Design / Build Services for Sebring Parkway Phase III, RFP Financial Management Number: Highlands County Project No.

Size: px
Start display at page:

Download "Design / Build Services for Sebring Parkway Phase III, RFP 13-034. Financial Management Number: 420082-2-58-01 Highlands County Project No."

Transcription

1

2 Table of Contents Extended Letter of Interest Wright Construction Group, Contact: G. Andy Powell, Vice President, 5811 Youngquist Road, Fort Myers, FL Phone: l andyp@wrightg.com Section One: Project Experience & Resources Section Two: Design/Build Experience of Contractor And Design Consultant Section Three: Similar Types of Work Experience Section Four: Outline Plan for Completing Work Section Five: Past Performance History Section One Project Experience & Resources INTRODUCTION: The Wright Construction Team understands Highlands County s desire to complete the Sebring Parkway Phase III project utilizing the Design-Build method. Your decision to utilize this method for this project s delivery indicates your desire to create a true Teaming relationship between the Design-Build Team and Highlands County; thereby, receiving the benefits derived from this relationship. For your consideration, The Wright Construction Team brings the most qualified local presence of seasoned professionals assembled to offer your Project the best possible resources available in Southwest Florida. The utilization of the Design-Build method of delivery and the selection of the Wright Construction Team will provide a cooperative environment that ensures the delivery of the highest overall value to the citizens of Highlands County. TEAM QUALIFICATIONS: Licensed General Contractor CGC , FDOT Pre-qualified- Drainage, Flexible Paving, Grading, Intermediate Bridges, Minor Bridges, R&R Minor Bridges, Sewer & Water Treatment Plants, and Sidewalk Florida Professional Engineer License No (Ryan Bell), FDOT Prequalified Project Development and Environmental (PD&E) Studies, Minor Highway Design, Major Highway Design, Traffic Engineering and Operations Studies, Traffic Engineering Stud- ies, Traffic Operations Design, Signing, Pavement Marking and Channelization, Signalization, Survey and Mapping, Control Surveying, Design, Right of Way & Construction Surveying, Right of Way Mapping, Construction Engineering Inspection, Roadway Construction Engineering Inspection, Minor Bridge & Miscellaneous Structures (CEI), Planning, Land Planning/Engineering, and Landscape Architect. SUBCONSULTANTS QUALIFICATIONS The Carol Group Inc. is a women owned business led by Carol Howard. Carol will be providing drainage and permitting assistance on the project. As former Executive Director of the South Florida Water Management District Carol is intimately familiar with the Environmental Resource Permitting (ERP) requirements and time frames. Carol s expertise will be very helpful in streamlining the permitting process. Certified DBE Florida Professional Engineer License No FDOT Prequalified Highway Design, Bridges; Miscellaneous Structures, Minor Bridge Design, Construction Engineering Inspection, Roadway Construction Engineering Inspection, Construction Materials Inspection, Minor Bridge & Miscellaneous Structures, CEI Universal Engineering Sciences (UES) will be providing geotechnical engineering and construction material testing services. FDOT Pre-qualified Soil Exploration, Geotechnical Classification Laboratory Testing, Highways Material Testing, Standard Foundation Studies, Non-Redundant Drilled Shaft Bridge Foundation Studies, Geotechnical Specialty Laboratory Testing, Roadway Construction Engineering Inspection and Construction Materials Inspection. Page 1 of 10

3 Section One Resources Design / Build Services for Sebring Parkway Phase III, RFP G. Andy Powell Project Executive Wright Construction Group, Inc. Total Years of Experience: 38, Years at Wright: 14 Key Projects: Fruitville Road Widening, State Road 80 Utility Replacement, Fort Myers Riverfront Redevelopment Certifications: Florida Certified Underground Utility/Excavation Contractor, Florida Class V Fire Contractor, OSHA Supervisor Trained, Competent Person Trained, 40 Hour HazWopper (Hazard Waste) Trained Robbie Powell Project Manager/Estimator Wright Construction Group, Inc. Total Years of Experience: 14, Years at Wright: 2 Key Projects: Collier Blvd. Widening Collier County, FDOT US 41 (SR 90) Improvements Certifications: (ATSSA) Florida Advanced Maintenance of Traffic Supervisor, (ATSSA) Advanced Work Zone Traffic Control Certified, (FDOT CTQP) Asphalt Paving Level 1 and Level 2, (FDOT CTQP) Quality Control Manager, OSHA 10 Hour Health and Safety Training Andrew Powell Superintendent Wright Construction Group, Inc. Total Years of Experience: 12, Years at Wright: 6 Key Projects: Fruitville Road Widening, State Road 80 Utility Replacement, FDOT US 41 (SR 90) Improvements CTQP (FDOT) Certifications: Earthwork I & II, Asphalt Paving I & II, Advanced MOT, Certified Quality Control Manager, Asphalt Maintenance & Road Repair, Quality Control Manager, FDOT Concrete Field Inspector, FDOT Pile Drive Inspector, Nuclear Density Gauge, Cert. NPDES Stormwater Erosion & Sedimentation Cont. (FDEP),GSSI Ground Penetrating Radar Ryan Bell, P.E. Director of Transportation, Johnson Engineering, Inc. Total Years of Experience: 11, Years at Johnson Engineering: 11 Key Projects: Design Experience BHG/ Treeline Ave, Six Mile Cypress Parkway Widening, Lee/Sunshine Intersection, Del Prado Widening, State Road 31 Widening Florida Professional Engineer, License No , B.S. Civil Engineering, University of Florida, Professional Affiliation American & National Society of Civil Engineers; Florida Engineering Society, Intermediate MOT, Advanced MOT, Asphalt Level I & II, QC Manager Andrew Tilton, P.E. Drainage, Johnson Engineering, Inc. Total Years of Experience: 35, Years at Johnson Engineering: 35 Key Projects: Helms Rd, SR 739 (Michael G. Rippe Pkwy), Piper Road, Ft. Myers Riverfront Redevelopment, Three Oaks Parkway South, SR31 Certifications: Florida Professional Engineer, License No , Andy has tremendous experience in drainage design including water management system design for roadways. Andy is also very familiar with the current water quality and SWFWMD permitting requirements. Laura Herrero Environmental, Johnson Engineering Total Years of Experience: 19, Years at Johnson Engineering: 13 Key Projects: SR31, Six Mile Cypress Parkway, Alico Rd Corridor Study, Livingston Rd Corridor Study, Gladioulus Drive, Goodlette-Frank Rd Certifications: Certified Ecologist, MSHA New Miner Certification ( ), FDEP Training on Numeric Nutrient Criteria Implementation, Rapid Periphyton Survey (RPS) and Linear Vegetation Survey (LVS) Methodologies, Stream Condition Index and Habitat Assessment Training, FDEP, Charlotte Harbor Watershed Summit, Red Cockaded Woodpecker (RCW) Biology and Management in the Picayune Strand State Forest, Cooperative Conservation Blueprint (CCB), ACOE Compensatory Mitigation Rule & Regulatory Program Update, Freshwater Biomonitoring Using Benthic Macroinvertebrates, Macroinvertebrate sampling techniques and identification. Page 2 of 10

4 Section Two Design/Build Experience Fort Myers Riverfront Redevelopment Design/Build Construction Cost: $5,275, Start Date: March 2012 Completion: Nov Client Reference: City of Fort Myers, Saeed Kazemi, P.E Second St. Fort Myers, FL Engineer: Johnson Engineering, Ryan Bell, , High Spans Eng. Project Description: This project included: Permitting, construction of water quality enhancements, pedestrian and vehicular bridges, marine construction, utility coordination and improvements, streetscape improvements, landscaping, and other work associated with a Riverfront Development Project. I-75 Rest Area Improvements, Alligator Alley, MM63 Design/Build Construction Cost: $8,819, Start Date: Dec Est. Completion: August 2014 Client Reference: FDOT, District One, Mary Wiley, 2981 N.E. Pine Island Rd. Cape Coral, FL 33902, Project Description: Wright Construction will be performing Design-Build improvements under this contract consisting of addition of two recreational parking areas, new safety facility for Collier county, demolition and reconstruction of the existing rest area building, a modified water treatment plant and associated roadwork to accommodate the new facilities. Melbourne Street Bridge Replacement Design/Build Construction Cost: $1,696, Start Date: October 2011 Completion: April 2012 Client Reference: BOCC Charlotte County, Barry Cohen, Murdock Circle, Ste. 344, Port Charlotte, FL 33948, ,1378 Project Description: Brick Replacement and roadway improvements consisting of concrete curb and gutter, 5 concrete sidewalk, 8 concrete shared use path, drainage improvement, gravity walls, milling and resurfacing, conduits & lighting. Rock Ridge Road Bridge Replacement Design/Build Construction Cost: $910, Start Date: April 2013 Est. Completion: August 2014 Client Reference: FDOT, District One, Kirby Radford, 2740 State Road 60 West, Bartow, FL Project Description: Wright Construction will be performing Design-Build improvements under this contract consisting of the removal and replacement of the existing bridge on Rock Ridge Road and all associated maintenance of traffic, roadway improvements and pavement marking. Mooringline Drive Bridge Rehabilitation Design/Build Construction Cost: $729, Start Date: July 2010 Completion: March 2011 Client Reference: FDOT District One, Gerald Byrne, 801 N. Broadway Ave. Bartow, FL Project Description: The project included the replacement of the non-standard traffic barriers, approach slabs, deck expansion joints, and asphalt wearing surface. Page 3 of 10

5 Section Two Design/Build Experience Anna Maria Bridge Repairs and Renovations Design/Build Construction Cost: $410, Start Date: October 2010 Completion: April 2010 Client Reference: FDOT District One, Lance Grace, P.E., st St. Sarasota, FL Project Description: This bridge rehabilitation project included beam patching repairs, deck replacement, expansion joint replacement, pile jacketing, concrete patching repairs on substructures, rip rap replacement, approach slab replacement, MOT, and pile repairs using cathodic protection. Matanzas Pass Bridge Improvements Design/Build Construction Cost: $400, Start Date: January 2011 Completion: Oct Client Reference: FDOT District One, Eunice Usher, P.E NE Pine Island Rd. Fort Myers, FL 33909, Phone: Project Description: Design//Build project that included the rehabilitation of the bridge in Fort Myers Beach, Florida. The project included concrete patching repairs, deck expansion joint replacement, installation of a bicycle bullet rail, rehabilitation of the navigational lights, painting of the bridge fascia, and the installation of ADA sidewalk ramps. FDOT C.R. 832 (Keri Road) Design/Build Construction Cost: $800, Completion: Client Reference: FDOT Ft. Myers Operation Center, Mary Zembo-Wiley, CCEI Project Manager, 2981 N.E. Pine Island Road, MS 1-88, Cape Coral, FL 33909, Project Description: This was Design-Build project administered by FDOT. Johnson Engineering was responsible for the CEI on 13 miles of milling, resurfacing, shoulder construction and isolated base reconstruction of this two lane rural roadway in central Hendry County. Bermont Road Improvements (Bridge #010010) Design/Build Construction Cost: $150, Completion: 2011 Client Reference: Ms. Joanne Vernon, P.E. Charlotte County Community Development, Stormwater Manager, 410 Taylor Street, Unit 104, Punta Gorda, FL 33950, Project Description: This was a fast-track, Design-Build with survey, design and permitting for Charlotte County. Improvements for a 15+ mile section of Bermont Road from U.S. 17 to S.R. 31 included bridge replacement, shoulder additions, drainage improvements, asphalt resurfacing and other minor enhancements along the roadway. Charlotte County Elkcam Bridges Replacement Design/Build Construction Cost: $80, Completion: 2012 Client Reference: Charlotte County, Charles Koons, P.E., Project Engineer, 410 Taylor Street, Punta Gorda, FL 33950, Suite 104, Project Description: This Charlotte County design-build project consisted of designing, removing, and replacing two bridges across the Elkcam Waterway at the North and South U.S. 41 Access Roads. Page 4 of 10

6 Section Three Similar Types of Work Experience State Road 80 Utility Replacement Project Construction Cost: $14,266, Start Date: September 2006 Completed: May 2008 Client Reference: City of Fort Myers, Saeed Kazemi, P.E., nd St. Fort Myers, FL Project Description: Complete reconstruction of SR 80 including clearing, demolition, utility replacements, roadway, curb, drainage, utility coordination, signalization, major MOT, landscaping, street lighting, bypass pumping, and grading. FDOT US 41 (SR 90) Roadway Improvements Construction Cost: $10,552, Start Date: September 2012 Est. Completion: March 2014 Client Reference: FDOT, District One, Chris Molitor, 2981 N.E. Pine Island Rd, Cape Coral, FL Engineer: Faller, Davis & Associates, Inc. Michael Oates, P.E., Project Description: Wright Construction is providing roadway construction services for FDOT. The project begins at SR 29 and runs 32 miles east to the Dade County line. This project requires the placement of approximately 28,000 tons of Superpave asphalt and 8,500 tons of friction course pavement and the modification of 41 separate bridges. Fruitville Road Widening Construction Cost: $8,557, Start Date: September 2009 Completion: Feb Client Reference: Sarasota County, Thai Tran, P.E., 1001 Sarasota Center Blvd. Sarasota, FL Engineer: Wilbur Smith Association, Christopher Pecor, P.E., Project Description: Widening of a two-lane road segment to four divided lanes from Coburn to Tatum Road. It included: drainage, four foot wide bicycle lanes, street lighting and signalization, 10 wide concrete and permeable paver sidewalks on both sides of Fruitville Road. Collier Blvd Widening Immokalee Road to Golden Gate Blvd (Individual Experience of Project Manager & Johnson Engineering Experience) Construction Cost: $8,500, Start Date: Nov Completion: March 2008 Client Reference: Collier County, Growth Management Dept. Steve Ritter, 2885 Horseshoe Dr., Naples, FL 34104, Engineer: Johnson Engineering, Ryan Bell, Project Description: Reconstruction and widening of 3 ½ miles of roadway in Collier County included: maintenance of traffic, removal of the existing roadway, new drainage, roadway reconstruction, new lights and signalization, asphalt paving and minor bridge widening. SR 739 (US 41 Business ) Improvements Construction Cost: $8,488, Start Date: Nov Est. Completion: March 2015 Client Reference: FDOT, District One, Mary Wiley, 2981 N.E. Pine Island Rd, Cape Coral, FL Project Description: Wright Construction will be performing improvements under this contract consisting of adding lanes and rehabilitating pavement including milling and resurfacing, widening, removal of a bridge, improving drainage, lighting, signalization, providing intelligent transportation system components and signing and pavement marking on SR 739. Page 5 of 10

7 Section Three Similar Types of Work Experience FDOT S.R. 739 (Michael G. Pippe Parkway) Construction Cost: $4,500, Completion: 2009 Client Reference: GEC Consultant to FDOT, David Long, P.E., PBS &J, 600 N. Broadway Ave. Suite 310, Bartow, FL 33830, Project Description: This project included design and permitting of approximately three miles of new roadway in Lee County. The roadway consisted of a new six lane suburban section roadway extending from Six Mile Cypress Parkway to the intersection of Alico Road and U.S. 41. Johnson Engineering performed the survey, roadway design, signing and marking, traffic control, drainage, environmental, permitting and utility coordination for the project. Charlotte County Piper Road Construction Cost: $2,400, Completion: 2009 Client Reference: Charlotte County Public Works, Brian Barnes, P.E., 7000 Florida Street, Punta Gorda, Fl 33950, Project Description: Johnson Engineering performed the route study and design for this new roadway in Charlotte County. The roadway was approximately four miles of new four lane urban roadway. Johnson Engineering performed all the survey, ROW mapping, roadway design, signing and marking, drainage, environmental, permitting and utility coordination. City of Cape Coral Del Prado Parkway Construction Cost: $1,800, Completion: 2008 Client Reference: City of Cape Coral Public Works, Christopher Camp, P.E., 1015 Cultural Park Boulevard, Cape Coral, FL 33990, Project Description: Johnson Engineering provided design services for this four to six lane reconstruction project for the City of Cape Coral in Lee County. This roadway project was approximately two miles long, extending from S.R. 78 (Pine Island Road) to Kismet Parkway. Johnson Engineering performed the survey, ROW mapping, roadway design, signing and marking, traffic control, drainage, environmental, permitting and landscape architecture for the project. Three Oaks Parkway South (Now Imperial Parkway) Construction Cost: $1,800, Completion: 2008 Client Reference: Lee County DOT, Randy Cerchie, 1500 Monroe Street, Fort Myers, FL Project Description: Johnson Engineering performed the route study, design and CEI for this new four mile roadway within the City of Bonita Springs in Lee County. The roadway consisted of a four lane urban section, designed for an ultimate six lanes, with closed drainage. Johnson Engineering performed all the survey, right of way (ROW) mapping, roadway design, signing and marking, drainage, environmental, permitting and utility coordination. Hendry County Helms Road Construction Cost: $1,600, Completion: 2011 (In Progress) Client Reference: Hendry County, Shane Parker, P.E., Hendry County Public Works Director, 99 East Cowboy Way, LaBelle, FL 33975, Project Description: Johnson Engineering was responsible for the design of approximately three miles of new four-lane roadway in Hendry County including all associated drainage, permitting, signalization and signing and marking. Passing through existing citrus groves an elaborate drainage cure plan was needed to ensure proper drainage and irrigation function of the groves during and after construction. Page 6 of 10

8 Section Four Outline Plan for Completing Work A. Outline Plan for Completing the Work 1. Pre-Design Evaluation Site conditions Geotechnical investigation & preliminary report Design survey and mapping Hydraulic evaluation/analysis Establish all permit requirements Storm Water & Surface Water Possible Mitigation of Environmental Impacts Protected Species Archaeological & Historical Features Contamination PD&E Other Utility Coordination Electric Water Sewer Telephone Cable Television Gas Others South Florida State College Coordination 2. Design Development Prepare permit applications for County review Incorporate County comments Submit permit applications Determine disposition of utilities 90% plans Final geotechnical report Roadway/drainage design documentation Project specifications Independent peer reviewer s comments and comment responses Submit documents for review and comment Public involvement Incorporate County review comments 100% plans Final documentation Final specifications package Independent peer review final letter Submit documents for review Submit For Construction Plans Receive Released for Construction Plans 3. Construction Services: Public information Quality Control Plan implementation Safety Plan implementation Hurricane Plan implementation Mobilization Erosion control (Best Management Practices) Maintenance of traffic Coordinate utility relocations as needed Construct embankment Construct drainage and road base Structural asphalt Intersection Improvements Sod/rip rap/etc. as required Friction course Pavement markings and signage 4. Project Closeout: Record drawings Other final documentation as required B. Outline Plan for Completing the Work The scope of this project is to design and construct a two-lane roadway along the east side of the right of way and an eight foot asphalt pathway on the west side of the roadway. Adjoining side streets will be reconstructed as needed to provide for proper access to the new roadway construction. Although the construction aspect of the project will result in a functional interim two lane roadway, the design will include the future two lanes which will be rough graded and sodded as required in the RFP documents. The construction of this phase of Sebring Parkway will provide a more direct north south access from Sebring to the Avon Park area. Sebring Parkway Phase III will help relieve congestion on US27 and provide for improved access to existing streets such as Scenic Highway and Memorial Drive. Our understanding of the project is summarized below along with our proposed design and construction approach: Design Approach We intend on fast-tracking the design and permitting for this project so that we can move to the construction phase as soon as possible. By maximizing the use of the existing information, digital files, and work performed to date, we can create great efficiency during the design phase. The roadway design is fairly straight forward since much of the alignment, access points, and typical section is already determined and the right of way is in hand. We believe the critical path lies not in the design or plan production but in the permitting. Our initial focus will be on the water management and environmental impact issues evaluated under the Environmental Resource Permit required of the Southwest Florida Water Management District (SWFWMD). We have visited the site and reviewed the SWFWMD Preapplication meeting minutes from the county s meeting earlier this year. We understand the issues and have successfully dealt with these on recent projects. Our goal is to quickly develop a water management design and permitting strategy and meet with the SWFWMD again to review and confirm our approach. Obtaining initial buy in on our specific methodology from the District will help expedite the overall process. In addition to the water quality and quantity issues we will also need to quickly evaluate and address the environmental concerns. Most of the Page 7 of 10

9 Section Four Outline Plan for Completing Work project passes through upland citrus groves however there are some areas, particularly in the low lying areas adjacent to Little Redwater Lake where there may be jurisdictional wetland impacts. We will verify and quantify these impacts up front so that we may develop a cost effective mitigation strategy. We also understand there has been a recent relocation of gopher tortoises on site. With this particular habitat however it is very likely that more gopher tortoises have moved in and additional relocations will be necessary. The design efforts for this project will be performed from Johnson Engineering s Sebring office. In addition to the key staff members shown we also have additional resources and personnel including transportation engineers, designers and technicians as well as ecologists and drainage engineers that may be called upon to expedite the design, plan production and permitting to meet the County s expectations. Construction Approach Roadway Approaches The construction of this roadway will require the balancing of existing material with imported material. The existing material has a very high percolation rates which will be extremely valuable for the final drainage design. This material will be tested and assessed, so as to limit the amount of imported structural fill needed for the construction of the roadway stability and support. The roadway base will be built using the FDOT design standard optional Base Group 9 material. With the optional base group design standards available for this project, it will give us a greater opportunity to provide the most economical way to build the road base for the project. We will be able to evaluate the cost effectiveness and constructability of using base products such as Limerock from the Moore Haven area, Bank Run Shell from the north Charlotte County area, Cemented Coquina Base from the Okeechobee area and Asphalt Base from the Highlands County area. The roadway base will be paved with super pave asphaltic concrete. The asphalt thickness will be a three inch finished layer, made up of SP 12.5 TLC and SP 9.5 TLC. Both products are readily available from manufacturers such as APAC Southeast and Better Roads Inc. The alternative proposal for this project whereby Highlands County provides the necessary super pave mix is always an option as well. All of this roadway work will be provided by a team of personnel each having more than 12 years of experience specifically in roadway construction and design. With that experience comes not only the knowledge of construction, but of safety in the work place and proper maintenance of traffic in all roadway situations. Maintenance of Traffic The traffic control plan for the construction of Sebring Parkway Phase III will address several aspects that are inherent in any roadway project. The first order of business will be to establish proper advanced warning signs in all roadway areas that encroach into the construction area. An area of high notification will be on Sebring Parkway south of the 90 degree bend. This area will experience an increased volume of truck traffic due to material deliveries. The public will be provided notices and reminders of truck traffic to provide the safest possible scenario for the traveling public. A secondary area of high traffic volume and increased truck traffic will be at the intersection of Memorial Drive and Sebring Parkway / College Drive. As construction traffic increases to this area, awareness and public information will need to be provided for the traveling public and specifically for the students and faculty of South Florida State College. All areas of interest will be provided advanced warning devices per FDOT design standards 600. As the project comes to completion it is inevitable that the traveling public will try to use the access before it has been properly completed and is deemed safe for the public. In this instance temporary barricades will be used to delineate the closure area of the new roadway and temporary barriers may be necessary to discourage the ability of public use prior to opening. All of these precautions will be performed under the supervision of the project. Traffic Control Supervisor and in close conjunction with Highland County officials who will be able to provide us valuable information of ongoing public issues. Intersection Approach In the construction of Sebring Parkway Phase III the RFP requires a signalized intersection at Sebring Parkway s 90 degree bend and Scenic Highway. In any new signalized intersection construction it is crucial that the traveling public be given plenty of time to adapt to the new signal. This avoids unnecessary safety risk to motorist and provides the traveling public time to adapt. During the construction of the intersection great emphasis will be taken on the identification of the utilities in the area. The design speed for both areas of signalized intersections is 50 MPH. This speed will require the signal to be place 18 feet off the edge of pavement for proper clearance. The drill shaft size for the signal needed to reach through the intersection area will likely be at a depth of 20 to 25 feet. In order to make sure there are absolutely no conflicts with the signalization installation the pre-planning of utility coordination and relocation will be critical. The Intersection construction at the tie-in of Memorial Drive and Sebring Parkway Phase III / College Drive will be unique to this area in using a roundabout method to move traffic. This method of intersection safety and mobility will allow for less traffic build up and increase awareness of the pedestrians and motorist in the area. The speed design for this area will be limited to 25 mph which will allow for greater ability to adjust the size and layout of the roundabout if potential conflicts existing in this area. Utility Coordination Utility coordination will be an integral part of the construction of this project. This is an area of construction that is most effectively managed when the planning during the preconstruction phase is coordinated closely between the contractor and the owner of the utility. During the construction portion of the utility coordination it is key to have on-site personnel that understands the need for advanced planning in order to avoid delay to the construction process. Highlands County Coordination We understand that Highlands County is the owner of the roadway and associated right of way and we intend to provide a design that meets the specific requirements of the County and the Florida Department of Transportation. We will conduct a meeting with the Public Works Department officials early on in the design phase to solicit feedback on the design of the new roadway. Page 8 of 10

10 Section Five: Past Performance History FDOT PAST PERFORMANCE SCORES: High Score Average Score Wright Construction Group, Inc Johnson Engineering, Inc Client Referrals City of Fort Myers, State Road 80 Saeed Kazemi, Director of Public Works 2200 Second Street, Fort Myers, FL AWARDS Fort Myers Riverfront Redevelopment 2013 American Public Works Association National Project of the Year Award 2013 Builders Industry Association, Summit Award for Heavy Infrastructure 2013 Associated Builders & Contractor, Excellence in Construction Eagle Award Melbourne Street Bridge Replacement Design-Build Charlotte County Community Development, Melbourne St. Bridge Charles Koons, Project Engineer DESIGN-BUILD 410 Taylor Street, Unit 104 Punta Gorda, FL American Public Works Association Regional Project of the Year Award 2013 Builders Industry Association, Summit Award for Heavy Infrastructure 2013 Associated Builders & Contractor, Excellence in Construction Eagle Award Page 9 of 10

11 Page 10 of 10

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

Roadway Cost Per Centerline Mile Revised June 2014

Roadway Cost Per Centerline Mile Revised June 2014 Rural Arterial From LRE MOT * Mobilization * Subtotal Total PE Design (15%) CEI (15%) Total Project ** New (2-Lane Roadway) with 5' Paved Shoulders $3,351,896 $335,190 $368,709 $4,055,794 $1,013,949 $5,069,743

More information

REPORTS & PRESENTATIONS AGENDA ITEM #III-3 CORTEZ BRIDGE PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY

REPORTS & PRESENTATIONS AGENDA ITEM #III-3 CORTEZ BRIDGE PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY NOTES REPORTS & PRESENTATIONS AGENDA ITEM #III-3 CORTEZ BRIDGE PROJECT DEVELOPMENT AND ENVIRONMENT (PD&E) STUDY Presenter: Summary: Tony Sherrad, FDOT Project Manager The Cortez Bridge in Manatee County,

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

Improving Access in Florida International University Biscayne Bay Campus Executive Summary

Improving Access in Florida International University Biscayne Bay Campus Executive Summary EXECUTIVE SUMMARY Improving Access in Florida International University Biscayne Bay Campus Executive Summary Prepared for: Miami-Dade County Metropolitan Planning Organization (Miami-Dade MPO) Prepared

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

I-66 Pavement Rehabilitation

I-66 Pavement Rehabilitation I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012 Project Location 2 Goal

More information

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to

More information

CID STREET INFRASTRUCTURE ASSESSMENT

CID STREET INFRASTRUCTURE ASSESSMENT ABSTRACT An evaluation of the street infrastructure in Foxberry Estates Phase 1, including pavement condition, verification of construction techniques, and subgrade quality. Recommendations and costs for

More information

2014 Surface Transportation Program Island Sub-region RTPO Technical Advisory Committee Recommendations. Amount Requested

2014 Surface Transportation Program Island Sub-region RTPO Technical Advisory Committee Recommendations. Amount Requested 2014 Surface Transportation Program Island Sub-region RTPO Technical Advisory Committee Recommendations Name Overlay s Applicant Amount Requested Recommended Funding Amount Coupeville, Langley $411,661

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

Corridor Goals and Objectives

Corridor Goals and Objectives Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Informational Workshop Public Meeting Kanawha Falls Bridge Project Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal

More information

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES 11.5.1 Purpose To provide a uniform procedure for determining that the last structural layer meets the applicable straightedge

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

MOHAMMAD I CHAUDHRY, P.E. A CONSTRUCTION PROJECT MANAGER Specialized in Highways, Bridges and Infrastructures construction & Maintenance

MOHAMMAD I CHAUDHRY, P.E. A CONSTRUCTION PROJECT MANAGER Specialized in Highways, Bridges and Infrastructures construction & Maintenance MOHAMMAD I CHAUDHRY, P.E. A CONSTRUCTION PROJECT MANAGER Specialized in Highways, Bridges and Infrastructures construction & Maintenance SUMMARY: Mr. Chaudhry, a decisive, innovative leader with a demonstrated

More information

VILLAS OF TRADITIONS AT GREY OAKS

VILLAS OF TRADITIONS AT GREY OAKS Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard

More information

5 ALTERNATIVE SOLUTIONS AND EVALUATION

5 ALTERNATIVE SOLUTIONS AND EVALUATION Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable

More information

SR 89/Fanny Bridge Community Revitalization Project. Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment

SR 89/Fanny Bridge Community Revitalization Project. Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment SR 89/Fanny Bridge Community Revitalization Project Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment 2015 Meeting Purpose Provide a summary description of alternatives

More information

EXHIBIT A Accessible Truck Routes Map

EXHIBIT A Accessible Truck Routes Map EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT

More information

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration

More information

MICHIGAN S LANDSCAPE ARCHITECTS

MICHIGAN S LANDSCAPE ARCHITECTS MICHIGAN S LANDSCAPE ARCHITECTS protecting the health, safety, and welfare of our citizens site design land use planning master planning streetscape design brownfield redevelopment guidelines and regulations

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

Goals & Objectives. Chapter 9. Transportation

Goals & Objectives. Chapter 9. Transportation Goals & Objectives Chapter 9 Transportation Transportation MISSION STATEMENT: TO PROVIDE A TRANSPORTATION NETWORK CAPABLE OF MOVING PEOPLE AND GOODS EFFICIENTLY AND SAFELY. T he transportation system

More information

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E. Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double

More information

5. MAJOR STREET CONSTRUCTION The B-Permit. 5.1. B-Permit Description and Purpose

5. MAJOR STREET CONSTRUCTION The B-Permit. 5.1. B-Permit Description and Purpose 5. MAJOR STREET CONSTRUCTION The B-Permit 5.1. B-Permit Description and Purpose The B-Permit is required for major street construction in the public right-of-way. This includes the widening of streets,

More information

EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT. BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309

EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT. BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309 EXHIBIT A SCOPE OF SERVICES WATER SERVICE REPLACEMENT PROJECT BROWARD OPERATIONS CENTER 5548 NW 9 th AVENUE FORT LAUDERDALE, FLORIDA 33309 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT FOUR 1.0 SCOPE OF

More information

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs

KENTUCKY TRANSPORTATION CABINET. Department of Rural and Municipal Aid. Office of Local Programs KENTUCKY TRANSPORTATION CABINET Department of Rural and Municipal Aid Office of Local Programs Office of Local Programs Transportation Enhancements Safe Routes to School Congestion Mitigation and Air Quality

More information

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis

Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Comprehensive Mobility Project Development Process Capital Metro ¼-Cent Fund Analysis Transportation & Mobility projects that meet the following criteria: enhances regional mobility; supports public transit;

More information

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST

More information

City of Indian Rocks Beach, Florida NFIP Number 125117

City of Indian Rocks Beach, Florida NFIP Number 125117 City of Indian Rocks Beach, Florida NFIP Number 125117 Floodplain Management Plan / Local Mitigation Strategy Annual Report - September 2015 Introduction The City of Indian Rocks Beach has been an active

More information

Planning Level Cost Estimation Tool. User s Manual

Planning Level Cost Estimation Tool. User s Manual Planning Level Cost Estimation Tool User s Manual Atlanta Regional Commission Submitted By: User s Manual Table of Contents 1. INTRODUCTION... 1 2. OBJECTIVE... 1 3. FRAMEWORK OF THE TOOL... 2 4. HOW TO

More information

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing.

Date. Resubmit this form during the year if there are changes in your company ownership or financial standing. COLORADO DEPARTMENT OF TRANSPORTATION CONTRACTOR PREQUALIFICATION STATEMENT (EXPERIENCE, EQUIPMENT AND FINANCIAL) Return to: Contracts & Market Analysis Prequalification Unit 4201 E. Arkansas,4th Floor

More information

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5 AGENCY COORDINATION AND PUBLIC INVOLVEMENT 5.1 AGENCY COORDINATION As part of the planning process for the Oregon Avenue Final EA, DDOT conducted an agency coordination program. This coordination included

More information

EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR. Project Description(s):

EXHIBIT A CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR. Project Description(s): EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR Project Description(s): US 41 (SR 45) At CR 776 (Harborview Rd) US 41 (SR 45) At Tarpon Boulevard US 41 (SR 45) At Kings Highway-Parmely

More information

Statewide Scheduling Engineers Meeting August 8-9, 2006 Turkey Lake Plaza

Statewide Scheduling Engineers Meeting August 8-9, 2006 Turkey Lake Plaza Statewide Scheduling Engineers Meeting August 8-9, 2006 Turkey Lake Plaza Attendees: Richard Massey(SCO), Brenda Haygood(D-2), Jimmy Miller(D-3), Robert McCracken(PBS&J-D-3), Abel Sierra(D-5), Luis Lopez(D-6),

More information

Exhibit A Scope of Work

Exhibit A Scope of Work Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW

More information

LOCATIONS OF UTILITIES IN PUBLIC RIGHTS-OF-WAY Examples from various Cities

LOCATIONS OF UTILITIES IN PUBLIC RIGHTS-OF-WAY Examples from various Cities LOCATIONS OF UTILITIES IN PUBLIC RIGHTS-OF-WAY Examples from various Cities American Public Works Association Utilities & Public Right of Way Committee February 29, 2000 Table o of Contents Index...Page

More information

Chapter 162 SHADE TREE COMMISSION

Chapter 162 SHADE TREE COMMISSION Chapter 162 SHADE TREE COMMISSION 162-1. Purpose. 162-2. Definitions. 162-3. Shade Tree Commission. 162-4. Powers and duties of Commission. 162-5. Approval required. 162-6. Duties and responsibilities.

More information

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP

1.0 INDEX TO SHEETS URGENT STORM DAMAGE REPAIR AVON PARK AIR FORCE RANGE LOCATION MAP LEGEND LOCATION MAP 5 INDEX TO SHEETS. NOTES AND TYPICAL SECTIONS. H. R. SMITH RD.CULVERT.3 0/5 END BARRIER ACCESS ROAD REPAIR. KISSIMMEE RD. AT MORGAN HOLE CR. ROAD REPAIR.5 RANGE INFRASTRUCTURE REPAIR N 0 000' 3 0,000'

More information

Maryland Invests $845 Million in New Highway and Bridge Projects

Maryland Invests $845 Million in New Highway and Bridge Projects Maryland Invests $845 Million in New Highway and Bridge Projects Completing Widening of MD 404 Talbot And Caroline Counties Top Regional Priority Queen Anne s, Talbot, and Caroline Counties Widening MD

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010) Bikeways and Enhancements Report for Lucas County (State Fiscal Years 2007 to 2010) Statewide Construction Summary by Major Work Type (in Millions) WORK TYPE SFY 2007 SFY 2008 SFY 2009 SFY 2010 TOTAL #

More information

With a flexible staff, we are able to efficiently meet the needs of the I-75 FMS project as it progresses through design and construction.

With a flexible staff, we are able to efficiently meet the needs of the I-75 FMS project as it progresses through design and construction. 7.1.3 PROPOSED PROJECT STAFFING STAFFING QUANTITY Cardno TBE has prepared a staffing estimate based on the DBF s anticipated work schedule (see Section 7.1.1) and our scope of services. The actual staffing

More information

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1

CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 CHAPTER VII CONSTRUCTION QUALITY CONTROL INSPECTION PROGRAM 1 1 This Chapter of the FERC Engineering Guidelines has been prepared under contract with R & H Thomas, Inc. JANUARY 1993 Chapter VII Construction

More information

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A Appendix A 1 1.0 Requirements and Minimum Qualifications This section outlines requirements and minimum qualifications for the GEC. It is anticipated that the GEC will be used to support and supplement

More information

Surface Transportation Program (STP)

Surface Transportation Program (STP) Project Name: Project Sponsor: FEDERAL FUNDS PROJECT APPLICATION TRANSPORTATION IMPROVEMENT PROGRAM 2008-2013 SALT LAKE and OGDEN/ LAYTON URBAN AREAS Surface Transportation Program (STP) Urban Surface

More information

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS TABLE OF CONTENTS I. RULES AND REGULATIONS A. TABLE OF CONTENTS... 2 B. TERMS AND DEFINITIONS... 3 C. DEVELOPER S/CONTRACTOR S RESPONSIBILITIES...

More information

RESOLUTION NO. 1539 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF BONNEY LAKE, PIERCE COUNTY, WASHINGTON, APPROVING THE 192 ND CORRIDOR STUDY AND DIRECTING THE MAYOR TO PROCEED WITH PARTIAL DESIGN AND

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

ACTT - Fitting the New Definition of Construction Management. Rick Smith Director, Project Control and Reporting

ACTT - Fitting the New Definition of Construction Management. Rick Smith Director, Project Control and Reporting ACTT - Fitting the New Definition of Construction Management Rick Smith Director, Project Control and Reporting New Definition of CM The totality of activities that address the management and technology

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

PROJECT MANAGEMENT HANDBOOK, PART 1 - ISSUES COMMON TO ALL PROJECT MANAGERS

PROJECT MANAGEMENT HANDBOOK, PART 1 - ISSUES COMMON TO ALL PROJECT MANAGERS CHAPTER 11 - Project Continuity Contents Introduction... 2 Phase Hand-Offs... 3 Project Feedback... 9 Project Management Team Approach... 10 Page 1 of 15 Introduction A primary objective of all Project

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT Volkert Field Office 80 M Street SE, Suite 725 Washington, DC 20003 RIVERSMART WASHINGTON - CONSTRUCTION RIVERSMART MACFARLAND, RIVERSMART LAFAYETTE AND GREEN ALLEYS CHEVY CHASE D.C. Contract No.: DCKA-2013-C-0160

More information

Porous Pavement Alternatives Cost Analysis

Porous Pavement Alternatives Cost Analysis Porous Pavement Alternatives Cost Analysis Prepared by Century West Engineering for Metro This cost analysis compares the construction costs of six different types of pavement for three different scenarios.

More information

Granger Bay Boulevard and Green Point Roundabout

Granger Bay Boulevard and Green Point Roundabout Granger Bay Boulevard and Green Point Roundabout INTRODUCTION Aurecon was appointed for the design and construction supervision of the Granger Bay Boulevard and Green Point roundabout that provides access

More information

Pavement Management Program

Pavement Management Program Pavement Management Program 2014 Street Maintenance Program Executive Summary 01/21/2014 Presented by Mark Thiel Assistant Director of Public Works Program Overview Start of current program 2005 825.1

More information

Trenching and Excavation Safety

Trenching and Excavation Safety 1.0 ACTIVITY DESCRIPTION 1.1 This document provides basic safety guidelines related to excavation and trenching in pipeline construction activities. These guidelines are applicable to the locating, marking

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013 Red Wing Bridge Project PAC #5/TAC #8 Meeting July 18, 2013 Alternatives Analysis Agenda Overview of Past Progress Progress Since April PAC Bridge 9103 Rehabilitation Study Bridge 9040 Rehab vs. Replacement

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section:

8.1.3 General Design Guidelines. The following guidelines shall be used when designing inlets along a street section: . Introduction Presented in this chapter are the criteria and methodology for design and evaluation of storm sewer inlets located in Town of Castle Rock. The review of all planning submittals will be based

More information

Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay

Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay Traffic Safety Initiatives in Tampa Bay Florida Department of Transportation District Seven Tampa Bay Peter Hsu, P.E. FDOT District Seven Safety Office Presentation Overview FDOT Traffic Safety Focus Areas

More information

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3 TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete

More information

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons)

5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) DATE: March 8, 2006 TO: FROM: SUBJECT: Plan Commission Larry D. Nelson, P.E., City Engineer 5901 Milwaukee Street Planned Unit Development (GDP) (Second Addition to Grandview Commons) The City Engineering

More information

Building Code Inspections and Fees

Building Code Inspections and Fees St. Mary s County Department of Land Use & Growth Management Customer Assistance Guide 22 Building Code Inspections and Fees May 10, 2014 This guide is intended to assist in the proper construction sequence

More information

FOR IMMEDIATE RELEASE September 17, 2013 Contact:

FOR IMMEDIATE RELEASE September 17, 2013 Contact: NEWS RELEASE FOR IMMEDIATE RELEASE September 17, 2013 Contact: Diana L. Klink 757.514.4104 757.359.1845 Tim Kelley 757.514.4103 757.871.3039 UPDATE (Bridge Road/Mills Godwin Bridge) The work scheduled

More information

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011

Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 Alternatives to the Circ Project Prioritization Methodology Prepared for Circ Task Force July 28, 2011 CCRPC staff has developed a draft methodology described below and detailed in the attached pages for

More information

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater) Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious

More information

SECTION 02221 SELECTIVE DEMOLITION

SECTION 02221 SELECTIVE DEMOLITION SECTION 02221 PART 1 -GENERAL 1.01 DESCRIPTION This section includes all material, labor, machinery and supervision required to demolish and remove the following items where applicable and as noted on

More information

CITY OF FT. MYERS TO CITY OF CAPE CORAL REUSE RIVER CROSSING PROJECT INFORMATION 10/25/2013

CITY OF FT. MYERS TO CITY OF CAPE CORAL REUSE RIVER CROSSING PROJECT INFORMATION 10/25/2013 CITY OF FT. MYERS TO CITY OF CAPE CORAL REUSE RIVER CROSSING PROJECT INFORMATION 10/25/2013 The River Crossing Project would allow the City of Ft. Myers to eliminate their current National Pollutant Discharge

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

SR-18 Corridor Improvements in Wood County

SR-18 Corridor Improvements in Wood County Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park

More information

Polk Commerce Centre CRA Spine Road Alignment Study

Polk Commerce Centre CRA Spine Road Alignment Study Polk Commerce Centre CRA Spine Road Alignment Study Florida Polytech Pace Road (LIMIT) Berkley Road Williams DRI Proposed Alignment Polk Commerce Centre CRA Boundary Braddock Road (LIMIT) Lake Myrtle Sports

More information

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14

Tabulation of Bids. Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date: 03/04/14 Solcitation No: DTFH71-14-B-00008 Division: Eastern Federal Lands State: DC County: Federal Land: 1 out of 9 Opened at: Easter Federal Lands Highway Division, Sterling, VA Opened by: Jason Albright Date:

More information

Exhibit C: Scope of Work and Schedule of Deliverables

Exhibit C: Scope of Work and Schedule of Deliverables Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

National Archives and Record Administration

National Archives and Record Administration National Archives and Record Administration Installation of Self-Closing Flood Barriers and Loading Dock Turntable Removal and Structural Slab Repairs ! 2010 Baltimore Washington Chapter Outstanding Repair

More information

Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration

More information

How To Build A City Of Virginia Beach Arena

How To Build A City Of Virginia Beach Arena City of Virginia Beach Arena Infrastructure Preliminary Conceptual Cost Estimates Doug Smith, Deputy City Manager Carl Tewksbury, Kimley-Horn City Council Briefing July 8, 2014 July 8, 2014 Presentation

More information

Asset Maintenance Bridge Emergency Response

Asset Maintenance Bridge Emergency Response FDOT Districts 1 & 7 Structures and Facilities Office Asset Maintenance Bridge Emergency Response Bridge No. 100300 Gandy Boulevard (US 92) over Tampa Bay, FL Jose Pepe Garcia, P.E., Florida DOT David

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local

More information

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

Harris County Flood Control District. Policy, Criteria, and Procedure Manual Harris County Flood Control District Policy, Criteria, and Procedure Manual For Approval and Acceptance of Infrastructure General Review October 10, 2003 Draft Please Provide Written Comments to the HCFCD

More information

PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015

PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015 PUBLIC INFORMATIONAL MEETING THURSDAY APRIL 30, 2015 AT ACTON TOWN HALL FAULKNER ROOM 472 MAIN STREET ACTON, MASSACHUSETTS 7:00 PM FOR THE PROPOSED ASSABET RIVER RAIL TRAIL (ARRT) IN THE TOWNS OF ACTON

More information

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike

More information

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP)

APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) APPLICATION LAFAYETTE METROPOLITAN PLANNING ORGANIZATION (MPO) SURFACE TRANSPORTATION PROGRAM (STP) FUNDS TRANSPORTATION IMPROVEMENT PROGRAM (TIP) To be considered for STP funding, a proposed project must

More information

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It

More information

CASFM Stormwater Quality Field Trip June 23rd, 2011

CASFM Stormwater Quality Field Trip June 23rd, 2011 CASFM Stormwater Quality Field Trip June 23rd, 2011 The 2011 CASFM Stormwater field trip included 42 attendees coming from as far south as Colorado Springs up to the Denver area and another 12 who joined

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS 1 Proposal & Plans Received? 2 Review Proposal, highlight important facts. Know proposal well to be able to find answers quickly.

More information

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

ADA POST INSPECTION CHECKLIST. Job No. Route County Location ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks

More information

Access Management South Dakota Department of Transportation

Access Management South Dakota Department of Transportation Public Meeting/ Open House October 21, 2014 Minnehaha County Environmental Assessment and Section 4(f) De Minimis Analysis Northern Segment of Hwy 100 I-90 to South of Madison Street Minnehaha County The

More information

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS

SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line

More information

How To Amend A Stormwater Ordinance

How To Amend A Stormwater Ordinance Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental

More information

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate

Legacy Trail Extension Feasibility Study. Preliminary Cost Estimate Preliminary Cost Estimate February 2015 Category item Unit Unit Cost Quantity Cost Notes Trail Corridor (Combined Trail length ~ 25,800' + Separated Trail length ~ 13,700' = Total Length ~ 39,500' or 7.5

More information

Surface Transportation Program (STP) Projects

Surface Transportation Program (STP) Projects Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE