommodation Officers Information Booklet Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy This Guideline has been produced solely for use by State Authorities that come within

More information

ASBESTOS POLICY AND MANAGEMENT PLAN

ASBESTOS POLICY AND MANAGEMENT PLAN ASBESTOS POLICY AND MANAGEMENT PLAN 1. INTRODUCTION 1.1. The Control of Asbestos at Work Regulations 2006 requires employers to prevent the exposure of their employees to asbestos, or where this is not

More information

Policy on Asbestos Safety

Policy on Asbestos Safety Policy on Asbestos Safety November Index. Aims and Objectives. Policy Reference. Asbestos Safety Policy Statement 4. Responsibilities 5. Asbestos Register 6. Asbestos Survey 7. Staff Asbestos Training

More information

have been provided with information on whether they do or do not contain asbestos before starting work;

have been provided with information on whether they do or do not contain asbestos before starting work; Health Effects of Asbestos If your work involves possible exposure to asbestos, you should: be aware of the risks from asbestos exposure; understand the importance of keeping exposure as low as possible;

More information

Author G Morton July 2015. Newcastle University Asbestos Management Plan 2015

Author G Morton July 2015. Newcastle University Asbestos Management Plan 2015 Newcastle University Asbestos Management Plan 2015 1 Contents 1.0 Introduction 2.0 Asbestos Management Duty Holder Responsibilities 2.1 Asbestos Manager (Head of Maintenance) 2.2 University Asbestos Survey

More information

MAIDENHEAD AND DISTRICT HOUSING ASSOCIATION TITLE: PAGE:

MAIDENHEAD AND DISTRICT HOUSING ASSOCIATION TITLE: PAGE: TITLE: PAGE: 1 OF 23 Maidenhead and District Housing Association Asbestos Policy and Management Page 1 of 23 TITLE: PAGE: 2 OF 23 FOREWORD This document details the system for the management of health

More information

ASBESTOS in state and local government

ASBESTOS in state and local government ASBESTOS in state and local government Inspection campaign In 2013/14, WorkSafe WA is conducting a proactive inspection campaign focusing on the management of asbestos in state and local government buildings.

More information

ASBESTOS AWARENESS. Environmental Health And Safety. www.uoguelph.ca/ehs MAINTENANCE CONTRACTORS

ASBESTOS AWARENESS. Environmental Health And Safety. www.uoguelph.ca/ehs MAINTENANCE CONTRACTORS ASBESTOS AWARENESS MAINTENANCE CONTRACTORS Environmental Health And Safety www.uoguelph.ca/ehs March 2007 ASBESTOS AWARENESS AT THE UNIVERSITY OF GUELPH What is Asbestos? The term asbestos refers to a

More information

ASBESTOS IN THE HOME

ASBESTOS IN THE HOME J:\Public Protection Division\Food and Occupational Safety\Leaflets\A S B E S T O S.docJ:\Public Protection Division\Food and Occupational Safety\Leaflets\A S B E S T O S.doc ASBESTOS IN THE HOME What

More information

Asbestos Survey Report

Asbestos Survey Report 0340 Asbestos Survey Report Sunnyside Court Avondale Road Southport PR9 0NU Client Contact: Gary Rostron The Regenda Group Regenda House Enterprise Business Park Northgate Close Horwich, Bolton BL6 6PQ

More information

H2 Opening Statement Asbestos

H2 Opening Statement Asbestos H2 Opening Statement Asbestos Every year there are thousands of asbestos related deaths. Asbestos fibres accumulate in the lungs, therefore several diseases can occur, among these are two main types of

More information

ABClean Frequently Asked Questions (FAQ)

ABClean Frequently Asked Questions (FAQ) ABClean Frequently Asked Questions (FAQ) 1. How can I recognize asbestos containing products during cleaning, renovation, demolition or dismantling task? Considering construction date, which buildings

More information

Control Provisions under the Air Pollution Control Ordinance

Control Provisions under the Air Pollution Control Ordinance ProPECC PN 2/97 ENVIRONMENTAL PROTECTION DEPARTMENT PRACTICE NOTE FOR PROFESSIONAL PERSONS Handlin of Asbestos Containin Materials in Buildins Introduction Asbestos is a generic name given to a group of

More information

Work with materials containing asbestos

Work with materials containing asbestos Health and Safety Commission Work with materials containing asbestos Control of Asbestos Regulations 2006 Approved Code of Practice and guidance Health and Safety Commission Work with materials containing

