C-130 Fleet CNS/ATM Solutions
|
|
- Georgina Hancock
- 8 years ago
- Views:
Transcription
1 C-130 Fleet CNS/ATM Solutions Steve Knoblock Lockheed Martin Flight Operations INFORMATION CONTAINED IN THIS BRIEFING IS FOR REFERENCE PURPOSES ONLY AND DOES NOT NECESSARILY REFLECT THE LATEST AIRCRAFT MODEL(S) OR CONFIGURATION(S). THIS PRESENTATION IS FOR INFORMATION ONLY. NO US GOVERNMENT COMMITMENT TO SELL, LOAN, LEASE, CO-DEVELOP OR CO-PRODUCE DEFENSE ARTICLES OR SERVICES IS IMPLIED OR INTENDED.
2 Overview LM Aero Marietta has designed and tested several avionics packages which address Future Navigation Requirements Legacy C-130 glass cockpit upgrade Multi-national Program tested and undergoing retrofit for C-130H aircraft Adaptable to other C-130 types C-130J Block Upgrade program Phased approach in 2 Software Block builds to achieve full compliance
3 Mandate for Compliance Worldwide capacity is being stretched Global Economy continues to expand with aviation a key part Infrastructure is either outdated or non-existent Economics to maintain/replace legacy ground based navaids or radar systems is marginal Some locations (oceanic, polar, remote locations) are more advantageous for flight routing yet have no infrastructure to support increased traffic Technology allows for more flexibility, greener operations, and reduced costs Limited funds are better spent on expandable technologies than on outdated systems
4 Mandate for Compliance New/NextGen Aircraft are designed and built to use new technologies New/NextGen ground systems are designed and built to make use of the new technologies Older aircraft will become more and more of an outcast in the future Bottom Line: Either play by the new rules or you re out of the game
5 The Big Picture
6 The Parts C N S Communications: 8.33 Khz radios, CPDLC, VHF datalink, BLOS voice and data (HF, HFDL, Satcom (Inmarsat, Iridium) Navigation: Performance Based Navigation (PBN) for RNAV or RNP, RVSM, 4-D Nav (LNAV, VNAV, TNAV), P-ILS Surveillance: Enhanced Mode S Surveillance (EHS), TCAS, GPWS, TAWS, ADS-C and ADS-B A T M Ground Based Command and Control to perform Air Traffic Management Functions: CPDLC, Air Traffic Services (ATS), Airline (Airlift) Operations Center (AOC over ACARS)
7 Multi-National C-130H AMP Upgrade Highlights Glass cockpit upgrade based on the Rockwell Collins Flight2 System Dual CDU7000 Flight Management System Controls Honeywell SNU-764GU EGI with RAIM and SAASM GNLU-955M MMR with civil GPS (WAAS/LAAS upgradeable) Dual CMU-900 Comm Management Units Interfaces with VDL-2000 and HF-9550 for datalink operations Integrated displays for PFD, Navigation, and Digital Map Honeywell TPA-110A ETCAS, Universal Avionics TAWS Collins WXR-2100 Multiscan Radar and APS-85 Autopilot APX-119 transponder and 406Mhz ELT
8
9 Multi-National C-130H AMP Upgrade Highlights
10 C-130J Block 7 Highlights Architecture change from Honeywell CNI-SP to GE Aviation Flight Management System Architecture adapted from B-737 and common to USAF C-130AMP design Adds Dual Esterline CMA 5024 WAAS GPS receivers Worldwide RNAV and RNP operations Incorporates enhanced VNAV cues and coupling Expands worldwide database coverage for DP(SIDs), STARS, and approaches
11 C-130J Block 7 Highlights VNAV PATH Guidance VNAV Cueing commands FMS Mode, Deviation, commanded VVI, Target Speed and Altitude
12 C-130J Block 7 Highlights Approach and missed approach depicted
13 C-130J Block 8 Highlights Expands on Block 7 capabilities by improving pilot-vehicle interface (PVI) and implementing inherent system capabilities Expanded alerting and flight mode annunciations Enables LPV functions in CMA 5024 GPS Implements BARO-VNAV operations Adds datalink functionality and ADS-B/C CPDLC, ATS, and AOC Design achieves FANS-1A compliance
14 C-130J Block 8 Highlights Vertical Profile Display - New Overlay Option - Range tied to Nav display - Vertical Range selectable - New Special alert for Below Path - Altitude restrictions depicted - VNAV Phase, speed/alt targets, and commanded VVI displayed - Digital VDEV shown - Vertical Path predictor
15 C-130J Block 8 Highlights Baro Vnav - New FMA - New path deviation indication - New Special alert for Below Path BELOW PATH LPV RDY LPV - New FMA - Existing ILS path deviation indication - LPV READY Status - New CDI Source Label - Exisiting GCAS Mode 5 GLIDESLOPE callout
