D. Permits: A building permit is required for the structural support of all solar energy device installations.

Guideline for Fire Safety Elements of Solar Photovoltaic Systems July 17, 2008 Rev: 1/1/10

City of Riverside Building & Safety Division Phone: (951)

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

GUIDELINES FOR PLAN CHECK AND PERMIT REQUIREMENTS FOR SOLAR ENERGY SYSTEMS

Doe Residence kw DC Roof Mounted Photovoltaic System

City of San Diego Residential Photovoltaic Systems Inspection Guidelines

SOLAR PV SYSTEMS PERMITTING PROCESS

Solar Water Heating and Photovoltaic Electrical Systems Installed on One or Two Family Dwellings

Los Angeles Fire Department Requirement No. 96 SOLAR PHOTOVOLTAIC SYSTEM

Expedited Permit Process for PV Systems AC Module

Submittal Requirements for Solar Photovoltaic Installations 10 kw or Less in One and Two Family (Duplex) Dwellings

SOLAR PV STANDARD ELECTRICAL PLAN Microinverter Systems for Single Family Dwellings

Solar Photovoltaic SPECIFICATION, CHECKLIST AND GUIDE. Renewable Energy Ready Home

Solar Photovoltaic (PV) Systems

Enphase Microinverters and Ungrounded Renewable Energy Systems: Canadian Electrical Code Compliance

Solar America Board for Codes and Standards

LIPA. Long Island Power Authority

What are the basic electrical safety issues and remedies in solar photovoltaic installations?

CITY OF SONOMA TOOLKIT DOCUMENT #1a

Focus of the Guidebook

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

Understanding the Cal Fire Solar Photovoltaic Installation Guideline

SOLAR ENERGY PERMIT. 1. Two (2) page Building Permit Application (signed and notarized); 2. Disclosure Affidavit (signed and notarized);

RACKING AND ATTACHMENT CRITERIA FOR EFFECTIVE MEMBRANE ROOF SYSTEM INTEGRATION Public Version 1: July 9, 2012

ADDENDUM #1(BID PACKAGE # 3)

Ontario Electrical Safety Code 25 th Edition/ 2012

Solar Water Heating and Solar Electric Generators Installed on One or Two Family Dwellings

BUILDING SAFETY UNIT

BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION Based on the 2014 LACBC

sdci 420 Seattle Permits Tip Solar Energy Systems GREEN PERMIT REQUIREMENTS Building Permit Types of Solar Energy Systems

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured.

Model Number Electrical Compatibility Module Connector Type. M LL-S22 60 cell PV module MC-4 Type 2 Locking

Request for Proposals for Photovoltaic System Installation

Plumas Sierra Solar Rebate Program Guidebook 2015

Connecting the Power of the Sun. DC Disconnects for Solar Photovoltaic Installations. DC disconnects for. solar photovoltaic installations

The Florida Building Code

Developed by CA Matt Paiss, and Bill Brooks, PE

SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE (In partnership with interested local fire officials, building officials, and industry representatives)

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Electrical safety of grid-connected solar installations in Western Australia December 2011

Chapter 3 Pre-Installation, Foundations and Piers

SHARP SOLAR Frequently Asked Questions for PV Integrators Revised 05/04/2010

CertainTeed SOLAR. Solar From A Proven Source

AC Module Installation Guide Content

2011/2008/2005 NATIONAL ELECTRICAL CODE SOLAR PV CODE COMPLIANCE REFERENCE

Installation Guide Content for P250xV-240 microinverters

2. What building projects are exempted? (permit not required)

Development Services Department Building Permit & Inspection Services Shed and Garage Construction Guide for Detached and Semi-Detached Dwellings

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

CITY OF FILLMORE CENTRAL PARK PLAZA 250 Central Avenue Fillmore, California (805) FAX (805)

City of Riverside Building & Safety Division Residential Electric Vehicle (EV) Charger Guidelines

Solar Water Heating SPECIFICATION, CHECKLIST AND GUIDE

DC disconnects for solar photovoltaic installations. Connecting the. power of the sun

Patio Covers / Carports

Residential Building Permits

EXPRESS PERMITS (No Plan Check Required)

Expedited Permit Process for PV Systems

AC Module Installation Guide Content

Residential Decks. Planning and Development Services Department

GENERAL BUILDING PERMIT INFORMATION FOR: RESIDENTIAL ALTERATIONS & ADDITIONS

Builder Specifications for Solar Ready Homes

REQUEST FOR PROPOSALS SOLAR POWER PURCHASE AGREEMENT (PPA)

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Vision Home Inspection

CERTIFICATE OF COMPLIANCE Prescriptive Residential Re-roof Project Name:

Fire Alarm System Plans Review Checklist Property location Date of Review

2010 Residential Water Heater Replacement Check List

Electric Service Guide for Residential Construction

Solar PV Safety for the Fire Service. Bill Brooks, Brooks Engineering Panel Lead: Code Official Panel, Solar ABC s

Building Permit, Fire Inspection and Operating Permit Fee Schedule

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

Exhibit C Design Review Guidelines

FARMERS MUTUAL INSURANCE COMPANY UNDERWRITING GUIDELINES HOMEOWNER PROGRAM

SWAN POINT YACHT & COUNTRY CLUB

MANUFACTURED HOUSING USED AS DWELLINGS

Placement of Manufactured Homes on Private Property

B. Related Sections: 1. Section Raceway and Boxes for Electrical Systems.

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

TOP 10 CHANGES 2013 CALIFORNIA ELECTRICAL CODE 2013 CALIFORNIA ENERGY CODE (ELECTRICAL)

ELECTRICAL INSPECTION BULLETIN (Effective )

Connecticut Standardized Municipal Instructions for Solar Photovoltaic (PV) Permitting Process Town of Pomfret

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

SCC NO AN ORDINANCE OF THE SACRAMENTO COUNTY CODE RELATING TO CONSTRUCTION PERMIT FEES

TOWN OF WOODSIDE. The Town Council introduced the attached draft ordinance at its regular meeting on July 28, 2015.

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

Does Wall Township require an inspection by the building department on resale of a home?

Transcription:

DEVELOPMENT AND RESOURCE MANAGEMENT DEPARTMENT BUILDING AND SAFETY SERVICES 2600 Fresno Street, Third Floor Fresno, California 93721-3604 (559) 621-8082 FAX (559) 498-4357 RESIDENTIAL PHOTOVOLTAIC SUBMITTAL REQUIREMENTS Chapter 1 Section 105.1 of the California Building Code requires any person engaged in the construction, alteration, expansion, repair, demolition or change of occupancy of a building/structure or its components (electrical, plumbing, mechanical systems) shall obtain appropriate permits. The following is provided in an effort to expedite the process of obtaining permits for the installation of Solar Photovoltaic Systems. SUBMITTAL REQUIREMENTS Plans are required for permits to install Photovoltaic Systems in compliance with the California Electrical Code as well as the California Building Code when structural review is required. Provide 2-sets of plans which include the following documents: 1. Site Plan: Provide the site address, property owner s name and address, all property lines and setbacks dimensioned, and location of all existing and proposed structures. Site plans shall be drawn to a suitable scale and sufficient clarity. (aerial or overhead photos are not acceptable) For PV systems installed on the existing building s roof structure, the site plan may also serve as a roof plan if the footprint of the building, roof layout, roofing material, and the location of the arrays and all equipment are clearly shown. For ground mounted PV systems, show property lines and setback dimensions to the supporting structure. (See attached Sample Site Plan) 2. Electrical Plan: Provide an electrical one-line diagram showing the number of photovoltaic panels, number of strings, with voltage and kilowatt output, all disconnects, all combiners, all inverters with input and output ratings, the size of the main electrical panel bussing in amperes, the size of the main service disconnect, the size of the PV circuit breaker in amperes, size and type of all raceways and the size and type of all conductors. Provide manufacturer s cut sheets for all modules and inverters that clearly specify all electrical information. DC Roof Top Disconnects: There shall be a separate emergency DC disconnect on the roof to disconnect solar panels from DC wiring running through and on the building to the inverter. This disconnect must be permanently labeled in reflective, fade-resistant material that states: "Emergency DC Disconnect." This provides a safety mechanism for firefighting ensuring power has been disabled as close to the source as possible. Disconnects, provided in a NEMA 3R box, shall be installed as close to the array as possible to eliminate any substantial length of energized wiring that cannot be shut down. (FMC section 10-50605.11.1) Exception: Conductors in rigid or electrical metallic tubing (EMT) All micro-inverter systems will require a rooftop AC disconnect. Electrical Load Calculations for the dwelling electrical panel is required when de-rating the main service breaker.

3. Structural Plans (if applicable see below): Ground Mounted Structures: Complete plans shall be required for all structures for ground mounted arrays, trellises, and patio covers. Provide the attachment of the panels to the roof for all roof mounted modules. If using pre-manufactured racking systems, provide the manufacturer s installation specifications. Existing Roof Structures: If the existing roofing material is tile or there is more than one layer of composition shingles, alterations may be required to the existing roof structure to support the additional loads imposed from the module system. Structural plans shall be provided that are of sufficient detail and scope to demonstrate the required load path to ground. (Roof framing plan, cross-sections, structural calculations and details as necessary). Structural design may require a licensed Architect or Engineer to prepare plans and calculations and properly certify in conformance with section 5537(b) of the California Business and Professions Code. (see Building Industry Bulletin at the end of this document for structural analysis requirements) PERMIT REQUIREMENTS 1. A Solar Photovoltaic Permit shall be required for the installation of all PV systems. Permit fees are calculated per the revised fee schedule adopted January 3, 2012 as follows: First 10 solar panels: $114.47 Each additional 10 panels over 10: $ 87.22 Standard Electrical fee: $ 81.76 Residential Solar Plan Check fee: $ 80.35 (may be subject to additional fees for complex structural review) 2. An additional Electrical Permit may be required for additional electrical modifications to the existing electrical system. (example: service panel change/upgrade, etc.) Fees shall be calculated as itemized in the revised fee schedule for stand-alone electrical permits. 3. An additional Building Permit may be required if structural modifications to the existing roof structure are required to provide adequate support for the solar panels. (to be determined during plan check) 4. A separate Building Permit is required for installations on new structures such as trellises, patio covers, carports, ground mounted structures, etc. to support the PV System. INSPECTIONS Required inspections may include: Electrical Underground Electrical Rough Electrical Final Structural-Foundation Structural-Rough Framing Structural-Final

WARNING LABELS As required by Article 690 of the California Electrical Code, signage or labels shall be posted at all equipment locations which state the following information:

5-0 Ground Mounted Photovoltaic Structure 5-0

BUILDING AND SAFETY SERVICES DIVISION DEVELOPMENT AND RESOURCE MANAGEMENT DEPARTMENT JENNIFER K. CLARK 2600 FRESNO STREET THIRD FLOOR ROOM 3043 DEPARTMENT DIRECTOR FRESNO, CALIFORNIA 93721-3604 (559) 621-8082 FAX (559) 498-4357 www.fresno.gov BUILDING INDUSTRY BULLETIN EFFECTIVE DATE: October 18, 2012 REVISED: August 12, 2015 TO: SUBJECT: ARCHITECTS, ENGINEERS, SOLAR CONTRACTORS, and ASSOCIATIONS STRUCTURAL DESIGN REQUIREMENTS FOR ROOFTOP SOLAR PHOTOVOLTAIC SYSTEMS ON EXISTING STRUCTURES BULLETIN NUMBER: 12-01 FROM: Brian T. Leong, C.B.O. Building Official/Building and Safety Services Manager BACKGROUND: The purpose of this bulletin is to clarify the requirements of the California Building Code and to establish uniform standards related to the structural support of Solar Photovoltaic Systems on existing roof structures. As indicated in Chapter 16 of the California Building Code, all structures and parts thereof shall be designed and constructed to support safely the load combinations defined in the code without exceeding the appropriate strength limits for the materials of construction. Upon review and consideration of various standards established by the Division of the State Architect, the Office of the State Fire Marshall, the Governor s Office of Planning and Research, and other jurisdictions in the State, the City of Fresno shall establish the following policy for verification of the structural integrity of solar photovoltaic systems on existing structures.

POLICY: 1. In an effort to streamline the permitting process for roof mounted solar PV systems, structural calculations are not required if all of the following conditions are met: Lightweight roof covering such as Composition with a maximum of 1-layer of roofing material. Weight of the solar panels does not exceed four pounds per square foot (4 psf). The maximum concentrated load imposed by the support device onto the roof structure is a maximum of 60 pounds. For wood construction, the maximum spacing for the support devices shall be 48 on center, and shall be anchored to solid roof rafters or to solid blocking with the appropriate connection as recommended by the manufacturer. The clear space between the roof and solar panels does not exceed 12 inches. 2. Structural Calculations: When structural calculations are required, calculations shall demonstrate that the structure will support the additional vertical and lateral loads from the solar panels and related equipment. 2.1 Roof Dead Load: The weight of the solar PV system shall be considered in the design of the structure along with all other applicable dead load requirements of the Code. 2.2 Roof Live Load: Live Load shall be considered in accordance with section 1607.12 of the California Building Code and section 4.2.1 of ASCE7-10. Live loads may be reduced in the area covered by the solar panels when such area is inaccessible as determined by the enforcing agency. (clear space between the roof and solar panels is 12 inches or less) Live loads may be reduced to a minimum of twelve pounds per square foot (12 psf) in areas considered inaccessible. Roof surfaces not covered by solar panels shall be designed for the full live load requirements as set forth in Table 1607.1 of the California Building Code. When the clear space between the roof and solar panels is in excess of 12 inches, live load requirements per Table 4.1 of ASCE7-10 shall be used. 300 lbs. concentrated roof live load per CBC Table 1607.1 for commercial structures and CRC Table 301.6 for residential structures shall be considered. 2.3 Pre-fabricated Roof Trusses: Combined Stress analysis for pre-engineered trusses shall be provided for the new loads imposed on existing trusses. 2.4 Wind Design: Calculations shall demonstrate that the solar PV panels and associated supporting members are designed to resist applied wind loads. 2.5 Seismic Design: Calculations shall demonstrate that the solar PV panels and associated supporting members are designed to resist earthquake loads. 3. For solar panels that are mounted on open grid framing, design the structural framing and components for: 1) 10 psf uniform roof live load with no solar panel dead load 2) 300 lbs. concentrated load with solar panel dead load