More information

KEEP ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET THIS GUIDE

KEEP ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET THIS GUIDE KEEP THIS GUIDE ASBESTOS YOUR QUICK GUIDE DON T BE AN EASY TARGET Asbestos could be in the house or building you are working on right now. Left alone, it isn t dangerous. However, once disturbed, tiny

More information

Asbestos Management Plan

Asbestos Management Plan Health and Safety Services Asbestos Management Plan Policy, Organisation and Arrangements Sean Callaghan Issue number 3 April 2014 Issue Date Nature of revision Prepared by Approved by 2 April 2013 First

More information

ASBESTOS AWARENESS. Steve Adamthwaite PEHO City of York Council

ASBESTOS AWARENESS. Steve Adamthwaite PEHO City of York Council ASBESTOS AWARENESS Steve Adamthwaite PEHO City of York Council ASBESTOS AWARENESS WHAT IS ASBESTOS? WHERE DOES IT COME FROM? WHY IS ASBESTOS CONSIDERED TO BE POTENTIALLY DANGEROUS? WHERE COULD WE POSSIBLY

More information

Asbestos in your home. Information on living with Asbestos

Asbestos in your home. Information on living with Asbestos Asbestos in your home Information on living with Asbestos Why I have I got this leaflet? You have received this leaflet as Slough Borough Council have identified, through an inspection process, that you

More information

Asbestos Awareness at the University of Toronto

Asbestos Awareness at the University of Toronto Asbestos Awareness at the University of Toronto What is Asbestos? Asbestos is a general term given to a group of naturally occurring mineral silicates that are made up of long thin fibres. These fibrous

More information

ASBESTOS POLICY MANAGEMENT PLAN

ASBESTOS POLICY MANAGEMENT PLAN ASBESTOS POLICY & MANAGEMENT PLAN HS20 Version V2 Approved by: Health, Safety and Security Committee Date approved: March 2011 Ratified by: Hospital Executive Committee Date ratified 24 th April 2012 Document

More information

ASBESTOS WORKING WITH IN BUILDINGS. *Building maintenance. *Building repair. *Building refurbishment

ASBESTOS WORKING WITH IN BUILDINGS. *Building maintenance. *Building repair. *Building refurbishment WORKING WITH ASBESTOS IN BUILDINGS Essential advice for workers carrying out: *Building maintenance *Building repair *Building refurbishment *Building services Asbestos: The hidden killer! Are you at risk?

More information

Asbestos Awareness Training Requirements

Asbestos Awareness Training Requirements Asbestos Awareness Training Requirements Guidance Note 3 Jan 14 1 Introduction This Guidance Note gives practical information about asbestos awareness training. Sample wording for a tool box talk briefing

More information

TAMPA ELECTRIC COMPANY ENERGY SUPPLY ASBESTOS AWARENESS PROGRAM

TAMPA ELECTRIC COMPANY ENERGY SUPPLY ASBESTOS AWARENESS PROGRAM ASBESTOS AWARENESS PROGRAM TABLE OF CONTENTS TITLE PAGE # PURPOSE / INTRODUCTION 1 RESPONSIBILITY 2 EMPLOYEE TRAINING AND DOCUMENTATION 2-4 MEDICAL SURVEILLANCE 4 UNPLANNED DISTRUBANCE OF ASBESTOS CONTAINING

More information

Asbestos at work guide

Asbestos at work guide Asbestos at work guide Contents Introduction.... 2 Frequently asked questions.... 4 The Control of Asbestos Regulations 2006... 5 Types of asbestos survey.... 7 1 Introduction This document provides a

More information

Caution Asbestos. Asbestos advice for residents

Caution Asbestos. Asbestos advice for residents Caution Asbestos Asbestos advice for residents Customer Approved This leaflet has been designed to address concerns and questions about asbestos in homes. It explains what it is, where it could be found,

More information

Managing asbestos in buildings:

Managing asbestos in buildings: Managing asbestos in buildings: A brief guide Who is this guidance for? This guidance is for, anyone who is responsible for maintenance and repairs in a building, which may contain asbestos. The duty to

More information

Policy on Asbestos Management

Policy on Asbestos Management Policy on Asbestos Management Introduction Asbestos and its derivatives were extensively used as building materials in the UK from the 1950s through to the mid-1980s. It was used for a variety of purposes

More information

Asbestos Policy. Policy. The whole of the Trust. Intranet

Asbestos Policy. Policy. The whole of the Trust. Intranet Document name: Document type: What does this policy replace? Staff group to whom it applies: Distribution: Asbestos Policy Policy Update of previous Procedure for the Safe Management of Asbestos guidance

More information

ASBESTOS SAMPLING REPORT. Urban Design. Louisa Ryland House Sampling to Ceiling in Room 201 44 Newhall Street Birmingham B3 3PL

ASBESTOS SAMPLING REPORT. Urban Design. Louisa Ryland House Sampling to Ceiling in Room 201 44 Newhall Street Birmingham B3 3PL ASBESTOS SAMPLING REPORT Urban Design Louisa Ryland House Sampling to Ceiling in Room 01 44 Newhall Street Birmingham B PL TECHNICAL REPORT: 09H/56 150 Phoenix House Valepits Road Garretts Green Birmingham

More information

UBC Plant Operations Asbestos Work Procedures April 2004

UBC Plant Operations Asbestos Work Procedures April 2004 UBC Plant Operations Asbestos Work Procedures April 2004 These Procedures are for use by UBC Plant Operations, Utilities, Housing & Conferences, and IT Services only and are not intended for use by other

More information

Part 2. Overview. Risk management. Workplace health and safety legislation. How should asbestos exposure be managed? Identifying asbestos hazards

Part 2. Overview. Risk management. Workplace health and safety legislation. How should asbestos exposure be managed? Identifying asbestos hazards Part 2. Overview Risk management Workplace health and safety legislation How should asbestos exposure be managed? identify hazards assess risk decide on control measures implement control measures monitor

More information

Bield Housing and Care POLICY, PROCEDURES. and MANAGEMENT PLAN ASBESTOS CONTAINING MATERIALS

Bield Housing and Care POLICY, PROCEDURES. and MANAGEMENT PLAN ASBESTOS CONTAINING MATERIALS Bield Housing and Care POLICY, PROCEDURES and MANAGEMENT PLAN for ASBESTOS CONTAINING MATERIALS Approved on: 24 April 2014 By Health & Safety Management Group Implementation date: 1 June 2014 Review Date

More information

Policy for the Management of Asbestos in Council Premises (Corporate and Housing)

Policy for the Management of Asbestos in Council Premises (Corporate and Housing) Policy for the Management of Asbestos in Council Premises (Corporate and Housing) Page 1 of 14 1. Policy Statement 1.1 This policy is designed to provide a clear acknowledgement of the responsibilities

More information

ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015

ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015 ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015 Prepared For: (School Name) PREPARED BY: DIOCESE OF JOLIET ENVIRONMENTAL OFFICE FOR ANY ENVIRONMENTAL RELATED EMERGENCY CONTACT: RICHARD

More information

Administrative Procedure. Asbestos

Administrative Procedure. Asbestos Administrative Procedure FT107 Asbestos Board Received: January 30, 2012 Review Date: February 2015 Accountability: 1. Frequency of Reports As needed 2. Severity Threshold As needed (eg. Ministry of Labour

More information

Asbestos Awareness Syllabus (Category A)

Asbestos Awareness Syllabus (Category A) Asbestos Awareness Syllabus (Category A) Introduction This syllabus sets out the guidance issued by the UK Asbestos Training Association (UKATA) for the provision of asbestos awareness training as contained

More information

How To Deal With Asbestos In Minster Of Minsteria

How To Deal With Asbestos In Minster Of Minsteria RELATED TO EXPOSURE TO ASBESTOS AT WORK [S.L.424.23 1 SUBSIDIARY LEGISLATION 424.23 RELATED TO EXPOSURE TO ASBESTOS AT WORK REGULATIONS LEGAL NOTICE 323 of 2006. 15th December, 2006 1. (1) The title of

More information

HOW TO SAFELY REMOVE ASBESTOS

HOW TO SAFELY REMOVE ASBESTOS HOW TO SAFELY REMOVE ASBESTOS Code of Practice DECEMBER 2011 Safe Work Australia is an Australian Government statutory agency established in 2009. Safe Work Australia consists of representatives of the

More information

The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing materials.

The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing materials. The Administration of Norfolk Island SAFE DISPOSAL OF ASBESTOS AT THE WASTE MANAGEMENT CENTRE The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing

More information

Asbestos in your home

Asbestos in your home Asbestos in your home How to dispose of Asbestos safely Telephone Number: 01372 732000 contactus@epsom-ewell.gov.uk www.epsom-ewell.gov.uk If you would like a copy of this document in large print, on tape

More information

ROYAL HOLLOWAY, UNIVERSITY OF LONDON

ROYAL HOLLOWAY, UNIVERSITY OF LONDON ROYAL HOLLOWAY, UNIVERSITY OF LONDON ASBESTOS MANAGEMENT POLICY (Version 2) This Policy defines the College s arrangements for the management of asbestos and the measures to be taken for the protection

More information

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW August 2006 NSW Department of Commerce Parsons Brinckerhoff Australia Pty Limited ACN 078 004 798 and Parsons

More information

AsbestosSurveyingNationwide www.asbestossurveyingnationwide.co.uk

AsbestosSurveyingNationwide www.asbestossurveyingnationwide.co.uk AsbestosSurveyingNationwide www.asbestossurveyingnationwide.co.uk Mencap Office, 4 Mount Folly Square, Bodmin, Cornwall. PL31 2DG. Management Survey and Asbestos Register January 2011 (Two of the samples

More information

Asbestos Safety Management Standard Issue 8 October 2008. www.walsall.org.uk/healthandsafety

Asbestos Safety Management Standard Issue 8 October 2008. www.walsall.org.uk/healthandsafety www.walsall.org.uk/healthandsafety Asbestos Safety Management Standard Issue 8 October 2008 Page 1 of 7 / WMBC/SMS Asb/008/01 UNCONTROLLED WHEN PRINTED Please contact us if you have any difficulty reading

More information

ADVICE to safety representatives

ADVICE to safety representatives UNITE LEGAL SERVICES - TRUST YOUR UNION ADVICE to safety representatives Unite has launched a new asbestos campaign aiming to: Raise members awareness of asbestos hazards at work Provide advice to Unite

More information

Asbestos Management Program

Asbestos Management Program Asbestos Management Program Facilities and Operations Revision #4: February 17, 2012 Page IMPORTANT Asbestos related incidents must be reported IMMEDIATELY to your supervisor Emergency Contacts During

More information

ASBESTOS CONTROL PLAN

ASBESTOS CONTROL PLAN ASBESTOS CONTROL PLAN POLICY It is the long term plan of Emily Carr University to have an asbestos free workplace. In the interim, The University plans to manage asbestos hazards based on prioritization

More information

Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:

Asbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of: Asbestos WHAT TO DO? What Is Asbestos? Asbestos is mineral fiber. It can be positively identified only with a special type of microscope. There are several types of asbestos fibers. In the past, asbestos

More information

Asbestos is found in many products used in buildings, including ceiling tiles, pipe insulation, boilers and sprayed coatings.

Asbestos is found in many products used in buildings, including ceiling tiles, pipe insulation, boilers and sprayed coatings. A Guide to Asbestos What is Asbestos? Asbestos is a naturally occurring fibrous material that has been a popular building material since the 1950s. It is used as an insulator (to keep in heat and keep

More information

Asbestos Management. 2. Introduction. Contents

Asbestos Management. 2. Introduction. Contents Asbestos Management Contents 1. Policy 2. Introduction 3. Scope 4. Definitions 5. Asbestos Inventory and Identification 6. Inspection 7. Access Control 8. Repair and Maintenance of Asbestos-Containing

More information

Beech Housing Association Asbestos Management Policy

Beech Housing Association Asbestos Management Policy Beech Housing Association Asbestos Management Policy Policy Statement The aim of this document is to define a policy for the control and management of the risk of exposure to asbestos within the dwellings

More information

ASBESTOS POLICY AND PROCEDURES

ASBESTOS POLICY AND PROCEDURES ASBESTOS POLICY AND PROCEDURES a CORPORATE RESOURCES DEPARTMENT PROPERTY SERVICES POLICY FOR THE MANAGEMENT OF ASBESTOS IN BUILDINGS OWNED AND/OR OPERATED BY LEICESTERSHIRE COUNTY COUNCIL LCC ASB/001 ISSUE

More information

What law applies Responsibilities of employers, building owners, householders, renovators and asbestos removalists regarding asbestos

What law applies Responsibilities of employers, building owners, householders, renovators and asbestos removalists regarding asbestos Asbestos Information available on managing and removing asbestos-containing materials has been updated to reflect the changes to legislation effective from 1 January 2006. What law applies Responsibilities

More information

Asbestos Management Policy

Asbestos Management Policy Central Bedfordshire Council www.centralbedfordshire.gov.uk Asbestos Management Policy The Housing Service Version 1.0 Directorate Social Care Health and Housing Service Housing Service Approved by Director

More information

Facts about Asbestos. Council policy

Facts about Asbestos. Council policy Facts about Asbestos Winchester City Council has produced this leaflet to give its tenants advice and information about the possible presence of asbestos in and around their homes. Its content gives general

More information