16 C-130J Block 8 Highlights
17 Bottom Line Legacy C-130 Summary Table C 130H CNS/ATM Capabilities CNS Criteria Category Example Legacy AMP d NAV MNPS NAT tracks RNP 10 (RNAV 10) PACOTS, WATRS, PACOTS, AFI RNAV 5 Europe, North Africa, SW Asia RNP 4 (datalink required) SOPAC (Australian/New Zealand FIR specific) RNAV 2 US Q and T routes RNAV 1 STARs, SIDs, RNAV DP RNP 1 RNAV(RNP) DP RNAV < 1 RNAV(GPS) LNAV only RNP 0.3 RNAV(GPS) LNAV only RNP<0.3 RNAV(RNP) LPV RNAV(GPS) LPV BARO VNAV RNAV(GPS) LNAV/VNAV RVSM Above FL 290 P ILS Schiphol NL = dependent on each version/operator
18 Bottom Line Legacy C-130 Summary Table C 130H CNS/ATM Capabilities CNS Criteria Category Example Legacy AMP d Comm Surveillance 8.33 Khz Europe Datalink AOC and ATS messaging CPDLC FANS Airspace TAWS/GPWS Mode S EHS Europe TCAS ADS C FANS Airspace Future Rqmt ABS B FAA 2020 Rqmt = dependent on each version/operator
19 Bottom Line C-130J Summary Table C 130J CNS/ATM Capabilities CNS Criteria Category Example NAV Block 6 and previous Block 7 Block 8 MNPS NAT tracks RNP 10 (RNAV 10) PACOTS, WATRS, PACOTS, AFI RNAV 5 Europe, North Africa, SW Asia RNP 4 (datalink required) SOPAC (Australian/New Zealand FIR specific) RNAV 2 US Q and T routes RNAV 1 STARs, SIDs, RNAV DP RNP 1 RNAV(RNP) DP RNAV < 1 RNAV(GPS) LNAV only RNP 0.3 RNAV(GPS) LNAV only RNP<0.3 RNAV(RNP) LPV RNAV(GPS) LPV BARO VNAV RNAV(GPS) LNAV/VNAV RVSM Above FL 290 P ILS Schiphol NL
20 Bottom Line C-130J Summary Table C 130J CNS/ATM Capabilities CNS Criteria Category Example Comm Surveillance Block 6 and previous Block 7 Block Khz Europe Datalink AOC and ATS messaging CPDLC FANS Airspace TAWS/GPWS Mode S EHS Europe TCAS ADS C FANS Airspace ABS B FAA 2020 Rqmt
21 Summary C-130 Legacy C-130H AMP design provides commonality, a modern digital architecture, and an integrated cockpit Delivers full RNAV and RNP capability down to 0.3nm Provides Cat 2 ILS and RNAV(GPS) approach capability to LNAV/VNAV minima FANS-1A capability Mode S EHS compliant Growth path to GLS and ADS-B
22 Summary C-130J C-130J Block 7 is a first step to CNS/ATM compliance Delivers full RNAV and RNP capability down to 0.3nm New FMS contains all terminal and approach procedures VNAV integration increased over Block 6 RNAV(GPS) approach capability to LNAV only minima with advisory VNAV
23 Summary C-130J C-130J Block 8 completes CNS/ATM compliance Approach capability expanded to include RNAV(GPS) to LPV and LNAV/VNAV minima Datalink implemented with AOC, ATS, and CPDLC ADS-C and ADS-B out implemented
24 Discussion
Tuesday, March 18, 2014 4:00 p.m. 5:30 p.m. MODERATED BY: Carey Miller Universal Avionics Systems Corp.
Avionics Tuesday, March 18, 2014 4:00 p.m. 5:30 p.m. MODERATED BY: Carey Miller Universal Avionics Systems Corp. International Operators Conference Tampa, FL March 17 20, 2014 Previous NBAA IOC s 2013
More informationEvolution in Regional Aircraft Avionics
Evolution in Regional Aircraft Avionics November, 2008 Agenda Evolution in Requirements from Takeoff to Touchdown Flight Deck Evolution Overview Communication Navigation Surveillance Displays and Situational
More informationAircraft Tracking & Flight Data Recovery
Airframer view Presented by: Claude Pichavant Aircraft Tracking & Flight Data Recovery Aircraft Tracking & Flight Data Recovery Airbus has contributed to the Aircraft Tracking Task Force (ATTF), to the
More informationhttp://www.nats.aero/rlat/
Reduced Lateral Separation RLATSM, Airline Briefing This guidance brief highlights the key aspects and details appropriate official publications supporting RLatSM implementation. NATS has also produced
More informationAERONAUTICAL INFORMATION CIRCULAR 26/15
AERONAUTICAL INFORMATION CIRCULAR 26/15 TRIAL IMPLEMENTATION OF 25 NAUTICAL MILE LATERAL SEPARATION MINIMUM IN THE ICAO NORTH ATLANTIC REGION Introduction (Supersedes AIC 18/15) As notified by State letter
More informationAustralian Enhanced Flight Tracking Evaluation Performance Report. August 2015
Australian Enhanced Flight Tracking Evaluation Performance Report August 2015 Contents 1.0 Executive Summary... 1 2.0 Background... 3 3.0 Evaluation Outline and Objectives... 5 3.1 Concept of Operations...
More information( T A C T ) C A ) I A
Air Traffic Control (ATC) AIRCOM Services and System Solutions Portfolio The SITA ATC Datalink and Voice Solutions enable Air Navigation Service Providers to deliver safety and efficiency benefits to equipped
More informationEPN, seminar AFIS, september 2013 Instrument approach procedures, PBN, GNSS
EPN, seminar AFIS, september 2013 Instrument approach procedures, PBN, GNSS By Frédéric BOISARD, AFIS-O at Cholet LFOU Thanks to Mrs Morgane BARDIEUX (DGAC DSAC/O) and to Mrs Corinne BOUSQUET (DGAC - DSNA/DTI)
More informationCAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS
CNS/ATM/SG/1 Appendix C to the Report on Agenda Item 4 4C-1 APPENDIX C CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS First Edition Rev 2.0 TABLE OF CONTENTS Page 1. INTRODUCTION... 2 1.1
More informationUnderstanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out
Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out White Paper Doc No.: WHTP-2013-14-05 Revised, October 2014 Safely guiding pilots and their passengers worldwide for
More informationALAMEDA DO AEROPORTO Caixa Postal, 227 - Maputo REGULATIONS NEW FORMAT FLIGHT PLAN
AERONAUTICAL INFORMATION CIRCULAR MOÇAMBIQUE INSTITUTO DE AVIAÇÃO CIVIL DE MOÇAMBIQUE DIRECÇÃO DOS SERVIÇOS DE NAVEGAÇÃO AÉREA AERONAUTICAL INFORMATION SERVICE Tel: (258) 21-465416 Fax: (258) 21-465415
More informationILS Replacement. ACI World Safety Seminar. 18 19 November 2008 Kempinski Hotel Beijing Lufthansa Centre
ILS Replacement Xiaosong Xiao, PhD Tetra Tech, Inc. Orlando, USA Contents: Ground-Based Navigation ILS Approach GNSS/SBAS Approach Comparisons between ILS and GNSS Example: Cost Analysis Between LAAS and
More informationFANS Over Iridium and Voice Solutions For the Cockpit & Cabin
FANS Over Iridium and Voice Solutions For the Cockpit & Cabin AEA Convention, Nashville, TN - March 14 th, 2014 Presented by Bruce Bell, Director Product Support Iridium Network Advantages True Global
More informationPerformance-based Navigation and Data Quality
ICAO APAC AAITF/8 Performance-based Navigation and Data Quality A Commercial Data Supplier View Bill Kellogg International Relations May 6-10, 2013 Ulaanbaatar, Mongolia Jeppesen Proprietary - Copyright
More informationFor More Information
THE ARTS CHILD POLICY CIVIL JUSTICE EDUCATION ENERGY AND ENVIRONMENT HEALTH AND HEALTH CARE INTERNATIONAL AFFAIRS NATIONAL SECURITY POPULATION AND AGING PUBLIC SAFETY SCIENCE AND TECHNOLOGY SUBSTANCE ABUSE
More information12 AERO Second-Quarter 2003 April CAPT. RAY CRAIG 737 CHIEF PILOT FLIGHT OPERATIONS BOEING COMMERCIAL AIRPLANES
CAPT. RAY CRAIG 737 CHIEF PILOT FLIGHT OPERATIONS BOEING COMMERCIAL AIRPLANES DREW HOUCK ASSOCIATE TECHNICAL FELLOW FLIGHT DECK DISPLAYS BOEING COMMERCIAL AIRPLANES ROLAN SHOMBER ASSOCIATE TECHNICAL FELLOW
More informationCNS/ATM SYSTEMS IN INDIA
CNS/ATM SYSTEMS IN INDIA Presentation at ICG02 4 th Sept-7 th Sept 2007, Bangalore M.IRULAPPAN General Manager (GNSS) Over Indian Airspace (AAI) provides Air navigation services (ANS) infrastructure Air
More informationMichael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University August 10-11. Federal Aviation Administration
Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University Suspending Current Belief Current practices for air traffic control, procedures and separation will not
More informationPolicy Regarding Datalink Communications Recording Requirements. AGENCY: Federal Aviation Administration (FAA), Department of Transportation (DOT).
[4910-13] DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Parts 91, 121, 125, and 135 [Docket No. FAA 2015-0289] Policy Regarding Datalink Communications Recording Requirements AGENCY:
More informationTítulo ponencia: RNP APCH Implementation
Título ponencia: RNP APCH Implementation Organizado por: Index Introduction RNP APCH implementation process PBN Europe plans Introduction RNP APCH Without vertical guidance With vertical guidance LNAV
More informationICAO FLIGHT PLAN MODIFICATIONS 2012
Aeronautical Information Circular Series A - 02/12 Page 1 Contact Post: Air Traffic Control the Netherlands Aeronautical Information Service P.O. Box 75200 1117 ZT Schiphol The Netherlands Tel: +31 (0)20
More informationIMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN)
REPUBLIC OF CYPRUS MINISTRY OF COMMUNICATIONS AND WORKS CHARTING, OBSTACLES AND PROCEDURES UNIT DEPARTMENT OF CIVIL AVIATION NICOSIA 1429 IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN) ROADMAP FOR
More informationSITA AIRCOM Service (VHF & Satellite)
SITA AIRCOM Service (VHF & Satellite) Safety in the Air 2009 Montego Bay, Jamaica, January 28-29, 2009 Adriana Mattos ATM Business Development Manager Latin America and Caribbean Agenda SITA Ground Network
More informationIMPLEMENTATION OF ADS-C & CPDLC SERVICES
IMPLEMENTATION OF ADS-C & CPDLC SERVICES Automation System and Integrated Telecommunications for Air Navigation Services/System-Wide Information Management (SWIM) Workshop (AUTO/SWIM) Mexico City, Mexico,
More informationAir Traffic Management. Steve Bradford Chief Scientist Architecture & NextGen Development April 22, 2013
Air Traffic Management Steve Bradford Chief Scientist Architecture & NextGen Development April 22, 2013 Trajectory Operations: Transformation Procedural Based Control: Control on Where We Think the Aircraft
More informationICAO 2012 Change Summary
ICAO 2012 Change Summary This dcument prvides an verview f the ICAO 2012 s. See the cmplete set f ICAO instructins here. ICAO FPL 2012 Change Overview Starting n vember 15, 2012, Filed Flight Plans must
More informationSpace Based ADS-B. Transforming the Way you See the Sky March, 2015. ken.mclean@aireon.com COPYRIGHT 2014 AIREON LLC. ALL RIGHTS RESERVED.
Space Based ADS-B Transforming the Way you See the Sky March, 2015 ken.mclean@aireon.com Enabling Operational Performance Communication Performance Airspace / Environment Surveillance 2 Today s Oceanic
More informationAIRBUS INDUSTRIE. Flight Operations Support - Customer Services Directorate
g e t t i n g t o g r i p s w i t h F A N S AIRBUS INDUSTRIE Flight Operations Support - Customer Services Directorate FANS Getting to grips with A Flight Operations View AIRBUS INDUSTRIE Note Should any
More informationA. Amendments to AMC/GM to Part-FCL
Anne I to ED Decision 2016/008/R Acceptable Means of Compliance and Guidance Material to Part-FCL (PBN) and Part-ARA (PBN, ARA.MED) A. Amendments to AMC/GM to Part-FCL 1. A new GM2 FCL.010 is inserted
More informationExclusively Offered With Our Strategic Partner. 2008 Falcon 7X SN 32
Exclusively Offered With Our Strategic Partner 2008 Falcon 7X SN 32 Aircraft Listing Details: Total Hours: 1882 Total Landings: 671 Engines: Pratt & Whitney PWC-307A #1 #2 #3 Total Hours: 1882 1882 1882
More informationPBN Aeronautical Charts and Procedure Design
PBN Aeronautical Charts and Procedure Design Raúl A. Martínez Díaz RO/AIM rmartinez@icao.int ICAO NACC 05 May 2015 Topics 1. AIS/AIM 2. Data flow 3. ICAO PBN Documents 4. Procedures design 5. PBN Aeronautical
More informationPAPER WORKING. International. Montréal, 12. (Presented by SUMMARY SARSAT. Appendix. C provides criteria. be undertaken. actions to 1. COSPAS-SAR 1.
International Civil Aviation Organization Global Tracking 2014-WP/6 7/5/14 WORKING PAPER MULTIDISCIPLINARY MEETING REGARDING GLOBAL TRACKING Montréal, 12 May to 13 May 2014 Agenda Item 1: Explore the need
More informationC-130 Recapitalization, Lockheed Martin Fleet Support Services
C-130 Recapitalization, Lockheed Martin Fleet Support Services Weldon Middleton Lockheed Martin / Fleet Support Services (work) 770 494-0670, (mobile) 678 446-7824 weldon.h.middleton@lmco.com INFORMATION
More informationTransport Spectrum Tune-Up 2009. Aviation Spectrum Issues. Eddy D Amico, RF Spectrum Manager Airservices Australia. November 2009
Transport Spectrum Tune-Up 2009 Aviation Spectrum Issues Eddy D Amico, RF Spectrum Manager Airservices Australia November 2009 Overview Background Importance of radio spectrum for aviation Communications
More informationAir Traffic Management
Air Traffic Management Transforming Air Traffic Management T rans f orming A ir Today s airspace users are grappling with the air traffic control system s inability to manage an ever-growing amount of
More informationCHANGE TO AERONAUTICAL INFORMATION MANUAL TO INCORPORATE NEW ICAO FLIGHT PLAN FILING REQUIREMENTS PLANNED EFFECTIVE DATE 11/15/2012
CHANGE TO AERONAUTICAL INFORMATION MANUAL TO INCORPORATE NEW ICAO FLIGHT PLAN FILING REQUIREMENTS PLANNED EFFECTIVE DATE 11/15/2012 1. PARAGRAPH NUMBER AND TITLE: 4-2-4. Aircraft Call Signs 4-6-1. Applicability
More informationCHAPTER 6 AIRSPACE OPERATIONS. 6.1.1. Federal Aviation Administration (FAA) Coordination.
CHAPTER 6 6.1. Pre-mission Coordination. AIRSPACE OPERATIONS 6.1.1. Federal Aviation Administration (FAA) Coordination. 6.1.1.1. Responsibilities. The Air Traffic Control System Command Center (ATCSCC)
More informationAvionics requirements for civil aircraft Edition 30/10/2013
Avionics requirements for civil aircraft Edition 30/10/2013 Civil aircraft Communication requirements Domain Programme Area VHF Com 8.33 KHZ Equipment The probability of the loss of voice communication
More informationSESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014
SESAR Air Traffic Management Modernization Honeywell Aerospace Advanced Technology June 2014 Honeywell in NextGen and SESAR Honeywell active in multiple FAA NextGen projects ADS-B Surface Indicating and
More informationIridium Update. Cross Polar Working Group. Mike Hooper Senior Business Manager - Aviation 05/12/15
Iridium Update Cross Polar Working Group Mike Hooper Senior Business Manager - Aviation 05/12/15 Iridium - Unique Global Network 66 cross-linked, low earth orbit (LEO) satellites Only fully global voice
More information2001 Cessna Citation CJ2 Serial Number: 525A-0033 Registration Number: F-HMSG AIRFRAME: 3,051 Total Time Since New 2,403 Landings
2001 Cessna Citation CJ2 Serial Number: 525A-0033 Registration Number: F-HMSG AIRFRAME: 3,051 Total Time Since New 2,403 Landings ENGINES: Williams FJ44-2C (3,500 TBO) Left: SN# 1069 Right: SN# 1070 3,051
More informationADS-B is intended to transform air traffic control by providing more accurate and reliable tracking of airplanes in flight and on the ground.
ADS-B is intended to transform air traffic control by providing more accurate and reliable tracking of airplanes in flight and on the ground. New Air Traffic Surveillance Technology Air traffic service
More informationSafety Management Challenges for Aviation Cyber Physical Systems
Safety Management Challenges for Aviation Cyber Physical Systems Prof. R. John Hansman & Roland Weibel MIT International Center for Air Transportation rjhans@mit.edu, weibel@mit.edu Challenges Target Level
More informationBombardier Challenger 605 Serial Number: 5865 Entered into Service: September, 2011 Total Time Since New: 910 Hours Cycles: 419
2011 Challenger 605 #5865 Bombardier Challenger 605 Serial Number: 5865 Entered into Service: September, 2011 Total Time Since New: 910 Hours Cycles: 419 GENERAL INFORMATION ENGINES : GE CF34-3B Left Engine
More informationADVISORY CIRCULAR AC 08-007
CIVIL AVIATION AUTHORITY OF THE PHILIPPINES ADVISORY CIRCULAR AC 08-007 APPLICATION & PROCESS: PERFORMANCE BASED NAVIGATION SECTION 1 POLICY AND GENERAL INFORMATION 1.1 PURPOSE The purpose of this advisory
More informationASIA/PACIFIC REGIONAL PERFORMANCE-BASED NAVIGATION IMPLEMENTATION PLAN
INTERNATIONAL CIVIL AVIATION ORGANIZATION ASIA AND PACIFIC OFFICE ASIA/PACIFIC REGIONAL PERFORMANCE-BASED NAVIGATION IMPLEMENTATION PLAN VERSION 3.0 September 2011 1 RECORD OF AMENDMENT Version Activity
More informationA Strategic Vision of Air Traffic Management in New Zealand to 2025
A Strategic Vision of Air Traffic Management in New Zealand to 2025 » contents Vision 4 Introduction 5 Stakeholders 6 Metrics 8 Hierarchy of documents 9 Air traffic enabling 10 Airspace management 16 ATM
More informationAirports Authority of India
Airports Authority of India Performance Based Navigation(PBN) Implementation Road Map Version-1 Dt. 01.09 Directorate of Air Traffic Management 1 Table of Contents 1. Introduction 2. PBN concepts 3. Benefits
More informationAutomatic Dependent Surveillance Broadcast (ADS-B)
Automatic Dependent Surveillance Broadcast () Surveillance development for Air Traffic Management As air traffic is predicted to increase steadily over the coming years, there is a clear need to ensure
More informationCS#7 Network Infrastructure Performance monitoring and analysis Service (NIPS) Eric Potier
CS#7 Network Infrastructure Performance monitoring and analysis Service (NIPS) Eric Potier CS7 Project Manager 21 October 2013 CS7 Context Communication Navigation Surveillance infrastructure Basic enabler
More informationRockwell Collins ARINC MultiLink SM flight tracking service
Rockwell Collins ARINC MultiLink SM flight tracking service Background Each time a highly publicized event involving a commercial airline occurs, the aviation community begins to clamor for automated transponders
More informationSYSTEM GLOBAL NAVIGATION SATELLITE SYSTEM LANDING TECHNOLOGY/PRODUCT DEVELOPMENT
GLOBAL NAVIGATION SATELLITE SYSTEM LANDING SYSTEM The aviation industry is developing a new positioning and landing system based on the Global Navigation Satellite System (GNSS). The GNSS landing system
More informationCNS / ATM R&D Activities in Korea
CNS / ATM R&D Activities in Korea 2010. 11. 10 D.M. Kim Korea Aerospace Research Institute Contents I Introduction to KARI II CNS/ATM Projects in Korea III Future Plan & Summary Introduction to KARI National
More informationLOG OF REVISIONS Revision Page FAA Date of Number Number(s) Description Approved Approval A All Initial Release K.
