PROJECT MANAGEMENT PLAN PMP/PMF STUDY CHERRY CREEK DAM



Similar documents
REVIEW PLAN For FLOOD RISK MANAGEMENT FOR DICKENSON COUNTY PUBLIC SCHOOLS LEVISA FORK BASIN DICKENSON COUNTY, VIRGINIA SECTION 202 NONSTRUCTURAL

PEER REVIEW PLAN JANUARY 2008 UPDATE

Old Phase Description New Phase Description

John Keel, CPA State Auditor. An Audit Report on The Dam Safety Program at the Commission on Environmental Quality. May 2008 Report No.

Distribution Restriction Statement

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES

Sample Quality Management Plan

Independent Third-Party Review Guidelines

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure

National Environmental Policy Act/ Clean Water Act Section 404 (NEPA/404) Merger Process and Agreement for Transportation Projects in Colorado

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL

Baseline Change Control Procedure

Project Delivery Process Overview

output: communications management plan

The answers to some of the following questions are separated into two major categories:

PROJECT PROCUREMENT PROCEDURES AND GUIDELINES

ATTACHMENT B PROGRAM MANAGEMENT SERVICES BEXAR COUNTY FY FY 2017 FLOOD CONTROL PROJECTS

DECISION DOCUMENT REVIEW PLAN USING THE NATIONAL PROGRAMMATIC REVIEW PLAN MODEL

HEADWATERS CONTROL STRUCTURE MANAGEMENT POLICY AND OPERATING PROCEDURES

TOWN OF SILVERTHORNE, COLORADO RFP for Independent Professional Auditing Services

POLICY STATEMENT Commonwealth of Pennsylvania Department of Corrections

US Army Corps of Engineers BUILDING STRONG

Project Knowledge Areas

The Program Managers Guide to the Integrated Baseline Review Process

THE PROJECT MANAGEMENT KNOWLEDGE AREAS

Project Management Competency Standards

Recreational Enhancements on the Lehigh River Public Information Workshop February 2013

- ATTACHMENT - PROGRAM MANAGER DUTIES & RESPONSIBILITIES MARYLAND STATE POLICE W00B

Attachment 1 CARRUTHERS CREEK FLOOD MANAGEMENT and ANALYSIS DRAFT TERMS OF REFERENCE

STATE OF CALIFORNIA STATE WATER RESOURCES CONTROL BOARD

Review Plan. F-4 Channel Rehabilitation. Tropicana and Flamingo Washes, Clark County, Nevada for Plans and Specification

Chapter 11. Costs and Funding

IT Project Governance Manual Version 1.1

REVIEW PLAN SUTTER BASIN, CALIFORNIA FLOOD RISK MANAGEMENT, ECOSYSTEM RESTORATION AND RECREATION FEASIBILITY STUDY SACRAMENTO DISTRICT

Section 19. Basin-wide Mitigation Action Plans

Increasing Environmental Services Buying Power Through Strategic Sourcing - Continued

Reclamation Manual Directives and Standards

CHAPTER 4 TYPES OF COST ESTIMATES

ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES

An Introduction to Project Management

Drought Response Program: Draft Funding Criteria for Review and Comment

How To Manage A Project

Practical Project Management For Administrative Professionals

5.14 Floodplains and Drainage/Hydrology

Controlling Our Critical Path: A CDOT Guide to Better Project Management Practices

BPA Policy Contract Lifecycle Management

Division of Legal Affairs Contract Review and Approval Process

MEMORANDUM OF UNDERSTANDING Between Defense Contract Audit Agency and Department of Homeland Security

Financial and Cash Management Task Force. Strategic Business Plan

Head, Office of Project Management Oversight

CHARTER. Interagency Information Systems Working Group. Timber Regulation and Forest Restoration Program June 23, 2015

Information Technology Project Oversight Framework

U.S. DEPARTMENT OF ENERGY CONTRACT AND PROJECT MANAGEMENT IMPROVEMENT. Closure Report

Department of Administration Portfolio Management System 1.3 June 30, 2010

Quality Management Plan

Project Management Guidelines

The United States Secret Service Has Adequate Oversight and Management of its Acquisitions (Revised)

OFFICE OF THE CIO. PROCEDURE Informational VERSION: 1.0

PHASE 5: DESIGN PHASE

UNITED STATES OF AMERICA 131 FERC 62,175 FEDERAL ENERGY REGULATORY COMMISSION. United Water Conservation District Project No.

Our focus on audit quality

USACE Dam Safety Program Current Approach & Methodology

U.S. Securities and Exchange Commission

The Hydrologic Engineering Center Training Course on

Stream Restoration Account of Flood and Drought Response Fund Grant Program Guidance May 2014

Module 1 Diploma of Project Management

MEMORANDUM OF UNDERSTANDING Between Defense Contract Audit Agency and Department of Homeland Security

A Guide to Renovation and Repair Contract Warranties

Appendix A Contractor Quality Control Plan The Contractor Quality Control Plan is the Contractor s management plan for executing the contract.

Best Practices Statement Project Management. Best Practices for Managing State Information Technology Projects

Audit of Controls Over Contract Payments FINAL AUDIT REPORT

The University of North Carolina at Pembroke

State of California Department of Transportation. Transportation System Data Business Plan

NUMBER: 12.PM-004 RESPONSIBILITY: Office of Project Support Services REVISION: 4 APPROVED BY: TITLE SUBJECT: Head, Office of Project Support Services

Manage Deliverables - Construction Step 6. July 12, 2012

RUBRICS FOR ASSESSING MASTER S LEVEL SCHOOL ADMINISTRATION PORTFOLIO EVIDENCE CLUSTERS APPALACHIAN STATE UNIVERSITY. Student Name.

Business Plan Helpsheet

Project Review Board Governance Guide

"Project" Permitting Specialist III Location Hadley Road - South Plainfield NJ (0010) Job Function Project Management.

Haulsey Engineering, Inc. Quality Management System (QMS) Table of Contents

Environmental Data Management Programs

Audit Report. Natural Resources Conservation Service Water and Climate Information System Review of Application Controls Portland, Oregon

Michigan Public School Accounting Manual presented by Glenda Rader Grand Ledge Public Schools September 23, 2015

Design-Build Process for Project Managers

ENGINEERING COMPETENCIES ENTRY LEVEL ENGINEER. Occupation Specific Technical Requirements

Nancy Mittman, Chief Financial Officer, Bonneville Power Administration

Independent Auditors Report

UPPER COLORADO AND SAN JUAN RIVER BASINS ENDANGERED FISH RECOVERY PROGRAMS

1.0 Purpose. 2.0 Roles and Responsibilities. Management System Description: Project Management. Management System Owner: Lorie Howard

Research Manager II. Task Statements

2. CORPORATE POLICIES 2.3 OTHER CORPORATE Asset Management Policy

REQUEST FOR PROPOSAL MECHANICAL, ELECTRICAL, PLUMBING ENGINEERING SERVICES VARIOUS BUILDING RENOVATIONS AND NEW CONSTRUCTION

CALLEGUAS MWD Senior Project Manager

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT

PHASE 3: PLANNING PHASE

January 2008 Report No. EVAL Evaluation of Contract Rationalization

CONTRACT MANAGEMENT POLICY

IST 645 Managing Information Technology Projects

WORK PERFORMED UNDER AGREEMENT DE-OE SUBMITTED BY Idaho Office of Energy Resources 322 E. Front St. P.O. Box Boise, ID

Transcription:

PROJECT MANAGEMENT PLAN PMP/PMF STUDY CHERRY CREEK DAM DENVER, COLORADO U.S. Army Corps of Engineers Omaha District Northwestern Division 1

PROJECT MANAGEMENT PLAN PMP/PMF STUDY CHERRY CREEK DAM DENVER, COLORADO January 2006 INTRODUCTION. This document presents the Project Management Plan (ProjMP) for the Probable Maximum Precipitation/Probable Maximum Flood (PMP/PMF) Study for Cherry Creek Dam in Denver, Colorado. PURPOSE OF A PROJECT MANAGEMENT PLAN (ProjMP). The ProjMP establishes the framework necessary for the execution of the design, procurement and construction of the project referenced in the ProjMP. The intent of the ProjMP is to outline the project scope, budget, and roles & responsibilities of the interfacing agencies. The ProjMP also outlines the technical performance requirements for the management and control of the project from initiation of the study through final product delivery. The plan provides performance measurement criteria including major milestones. A project schedule is included depicting tasks/activities, milestones, and durations. This plan also identifies the commitments of all the project participants. Providing a quality study on schedule and within budget is the primary objective of all project participants. The operating procedure described in this plan supplements existing regulations for the purpose of establishing more detailed and specific relationships among organizations participating in this project. It is intended that this ProjMP be a living document subject to change as conditions warrant or as project experience dictates. 1. PROJECT REQUIREMENTS. To identify a project Probable Maximum Precipitation/Probable Maximum Flood (PMP/PMF) for the Cherry Creek Reservoir. This effort is part of the overall Dam Safety study process that the Corps follows for Corps dams and is in accordance with ER 1110-8-2 (FR), Inflow Design Floods for Dams and Reservoirs. All NEPA requirements will be followed for development of remediation alternatives, if required. 2. TEAM IDENTIFICATION. The members of the product delivery team are provided in Appendix A. Team members will be assigned to those disciplines where no personnel are assigned as the work effort progresses. The Corps project manager and primary point-of-contact (POC) is: John A. Palensky, P.E. Project Manager 402-221-4584 2

Non Federal Sponsor/Stakeholders: Tom Browning, P.E. Chief, Flood Protection/ 303-866-4807 Watershed Restoration/ Weather Modification Section Colorado Water Conservation Board 3. SCOPE. The scope for this effort is shown in Appendix B. 4. FUNDING. Funding for this study is provided under the Corps of Engineers authority for Operations and Maintenance of the Cherry Creek Dam project and is limited to $340 K for the PMP/PMF effort, as directed by the Congressional Representatives for the Cherry Creek vicinity (see item 4.1). 4.1 AUTHORITY. This study is authorized by the Corps of Engineers general authority for Operations and Maintenance of the Cherry Creek Dam project and is supported by Representatives Tancredo and Hefley of Colorado (See Attachment 1 for October 2005 letter of support). 5. SCHEDULE. The proposed schedule for this study is shown as Appendix C. The schedule has been coordinated with the signatories of this ProjMP. The schedule will also be loaded in to the Corps of Engineers management tools known as JOBS and P2.. During the course of the study, the schedule will be revised as necessary to show current conditions and forecasted changes. Schedule compliance and changes will be tracked through the JOBS/P2 programs. Revisions to the schedule will be coordinated with the study team as provided in the Change Control Plan. 6. WORK BREAKDOWN STRUCTURE. A Work Breakdown Structure (WBS) is a breakdown of the project into its component work tasks and products. The WBS for this project is generally represented in the project scope of services. If the study effort proceeds beyond the PMP/PMF analysis, the scope of services will be modified. 7. PROJECT QUALITY. A Quality Control Plan (QCP) for this study is provided in Appendix D. This plan outlines the procedures (i.e., checks and reviews) that will be implemented to insure that the products meet the quality objectives provided above. A mandatory quality control review (QCR) or reviews is a critical element of the Corps quality control process. An independent technical review team will perform the QCR to insure that all products conform to these quality objectives and District policy and procedures. Persons selected as QCR reviewers will have sufficient expertise and experience in the disciplines to be reviewed and a degree of independence from the individuals who prepared the products. A QCR reviewer would not normally be someone who has closely participated in the 3

study in an advisory or mentoring capacity. The members of the independent technical review team will be selected at a later date. 8. ACQUISITION STRATEGY. For this study, the determination was made that execution could be performed exclusively with in-house staff. The Omaha District in house staff is uniquely qualified to perform this study due to our familiarity with the project from design and construction through to present day operations and maintenance. As the study progresses, the need for contracts or work with other agencies will be considered and utilized where appropriate. 9. RISK MANAGEMENT. Any study has inherent risk and uncertainty associated with it due to natural conditions and limitations in analysis. The more detailed and comprehensive the analysis, the lower the risk. In addition, the more detailed and updated the site information is, the lower the risk. For this study, hydrologic and hydraulic models will be employed that are state of the art and are commonly used by the Corps of Engineers (eg. HEC-HMS, HEC-RAS, etc). In addition, models developed by HDC and HAC will be utilized during the hydropower analysis portion of study. At each step throughout the study, every attempt will be made to use the best information available and to use state of the art engineering practices to minimize risk. For this study, the PDT agrees that the risk is acceptable for the level of detail that will be applied. Study results will be monitored on a continual basis and modifications will be made if the PDT determines that the risk is not acceptable. 10. SAFETY PLAN. The PDT will adhere to the general safety requirements of the U.S. Army Corps of Engineers and the policies and procedures established by the Division, Branch, or Section in which that person represents. Work performed that requires a pre-approved safety plan shall not commence until official approval is given (approvals shall be those that are required for the specific work task(s) and accompanying policies set forth by the office which the PDT member represents). For work where a pre-approved safety plan is generally not required (e.g. routine site visits for Planning/Civil works projects), the PDT shall conform to standard safety practices. If any member of the PDT is uncertain or needs guidance in safety practices, contact the safety office, CENWO-SO, at 402/221-4051. 11. CHANGE MANAGEMENT. PDT members are responsible for identifying any changes in scope, budget, or schedule as early as possible so that the PM can resolve the issue, approve the change, or elevate the change to the appropriate level for action. The greater the change and its impact to the study, the higher the level of authority that may be required for action. Changes that affect the overall scope, budget, or schedule require approval by the PM. The PM maintains a record of approved changes and modifies the ProjMP accordingly. Unanticipated changes in the project will be accommodated with no change in total project costs so long as sufficient contingencies exist. The draw down of contingencies will be managed to offset study cost increases. 12. COMMUNICATIONS STRATEGY. 4

12.1 Communication Plan. The Project Manager will be the main point of contact for the PDT for the study. A technical lead may also be identified as the study progresses. A communication plan must be developed that addresses discussions between the PDT members, discussions with other stakeholders/observers, discussions with Congressional Representatives, discussions with the public, and discussions with the media. The strategy for communications for these various components are as follows. 12.2 Project Development Team (PDT) Meetings. Project Development Team meetings will be periodically scheduled by the PM or Lead Technical Office to discuss technical issues, update status, etc. 12.3 Omaha District Meetings. In addition to the day-to-day discussions required for a study the Corps management will also be kept informed through reports to the Project Review Committee (PRC) and Project Review Board (PRB). These reports are prepared by the PM and will discuss accomplishment of project objectives, identify issues, and forecast changes to schedules and costs. Other internal reports will be periodically prepared for various purposes. Milestone reports showing tasks, funds, and dates for work requests from various functional divisions within the District are prepared so that the District workload may be planned. Reports showing past and estimated future expenditures are prepared for budget planning. These internal reports are prepared monthly, quarterly, or annually, according to established District procedures. One or more fact sheets with condensed information about the project are maintained to provide background information to higher authority or to respond to inquiries. Some informal internal reports are made for recording purposes. These include trip reports, telephone call memos, and minutes of meetings. 12.4 Stakeholders/Other Interested Parties. The goal of any discussions outside of the main Corps/CWCB PDT is that we will speak with one message. As the study progresses, the PDT will determine appropriate times to call a meeting with the stakeholders and make ourselves available to share information, as needed. Information that is considered draft or has not reached consensus with the PDT will not be shared without the full understanding of all PDT members. 12.5 Public Involvement. Meetings may be held as needed throughout the course of the study to brief other interested parties, including members of the general public. The dam safety process will require public input and communication with news outlets to convey the message. These requirements will be adhered to and implemented as required. Other governmental agencies will be consulted as needed throughout the study. 12.6 Public Affairs and Media. The CWCB and the Corps of Engineers both have active public affairs offices that may be involved with this study. Whenever possible, news releases to the media will be a joint collaboration between the CWCB and the Corps of Engineers. 5

12.7 Information Management. Electronic and hard copy files will be maintained in accordance with current policies established by the Omaha District. 13. VALUE MANAGEMENT. Value Management (VM) is a process to facilitate and encourage the understanding, consideration, and integration of the needs of all customer, PDT members, partners, and stakeholders. VM seeks the highest value for a project or study by balancing resources and quality. The VM process emphasizes the use of multidisciplinary teams and their resulting synergy, using a functional analysis approach for decision-making. It is a management tool that should be applied continuously throughout the life cycle of projects or studies and programs. VM is applicable to all business processes. For purposes of this study, the principles of VM shall be adhered to and enforced through the procedures put in place in the aforementioned sections. 14. CLOSEOUT PLAN. At the conclusion of the study, the PDT, including identified stakeholders, shall agree that the delivered product meets the expectation of the Scope of Services. 15. APPROVALS. This Project Management Plan for the PRB/PMF study for Cherry Creek was prepared and approved by the Project Delivery Team. See approvals in Appendix A. 6