Data centers have been cooled for many years by delivering

Prediction Is Better Than Cure CFD Simulation For Data Center Operation.

Five Reasons your Data Center s Availability, Capacity and Efficiency are being Compromised

Using Simulation to Improve Data Center Efficiency

Using Simulation to Improve Data Center Efficiency

Managing Cooling Capacity & Redundancy In Data Centers Today

Airflow Simulation Solves Data Centre Cooling Problem

Nominee: FieldView Solutions, Inc.

Data center upgrade proposal. (phase one)

BEYOND DIAGRAMS AND SPREADSHEETS DATA CENTER INFRASTRUCTURE MANAGEMENT (DCIM)

Using CFD for optimal thermal management and cooling design in data centers

Utilizing Temperature Monitoring to Increase Datacenter Cooling Efficiency

Applying Data Center Infrastructure Management in Collocation Data Centers

Data Center Infrastructure Management (DCIM) Demystified

Data Center Lifecycle and Energy Efficiency

5 Reasons. Environment Sensors are used in all Modern Data Centers

Data Center Infrastructure Management. optimize. your data center with our. DCIM weather station. Your business technologists.

Why Energy Management Is Driving Adoption of Data Center Infrastructure Management Solutions

Global Headquarters: 5 Speen Street Framingham, MA USA P F

Strategies for Deploying Blade Servers in Existing Data Centers

Uptime Institute Network Top 10 Data Center Technology Priorities for Vice President, Global Director

Data center lifecycle and energy efficiency

THE BENEFITS OF MANAGED PRINT SERVICES AND DOCUMENT MANAGEMENT SOLUTIONS FOR BUSINESSES

Improve competiveness of IDC and enterprise data centers with DCIM

Power and Cooling for Ultra-High Density Racks and Blade Servers

The Intelligent Data Centre

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency

The art of the possible.

Enabling an agile Data Centre in a (Fr)agile market

Dealing with Thermal Issues in Data Center Universal Aisle Containment

Understanding the Promise of (DCIM)

Overview of Green Energy Strategies and Techniques for Modern Data Centers

EMC PERSPECTIVE Managing Energy Efficiency in the Data Center

Comprehensive Solutions for Data Centers. Rely on Siemens for maximum uptime, reliability, and efficiency.

Reducing Data Center Energy Consumption

Specialty Environment Design Mission Critical Facilities

Energy Management Services

How green is your data center?

Greener Pastures for Your Data Center

Power Distribution Units (PDUs): Power monitoring and environmental monitoring to improve uptime and capacity planning

Redefining Infrastructure Management for Today s Application Economy

Re Engineering to a "Green" Data Center, with Measurable ROI

Model Manage Monitor Maximize your Data Center

Cheat Sheets to Data Center Infrastructure Management

The business case for managed next generation firewalls. Six reasons why IT decision makers should sit up and take notice

Delivering results with Datacenter Clarity LC TM

Introducing Computational Fluid Dynamics Virtual Facility 6SigmaDC

EXECUTIVE REPORT. The Data Center Build-or-Buy Decision: 6 Key Factors You Should Consider

High Density Data Centers Fraught with Peril. Richard A. Greco, Principal EYP Mission Critical Facilities, Inc.

FAC 2.1: Data Center Cooling Simulation. Jacob Harris, Application Engineer Yue Ma, Senior Product Manager

Thermal Management of Datacenter

Solutions to Make Your Data Center Energy Effi cient

Can Your Data Center Infrastructure Handle the Heat of High Density? 5 Ways to Test Your Data Center Infrastructure before Installing Blades

APC APPLICATION NOTE #92

Comprehensive Data Center Energy Management Solutions

Data Center Infrastructure Management: ERP for the Data Center Manager

Convergence of Complexity

Cooling Capacity Factor (CCF) Reveals Stranded Capacity and Data Center Cost Savings

Introducing the. Virtual Facility

Integrated Data Center Infrastructure Optimizes Power, Space and Cooling While Reducing Complexity

Microsoft Technology Center: Philadelphia

CarbonDecisions. The green data centre. Why becoming a green data centre makes good business sense

Data Center Power Consumption

Managing Data Centre Heat Issues

DCIM Readiness on the Rise as Significant Data Center Capacity Remains Unused. A Research Report from the Experts in Business-Critical Continuity TM

Comprehensive Data Center Energy Management Solutions

Data centres that deliver

Data Center Trend: Distributed Power in the White Space

DCM13: Using DCIM Tools to Facilitate a Data Center Move

Integrated Infrastructure Solutions. Building a Data Center for the Future

CenterMind G+ Smart and Proactive Environment Monitoring

Converged Infrastructure Solutions. Building a Data Center for the Future

The New Truth in Data Center Management

T:

WHITE PAPER Delivering Improved Energy Efficiency for the Datacenter

Changing the way companies run their data centers

DCIM Data Center Infrastructure Monitoring

The New Virtualization Management. Five Best Practices

Introduction. Rising demand

ACE Performance Assessment - Empowering the Data Center Operator

Data Center Power Distribution and Capacity Planning:

MAXIMIZING YOUR DATA CENTER INFRASTRUCTURE: CENTRALIZED MANAGEMENT AND WIRE-FREE ENVIRONMENTAL MONITORING

IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT

Relative Sensitivity based Fire Detection Systems used in High Density Computer Rooms with In-Row Air Conditioning Units

Design Best Practices for Data Centers

Rose Business Technologies

THE KEY TO DATA CENTRE INFRASTRUCTURE

Ten Steps to Increasing Data Center Efficiency and Availability through Infrastructure Monitoring

DATA CENTER ASSESSMENT SERVICES

A NEUTRAL COLOCATION CENTRE BETWEEN QUEBEC CITY AND MONTREAL

Visualization, Management & Optimization Keys for an efficient Data Center Sergio Uribe - CommScope

Vigilent shows market awareness with datacenter dynamic cooling update

AIRAH Presentation April 30 th 2014

Introducing AUDIT-BUDDY

Data center management suite. Providing optimal control and efficiency to data center management.

Energy Efficiency and Availability Management in Consolidated Data Centers

Transcription:

Predictive Data Center Infrastructure Management (DCIM) A toolset to maximize the return on capital expenditure in the physical data center Sherman Ikemoto, Matt Warner, Akhil Docca, Hassan Moezzi 11/21/2012

Table of Contents Executive Summary The Elephant in the Room... 2 Data center capacity Fragmentation... 3 Cooling Fragmentation - Just Because You Don t See It Doesn t Mean It s Not There... 5 You Can t Manage if You Can t Predict Cause and Effect... 7 The Way Forward: Predictive DCIM with the Virtual Facility... 8 List of references:... 9 Page 1

Executive Summary The Elephant in the Room Data center capacity is the amount of IT equipment that is intended to be loaded in the data center and is typically expressed in terms of kw/sqft or kw/cabinet. This specification is derived from projections from the business units for the amount of computing capacity required over the long term and is the primary cost driver for the construction of the data center facility. But, most data centers never achieve the capacity they were designed for. This is a financial disaster or owner/operators because a significant percentage of the original capital expenditure is wasted and additional capital must be spent years sooner than planned. The cost of this lost capacity dwarfs all other financial considerations for a data center owner/operator. Often 30% or more of data center capacity is lost in operation. [1] On a global scale, out of 15.5 GW [2] of available data center capacity, a minimum of 4.65 GW is unusable. At industry averages, this amounts to about 31 million square feet of wasted data center floor space and $70B of unrealized capital expense in the data center. The losses are staggering. Gartner has found that 70% of data center facilities have failed to meet their capacity requirements without some level of renovation, expansion or relocation. [3] In an Uptime Institute survey of 21,000 data center operators, 54% of respondents ranked data center capacity as the driver for their long term approach to data center energy efficiency [4] outweighing by far all other drivers. Given the stakes, why isn t much being said about lost capacity? Because these losses are due to fragmentation of infrastructure resources space, power, cooling and networking that build slowly and unperceptively early in the data center life span. As resources fragment, the data center becomes less and less able to support the full, intended IT load. Only well into the operational life of the facility, when the margin on capacity has closed is the problem discovered. Lack of visibility and the delay between cause and detection conceal the elephant in the room: Lost Capacity. This paper addresses the causes of lost data center capacity, the challenge of early detection and avoidance, the business impact, and proposes a way forward for data center operators to start reducing the effects. Page 2

Data Center Capacity Fragmentation Fragmentation occurs because a typical owner/operator will almost certainly break the original IT load assumptions made during the design phase of the facility. One example is that owner/operators will assume power density values for the IT equipment that will be installed in the future. Inevitably, after installation the owner/operator discovers that the assumptions were wrong. This error will fragment space or power depending on if the estimates were too high or low. The end result is lost data center capacity. A second common example is that data center designers and owner/operators will assume generic cooling and physical characteristics for the cabinets and IT equipment that will be installed in the future. These assumptions may yield a successful configuration during the design phase, but quickly break down as real IT devices and cabinets are introduced into the data center. For example, while the power draw of a blade server might be the same as standard server hardware, the cooling (airflow) utilization will be substantially different. This and other seemingly minor differences between the design assumptions and the actual IT technology, cabinets and IT layouts will fragment the cooling distribution, often dramatically. The result is lost data center capacity. Capacity lost Capacity available Data center capacity plot for a data center that is subjected to an idealized IT configuration Data center capacity plot for the same data center subjected to an actual IT configuration Data center capacity comparison between a typical, idealized IT configuration and a specific IT configuration made up of a mixed set of vendor supplied cabinets and IT equipment. To better understand fragmentation, consider a computer hard drive. Given that you pay per unit of storage, your goal is to fully utilize the capacity you have before buying more. However, hard drive capacity will fragment incrementally as you load and delete programs and files. The amount of Page 3

fragmentation that occurs depends on how the hard drive is used. Eventually, a point is reached at which the remaining available capacity is too fragmented to be of use. Only with defragmentation tools can you reclaim what has been lost and fully realize your investment in the device. Fragmentation of hard drive storage capacity The concept of resource fragmentation also applies to the data center. Data center capacity, like hard drive storage capacity, will fragment through use, at a rate that depends on how it is used. The simple answer to fully realizing the capacity potential of the data center is continuous defragmentation. This, however, is where the similarities between hard drives and data centers end. The first difference is that hard drive capacity is defined by space only while data center capacity is defined by the combination of space, power, cooling and networking. This makes defragmentation of data center capacity significantly more complicated as it requires coordinated management of four data center resources that are traditionally managed independently. The second difference is that unlike hard drive capacity, data center capacity cannot be tracked by traditional means. This is because cooling a component of capacity is dependent on airflow that is invisible and impractical to monitor with sensors. Cooling problems therefore can be addressed only if airflow is made visible. A simulation technique called computational fluid dynamics (CFD) is the only way to make airflow visible. Therefore, the only means to defragment data center capacity that has been affected by cooling problems is through the use of CFD simulation. The final difference is that unlike the hard drive, defragmentation of data center capacity is often not an option because it puts IT service availability at risk. Therefore, to protect against data center capacity Page 4

loss, fragmentation issues must predicted and addressed before IT deployments are physically implemented. These differences have a significant impact on the techniques required to protect against data center capacity fragmentation. Let s take a closer look at a common fragmentation problem. Cooling Fragmentation - Just Because You Don t See It Doesn t Mean It s Not There Early in the life of a data center, capacity management seems straightforward. Cabinets are loaded with IT equipment and placed. Space and power are widely available and utilization is tracked with spread sheets and DCIM tools. IT load growth and capacity utilization seems to be progressing as planned and fragmentation is the furthest issue from your mind. Later, as your data center approaches 50% of full load, fragmentation problems start to appear. With careful tracking, your teams have been able to keep space and power fragmentation under control just barely. However, your temperature monitoring system is registering hot spots that are forming. This of course shouldn t be happening. You have followed the deployment guidelines and best practices, and on paper have plenty of space, power and cooling capacity left! Simple tracking of capacity-used overlooks the problem of capacity fragmentation At this point, you realize that hot spots are a symptom of a problem that you can t see. Your monitoring system has been alerting you to the problem, but does not help you understand the cause. The only options you seem to have are to either lower the temperature of the entire facility or to embark on an expensive infrastructure upgrade. Page 5

In reality, cooling has been fragmenting from day one because your IT configuration has been evolving away from the original design configuration. As a consequence, the cooling distribution (airflow) within the room and inside of the cabinets has been changing relative to the original design intent and separating from the space and power distributions. Power Space Physical characteristics of IT equipment and cabinets are idealized for design Actual physical characteristics of IT configurations are non-ideal The physical characteristics of design IT loads and cabinets are always different from the actual IT loads. This is a common cause of cooling fragmentation and lost data center capacity. The total amount of cooling hasn t changed, but its distribution relative to the IT configuration has. This in turn has reduced data cente capacity, because capacity is set by the least available infrastructure resource. Capacity lost Capacity available Data center capacity and cooling distribution for an idealized design IT configuration Data center capacity for the actual IT configuration that the design was intended to represent Cooling distribution and data center capacity are determined by the physical characteristics of the IT configuration. This effect is can be seen only with a simulation model. Page 6

Now if cooling (airflow) was visible like space and power, you would have seen it fragmenting as the IT evolved. You would also have seen that best practices and deployment guidelines are effective under specific conditions only, not universally applicable as many in industry believe. This brings you to today where your fragmentation symptoms have stopped further IT deployments and you realize that you must be able to visualize cooling and how it relates to space, power, to protect and optimize data center capacity. You re stuck at 60% of full capacity, and have lost 40% somewhere inside this data center. And you are not alone. You Can t Manage if You Can t Predict Cause and Effect In order to protect and optimize data center capacity, the ability to simulate and visualize the fragmentation of infrastructure resources before IT deployments are made is required. This predictive capability brings to light fragmentation problems that would otherwise be discovered after the IT equipment is deployed when risk of IT service downtime prevents them from being addressed. Simulation also makes the connection between decisions made today and available data center capacity over the long term. This foresight prevents the owner/operator from accumulating fragmentation problems for years before the symptoms become severe enough to detect with a monitoring system. Today, simulation is a common practice in data center design to validate designs and enable innovative energy saving design concepts. Given that the design will change many times during the lifespan of the data center, doesn t it make sense to re-validate each change to ensure the original data center capacity specifications still hold? Modern simulation techniques can fulfill these requirements by integrating live data, data from DCIM systems and the latest IT configuration roadmap information as input to predict the impact of proposed changes before they are implemented. In effect, data collection and the simulation model combined provide operational validation of a continuously changing data center design. The focus of validation in this form is the most critical data center performance metrics: IT service availability and long-term data center capacity. Page 7

The Way Forward: Predictive DCIM with the Virtual Facility To this end, the Virtual Facility from Future Facilities is a predictive DCIM solution to identify and avoid the conditions that lead to lost data center capacity and IT service interruptions. The Virtual Facility is a dynamic, 3-dimensional, predictive model of the physical and logical data center. The inputs to the Virtual Facility model are: data collected by the various real-time monitoring components of traditional DCIM solutions such as power consumption, IT asset tracking and environmental data the continuously changing IT and facilities roadmap of future changes Upon consolidation of the input data, simulations are performed to predict the short term and long term consequences of future IT deployment decisions such that rack and cooling resources are maximized. The predictive capability of the Virtual Facility enables the owner/operator to weigh the short and longterm cost and performance consequences of IT deployments, facility upgrades and energy savings programs prior to implementing changes. The latest implementations of the Virtual Facility in the field demonstrate the following outcomes: Increase data center capacity utilization to above 90% from the typical 60-70% Page 8

Increase IT service availability by addressing redundancy problems and environmental risks before changes are implemented in the data center Make better operational decisions that extend the lifespan of the data center facility and offset the need for costly infrastructure upgrades For more information, please visit www.futurefacilities.com List of references: [1] Future Facilities Data Center Lost Capacity Client Survey [2] Global Data Center Energy Demand Forecasting - DataCenter Dynamics - September 2011 [3] Use Best Practices to Design Data Center Facilities, Gartner research publication ID#: G00127434 [4] Special Report: Data Center Capacity and Energy Efficiency Survey, Kenneth Brill, Uptime Institute, March 2008 Page 9