LOG OF REVISIONS Revision Page FAA Date of Number Number(s) Description Approved Approval A All Initial Release K. Campbell* 4/4/00 B 5, 10 Remove SKYWATCH and add GTX 330 TIS G. Baker* 11/21/02 C All
More informationHoneywell Aerospace Fleet Experience
Honeywell Aerospace Fleet Experience Rob Wilson Vice President, Business & General Aviation Carl Esposito Vice President, Marketing & Product Management Forward Looking Statements This report contains
More informationTACTICAL DATA LINKS, AIR TRAFFIC MANAGEMENT, AND SOFTWARE PROGRAMMABLE RADIOS*
TACTICAL DATA LINKS, AIR TRAFFIC MANAGEMENT, AND SOFTWARE PROGRAMMABLE RADIOS* B. E. White, The MITRE Corporation, Bedford, MA Abstract Background on Link 16, global air traffic management (GATM), and
More informationWhite Paper Mode S and the European Mandates
White Paper Mode S and the European Mandates The Elementary Surveillance Mandate Mode S and the European Mandate Page 1 of 7 Honeywell For several years, the International Civil Aviation Organization (ICAO)
More informationInternational Civil Aviation Organization South American Regional Office
SAM/IG/3 WP/18 08/04/09 International Civil Aviation Organization South American Regional Office THIRD WORKSHOP/MEETING OF THE SAM IMPLEMENTATION GROUP (SAM/IG/3) REGIONAL PROJECT RLA/06/901 Lima, Peru,
More informationPrevention of loss of communication. Air China
Prevention of loss of communication Air China MAIN CONTENTS summary Analyze of TEM Prevention summary B767-300 loss of communication near Bordeaux May 4th 2014, Boeing 767-300 performed flight from Rome
More informationArea Navigation (RNAV)/Wide Area Augmentation System (WAAS) Instrument Approach Procedures (IAP s) and the New Charting Format.
PURPOSE. Area Navigation (RNAV)/Wide Area Augmentation System (WAAS) Instrument Approach Procedures (IAP s) and the New Charting Format. [REVISED 1/5/00] Instrument procedures in the first half of the
More informationICAO Amendment 1 - Australian Flight Planning Guidance
ICAO Amendment 1 - Australian Flight Planning Guidance Amendment 1 to the 15 th Edition of ICAO Doc. 4444 introduces changes to useable identifiers and codes within the ICAO flight plan, specifically in
More informationWhat is NextGen? NextGen is more than just a. Single project It is the integration of many projects, concepts, and technologies.
Single project It is the integration of many projects, concepts, and technologies. Program plan It is the integration of many program plans, some new and some ongoing, to deliver new service capabilities
More informationwww.ibac.org IBAC Bulletin B00-2 Pacific Implementation of RVSM and RNP 10/50NM Lateral
www.ibac.org IBAC Bulletin B00-2 Subject: Pacific Implementation of RVSM and RNP 10/50NM Lateral Previous notification had been made regarding implementation of RVSM and RNP in the Pacific Region. This
More informationCabin and Cockpit SATCOM Connectivity Inmarsat Aero Conference June 12/13, 2013
Cabin and Cockpit SATCOM Connectivity Inmarsat Aero Conference June 12/13, 2013 Honeywell s Businesses Aerospace Automation and Control Solutions Performance Materials and Technologies Transportation Systems
More informationBlock 0: Capabilities within our Grasp
Block 0: Capabilities within our Grasp 1 ICAO Block Upgrades Assumptions and Constraints Current ATM infrastructure and procedures will not support forecasted traffic growth Implementation of major ATM
More informationIridium Venture Offers to Track Planes
Iridium Venture Offers to Track Planes Aireon Service, in Emergencies, Would Fill in Gaps in Radar By ANDY PASZTOR Sept. 21, 2014 10:03 p.m. ET The air-traffic control tower at Kuala Lumpur International
More informationArea Navigation (RNAV) and Required Navigation Performance (RNP)
Area Navigation (RNAV) and Required Navigation Performance (RNP) Program Overview Presented to: CDA Workshop By: Bruce Tarbert RNAV and RNP Group Date: January 19,2006 Roadmap for Performance-Based Navigation
More informationFAA Familiarization Briefing
FAA Familiarization Briefing Presented by: Kathryn Vernon Presented to: Regional Administrator Northwest Mountain Region Oregon Congressional Staff Presented on: March 13, 2015 FAA Statistics National
More informationPRESENTATION. Patrick Ky Executive Director EUROPEAN COMMISSION
EUROPEAN COMMISSION PRESENTATION Patrick Ky Executive Director EUROPEAN COMMISSION WHY SESAR? EUROPEAN COMMISSION EUROPEAN CHALLENGES: Capacity: Air Traffic to double by 2030 Safety: Improvements linked
More informationStatement of Jens C. Hennig Vice President of Operations General Aviation Manufacturers Association
Statement of Jens C. Hennig Vice President of Operations General Aviation Manufacturers Association Before the Transportation and Infrastructure Subcommittee on Aviation United States House of Representatives
More informationSkedsmo videregående skole NO.147.0002 Rev. dato: 01.08.2014
Årsplan for faget: M13 LASS Ref: Grunnleggende mål i læreplan for programfagene Lærebøker, hefter og bilag som benyttes: Godkjent avdelingsleder Revisjonsdatoer på LTT pdf dokumenter er i henhold til listen
More informationOn-Board Performance Monitoring and Alerting (OPMA)
E n c l o s u r e t o L e t t e r F 0 6 4 - L 0 9-0 5 6 E N C L O S U R E On-Board Performance Monitoring and Alerting (OPMA) Airborne System Calculations, Statistical Meaning and Relationships to Separation
More informationAppendice 1 al Regolamento ENAC ATSEP Basic training Shared
Regolamento ENAC ATSEP Appendici Pag. 1 Appendice 1 al Regolamento ENAC ATSEP Basic training Shared Subject 1: INDUCTION TOPIC 1 BASIND Induction Sub-topic 1.1 BASIND Training and Assessment Overview Sub-topic
More informationProviding Safety and Reliability with PBN Guy Greider HUGHES PROPRIETARY
Providing Safety and Reliability with PBN Guy Greider Layout plan for integrated fully supported low level PBN airspace Providing Safety and Reliability with PBN Helicopter Accident Rate Vertical Flight
More informationICAO-ENAC PBN PROCEDURE DESIGN COURSE
ICAO-ENAC PBN PROCEDURE DESIGN COURSE REFERENCE AND TITLE Performance Based Navigation Concept : Procedure design course for PBN applications: RNAV1 SID and STAR, RNP APCH (Non Precision Approach and APV
More informationADS-B over Satellite Global Air Traffic Surveillance from Space
www.dlr.de Chart 1 ADS-B over Satellite Global Air Traffic Surveillance from Space ATM World Congress, March 11 th 2015 in Madrid K. Werner, German Aerospace Center (DLR) Institute of Flight Guidance T.
More informationMcDonnell Douglas MD-11 Avionics System
31 McDonnell Douglas MD-11 Avionics System Gordon R. A. Sandell Boeing 31.1 Introduction 31.2 Flight Controls (ATA 22-00 and 27-00) 31.3 Communications System (ATA 23-00) 31.4 Entertainment System (23-00)
More informationTítulo ponencia: Helicopter IFP. Point-in-Space (PinS)
Título ponencia: Helicopter IFP. Point-in-Space (PinS) Organizado por: Index Introduction Helicopter IFP A/C Certification requirements GNSS Certified rotorcrafts Most relevant projects in Europe Introduction
More informationSurveillance in Canadian Airspace Today and in the Future
Surveillance in Canadian Airspace Today and in the Future Jeff Dawson Director, Standards and Procedures, NAV CANADA ATM Global, Dubai UAE - 5 October 2015 Outline NAV CANADA Overview Evolution of Canadian
More informationRef.: AN 13/2.5-09/45 19 June 2009
International Civil Aviation Organization Organisation de l aviation civile internationale Organización de Aviación Civil Internacional Международная организация гражданской авиации Tel.: +1 (514) 954-6711
More informationCyber-hijacking Airplanes:
Cyber-hijacking Airplanes: Truth or Fiction? Dr. Phil of Bloomsburg University @ppolstra http://philpolstra.com Captain Polly of University of @CaptPolly Why This Talk? Lots of bold claims concerning
More informationGlobal Avionics Training Specialists, LLC.
Global Avionics Training Specialists, LLC. PRIMUS 2000/DORNIER 328 JET INTEGRATED AVIONICS SYSTEM LINE MAINTENANCE FAMILIARIZATION COURSE SYLLABUS I. INTRODUCTION A. SYSTEM DESCRIPTION The PRIMUS 2000
More informationPerformance Based Navigation (PBN)
Ministry of Transport, Public Works and Water Management Performance Based Navigation (PBN) ROADMAP for the Kingdom of the Netherlands 2010-2020 Ministry of Transport, Public Works and Water Management
More informationTECHWATCH SUMMER 2015 EDITION
TECHWATCH SUMMER 2015 EDITION TECHWATCH is published twice a year to provide customers and stakeholders with updated information regarding the technology and systems developed and used by NAV CANADA. Table
More informationThe Rebirth of Aviation and Air Transportation in Ohio
The Rebirth of Aviation and Air Transportation in Ohio On the implementation of the NextGen Air Traffic Management System to enhance air transportation safety, capacity, and environmental sustainability
More informationMitigating the Impacts of Space Weather on Aviation Operations
Mitigating the Impacts of Space Weather on Aviation Operations Rick Heuwinkel, Manager NextGen Aviation Weather Division Federal Aviation Administration Potential Impacts of Space Weather Aviation Communications
More informationWhy it may be time to consider Certified Avionics for UAS (Unmanned Aerial Vehicles/Systems) White paper
Why it may be time to consider Certified Avionics for UAS (Unmanned Aerial Vehicles/Systems) White paper UAS growth There are a number of different UAS types flying today in multiple applications. There
More informationTOPICS OFFERED (TOPICS AND NUMBER OF LESSONS SUBJECT TO CHANGE)
ROTARY WING PILOT PROGRAM TrainingPort provides customized and comprehensive programs that meet your needs. A Training Needs Assessment assists in determining requirements that, until recently, have been
More informationAircraft Hacking Practical Aero Series
Aircraft Hacking Practical Aero Series IT Security Commercial Pilot Hugo Teso (@hteso) (@48bits) www.48bits.com One and a half architecture Aero Series www.commandercat.com Agenda Part 1: The $PATH to
More informationAOPA Comments to FAA-2007-29305 Page 2 March 3, 2008
Docket Management Facility U.S. Department of Transportation 1200 New Jersey Avenue, SE West Building Ground Floor, Room W12-140 Washington, DC 20590-0001 Re: Docket Number FAA-2007-29305 Notice of Proposed
More informationEnhancing Airspace Efficiency and Capacity in the Asia Pacific Region
Enhancing Airspace Efficiency and Capacity in the Asia Pacific Region ABSTRACT The Asia Pacific region currently has a market share of 30 per cent of the world s total number of passengers per kilometre
More informationDelivering the most complete avionics modernization solution for H-60 and S-70 helicopters.
BLACK HAWK digital avionics management system Delivering the most complete avionics modernization solution for H-60 and S-70 helicopters. Proactively addressing mission avionics obsolescence is easier
More informationFuture Communications Study (FCS)
A I R T R A F F I C O R G A N I Z A T I O N Future Communications Study (FCS) Brent Phillips NAS Technical Engineering Operations Planning Jim Eck ATC Communications Directorate Technical Operations August
More information09 FLIGHT MANAGEMENT, NAVIGATION
Course overview N E X T G E N E R A T I O N Airplane General Air Systems Warning Systems, Communications, Ice & Rain Protection Electrical Engines, APU, Fuel System Hydraulics, Flight Controls, Landing
More informationAVIATION INVESTIGATION REPORT A02P0004 OPERATING IRREGULARITY
AVIATION INVESTIGATION REPORT A02P0004 OPERATING IRREGULARITY NAV CANADA COMMUNICATIONS EQUIPMENT FAILURE VANCOUVER AREA CONTROL CENTRE 04 JANUARY 2002 The Transportation Safety Board of Canada (TSB) investigated
More informationC-130 Investigators Handbook
C-130 Investigators Handbook Chapter 1. Basic Specifications 1.1 General View (external diagrams) The Lockheed C-130Q Hercules is a four-engine, medium-size utility aircraft which has proven to be one
More informationWith all of the new hype the
T E C H N O L O G Y All About MODE S TRANSPONDERS B Y T O N Y B A I L E Y Air Traffic Control Radio Beacon System (ATCRBS) With all of the new hype the past few months concerning Elementary Surveillance
More informationCOMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP)
International Civil Aviation Organization WORKING PAPER 26/1/10 English and Spanish only 1 COMMITTEE ON AVIATION ENVIRONMENTAL PROTECTION (CAEP) EIGHTH MEETING Montréal, 1 to 12 February 2010 Agenda Item
More informationB777. Automatic Flight DO NOT USE FOR FLIGHT
B777 Automatic Flight DO NOT USE FOR FLIGHT 4.10 Automatic Flight-Controls and Indicators Mode Control Panel (MCP) A/T ARM L R IAS MACH HDG TRK V/S FPA ALTITUDE A/P F/D ON OFF CLB CON IAS LNAV VNAV AUTO
More informationADS-B Webinar. Ted Lester. August 17, 2011. 2011 Avidyne Corporation. All rights reserved. 55 Old Bedford Road Lincoln, MA 01773 www.avidyne.
ADS-B Webinar Ted Lester Product Manager August 17, 2011 1 Agenda About Myself What is ADS-B? Types of ADS-B Applications of ADS-B Out and In FAA s ADS-B Progress FAA Mandate and Installation Approvals
More information