Similar documents
Certificate of Registration

Application For General Liability Coverage

REQUIREMENTS FOR REGISTRATION AS A PROFESSIONAL ENGINEER WITH THE PROFESSIONAL ENGINEERS BOARD SINGAPORE

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

Sixteenth Meeting of the Cross Polar Trans East Air Traffic Management Providers Work Group (CPWG/16) (Ottawa, Canada 3-6 December 2013)

Ordinance on Railway Infrastructure. General provisions. Article 1

Description of Selected Services under the UN CPC system in which the EC made Market Access Commitments in the EPA

Examples of Eligible Projects. Project Category Description Examples

COMMERCIAL GENERAL LIABILITY INSURANCE APPLICATION - AIRPORT TENANTS (FBO)

The total estimated PFC revenue for the application is $266,900,000. The estimated charge effective date for this application is December 1, 2016.

Professor Dimitrios Tsamboulas National Technical University of Athens, Greece Expert

Operations at Coulter Airfield

PROJECT PROPOSAL FOR THE SUPPLY AND OF A MULTI-PURPOSE AIRCRAFT HANGAR, A PARALLEL TAXI-WAY, NEW TERMINAL BUILDING AND

MCAS Miramar Construction. Christopher Manis Deputy S-4, MCAS Miramar

DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT ARCHITECTURAL/ENGINEER FEES EFFECTIVE DATE: July 13, 2015

2. LIABILITY COVERAGE OPTIONS AND LIMITS DESIRED (please complete using N/A when not applicable)

Dallas/Fort Worth International Airport SEADOG ASSESSMENT TEAM. TEAM MEMBER BIOGRAPHIES October 2008

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide

DIVISION OF FACILITIES AND CONSTRUCTION MANAGEMENT ARCHITECTURAL/ENGINEER FEES EFFECTIVE DATE: April 18, 2016

Technical Council on Lifeline Earthquake Engineering (TCLEE) Anshel J. Schiff

Florida SUPPLY CHAIN MANAGEMENT. Executive Summary

ELECTRICAL ENGINEERING ASSOCIATE, 7525

School of Engineering

WATER SUPPLY SYSTEMS FOR 150/5220-4B AAS-100 AIRCRAFT FIRE AND RESCUE PROTECTION

Types of Engineering Jobs

APEC CAPABILITIES PROJECT MANAGEMENT / SUPPORT

CENTRAL OHIO NORTHEAST OHIO

Strategic Business Plan

DEFENCE FORCE REMUNERATION TRIBUNAL

Aerodrome Advisory Circular

2012 Regional Overview

DIVISION D ELECTRICITY, GAS, WATER AND WASTE SERVICES

Advanced Medical Transport

SAME Oklahoma City Post

SEBENICO ATSI COMPANY OVERVIEW

About us. Eugensa is an ISO 9001:2008 certified company. CERT

Existing Facilities. Current and Forecast Demand

Plant Design for Oil & Gas Industry Client

Fuel Tanker Online Content Monitoring. Petroleum Products Real Time! Solution for Modern Businesses

Hydrogen Powered Bus Fleets Hydrogen Supply & Fueling. National Fuel Cell Bus Workshop October 5, New Orleans, LA

NAPCS Product List for NAICS 54134: Drafting Services

The Future is Made of Ideas. Power Converters Included.

How To Know The History Of The Airport

CIVIL AND MINING CONTRACTORS

INCIDENT COMMAND SIMULATOR

Guardian Telecom Systems. Telephone.

Climate Change and Infrastructure Planning Ahead

WATER / WASTEWATER & POWER PROJECTS LAST 5 YEARS. No of Staff Provided by BCE. Overall Project Value (SR)

BONATTI: COMPANY OVERVIEW

AGILITY TRANSPORT OVERVIEW. May 2014

Attention to whom it may concern,

CIVIL ENGINEERING ASSOCIATE, 7246

Exceptional... Everytime!

Effective Date: Expiry Date: STATEMENT OF FACT

Electricity market drivers

Please provide details of your claims within the last 5 years Date Incident details Amount paid Amount reserved

Latest State of Direct Refueling Technology

MASTER PLAN PREPARATION

Esa Jokioinen Rolls Royce Marine MUNIN Workshop at SMM. Trusted to deliver excellence

ESTIMATES OF EXPENDITURE ON DEVELOPMENT ACCOUNT 2012/2013

LOGAN TERMINAL B SUBSTATION UPGRADE

Executive Flight Office & Hangar

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

Role in the project (e.g. Prime Engineering Consultant or Contractor), and summary of professional Duties : Name Professional Duties Contract Awarded?

STV. ENDURING. DRIVEN. VISIONARY. ENERGY SERVICES

Pipeline Engineering and Field Services


Pavement Management Program

INDUSTRIAL ZONE KUTNÁ HORA

Military Transactions

Industrial area with Hangar. Land area: sqm Hangar area: sqm Office area: 250 sqm Brazil Espírito Santo Serra Highway BR 101 North

MBJ Environmental Programmes

TECHNICAL CERTIFICATION CATEGORIES INTERNAL SERVICES DEPARTMENT A&E SERVICES PROFESSIONAL SERVICES CERTIFICATION

ESBI Company Profile. ESB International. Bringing Energy Innovation to the World...

About DRA Infrastructure

C-2 Construction, Inc. - NAICS Codes

Construction Services

Society of American Military Engineers Omaha District

Tank Gauging & Inventory Management Solutions

Transcription:

ESER was established in 1968 under the name of Tekser Technical Services Inc. Following a change in its name in 1985, it has served its customers under the name of ESER Consulting Engineering Inc. ESER is a multidisciplinary engineering and consulting company, completely independent with no ties to construction companies, manufacturers, suppliers and/or financial institutions and thus exclusively serves to the interests of its customers. ESER being an independent technical consultant, is member of FIDIC International Federation of Consulting Engineers and EFCA European Federation of Consulting Associations. ESER offers a wide range of engineering and consultancy services from feasibility studies to implementation and commissioning in its fields of activity. ESER's one of the basic service criteria is reliability in terms of quality, cost and deadlines and, with the quality of its works, is always aimed at exceeding the expectations of its customers. ESER's Quality Management System certified according to TS EN ISO 9001:2008 gives its customers the assurance of being in safe hands. ABOUT US ESER, with its areas of competence and quality of services, engineering and consulting companies in Turkey. ranks among the top

RANGE of SERVICES and FIELDS of ACTIVITY The services offered by ESER follow the forms of different types of projects, in accordance with the needs and requirements of the customers, and are aimed at exceeding customers' expectations. RANGE of SERVICES Procurement Documentation Tender Documentation Tender Evaluation Construction Shop Drawings Construction Specifications Construction Supervision Project Management Construction Management Contract Management Cost Control and Time Scheduling Start-up Inspections Commissioning Operating & Maintenance Instructions Feasibility Studies Economical & Financial Analyses Environmental Impact Studies As-built Documentation Reconnaissance Surveys Topographical Surveys Transportation Studies Conceptual Engineering Geotechnical Studies Geophysical Studies Basic Engineering Detailed Engineering Cost Estimations FIELDS of ACTIVITY WATER SUPPLY and WASTEWATER Dams and Reservoirs Water and Sewage Networks, Treatment Plants Pump Stations, Storage Tanks BUILDINGS and SPECIAL STRUCTURES Intelligent Buildings, Hospitals Aircraft Hangars, Industrial Complexes OIL and GAS FACILITIES Pipelines, Pump Stations and Storage Facilities Pressure Reducing and Metering Stations Storage, Loading/Unloading Facilities MOTORWAYS and STATE HIGHWAYS Motorways and State Highways Tunnels, Bridges and Viaducts Junctions and Signalization AIRPORTS and MARINE STRUCTURES Runways and Paved Areas Terminals and Airfield Facilities Naval Bases, Harbours and Piers RAILWAYS and LIGHT RAIL SYSTEMS Urban Mass Transit Systems High Speed Railways, Station Facilities Tunnels, Bridges, Viaducts ENERGY PRODUCTION and OTHERS Wind Energy Systems Hydroelectric Power Plants and Transmission Lines

COMPLETED AIRFIELD FACILITIES TURKEY MILITARY AIRFIELDS - TURKEY (NATO) CIVIL AIRPORTS - TURKEY MILITARY AIRFIELDS - IRAQ (USACE) MILITARY AIRFIELD - KUWAIT IRAQ KUWAIT

CORLU AIRFIELD (NATO) N 08 08 13 12 08 09 06 11 03 07 02 05 05 07 04 01 04 07 07 11 10 CIVIL TERMINAL FACILITIES 01 - Concrete Runway (3,000 m x 45 m), LCN 59 02 - Concrete Parallel Taxiway (3,000 m x 22.5 m) LCN 59 03 - Concrete Loading and Unloading Platform (2,000 sqm) LCN 59 04 - Concrete Asphalt Overruns (150 x 45 m) 05 - Connection Taxitracks (16,700 sqm) 06 - Concrete Aircraft Parking Apron (95,000 sqm) 07 - CAT 2 Runway, Taxiway, Apron Lighting Systems 08 - Internal Roads (30,170 sqm) 09 - Parking and Marshalling Area (50,780 sqm) 10 - GCA Facilities (200 sqm) 11 - Perimeter Wire Fence (11,700 m) 12 - Jet Fuel Storage Facilities 13 - Headquarters Facilities

13 01 - Concrete Runway (3,000 m x 45 m), LCN 59 02 - Concrete Parallel Taxiway (3,000 m x 22.5 m) LCN 59 05 - Connection Taxitracks (16,700 sqm) 06 - Concrete Aircraft Parking Apron (95,000 sqm) 08 - Internal Roads (30,170 sqm) 09 - Parking and Marshalling Area (50,780 sqm) 12 - Jet Fuel Storage Facilities 12A - Hydrant Refueling Pit CORLU AIRFIELD (NATO) 08 12 N 15 15 08 08 14 16 19 15 18 17 12A 12A 09 12A 12A 13 - Headquarters Facilities 14 - Communication and Meteorology Building (123 sqm) 15-15.8 kv Transformer Building 16 - Motor Fuel Underground Storage (40 cum, 10 cum) 17 - Aircraft Maintenance Hangar 18 - Open Storage Area (10,375 sqm) 19 - Warehouse (1,065 sqm) 02 06 05 01

AFYON AIRFIELD (NATO) N 01 - Taxitrack Loop (22,212 sqm) 02 - Connection Taxitracks (9,087 sqm) 03 - Aircraft Parking Platforms (8,960 sqm) 04 - Strategic Cargo A/C Parking Platform (8,000 sqm) 05 - Maintenance and Inspection Apron (9,500 sqm) 06 - Internal Roads (1,260 sqm) 07 - Taxitrack Lighting 08 - Jet Fuel Storage Facility 09 - Liquid Oxygen Storage Building 10-6.3 Kv Transformer Substation 03 11 - Squadron Operations Building 08 06 10 09 02 05 02 11 03 01 04 07

01-3400 m x 45 m Runway Restoration (LCN 65) 02-3400 m x 22.5 m Parallel Taxiway Restoration (LCN 65) 03-2 each Connecting Taxiway Restoration (LCN 65) 04-2 each Connecting Taxiway (LCN 65) 05 - Parking and Maintenance Apron (LCN 65, 30,000 sqm) 06 - Jet Fuel Storage Facility KONYA MAIN AIRFORCE BASE (NATO) 07 - AWACS Aircraft FOB Facilities 08 - Aircraft Parking Apron Jet Fuel Hydrant System 09 - Electrical System Restoration (5 TR, 11.5 km MV Cable) 10 - Jet Fuel Pipeline (6 inch, 5560 m) 11 - Sewage System (15,130 m) 12 - Main Power Transformer (7500 kva) N 09 11 11 09 10 07 06 08 05 04 01 03 03 04 02 10 12 09 11 09 10 11 CIVIL TERMINAL FACILITIES

14 KONYA MAIN AIRFORCE BASE (NATO) N 09 10 07 06 06 11 13 16 12 06 15 01-3400 m x 45 m Runway Restoration (LCN 65) 05 - Parking and Maintenance Apron (LCN 65, 30,000 sqm) 06 - Jet Fuel Storage Facility 07 - AWACS Aircraft FOB Facilities 08 - Aircraft Parking Apron Jet Fuel Hydrant System 09 - Electrical System Restoration (5 TR, 11.5 km MV Cable) 10 - Jet Fuel Pipeline (6 inch, 5560 m) 11 - Aircraft Maintenance Hangar 08 05 15 16 16 15 12 - Refueling Truck Shelters 13 - AWACS Parking Apron Lighting System 14 - Water Storage 15 - AWACS Apron Frequency Converters (312.5 kva) 16 - AWACS Apron Dehumification Units 01

01 - Main Runway Concrete Pavement Renewal (3,250 m x 45 m) 02 - Runway Heads Concrete Pavement Renewal (150 m x 45 m) 03 - Overruns Asphalt Pavement Renewal (150 m x 51 m) 04 - East Runway Head Connection Taxitrack Concrete Pavement Renewal (1,380 sqm) 05 - West Runway Head Connection Taxitrack Concrete Pavement Renewal (1,380 sqm) 06 - Intermediate Connection Taxitrack Asphalt Pavement Renewal (810 sqm) 07 - Intermediate Connection Taxitrack Asphalt Pavement Renewal (600 sqm) MUS AIRFIELD (NATO) N CIVIL TERMINAL FACILITIES 03 02 10 02 03 01 09 05 06 08 07 04 11 11 12 12 08 - Storm Water Drainage System Renewal 09 - Main Runway Painting and Marking (15,975 sqm) 10 - Runway Lighting System Restoration and Renewal 11 - Internal Roads Asphalt Pavement Renewal (6,000 m x 6 m) 12 - Internal Roads Asphalt Pavement Renewal (3,000 m x 3.5 m)

DALAMAN AIRFIELD (NATO) 13 17 01 - Concrete Taxitrack Loop (22,075 sqm) 02 - Concrete Aircraft Parking Aprons (10,455 sqm) 03 - Concrete Alarm Apron (3,188 sqm) 04 - Concrete Connection Taxitracks (12,837 sqm) 05 - Aircraft Maintenance Apron (1,740 sqm) 06 - CAT 2 Taxitrack and Apron Lighting Systems 07 - Third Generation Aircraft Shelters 08 - Aircraft Maintenance Hangar and Workshop (1,300 sqm) 09 - TACAN (Tactical Air Navigation) Building 12 19 10 15 19 11 14 10 - Headquarters Facilities 19 11 - Internal Roads (33,800 sqm) 12 - Parking Areas (6,800 sqm) 13 - Jet Fuel Storage Facilities 14 - Ammunition Storage 15 - Hardened Squadron Operations Building (593 sqm) 16 - Hardened Liquid Oxygen Storage (60 sqm) 17 - Hardened Refueling Truck Shelter 18 - Heating Center 19 - Transformer Substation (6 each) N 11 07 02 01 08 05 06 01 18 07 06 19 17 11 16 11 02 04 02 CIVIL TERMINAL FACILITIES 03 09 04

AKHISAR AIRFIELD (NATO) N 03 09 05 06 01 11 02 04 05 11 10 07 11 08 01 - Taxitrack Loop (10,000 sqm) 02 - Aircraft Parking Platforms (3,400 sqm) 03 - Connection Taxitracks (1,488 sqm) 04 - Third Generation Aircraft Shelters 05 - Internal Roads (9,000 sqm) 06 - CAT2 Taxitrack Lighting System 07 - Ammunition Storage Igloos 08 - Ammunition Maintenance and Missile Facility 09 - Hardened Refuelling Truck Shelter (78 sqm) 10 - Jet Fuel Storage Facility 11-6.3 kv Transformer Substations

TOPEL AIRFIELD (NATO) N 01 - Helicopter Parking Platforms 02 - Maintenance and Inspection Apron 03 - COC (Command Ops. Center) Building 04 - Squadron Operations Building 05 - Airfield Headquarters Building 06 - Engine Workshop 07 - General Maintenance Workshop 01 02 04 07 03 06 05

ERZINCAN 3rd ARMY AIRBORNE FLEET (NATIONAL) N CIVIL AIRPORT and TERMINAL FACILITIES 05 03 11 07 06 01 08 10 02 04 09 01 - Runway Restoration (1800 m x 47 m) 02 - Helicopter Apron Restoration (60 m x 80 m) 03 - Taxitrack Restoration (355 m x 10 m) 04 - Connection Roads Restoration (220 m) 05 - New Taxitrack (153 m x 10 m) 06 - New Taxitrack to Apron (150 m x 10 m) 07 - New Taxitrack to Apron (310 m x 10 m) 08 - New Helicopter Maintenance Apron (95 m x 105 m) 09 - New Vehicle Parking Platform 10 - New Ammunition Loading and Unloading Apron 11 - New Connection Road (1200 m x 6 m)

01 - MEDEVAC Aircraft Parking Apron (25,000 sqm) 02 - CSAR Aircraft Parking Apron (30,000 sqm) 03 - JSOAD Aircraft Parking Apron (32,000 sqm) 04 - HOT CARGO Aircraft Parking Apron (30,000 sqm) 05 - APACHE Helicopter Parking Apron (130,000 sqm) 06 - MAIN Helicopter Parking Apron (134,000 sqm) 07 - Tactical Aircraft Parking Apron (92,000 sqm) 08 - CAT2 Runway 1 Lighting Systems (Approach, Edge, PAPI, etc.) 09 - CAT2 Runway 2 Lighting Systems (Approach, Edge, PAPI, etc.) BALAD AIRFORCE BASE - IRAQ (USACE) N 07 04 09 08 05 02 03 01 06

AIRCRAFT MAINTENANCE HANGARS (CIVIL) ANKARA ESENBOGA CIVIL AIRPORT TURKISH AIRLINES (TURKISH TECHNIC) AIRCRAFT MAINTENANCE HANGAR (10,840 sqm) MURTED AIRFORCE BASE TURKISH AEROSPACE INDUSTRIES AWACS AIRCRAFTS MAINTENANCE HANGAR (8,220 sqm)