1 1 Introduction 1.1 This paper documents the Change Management Policy that is used within the Information Services Directorate (ISD) in the University of Bedfordshire, as part of the Service Support process within Service Management. The policy is applied to all Requests For Change (RFC) that have been raised, which will result in changes to the configuration of one or more systems or services. 1.2 A Change is defined as the process of moving from one defined state to another. Change Management is responsible for managing the Change process involving: Hardware System software Live application software Communications equipment and software Documentation and procedures associated with the running, support and maintenance of live systems. 1.3 The Change Management process does not extend to development environments, for which the respective development team assumes responsibility for the changes to these environments or systems. The Change process will however cover Test environments, when these are available to users to test out their own local business processes. 1.4 The process consists of a number of defined steps, which are described in this policy document: i) Request for Change ii) Impact Assessment iii) Approval iv) Implementation v) Post Implementation Review Request for Change Initial Assessment Change model scope Major Change Log Seek Approve Seek CAB Build Estimate Approval etc Scope of Change? Apply appropriate Change model Implement as defined in model Moderate Change Minor Change Standard Change Log Approve All actions Update CMDB Build Test Implement etc. Figure 1. Change process model UoB_Change_Management_policy.doc Page 1 of 8 31 Jan 2007

2 1.5 Figure 1 outlines the Change process model to be adopted. An initial assessment will be carried out to identify the scope of the Change, and therefore the appropriate detailed model to be applied. Separate models will be developed for the various services and systems supported by ISD, as the details will vary considerably according to the requirements of the users and owners of each system. 2 Request For Change (RFC) 2.1 As soon as a requirement for Change is identified, usually as a result of a Problem investigation, but may be due to an external driver (e.g. supplier advice), then a Request For Change (RFC) is raised. An example of the information required in the RFC is provided in Appendix The RFC will undergo an initial assessment by the Change Manager, working with the originator, to determine the scope of the Change. The appropriate Change model will then be identified and applied. 2.3 Three categories of Change models are defined Major, Moderate and Minor. The application of the particular model to a RFC will depend on the system or service being changed, as the potential impact of the Change will vary across the services. 2.4 Major Change A Major Change will potentially have an impact on the whole university and is therefore subject to the most detailed analysis and planning. Authorisation for the Change will be provided by the appropriate senior management, in consultation with members of the Change Advisory Board (CAB). Examples of a Major Change may include: Key system upgrade (e.g. Student Record System, Finance System), server reconfiguration, Student Record System data structure reconfiguration. 2.5 Moderate Change A Moderate Change will have a more limited impact, but may cause a service impact or procedural change to a number of users across the university. The RFC will be referred to the Change Advisory Board, whose members will be representative of the key users of that service. The CAB will advise the Change Manager, who will ultimately authorise the Change and co ordinate the implementation. Examples of a Moderate Change may include: a Hotfix installation, SRS data changes affecting reporting, minor desktop reconfiguration, telephone voic enhancements. 2.6 Minor Change A Minor Change can follow a standard change process which follows an established path, is relatively common and is the accepted solution to a specific requirement. Key elements of a standard change are: Tasks are well known and proven, Authority is effectively given in advance, Train of events can usually be initiated by the Service Desk. Examples of a Minor Change may include: setting up a new user on the SRS, replacement of a user PC, changes to Auto Attendant telephone messages to meet end user requirements. UoB_Change_Management_policy.doc Page 2 of 8 1 July 2008

3 2.7 Change Advisory Board (CAB) The CAB will be chaired by the Change Manager and consist of representatives of the business and user community. The precise constitution of the Board will vary according to the system or service to undergo the Change, and therefore the user community impacted. The members will be able to assess the Change from both a user and technical viewpoint, and therefore recommend to the Change Manager the appropriate prioritisation and Release timetable. The CAB will be responsible for approving all Moderate and Major Changes. It will not be required to consider Minor Changes. It may not always be necessary for formal meetings to take place to approve every Change. This is particularly true for Emergency Changes, which may be needed urgently to address an immediate problem. In this case, approval may be given by e mail from the appropriate parties. 2.8 Emergency Changes Where an Emergency Change is required, the Change Manager may consult with nominated select members of the normal CAB for that service. The service owners will determine who the appropriate members will be to authorise such changes. An Emergency Change may be approved by these members. 3 Impact Assessment 3.1 An assessment of the impact of the change will be undertaken by the appropriate members of the CAB. The impact analysis will include the resources required to implement the change, financial implications, the communication that will be required to users, the timescale for implementation and any other factors that may apply to that system or service (e.g. capacity availability, provision of service continuity). 3.2 A Risk Assessment will also be carried out to identify the potential risks that may arise through the implementation of this change. 3.3 Reference will be made to the Forward Schedule of Changes to ensure that the impact of the change does not affect or is compromised by any changes to other systems or services. 3.4 The Impact Assessment will be reviewed by the CAB and approval advised to the Change Manager. 4 Approval 4.1 The Change Manager will approve the Change, under advice where necessary from the CAB, schedule the implementation date and update the Forward Schedule of Changes (FSC). 5 Implementation 5.1 The Change Builder will design and build the Change in accordance with the timetable agreed with the Change Manager. The steps involved in this process will be in accordance with the model used for this service, and will typically include the necessary test plans and back out procedures. 5.2 Testing will be carried out by the nominated independent tester for the service. In certain circumstances, for Emergency Changes, testing may be curtailed as agreed with the appropriate members of the CAB. UoB_Change_Management_policy.doc Page 3 of 8 1 July 2008

4 6 Post Implementation Review 6.1 Following completion of the implementation, the Change Manager will undertake a PIR of the release. The scope of this PIR will depend on the nature of the Change. For Moderate or Major Changes, the PIR will as a minimum consist of the standard ISD PIR report see Appendix 3. For Minor changes, a formal PIR is not required, but the Change Manager will record that the change has been implemented satisfactorily. 7 Relationship between Change, Release and Configuration Management 7.1 Figure 2 illustrates the relationship between Change, Release and Configuration Management, and the responsibilities of each process. Within the ISD, reflecting the close links between the two, the Change and Release Management processes will be combined into one. Change Management Release Management Configuration Management Request for Change Register and allocate RFC number Reports and Configuration audit to check environment Assess Analyse impact Reports on CIs, areas and parties impacted Approved Change Update CM records Implement Change This will involve prerelease testing where software changes are required Post Implementation Review Has change met expectations? Release and distribute new versions of software and hardware with documentation Baseline, release software from DSL and update DSL and CM records CMDB Definitive Software Library Close Change Analyse impact Check all CM records were updated End Figure 2. Change, Release and Configuration Management UoB_Change_Management_policy.doc Page 4 of 8 1 July 2008

5 8 Release Management 8.1 A Release is defined as a collection of authorised changes to an IT service. The size of the Release can vary, according to the service involved, and the number and complexities of the changes included with the Release. Likewise, the frequency of Releases across different services will vary. It is not possible, therefore, to define a detailed global Release policy that can be applied to every system or service. This policy outlines the key tasks within the overall Release policy. 8.2 The Release Manager will oversee the Release to ensure that only correct, authorised and tested versions of software are installed. The aim is to protect the Live environment and the integrity of the software. As with the Change Management process, the Release Management process will only cover Live and Test environments, where users may use the service to test operational processes. Development environments are not included in this policy. 8.3 A Release Unit is defined as a portion of the IT infrastructure that is normally released together. The size of the Release Unit will depend on the service affected. 8.4 Types of Release i) Delta Release This is a partial release which contains only those configuration items that have actually changed. This is the fastest and least costly release, but carries an increased risk due to the reduced opportunity for full integration testing. ii) iii) Full Release This contains all the components of the single Release Unit, whether they have changed or not. All components of the Release Unit will be tested to ensure that the changed items have no unexpected impact. Package Release A number of different Release Units are brought together to form a package. Each individual package may contain either Delta or Full releases, but full integration testing will be performed on all Units. The Release record will define which type of release is being made and will list the configuration items and release units that are being released. 8.5 The Release Manager will act as the librarian for the Definitive Software Library (DSL). This library contains the master copies of all software released on the University systems, together with the licence documentation (where applicable). The DSL may be a physical store, or a logical file directory, depending on the software required to deliver the service. The Release Manager is responsible for ensuring the integrity of the software contained in the DSL, and that only the latest, tested and authorised copies are released to the Live environment. 8.6 If changes to hardware are included in the Release, the Release Manager will co ordinate the movement of equipment from the Definitive Hardware Store (DHS). (The DHS is the location of the store of Hardware components which are the same as those used in the Live environment). UoB_Change_Management_policy.doc Page 5 of 8 1 July 2008

6 Appendix 1 Request for Change RFC Number Item(s) to be changed (include version number) Reason for Change Effect of not implementing change Person requesting the Change Date of Request for Change Priority Scope of Change Major / Moderate / Minor Impact and Resource assessment Authorised by Authorised date Implementation Plan Proposed Date of Release Release Plan prepared by Change Builder Back out Plan Actual date of change Review Date Review Results Impact on Business Continuity / contingency plan UoB_Change_Management_policy.doc Page 6 of 8 1 July 2008

7 Appendix 2 Examples of Changes Student Record System Major Change SITS Release upgrade Server reconfiguration URL address change Data structure re configuration (instigated by Planning) e.g. new Faculty Moderate Change Hotfix installation Changes to data which may affect reporting (Planning) Minor Change (standard change procedure applies) Request for new user set up User Password reset UoB_Change_Management_policy.doc Page 7 of 8 1 July 2008

8 INFORMATION SERVICES DEPARTMENT Appendix 3 Project Post Implementation Review Project Title: Project Manager: Objectives: (brief description of core objectives) Weights for all key objectives must total 100%. Key Objectives i) ii) Weight ( ) Score (for each key objective) 1 Not delivered 5 Fully delivered iii) iv) Average Score 0% Comments on Objectives Costs Budget Actual Variance Score ( percentage > budget) 5 < 10 % 2 40% 50% 4 10% 20% 1 >50% 3 20% 40% Capital: k k Comment on Costs Delivery Date Planned Actual Delay (Months) Score (months late) 5 On time m 4 0 3m 1 >12m 3 3 6m m Comment on Delivery Date Total Project Score 0.0 Completed by Date: PIR result Positive PIR >= 12 Negative PIR < 12 Lessons learned (for ISD circulation) UoB_Change_Management_policy.doc Page 8 of 8 1 July 2008

Utolsó módosítás: 2011.03.31.

Utolsó módosítás: 2011.03.31. Utolsó módosítás: 2011.03.31. 1 2 3 Release Management: The Process responsible for Planning, scheduling and controlling the movement of Releases to Test and Live Environments. The primary objective of

More information

ITIL Example change management procedure

ITIL Example change management procedure ITIL Example change management procedure An example change process diagram Change Intiators outside IT (users/customers/supplier/etc.) Change Initiators IT SERVICE DESK Filters change requests RFC REJECT

More information

Which ITIL process or function deals with issues and questions about the use of services, raised by end users?

Which ITIL process or function deals with issues and questions about the use of services, raised by end users? 1 of 40 Which ITIL process or function deals with issues and questions about the use of services, raised by end users? A. Availability Management B. Service Level Management C. Problem Management D. Service

More information

Service Support. 2005 Kasse Initiatives, LLC. ITIL Configuration Management - 1. version 2.0

Service Support. 2005 Kasse Initiatives, LLC. ITIL Configuration Management - 1. version 2.0 Service Support Configuration Management ITIL Configuration Management - 1 Goals of Configuration Management The goals of Configuration Management are to: Account for all the IT assets and configurations

More information

ITIL Essentials Study Guide

ITIL Essentials Study Guide ITIL Essentials Study Guide Introduction Service Support Functions: Service Desk Incident Management Problem Management Change Management Configuration Management Release Management Service Delivery Functions:

More information

Process Guide. Release Management. Service Improvement Program (SIP)

Process Guide. Release Management. Service Improvement Program (SIP) Process Guide Release Service Improvement Program (SIP) i Table of Contents Process Guide Release Document Information... 3 Approval... 4 Section 1: Process Vision... 6 Overview... 6 Process Mission and

More information

Release Management PinkVerify v2.1. Mandatory Criteria

Release Management PinkVerify v2.1. Mandatory Criteria Mandatory Criteria *CMDB= Configuration Management Database *CI= Configuration Item *DSL= Definitive Software Library *RFC= Request for Change *SLA= Service Level Agreement 1. Does the tool facilitate

More information

University of Waikato Change Management Process

University of Waikato Change Management Process 1. Overview Information Technology Services and the Faculty and Division ICT staff have adopted the Information Technology Infrastructure Library (ITIL) systems management framework as its model for best

More information

ITIL Introducing service transition

ITIL Introducing service transition ITIL Introducing service transition The goals of service transition Aligning the new or changed service with the organisational requirements and organisational operations Plan and manage the capacity and

More information

ITIL Version 3.0 (V.3) Service Transition Guidelines By Braun Tacon

ITIL Version 3.0 (V.3) Service Transition Guidelines By Braun Tacon ITIL Version 3.0 (V.3) Service Transition Guidelines By Braun Tacon Executive Summary: This document is seven pages. Page one is informational/background only. What follows over the next six pages are

More information

ITIL V3 Foundation Certification - Sample Exam 1

ITIL V3 Foundation Certification - Sample Exam 1 ITIL V3 Foundation Certification - Sample Exam 1 The new version of ITIL (Information Technology Infrastructure Library) was launched in June 2007. ITIL V3 primarily describes the Service Lifecycle of

More information

INTERVIEW QUESTIONS. Que: Which process is responsible for ensuring that the CMDB has been updated correctly?

INTERVIEW QUESTIONS. Que: Which process is responsible for ensuring that the CMDB has been updated correctly? http://www.tutorialspoint.com/itil/interview.htm INTERVIEW QUESTIONS Copyright tutorialspoint.com Que: Which process is responsible for ensuring that the CMDB has been updated correctly? Release Management

More information

IT Service Management

IT Service Management IT Service Management Centra Session 1 Wednesday 13 April 2011 Harry Powell DER Program Manager, DECS Deputy Chairman, itsmf Australia Director Strategic Planning, itsmf Australia Don Priest DER Project

More information

Page 1 of 8. Any change, which meets the following criteria, will be managed using IM/IT Change Management Process.

Page 1 of 8. Any change, which meets the following criteria, will be managed using IM/IT Change Management Process. Page 1 of 8 1. Introduction This policy describes the Authority s Information Management/Information Technology (IM/IT) change management procedures. IM/IT manages changes to applications, infrastructure

More information

CCIT Change Management Procedures & Documentation

CCIT Change Management Procedures & Documentation CCIT Change Management Procedures & Documentation 1.0 Introduction A major challenge within any organization is the ability to manage change. This process is even more difficult within an IT organization.

More information

Infrastructure Change Management. The process and procedures for all changes to the live environment

Infrastructure Change Management. The process and procedures for all changes to the live environment Infrastructure Change Management The process and procedures for all changes to the live environment Version 4.1 October 2012 1.0 Introduction... 3 2.0 The Change Process... 4 2.1 Why raise a change?...

More information

sample questions Practitioner module Release and Control (IPRC) ITIL Practitioner module Release and Control Sample questions IPRC edition June 2005

sample questions Practitioner module Release and Control (IPRC) ITIL Practitioner module Release and Control Sample questions IPRC edition June 2005 sample questions Practitioner module Release and Control (IPRC) ITIL Practitioner module Release and Control Sample questions IPRC edition June 2005 contents 3 introduction 4 sample questions 11 answer

More information

We released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions

We released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions We released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions SCHEDULE 2 SERVICES 1 Purpose of this Schedule 1.1 This

More information

ITIL Example emergency change management procedure

ITIL Example emergency change management procedure ITIL Example emergency change management procedure An example emergency change process diagram Emergency RFC Actually logging of the emergency request for change can all be done retrospectively Emergency

More information

White Paper August 2006. BMC Best Practice Process Flows for ITIL Change Management

White Paper August 2006. BMC Best Practice Process Flows for ITIL Change Management White Paper August 2006 BMC Best Practice Process Flows for ITIL Change Management Copyright 1991 2006 BMC Software, Inc. All rights reserved. BMC, the BMC logo, all other BMC product or service names,

More information

The Newcastle upon Tyne Hospitals NHS Foundation Trust. IT Change Management Policy and Process

The Newcastle upon Tyne Hospitals NHS Foundation Trust. IT Change Management Policy and Process The Newcastle upon Tyne Hospitals NHS Foundation Trust Version No.: 2.0 Effective From: 16 July 2015 Expiry Date: 16 July 2018 Date Ratified: 5 June 2015 Ratified By: Director of IT 1 Introduction IT Change

More information

EXIN IT Service Management Foundation based on ISO/IEC 20000

EXIN IT Service Management Foundation based on ISO/IEC 20000 Sample Exam EXIN IT Service Management Foundation Edition October 2013 Copyright 2013 EXIN All rights reserved. No part of this publication may be published, reproduced, copied or stored in a data processing

More information

Exam : EX0-100. Title : ITIL Foundation Certificate in IT Service Management. Ver : 08.01.06

Exam : EX0-100. Title : ITIL Foundation Certificate in IT Service Management. Ver : 08.01.06 Exam : EX0-100 Title : ITIL Foundation Certificate in IT Service Management Ver : 08.01.06 QUESTION 1 The successful diagnosis of a problem results in a Known Error. On the basis of this Known Error a

More information

Service Level Agreement (SLA) Information Technology Support. for. Departments within Southern Clinical School. Provided by

Service Level Agreement (SLA) Information Technology Support. for. Departments within Southern Clinical School. Provided by Service Level Agreement (SLA) Information Technology Support for Departments within Southern Clinical School Provided by Network Services Monash University Monash Medical Centre Version 3 Page 1 of 12

More information

WHITE PAPER. Best Practices in Change Management

WHITE PAPER. Best Practices in Change Management Best Practices in Change Management The change management function employs standard methods and procedures to efficiently and promptly balance the need for change against the impact of change, preventing

More information

ITIL Roles Descriptions

ITIL Roles Descriptions ITIL Roles s Role Process Liaison Incident Analyst Operations Assurance Analyst Infrastructure Solution Architect Problem Manager Problem Owner Change Manager Change Owner CAB Member Release Analyst Test

More information

Florida Courts efiling Authority. User Forum Policy. Page 1 of 11 DRAFT

Florida Courts efiling Authority. User Forum Policy. Page 1 of 11 DRAFT Florida Courts efiling Authority User Forum Policy Page 1 of 11 DRAFT Introduction In conjunction with the Chief Justice and the Supreme Court, the Florida Courts E-Filing Authority was established in

More information

Free ITIL v.3. Foundation. Exam Sample Paper 1. You have 1 hour to complete all 40 Questions. You must get 26 or more correct to pass

Free ITIL v.3. Foundation. Exam Sample Paper 1. You have 1 hour to complete all 40 Questions. You must get 26 or more correct to pass Free ITIL v.3. Foundation Exam Sample Paper 1 You have 1 hour to complete all 40 Questions You must get 26 or more correct to pass Compliments of Advance ITSM www.advanceitsm.com 1. What is the main reason

More information

Service Integration &

Service Integration & This is a DRAFT document, being published for review & comment The content is therefore subject to change & revision This document is part of the XGOV Strategic SIAM reference set Service Integration &

More information

Overview of Service Support & Service

Overview of Service Support & Service Overview of Service Support & Service Delivery Functions ITIL Service Support / Delivery- 1 Service Delivery Functions Availability Management IT Services Continuity Management Capacity Management Financial

More information

Service Transition. ITIL is a registered trade mark of AXELOS Limited.. The Swirl logo is a trade mark of AXELOS Limited.. 1

Service Transition. ITIL is a registered trade mark of AXELOS Limited.. The Swirl logo is a trade mark of AXELOS Limited.. 1 Service Transition ITIL is a registered trade mark of AXELOS Limited.. The Swirl logo is a trade mark of AXELOS Limited.. 1 Lesson Objectives Service Transition - Introduction - Purpose and Objectives

More information

Sample Exam. IT Service Management Foundation based on ISO/IEC 20000

Sample Exam. IT Service Management Foundation based on ISO/IEC 20000 Sample Exam IT Service Management Foundation based on ISO/IEC 20000 Edition April 2011 Copyright 2011 EXIN All rights reserved. No part of this publication may be published, reproduced, copied or stored

More information

White Paper November 2006. BMC Best Practice Process Flows for Asset Management and ITIL Configuration Management

White Paper November 2006. BMC Best Practice Process Flows for Asset Management and ITIL Configuration Management White Paper November 2006 BMC Best Practice Process Flows for Asset and ITIL Configuration Copyright 2006 BMC Software, Inc. All rights reserved. BMC, the BMC logo, all other BMC product or service names,

More information

SERVICE MANAGEMENT OVERVIEW

SERVICE MANAGEMENT OVERVIEW SERVICE MANAGEMENT OVERVIEW Service Management Overview Page 1 of 40 Contents CONTENTS... 2 IT SERVICE MANAGEMENT... 3 SERVICE DESK... 6 PROBLEM MANAGEMENT... 10 CHANGE MANAGEMENT... 13 RELEASE MANAGEMENT...

More information

Quality assurance in an Agile delivery method

Quality assurance in an Agile delivery method Quality assurance in an Agile delivery method Guy Nelson (Quality Manager, Fidelity International) Barbara Roberts (Accredited DSDM Consultant) April 2006 Agenda The Challenges to Quality Assurance CMMi

More information

Service Asset & Configuration Management PinkVERIFY

Service Asset & Configuration Management PinkVERIFY -11-G-001 General Criteria Does the tool use ITIL 2011 Edition process terms and align to ITIL 2011 Edition workflows and process integrations? -11-G-002 Does the tool have security controls in place to

More information

Managing and Monitoring Windows 7 Performance Lesson 8

Managing and Monitoring Windows 7 Performance Lesson 8 Managing and Monitoring Windows 7 Performance Lesson 8 Objectives Configure Windows Updates with Windows Update Client and WSUS Monitor Windows Performance using Event Viewer, Performance Information and

More information

An ITIL Perspective for Storage Resource Management

An ITIL Perspective for Storage Resource Management An ITIL Perspective for Storage Resource Management BJ Klingenberg, IBM Greg Van Hise, IBM Abstract Providing an ITIL perspective to storage resource management supports the consistent integration of storage

More information

The following characteristics are used to identify the severity of a problem report:

The following characteristics are used to identify the severity of a problem report: APPENDIX-E SERVICE LEVEL AGREEMENT (SLA) 1. PURPOSE purpose of this Service Level Agreement (SLA) is to specify in detail the level of maintenance and support service expected from the Supplier under the

More information

Software Asset Management (SAM) and ITIL Service Management - together driving efficiency

Software Asset Management (SAM) and ITIL Service Management - together driving efficiency Software Asset Management (SAM) and ITIL Service Management - together driving efficiency Ian Preskett MIET C.Eng. MBCS CITP Software Asset Management Consultant ian.preskett@ipassociatesltd.co.uk Agenda

More information

ICT Change Management Policy. 3 rd Party Support Guide

ICT Change Management Policy. 3 rd Party Support Guide ICT Change Management Policy 3 rd Party Support Guide Christchurch International Airport Ltd All rights reserved No part of this document may be copied, photocopied or reproduced in any form or by any

More information

ROYAL AUSTRALASIAN COLLEGE OF SURGEONS Division Resources Ref. No. RES-INT-010 Department Information Technology Asset Management

ROYAL AUSTRALASIAN COLLEGE OF SURGEONS Division Resources Ref. No. RES-INT-010 Department Information Technology Asset Management 1. PURPOSE AND SCOPE The purpose of this policy is to define the management of Iinformation Technology (IT) assets of the IT at the Royal Australasian College of Surgeons (the College). 2. KEYWORDS, Assets,

More information

CONNECTING THE CONCEPTS: FROM CONFIGURATION ITEM TO RELEASE POLICY

CONNECTING THE CONCEPTS: FROM CONFIGURATION ITEM TO RELEASE POLICY CONNECTING THE CONCEPTS: FROM CONFIGURATION ITEM TO RELEASE POLICY Version: 1.0 Date: March 2007 Author: Pierre Bernard Manager, Product Development Pink Elephant Table of Contents 1 INTRODUCTION... 3

More information

Request for Change Process

Request for Change Process Request for Process Currently we have an unstructured and inconsistent approach We need a site for a research project where Our site needs a do we go? major redesign We need our video to be available in

More information

EPA Classification No.: CIO 2123.0-P-01.1 CIO Approval Date: 06/10/2013 CIO Transmittal No.: 13-003 Review Date: 06/10/2016

EPA Classification No.: CIO 2123.0-P-01.1 CIO Approval Date: 06/10/2013 CIO Transmittal No.: 13-003 Review Date: 06/10/2016 Issued by the EPA Chief Information Officer, Pursuant to Delegation 1-84, dated June 7, 2005 CONFIGURATION MANAGEMENT PROCEDURE 1 PURPOSE The purpose of this procedure is to describe the process EPA Program

More information

Change Management. Service Excellence Suite. Users Guide. Service Management and Service-now

Change Management. Service Excellence Suite. Users Guide. Service Management and Service-now Change Management Users Guide Service Management and Service-now Service Excellence Suite Table of Contents Introduction... 3 Overview and Objectives... 4 Overview... 4 Objectives... 4 Primary Benefits

More information

ISO 20000-1:2005 Requirements Summary

ISO 20000-1:2005 Requirements Summary Contents 3. Requirements for a Management System... 3 3.1 Management Responsibility... 3 3.2 Documentation Requirements... 3 3.3 Competence, Awareness, and Training... 4 4. Planning and Implementing Service

More information

Risk profile table for deployment of releases to the main web site. High Acceptable Unacceptable Unacceptable

Risk profile table for deployment of releases to the main web site. High Acceptable Unacceptable Unacceptable ITIL V3 Intermediate Capability Stream: RELEASE, CONTROL AND VALIDATION (RC&V) CERTIFICATE SCENARIO BOOKLET Scenario One A global company develops their own applications to support the business. The Service

More information

ICS Operations & Policies Manual. For State Agencies Providing and Using Consolidated Services

ICS Operations & Policies Manual. For State Agencies Providing and Using Consolidated Services 2010 ICS Operations & Policies Manual For State Agencies Providing and Using Consolidated Services This manual is intended to be an Idaho state operations process framework based on the Information Technology

More information

UMHLABUYALINGANA MUNICIPALITY PATCH MANAGEMENT POLICY/PROCEDURE

UMHLABUYALINGANA MUNICIPALITY PATCH MANAGEMENT POLICY/PROCEDURE UMHLABUYALINGANA MUNICIPALITY PATCH MANAGEMENT POLICY/PROCEDURE Originator Patch Management Policy Approval and Version Control Approval Process: Position or Meeting Number: Date: Recommended by Director

More information

Best Practices in Change Management WHITE PAPER

Best Practices in Change Management WHITE PAPER Best Practices in Change Management WHITE PAPER Table of Contents Change Management and Release Management 3 Change Management and Configuration Management 3 The Change Management Process 4 Assessing and

More information

SysAidTM ITIL Package Guide. Change Management, Problem Management and CMDB

SysAidTM ITIL Package Guide. Change Management, Problem Management and CMDB SysAidTM ITIL Package Guide Change Management, Problem Management and CMDB Document Updated: 10 November 2009 Introduction 2 First Chapter: Change Management 5 Chapter 2: Problem Management 33 Chapter

More information

FLORIDA COURTS E-FILING AUTHORITY HELP DESK POLICIES & PROCEDURES

FLORIDA COURTS E-FILING AUTHORITY HELP DESK POLICIES & PROCEDURES FLORIDA COURTS E-FILING AUTHORITY HELP DESK POLICIES & PROCEDURES Introduction The Florida Courts E-Filing Authority ( Authority ) was created and established in order to: (1) design, develop, implement,

More information

Change & configuration management

Change & configuration management 2008-01-18 12:42:00 G007_CHANGE_AND_CONFIGURATION_MANAGEMENT Change & configuration management Guidelines Page 1 of 11 1. Preliminary 1.1 Authority This document is issued by the (the Commission) pursuant

More information

INFORMATION TECHNOLOGY SERVICES IT CHANGE MANAGEMENT POLICY & PROCESS

INFORMATION TECHNOLOGY SERVICES IT CHANGE MANAGEMENT POLICY & PROCESS INFORMATION TECHNOLOGY SERVICES IT CHANGE MANAGEMENT POLICY & PROCESS Revised: 12/5/2011 Table of Contents Overview... 3 Roles and Responsibilities... 4 Management Process Definition... 6 Management Process

More information

Trainning Education Services Av. Paulista, 777-15º andar SP Tel/Fax: 55+ (11) 3323-1676 www.trainning.com.br comercial@trainning.com.

Trainning Education Services Av. Paulista, 777-15º andar SP Tel/Fax: 55+ (11) 3323-1676 www.trainning.com.br comercial@trainning.com. Simulados ITIL Question 1 Which of the following is a Service desk activity? A) functioning as the first point of contact for the customer B) investigating the cause of disruptions for the customer C)

More information

Network Resource Management Directive

Network Resource Management Directive Office of the Prime Minister Central Information Management Unit Directive document CIMU D 0036:2003 Network Resource Management Directive Version: 1.0 Effective date: 10.12.2003 Table of Contents 1. Purpose...3

More information

Commonwealth of Massachusetts IT Consolidation Phase 2. ITIL Process Flows

Commonwealth of Massachusetts IT Consolidation Phase 2. ITIL Process Flows Commonwealth of Massachusetts IT Consolidation Phase 2 ITIL Process Flows August 25, 2009 SERVICE DESK STRUCTURE Service Desk: A Service Desk is a functional unit made up of a dedicated number of staff

More information

ITP01 - Patch Management Policy

ITP01 - Patch Management Policy IT Services Policy ITP01 - Patch Management Policy Prepared by: < Shelim Miah> Version: V1.0 Page 1 of 8 Description & Target Audience: Policy to outline the requirement of all systems and software applications

More information

ResNet services Roles and responsibilities

ResNet services Roles and responsibilities ResNet services Roles and responsibilities Suppliers: Information and Communication Technology Services (ICTS), Student Housing and Residence Life (SH&RL) Customer: Residents in UCT accommodation managed

More information

EXIN.Passguide.EX0-001.v2014-10-25.by.SAM.424q. Exam Code: EX0-001. Exam Name: ITIL Foundation (syllabus 2011) Exam

EXIN.Passguide.EX0-001.v2014-10-25.by.SAM.424q. Exam Code: EX0-001. Exam Name: ITIL Foundation (syllabus 2011) Exam EXIN.Passguide.EX0-001.v2014-10-25.by.SAM.424q Number: EX0-001 Passing Score: 800 Time Limit: 120 min File Version: 24.5 http://www.gratisexam.com/ Exam Code: EX0-001 Exam Name: ITIL Foundation (syllabus

More information

School of Computer Science and Engineering policy with regard to self-administered computers

School of Computer Science and Engineering policy with regard to self-administered computers School of Computer Science and Engineering policy with regard to self-administered computers CSE Computer Security Committee October, 2002 Abstract The School s Computing Support Group (CSG) provides a

More information

Dublin City University

Dublin City University Asset Management Policy Asset Management Policy Contents Purpose... 1 Scope... 1 Physical Assets... 1 Software Assets... 1 Information Assets... 1 Policies and management... 2 Asset Life Cycle... 2 Asset

More information

How To Create A Help Desk For A System Center System Manager

How To Create A Help Desk For A System Center System Manager System Center Service Manager Vision and Planned Capabilities Microsoft Corporation Published: April 2008 Executive Summary The Service Desk function is the primary point of contact between end users and

More information

SOFTWARE MANAGEMENT EXECUTIVE SUMMARY

SOFTWARE MANAGEMENT EXECUTIVE SUMMARY SOFTWARE MANAGEMENT EXECUTIVE SUMMARY Under a task order with the Office of Inspector General, Jefferson Wells reviewed the Commission s software management. Our review found that some controls and best

More information

CCIT Change Management Policy

CCIT Change Management Policy CCIT Change Management Policy Executive Summary The Clemson Computing & Information Technology (IT) infrastructure at Clemson University is expanding and continuously becoming more complex. There are more

More information

ABERDEEN CITY COUNCIL. Title of Report : Blackberry Managed Support Services

ABERDEEN CITY COUNCIL. Title of Report : Blackberry Managed Support Services ABERDEEN CITY COUNCIL Name of Committee : Continuous Improvement Date of Meeting : 6 May 2008 Title of Report : Blackberry Managed Support Services Lead Officer : Rhona Atkinson, Head of Service Design

More information

UMHLABUYALINGANA MUNICIPALITY IT CHANGE MANAGEMENT POLICY

UMHLABUYALINGANA MUNICIPALITY IT CHANGE MANAGEMENT POLICY UMHLABUYALINGANA MUNICIPALITY IT CHANGE MANAGEMENT POLICY Originator IT Change Management Policy Approval and Version Control Approval Process: Position or Meeting Number: Date: Recommended by Director

More information

IMPLEMENTING IT SERVICE MANAGEMENT. Jon Iden and Tom Roar Eikebrokk Borås 30.9.15

IMPLEMENTING IT SERVICE MANAGEMENT. Jon Iden and Tom Roar Eikebrokk Borås 30.9.15 IMPLEMENTING IT SERVICE MANAGEMENT Jon Iden and Tom Roar Eikebrokk Borås 30.9.15 ITSM Monitor - the status of ITSM in the Nordic countries 2007-2014 2010: 446 individual experts 2012-2014: 160-161 firms

More information

Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce

Maturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce Maturity Model March 2006 Version 1.0 P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value Added product which is outside the scope of the HMSO

More information

The ITIL Foundation Examination

The ITIL Foundation Examination The ITIL Foundation Examination Sample Paper A, version 5.1 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. All answers are to be marked on the answer grid provided. 3. You have

More information

Performance Management 2012/ 13: Quarter 4

Performance Management 2012/ 13: Quarter 4 Performance Management 2012/ 13: Quarter 4 Policy and Resources Committee Chief Executive Director of Finance and Corporate Resources Director of Social and Community Services Director of Technical Services

More information

ITIL Terms and Definitions Terms in Bold are Foundation exam terms

ITIL Terms and Definitions Terms in Bold are Foundation exam terms s in Bold are Foundation exam terms Absorbed overhead Accounting Activity Based Costing Allocated cost Application Sizing Asset Asset Management Audit Authorization Availability Availability Management

More information

ICT Project Management Procedure

ICT Project Management Procedure ICT Project Management Procedure Version: 1.0 Page 1 of 15 PROJECT PLAN 1. Scope The purpose of this procedure is to ensure that ICT projects are managed in a structured way using a subset of the Prince2

More information

How to Use the Yellow Machine Appliance in a Windows 2000/2003 Server Environment

How to Use the Yellow Machine Appliance in a Windows 2000/2003 Server Environment How to Use the Yellow Machine Appliance in a Windows 2000/2003 Server Environment This procedure is for software versions 2.91 and 2.92 Overview This document will help you to configure the Yellow Machine

More information

Information Technology Services

Information Technology Services Responsible Officer Approved by Chief Information Officer Council Approved and commenced August, 2014 Review by August, 2017 Relevant Legislation, Ordinance, Rule and/or Governance Level Principle ICT

More information

Business Operations. Module Db. Capita s Combined Offer for Business & Enforcement Operations delivers many overarching benefits for TfL:

Business Operations. Module Db. Capita s Combined Offer for Business & Enforcement Operations delivers many overarching benefits for TfL: Module Db Technical Solution Capita s Combined Offer for Business & Enforcement Operations delivers many overarching benefits for TfL: Cost is reduced through greater economies of scale, removal of duplication

More information

Change Management Living with Change

Change Management Living with Change Change Management Living with Change Introduction Neil Thomas Industry experience in IT & IT support ITIL Vendor Product Management ITIL Consulting Specialised in Service Catalog & CMDB Introduction Fully

More information

1 Why should monitoring and measuring be used when trying to improve services?

1 Why should monitoring and measuring be used when trying to improve services? 1 Why should monitoring and measuring be used when trying to improve services? a) To validate, direct, justify and intervene b) To validate, measure, monitor and change c) To validate, plan, act and improve

More information

ITlL SERVICE DESK IMPLEMENTATION

ITlL SERVICE DESK IMPLEMENTATION Report Asset Management Committee 31 January 2006 14 ITlL SERVICE DESK IMPLEMENTATION 1. Reason for Report To seek Member's approval for the procurement and implementation of the Infra Service Desk software

More information

Computer System Validation for Clinical Trials:

Computer System Validation for Clinical Trials: Computer System Validation for Clinical Trials: Framework Standard Operating Procedure (F-SOP) Author: Tim Cross Version History: 0.1di DRAFT 24-April-2013 0.2 DRAFT 12-June-2013 Current Version: 1.0 17-June-2013

More information

USFWC Project Management Workshop May 31 st, 2014

USFWC Project Management Workshop May 31 st, 2014 USFWC Project Management May 31 st, 2014 Project Management Basics Project Management Basics Project Definition Why do projects fail? Pain Curve Triple Constraint Principle Progressive Elaboration vs.

More information

The ITIL Foundation Examination

The ITIL Foundation Examination The ITIL Foundation Examination Sample Paper B, version 4.0 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. All answers are to be marked on the answer grid provided. 3. You have

More information

Preparation Guide. IT Service Management Foundation Bridge based on ISO/IEC 20000

Preparation Guide. IT Service Management Foundation Bridge based on ISO/IEC 20000 Preparation Guide IT Service Management Foundation Bridge based on ISO/IEC 20000 Edition April 2011 Copyright 2011 EXIN All rights reserved. No part of this publication may be published, reproduced, copied

More information

Subject: 1268-1 Information Technology Configuration Management Manual

Subject: 1268-1 Information Technology Configuration Management Manual Form 1221-2 (June 1969) UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT Release 1-1741 Date MANUAL TRANSMITTAL SHEET 06/19/2012 Subject: 1268-1 Information Technology Configuration Management

More information

I.T. Service Management

I.T. Service Management I.T. Service Management The ITIL approach to service delivery Gerald O Sullivan Human Sciences Research Council egovernment challenges Measurable egovernment value Lowering service delivery costs Increased

More information

Role Purpose: Position Context. Responsibilities Duties

Role Purpose: Position Context. Responsibilities Duties Mount St. Joseph Girls College Systems Administrator / Service Desk Level 1 and 2 Position Description Role Purpose: The Systems Administrator / Service Desk position is responsible for the day to day

More information

POST DESCRIPTION AND PERSON SPECIFICATION

POST DESCRIPTION AND PERSON SPECIFICATION POST SALARY HOURS OF DUTY LOCATION REPORTING TO RESPONSIBLE FOR SUPPORT DESK MANAGER 31,284-34,032 (subject to review) 35 Hours per Week TO BE ADVISED Head of Support Services Service Delivery Engineers

More information

Implementation of Internal Audit Recommendations: Summary of Progress Report by Head of Finance

Implementation of Internal Audit Recommendations: Summary of Progress Report by Head of Finance Financial Scrutiny and Audit Committee 11 February 2014 Agenda Item No 13 Implementation of Internal Audit : Summary of Progress Report by Finance Summary: This report updates members on progress in implementing

More information

Mary Immaculate. ICT Services. ICT Helpdesk. User Guide

Mary Immaculate. ICT Services. ICT Helpdesk. User Guide Mary Immaculate ICT Services ICT Helpdesk User Guide Table of Contents 1. Introduction 3 2. How To Log A Call With The ICT Helpdesk 3 2.1 Email 3 2.2 Phone 3 2.3 Voicemail 3 2.4 Web Self Service Option

More information

Position Description

Position Description Position Description Position Title: Group/Division/Team: WebCenter / UCM Technical Support Business Technology Services Group / IT Operations Division Date: December 2011 Reports To: Roles Reporting To

More information

The ITIL Foundation Examination

The ITIL Foundation Examination The ITIL Foundation Examination Sample Paper A, version 4.2 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. All answers are to be marked on the answer grid provided. 3. You have

More information

Foundation. Summary. ITIL and Services. Services - Delivering value to customers in the form of goods and services - End-to-end Service

Foundation. Summary. ITIL and Services. Services - Delivering value to customers in the form of goods and services - End-to-end Service ITIL ITIL Foundation Summary ITIL and s Design s - Delivering value to customers in the form of goods and services - End-to-end ITIL Best Practice - Scalable and not prescriptive - Gathered from Users,

More information

Roles within ITIL V3. Contents

Roles within ITIL V3. Contents Roles within ITIL V3 Roles are employed in order to define responsibilities. In particular, they are used to assign Process Owners to the various ITIL V3 processes, and to illustrate responsibilities for

More information

JOB DESCRIPTION. Financial Services and Support. Lead Service Desk Analyst

JOB DESCRIPTION. Financial Services and Support. Lead Service Desk Analyst a JOB DESCRIPTION Job Title: Division: Department/Region/Section: Location: Reports to: Responsible for: Grade: Service Desk Analyst Financial Services and Support Information Systems & Support HQ, Southwater

More information

The ITIL Foundation Examination

The ITIL Foundation Examination The ITIL Foundation Examination Sample Paper B, version 5.0 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. All answers are to be marked on the answer grid provided. 3. You have

More information

Project Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee

Project Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee Page 1 2 Contents 1. Introduction... 3 1.1 Definition of a... 3 1.2 Why have

More information

IT & Automation. Service process hos. Novo Nordisk A/S. COWIs temadag. Date: 6 of november 2008 Prepared by JKSQ/APKJ

IT & Automation. Service process hos. Novo Nordisk A/S. COWIs temadag. Date: 6 of november 2008 Prepared by JKSQ/APKJ COWIs temadag IT & Automation Service process hos Novo Nordisk A/S Date: 6 of november 2008 Prepared by JKSQ/APKJ 1 The scope Service process 2 The idea One global framework IT & Automation service is

More information

Managing and Maintaining Windows Server 2008 Servers

Managing and Maintaining Windows Server 2008 Servers Managing and Maintaining Windows Server 2008 Servers Course Number: 6430A Length: 5 Day(s) Certification Exam There are no exams associated with this course. Course Overview This five day instructor led

More information

Chris Day, Acting Director of IT Services C Day. Configuration Manager Change Manager Change Assessors Change Implementers

Chris Day, Acting Director of IT Services C Day. Configuration Manager Change Manager Change Assessors Change Implementers Standard Operating Procedures (SOP) for: Configuration Management and Change Control SOP Number: DG25 Version Number: 1 Effective Date: 14/07/2014 Review Date: 14/07/2015 Author: Reviewer: Authorisation: