WHO NEEDS TO KNOW YOUR DATA CENTRE DESIGN?

Size: px
Start display at page:

Download "WHO NEEDS TO KNOW YOUR DATA CENTRE DESIGN?"

Transcription

1 WHO NEEDS TO KNOW YOUR DATA CENTRE DESIGN?

2 SPOF

3 THE CONTENT THE AUDIENCE THE FRAMEWORK THE ACCESSIBILITY THE DEVELOPMENT THE UPDATES

4 THE CONTENT Detailed Design Documentation Testing and Commissioning Data As-built Operations Manuals Consolidated Design Overviews and Asset Registers Systems Design and Basic Operational Instructions Data Centre Inductions Incident Response and BCP s Maintenance Schedules Maintenance Contracts and SLA s EH& S Documentation Site Security Plan Data Centre Management Plan Stakeholder Roles and Responsibilities

5 THE AUDIENCE Data Centre Managers Facility Managers Provisioning Managers Financial Controllers Sales Personnel IT Engineers Maintenance Contractors Security Personnel Executives Security Auditors / Officers Customers Network Operations Centres (NOC s)

6 THE FRAMEWORK Policies Security Classifications Document Hierarchy Standardised Formats Standardised File Naming Governance Review Scheduling

7 THE ACCESSIBILITY Site Manuals SharePoint / Confluence (Intranet) Document Portal FM Portal Local to the System Hybrids

8 THE DEVELOPMENT Executive Management Support Security Officer Reviews Designers Facility Managers IT Managers Vendors Servicing Contractors End Users Project Management

9 THE UPDATES MAC s - Moves, Adds and Changes Improvements Major Refresh Industry Changes Security Changes Business Drivers Restructures

10 DOCUMENT SUITE EXAMPLE Area 1. Site Inspections 2. Operational s & descriptions 3. Maintenance Agreements and schedules Document title Data Centre Health Check Cabinet - Auditing Safety Auditing Thermal imaging Emergency Spares Document type Equipment Register Data Centre Access Data Centre After Hours Access Data Centre Provisioning standard Data Centre Provisioning checklist Data Centre Cleaning Equipment Transfer Electrical power up & down Electrical - UPS status Electrical - UPS operation Electrical - Generator operation Electrical - Main Switchboard Electrical - UPS Main Dist. Board Electrical - UPS CDB provisioning Electrical - Bulk Fuel Storage Electrical - Mains Fail testing Mechanical - Process Coolers status Mechanical - Process Coolers operation Mechanical - Condenser Water status Mechanical - Chilled Water status Mechanical - BMS operation Mechanical - BMS alarms list Fire System - Impairment Handling Fire System - Isolation operation Fire System - operational description Fire System - VESDA - Bushfire effect Security - Access control Security System operation Security System details Hydraulic System details Maintenance Annual Services Schedule Electrical - Generators Electrical - UPS Electrical - General (DB's thermal Mechanical Services (All systems) Fire Services (All systems) Environmental Monitoring Security (All systems) Cleaning 4. Repairs and fault management 5. Life cycle forecasting and budgets 6. Financials 7. Projects Problem escalation Electrical - loss of power Electrical - lighting Mechanical - loss of cooling Mechanical - Overtemp. (room & equip) Mechanical - water under floor Fire - smoke and flame response Security - system faults Security - breaches Environmental systems life cycle plan Spreadsheet Environmental budget vs costs recording Spreadsheet Request for upgrade Request for upgrade format Preferred Contractor list 8. Communications Work Method Statement format 9. Reporting 10. After Hours Support 11. Risk Management 12. Maintenance Agreements 13. Change & Configuration Control 14. Capacity Planning Monthly report format Fault report format Daily Log (for Data Centre activities) After Hours call out & escalation Data Centre Induction Site Emergency instructions Identified risk notification Incident and risk report format Permission to work Fire isolation format Staff Training presentation Staff Training questionnaire All systems CCC procedure CCC format Data Centre utilisation review Slideshow

11 WHO NEEDS TO KNOW YOUR DATA CENTRE DESIGN?

SOC 2 Report Seattle, WA (SEF)

SOC 2 Report Seattle, WA (SEF) SOC 2 Report Seattle, WA (SEF) October 1, 2013 January 31, 2014 Independent Service Auditor s Report INTERNAP NETWORK SERVICES CORPORATION Company-Controlled Data Center Services Type 2 Report on Controls

More information

OH&S Management Systems Audit Checklist (NAT, E3)

OH&S Management Systems Audit Checklist (NAT, E3) 3.1.2 3.1.1 Introduction OH&S Management Systems Audit Checklist (NAT, E3) This audit checklist is based on Element 3 (Implementation) of the National Self-Insurers OHS Audit Tool. For a full copy of the

More information

<COMPANY> P01 - Information Security Policy

<COMPANY> P01 - Information Security Policy P01 - Information Security Policy Document Reference P01 - Information Security Policy Date 30th September 2014 Document Status Final Version 3.0 Revision History 1.0 09 November 2009: Initial release.

More information

Statement of Work. 3.0 Details of Service Pre Start-up. - 1 - Cooling Start-up Service. Installation Service. Table of Contents. 1.0 Executive Summary

Statement of Work. 3.0 Details of Service Pre Start-up. - 1 - Cooling Start-up Service. Installation Service. Table of Contents. 1.0 Executive Summary Installation Service Statement of Work - 1 - Cooling Start-up Service Cooling Start-up Service Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features & Benefits 3.0 Details

More information

Tecknodreams Software Consulting Pvt. Ltd. Managing IT Services in an Insurance Company

Tecknodreams Software Consulting Pvt. Ltd. Managing IT Services in an Insurance Company Tecknodreams Software Consulting Pvt. Ltd. Managing IT Services in an Insurance Company Company Profile This Insurance Company is a specialist in Health Insurance and provides quality service at the best

More information

Data Centre Service Level Agreement

Data Centre Service Level Agreement Datatech UK Ltd Data Centre Service Level Agreement Prospect House Fishing Line Road Redditch Worcestershire B97 6EW Data Centre Service Level Agreement This Service Level Agreement sets the expectations

More information

Ticket Management & Best Practices. April 29, 2014

Ticket Management & Best Practices. April 29, 2014 Ticket Management & Best Practices April 29, 2014 Trouble Ticketing System Objectives CURRENT STATE Assumption: Network Operations Centers are governed by two principles 1. Pursuit of excellence in customer

More information

Method Statement Switchboard Services

Method Statement Switchboard Services CONFORMED COPY Method Statement Revision History Revision Date Reviewer Status 23 March 2007 Project Co Final Version 1 Table of Contents 1 Objectives... 3 2 Management Supervision and Organisation Structure...

More information

Measuring your capabilities in Fleet Safety Management ACC Fleet Saver

Measuring your capabilities in Fleet Safety Management ACC Fleet Saver Measuring your capabilities in Fleet Safety Management ACC Fleet Saver Audit Standard 29 May 2014 Table of Contents Page 2 1. Getting Started...3 2. Critical element 1: Registered Owner Commitment to Safety

More information

CONTENTS. Security Policy

CONTENTS. Security Policy CONTENTS PHYSICAL SECURITY (UK) PHYSICAL SECURITY (CHICAGO) PHYSICAL SECURITY (PHOENIX) PHYSICAL SECURITY (SINGAPORE) SYSTEM SECURITY INFRASTRUCTURE Vendor software updates Security first policy CUSTOMER

More information

Understanding the Promise of (DCIM)

Understanding the Promise of (DCIM) Understanding the Promise of Data Center Infrastructure Management (DCIM) Chuck Kramer, RCDD, NTS, CDCP, CDFOM Senior Solutions Consultant Emerson Network Power What is DCIM? The monitoring, collection

More information

ENVIRONMENTAL HEALTH AND SAFETY. Fire Protection System Impairment Procedure

ENVIRONMENTAL HEALTH AND SAFETY. Fire Protection System Impairment Procedure ENVIRONMENTAL HEALTH AND SAFETY Fire Protection System Impairment Procedure April 2013 Fire Protection System Impairment Procedures Table of Contents I. Purpose II. III. IV. Fire Protection Systems Compliance

More information

Data Centres at the core of your business

Data Centres at the core of your business Data Centres at the core of your business Data Centres We are leading experts in the design, installation and commissioning of innovative data centre environments. We create high availability data centre

More information

ASSET Connect. The next level in Critical Environment Operational Efficiency

ASSET Connect. The next level in Critical Environment Operational Efficiency Connect The next level in Critical Environment Operational Efficiency 10-30% is the potential efficiency gain from optimized Data Centers and Critical Environments Operational Efficiency of Your Critical

More information

Data Center Knowledge, Vision Control

Data Center Knowledge, Vision Control Data Center Knowledge, Vision Control Objective Overview of the progressive trends in Data Centers, driven by Intelligent Infrastructure Solutions Data Center Layout Secured Storage Back up Core Backbone

More information

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST

FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST FACILITY FIRE PREVENTION AND EMERGENCY PREPAREDNESS INSPECTION CHECKLIST Date of Inspection: Conducted by: Location: Reviewed by: Date of Review: Comments or additional corrective action taken as a result

More information

DATA CENTRE DATA CENTRE MAY 2015

DATA CENTRE DATA CENTRE MAY 2015 DATA CENTRE DATA CENTRE MAY 2015 CONCERTHOUSE MUSIC Concerthouse Music Data Centre services are located in the Equinix Internet Business Exchange (IBX ) Centre at Mascot. This IBX offers the highest level

More information

ISO 20000-1:2005 Requirements Summary

ISO 20000-1:2005 Requirements Summary Contents 3. Requirements for a Management System... 3 3.1 Management Responsibility... 3 3.2 Documentation Requirements... 3 3.3 Competence, Awareness, and Training... 4 4. Planning and Implementing Service

More information

GMS NETWORK ADVANCED WIRELESS SERVICE PRODUCT SPECIFICATION

GMS NETWORK ADVANCED WIRELESS SERVICE PRODUCT SPECIFICATION GMS NETWORK ADVANCED WIRELESS SERVICE PRODUCT SPECIFICATION 1. INTRODUCTION This document contains product information for the GMS Network Service. If you require more detailed technical information, please

More information

DISASTER RECOVERY PLAN

DISASTER RECOVERY PLAN DISASTER RECOVERY PLAN Section 1. Goals of a Disaster Recovery Plan The major goals of a disaster recovery plan are: To minimize interruptions to normal operations. To limit the extent of disruption and

More information

EXAMPLE OF A DATA CENTRE BUILD

EXAMPLE OF A DATA CENTRE BUILD EXAMPLE OF A DATA CENTRE BUILD BT Harmondsworth Data Centre Hall 2 Upgrade Temperature Control have been involved in providing specialist to data centres for over 20 years, starting from providing specialist

More information

IT Help Desk Call Priorities

IT Help Desk Call Priorities Author Zachary Nashed Document Name Call Priorities Version Control IT Help Desk Priorities_1.01 03/07/08 -Updated IT Help Desk Priorities_1.02 05/08/09-Updated IT Help Desk Priorities_1.03 24//08/09-Updated

More information

ASIAN PACIFIC TELECOMMUNICATIONS PTY LTD STANDARD FORM OF AGREEMENT. Schedule 3 Support Services

ASIAN PACIFIC TELECOMMUNICATIONS PTY LTD STANDARD FORM OF AGREEMENT. Schedule 3 Support Services ASIAN PACIFIC TELECOMMUNICATIONS PTY LTD STANDARD FORM OF AGREEMENT Schedule 3 Support Services December 2013 Table of Contents 1. SERVICE SCHEDULE 3 SUPPORT SERVICES... 3 1.1 OVERVIEW... 3 1.2 STANDARD

More information

A Framework for Enterprise IT Capacity Management

A Framework for Enterprise IT Capacity Management A Framework for Enterprise IT Capacity Management October 2013 Bhargav.Lavu@tcs.com Computer Measurement Group, India 1 Agenda Background The Framework Examples of Success Conclusion Questions Computer

More information

Forum Internacional de Data & Telecomunicaciones

Forum Internacional de Data & Telecomunicaciones Forum Internacional de Data & Telecomunicaciones TAC Data Center & Telecommunications Eduardo Espinosa Agenda Company Products Data Center & Telecomm Concerns TAC Integrated Cooling, Power & Security TAC

More information

OCCUPATIONAL STANDARD (For use in the development of supply chain related job descriptions, performance evaluations, career development plans, etc.

OCCUPATIONAL STANDARD (For use in the development of supply chain related job descriptions, performance evaluations, career development plans, etc. OCCUPATIONAL STANDARD (For use in the development of supply chain related job descriptions, performance evaluations, career development plans, etc.) Description of Position (As defined by the CSCSC Stakeholder

More information

Service Portfolio Management PinkVERIFY

Service Portfolio Management PinkVERIFY -11-G-001 General Criteria Does the tool use ITIL 2011 Edition process terms and align to ITIL 2011 Edition workflows and process integrations? -11-G-002 Does the tool have security controls in place to

More information

South Asia s First Uptime Institute Certified TIER-IV IDC in Mumbai delivering 99.999% guaranteed uptime

South Asia s First Uptime Institute Certified TIER-IV IDC in Mumbai delivering 99.999% guaranteed uptime South Asia s First Uptime Institute Certified TIER-IV IDC in Mumbai delivering 99.999% guaranteed uptime GPX India Pvt Ltd The Leader In Carrier Neutral TIER IV IDC s In Emerging Markets Incorporated in

More information

Information Technology Policy

Information Technology Policy ITP Number ITP-SEC024 Category Security Contact RA-ITCentral@pa.gov Information Technology Policy IT Security Incident Policy Effective Date August 2, 2012 Supersedes Scheduled Review Annual 1. Purpose

More information

Your Data Center Is the Lifeblood of Your Operations.

Your Data Center Is the Lifeblood of Your Operations. Data Specialties Inc. Data Specialties Inc. Your Data Center Is the Lifeblood of Your Operations. Your Data Center Houses the Mission-Critical Systems that Drive Your Company. Assessment and Design Data

More information

Facilities Maintenance Contract

Facilities Maintenance Contract Re-tendering the Facilities Maintenance Contract Asset Management Services UTAS Property Portfolio Total Asset Management Reviewing options and preferences Contract structure & deliverables Tendering process

More information

Health and Safety Management Standards

Health and Safety Management Standards Health and Safety Management Standards Health and Safety Curtin University APR 2012 PAGE LEFT INTENTIONALLY BLANK Page 2 of 15 CONTENTS 1. Introduction... 4 1.1 Hierarchy of Health and Safety Documents...

More information

HealthcareBookings.com Security Set Up

HealthcareBookings.com Security Set Up HealthcareBookings.com Security Set Up Introduction... 2 Overview of the process for using HealthcareBookings.com... 2 Professionals... 2 Patients... 3 Passwords... 4 Hosting Security... 4 Overview of

More information

Guide to your Home Emergency Management and Defect Notification Service

Guide to your Home Emergency Management and Defect Notification Service Guide to your Home Emergency Management and Defect Notification Service Table of Contents Welcome... 2 Registering your properties... 3 Property & Contact details... 3 Nominated Contractors... 3 Escalation

More information

A cure for water damage in real estate

A cure for water damage in real estate A cure for water damage in real estate Presented for BC Non-Profit Housing Association by Jeff Shearman, Zurich Services Corporation 2010 Zurich Canada Focused on our customer Reduce overall risk by reducing:

More information

1. INCIDENT MANAGEMENT

1. INCIDENT MANAGEMENT 1. INCIDENT MANAGEMENT Topic/Question 1.1 Incident Identification Can incident records be created manually? 1.2 Unique Reference Does the tool automatically allocate a unique reference to newly created

More information

Advanced planning / change impact features

Advanced planning / change impact features IT Inventory, Space and ivity Management Automated diagramming reduces workload and errors Find any device and it s connectivity (LAN/WAN/SAN/Power) quickly Reduce cost and risk of implementing infrastructure

More information

FIRE ALARM /FIRE PROTECTION OUTAGE/IMPAIRMENT RESPONSE GUIDELINE

FIRE ALARM /FIRE PROTECTION OUTAGE/IMPAIRMENT RESPONSE GUIDELINE Page 1 of 10 FIRE ALARM /FIRE PROTECTION OUTAGE/IMPAIRMENT RESPONSE GUIDELINE SYSTEM TESTING 1. Testing of the Fire Alarm and Fire Protection Systems 1.1. The Building Engineer, Electrician, Plumber (or

More information

Network Router Monitoring & Management Services

Network Router Monitoring & Management Services Network Router Monitoring & Management Services Get different parameters of routers monitored and managed, and protect your business from planned and unplanned downtime. SERVICE DEFINITION: NETWORK ROUTER

More information

Fire Alarm Systems Certification

Fire Alarm Systems Certification Fire Alarm Systems Certification The skills and knowledge listed under each task are suggestive of those involved in that task, but are not intended to constitute an exhaustive listing. 2.1 Submittal Preparation

More information

ITIL Roles Descriptions

ITIL Roles Descriptions ITIL Roles s Role Process Liaison Incident Analyst Operations Assurance Analyst Infrastructure Solution Architect Problem Manager Problem Owner Change Manager Change Owner CAB Member Release Analyst Test

More information

ASX Australian Liquidity Centre. ASXCoLo

ASX Australian Liquidity Centre. ASXCoLo ASX Australian Liquidity Centre ASXCoLo Australian Liquidity Centre Location The ASX Australian Liquidity Centre is located at: Gore Hill Business Park 219-247 Pacific Highway Artarmon. NSW, 2064 The location

More information

This 5 days training Course focuses on Best Practice Data Centre Design, Operation and Management leading to BICSI credits.

This 5 days training Course focuses on Best Practice Data Centre Design, Operation and Management leading to BICSI credits. This 5 days training Course focuses on Best Practice Data Centre Design, Operation and Management leading to BICSI credits. DCD, DCOM, DCE DESIGN IMPLEMENTATION BEST PRACTICE OPERATION & MANAGEMENT DATA

More information

Managed Support Policy

Managed Support Policy TABLE OF CONTENTS 1. SERVICE DESCRIPTION 2 2. SUPPORT OPTIONS 2 3. SERVICE SUPPORT HOURS 3 4. MONITORING AND OUTAGES 3 5. SERVICE LEVEL AGREEMENT 4 6. PLANNED MAINTENANCE AND UPGRADES 5 7. TARGET UPTIME

More information

South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering 99.999% uptime

South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering 99.999% uptime South Asia s First Uptime Institute Certified TIER- IV IDC in Mumbai delivering 99.999% uptime GPX India Pvt Ltd The Leader In Carrier Neutral TIER IV IDC s In Emerging Markets Incorporated in August 2002,

More information

Engineering & Support Services

Engineering & Support Services Engineering & Support Services Expert Project, Engineering & Customer Support Services Providing a range of Engineering and Support Services for:- Mission Critical Environments Data Centres & Server Room

More information

ANNEXURE C Operate and Maintenance Services for COT

ANNEXURE C Operate and Maintenance Services for COT ANNEXURE C Operate and Maintenance Services for COT Page 1 of 8 Table of Contents 1. Network Proposal Product Offering...3 2. Service Offering...4 3. Voice Services on all locations with CPE (AR2220)...4

More information

Sample - Existing Building Commissioning Plan

Sample - Existing Building Commissioning Plan Sample - Existing Building Commissioning Plan Version: Draft for Review Final Approved: Owner Site Address: Primary Site Contact Name and Telephone Number: Date Building Description The site consists of

More information

PAAS Public Sector Managed Services

PAAS Public Sector Managed Services Meritec Limited Meritec House, Acorn Business Park, Skipton, North Yorkshire, BD23 2UE 0845 3451155 servicepoint@meritec.co.uk www.meritec.co.uk Registered In England & Wales No. 3224622 Table of Contents

More information

SYSTRUST CERTIFICATION REPORT FOR COLLOCATION AND DATA CENTER HOSTING SERVICES FOR THE PERIOD FROM JANUARY 1, 2013 TO DECEMBER 31, 2013

SYSTRUST CERTIFICATION REPORT FOR COLLOCATION AND DATA CENTER HOSTING SERVICES FOR THE PERIOD FROM JANUARY 1, 2013 TO DECEMBER 31, 2013 SYSTRUST CERTIFICATION REPORT FOR COLLOCATION AND DATA CENTER HOSTING SERVICES FOR THE PERIOD FROM JANUARY 1, 2013 TO DECEMBER 31, 2013 TABLE OF CONTENTS SECTION I: INDEPENDENT PRACTITIONERS TRUST SERVICES

More information

FM & SECURITY SOLUTIONS. SSS Managed Services. Impartial, innovative, involved

FM & SECURITY SOLUTIONS. SSS Managed Services. Impartial, innovative, involved FM & SECURITY SOLUTIONS SSS Managed Services Impartial, innovative, involved SSS MANAGED SERVICES INTRODUCTION SSS Managed Services provides a range of flexible, scalable and service-led solutions for

More information

SECTION I: REPORT OF INDEPENDENT SERVICE AUDITORS... 3 SECTION II: MANAGEMENT OF INTERNAP NETWORK SERVICES CORPORATION'S ASSERTION 5

SECTION I: REPORT OF INDEPENDENT SERVICE AUDITORS... 3 SECTION II: MANAGEMENT OF INTERNAP NETWORK SERVICES CORPORATION'S ASSERTION 5 SOC 2 - Availability Report on Internap Network Services Corporation's Description of its SEF Company-Controlled Data Center System and Suitability of Design and Operating of Controls Throughout the Period

More information

Colocation Service Level Agreement

Colocation Service Level Agreement Colocation Service Level Agreement (February 2011) 1 Contents 2 Summary... 2 3 Power Summary... 2 4 Access... 2 5 Security... 2 6 Environment... 3 7 Fire Protection... 3 8 Connectivity... 3 9 Monitoring...

More information

Best Practice Guide for the Co-Installation of Maximo Asset Configuration Manager (ACM) and Maximo for Transportation (Tr)

Best Practice Guide for the Co-Installation of Maximo Asset Configuration Manager (ACM) and Maximo for Transportation (Tr) Best Practice Guide for the Co-Installation of Maximo Asset Configuration Manager (ACM) and Maximo for Transportation (Tr) August 20, 2013 Version 1.0 Authors: Carey Clarke - Lead Architect, Maximo for

More information

ANNEXURE I SERVICE LEVEL AGREEMENT BETWEEN. The Client. and. The Contractor/Service Provider. HVAC Systems Maintenance Service

ANNEXURE I SERVICE LEVEL AGREEMENT BETWEEN. The Client. and. The Contractor/Service Provider. HVAC Systems Maintenance Service ANNEXURE I SERVICE LEVEL AGREEMENT BETWEEN The Client and The Contractor/Service Provider HVAC Systems Maintenance Service Page 1 of 11 Version Number Originator Status Date Signature Page 2 of 11 Table

More information

Integrated Asset Management System for the Australian Capital Territory. Enabling Decision Making For Asset Owners Through Evidence Based Information

Integrated Asset Management System for the Australian Capital Territory. Enabling Decision Making For Asset Owners Through Evidence Based Information Integrated Asset Management System for the Australian Capital Territory Enabling Decision Making For Asset Owners Through Evidence Based Information Territory and Municipal Services - TAMS Roads ACT Land

