Failure Trend Alert - Missing Revisions on Certificate on Conformance (C of C)



Similar documents
Supplier Quality Requirements F16 Program

Q2A First Article Inspection (FAI) AS9102 * Revised ** Added

When the template is complete, the whole Product Description document can be printed and approved.

Q2A First Article Inspection (FAI) AS9102

Introduction to AS 9100

Purchase Order Attachment 1600 Revision 02 June Raytheon Aircraft Company Supplier Quality Requirements Document

Supplier Quality Assurance Requirements Manual

Supplier Quality Assurance Requirements Manual


Supplier Quality. Assurance Provisions. Manual. SQAP-001 Rev. E

Supplier Quality Requirements and Clauses

SAP Master Data Governance

QUICK REFERENCE GUIDE

Software Process Training

INTRODUCTION: PURPOSE:

First Article Inspection (FAI) Training

Purchase Order Clauses and Conditions

User Guide Package Exception Management

Questionnaire/Compliance Form for COBRA Administration

Important Information for Invoicing Hewlett Packard:

State of Connecticut Core-CT Continuing Education Initiative. Introduction to eprocurement

SUPPLIER FIRST ARTICLE INSPECTION INSTRUCTIONS AND FORMS

Bogue Machine Company, Inc. Business Instruction

Proven deployments across different Industry verticals; Being used by leading brands

In partnership with. PO Convert User Guide - Service-Type Purchase Orders

WebSphere Business Monitor

ELECTRONIC TRACEABILITY SYSTEMS VS. PAPER BASED TRACEABILITY SYSTEMS

Start Date. Start Time. Finish Date. Finish Time. Comments

Product Order Quality Requirements Meggitt (Orange County), Inc.

EDI Testing System (ETS) User Guide

How To Manage A Plant

Quality Requirements for Suppliers

Internet connection (high speed recommended) Microsoft Excel (installed locally) Adobe Reader 8.1 or later (installed locally)

Walmart Stores, Inc. Getting Started with EDI Implementation Guideline Document version: 1.0 Published November 2011

CHAPTER 7 Software Configuration Management

Quality Assurance Provisions

GARDNER AEROSPACE SUPPLIER QUALITY REQUIREMENTS MANUAL

Debt collector response template

Personal Spam Solution Overview

PEP 2 Peoplesoft eprocurement Hands on Training 1

Volume EASTMAN KODAK COMPANY. Worldwide Purchasing. Supplier Manual

PRISM Compliance Management Vendor Rollout Series PRISM Vendor User Training

RTP s NUCLEAR QUALITY ASSURANCE PROGRAM

QUALITY MANAGEMENT SYSTEM

Supplier Quality Assurance

QCI Counterfeit Avoidance and Mitigation Procedure

LANDesk Server Manager. Single Console Multi-Vendor Management Solution

Taking the pain out of Risk and Compliance Management Systems. Presented by Andrew Batten 23 April 2015

Accelerating Your Cash Flow

Product Data Reporting and Evaluation Program (PDREP) PDREP Search Tool

Distributors In addition to the requirements noted herein, Distributors shall have a Quality System

SIEMENS. Teamcenter Change Manager PLM

With Windows, Web and Mobile clients Richmond SupportDesk is accessible to Service Desk operators wherever they are.

Welcome to the topic on managing delivery issues with Goods Receipt POs.

DOMESTIC ROUTING GUIDE AND PACKING INSTRUCTIONS

Frequently Asked Questions Please read this document before using this application.

REFERENTIEL- SODERN. Autre référence / Other reference :

Effective Ways to Manage User Life Cycle in Active Directory

Unincorporated changes to Revision J of the SPOC Manual UPDATED November 22, 2011

Mellanox Value Added Services & Support

Welcome! Frank Teleso. Quality Manager

DOCUMENT PREPARATION UNDER LETTERS OF CREDIT

EPS SELLER MANUAL FOR SAIL PLANT

ISO :2005 Requirements Summary

Managed Service for MaaS360 Helpdesk to Helpdesk Support Service Charter

Accounts Receivable. I. Overview Definitions and Abbreviations. Equipment and Supplies Required

Emptoris Contract Management Solution for Healthcare Providers

Federal Business Opportunities (FedBizOpps.gov) Change Management Plan (CMP)

WHITEPAPER. Achieving Network Payment Card Industry Data Security Standard (PCI DSS) Compliance with NetMRI

IT3205: Fundamentals of Software Engineering (Compulsory)

University of Bedfordshire ISD Change Management Policy

IT SERVICE MANAGEMENT POLICY MANUAL

STANDARD MICROCIRCUIT DRAWING MICROCIRCUIT, LINEAR, ADJUSTABLE ANALOG CONTROLLER, MONOLITHIC SILICON

GLOBAL AEROSPACE PROCEDURE

Valuable Metrics for Successful Supplier Management

COSTARS Sales Reporting Manual December 2013

Using HP System Software Manager for the mass deployment of software updates to client PCs

IMARDA i360 MANAGING FLEET-WIDE COMPLIANCE COMPLIANCE ISSUES:

SysAidTM ITIL Package Guide. Change Management, Problem Management and CMDB

Sterling Supplier Portal. Overview Guide. DocumentationDate:9June2013

ORACLE QUALITY ORACLE DATA SHEET KEY FEATURES

Contractor Environment, Health and Safety Management Plan

Helical Products Co., Inc.

Tungsten Network Web Form Invoice Submission Guide

Audits. Alerts. Procedure

What are the minimum internal control standards for lines of credit?

E-INVOICING A COMPANY-WIDE PROJECT?

Creating Rules in Outlook

Getting Started with EDI Implementation Guide

Accounts Payable FIS Manual

3] Alert Configuration for User Login Failure and Incorrect Guest Details [HIA]

Understand the impact the POA & ASN has on the Perfect PO Kevin Wilson Q Data USA SESSION CODE: SC163

Welcome to Metafile. Solving document issues for over 30 years. Matt Akin x 301

PROCESSING UTILITY PAYMENTS...

Transcription:

Dear Valued Partner: In our continued journey to assist our supplier partners, Raytheon IDS will be expanding the new program to proactively communicate failure trend concerns to our supplier partners. The failure trend information is being extracted from recently developed systems that provide real time analysis for failures at Incoming Inspection and within manufacturing. You should also be aware that some of the failure trends are a result of more detailed inspections being performed on supplied material. It is Raytheon's commitment to raise the bar with everything we do. Failure Trend Alert - Missing Revisions on Certificate on Conformance (C of C) Missing Part Number Revisions on C of C's have become a high fault drivers at Raytheon's Incoming Inspection. Raytheon Quality Note FA (see attached) requires the C of C to list Part Number Revision. In most cases, the material is not returned to the supplier but the supplier's SRS Rating is impacted. Please review your C of C template to assure that Part Number Revision is being recorded. [attachment "RQN FA_5_1-15-08.pdf" deleted by Joseph D Bostic/US/Raytheon]

Dear Valued Partner, In continuing Raytheon's journey to assist our supplier partners, Raytheon IDS is sending this trend alert to notify you of a trend issue we are seeing at Raytheon s incoming inspection in regard to Packaging Information for Vendors (PIVs). When called out on your purchase order, PIVs, are an integral part of the contract (purchase order). The revision in effect at the time the purchase order was placed applies. PIVs are specifications provided to inform vendors of Raytheon's minimum packaging requirements. Listed below are general packaging guidelines; consult your purchase order for specific PIV requirements: In general, no packaging material shall be used that will leave any residue from the packaging material on the parts as a result of packaging or unpacking the product. There shall be no foreign objects received in packaging and packaging containers. Foreign objects can include staples used for closure of unit packaging, foam peanuts used for cushioning and Styrofoam (can break down and particles cling to parts) used for cushioning. It is the suppliers responsibility to ensure that you have the latest requirements documents called out on the contract (purchase order), including PIVs. If you don t have the latest revision of a PIV requirement, called out on your contract (purchase order) you should contact: 1) The buyer whose name appears on your purchase order 2) The : phone: 978.858.1357

email: SupplierQuality.Hotline@raytheon.com 3) For suppliers with access to icenter, PIVs are accessible via this tool Be advised that faults for not following PIV requirements will result in a supplier caused failure at incoming inspection which will impact your SRS Rating. You should also be aware that some of the failures are a result of more detailed inspections being performed on supplied material. It is Raytheon's commitment to raise the bar with everything we do. Dear Valued Partner: In continuing with Raytheon's journey to assist our supplier partners, Raytheon IDS is expanding our new program to increase the timely communication of failure information to our partners. This failure information is being extracted from the new systems that provide real time failure information. The Failure Information Alert listed below was for a failure identified at Raytheon's Incoming Inspection in Andover, MA. The fault condition was reworked at Raytheon and the material was not returned back to you. The fault was recorded as a supplier caused failure which will impact your SRS Rating. You should also be aware that we are conducting more detailed inspections

of supplied material. This is Raytheon's commitment to excellence, raising the bar with everything we do. We owe our Warfighters nothing less! Failure Trend Alert - Marking A. Missing Marking Requirements per requirements of TDP- Technical Data Package - Missing Cage Code - Missing Part Number - Missing Date Code - Missing Lot Code B. Incorrect Markings per requirements of TDP- Technical Data Package - Incorrect Part Number C. Error on paperwork per Quality Note FA Certificate of Conformance - Discrepancy between Purchase Order Number listed C of C and part - Discrepancy between Date Code listed C of C and part In most cases, the material is not returned to the supplier but the supplier's SRS Rating is impacted. Please review your TDP and Quality Note FA requirements to assure that parts are compliant. Dear Valued Partner:

In continuing with Raytheon's journey to assist our supplier partners, Raytheon IDS is expanding our new program to pro-actively communicate failure trend concerns to our supplier partners. This failure trend information is being extracted from the new systems that provide real time analysis for failures at Incoming Inspection and within manufacturing. You should also be aware that some of the failure trends are a result of more detailed inspections being performed on supplied material. This is Raytheon's commitment to excellence, raising the bar with everything we do. We owe our Warfighters nothing less! Failure Trend Alert - First Article Inspection (FAI) - P/N revision changes Ref. Raytheon Quality Note - DD Purpose: This Failure Trend Alert is to articulate Raytheon s FAI requirements per Quality Note - DD, specifically regarding P/N revision changes. Issue: Noncompliance to QN-DD has been identified as a trend by Incoming Inspection at IADC. QN- DD flows down FAI requirements per SAE Aerospace Standard AS9102 with additional Raytheon conditions. Communication: An FAI must be completed on the first purchase order for the P/N and a Delta* FAI is required for each new revision thereafter. The Delta* FAI submitted for approval must articulate the change(s), including notation that engineering has determined the new revision is interchangeable with previous revision, if applicable. * Delta FAI: The FAI requirements may be satisfied by addressing differences between current configuration and prior approved configurations. (Refer to SAE AS9102 Para. 5.3 regarding partial FAI.) Andover, MA 01810 desk: email: