Design Standards Fire Alarm Systems Division 13860 (1995 CMS); 283100 (2004 CMS) Amended Feb 2015



Similar documents
FIRE ALARM SYSTEM RECORD OF COMPLETION

FIRE ALARM SYSTEM RECORD OF COMPLETION

FLORIDA ATLANTIC UNIVERSITY FIRE ALARM SYSTEM INSTALLATION MANUAL

SECTION FIRE ALARM AND DETECTION SYSTEMS

OBOA 2009 Huntsville, ON Overview of ULC Standards Affecting Building Occupancy Alan Cavers Area Manager Fire & Security Systems Group

FIRE ALARM AND DETECTION SYSTEMS SECTION 16721

SECTION FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

PLAN REVIEW GUIDE FOR FIRE ALARM

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

NC State University Design and Construction Guidelines Division 26 Fire Alarm Systems

1.0 General. Inspection, Testing, and Maintenance 1 of 8

CITY OF PHILADELPHIA DEPARTMENT OF LICENSES AND INSPECTIONS ANNUAL CERTIFICATION FOR FIRE ALARM SYSTEMS

CFAA NCR CHAPTER ANNUAL SENINAR. Commonly Overlooked Fire Alarm Requirements

DTW Works Master Specification Version 2006

SECTION FIRE ALARM AND DETECTION SYSTEM

Bold items are particular to the City of Euless

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

FireSeeker Fire Alarm Control Panel Model FS-250 Programming Manual

SECTION FIRE ALARM AND DETECTION SYSTEM

FIRE ALARM AND EMERGENCY COMMUNICATION SYSTEM RECORD OF COMPLETION

Module 5. Fire and Emergency Alarm System Part I- Basics

TAMARAC FIRE RESCUE INSTRUCTIONS FOR FIRE ALARM PRE-SUBMITTAL CHECKLIST

City of Bettendorf Fire Alarm System Requirements

Small Building Life Safety Solutions. GE Security. Affordable FireShield Conventional Fire Alarm Control Panels. imagination at work

2012 Ontario Building Code Changes Affecting Fire Alarm Systems

DELAWARE STATE FIRE MARSHAL FIRE ALARM SYSTEM CERTIFICATE OF INSTALLATION

Fire Alarm System Plans Review Checklist Property location Date of Review

1. The objective of this guideline is to provide minimum standards for design and installation of fire alarm systems for the University of Missouri.

BUILDING OWNERS - SERVICE RELATED ISSUES FOR FIRE ALARM SYSTEMS

BUILDING DESIGN STANDARDS UNIVERSITY SERVICES ELECTRONIC SAFETY AND SECURITY - DIVISION 28 Fire Alarm Systems

SPECIFICATION MICROMIST FIRE SUPPRESSION SYSTEM WITH CHEETAH Xi CONTROL PANEL

University Design Standard. Fire Alarm Systems

Fire Alarm System Plans Submittal Guidelines For New and Existing Systems

Fire Alarm FAQs. Q: How many zone/circuit fire alarm panel do I need? Q: What candela strobes do I need?

Invitation to Bid FIRE ALARM & DETECTION SYSTEM

Project No. 4 Analysis of Active Fire Alarm Systems in WTC 1 & 2. Robert J. Keough Rolf Jensen & Associates Raymond A. Grill, P.E.

SECTION FIRE ALARM SYSTEM

Section : Fire Alarm Detection Systems (formally Section 16720) Definitions. EPROM Electrically Programmable Read Only Memory

Module 4, Lesson 12 Fire Alarm Systems

Telluride Fire Protection District Fire Alarm Systems Policy Version 03/2007

Fire Alarm and Detection Systems And Central Station Monitoring Plan Submittal Guidelines

INTELLIGENT FIRE ALARM CONTROL UNITS. MMX NDS Intelligent Network Fire Alarm Control Unit. Features. Description

CAN/ULC-S Installation and Services for Fire Signal Receiving Centres and Systems- Ottawa 2013

FIRE ALARM SYSTEMS PERMIT APPLICATION, PLAN SUBMITTAL, DESIGN, INSTALLATION AND INSPECTION REQUIREMENTS Effective Date: January, 2011

FVSU REPAIR & UPGRADE FIBER OPTIC SECTION FIRE ALARM SYSTEM CONNECTIVITY

FIRE DETECTION AND ALARM

CAN/ULC S Integrated Systems Testing of Fire Protection and Life Safety Systems and Fire Protection Commissioning

INSTRUCTIONS FOR BUILDINGS WITH FIRE PROTECTION EQUIPMENT

FIRE ALARM SYSTEM SUBMITTAL CHECKLIST AND APPLICATION

A. This Standard outlines the requirements for an addressable fire detection and alarm system.

INTELLIGENT FIRE ALARM CONTROL PANELS. MR-2100/MR-2200 Intelligent Fire Alarm Control Panels MEA. Features. Description

FIRE ALARM APPLICATION

ENGINEERING SPECIFICATIONS

BELMONT FIRE DEPARTMENT FIRE ALARM SYSTEM REQUIREMENTS BFD-OFM

SECTION FIRE ALARM AND DETECTION SYSTEM

C. Conform to requirements of Americans with Disabilities Act (ADA).

EXHIBIT A SCOPE OF WORK

SFC-200 SERIES FIRE ALARM CONTROL PANELS. SFC-200 Series Fire Alarm Control Panels. Features. Description

Sprinkler and Fire Alarm Systems for the Building Official

CBD-233. Fire Alarm and Detection Systems

CLARK COUNTY FIRE DEPARTMENT Fire Hazard & Prevention Services

PARTICIPATION HOUSE 9 BUTTERNUT LANE, MARKHAM

SECTION FIRE DETECTION AND ALARM SYSTEM PART 1 - GENERAL 1.01 DESCRIPTION

University of Houston Master Construction Specifications Insert Project Name

B. NICET: National Institute for Certification in Engineering Technologies.

SECTION ( ) FIRE DETECTION AND ALARM SYSTEM

HERNANDO COUNTY FIRE ALARM GUIDELINES

Fire Alarm System Monitoring - CAN/ULC-S561-03

FIRE SPRINKLER SYSTEM SUPERVISORY SERVICE User s Guide (DamarNet RAR Service)

Original Document 10/16/07 Revised 01/30/09 2 nd Revision rd Revision- 12/18/14

The Benefits of ADDRESSABLE Fire Alarm Technology

HONEYWELL COMMERCIAL FIRE/BURG PANEL UL LISTING REQUIREMENTS (Compiled from VistaFBPT Installation Instructions V1 Rev A 11/12)

A. 70 National Electrical Code (NEC). B. 72 National Fire Alarm Code. C. 90A Installation of Air Conditioning and Ventilating systems.

SPECIFICATION FOR A TOTAL FLOOD HFC-227ea CLEAN AGENT FIRE SUPPRESSION SYSTEM FOR USE WITH THE Cheetah Xi CONTROL PANEL SYSTEM

FIRE RATED WIRING. What the FT4! Paul Latreille, C.E.T. Ottawa Branch Manager

SECTION FIRE ALARM SYSTEM

EDWARDS SIGNAL SOLUTIONS DISTRIBUTED BY: Lee Dan Communications, Inc. Toll-Free:

SECTION FIRE DETECTION AND ALARM SYSTEM

FIRE ALARM SYSTEM CHECKLIST For Addressable Systems PRIOR TO INSPECTION

Attachment 9. Trouble signals. Interfaced equipment. Primary (main) power supply

Finance and Administration Department 907 Billy Mitchell Blvd. P: (210) Fire Alarm Permit Application

Fire Alarm System Standpipes Sprinkler Systems Fire Drills Commercial Cooking Hood and more

SECTION DETECTION AND ALARM

City of Columbus Department of Building and Zoning Services

FA-300 Series. LCD Fire Alarm Control Panel. User Guide. LT-954 Rev. 0.1 February FA-300 SERIES Fire Alarm Control Panel

FIRE ALARM AND VOICE COMMUNICATION SYSTEM Request for Qualifications

INSPECTION AND TESTING OF FIRE ALARM SYSTEMS

ENVIRONMENTAL HEALTH & SAFETY 6 East Dr., Amherst MA

SFC-200 SERIES LCD FIRE ALARM PANEL

Design and Construction Standards SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

SECTION ( ) FIRE DETECTION AND ALARM SYSTEM

GE Concord 4 Quick User Guide

NATIONAL FIRE ALARM AND SIGNALING CODE

Commercial Fire Alarm Standards July 1, 2010 Edition Page 1 of 14

conventional system operation

FIRE ALARM SYSTEM PLAN SUBMITTAL CHECKLIST

SARATOGA FIRE DISTRICT EARLY WARNING FIRE ALARM SYSTEM STANDARDS AND REQUIRMENTS CONTENTS

CHAPTER. Fire Alarm Systems APPROVAL AND ACCEPTANCE. Shop Drawings

Transcription:

Design Standards Fire Alarm Systems Division 13860 (1995 CMS); 283100 (2004 CMS) Amended Feb 2015

13860 (283100) FIRE ALARM SYSTEM The following standard shall be followed for the design of University of Toronto fire alarm systems..1 Acceptable manufacturers and model numbers are as follows: Chubb-Edwards EST-3 series for systems with more than 8 zones or those using addressable devices; Chubb-Edwards EST-FS fireshield series for systems with 1-8 zones provided building is not sprinklered. Verify system selection with University of Toronto Fire Prevention during conceptual design stage..2 All fire alarm system devices and control units shall be purchased by the Contractor, directly from the manufacturer..3 New installations with more than 32 zones shall utilize active field devices, using analog addressable technology. Upgrades or retrofit work shall utilize this technology if budget permits. Data communication links for active field devices shall be configured in a DCLA style as defined by CAN/ULC-S524. System installation shall conform to CAN/ULC-S524..4 System Operation: Single stage operation unless otherwise approved by University of Toronto Fire Prevention. Manual signal silence only (no automatic silence feature)..5 Signalling Appliances.1 New installations with no OBC-mandated voice requirement: 24VDC, parallel wired horn/strobe, using temporal signal pattern in accordance with OBC Chubb-Edwards catalog # 757-7A-TW..2 Existing installations/renovations: match existing..6 Annunciation: Locate main control panel or CACF at the designated Fire Department response point, to be used as the main annunciator. Provide light emitting diode (LED) annunciation of zones (as conventionally defined by the OBC), and liquid crystal display (LCD) annunciation of individual active field devices via the alphanumeric LCD. Provide water shield covers for fire alarm panels in sprinklered areas to protect panel from water damage. Fire Alarm Control Panels shall not be located in mechanical rooms where steam heat piping is present..7 Zone and active field device descriptions for annunciation & LCD programming are to be coordinated with and approved by U of T Fire Prevention..8 Maglocks are not permitted to be installed in U of T buildings without prior applicationspecific written approval by University of Toronto Fire Prevention, and will not be accepted otherwise..9 Standpipe main flow detection shall annunciate as a supervisory indication only..10 Automatic detection in elevator shafts shall be accomplished with heat detectors..11 Install automatic detection only in those places where required by OBC..12 Use photoelectric type smoke detectors when smoke detection is specifically required by the OBC. Ionization (only) detection shall not be used in University buildings unless approved by U

of T Fire Prevention. Where the code requires fire detectors, giving a choice between heat or smoke detection, heat detectors shall be used..13 Use only photoelectric smoke alarms in residences when smoke alarms are required by the OBC.14 High temperature, "fixed" type heat detectors shall be used in high temperature areas such as boiler rooms, laundry rooms, rooms equipped with autoclaves, etc., otherwise use rate of rise type heat detection..15 Automatic fire detection shall not be installed in washrooms, "cold rooms", or walk-in freezers..16 If a floor area is fully sprinklered, heat detectors are not required and shall not be installed within that floor area..17 Door hold-open devices are required to release immediately upon activation of the fire alarm system as per OBC 3.1.8.12..18 Smoke detection and smoke control measures are required for an interconnected floor space as per OBC 3.2.8.8..19 Recirculating air handling units shall meet the requirements for smoke detection only where specifically required by OBC 3.2.4.12. Non-recirculating units shall not be equipped with duct smoke detection. All recirculating air handling units that do not have a smoke control mode shall shut down automatically upon any common fire alarm activation, and will be interconnected in such a way to restart automatically upon fire alarm system restoration to normal..20 Emergency power requirements shall be designed to the minimum requirements of OBC 3.2.7.8. If the fire alarm system is connected to an emergency generator, standby batteries shall be included to provide for 2 hours of supervisory power only..21 Printers and/or video displays are not desired and will not be accepted by U of T Fire Prevention..22 New systems shall be designed and installed as part of the University of Toronto fire alarm central monitoring system, reporting system alarm and system trouble information back to the Central Monitoring location at the Campus Police Station, 21 Sussex Avenue..1 Design and installation of the interconnection on site shall be to Chubb-Edwards Systems specifications under the direction of U of T Fire Prevention..2 The Contractor shall co-ordinate wiring or fibre runs and tie-in with University of Toronto Computing and Networking Services and University of Toronto Fire Prevention..3 The Contractor shall arrange for setup of monitoring connections through the U of T Project Manager at least two weeks prior to the date required for Toronto Fire inspection..4 The Contractor shall terminate the required connections for central monitoring in a junction box within 1m of the fire alarm system wallbox where the connection is required to be tied in..5 The Contractor shall pre-schedule final system tie-in at least 7 days in advance, with University of Toronto s Fire Alarm Testing & Maintenance Contractor, who shall make the final connections between the junction box and the control panel and test the circuits. The Contractor shall carry the cost of this work by U of T s Fire Alarm Testing & Maintenance Contractor.

.22 New EST-3 systems shall include the following common control features (password protected): -sprinkler test mode switch -silent test switch -ancillary bypass switch -one minute inhibit bypass switch.23 Beam type smoke detectors shall not be incorporated as a means of smoke detection without prior application-specific written approval from U of T Fire Prevention..24 Data Gathering Panels or remote annunciators (distributed intelligence) shall not be used without prior application-specific written approval from U of T Fire Prevention. 3.1 As-Built Drawings.1 A complete set of as-built drawings shall be compiled and submitted to U of T Fire Prevention, showing locations of all fire alarm devices, conduits, junction boxes, and end of line devices. Drawings shall identify numbers of conductors and zones served, as well as device addresses for addressable systems. The installation will not be accepted until this documentation has been received in full. 3.2 CONDUITS AND WIRING.1 Fire alarm system conduits shall be identified every 3 metres by a band of red tape or other means deemed acceptable in writing by U of T Fire Prevention. Junction boxes for fire alarm system wiring shall be similarly identified or marked F/A. Signal circuit wiring shall be run in a separate conduit from initiating circuit wiring or communication wiring (including active field device wiring)..2 Where fire alarm junction boxes will normally be inaccessible, properly identified access hatches shall be provided. Locations of access hatches shall be shown on as-built drawings and shall be identifiable in the field by permanently affixed markings to the approval of University of Toronto Fire Prevention..3 All conduits shall enter the fire alarm control units from the bottom of the cabinet. Two additional knockouts shall be punched in the bottom of each cabinet, and fitted with a wire mesh screen in order to protect system components from possible water damage that may enter the control panel via conduits. Fire alarm control units shall be protected from sprinkler discharge by adequate drip trays. 3.3 WITNESSING OF FIRE ALARM/SPRINKLER VERIFICATION.1 All fire alarm system modifications and new installations shall be verified in accordance with the requirements of the Ontario Fire Code. Verification in its entirety shall be witnessed by the University of Toronto s Fire Alarm Testing & Maintenance Contractor, to help to ensure the integrity of the field verification process. The contractor performing the Work shall include the cost of subcontracting this work in his bid as a separate identified price, and shall schedule the verification with University of Toronto s Fire Alarm Testing & Maintenance Contractor at least two weeks in advance of its commencement. Verification will not be accepted without a letter of witnessing from the University s Fire Alarm Testing & Maintenance Contractor. Any exceptions to this requirement shall be authorized in writing, at the discretion of University of Toronto Fire Prevention, acting in the best interests of the University.

.2 Further to sentence 3.3.1, when a relocation, addition, or deletion of a device has been carried out, all devices in the zone shall be tested and documented for proper operation. This applies to both alarm initiating and signal (output) circuits. This testing shall be witnessed as noted in the previous item, and the cost for such shall be included in the Contractor s bid.