1 TECHWATCH SUMMER 2015 EDITION TECHWATCH is published twice a year to provide customers and stakeholders with updated information regarding the technology and systems developed and used by NAV CANADA.

2 Table of Contents Aircraft Movement Surface Condition Reports (AMSCRs) 4 Automatic Dependent Surveillance-Broadcast (ADS-B) 4 ADS-B via Ground Stations 4 ADS-B via LEO Satellites 4 Canadian Automated Air Traffic System (CAATS) 5 CPDLC 6 Wake Vortex Warning Feature 6 Electronic Flight Data 7 Medium Term Conflict Detection 7 Collaborative Flight Planning System 7 FSS Information Management System (FIMS) 8 Gander Automated Air Traffic System (GAATS) 9 Multilateration Surface Detection 10 Multilateration Wide Area Multilateration (WAM) 10 Navaid Life-Cycle Replacement Projects 11 ILS (Instrument Landing Systems) 11 NAVCANsuite (formerly INTAS) 11 NOTAM Modernization 12 Performance Based Navigation 12 Area Navigation (RNAV) 12 Required Navigation Performance (RNP) 13 Wide Area Augmentation System (WAAS) 12 Preventive Maintenance Automation & Common Hardware Integration Platform 14 Weather Systems Upgrade Program 14 Automated Weather Observation System (AWOS) 14 Digital Weather Cameras 15 Human Weather Observation System (HWOS) 15 Ice Resistant Anemometers 16 Remote Digital Temperature Sensors and Displays 16 For further details please contact service@navcanada.ca. 2

3 Aircraft Movement Surface Condition Reports (AMSCRs) Description: NAV CANADA has automated the submission process for Aircraft Movement Surface Condition Reports. Until recently, runway surface condition reports have been transmitted to NAV CANADA via an AMSCR form, or through advanced reporting systems used by major airports. Regardless of the tool used by the reporting authority, the result was always a fax at the receiving Flight Information Centre that was then manually entered into NAV CANADA s Flight Information Management System. Reporting authorities can now submit the reports directly into NAV CANADA systems using the advanced interfaces developed by companies such as Tradewind, Team Eagle, Twisted-Leaf or FALCON Environmental Services or using a web application developed by NAV CANADA and available for fixed airport office use, called SNOWiz. Using drop-down fields on the SNOWiz web interface, users enter standardized surface condition information on a form that is then automatically made available within seconds to customers when submitted. Customer Benefits: The new processes enhance safety by putting the most recent information in the hands of customers, as soon as it s reported on the Aviation Weather Web Site (AWWS) and Aeronautical Fixed Telecommunications Networks (AFTN). With SNOWiz, less manual entries will be received which will allow for quicker processing of the ones NAV CANADA does receive. The web application, which was launched in October 2012, is offered alongside the traditional fax-based method of submitting AMSCRs. As of June 2015, more than 200 airports have signed up to use SNOWiz; a recent agreement with the Government of the Northwest Territories has 24 new airports now using SNOWiz. Tradewind, Team Eagle and Twisted-Leaf and FALCON Environmental Services also offer a tablet-based solution which connects into the NAV CANADA SNOWiz system. Airport authorities can request a login by sending an to service@navcanada.ca and completing a Service Level Agreement. With the login, users receive a training package to help them get started. A future phase will include the full transition from Canada s NOTAMJ format to the ICAOendorsed SNOTAM format which enables reporting of conditions by runway thirds. Automatic Dependent Surveillance-Broadcast (ADS-B) ADS-B via Ground Stations Description: ADS-B provides radar-like surveillance of suitably equipped aircraft using satellites (GPS), aircraft avionics and ground infrastructure to relay aircraft identification, position and altitude to air traffic controllers. Aircraft with ADS-B automatically transmit accurate position reports with integrity every second to air traffic control. Adding surveillance allows reduced separation minima to be applied between equipped aircraft. It also enables more aircraft to follow the most efficient flight trajectory and optimal cruising altitude. Customer Benefits: The system brings significant safety and efficiency benefits, enabling ATC to offer equipped aircraft more flexible, fuel-saving routes and earlier climbs through airspace previously managed using only procedural air traffic control. 3

4 Between the start of the program and 2020, NAV CANADA estimates that ADS-B over Hudson Bay, northeastern Canada and over southern Greenland will save customers 372 million litres of fuel and reduce GHG emissions by 979,000 metric tons. ADS-B services are currently provided by three ACC units Edmonton, Montreal and Gander mostly in the high level airspace, FL290 and above, over Hudson Bay, Baffin Island, northeast Quebec and southern Greenland. As of December 2014, some 92 per cent of all flights operating in these coverage areas were equipped for ADS-B services. ADS-B via Low Earth Orbit (LEO) Satellites Description: The expansion of ADS-B in Canada and in many other countries has improved air traffic management in airspace previously managed using procedural control. Provision of ADS-B services will increase significantly as airlines equip with this technology. However, the ability to bring the substantial benefits of modern ATC surveillance technologies to more remote areas and oceans has been limited by geographic constraints for ground station installations. NAV CANADA, ENAV of Italy, the Irish Aviation Authority (IAA), Naviair of Denmark and Iridium Communications Inc. have entered into a joint venture, called Aireon, to install ADS-B sensors as a hosted payload on the newest generation of the Iridium constellation of Low Earth Orbit (LEO) satellites that will begin launching in late This project will allow for the expansion of air traffic surveillance capability to the entire planet. When the required constellation of 66 cross-linked LEO satellites is in place, geographic restraints will no longer be a limiting factor in the provision of ADS-B coverage. NAV CANADA is a significant partner in this joint venture and will be the first customer of this new service. Our initial focus will be on deployment in the oceanic airspace over the North Atlantic. Customer Benefits: With the increase in surveillance, air traffic controllers will be able to safely apply reduced separation standards between aircraft, resulting in a significant increase in efficiency by the provision of flexible and predictable fuel efficient routings. NAV CANADA estimates that this new capability will result in fuel savings for customers on the North Atlantic alone of over 125 million litres per year as well as reduced annual GHG emissions of 324,000 metric tons. The ADS-B receivers will be built into Iridium NEXT, the second generation satellite constellation that will be launched by Iridium. An Advisory Committee has been established with representatives of IATA, Airlines and ANSPs. Customer data service agreements have been reached with NAV CANADA, NATS, ENAV, Naviair, and IAA. MOAs have been signed with: o NAV Portugal o Blue Med FAB (Cyprus, Greece, Italy and Malta) o The Civil Aviation Authority of Singapore (CAAS) o Agency for the Security of Aviation Navigation in Africa and Madagascar (ASECNA) o ISAVIA o Airways New Zealand 4

5 ADS-B payload has passed space qualification tests and is in production and being integrated on to sattelites. Iridium NEXT satellite constellation to launch ADS-B services to commence in In addition to its core air traffic surveillance capability, Aireon will provide a global emergency tracking solution that will be available free of charge for all ADS-B equipped aircraft. The Aireon Aircraft Locating and Emergency Response Tracking (Aireon ALERT) service will allow rescue agencies to request the location and last flight track of any suitably equipped aircraft flying in airspace currently without surveillance. NAV CANADA is focussed on making the necessary changes to its systems to be ready to take advantage of full ADS-B surveillance in our oceanic and remote airspace. Canadian Automated Air Traffic System (CAATS) Description: CAATS is one of the world s most advanced flight data processing systems and the foundation for the Company s air traffic management system. CAATS is an integrated flight data processor which automates flight profile monitoring and extends conflict prediction and detection into non-radar airspace. It also processes and distributes flight data information to other NAV CANADA and international systems. Customer Benefits: CAATS enables collaborative decision-making in flight planning which results in operators flying preferred routes more often. Further functionality improvements will increase fuel saving opportunities. CAATS simplifies the flight management process for air traffic controllers and other operational staff by automatically updating flight information coming from other centers, computing flight estimates and processing flight plans. The elimination of many manual processes, including the need to verbally hand off aircraft, improves safety by increasing the time available to focus on separating aircraft. CAATS has been implemented in all Area Control Centers in Canada since Internet flight planning for IFR and VFR customers was integrated into CAATS in July An automated flight data exchange with Oakland ARTCC was enabled in June In addition, the following enhancements are described in more detail below: CPDLC, Wake Vortex Warning, Electronic Flight Strips/Lists and Medium Term Conflict Detection. Controller Pilot Data Link Communication (CPDLC) Description: CPDLC is a means of direct electronic communication between controller and pilot using data link instead of voice. CPDLC communications can include altitude and speed clearances, change requests, or any related ATS information. Customer Benefits: CPDLC delivers customer service enhancements by relieving frequency congestion, reducing potential communications errors and contributing to efficient customer operations. It helps reduce frequency congestion by decreasing the need for voice communications and enhances safety by using standardized messages and reducing the likelihood of read-back and hear-back errors. CPDLC has been in use in the Gander Oceanic FIR for the last decade. CPDLC is now in use in all Canadian Flight Information Regions above Flight Level

6 Domestic CPDLC equipage rates are growing but continue to vary by region. The equipage rates are as follows (as of April 2015): 90% for Gander Oceanic and 85% for the Gander domestic sector, 73% for Moncton, 56% for Montreal, 32% for Edmonton, 35% for Winnipeg, 34% for Vancouver and 21% for Toronto. During May 2015, more than 261,000 messages were exchanged in domestic airspace and more than 85,000 in Oceanic airspace using the system. NAV CANADA, in collaboration with customers, is examining opportunities to ensure that communications via CPDLC are as efficient as they can be. This includes analysis of downlink and uplink counts to establish communications patterns, as well as response patterns at various time intervals. The Company is working on an enhancement that will support the delivery of full route clearances to aircraft and is examining the feasibility of introducing CPLDC into the lower level airspace in the country. Wake Vortex Warning Feature Description: NAV CANADA is working to develop a Wake Vortex Warning feature in CAATS that will simulate or predict where an aircraft vortex will travel taking into consideration the effects of wind. An alarm would notify the air traffic controller if another aircraft is predicted to enter it based on the aircraft weight category and distance. Customer Benefits: The Vortex Warning Feature has the potential to enhance safety by increasing situational awareness and providing information regarding potential wake vortex threats related to customer operations. A deployment plan will be developed, including ATC procedures, following R & D. Electronic Flight Data Description: Electronic Flight Data is replacing the paper strips in ACCs. Electronic Flight Data will provide controllers with the ability to read and change flight data information without the requirement to keep track of changes on paper strips. By integrating the CAATS Situational Display (CSit) with an auxiliary display, controllers will have access to the Flight Data information either directly on the Data Tag or through additional Flight Data information displayed on an auxiliary display. The system will keep track of all flight data changes in real time and display the most current but also historical data to the controllers at any given time. Customer Benefits: CAATS Electronic Flight Data will reduce the amount of time retrieving and updating flight data for controllers and eliminate the potential for mistakes when writing the information on a flight strip. This translates into more time spent monitoring the situational display which could lead to increased safety and efficiency for our customers. Deployed in Montreal ACC NORD specialty on November Deployment in the remaining Vancouver High specialty airspace took place in December 2014 and deployment in the remaining Edmonton High specialty occurred in May Toronto and Gander deployment is planned for

7 Medium Term Conflict Detection Description: Medium Term Conflict Detection (MTCD) provides a notification of a potential conflict situation to the controller with a look-ahead window of 5 to 20 minutes. The tool allows the controller to perform trial probes on controller-planned resolutions to ensure a conflict-free clearance is issued. MTCD augments the existing Conflict Prediction functionality that is in place for procedural airspace. Customer Benefits: MTCD has the potential to enhance safety by increasing situational awareness and providing information regarding potential conflict situations. MTCD is currently installed at Winnipeg, Edmonton, Montreal, Moncton, and Vancouver ACCs. Moncton and Vancouver have expanded MTCD use to FL200. Gander ACC is planning to implement in Summer Toronto ACC is planning to implement in Collaborative Flight Planning System Description: The Collaborative Flight Planning System (CFPS) makes it possible to file, update or cancel a flight plan online. CFPS improves on the previous system by providing a two-way flow of information. Customers now receive a clear confirmation following a transaction, and amendments to a flight plan no longer require a call to the ACC or FIC. With CFPS, customers can set up an account online and the vast majority of flight plan changes can be completed through this account. Customer Benefits: CFPS improves collaboration between pilots, dispatchers, flight service specialists and air traffic controllers. Changes made by customers to a flight plan are automatically reflected on NAV CANADA s systems. Conversely, changes made by air traffic services now show up on a customer s account. In addition, the intuitive flight plan form featured in CFPS reduces the need for manual verification of flight plans while automatically flagging flight plans that do not meet standard parameters. Upcoming enhancements will seamlessly combine weather, aeronautical, chart, flight plan and NOTAM information on a map, providing all the essential information needed to plan and file a flight plan, and requiring only one login. The CFPS website (plan.navcanada.ca) has more than 7,500 registered users and, as of May 2015, more than 120,000 flight plans have been filed. Two-way communication with FICs and ACCs allows both VFR and IFR flight plans to be filed, updated or cancelled online. Dispatchers and organizations can now manage flight plans and templates while permitting other members of the organization to view and use the same templates, eliminating duplicates and improving information-sharing. Organizations can create flight plan templates for aircraft, routes, pilots and flight numbers. These templates can be combined to quickly create flight plans. Flight planning information (weather, aeronautical, NOTAM and flight plan) will be displayed on a geo-referenced base map, allowing customers to select information pertinent to their needs. Features will be incrementally added to the map. Initial roll-out to FICs began in Summer 2014, with customer access to the map expected later in

8 FSS Information Management System (FIMS) Description: The FSS Information Management System (FIMS) provides the tools for the Flight Information Centers (FIC) to deliver preflight and enroute services to General Aviation and Commercial flight operations; FIMS is used to provide interpretive weather briefing service, flight planning and VFR alerting service; Aeronautical information (SIGMET, AIRMET, PIREP and NOTAM). FIMS reduces routine workload and associated errors due to manual data input and improves data retrieval for more efficient briefings. This automated flight data processing system centralizes flight information while allowing each specialist to access any part of this information whether they are performing pre-flight or enroute services or communications search activities. Updates to FIMS have improved the interface with CAATS for seamless exchange between systems as well as the ability to exchange flight information with CFPS and also EXCDS in Flight Service Stations and Towers. Customer Benefits: FIMS provides improved service delivery through more advanced intuitive briefing and flight planning tools. Improvements to continuity of service and overall reduction in system support costs are accomplished through the replacement of aging computer equipment with FIMS. FIMS latest software version (10.2) was delivered in November FIMS 11.0 will be delivered in November 2015 and contain up to 70 changes and Modification Requests (MRs). Specialists from the field will be used to test and certify the new software. Gander Automated Air Traffic System (GAATS) Description: The Gander Automated Air Traffic System (GAATS) is an advanced oceanic air traffic system used to control aircraft crossing the North Atlantic (NAT) airspace between North America and Europe. Features include flight plan processing, 4-dimensional trajectory modeling, generation of the Organized Track System (OTS) based on current jet stream winds, advanced conflict prediction/resolution and extensive Data Link communication capabilities including (Automatic Dependent Surveillance Contract (ADS-C)), Controller Pilot Data Link Communication (CPDLC) and Oceanic Clearances (OCL). The latest generation of GAATS, known as GAATS+, was implemented in Gander in February GAATS+ uses an ATC LCD display technology to provide electronic flight strips and advanced planner and controller functionality, including jurisdictional surveillance separation capabilities, based on radar for traffic transiting into and out of domestic airspace and ADS-B for aircraft over the southern portion of Greenland. This will form the basis of space-based ADS-B support when the service from Aireon becomes operational in Reduced Longitudinal Separation Minimum (RLongSM) was jointly implemented in Gander and Shanwick oceanic airspace on March 30, RLongSM allows appropriately equipped aircraft to fly on the same route with a longitudinal separation of five minutes versus the traditional 10 minutes required for non-radar airspace. Further collaboration activities with NATS are now underway for Reduced Lateral Separation Minimum (RLatSM). By November 2015, RLatSM will allow Data Link Mandate (DLM) compliant aircraft to fly on tracks with half-degree separation versus the traditional full degree required in the past. 8

9 ADS-B Phase 2 In-Trail was implemented on April 29, 2013, allowing controllers to maintain ADS-B separation between aircraft at the same level, in addition to capabilities for Climb- Through implemented in Phase 1. The Gander Operational Flight Level Initiative (GO-FLI) was implemented on November 7, GO-FLI automatically detects climb opportunities for all flights and makes these readily accessible for controllers to share with pilots and to issue clearances to climb via CPDLC when wanted. The availability of Automatic Dependent Surveillance-Broadcast (ADS-B) and the integration of North Warning System radars and VHF communications off the East Coast of Canada supported the creation of the Gander Oceanic Transition Area (GOTA). Where procedural control standards were previously used, the new transition area pushes the boundary of surveillance-based control standards 185 nautical miles east over the North Atlantic as aircraft use new oceanic entry/exit points. GOTA provides an additional 20 to 25 minutes of flying time under surveillance as aircraft transit the North Atlantic Customer Benefits: GAATS+ automates flight data processing, and integrates automatic dependent surveillance (ADS) position reports, CPDLC communication and Oceanic Clearance (OCL), resulting in faster responses to customer requests. CPDLC and ADS-C also enabled the introduction of Reduced Longitudinal Separation functionality in GAATS+ on March 30, These functionalities provide greater opportunities for equipped aircraft to achieve more optimal flight profiles, yielding significant fuel savings for customers. The ICAO Data Link Mandate (DLM) is now supported by GAATS+ as of February 2013, with support for Phase 2 implemented in February DLM provides FANS1A equipped aircraft with access to routes on designated core tracks, along with more opportunities to utilize RLongSM to achieve more optimal flight levels. DLM and the concept of core tracks provide the foundation for the future implementation of Reduced Lateral Separation Minimum (RLatSM). GAATS+ replaced SAATS at the Oceanic Control Centre in Prestwick in November An unprecedented level of technical and operational convergence was achieved as a result of both sites having a common GAATS+ system. In late 2013, NAV CANADA and NATS signed a new collaboration program, called COAST (Collaboration on Oceanic Airspace and System Tools). The new program will provide a structure for NATS and NAV CANADA to work together on operational service improvements that support advancements in safety and efficiency. The implementation of GAATS+ occurred in February Implementation of RLongSM occurred in March Implementation of Oceanic ADS-B occurred in March Implementation of the ICAO Data Link Mandate (DLM) Phase 1 occurred in February 2013, with core tracks in the North Atlantic requiring data link during specific track activation hours. Phase 2, completed in February 2015, saw the implementation of CPDLC for all tracks between FL350 and FL390 inclusive. Implementation of ADS-B Phase 2 In-Trail occurred in April Implementation of GO-FLI occurred in November Implementation of enhancements to existing North Atlantic Common Co-ordination will provide the ability to exchange additional coordinating messages with adjacent Oceanic ATC centers. GAATS+ was implemented at Prestwick in November RLatSM will be implemented by November

10 Multilateration Surveillance Surface Detection Description: Multilateration (MLAT) is being used as an effective situational awareness tool at busy airports. The Company has deployed MLAT for surface detection, as a complement to Airport Surface Detection Equipment (ASDE) and a component of Advanced Surface Movement Guidance and Control Systems (A-SMGCS). Customer Benefits: Since multilateration uses existing transponder technology, no additional investment is required on the part of customers to modify aircraft equipment. Multilateration improves safety at airports where it is installed by providing air traffic controllers with additional situational awareness. NAV CANADA s first operational use of multilateration as a complement to ASDE was at Montreal Pierre Elliot Trudeau International Airport (installed in spring 2010). Multilateration is operational at Toronto Pearson, increasing situational awareness for controllers with information integrated on sophisticated display systems. Multilateration is operational at Calgary International Airport and was expanded for the opening of the new runway in spring Multilateration Wide Area Multilateration (WAM) Description: WAM is a system of ground stations that receive signals from aircraft transponders on Mode 3/A, C and S to determine aircraft position. This information can then be used by ATC for SSR-equivalent surveillance and separation. Customer Benefits: WAM can provide coverage in areas where it is not possible or too costly to install radar. As a result, NAV CANADA will be able to increase or augment surveillance capability in areas where it would improve the safety and/or efficiency of flight operations. WAM installations in Fort St. John, Vancouver Mainland, Kelowna, Springbank and Fredericton are now operational. Navaid Life-Cycle Replacement Projects ILS (Instrument Landing Systems) Description: To improve service reliability and reduce maintenance costs, ILS equipment installed in the 1970s through 1990s is being replaced with new state-of-the-art equipment at 117 runways across Canada. Unlike the old systems, the replacement ILS transmit localizer and glide path signals which are capable of meeting Category I, II and III precision and reliability standards. As the new systems do not radiate a useable back course signal for the reciprocal runway end, LNAV, LNAV/VNAV and/or LPV approaches (with vertical guidance) are being designed to 10

11 replace the localizer back course approach capability where required to maintain or improve airport accessibility. Customer Benefits: The new systems are more reliable and more stable thus providing better service to our customers. 95 ILS have been replaced with new systems over the past ten years. During this period, new ILS precision approach service has been established for 6 runways, including Kamloops Runway 08 (2009), Nanaimo Runway 16 (2009), Calgary Runway 10 (2011), Villeneuve Runway 26 (2014), and two Category III ILS for Calgary s new parallel runway (2014). The fourth phase of the national replacement program was approved in February With this new phase underway, the current ILS replacement program now covers 16 remaining installations through New ILS are being installed for Terrace Airport on runway 33 and at Vancouver International on runway 26L. NAVCANsuite Description: NAVCANsuite is a family of tower automation products, providing fast and reliable access to airport, tower, and terminal ATC information. It features an integrated controller working position comprising up to four touch screen monitors that provide NAVCANatm products such as: NAVCANstrips electronic flight data strips; NAVCANinfo a graphical display of real-time airport, NOTAM and meteorological data; NAVCANcontrol navaid and airfield lighting information; NAVCANatis an automatic terminal information service; and NAVCANsitu which combines fused track data with on-screen surveillance data on situational displays. A fully digital voice communications subsystem, supplied by Harris/SolaCom, will be incorporated directly into NAVCANsuite for air-ground/ground-ground communications. Customer Benefits: NAVCANsuite offers air traffic controllers an environment that enhances safety and efficiency by providing real-time access to critical flight, surveillance and operational data as well as voice communications. Sales of the system to other ANSPs generate revenue for reinvestment in the Canadian ANS. Visit for the status of NAVCANsuite projects. NOTAM Modernization Description: The Company is in the process of developing a self-serve, web-based application for the submission of NOTAMs by external reporting authorities (such as airports and telecommunication companies) for approval and prompt dissemination of notices to customers, called NOTAMWiz. The new application will support the production of NOTAMs to the ICAO format, versus the domestic standard currently being used. Customer Benefits: By digitizing NOTAM requests the Company will provide reporting authorities with a user-friendly option for the submission of notices. In addition, this will reduce workload as a result of standardization and the current need for air traffic services to manually input information. The result will be quicker turnaround times between submission of a notice and its availability to customers on the Collaborative Flight Planning System, the Aviation Weather Web Site and through external providers. 11

12 Status: NOTAMWiz is currently in the development stage with internal deployment targeted for Summer 2016 and external deployment targeted for Fall Performance-based Navigation (PBN) Description: Performance-based Navigation is mainly about transitioning to area navigation in a globally-harmonized fashion by means of implementing navigation specifications. It encompasses both Area Navigation (RNAV) and Required Navigation Performance (RNP). A navigation specification that includes the requirement for on-board performance monitoring and alerting is referred to as an RNP specification. An RNAV specification does not require the monitoring and alerting function. The added position integrity from an RNP system will usually result in the ability to bring aircraft closer to each other or fixed obstacles while maintaining an equivalent level of safety. The implementation of PBN everywhere in Canada is aimed at using the most appropriate navigation specification, whether it is RNAV or RNP, to suit customers operational requirements. As customers upgrade their avionics, greater ATM opportunities will be presented with an eventual transition towards 4D (Lateral, Longitudinal, Vertical and Time) operations, that consider gate-to-gate implementations producing greater efficiencies. Global Navigation Satellite System (GNSS) is one of the major tools to introduce efficient airspace management and is expected to become essential in high traffic density terminal areas over time. NAV CANADA has already implemented many PBN procedures both in the terminal and enroute environments and will continue to incrementally build on these successes. Customer Benefits: RNAV and RNP-certified aircraft have better access to, and flexibility for, point-to-point operations, rather than being required to navigate between ground-based navigation aids such as VORs and NDBs. Between program start and 2020, NAV CANADA estimates that PBN will save customers 598 million litres of fuel and reduce GHG emissions by 2,107,000 metric tons. Current status: There are over 1,000 RNAV procedures published in Canada. The first phase of the Windsor/Toronto/Montreal (WTM) Airspace Project was implemented in 2012 and resulted in a new RNAV structure including Standard Instrument Departure (SID) and Standard Terminal Arrival Route (STAR) procedures leading to and from a new RNAV enroute structure. The second phase of the WTM project was implemented in 2014 and included cross border linkages to the FAA. A similar project reviewed the Calgary-Edmonton airspace corridor taking into consideration the new parallel runway at Calgary. This project was implemented in May In collaboration with WestJet, NAV CANADA has implemented a number of instrument approaches that include a constant descent and, in a number of cases, a much shorter flight route than the normal approach. TP 308 V6 now incorporates all elements of FAA criteria as adopted by Transport Canada, effective October 17, Jeppessen Sanderson Boeing Design services division has been contracted by NAV CANADA to build public RNP AR approaches in Canada. NAV CANADA and Jeppesen are currently developing RNP AR approaches at the Calgary, Vancouver, Montreal, Ottawa, Toronto, Kelowna and Kamloops aerodromes. In 2015, work also started on additional sites. 12

13 Wide Area Augmentation System (WAAS) Description: WAAS is a satellite-based GPS augmentation system that uses a network of ground reference stations and geostationary satellites to monitor signal delays caused by the ionosphere and provide improved position accuracy and integrity of messages to aircraft via satellites. This American system is designed specifically for aviation with a high level of reliability and availability and has a North America-wide reach. NAV CANADA has participated in the development of WAAS by installing four reference stations in Canada. Customer Benefits: With WAAS, the accuracy, integrity and availability of enroute, terminal and approach guidance navigation are significantly improved. There is also a significant safety benefit as WAAS makes possible localizer performance with vertical guidance (LPV) approaches with limits as low as 200 feet where terrain, runway equipment and aerodrome certification permit. This means that an LPV precision-like approach with both lateral and vertical guidance can be flown using WAAS at any qualifying airport within WAAS coverage. More than 210 LPV approaches, supported by WAAS have been published to date. Additional sites are planned but are dependent upon provision of necessary airport survey data. Recent improvements in reference station software and prediction performance has extended LPV coverage from coast to coast and up to 70 N throughout the Arctic. Through the PBN Customer Working Group, NAV CANADA is beginning to investigate the benefits of Ground Based Augmentation System (GBAS) Landing Systems (GLS). Preventive Maintenance Automation & Common Hardware Integration Platform Description: The current ATM Operational environment is built on a mix of systems - each deployed and maintained independently through life cycle management. With future updates planned to several core systems, such as the Canadian Automated Air Traffic System (CAATS), Fusion, and NAVCANsuite products, NAV CANADA has the opportunity to consolidate much of the key underlying architecture to LINUX and a hardware infrastructure centered on blade server technology at Area Control Centres. This will support a move towards a Restart, Reload, Swap philosophy that is emerging in other leading ANSPs. Customer Benefits: By moving to a common platform, the Company will be able to increase automation for monitoring and other tasks (such as file clean up, verification of parameters, accuracy checks), decrease maintenance costs and improve overall reliability of the systems. The system will support shorter turn-around times for system maintenance and component replacement as well as allow for future growth. The system has undergone multiple design reviews, proof of concepts, and Failure Mode Case Analysis to ensure a robust system to take us through years to come. Procurement of hardware is currently underway while training programs are being developed to support a national deployment to be completed in

14 Weather Systems Upgrade Program NAV CANADA is undertaking a major upgrade to the weather reporting infrastructure, by taking an integrated approach to replacement of AWOS, weather cameras, anemometers and temperature sensors. It will provide for more accurate and reliable reporting of essential aviation weather information. Implementation of this program began in AWOS (Automated Weather Observation System) Description: Legacy AWOS provided sky condition, visibility, precipitation, temperature, dew point, wind, pressure and ice accretion data for weather reports and forecasts at 72 sites. These older systems were aging and becoming increasingly difficult and costly to maintain. A replacement initiative, now completed, has introduced new, more-advanced AWOS that meet regulatory sensor accuracy requirements. Customer Benefits: More reliable and accurate provision of METAR/SPECI will increase airport accessibility and improve safety. The new AWOS are designed to report thunderstorms and, where available, RVR information and use an ice-resistant anemometer to report wind speed and direction during freezing precipitation, freezing fog, and wet snow events. New AWOS are currently operational at 73 sites across the country through the legacy replacement project and another 17 have been installed through other projects. Two additional AWOS are currently undergoing the installation and commissioning process. Digital Weather Cameras Description: In 2008, NAV CANADA began installing new Digital Aviation Weather Cameras (WxCam) to replace the 22 existing analog camera systems and to expand the network. WxCam images are intended to be used as a supplement to existing weather information products. The new cameras have a 91 angle of view and provide improved higher resolution images that are updated every 10 minutes and distributed through a redesigned WxCam interface on the NAV CANADA Aviation Weather Web Site (AWWS). Customer Benefits: The colour images are updated every 10 minutes providing visual, near real-time information about weather for flight planning - a feature that is especially useful during marginal conditions and at sites commonly affected by localized weather phenomena. Currently, there are 160 sites with WxCams available on the AWWS. One site is awaiting reception of the reference images and these will be added once completed. More than 100 sites will be added by the end of Additionally, by the end of 2017, 66 AWOS sites will have a fourth camera installed to provide additional reference images. HWOS (Human Weather Observation System) 14

15 Description: In addition to the AWOS, NAV CANADA is in the process of installing HWOS at most human weather observing sites. HWOS provides quick, accurate and reliable weather reporting where manned weather observations are an integral part of aviation operations. The HWOS data entry system replaces the two legacy systems currently used to input weather observations (WinIDE and MIDS). HWOS also includes a set of updated sensors (including Ice Resistant Anemometers and Remote Digital Temperature Sensors and Displays) used in the AWOS that are directly linked to the data entry system. Centralized weather data from the HWOS conveniently interfaces with tower controller and flight service specialist working positions to provide real-time wind, altimeter, and other weather information on their touch screen display. This configuration replaces dedicated instrument displays and enhances the efficiency of the cab environment. NAV CANADA also launched an initiative to allow HWOS to incorporate a Limited Weather Information System (LWIS) capability outside of the hours of operations of part-time human reporting sites. This addition allows the HWOS installed at part-time human sites to issue an LWIS message (temperature, dew point, wind and altimeter) which is updated hourly. This LWIS message is available via the FIC, the ACC or the Aviation Weather Web Site (AWWS). Customer Benefits: The new data entry system provides a standardized system throughout the network which brings a reduction in support costs. It allows for direct ingestion of sensor data. This improves the quality and assurance of data that might otherwise be prone to human error. The LWIS feature provides access to essential weather information for take-off and landing 24 hours/day and 7 days/week, supporting the use of an IFR approach when a human weather observation is unavailable. Installation of the data entry system started during fall HWOS systems are currently operational. An additional two are undergoing or soon to undergo ORD. These two will complete the installation of the HWOS systems at all NAV CANADA observing sites. The three LWIS test sites (Red Lake, Pickle Lake and Powell River) were commissioned on July 4 th In addition, a modification release containing the LWIS capability has been implemented at a total of 38 sites. HWOS installed at part-time human sites since Fall 2014 had the LWIS capability activated during ORD. In total, this capability has now been implemented at 63 sites. Ice Resistant Anemometers Description: Anemometers are required at 176 staffed airport weather observation sites. Aging, conventional anemometers (rotating cups and wind vanes) will be replaced with heated, ice resistant, sonic probes that have no moving parts. Customer Benefits: These devices will provide more reliable and accurate wind direction and speed information for takeoff and landing. The same system will be used in the AWOS sites thereby realizing cost efficiencies. Installation is being done in concert with the rest of the integrated program and began in late summer

16 Remote Digital Temperature Sensors and Displays Description: Legacy equipment at 172 staffed airports is costly to maintain and requires observers to walk to the instrument s location to take readings. New digital sensors will facilitate the delivery of data directly to the observer. Customer Benefits: Reliable, timely and accurate temperature and dew point information will allow aviation weather observers to include the same information in their special weather reports (SPECI) as they do in their routine hourly reports (METAR). The same system is used in the AWOS, thereby realizing cost efficiencies. Installation began in summer 2010 and is being completed in concert with the rest of the integrated program. 16

Surveillance in Canadian Airspace Today and in the Future

Surveillance in Canadian Airspace Today and in the Future Surveillance in Canadian Airspace Today and in the Future Jeff Dawson Director, Standards and Procedures, NAV CANADA ATM Global, Dubai UAE - 5 October 2015 Outline NAV CANADA Overview Evolution of Canadian

More information

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS CNS/ATM/SG/1 Appendix C to the Report on Agenda Item 4 4C-1 APPENDIX C CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS First Edition Rev 2.0 TABLE OF CONTENTS Page 1. INTRODUCTION... 2 1.1

More information

ILS Replacement. ACI World Safety Seminar. 18 19 November 2008 Kempinski Hotel Beijing Lufthansa Centre

ILS Replacement. ACI World Safety Seminar. 18 19 November 2008 Kempinski Hotel Beijing Lufthansa Centre ILS Replacement Xiaosong Xiao, PhD Tetra Tech, Inc. Orlando, USA Contents: Ground-Based Navigation ILS Approach GNSS/SBAS Approach Comparisons between ILS and GNSS Example: Cost Analysis Between LAAS and

More information

ADS-B is intended to transform air traffic control by providing more accurate and reliable tracking of airplanes in flight and on the ground.

ADS-B is intended to transform air traffic control by providing more accurate and reliable tracking of airplanes in flight and on the ground. ADS-B is intended to transform air traffic control by providing more accurate and reliable tracking of airplanes in flight and on the ground. New Air Traffic Surveillance Technology Air traffic service

More information

Space Based ADS-B. Transforming the Way you See the Sky March, 2015. ken.mclean@aireon.com COPYRIGHT 2014 AIREON LLC. ALL RIGHTS RESERVED.

Space Based ADS-B. Transforming the Way you See the Sky March, 2015. ken.mclean@aireon.com COPYRIGHT 2014 AIREON LLC. ALL RIGHTS RESERVED. Space Based ADS-B Transforming the Way you See the Sky March, 2015 ken.mclean@aireon.com Enabling Operational Performance Communication Performance Airspace / Environment Surveillance 2 Today s Oceanic

More information

Remote Tower Solutions. BY SEARIDGE TECHNOLOGIES AND NAVCANatm. The cost-effective alternative for airport monitoring and control

Remote Tower Solutions. BY SEARIDGE TECHNOLOGIES AND NAVCANatm. The cost-effective alternative for airport monitoring and control Remote Tower Solutions BY SEARIDGE TECHNOLOGIES AND NAVCANatm The cost-effective alternative for airport monitoring and control Advancing Current Methods of Operations Geographic location, low air traffic

More information

Iridium Venture Offers to Track Planes

Iridium Venture Offers to Track Planes Iridium Venture Offers to Track Planes Aireon Service, in Emergencies, Would Fill in Gaps in Radar By ANDY PASZTOR Sept. 21, 2014 10:03 p.m. ET The air-traffic control tower at Kuala Lumpur International

More information

Tuesday, March 18, 2014 4:00 p.m. 5:30 p.m. MODERATED BY: Carey Miller Universal Avionics Systems Corp.

Tuesday, March 18, 2014 4:00 p.m. 5:30 p.m. MODERATED BY: Carey Miller Universal Avionics Systems Corp. Avionics Tuesday, March 18, 2014 4:00 p.m. 5:30 p.m. MODERATED BY: Carey Miller Universal Avionics Systems Corp. International Operators Conference Tampa, FL March 17 20, 2014 Previous NBAA IOC s 2013

More information

Air Traffic Management Services Plan 2012-2017

Air Traffic Management Services Plan 2012-2017 Air Traffic Management Services Plan 2012-2017 Airservices Australia 2012 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced by any process

More information

Direct Approach Consulting Inc.

Direct Approach Consulting Inc. Direct Approach Consulting Inc. Flight Procedure Design Your best approach for: safety operational efficiency maximizing revenue Direct Approach Direct Approach is a Canadian based company providing instrument

More information

Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University August 10-11. Federal Aviation Administration

Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University August 10-11. Federal Aviation Administration Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University Suspending Current Belief Current practices for air traffic control, procedures and separation will not

More information

http://www.nats.aero/rlat/

http://www.nats.aero/rlat/ Reduced Lateral Separation RLATSM, Airline Briefing This guidance brief highlights the key aspects and details appropriate official publications supporting RLatSM implementation. NATS has also produced

More information

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out White Paper Doc No.: WHTP-2013-14-05 Revised, October 2014 Safely guiding pilots and their passengers worldwide for

More information

CNS/ATM SYSTEMS IN INDIA

CNS/ATM SYSTEMS IN INDIA CNS/ATM SYSTEMS IN INDIA Presentation at ICG02 4 th Sept-7 th Sept 2007, Bangalore M.IRULAPPAN General Manager (GNSS) Over Indian Airspace (AAI) provides Air navigation services (ANS) infrastructure Air

More information

Performance-based Navigation and Data Quality

Performance-based Navigation and Data Quality ICAO APAC AAITF/8 Performance-based Navigation and Data Quality A Commercial Data Supplier View Bill Kellogg International Relations May 6-10, 2013 Ulaanbaatar, Mongolia Jeppesen Proprietary - Copyright

More information

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014 SESAR Air Traffic Management Modernization Honeywell Aerospace Advanced Technology June 2014 Honeywell in NextGen and SESAR Honeywell active in multiple FAA NextGen projects ADS-B Surface Indicating and

More information

EPN, seminar AFIS, september 2013 Instrument approach procedures, PBN, GNSS

EPN, seminar AFIS, september 2013 Instrument approach procedures, PBN, GNSS EPN, seminar AFIS, september 2013 Instrument approach procedures, PBN, GNSS By Frédéric BOISARD, AFIS-O at Cholet LFOU Thanks to Mrs Morgane BARDIEUX (DGAC DSAC/O) and to Mrs Corinne BOUSQUET (DGAC - DSNA/DTI)

More information

IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN)

IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN) REPUBLIC OF CYPRUS MINISTRY OF COMMUNICATIONS AND WORKS CHARTING, OBSTACLES AND PROCEDURES UNIT DEPARTMENT OF CIVIL AVIATION NICOSIA 1429 IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN) ROADMAP FOR

More information

Evolution in Regional Aircraft Avionics

Evolution in Regional Aircraft Avionics Evolution in Regional Aircraft Avionics November, 2008 Agenda Evolution in Requirements from Takeoff to Touchdown Flight Deck Evolution Overview Communication Navigation Surveillance Displays and Situational

More information

AERONAUTICAL INFORMATION CIRCULAR 26/15

AERONAUTICAL INFORMATION CIRCULAR 26/15 AERONAUTICAL INFORMATION CIRCULAR 26/15 TRIAL IMPLEMENTATION OF 25 NAUTICAL MILE LATERAL SEPARATION MINIMUM IN THE ICAO NORTH ATLANTIC REGION Introduction (Supersedes AIC 18/15) As notified by State letter

More information

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)

COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP) International Civil Aviation Organization WORKING PAPER 26/1/10 English and Spanish only 1 COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP) EIGHTH MEETING Montréal, 1 to 12 February 2010 Agenda Item

More information

GENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS

GENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS GENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS 1. INTRODUCTION Navigation technologies with precision approach and landing systems, for civilian and military purposes, enable aircrafts to perform their

More information

( T A C T ) C A ) I A

( T A C T ) C A ) I A Air Traffic Control (ATC) AIRCOM Services and System Solutions Portfolio The SITA ATC Datalink and Voice Solutions enable Air Navigation Service Providers to deliver safety and efficiency benefits to equipped

More information

Australian Enhanced Flight Tracking Evaluation Performance Report. August 2015

Australian Enhanced Flight Tracking Evaluation Performance Report. August 2015 Australian Enhanced Flight Tracking Evaluation Performance Report August 2015 Contents 1.0 Executive Summary... 1 2.0 Background... 3 3.0 Evaluation Outline and Objectives... 5 3.1 Concept of Operations...

More information

C-130 Fleet CNS/ATM Solutions

C-130 Fleet CNS/ATM Solutions C-130 Fleet CNS/ATM Solutions Steve Knoblock Lockheed Martin Flight Operations Stephen.a.knoblock@lmco.com 770-351-6353 INFORMATION CONTAINED IN THIS BRIEFING IS FOR REFERENCE PURPOSES ONLY AND DOES NOT

More information

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION

PRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION EUROPEAN COMMISSION PRESENTATION Patrick Ky Executive Director EUROPEAN COMMISSION WHY SESAR? EUROPEAN COMMISSION EUROPEAN CHALLENGES: Capacity: Air Traffic to double by 2030 Safety: Improvements linked

More information

FAA Familiarization Briefing

FAA Familiarization Briefing FAA Familiarization Briefing Presented by: Kathryn Vernon Presented to: Regional Administrator Northwest Mountain Region Oregon Congressional Staff Presented on: March 13, 2015 FAA Statistics National

More information

WHICH AIR TRAFFIC CONTROLLER TO CONTACT

WHICH AIR TRAFFIC CONTROLLER TO CONTACT WHICH AIR TRAFFIC CONTROLLER TO CONTACT 1. Introduction This article is written in order to explain to all beginners in the IVAO network the basics for any pilot to contact the correct air traffic controller.

More information

Aurora Air Traffic Management System

Aurora Air Traffic Management System redefining the way people work, learn and live Aurora Air Traffic Management System White Paper ADACEL: 2013 Adacel TM Inc. Information in this document is subject to change without notice. This document

More information

Título ponencia: Helicopter IFP. Point-in-Space (PinS)

Título ponencia: Helicopter IFP. Point-in-Space (PinS) Título ponencia: Helicopter IFP. Point-in-Space (PinS) Organizado por: Index Introduction Helicopter IFP A/C Certification requirements GNSS Certified rotorcrafts Most relevant projects in Europe Introduction

More information

Flight information that keeps pilots a step ahead.

Flight information that keeps pilots a step ahead. Integrated Flight Information system Flight information that keeps pilots a step ahead. At Rockwell Collins, we re ushering in the era of the truly paperless flight deck while providing a higher level

More information

A Strategic Vision of Air Traffic Management in New Zealand to 2025

A Strategic Vision of Air Traffic Management in New Zealand to 2025 A Strategic Vision of Air Traffic Management in New Zealand to 2025 » contents Vision 4 Introduction 5 Stakeholders 6 Metrics 8 Hierarchy of documents 9 Air traffic enabling 10 Airspace management 16 ATM

More information

AVIATION INVESTIGATION REPORT A02P0004 OPERATING IRREGULARITY

AVIATION INVESTIGATION REPORT A02P0004 OPERATING IRREGULARITY AVIATION INVESTIGATION REPORT A02P0004 OPERATING IRREGULARITY NAV CANADA COMMUNICATIONS EQUIPMENT FAILURE VANCOUVER AREA CONTROL CENTRE 04 JANUARY 2002 The Transportation Safety Board of Canada (TSB) investigated

More information

Global Data Center. Worldwide Aircraft Communications and Flight Support Services

Global Data Center. Worldwide Aircraft Communications and Flight Support Services Global Data Center Worldwide Aircraft Communications and Flight Support Services Your 24-hour partner for flight support services Keeping you in touch with your world The leader in worldwide datalink communications

More information

What is NextGen? NextGen is more than just a. Single project It is the integration of many projects, concepts, and technologies.

What is NextGen? NextGen is more than just a. Single project It is the integration of many projects, concepts, and technologies. Single project It is the integration of many projects, concepts, and technologies. Program plan It is the integration of many program plans, some new and some ongoing, to deliver new service capabilities

More information

Appendice 1 al Regolamento ENAC ATSEP Basic training Shared

Appendice 1 al Regolamento ENAC ATSEP Basic training Shared Regolamento ENAC ATSEP Appendici Pag. 1 Appendice 1 al Regolamento ENAC ATSEP Basic training Shared Subject 1: INDUCTION TOPIC 1 BASIND Induction Sub-topic 1.1 BASIND Training and Assessment Overview Sub-topic

More information

Transport Spectrum Tune-Up 2009. Aviation Spectrum Issues. Eddy D Amico, RF Spectrum Manager Airservices Australia. November 2009

Transport Spectrum Tune-Up 2009. Aviation Spectrum Issues. Eddy D Amico, RF Spectrum Manager Airservices Australia. November 2009 Transport Spectrum Tune-Up 2009 Aviation Spectrum Issues Eddy D Amico, RF Spectrum Manager Airservices Australia November 2009 Overview Background Importance of radio spectrum for aviation Communications

More information

SITA AIRCOM Service (VHF & Satellite)

SITA AIRCOM Service (VHF & Satellite) SITA AIRCOM Service (VHF & Satellite) Safety in the Air 2009 Montego Bay, Jamaica, January 28-29, 2009 Adriana Mattos ATM Business Development Manager Latin America and Caribbean Agenda SITA Ground Network

More information

Air Traffic Management Solutions

Air Traffic Management Solutions Air Traffic Management Solutions Exelis Air Traffic Management Solutions For over 70 years, Exelis has been a trusted provider of mission critical products, solutions, and services that support civil air

More information

Pricing Framework July 2012

Pricing Framework July 2012 Pricing Framework July 2012 Contact us: Service and Pricing Team Airways New Zealand PO Box 294 Wellington New Zealand servicefeedback@airways.co.nz www.airways.co.nz Contents 1 Introduction 4 1.1 The

More information

12 AERO Second-Quarter 2003 April CAPT. RAY CRAIG 737 CHIEF PILOT FLIGHT OPERATIONS BOEING COMMERCIAL AIRPLANES

12 AERO Second-Quarter 2003 April CAPT. RAY CRAIG 737 CHIEF PILOT FLIGHT OPERATIONS BOEING COMMERCIAL AIRPLANES CAPT. RAY CRAIG 737 CHIEF PILOT FLIGHT OPERATIONS BOEING COMMERCIAL AIRPLANES DREW HOUCK ASSOCIATE TECHNICAL FELLOW FLIGHT DECK DISPLAYS BOEING COMMERCIAL AIRPLANES ROLAN SHOMBER ASSOCIATE TECHNICAL FELLOW

More information

International Civil Aviation Organization. The Third Meeting of the Regional ATM Contingency Plan Task Force (RACP/TF/3)

International Civil Aviation Organization. The Third Meeting of the Regional ATM Contingency Plan Task Force (RACP/TF/3) International Civil Aviation Organization RACP/TF/3 WP06 12-15/11/2013 The Third Meeting of the Regional ATM Contingency Plan Task Force (RACP/TF/3) Bangkok, Thailand, 12 15 November 2013 Agenda Item 4:

More information

Ref.: AN 13/2.5-09/45 19 June 2009

Ref.: AN 13/2.5-09/45 19 June 2009 International Civil Aviation Organization Organisation de l aviation civile internationale Organización de Aviación Civil Internacional Международная организация гражданской авиации Tel.: +1 (514) 954-6711

More information

Corporate Report COUNCIL DATE: March 31, 2008

Corporate Report COUNCIL DATE: March 31, 2008 Corporate Report COUNCIL DATE: March 31, 2008 NO: R046 REGULAR COUNCIL TO: Mayor & Council DATE: March 26, 2008 FROM: City Solicitor FILE: 0220-07 SUBJECT: Nav Canada Airspace Procedure Changes and Direct

More information

ADS-B NRA deployment by DSNA

ADS-B NRA deployment by DSNA Direction Générale Direction de la Technique et Systèmes bord de Présenté par DTI/SO/3ES ADSB NRA deployment by DSNA CASCADE Workshop ADSB implementation plans Operational implementation ADSB NRA in la

More information

Federal Aviation Administration Report on NextGen Performance Metrics Pursuant to FAA Modernization and Reform Act of 2012, H.R. 658, Section 214 2013 Introduction The Next Generation Air Transportation

More information

Area Navigation (RNAV)/Wide Area Augmentation System (WAAS) Instrument Approach Procedures (IAP s) and the New Charting Format.

Area Navigation (RNAV)/Wide Area Augmentation System (WAAS) Instrument Approach Procedures (IAP s) and the New Charting Format. PURPOSE. Area Navigation (RNAV)/Wide Area Augmentation System (WAAS) Instrument Approach Procedures (IAP s) and the New Charting Format. [REVISED 1/5/00] Instrument procedures in the first half of the

More information

Background on Airspace

Background on Airspace Background on Airspace There are six classifications of airspace in the United States; A, B, C, D, E, and G. Class A is the most restrictive and Class G the least restrictive. They can be categorized as:

More information

Air Traffic Management. Steve Bradford Chief Scientist Architecture & NextGen Development April 22, 2013

Air Traffic Management. Steve Bradford Chief Scientist Architecture & NextGen Development April 22, 2013 Air Traffic Management Steve Bradford Chief Scientist Architecture & NextGen Development April 22, 2013 Trajectory Operations: Transformation Procedural Based Control: Control on Where We Think the Aircraft

More information

Block 0: Capabilities within our Grasp

Block 0: Capabilities within our Grasp Block 0: Capabilities within our Grasp 1 ICAO Block Upgrades Assumptions and Constraints Current ATM infrastructure and procedures will not support forecasted traffic growth Implementation of major ATM

More information

NAMIBIAN RADIO LICENSE VALIDATION

NAMIBIAN RADIO LICENSE VALIDATION NAMIBIAN RADIO LICENSE VALIDATION Introduction This procedure is provided as a guide for applicants wishing to complete a Namibian Radio license validation, a requirement of a Namibian Pilot License Validation.

More information

Air Traffic Management

Air Traffic Management Air Traffic Management Transforming Air Traffic Management T rans f orming A ir Today s airspace users are grappling with the air traffic control system s inability to manage an ever-growing amount of

More information

Enhancing Airspace Efficiency and Capacity in the Asia Pacific Region

Enhancing Airspace Efficiency and Capacity in the Asia Pacific Region Enhancing Airspace Efficiency and Capacity in the Asia Pacific Region ABSTRACT The Asia Pacific region currently has a market share of 30 per cent of the world s total number of passengers per kilometre

More information

Iridium Update. Cross Polar Working Group. Mike Hooper Senior Business Manager - Aviation 05/12/15

Iridium Update. Cross Polar Working Group. Mike Hooper Senior Business Manager - Aviation 05/12/15 Iridium Update Cross Polar Working Group Mike Hooper Senior Business Manager - Aviation 05/12/15 Iridium - Unique Global Network 66 cross-linked, low earth orbit (LEO) satellites Only fully global voice

More information

CIVIL AVIATION REQUIREMENTS SECTION 9 AIR SPACE AND AIR TRAFFIC MANAGEMENT SERIES 'D' PART VI

CIVIL AVIATION REQUIREMENTS SECTION 9 AIR SPACE AND AIR TRAFFIC MANAGEMENT SERIES 'D' PART VI GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJANG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 9 AIR SPACE AND AIR TRAFFIC MANAGEMENT SERIES 'D'

More information

Título ponencia: RNP APCH Implementation

Título ponencia: RNP APCH Implementation Título ponencia: RNP APCH Implementation Organizado por: Index Introduction RNP APCH implementation process PBN Europe plans Introduction RNP APCH Without vertical guidance With vertical guidance LNAV

More information

A. Amendments to AMC/GM to Part-FCL

A. Amendments to AMC/GM to Part-FCL Anne I to ED Decision 2016/008/R Acceptable Means of Compliance and Guidance Material to Part-FCL (PBN) and Part-ARA (PBN, ARA.MED) A. Amendments to AMC/GM to Part-FCL 1. A new GM2 FCL.010 is inserted

More information

SYSTEM GLOBAL NAVIGATION SATELLITE SYSTEM LANDING TECHNOLOGY/PRODUCT DEVELOPMENT

SYSTEM GLOBAL NAVIGATION SATELLITE SYSTEM LANDING TECHNOLOGY/PRODUCT DEVELOPMENT GLOBAL NAVIGATION SATELLITE SYSTEM LANDING SYSTEM The aviation industry is developing a new positioning and landing system based on the Global Navigation Satellite System (GNSS). The GNSS landing system

More information

Aircraft Tracking & Flight Data Recovery

Aircraft Tracking & Flight Data Recovery Airframer view Presented by: Claude Pichavant Aircraft Tracking & Flight Data Recovery Aircraft Tracking & Flight Data Recovery Airbus has contributed to the Aircraft Tracking Task Force (ATTF), to the

More information

Policy Regarding Datalink Communications Recording Requirements. AGENCY: Federal Aviation Administration (FAA), Department of Transportation (DOT).

Policy Regarding Datalink Communications Recording Requirements. AGENCY: Federal Aviation Administration (FAA), Department of Transportation (DOT). [4910-13] DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Parts 91, 121, 125, and 135 [Docket No. FAA 2015-0289] Policy Regarding Datalink Communications Recording Requirements AGENCY:

More information

PBN Aeronautical Charts and Procedure Design

PBN Aeronautical Charts and Procedure Design PBN Aeronautical Charts and Procedure Design Raúl A. Martínez Díaz RO/AIM rmartinez@icao.int ICAO NACC 05 May 2015 Topics 1. AIS/AIM 2. Data flow 3. ICAO PBN Documents 4. Procedures design 5. PBN Aeronautical

More information

REPUBLIC OF INDONESIA MINISTRY OF TRANSPORTATION CIVIL AVIATION SAFETY REGULATION (C.A.S.R)

REPUBLIC OF INDONESIA MINISTRY OF TRANSPORTATION CIVIL AVIATION SAFETY REGULATION (C.A.S.R) REPUBLIC OF INDONESIA MINISTRY OF TRANSPORTATION CIVIL AVIATION SAFETY REGULATION (C.A.S.R) PART 170 AIR TRAFFIC RULES LAMPIRAN KEPUTUSAN MENTERI PERHUBUNGAN NOMOR : KM 14 Year 2009 TANGGAL : 16 Feb 2009

More information

INITIAL TEST RESULTS OF PATHPROX A RUNWAY INCURSION ALERTING SYSTEM

INITIAL TEST RESULTS OF PATHPROX A RUNWAY INCURSION ALERTING SYSTEM INITIAL TEST RESULTS OF PATHPROX A RUNWAY INCURSION ALERTING SYSTEM Rick Cassell, Carl Evers, Ben Sleep and Jeff Esche Rannoch Corporation, 1800 Diagonal Rd. Suite 430, Alexandria, VA 22314 Abstract This

More information

8-1 Chapter 8 Radio Operations: Aviation Spoken Here

8-1 Chapter 8 Radio Operations: Aviation Spoken Here 8-1 Chapter 8 Radio Operations: Aviation Spoken Here Radio Technique 1. [8-2/1/1] Using the radio is no great mystery. When transmitting, hold the radio close to your. A. mouth B. ear C. tongue VHF Transmitions

More information

What, Why and How. Hosted Payloads: A guide to commercially hosted government payloads from the Hosted Payload Alliance. www.hostedpayloadalliance.

What, Why and How. Hosted Payloads: A guide to commercially hosted government payloads from the Hosted Payload Alliance. www.hostedpayloadalliance. Hosted Payloads: What, Why and How A guide to commercially hosted government payloads from the Hosted Payload Alliance The Hosted Payload Alliance (HPA) is a satellite industry alliance formed in 2011

More information

Training program for S2 (TWR) rating

Training program for S2 (TWR) rating Training program for S2 (TWR) rating Introduction This is the official Vatsim Scandinavia training program for students training for the TWR (S2) Rating. Each mentor is expected to take his student through

More information

Workpackages. This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage.

Workpackages. This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage. Workpackages This view provides the list of the SESAR Workpackages More information can be obtained by selecting a Workpackage. CODE TITLE 03.00 Global Co-ordination and Management 03.01 Validation Infrastructure

More information

Doc 9849 AN/457. Approved by the Secretary General and published under his authority. First Edition 2005. International Civil Aviation Organization

Doc 9849 AN/457. Approved by the Secretary General and published under his authority. First Edition 2005. International Civil Aviation Organization Doc 9849 AN/457 Global Navigation Satellite System (GNSS) Manual Approved by the Secretary General and published under his authority First Edition 2005 International Civil Aviation Organization AMENDMENTS

More information

Area Navigation (RNAV) and Required Navigation Performance (RNP)

Area Navigation (RNAV) and Required Navigation Performance (RNP) Area Navigation (RNAV) and Required Navigation Performance (RNP) Program Overview Presented to: CDA Workshop By: Bruce Tarbert RNAV and RNP Group Date: January 19,2006 Roadmap for Performance-Based Navigation

More information

Traffic Flow Management. December 2010

Traffic Flow Management. December 2010 Traffic Flow Management December 2010 TRAFFIC MANAGEMENT CENTERS 2 3 CFMU (EUROCONTROL) 4 CCFMEX 5 BOGOTA ATFM 6 BRAZIL ATFM 7 JAPAN ATFM 8 9 Evolution of Traffic Flow Management 1960 s Ground stop programs

More information

Providing Safety and Reliability with PBN Guy Greider HUGHES PROPRIETARY

Providing Safety and Reliability with PBN Guy Greider HUGHES PROPRIETARY Providing Safety and Reliability with PBN Guy Greider Layout plan for integrated fully supported low level PBN airspace Providing Safety and Reliability with PBN Helicopter Accident Rate Vertical Flight

More information

Benefits of Highly Predictable Flight Trajectories in Performing Routine Optimized Profile Descents: Current and Recommended Research

Benefits of Highly Predictable Flight Trajectories in Performing Routine Optimized Profile Descents: Current and Recommended Research Benefits of Highly Predictable Flight Trajectories in Performing Routine Optimized Profile Descents: Current and Recommended Research Environmental Working Group Operations Standing Committee 2009 Annual

More information

ASIA/PACIFIC REGIONAL PERFORMANCE-BASED NAVIGATION IMPLEMENTATION PLAN

ASIA/PACIFIC REGIONAL PERFORMANCE-BASED NAVIGATION IMPLEMENTATION PLAN INTERNATIONAL CIVIL AVIATION ORGANIZATION ASIA AND PACIFIC OFFICE ASIA/PACIFIC REGIONAL PERFORMANCE-BASED NAVIGATION IMPLEMENTATION PLAN VERSION 3.0 September 2011 1 RECORD OF AMENDMENT Version Activity

More information

Airspace. Chapter 14. Introduction

Airspace. Chapter 14. Introduction Chapter 14 Airspace Introduction The two categories of airspace are: regulatory and nonregulatory. Within these two categories there are four types: controlled, uncontrolled, special use, and other airspace.

More information

www.ibac.org IBAC Bulletin B00-2 Pacific Implementation of RVSM and RNP 10/50NM Lateral

www.ibac.org IBAC Bulletin B00-2 Pacific Implementation of RVSM and RNP 10/50NM Lateral www.ibac.org IBAC Bulletin B00-2 Subject: Pacific Implementation of RVSM and RNP 10/50NM Lateral Previous notification had been made regarding implementation of RVSM and RNP in the Pacific Region. This

More information

CHAPTER 6 AIRSPACE OPERATIONS. 6.1.1. Federal Aviation Administration (FAA) Coordination.

CHAPTER 6 AIRSPACE OPERATIONS. 6.1.1. Federal Aviation Administration (FAA) Coordination. CHAPTER 6 6.1. Pre-mission Coordination. AIRSPACE OPERATIONS 6.1.1. Federal Aviation Administration (FAA) Coordination. 6.1.1.1. Responsibilities. The Air Traffic Control System Command Center (ATCSCC)

More information

Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India

Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India Communication, Navigation, Surveillance (CNS) engineers and executives of Airports Authority of India CNS Officers Guild 1 Airports Authority of India (AAI) is entrusted with responsibility of providing

More information

Rockwell Collins ARINC MultiLink SM flight tracking service

Rockwell Collins ARINC MultiLink SM flight tracking service Rockwell Collins ARINC MultiLink SM flight tracking service Background Each time a highly publicized event involving a commercial airline occurs, the aviation community begins to clamor for automated transponders

More information

SESAR BENEFITS: TOMORROW STARTS NOW

SESAR BENEFITS: TOMORROW STARTS NOW 1 SESAR BENEFITS: TOMORROW STARTS NOW Integrating Rotorcraft into future European ATM Concepts Fabio Mangiaracina - SICTA (ENAV Group), Philippe Rollet - EHA The European Helicopter Association (EHA) The

More information

DEVELOPMENT OF TRAINING PROGRAMME FOR TECHNICAL STAFF PROVIDING METEOROLOGICAL SERVICES FOR AIR NAVIGATION

DEVELOPMENT OF TRAINING PROGRAMME FOR TECHNICAL STAFF PROVIDING METEOROLOGICAL SERVICES FOR AIR NAVIGATION SWAZIALAND CIVIL AVIATION AUTHORITY Advisory Circular CAA-AC-MET 003A June 2014 DEVELOPMENT OF TRAINING PROGRAMME FOR TECHNICAL STAFF PROVIDING METEOROLOGICAL SERVICES FOR AIR NAVIGATION 1.0 PURPOSE 1.1.

More information

AOPA Comments to FAA-2007-29305 Page 2 March 3, 2008

AOPA Comments to FAA-2007-29305 Page 2 March 3, 2008 Docket Management Facility U.S. Department of Transportation 1200 New Jersey Avenue, SE West Building Ground Floor, Room W12-140 Washington, DC 20590-0001 Re: Docket Number FAA-2007-29305 Notice of Proposed

More information

Pilot Professionalism It Isn t Just For The Big Guys

Pilot Professionalism It Isn t Just For The Big Guys Pilot Professionalism It Isn t Just For The Big Guys Earl F Weener Board Member American Bonanza Society Convention & Trade Show Buffalo, NY September 25, 2010 Pilot Professionalism - NTSB Interest Lack

More information

Snohomish County Airport Paine Field

Snohomish County Airport Paine Field Snohomish County Airport Paine Field PUGET SOUND REGIONAL COUNCIL AND THE REGIONAL AIRPORT SYSTEM The Puget Sound Regional Council (PSRC) is the planning agency for the central Puget Sound region, which

More information

Thien Ngo Federal Aviation Administration Washington, DC 20591 thien.ngo@faa.gov

Thien Ngo Federal Aviation Administration Washington, DC 20591 thien.ngo@faa.gov OCAT The Oceanic Conflict Advisory Trial Robert L. Heligman Lockheed Martin Information Systems & Global Solutions 9221 Corporate Boulevard, Rockville MD 20850 bob.heligman@lmco.com Thien Ngo Federal Aviation

More information

Annual SERC Research Review (ASRR)

Annual SERC Research Review (ASRR) Annual SERC Research Review (ASRR) Implementing the Next Generation Air Transportation System Victoria Cox Assistant Administrator for NextGen October 5, 2011 What is NextGen? NextGen is not a single program

More information

RTCA SC-214 / EUROCAE WG-78 Advanced Data Communication Baseline 2 Standards. Baseline 2 Tutorial. Melbourne (FL), March 2013

RTCA SC-214 / EUROCAE WG-78 Advanced Data Communication Baseline 2 Standards. Baseline 2 Tutorial. Melbourne (FL), March 2013 RTCA SC-214 / EUROCAE WG-78 Advanced Data Communication Baseline 2 Standards Baseline 2 Tutorial, March 2013 Objectives Provide tutorial on SC214/WG78 Baseline 2 To get operational feedback from Users

More information

2014 NIFA CRM Contestant Briefing Guide San Diego, California

2014 NIFA CRM Contestant Briefing Guide San Diego, California 2014 NIFA CRM Contestant Briefing Guide San Diego, California Region 2 SAFECON 2014 November 12 15 This document supports the 2014 NIFA Collegiate Cockpit Resource Management Simulation and is not for

More information

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking

THE SESAR CONCEPT AND SWIM. David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking THE SESAR CONCEPT AND SWIM David Bowen Head of ATM Operations & Systems SESAR Joint Undertaking 1 Satellite based Communication & Navigation Advanced Flexible Use of Airspace Integrated Departure & Arrival

More information

ICAO Standard Phraseology A Quick Reference Guide for Commercial Air Transport Pilots

ICAO Standard Phraseology A Quick Reference Guide for Commercial Air Transport Pilots ICAO Standard Phraseology A Quick Reference Guide for Commercial Air Transport Pilots Communication error is the biggest causal factor in both level busts and runway incursions in Europe. This document

More information

Airspace Change Communications and Consultation Protocol Protocol

Airspace Change Communications and Consultation Protocol Protocol Airspace Change Communications and Consultation Protocol Protocol A voluntary protocol of the aviation industry June 2015 Preface The primary duty of the aviation industry in Canada is to ensure the safety

More information

ADS-B and Multilateration Integration in the U.S. The Role of the Integrator

ADS-B and Multilateration Integration in the U.S. The Role of the Integrator ADS-B and Multilateration Integration in the U.S. The Role of the Integrator John Kefaliotis Vice President Next Generation Air Transportation Systems ICAO/FAA Workshop on ADS-B and Multilateration Implementation

More information

LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents

LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL Introduction of Standard Instrument Departure Procedures to Routes in the London Terminal Control Area Sponsor Consultation 2016 Executive Summary and About

More information

ICAO-ENAC PBN PROCEDURE DESIGN COURSE

ICAO-ENAC PBN PROCEDURE DESIGN COURSE ICAO-ENAC PBN PROCEDURE DESIGN COURSE REFERENCE AND TITLE Performance Based Navigation Concept : Procedure design course for PBN applications: RNAV1 SID and STAR, RNP APCH (Non Precision Approach and APV

More information

CHARTING THE FUTURE. The Air Navigation System Plan

CHARTING THE FUTURE. The Air Navigation System Plan CHARTING THE FUTURE The Air Navigation System Plan SEPTEMBER 2015 CONTENTS FOREWORD 1 INTRODUCTION 1 1 PERFORMANCE BASED NAVIGATION (PBN) 3 2 COMMUNICATIONS 7 3 SURVEILLANCE 11 4 AIR TRAFFIC MANAGEMENT

More information

1 INTRODUCTION... 1 2 KEY CONSIDERATIONS IN CAPITAL PLANNING... 6 3 CAPITAL INVESTMENT PLAN SUMMARY... 9

1 INTRODUCTION... 1 2 KEY CONSIDERATIONS IN CAPITAL PLANNING... 6 3 CAPITAL INVESTMENT PLAN SUMMARY... 9 1 INTRODUCTION... 1 1.1 The Capital Investment Plan...1 1.2 Strategic Priorities and the CIP...2 1.3 Important Factors Affecting Planning for the Future...3 1.3.1 Economic Considerations...3 1.3.2 Air

More information

IMPLEMENTATION OF ADS-C & CPDLC SERVICES

IMPLEMENTATION OF ADS-C & CPDLC SERVICES IMPLEMENTATION OF ADS-C & CPDLC SERVICES Automation System and Integrated Telecommunications for Air Navigation Services/System-Wide Information Management (SWIM) Workshop (AUTO/SWIM) Mexico City, Mexico,

More information

The International Scenario

The International Scenario National ADS-B Implementation Programme 1 The International Scenario The ADS-B implementation programme is carried out in an European context ü Related to SESAR Implementation Package 1 (IP1) 2008 2013

More information

IMPACT OF ADS-B ON CONTROLLER WORKLOAD: RESULTS FROM ALASKA S CAPSTONE PROGRAM

IMPACT OF ADS-B ON CONTROLLER WORKLOAD: RESULTS FROM ALASKA S CAPSTONE PROGRAM IMPACT OF ADS-B ON CONTROLLER WORKLOAD: RESULTS FROM ALASKA S CAPSTONE PROGRAM Arthur P. Smith and Anand D. Mundra, The MITRE Corporation, McLean, VA Abstract The Capstone program introduced avionics in

More information

Implementation Guidance of Aeronautical Meteorological Forecaster Competency Standards

Implementation Guidance of Aeronautical Meteorological Forecaster Competency Standards Implementation Guidance of Aeronautical Meteorological Forecaster Competency Standards The following guidance is supplementary to the AMP competency Standards endorsed by Cg-16 in Geneva in May 2011. Implicit

More information

CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT

CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT 7.1.1 Definition of Resource Airspace management is defined as directing, controlling, and handling flight operations in the volume of air that overlies the