More information

Information Technology Engineers Examination. Information Technology Service Manager Examination. (Level 4) Syllabus

Information Technology Engineers Examination. Information Technology Service Manager Examination. (Level 4) Syllabus Information Technology Engineers Examination Information Technology Service Manager Examination (Level 4) Syllabus Details of Knowledge and Skills Required for the Information Technology Engineers Examination

More information

Sarbanes Oxley Act Statement of Ability. An AdRem Software White Paper

Sarbanes Oxley Act Statement of Ability. An AdRem Software White Paper Sarbanes Oxley Act Statement of Ability An AdRem Software White Paper 2009 AdRem Software, Inc. This document is written by AdRem Software and represents the views and opinions of AdRem Software regarding

More information

Physical Security Policy

Physical Security Policy Physical Security Policy Author: Policy & Strategy Team Version: 0.8 Date: January 2008 Version 0.8 Page 1 of 7 Document Control Information Document ID Document title Sefton Council Physical Security

More information

Data Protection Breach Management Policy

Data Protection Breach Management Policy Data Protection Breach Management Policy Please check the HSE intranet for the most up to date version of this policy http://hsenet.hse.ie/hse_central/commercial_and_support_services/ict/policies_and_procedures/policies/

More information

Intrado Call Handling CPE. Standard Maintenance and Support Services ( MSS Terms )

Intrado Call Handling CPE. Standard Maintenance and Support Services ( MSS Terms ) Intrado Call Handling CPE Standard Maintenance and Support Services ( MSS Terms ) These Maintenance and Support Services terms ( MSS Terms ) describe the current offerings for maintenance and support services

More information

Auditing in an Automated Environment: Appendix C: Computer Operations

Auditing in an Automated Environment: Appendix C: Computer Operations Agency Prepared By Initials Date Reviewed By Audit Program - Computer Operations W/P Ref Page 1 of 1 Procedures Initials Date Reference/Comments OBJECTIVE - To document the review of the computer operations

More information

MSP Service Matrix. Servers

MSP Service Matrix. Servers Servers MSP Service Matrix Microsoft Windows O/S Patching - Patches automatically updated on a regular basis to the customer's servers and desktops. MS Baseline Analyzer and MS WSUS Server used Server

More information

Controlled Environments from M&E Services

Controlled Environments from M&E Services Controlled Environments from M&E Services EW EWS M&E Services designs, installs, and commissions air conditioning, heat recovery, together with heating & ventilation systems, throughout the UK. Established

More information

DataCentre Access Policies & Procedures

DataCentre Access Policies & Procedures DataCentre Access Policies & Procedures Contents Purpose... 3 Overview... 3 DataCentre Access... 3 DataCentre Access Levels... 4 Periodic Review & Termination of Access... 5 DataCentre Access Log... 5

More information

Document Details. 247Time Backup & Disaster Recovery Plan. Author: Document Tracking. Page 1 of 12

Document Details. 247Time Backup & Disaster Recovery Plan. Author: Document Tracking. Page 1 of 12 Document Details Title: Author: 247Time Backup & Disaster Recovery Plan Document Tracking Page 1 of 12 TABLE OF CONTENTS 1 INTRODUCTION... 3 1.1 OVERVIEW... 3 1.2 DEFINED REQUIREMENT... 3 2 DISASTER OVERVIEW...

More information

BlueCielo Meridian Today

BlueCielo Meridian Today BlueCielo Meridian Today Positioning of our current product portfolio BlueCielo Meridian Customer Day June 26, 2014 Gilze Rijen The Netherlands Edwin van Dijk, Business Solution Specialist BlueCielo ECM

More information

Amcom Service Level Agreement

Amcom Service Level Agreement Amcom Service Level Agreement September 2015 Amcom Pty Ltd ACN 009 336 341 amcom.com.au Level 22, 44 St Georges Terrace, Perth WA 6000 GPO Box 2541, Perth WA 6001 Contents Definitions and Interpretation...

More information

Intelligent Workforce Management

Intelligent Workforce Management Intelligent Workforce Management ASSESSING CURRENT ACTIVE PERSON PROFILE (APP) NUMBERS Customer Procedure Contents 1 Active Person Profile (APP) Definition... 3 2 Active Person Profile (APP) Licensing...

More information

Role of Support Infra & Best Practices

Role of Support Infra & Best Practices Role of Support Infra & Best Practices Sharat Chandra Infrastructure Management from a Shared Services Provider point of view Safe harbor Neither the information nor any opinion expressed in this presentation

More information

PII Compliance Guidelines

PII Compliance Guidelines Personally Identifiable Information (PII): Individually identifiable information from or about an individual customer including, but not limited to: (a) a first and last name or first initial and last

More information

Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool

Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool This WHS Auditing System Tool is to be used as a self-assessment of YOUR COMPANY compliance with AS 4801 and the Work Health and Safety Act

More information

Service Asset & Configuration Management PinkVERIFY

Service Asset & Configuration Management PinkVERIFY -11-G-001 General Criteria Does the tool use ITIL 2011 Edition process terms and align to ITIL 2011 Edition workflows and process integrations? -11-G-002 Does the tool have security controls in place to

More information

SAFETY and HEALTH MANAGEMENT STANDARDS

SAFETY and HEALTH MANAGEMENT STANDARDS SAFETY and HEALTH STANDARDS The Verve Energy Occupational Safety and Health Management Standards have been designed to: Meet the Recognised Industry Practices & Standards and AS/NZS 4801 Table of Contents

More information

250 St Georges Tce, Perth, WA (QV1)

250 St Georges Tce, Perth, WA (QV1) 250 St Georges Tce, Perth, WA (QV1) Building Profile Building Construction date 1991 Refurbishment date Owner Building Size Refurbishment Team Building Management Awards Ratings QV.1, 250 St Georges Terrace,

More information

DATA CENTRE DATA CENTRE

DATA CENTRE DATA CENTRE DATA CENTRE DATA CENTRE v. OCT 2014 DJ CENTRAL DJ Central Data Centre services are located in the Equinix Internet Business Exchange (IBX ) Centre at Mascot. This IBX offers the highest level of service

More information

Service Level Agreement for Microsoft Online Services

Service Level Agreement for Microsoft Online Services Service Level Agreement for Effective: September 1, 2011 1. Introduction. This Service Level Agreement for (this SLA ) is provided in connection with, and is a part of, Customer s agreement with Bell for

More information

Records Management plan

Records Management plan Records Management plan Prepared for 31 October 2013 Audit Scotland is a statutory body set up in April 2000 under the Finance and Accountability (Scotland) Act 2000. We help the Auditor General for Scotland

More information

Service Description Email Filtering

Service Description Email Filtering Service Description Email Filtering Table of Contents Overview iomart Email Filtering... 3 iomart Email Filtering Features... 3 Technical Features... 3 Anti-Spam... 3 Cost Reduction... 4 Anti-Virus...

More information

Pennsylvania Summer Reliability

Pennsylvania Summer Reliability A. Reliability Enhancement Programs In 2015, Pennsylvania Power Company s ( Penn Power or Company ) reliability plan incorporates projects and programs to enhance overall reliability. The plan is structured

More information

OAMC ICT Maintenance Presentation

OAMC ICT Maintenance Presentation OAMC READINESS - ICT OAMC ICT Maintenance Presentation 17 th March 2014 SYSTEMS OVERVIEW Business Systems Airport Systems Building Systems Security Systems 1) Enterprise Resource Planning (ERP) 2) Computerized

More information

Supplier Security Assessment Questionnaire

Supplier Security Assessment Questionnaire HALKYN CONSULTING LTD Supplier Security Assessment Questionnaire Security Self-Assessment and Reporting This questionnaire is provided to assist organisations in conducting supplier security assessments.

More information

Exhibit to Data Center Services Service Component Provider Master Services Agreement

Exhibit to Data Center Services Service Component Provider Master Services Agreement Exhibit to Data Center Services Service Component Provider Master Services Agreement DIR Contract No. DIR-DCS-SCP-MSA-002 Between The State of Texas, acting by and through the Texas Department of Information

More information

Introducing UNSW s R1 Data Centre

Introducing UNSW s R1 Data Centre Introducing UNSW s R1 Data Centre R1-DC Our New High Density Data Centre Right here Right now - Welcome to our newest UNSW Data Centre R1-DC R1 Location on UNSW Randwick campus. Keeping it in the family

More information

OPERATIONAL SERVICE LEVEL AGREEMENT BETWEEN THE CLIENT AND FOR THE PROVISION OF PRO-ACTIVE MONITORING & SUPPORT SERVICES

OPERATIONAL SERVICE LEVEL AGREEMENT BETWEEN THE CLIENT AND FOR THE PROVISION OF PRO-ACTIVE MONITORING & SUPPORT SERVICES OPERATIONAL SERVICE LEVEL AGREEMENT BETWEEN THE CLIENT AND FOR THE PROVISION OF PRO-ACTIVE MONITORING & SUPPORT SERVICES IN CONFIDENCE TABLE OF CONTENTS 1 CONTACT DETAILS 1 1.1 The Client Contract Management

More information

Essential NCPI Management Requirements for Next Generation Data Centers

Essential NCPI Management Requirements for Next Generation Data Centers Essential NCPI Requirements for Next Generation Data Centers By Ted Ives White Paper #14 1 Executive Summary The management of physical infrastructure in data centers can no longer be considered independently

More information

Risk Guidance Note 03. Management of In-Rack Automatic Sprinklers (IRAS)

Risk Guidance Note 03. Management of In-Rack Automatic Sprinklers (IRAS) Risk Guidance Note 03 Management of In-Rack Automatic Sprinklers (IRAS) Overview In-rack automatic sprinklers (IRAS) are often a fundamental part of the fire protection solution for racked storage areas.

More information

Data Center Application and Equipment Hosting Services Effective April 1, 2009 Revised March 7, 2011

Data Center Application and Equipment Hosting Services Effective April 1, 2009 Revised March 7, 2011 Information Technology Data Center Application and Equipment Hosting Services Effective April 1, 2009 Revised This document outlines the services NUIT provides from the central data centers to host applications

More information

Project Management Handbook 2014. "To Understand the Causes of Things"

Project Management Handbook 2014. To Understand the Causes of Things Management Handbook 2014 "To Understand the Causes of Things" AMENDMENT RECORD This document has been issued and amended as follows: - Isu. Rev. Reason for Issue / revision Date Issued to Team Stakeholders

More information

Does it state the management commitment and set out the organizational approach to managing information security?

Does it state the management commitment and set out the organizational approach to managing information security? Risk Assessment Check List Information Security Policy 1. Information security policy document Does an Information security policy exist, which is approved by the management, published and communicated

More information

University of Brighton School and Departmental Information Security Policy

University of Brighton School and Departmental Information Security Policy University of Brighton School and Departmental Information Security Policy This Policy establishes and states the minimum standards expected. These policies define The University of Brighton business objectives

More information

CONTRACTOR SAFETY MANAGEMENT PROCEDURE

CONTRACTOR SAFETY MANAGEMENT PROCEDURE CONTRACTOR SAFETY MANAGEMENT PROCEDURE Version 1.0 TRIM file number Short description Relevant to Authority Responsible officer Responsible office Date introduced July 20, 2015 Date(s) modified June 11,

More information

JOB DESCRIPTION CONTRACTUAL POSITION

JOB DESCRIPTION CONTRACTUAL POSITION Ref #: IT/P /01 JOB DESCRIPTION CONTRACTUAL POSITION JOB TITLE: INFORMATION AND COMMUNICATIONS TECHNOLOGY (ICT) SECURITY SPECIALIST JOB SUMMARY: The incumbent is required to provide specialized technical

More information

Server Monitoring & Management Services

Server Monitoring & Management Services Server Monitoring & Management Services Monitor and manage your applications and servers under enterprise-class monitoring solutions, and protect your business from planned and unplanned downtime. ITI

More information

LIFT MANAGEMENT. Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee

LIFT MANAGEMENT. Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee LIFT MANAGEMENT Version 01 / November 2015 Page 1 of 9 Approved by Health & Safety Committee This is a controlled document. It should not be altered in any way without the express permission of the author

More information

MICHIGAN AUDIT REPORT OFFICE OF THE AUDITOR GENERAL THOMAS H. MCTAVISH, C.P.A. AUDITOR GENERAL

MICHIGAN AUDIT REPORT OFFICE OF THE AUDITOR GENERAL THOMAS H. MCTAVISH, C.P.A. AUDITOR GENERAL MICHIGAN OFFICE OF THE AUDITOR GENERAL AUDIT REPORT THOMAS H. MCTAVISH, C.P.A. AUDITOR GENERAL The auditor general shall conduct post audits of financial transactions and accounts of the state and of all

More information

General Platform Criterion Assessment Question

General Platform Criterion Assessment Question Purpose: [E]nsure that the assets required to deliver services are properly controlled, and that accurate and reliable information about those assets is available when and where it is needed. (ST 4.3.1)

More information

APPENDIX 1 PRODUCT SPECIFICATION

APPENDIX 1 PRODUCT SPECIFICATION APPENDIX 1 PRODUCT SPECIFICATION Product Specifications Voice System Maintenance Service 1. Introduction This document contains information describing the Voice System Maintenance Service. This document

More information

Critical Infrastructure Private Guarding Company Requirements Checklist

Critical Infrastructure Private Guarding Company Requirements Checklist Critical Infrastructure Private Guarding Company Requirements Checklist Introduction 1. Secure and protected critical infrastructure sites are vital to the security and stability of each EU Member State

More information

ORACLE QUALITY ORACLE DATA SHEET KEY FEATURES

ORACLE QUALITY ORACLE DATA SHEET KEY FEATURES ORACLE QUALITY KEY FEATURES Enterprise wide Quality Data Repository In-process Quality Integrated with manufacturing, logistics, maintenance and service modules in the Oracle E-Business Suite. Analysis

More information