Windfarm Installation Barge. a novel approach to installing foundations in offshore wind



Similar documents
New contract for jacket to the Johan Sverdrup Process Platform. 8 October 2015 Sverre Myklebust, Executive Vice President, Jackets

Preferred partner. Investor Day London, March 17, 2015 Luis Araujo, CEO Svein Stoknes, CFO

The 5th INTERNATIONAL CONFERENCE ON INTEGRATED OPERATIONS

Aker Solutions Splits Into Two Companies

Aker Drilling Riser Brazil

Third quarter results 2014

Direkte elektrisk røroppvarming

Third quarter results 2012

Monitor Oil PLC (incorporated under the laws of the Cayman Islands) (formerly Monitor Oil Production, Limited) Registered Number: HL (MONI)

INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS

DNO ASA Corporate Presentation and Update

Logistic solutions for the installation of offshore wind farms

Technology services for existing facilities

OWPST & Titan 200 & UK Offshore

Offshore Structures. Offshore Drilling Equipment

Life-Cycle Cost of a Floating Offshore Wind Farm

Welcome at Aker Wirth

NSW Submarine Power. Cables for the future, delivered today.

JEDI Capital Expenditure Update

Monobuckets and the competitiveness versus monopiles and jacket structures.

OFFSHORE WIND Peter Robert

DELIVERY THROUGH TECHNOLOGY Parque das Conchas Project

Tidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy.

Allianz Global Corporate & Specialty Hull and Machinery Insurance

EXPERIENCE WITH DP-SYSTEMS ON BOARD

MERMAID FLEET PROFILE SUBSEA SERVICES

Offshore Work Packages

Stocks: Quick-start guide part 3 - Orders & Tickets

Pareto Securities Oil & Offshore Conference

maersksupplyservice.com S-TYPE ANCHOR HANDLING TUG SUPPLY VESSEL Visit our web site at: maersksupplyservice.com

Steel construction. Solutions for the renewable energy and offshore sectors. published by energyengineering magazine

INCREASE UPTIME THROUGH SAFE ACCESS

Northern Norway Subsea Value Chain

Azimuth thrusters. propulsors

Standards for design of offshore wind farm structures and their foundations

GOLIATH DPIII OFFSHORE SUPPORT VESSEL. Vessel Specification - December 2011

G9 Offshore wind health and safety association

Introduction. Anders Runevad, Group President & CEO Marika Fredriksson, Executive VP & CFO

The installation and servicing

Fourth Generation Modular Construction

Preliminary Information Memorandum. Thanet Offshore Transmission Assets. July 2009

NSW Submarine Power. Cables for the future, delivered today

Platform Technologies for Offshore Renewable Energy Conversion Diego Vannucci, RINA

installation, operations & maintenance

Structural concepts for minimum facility platforms for Marginal field development in western offshore, India

GAS FLAWLESS - FORM C

User manual data files meteorological mast NoordzeeWind

Virtual Contact Center. Release Notes. Version Revision 1.0

Depth-independent solution for Offshore Wind the WindFloat

How To Profit From Oil And Gas

Advantages of our solution

KNUD E. HANSEN A/S. Design of Wind Turbine Installation Vessel Pacific Orca for Swire Blue Ocean

How To Operate A Pipelay Vessel

Facilities Pori construction yard

An Oracle White Paper November Oracle Business Intelligence Standard Edition One 11g

Pandora FLNG Wison Offshore & Marine

To enable transport of wellstream over long distances. Compressor located by the wellheads.

Subsea Market Review. Subsea 2011 February 9 10, Quest Offshore Resources, Inc. 1

Oracle FLEXCUBE Direct Banking Release Retail Credit Card User Manual. Part No. E

Best practice report - Installation Procedures

GRAVITY BASE FOUNDATIONS

How To Make A Profit From Oil And Gas

Kuehne + Nagel International AG Analyst Conference Call Q1 results April 14, 2015 (CET 14.00) Schindellegi, Switzerland

Beacon to Beacon Northern & Southern Maps

SaxoTraderGO. Saxo Academy. Placing Forex Trade Orders. academy.tradingfloor.com

GRANULAR POLYSILICON TECHNOLOGY

DP platform installation/ decommissioning and pipelay vessel Pieter Schelte

Fot. Kacper Kowalski/aeromedia.pl

An insights report by the Energy Technologies Institute. Offshore Wind Floating Wind Technology

MERIAURA LTD >YOUR EXPERT IN MARINE TRANSPORTATION

Offshore Wind: some of the Engineering Challenges Ahead

Heerema Fabrication Group Zwijndrecht Yard. Bart Pluijmers Asset & Facility Manager 03 oktober 2014

Allianz Global Corporate & Specialty Project Cargo

INSIDE Secure. October 30, Third Quarter 2015 Revenue. Amedeo D Angelo, CEO Richard Vacher Detournière, GM & CFO

CURATING THE ASSORTMENT. Capital Markets Day 25 March 2015

RESUME for Dr. Walter L. Kuehnlein

Product brochure Multi Functional Switchgear PASS M kv Flexible and compact switchgear solutions for windfarms

Installation, future demands for recruitment and competencies. Speaker: Hans Schneider Date: 4 April 2013

Future renewable energy costs: offshore wind

MAXIMISING YOUR. Offshore wind assets ASSET OPERATION & MAINTENANCE SERVICES

Geotechnical Design Monopile Foundations for Offshore Wind Turbines

FLEET LIST OFFSHORE SUPPORT VESSELS

INTERNATIONAL MARINE UNDERWRITERS COMMERCIAL MARINE PACKAGE POLICY APPLICATION

Contractual Allocation Of Risks / Insurance Requirement FPSO Projects Presentation Lillehammer Energy Claims Conference 2012

INNWIND.EU Offshore wind energy DTU Contributions to WP4.2 Technology, ecomony, trends and research. Henrik Bredmose Thomas Buhl

Allianz Global Corporate & Specialty Global Energy

How to Deliver Self Service BI

FLEET LIST OFFSHORE SUPPORT VESSELS

DYNAMIC PLANNER RISK PROFILER

Telio & NextGenTel. NextGenTel Holding ASA. Q Presentation. Eirik Lunde, CEO. Felix Konferansesenter Oslo 7 May 2015

ORACLE HYPERION PUBLIC SECTOR PLANNING AND BUDGETING

SaxoTraderGO. Saxo Academy. Trading CFDs on Live Prices. academy.tradingfloor.com

Irish-Scottish Links on Energy Study (ISLES)

Transcription:

Windfarm Installation Barge a novel approach to installing foundations in offshore wind North Sea Offshore Cranes and Lifting Conference in Aberdeen by Paal Strømstad (paal.stromstad@ingenium.no) April 2012

copyright and disclaimer Copyright Copyright of all published material including photographs, drawings and images in this document remains vested in Ingenium AS and Ingenium Ventus AS and third party contributors as appropriate. Accordingly, neither the whole nor any part of this document shall be reproduced in any form nor used in any manner without express prior permission and applicable acknowledgements. No trademark, copyright or other notice shall be altered or removed from any reproduction. Disclaimer This Presentation includes and is based, inter alia, on forward-looking information and statements that are subject to risks and uncertainties that could cause actual results to differ. These statements and this Presentation are based on current expectations, estimates and projections about global economic conditions, the economic conditions of the regions and industries that are major markets for Ingenium AS and Ingenium Ventus AS (including subsidiaries and affiliates) lines of business. These expectations, estimates and projections are generally identifiable by statements containing words such as expects, believes, estimates or similar expressions. Important factors that could cause actual results to differ materially from those expectations include, among others, economic and market conditions in the geographic areas and industries that are or will be major markets for Ingenium AS and Ingenium Ventus AS businesses, oil prices, market acceptance of new products and services, changes in governmental regulations, interest rates, fluctuations in currency exchange rates and such other factors as may be discussed from time to time in the Presentation. Although Ingenium AS and Ingenium Ventus AS believes that its expectations and the Presentation are based upon reasonable assumptions, it can give no assurance that those expectations will be achieved or that the actual results will be as set out in the Presentation. Ingenium AS and Ingenium Ventus AS is making no representation or warranty, expressed or implied, as to the accuracy, reliability or completeness of the Presentation, and neither Ingenium AS and Ingenium Ventus AS nor any of its directors, officers or employees will have any liability to you or any other persons resulting from your use. Ingenium AS and Ingenium Ventus AS consists of legally independent entities, constituting their own separate identities. Ingenium is sometimes used as the common brand or trade mark for most of these entities. In this presentation we may sometimes use Ingenium, we or us or other expressions when we refer to Ingenium companies in general or where no useful purpose is served by identifying any particular Ingenium company. 2

The multipurpose Windfarm Installation Barge Photo by: Sindre Blålid Kvalheim, Fjordenes Tidene

about Ingenium Ventus AS Ingenium Ventus share holders: Ingenium AS IKM Industri Invest www.ikm.no Tristein AS www.tristein.no 4

triggers Developers request and the particular demands of offshore wind: Cost reductions subsidy based business! Tailor made solutions to cope with high volumes. Improved operational time ability to work in higher sea states

cost & time efficient for installation of foundations Low CAPEX & OPEX costs Long slender catamaran hulls Manned tow Lift in vessel center ensures excellent seastate capability DP positioning on site Floating vessel independent of soil conditions Photo by: Sindre Blålid Kvalheim, Fjordenes Tidene PATENT AWARDED!

design 8

technical specification General: Catamaran shaped hull with tilting frame for installation of foundations for offshore wind turbines. Classification: Germanischer Lloyd. + DP 2, +100 A5 Pontoon equipped for wind turbine, +A MC Installation capabilities: Limit installed load: 1000te Water depth for installation: 15 60m Limit footprint: 31 x 31m Main particulars: Hull length: 120m Hull width: 45m Hull height: 12m Scantling draft: 3.5-4.5m Air gap under pontoon bridge: 3.5m Pontoon length and width: 120m x 7m Distance between pontoons: 31m Hull steel weight: 3300te Tilt frame (L x B x H): 83m x 30,5m x 20m Tilt frame weight: 1000te Environmental capabilities: Limiting Hs for installation: 2.5m Limiting wind speed for installation: 12m/s Limiting Hs for transit: 3.0m Propulsion: None requires tow by tug. Navigation and dynamic positioning system: DP controlled retractable azimuth thrusters, 4 x 1000hp independent diesel drives. DP reference system: 2xDGPS with supplementary taut wire, laser and radio reference 9

Load out by skidding foundation from shore. Windfarm Installation Barge (WIB) foundation load out flexibility; from shore or from flat top barge Barge transport of foundation to WIB. Transfer by skidding to WIB. WIB towed to field by tug (tug). Barge transport. Transfer by skidding to WIB. 10

jacket foundation installation procedure WIB on DP. Launch of survey system (1 of 2). 11

jacket foundation installation procedure Launch of survey system (2 of 2). 12

jacket foundation installation procedure WIB on DP. Deployment of foundation. Foundation can be rotated Vessel can choose best heading Monitoring by survey system. 13

jacket foundation installation procedure WIB on DP. Confirmation of contact between foundation and pre-installed piles. 14

competitiveness Study Price comparison per jacket installed Scenario: 60 Jacket Foundations on preinstalled Piles Piling and grouting cost for WIB1 and competitors 50 km between load out and installation sites 265% 204% 221% 165% 100%

installation of complete assembly WIB on DP operation at the installation site Tilting the wind turbine Final installation Tow away 16

Alternative use

business development plan / alternative use of WIB1 Offshore substations and topsides: Installation Decommissioning Capacity: Up to SWL 1000t 18

business development plan / alternative use of WIB1 Offshore oil & gas field: Installation Decommissioning Subsea structures, trees, templates, suction anchors Capacity: - Water depth: 15-70m. SWL 950t - Water depth: 70-230m. SWL 650t - Water depth: 230-370m. SWL 330t 19

Status: - Main scantling approval from Germanischer Lloyd - Engineering largely complete - Hydrodynamic model testing performed - Patent awarded Windfarm Installation Barge (WIB) status on the vessel - Full technical specification - Comprehensive business plan Seeking investors/ financing for this excellent business opportunity Contact Paal Strømstad, mob:+4748208091, e-mail: paal.stromstad@ingenium.no Tilting the wind turbine Tow away 20