EMR project Overview



Similar documents
Progress status of EMR Geneva

Progress status of EMR Geneva

Electron-Muon Ranger (EMR)

MICE detectors and first results. M. Bonesini Sezione INFN Milano Bicocca

Aerogel and Assembly. Aerogel shipped to US (IIT) in June; shipment to RAL after inspection. Counter 1: n=1.08; counter 2: n=1.12.

I BEAM TRACK INSTALLATION

PRS X-axis E-chain installation: For tools with a 12 Z-Axis

Lathe Milling Attachment

LG G5 Chassis Brace Gen 5 Camaro THE MOST POWERFUL HEADERS ON THE PLANET Brought to you by LG Motorsports

INSTALLATION INSTRUCTIONS

19" Data Racks. Adjustable feet To compensate for uneven floors and assure great stability all feet can be up to 20 mm adjusted.

An option for the SHiP Muon Detector: Scintillator bars with WLS fibers and SiPMs readout

FTC DIY Mountain Build Guide

Standard Sleep Pod Side Entry Assembly Instructions

SUPERCHIPPER CASTING MAINTENANCE

Linear modules Lifting units Rotary modules Grip modules Inductive proximity switches Plug connectors

Single Cavity Mould. Basic Mould Construction. Ejection System. Multi Cavity Mould

TopSky DLG Installation Manual

AstroSystems Digital Setting Circles for Zhumell, GSO, Apertura and Astro-Tech

INSTRUCTIONS FOR CHAIN LINK INSTALLATION Chain Link fence & Posts Meshdirect.co.uk

Modeling Curved Surfaces

Drive shaft, servicing

mechanics PP-Profiles Panel Profiles PT-Profiles T-Groove Plates RE-Profiles Rectangular Profiles PU-Profiles Universal Profiles

Post Mount Light Installation*

Introduction to Autodesk Inventor for F1 in Schools

1/5 PIPER J-3 CUB. Before commencing assembly,please read these instructions thoroughly. Wing Span:84. 0 in / 2130 mm

TEC APO140. This telescope is closer to optical perfection more than any instrument I have ever used before. R.Renzi, Italy.

SERVICE PARTS LIST PAGE 1 OF 6 BASE ASSEMBLY SPECIFY CATALOG NO. AND SERIAL NO. WHEN ORDERING PARTS 12" DUAL BEVEL COMPOUND MITER SAW B27A

Precision Vise Combinations

Depending on which elastic support you have you can secure the V2 power unit to the following seat bracket tubes: EXTERNAL DIAMETER 27.

Fiberstars Lighted Laminar Flow Fountain Installation Manual

2003 ACCORD - Automatic Transmission Removal

2740 Whitten Rd Bldg 103 Memphis, TN Telephone

James M. Pleasants Company

PREASSEMBLED ELEMENTS FOR LIFTING AND SLIDING DOORS

Technical data. Assembly: Introduction. Before starting construction. Equipment needed. Glider or Electro Glider?

Things you need to assemble the tube actuator. Left to right. are small piece of masking tape, super glue,pen knife and small

INSTALL/REMOVAL INSTRUCTIONS: WINDOW REGULATOR

ECONOMIC DESIGN OF INJECTION MOLDED PARTS USING DFM GUIDELINES - A REVIEW OF TWO METHODS FOR TOOLING COST ESTIMATION

3. SEISCO PARTS & SERVICE REMOVAL AND REPAIR GUIDE

Parts List. The HyperStar Lens Assembly includes three pieces: HyperStar Lens Secondary Mirror Holder Counterweight

16 April F Dodge Adjustable Track bar with Relocation Bracket 1

TRANS-05, Torque Tube Removal, Rebuilding, and Installation

COYOTE PUP CLOSURE FOR UNDERGROUND, AERIAL, AND BURIED SPLICES 6.0" x 17" (152.4 mm x mm)

HOME GYM. Model. Retain This Manual for Reference OWNER'S MANUAL.

MONDOATHENS BASKETBALL SET (Reference PK110)

Tubular connection elements

Tyco PremiAir Pneumatic Actuators

Navico-Northstar 2kW JRC Radar Package, Scanner Cable Removal and Replacement

Direct Operated Regulator for 6.0 MPa (Relieving Type) How to Order. Body size 30 40

INSTALLATION & OPERATION MANUAL LED

NUMBER: 08 DD15-10 S.M. REF.: 3.2 ENGINE: DD15 DATE: September 2008

Removing chips is a method for producing plastic threads of small diameters and high batches, which cause frequent failures of thread punches.

EH-20 20m antenna. By VE3RGW

The Use of Optimization Software TOSCA in a Standard Flexplate Design Process

Autodesk Fusion 360: Assemblies. Overview

The Plastic Injection Moulders. Furniture Fittings & Tube Inserts

Structural Integrity Analysis

List of Problems Solved Introduction p. 1 Concept p. 1 Nodes p. 3 Elements p. 4 Direct Approach p. 5 Linear Spring p. 5 Heat Flow p.

Skirt 1 / 4. The Skirt. The skirt patterns were downloaded from Mark's site but they need expanding before they can be used.

Rittal s Comprehensive Family Of... NETWORK RACK SOLUTIONS

HC-3000 SERIES RAKE Parts Breakdown DURABILT INDUSTRIES, LLC AIRPORT ROAD POCAHONTAS ARKANSAS 72455

The "DAVID" Steam Engine By Alan Marconett Hobbit Engineering

READ CAREFULLY - FAILURE TO FOLLOW INSTRUCTIONS AND SAFETY RULES MAY RESULT IN SERIOUS INJURY

Thanks for choosing Toroidal. This file is developed to assist you in assembling and aligning Toroidal Dish.

Free Stall Cleaner System with Cable. A new generation of equipment and systems. GEA Farm Equipment Houle

Glass Fibers Reinforced Composits (GFRP) for TUNNELLING

Multilevel Socket Technologies

DOE Solar Energy Technologies Program Peer Review. Denver, Colorado April 17-19, 2007

Reaction Torque Sensor

Chapter. 4 Mechanism Design and Analysis

Slide the new steering column shaft through the steering column from the driver compartment.

Diffractive Optical Elements (DOE) for FLEXPOINT Laser Modules

Step-by-step instructions:

POSEIDON 2-29, 2-25 & 2-22 POSEIDON 2-29, 2-25 & 2-22 XT

TECHNICAL INFORMATION

Opticom Fiber Optic Splice Module

Washer, Electrical Equipment Bond. WEEB Patent Pending INSTALLATION INSTRUCTIONS. For Kinetic Solar K-Rack only

Char-Lynn Spool Valve Hydraulic Motors. Repair Information. W Series Geroler Motors

Sliding and Folding Door Fittings Sliding Door Accessories

INSTRUCTIONS THOROUGHLY BEFORE BEGINNING***************

Universal Installation and Maintenance Instructions Double Wall Spill Containment Bucket (5 and 15 gal)

prepared by Gabe Landes for T. Purdy 2009

Three Channel Optical Incremental Encoder Modules Technical Data

TASK: Restring or Replace Cord Lock for Cellular, Pleated or Roman Shades

Introduction to Autodesk Inventor for F1 in Schools

Equipped with AEM Dryflow Filter No Oil Required! INSTALLATION INSTRUCTIONS PART NUMBER DS BMW 335i 3.0L

Installation Manual. SKU# series (Base Rails) SKU# series (Overhead Racks)

Roll Up Banners. Display Banners. Pop-Up Counter. Display Wall. Flags. Free Hanging Banners

ESTATE WAGON MODEL 300 OWNER MANUAL

Rexroth Linear Motion Technology

How to Build a Poker Table

Precision Miniature Load Cell. Models 8431, 8432 with Overload Protection

Auto-belay Cable Replacement Process

Transcription:

EMR project Overview MICE Collaboration Meeting RAL, May 31, June 3-2009 1. 1. EMR EMR conceptual design design 2. 2. Mechanical envelope 3. 3. Pending issues issues & outlook outlook University of Geneva: A.Blondel, J-S Graulich, V.Verguilov, F.Masciocchi, L. Nicola, R. Bloch, P. Béné, F. Cadoux 1

Thanks to INFN Trieste team, we didn t start from scratch in March 09 (meeting held in Trieste) UniGe took over the EMR mechanics Adapt their first prototype (reduced scale, rectangular bars) Scintillation bars (white painted) WLS optical fibers Moving to Rectangular shaped bars (used for the proto) Triangular shaped bars (1.1m long, from Fermilab) 2

Re use their R&D on fiber gluing into the bars (at first) Short length to 1m long bar Use of syringes (top and bottom) Molding compound Tests at UniGe on triangular bars to be performed soon Based on 2 fibers per bars (see previous studies) Start R&D for gluing in parallel (several bars in one go, mass prod )? Same glue as used by INFN Trieste (no safety issue) 3

First step: the EMR plane concept (59 bars side by side) EMR will be made of 50 planes (X and Y alternatively) X+Y planes is called Module so 25 modules totally! Designed by Florian Masciocchi (UniGe) Bars fixed to the aluminum beam (see next slides) 59 bars WLS Fibers coming from the bars Aluminum beam removed for clarity 4

EMR plane concept (2 beams in aluminum as part of the module mechanics): stress free mounting of the bars (bars to be water jet cut to get a precise length for all in one go ) Single pixel PMT 1mm deep groove (anti rotation + alignment of the bars) scintillators 30mm Al profiles (standard) Multi anodes PMT (64 pixels) Protection box (light tight) 5

EMR plane concept : CAD exploded view 1 EMR Conceptual design Double threaded cylinder Grommet for fibers Thru hole for fibers exit Torque value TBD! Nut for bolting 6

EMR plane concept : a few figures EMR Conceptual design 30mm Plane Cross section L=990 mm L=1100 mm 16.5mm (hole pattern giving alignment) Fibers going thru the bars and the 2 beams All the grommets in place (In plastic, to prevent any breakage on fibers) X + Y planes together (active surface) will cover nearly 1m 2 7

EMR plane concept : Fiber bundles and PMT assembly thru side boxes (1) CAD model side view 2 fibers per bar About 150mm (minimum) 2 side boxes (light tightness) 1 pixel PMT Top part of side boxes removed for clarity 64 pixels PMT 8

EMR plane concept : Fiber bundles and PMT assembly thru side boxes (2) Shielding Tube not shown here PMT holder (light tight) Holder in 2 parts (fiber polishing) PMT end cap 64 pixels PMT 9

EMR plane concept : Fiber bundles and PMT assembly thru side boxes (3) Pixel Cross talk issue (to be limited by fiber positioning & arrangement) Pixel size: 2x2mm 2 Fiber size: 1mm dia. Fiber filling according to a special arrangement: 2 successive bars are shifted to 1 pixel and so on. bar1 bar3 bar2 10

EMR plane concept : Fiber bundles and PMT assembly thru side boxes (4) 1 pixel PMT (from a former experiment at DPNC) Rigidity has been tested on aluminum plates Some loops to get the same length for all the fibers (by CAD: 1200mm +1100mm +1200mm) PMT 11

EMR Module concept : 2 planes assembled in X and Y (corner blocks) Also used for handling (40 Kg) X Y First DPNC proto Corner blocks (4 per module) bolted thru the beams Each individual module thru Commissioning prior final integration 12

EMR Module concept : 2 modules assembled EMR Conceptual design Electronic boards to be optimized (FEE, HV divider) In case of integration issue It could be reduced 5mm gap between modules 1mm gap between planes 13

EMR Module concept : the whole assembly (25 modules ) EMR Envelope Beam Nearly 2500mm 1684mm Stand still to be optimized 1500 mm 14

EMR Module concept : the whole assembly (25 modules ) EMR Envelope Every PMT accessible till the last moment Access needed underneath First idea on shielding tube (may too close to each others ) 15

EMR Envelope EMR Module concept : The staking of the modules (from 1 side, flexibility for integration) 16

EMR Pending issues and outlook Electronics definition: Size of the boards, number, location EMR envelope definition: what is the constraint / neighborhood? FEA simulations still to be performed Magnetic shielding issue: simulations? PMT to be oriented / field? FIRST MODULE PROTOTYPE TO BE ASSEMBLED AT UNIGE BY Oct 09 (still to understand with which electronics for testing purposes, including R&D on multi anode pixels for cross talk issue, light tightness ) 17