PEER REVIEW PLAN JANUARY 2008 UPDATE
|
|
|
- Bertha Angel Shepherd
- 9 years ago
- Views:
Transcription
1 PEER REVIEW PLAN Manhattan, Kansas Levee Section 216 FLOOD RISK MANAGEMENT PROJECT FEASIBILITY STUDY JANUARY 2008 UPDATE 1
2 PEER REVIEW PLAN Manhattan, Kansas Levee Section 216 FLOOD RISK MANAGEMENT PROJECT FEASIBILITY STUDY Table of Contents 1. DOCUMENT OBJECTIVE GENERAL INFORMATION LEVELS OF REVIEW SELECTED REVEW PROCESS ITR REFERENCES COMPOSITION AND ORGANIZATION OF THE ITR TEAM ITR SCHEDULE ITR BUDGET PUBLIC COMMENT OPPORTUNITIES AVAILABILITY OF PUBLIC COMMENTS TO REVIEW TEAM
3 PEER REVIEW PLAN Manhattan, Kansas Levee Section 216 FLOOD RISK MANAGEMENT PROJECT FEASIBILITY STUDY 1. DOCUMENT OBJECTIVE This Project Review Plan (PRP) is a part of the Project Management Plan (PMP) under the QC/QA element in accordance with EC and the Standard Operating Procedures for Planning Centers of Expertise. This PRP provides guidance to the Project Delivery Team (PDT) on the specific review levels, responsibilities, and process requirements for execution of reviews for the Manhattan, Kansas Levee feasibility study. 2. GENERAL INFORMATION Executive Summary -- Study Purpose and Background. The U.S. Army Corps of Engineers Kansas City District along with local project sponsors, are conducting a feasibility study of the existing Manhattan, Kansas Levee flood risk management project. The study is authorized under Section 216 of the 1970 Flood Control Act (review of completed civil works). The levee unit withstood the Flood of 1993, but some elements were seriously challenged as releases from Tuttle Creek Dam (which lies just upstream on the Big Blue River) created a near overtopping situation at some locations along the Big Blue River levee segment. This event raised a concern that the project may provide less than the level of performance for which it was designed. This feasibility study will update and verify data on the level of flood risk management provided by the project, and if warranted, will develop alternative plans for increasing the reliability of the existing levee unit. Such plans will be technically viable, economically feasible and environmentally acceptable. Study Authority. Section 216 of the 1970 Flood Control Act provides authority to reexamine completed civil works. Section 216 reads as follows: The Secretary of the Army, acting through the Chief of Engineers, is authorized to review the operation of projects, the construction of which has been completed and which were constructed by the Corps of Engineers in the interest of navigation, flood control, water supply, and related purposes, when found advisable due to the significantly changed physical or economic conditions, and to report thereon to Congress with recommendations on the advisability of modifying structures or their 3
4 operation, and for improving the quality of the environment in the overall public interest. Original Project Authority. The original Manhattan, Kansas Levee project was authorized by the Flood Control Act approved 3 September 1954 (Title II, Public Law 780, 83d Cong., 2d Sess., H.R. 9859). Feasibility Study Objectives. The Kansas City District is undertaking this feasibility study with the following objectives: 1. adequately evaluate the reliability and performance of the existing levee project, 2. formulate plans for increasing the levee reliability through a cost-shared construction project, and if such plans are deemed feasible, then 3. develop the documentation necessary to seek project authorization and implementation. Summary Study Scope and Execution Parameters. The Project Management Plan for this study is based on a two-phase approach to performing the feasibility study. Feasibility Phase 1 will focus on refining knowledge of study area problems and a characterization of the existing condition of the levee unit with an emphasis on reliability quantification and an approximate determination of potential economic damages from various types of levee failure. Feasibility Phase 2 will focus on: a more detailed and accurate assessment of existing conditions economic damages, generating reliability improvement options array, development and costing of concept designs for implementation of such recommendations, overall plan formulation and evaluation, and the preparation of decision documents necessary for review and authorization of any proposed project. While it is the intent of all parties to proceed through the entire feasibility process, a formal checkpoint will occur after the essential completion of the Phase 1 study and associated ITR, whereby the Kansas City District PDT and Planning Branch Management, the ITR team leader and the Sponsor will perform a detailed joint examination of the Phase 1 results to date, review current costs in detail, and perform a verification of both Federal and sponsor interest in proceeding into feasibility Phase 2. If warranted, the PMP study scope, estimated cost, and schedule may be updated at this checkpoint. Local Sponsorship and Funding. Feasibility funding source is 50% Federal General Investigations (GI) -- Civil Works Appropriation & 50% local cost share funding. All local funding will be provided from the City of Manhattan, Kansas. The City owns and operates the levee unit. The City signed a Feasibility Cost Sharing Agreement (FCSA) with the Corps in Nov Description of Existing Overall Project and Problem. The existing levee unit consists of 28,841 feet of levee, plus 4,100 feet of channel improvement for the Kansas River, the modification of a Rock Island (now Union Pacific) railroad bridge, six pressure relief wells, and two active pumping plants to address flooding from the Big Blue and 4
5 Kansas Rivers. Construction of the project was initiated on 4 May 1961 and the completed project was transferred to local interests for operation and maintenance in July The levee unit is located in/around the City of Manhattan, Kansas. Manhattan, the seat of Riley County, has an area of about 16 square miles. The 2000 population stood at 44,831, which represented an impressive growth of nearly 19 percent over the 1990 population of 37,712. The city is the ninth-largest in Kansas. The broader Riley County area had a 2000 population of 62,843. The community is dominated by two public institutions: Kansas State University, with about 22,000 students and 3,000 employees, and the U.S. Army s Fort Riley (just west of the city) with a base population of more than 8,000. The number of active duty personnel at Fort Riley is expected to increase substantially given recent Congressional BRAC recommendations. This will in turn increase the surrounding civilian population. Manhattan is also the primary service and retail center for a three-county area of more than 100,000 people. The town is situated along U.S. Highway 24, which links the area to Kansas City (about 125 miles to the east), and is also served by state routes 18 and 177 which link the area to Interstates 70 and 135. The Corps of Engineers Tuttle Creek Lake is situated to the north of Manhattan (see enclosure 3 and 4 for plans and description). Tuttle Creek is a major lake in the Kansas River basin system of flood control lakes. The urban Manhattan floodplain includes a centrally located downtown and commercial area (which includes a major regional shopping mall), neighborhoods generally to the west of the downtown area, and a light industrial area comprising the eastern half of the study area. The study area contains more than 1,500 homes and roughly 500 businesses and public facilities. The estimated value of these homes and businesses, based on reconnaissance-level data, is more than $600 million. This study was triggered by an incident in July of With approx. 60,000 cfs released from Tuttle Creek reservoir, and approx. 100,000 cfs flowing in the Kansas River, some problems related to potential overtopping were indicated along the Big Blue River segment of the levee unit. The original design documentation describes a levee unit designed for a significantly higher coincident flow regime than was experienced in During the last decade, the City of Manhattan has undertaken a series of actions including engineering studies to characterize the potential overtopping threat posed under similar and higher discharge events. Those recent local efforts have produced a digital hydraulic model (Flood Predictive Model) that indicates much lower levels of flood performance than the original Corps design documentation. The Corps undertook a reconnaissance study at the request of the City and performed most of the reconnaissance investigation in the 2003 to 2004 timeframe. The subsequent 905B document was approved in Nov 2004 by CENWD for progress into feasibility. 5
6 3. LEVELS OF REVIEW Internal Peer Review (IPR). Internal Peer Review will be conducted on the project feasibility study. As part of the Quality Management Plan on any project, there are internal reviews or design checks that constitute quality control for each deliverable product. It is the responsibility of each product development team member, their supervisors, and the Project Manager to ensure that every product receives an internal quality control review. It is the responsibility of the supervisor or section chief for each team member to ensure that a qualified internal peer review is selected and conducts a review of their product prior to delivery to the Project Manager, or prior to completion. Independent Technical Review (ITR). Independent Technical Review will be conducted. Independent Technical Review is an independent review, outside of Kansas City District, of the deliverables for the project and constitutes an independent review of the entire project. In accordance with EC dated 31 May 2005, and CECW-CP Memorandum dated 8 November 2006, all outside independent review teams for qualifying projects is coordinated through the Corps Flood Risk Management Center of Expertise. The PCX works collaboratively with the Division staff and the District Project Manager to find team member staff outside the Kansas City District with the requisite experience and qualifications to review the project. Review comments will be documented, processed, and resolved through the Dr. Checks software package. External Peer Review (EPR). External Peer Review (EPR) does not apply to this feasibility study and will not be conducted. EPR is an additional national level independent review process, outside the Corps of Engineers, to ensure that the projects are of national or regional interest and meet the requirements of Federal participation. Specific criteria that trigger the development and implementation of EPR are projects where novel methods are utilized, where the project presents complex challenges, where the project uses precedent setting methods or models, where the project is likely to present landmark conclusions that will affect policy, or where the project is centered or focused on an issue or proposal that is highly controversial. Also, per the Water Resources Development Act (WRDA) of 2007, an EPR will be conducted where the potential implementation cost will exceed $45 million. This feasibility study is an evaluation of the condition and performance of an existing levee unit. There are currently no features or components anticipated to be highly controversial or significant to national policy. During the levee evaluation, standard Corps criteria, methods, and models will be utilized. No novel or precedent setting methods are anticipated. The potential implementation cost is not expected to exceed $45 million. Thus, EPR will not be conducted based on the project plan and the criteria established for use of EPR. Architect-Engineer (AE) or Consulting Contracts. Contracts used on this project will undergo a Quality Assurance Review of each deliverable product by assigned District PDT members. Additionally, any products developed by contract will also undergo ITR along with other products as outlined in the ITR paragraph above. All AE contractors are required to develop a Quality Management Plan for Corps Project Manager 6
7 review. This plan will detail the firm s internal quality management and design check review processes. 4. SELECTED REVEW PROCESS The selected review process level for the Manhattan, Kansas Levee feasibility study is the Independent Technical Review. The ITR will be developed in coordination with the PCX for Flood Risk Management and the ITR team leader. This process will be coordinated through CENWD. Internal peer review (internal design checks) will be conducted in accordance with the approved District Business Practices, as outlined above. It is anticipated that A-E contracts will be utilized for development of technical products for this project. Contracts will be procured in accordance with the prior approval of the District Acquisition Strategy Board, as outlined in the approved District Business Quality Procedures. 5. ITR REFERENCES Refer to ER , the primary Corps ITR regulation (see enclosed exhibit for summary of the major ITR requirements described in this regulation). EC dated 31 May 2005 CECW-CP Memoranda dated 8 November 2006 and 30 March Refer to Kansas City District Business Quality Procedure (BQP) (Quality Plans). Pertinent excerpts are quoted below: 5.6 ITRT Members: Verify compliance with established policy, principles and procedures. Verify criteria applied. Verify assumptions, methods, procedures, and material used in analyses. Evaluate alternatives. Verify the appropriateness of data used and level of data obtained. Verify completeness of design and documents. Verify reasonableness of the results, including whether the product meets the customer's needs consistent with law and existing Corps policy. Conduct spot checks for interdisciplinary coordination. Identify the specialized knowledge, experience, or training required to competently complete the product. Verify comments are resolved by: o Verifying incorporation of their comments or, o Accepting the verification conducted by either the PM or ITRT Leader or, o Withdrawing the comment Independent Technical Review: Qualified staff verifies the work meets reasonable professional levels and satisfies the client s needs and expectations. For small, simple, low complexity, low risk projects, independent technical review can be accomplished at the section level. Independent technical review can be managed at branch levels when a few disciplines are involved, the project is of moderate cost and complexity and the risk for life safety is relatively low. Independent technical review for all other projects should include individuals who do not have a vested interest in the project and are not involved in 7
8 the day-to-day direction of the product. The PMP should define the level of independent technical review. Independent technical review is not a detailed check but a broad overview including: Review of criteria applied, Review of the methods of analysis and design, Compliance with client and/or program requirements, Completeness of design and documents, Spot checks for interdisciplinary coordination, Biddability, constructability, operability and environmental Independent reviewers are brought on board early on to participate in establishing criteria selection and broad approaches to be taken in addressing potential issues thus ensuring seamless review. 6. COMPOSITION AND ORGANIZATION OF THE ITR TEAM Discipline-Specific Guidance & Expertise Requirements. ITR Team representation is required in the disciplines listed below. A statement of qualifications is required for each team member prior to acceptance as an ITR Team member and for any subsequent changes thereto. Hydrology & Hydraulics: Team member will be an expert in the field of large-river hydrology & hydraulics, have a through understanding of the dynamics of the confluence of two rivers, and be familiar with interior drainage issues related to levee construction. The team member will have an understanding of computer modeling techniques that will be used for this project (HEC-HMS, HEC-RAS, UNET, and TABS). Structural: Team member will have a thorough understanding of levee, flood wall, and retaining wall design, and structures typically associated with levees (pump stations, gatewell structures, utility penetrations, stoplog & sandbag gaps, and other closure structures). Mechanical: Team member shall be familiar with levee pump station and closure structure design. Engineering disciplines other than Mechanical may be acceptable for review of this area of work subject to meeting the experience requirement stated above. Electrical (if deemed necessary) : Team member shall be familiar with levee pump station and electrical utilities design. Electrical ITR requirements for this study are very minimal. Geotechnical: Team member will have extensive experience in levee and floodwall design, post-construction evaluation, and rehabilitation. Very critical ITR team member Economics: Team member will have extensive experience in related flood risk management projects, and have a thorough understanding of HEC-FDA. Plan Formulation: Team member will be familiar with current flood risk management planning and policy guidance, and have experience in plan formulation for large-scale flood risk management projects. 8
9 Civil / Site / Utilities / Relocations: This requirement may require a dedicated team member, or may be satisfied by structural or geotechnical reviewer, depending on individual qualifications. Team member will have experience in utility relocations and positive closure requirements for levee construction. Cost Estimating: Team member will be familiar with cost estimating for similar projects using MCACES. Team member will be a Certified Cost Technician, Certified Cost Consultant, or Certified Cost Engineer. Cost estimating efforts will be coordinated with and separately reviewed by the Cost Engineering Center of Expertise at the USACE- Walla Walla District. Other disciplines/functions involved in the project include Hazardous/Toxic Waste, Environmental/NEPA, Real Estate, Cultural Resources, and Legal. In each case, any required Independent Technical Review within these disciplines may be accomplished within Kansas City District or by other independent sources. The general experience requirements and principles contained in this document also apply to these disciplines/functional areas. (Exception: Legal review is not under the purview of the ITR Team Leader but is instead responsible to the Corps of Engineers Office of Counsel chain-of-command). ITR Team Leader. One member of the ITR Team will act as the ITR team leader. Team leader designation will be finalized based on input from ITR Team members and the CENWK Project Manager, the PDT, and CENWK staff. The ITR leader shall, in addition to discipline-specific review requirements, be responsible for: Acting as a liaison between the Product Development Team and the ITR Team In conjunction with the PM, the ITR team leader will perform active coordination of the ITR process and study findings with the Corps Flood Risk Management Center of Expertise (FRM-PCX, South Pacific Division), and ensure compliance with an adequate level of FRM- PCX review. Distributing information for review and coordinating efforts of the ITR Team. Ensuring that individual ITR Team members are operating IAW the guidelines established for ITR by ER (see enclosed exhibit for summary of the major ITR requirements described in this regulation). The ITR team is not geographically co-located. Therefore, it is of paramount importance that the ITR Team Leader be capable of organizing the total ITR efforts across District and Division boundaries. A substitute ITR Team Leader from the ITR team will be named by the ITR team leader for periods of extended (over 60 days) absence. ITR Team Members and Organization. The ITR team membership and ITR team organization will remain partially intact from a previously established ITR team for the Kansas Citys Levees feasibility study. This has the major advantage of keeping some experienced and approved reviewers in-place. 9
10 ITR, PDT, EPR and PCX Team Membership Appendix. A separate appendix to this Peer Review Plan will be submitted for ITR team leader and FRM- PCX review as PDT, ITR, PCX, and EPR membership is finalized. Significant team member turnover has occurred over the past 18 months due to gaps in the project funding stream. ITR and PDT Communication. The ITR team members will be contacted on a regular basis by the corresponding PDT members so as to be kept aware of criteria selection and the broad approaches employed in this study thus ensuring a seamless review when products are submitted for ITR. The PM and the ITR leader will coordinate the exact timing, duration and information requirements for various interim and final ITR reviews. 7. ITR SCHEDULE Project Schedule and Current Status. The feasibility phase was initiated in November The Feasibility phase schedule continues to be impacted by constrained levels of Federal funding, and received limited funding in FY Federal funds were allocated in April 2007 and the feasibility study was reinitiated after being on hold for lack of funds since December Federal funding levels in FY 2008 are sufficient to maintain some progress on early portions of feasibility Phase 1 activities. The project schedule is being adjusted to reflect funding levels actually provided each fiscal year. ITR Team Site Visit. An initial site visit is required and will be schedule at some point within the existing conditions review and analysis period. The site visit timing is subject to adequate project funding and adequate establishment and availability of the ITR team. This site visit will provide each reviewer with the opportunity to view existing conditions and to meet corresponding Product Development Team members. Phase 1 Schedule. The Existing Conditions (EC) development (feasibility Phase 1) is to be accomplished Nov 2005 to Sep 2009 (SAF). ITR of the existing conditions findings and associated analysis products, which are primarily engineering related analysis supplemented with some HTRW, Real Estate, and Environmental baseline conditions documentation, will follow immediately thereafter. The Phase 1 ITR timeframe will be coordinated with the ITR review team as the review time approaches. Phase 2 Schedule. Anticipated milestones related to Phase 2 (Future Conditions and Alternatives Formulation and Development) activities and associated Feasibility Report (draft and final) product reviews are as follows (subject to change): Sep 2010: Complete draft Engineering Appendix and fwd to ITR review. Dec 2010: Complete draft Engineering Appendix ITR and resolution of comments. Mar 2011: Complete draft main Feasibility Report, HTRW, Econ, & RE Appendices & draft EIS for ITR. Jun 2011: Hold AFB review with CENWD, HQUSACE, selected ITR staff, and sponsors. 10
11 Late early 2012: depending on HQUSACE PGM and policy guidance timeframe, and the CWRB recommendations, a final feasibility report, EIS, and all appendices should be available for final ITR review in mid : Complete feasibility and begin authorization process. 8. ITR BUDGET ITR is currently budgeted at $50,000 to $60,000 total for the: initial ITR team site visit, formal ITR reviews at the: Existing Conditions documentation checkpoint; pre-afb submission of the Draft Feasibility Report, EIS and all appendices; and the Final Feasibility Report, EIS and all appendices, plus all associated interim coordination and consultations. Note that the final ITR budget is dependent on: -- the number and quantity of the areas of interest (those areas which are viable candidates for potential Federal project formulation efforts) developed during the feasibility study. -- and the number of the reviews actually required to resolve any issues developed during the feasibility study. 9. PUBLIC COMMENT OPPORTUNITIES This Project Review Plan will be available on the national Corps of Engineers planning website, and the CENWK project website, at the following links: Public and Agency Review for this project will be conducted in accordance with NEPA, as well as the provisions of the Water Resources Development Act (WRDA) 2000, and as outlined in ER As such the review plan will be available through all public and agency scoping and other processes for the project 10. AVAILABILITY OF PUBLIC COMMENTS TO REVIEW TEAM Public input from the NEPA workshops and the public scoping meetings will be available to the ITR members to ensure that public comments have been considered in the development of reviews and final reports. ==//== 11
REVIEW PLAN For FLOOD RISK MANAGEMENT FOR DICKENSON COUNTY PUBLIC SCHOOLS LEVISA FORK BASIN DICKENSON COUNTY, VIRGINIA SECTION 202 NONSTRUCTURAL
REVIEW PLAN For FLOOD RISK MANAGEMENT FOR DICKENSON COUNTY PUBLIC SCHOOLS LEVISA FORK BASIN DICKENSON COUNTY, VIRGINIA SECTION 202 NONSTRUCTURAL PROJECT Huntington District October 2010 REVIEW PLAN FLOOD
Distribution Restriction Statement
CECW-EP Engineer Regulation 1110-2-1150 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 ER 1110-2-1150 31 August 1999 Engineering and Design ENGINEERING AND DESIGN FOR CIVIL
Review Plan. F-4 Channel Rehabilitation. Tropicana and Flamingo Washes, Clark County, Nevada for Plans and Specification
Review Plan F-4 Channel Rehabilitation Tropicana and Flamingo Washes, Clark County, Nevada for Plans and Specification June 2015 (THIS PAGE LEFT INTENTIONALLY BLANK) Review Plan F-4 Channel Rehabilitation
DECISION DOCUMENT REVIEW PLAN USING THE NATIONAL PROGRAMMATIC REVIEW PLAN MODEL
Continuing Authorities Program Section 1135, Water Resources Development Act of 1986, as Amended Project Modifications for the Improvement of the Environment DECISION DOCUMENT REVIEW PLAN USING THE NATIONAL
Swannanoa River Flood Risk Management Study
Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River
PROJECT MANAGEMENT PLAN PMP/PMF STUDY CHERRY CREEK DAM
PROJECT MANAGEMENT PLAN PMP/PMF STUDY CHERRY CREEK DAM DENVER, COLORADO U.S. Army Corps of Engineers Omaha District Northwestern Division 1 PROJECT MANAGEMENT PLAN PMP/PMF STUDY CHERRY CREEK DAM DENVER,
FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012
FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 Table of Contents TABLE OF CONTENTS Table of Contents... 1 Executive Summary... 2 1 Objective... 4 2 Study Approach...
DEPARTMENT OF THE ARMY SOUTH ATLANTIC ONISI ON, CORPS OF ENGINEERS ROOM 10M15, 60 FORSYTH ST, S.W. ATLANTA. GEORGlA 30303 3490
DEPARTMENT OF THE ARMY SOUTH ATLANTIC ONISI ON, CORPS OF ENGINEERS ROOM 10M15, 60 FORSYTH ST, S.W. ATLANTA. GEORGlA 30303 3490 R PLY TO ATIENTION OF; CESAD-PDS-P '1OCT 2010 MEMORANDUM FOR Commander, Jacksonville
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
Final Independent External Peer Review Report of the Rio Grande de Arecibo, Puerto Rico Post Authorization Change Limited Reevaluation Report
Final Independent External Peer Review Report of the Rio Grande de Arecibo, Puerto Rico Post Authorization Change Limited Reevaluation Report Prepared by Battelle Memorial Institute Prepared for Department
CECW-CP 21 June 16. No. 1 EC 1165-2-216
CECW-CP 21 June 16 No. 1 EC 1165-2-216 Water Resources Policies and Authorities POLICY AND ROCEDURS GUIDANCE FOR PROCESSING REQUESTS TO ALTER US ARMY CORPS OF ENGINEERS CIVIL WORKS PROJECTS PURSANT TO
Review Plan U.S. Army Corps of Engineers Kansas City District Northwestern Division. Missouri River Recovery Program Searcy Bend Interception MRRP
Review Plan U.S. Army Corps of Engineers Kansas City District Northwestern Division Missouri River Recovery Program Searcy Bend Interception MRRP January 2016 (This page intentionally left blank) Table
Release of EC 1110-2-6067 USACE Process for the National Flood Insurance Program (NFIP) Levee System Evaluation. Frequently Asked Questions
Release of EC 1110-2-6067 USACE Process for the National Flood Insurance Program (NFIP) Levee System Evaluation Frequently Asked Questions 1. What does Engineer Circular (EC) 1110-2-6067, USACE Process
LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL
LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL August 2008 TABLE OF CONTENTS Section 1 - Introduction... 3 1.1 Defining Plan Quality...
BINGHAMTON FLOOD DAMAGE REDUCTION PROJECT
BINGHAMTON FLOOD DAMAGE REDUCTION PROJECT Department of Environmental Conservation Region 7 Counties: Broome, Cayuga, Chenango, Cortland, Madison, Onondaga, Oswego, Tioga, Tompkins Operated and Maintained
MEMORANDUM FOR COMMANDER, JACKSONVILLE DISTRICT (CESAJ-OD/ JIM W. JEFFORDS)
REPLY TO ATTENTION OF CESAD-RBT DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 1 OM15 ATLANTA, GA 30303-8801 MEMORANDUM FOR COMMANDER, JACKSONVILLE
TITLE 42 THE PUBLIC HEALTH AND WELFARE (42 USC Sec. 10301 et. seq.)
Note: Chapter 109 - Water Resources Research (42 USC 10301) was amended by the Water Resources Research Act Amendments of 2000 (Public Law 106-374) (114 STAT. 1434). President Clinton signed this Act into
US Army Corps of Engineers BUILDING STRONG
Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,
Appendix A Contractor Quality Control Plan The Contractor Quality Control Plan is the Contractor s management plan for executing the contract.
Appendix A Contractor Quality Control Plan The Contractor Quality Control Plan is the Contractor s management plan for executing the contract. The Contractor QCP describes the way in which the Contractor
Tres Rios del Norte Feasibility Study
Tres Rios del Norte Feasibility Study Santa Cruz River Pima County, Arizona February 2011 Study Area: 18 Miles of Santa Cruz River (Prince to Sanders), portions of City of Tucson, Town of Marana, and unincorporated
Section 19. Basin-wide Mitigation Action Plans
Section 19. Basin-wide Mitigation Action Plans This Mitigation Plan identifies twelve specific hazards that could affect the Basin. Section 20 of this Plan set forth mitigation action plans to be carried
APPENDIX 9-1 Project 1: City of Lompoc, Lompoc Valley Leak Detection and Repair Project
APPENDIX 9 APPENDIX 9-1 Project 1: City of Lompoc, Lompoc Valley Leak Detection and Repair Project This project does not require an appendix to this attachment. APPENDIX 9-2 Project 2: City of Santa Maria,
United States Army Corps of Engineers, Civil Works
United States Army Corps of Engineers, Civil Works Fiscal Year 2013 Federal Program Inventory May 2013 Table of Contents Introduction... 2 Program Inventory... 3 1. Navigation... 3 2. Flood Risk Management...
5.14 Floodplains and Drainage/Hydrology
I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important
Managing Complexity: Implementing an Ecosystem Restoration Program*
Managing Complexity: Implementing an Ecosystem Restoration Program* Program Implementation Framework Program Management Tools Lesson Learned *How I Stopped Worrying and Learned to Love Change and Uncertainty!
U.S. Army Corps of Engineers Tulsa District
U.S. Army Corps of Engineers Tulsa District Mike Abate, PMP. Chief, Civil Works Branch, PPMD April 17, 2015 US Army Corps of Engineers Civil Works Mission Water Supply 50% of Corps water supply contracts
Upper Des Plaines River & Tributaries, IL & WI Feasibility Study
Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Jeffrey Zuercher Project Manager Chicago District February 19, 2014 Study Partnership: US Army Corps of Engineers Agenda Background Study
Guidelines for Coordinating Flood Emergency Operations
Guidelines for Coordinating Flood Emergency Operations Completed in compliance with the Flood Emergency Action Team (FEAT): Initiative Number 1 Governor s Executive Order W-156-97 Approved by the Standardized
Sims Bayou Federal Flood Damage Reduction Project
Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD
Nashville District Workload for Nashville SAME Professional Development Workshop
Nashville District Workload for Nashville SAME Professional Development Workshop Thomas Cayce, PE Chief, Programs and Project Delivery Branch Nashville District 17 August 2011 US Army Corps of Engineers
RESUME Lee A. Knuppel, P.E.
RESUME Lee A. Knuppel, P.E. OFFICE: EDUCATION: LEE A. KNUPPEL AND ASSOCIATES, Inc. 7770 Cooper Road, Suite 7 Montgomery, Ohio 45242 (513) 793-4222 Graduate: UCLA, Los Angeles, CA M.S. in Civil Engineering,
HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA
HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA James Chieh, Ph.D., P.E., Senior Hydraulic Engineer, USACE, Los Angeles, California, [email protected]; Jay Pak,
Kansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater
Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún
Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION
Pipeline Engineering and Field Services
Pipeline Engineering and Field Services Field Services Professionals Your Reliable Partner Mustang s Pipeline Field Services Group is recognized by the industry as a reliable partner for providing a complete
REVIEW PLAN. Caño Martín Peña Ecosystem Restoration Project, San Juan, PR Feasibility Report. Jacksonville District. December 2012 Draft P2: 354832
REVIEW PLAN Caño Martín Peña Ecosystem Restoration Project, San Juan, PR Feasibility Report Jacksonville District December 2012 Draft P2: 354832 MSC Approval Date: December 14, 2012 Last Revision Date:
Information Technology Security Certification and Accreditation Guidelines
Information Technology Security Certification and Accreditation Guidelines September, 2008 Table of Contents EXECUTIVE SUMMARY... 3 1.0 INTRODUCTION... 5 1.1 Background... 5 1.2 Purpose... 5 1.3 Scope...
Develop hazard mitigation policies and programs designed to reduce the impact of natural and human-caused hazards on people and property.
6.0 Mitigation Strategy Introduction A mitigation strategy provides participating counties and municipalities in the H-GAC planning area with the basis for action. Based on the findings of the Risk Assessment
U.S. DEPARTMENT OF ENERGY CONTRACT AND PROJECT MANAGEMENT IMPROVEMENT. Closure Report
U.S. DEPARTMENT OF ENERGY CONTRACT AND PROJECT MANAGEMENT IMPROVEMENT Closure Report April 2012 Executive Summary The Department of Energy (DOE) is committed to making continuous improvements in contract
CHAPTER 20 Project Development Cost Estimates Table of Contents
Chapter 20 Project Development Cost Estimates Table of Contents CHAPTER 20 Project Development Cost Estimates Table of Contents CHAPTER 20 Project Development Cost Estimates... 20-3 SECTION 1 Project Cost
ENGINEERING AND CONSTRUCTION BULLETIN
ENGINEERING AND CONSTRUCTION BULLETIN No. 2013-10 Issuing Office: CECW-CE Issued: 9 Apr 2013 Expires: 9 Apr 2015 Subject: Administrative Contracting Officer and Contracting Officer Representative Requirement
Project Management Institute. Construction. Extension to. A Guide to the Project Management Body of Knowledge. PMBOK Guide 2000 Edition.
Project Management Institute Construction Extension to A Guide to the Project Management Body of Knowledge PMBOK Guide 2000 Edition Provisional Construction Extension to A Guide to the Project Management
National Environmental Policy Act/ Clean Water Act Section 404 (NEPA/404) Merger Process and Agreement for Transportation Projects in Colorado
Background In a May 12, 2003, letter from Mr. James L. Connaughton, Executive Office of the President, Council on Environmental Quality, to Mr. Norman Y. Minneta, Secretary of Transportation, Mr. Connaughton
How to Become a Navy Engineer For $78,000 in USD
Presentation to Associated General Contractors COL Mark Deschenes Commander US Army Corps of Engineers Rock Island District February 2014 US Army Corps of Engineers Rock Island District 78,000 Square Miles
Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014)
Mid-Coast Corridor Transit Project San Diego, California New Starts Project Development (Rating Assigned November 2014) Summary Description Proposed Project: Light Rail Transit 10.9 Miles, 9 Stations Total
Why does Kittitas County want to form a Flood Control Zone District?
KITTITAS COUNTY DEPARTMENT OF PUBLIC WORKS Kirk Holmes, Director What is a Flood Control Zone District (FCZD)? A Kittitas County Flood Control Zone District (FCZD) would be a special-purpose government
John Keel, CPA State Auditor. An Audit Report on The Dam Safety Program at the Commission on Environmental Quality. May 2008 Report No.
John Keel, CPA State Auditor An Audit Report on The Dam Safety Program at the Commission on Environmental Quality Report No. 08-032 An Audit Report on The Dam Safety Program at the Commission on Environmental
REQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS LOWER GREAT MIAMI RIVER NUTRIENT MANAGEMENT PROJECT INTRODUCTION On behalf of a partnership of Water Resource Recovery Facilities (WRRFs) WRRFs and other stakeholders with permitted
DEPARTMENT OF THE ARMY ER 1110-1-8162 U.S. Army Corps of Engineers CECW-CE Washington, DC 20314-1000
DEPARTMENT OF THE ARMY ER 1110-1-8162 U.S. Army Corps of Engineers CECW-CE Washington, DC 20314-1000 Regulation 31 January 2014 No. 1110-1-8162 Engineering and Design DESIGN AND CONSTRUCTION POLICY FOR
Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1
Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the
Old Phase Description New Phase Description
Prologue This amendment of The FAA and Industry Guide to Product Certification (CPI Guide) incorporates changes based on lessons learned and supports the broader use of this guide by providing additional
Society of American Military Engineers Omaha District
Society of American Military Engineers Omaha District Kim Thomas Deputy Chief, Plans, Programs, and Project Management Division Omaha District July 21, 2015 US Army Corps of Engineers Omaha District Spotlight
BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK
BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN
JURISDICTION AND PROCEDURES OF THE LANDMARKS PRESERVATION ADVISORY BOARD (LANDMARKS BOARD)
SAN FRANCISCO PRESERVATION BULLETIN NO. 1 JURISDICTION AND PROCEDURES OF THE LANDMARKS PRESERVATION ADVISORY BOARD (LANDMARKS BOARD) LANDMARKS BOARD This summary is designed to clarify for project sponsors
COMMUNITY CERTIFICATIONS
National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden
Fiscal Year 2013-2014 St. Lucie River Issues Team Surface Water Restoration Grant Package
Fiscal Year 2013-2014 St. Lucie River Issues Team Surface Water Restoration Grant Package Grant Guidelines.. 2 Grant Application & Statement of Work. 7 Fiscal Year 2013-2014 St. Lucie River Issues Team
REQUEST FOR QUALIFICATIONS ARCHITECTURAL DESIGN SERVICES FOR A FIRE STATION
Architectural Design Services RFQ October 30, 2015 Shoreline Fire Station & Headquarters Modifications REQUEST FOR QUALIFICATIONS ARCHITECTURAL DESIGN SERVICES FOR A FIRE STATION A. Purpose of Request:
DRAFT SOUTH FORK SKYKOMISH RIVER
DRAFT SOUTH FORK SKYKOMISH RIVER 9 levees and revetments / Approximately 1.1 miles of river bank are armored Revetments provide limited, localized erosion protection, but impact habitat Frequent and costly
ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND
ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning
Facilities Development Manual Chapter 2 Project Management Section 15 Project Integration Management
Facilities Development Manual Chapter 2 Project Management Section 15 Project Integration Management Wisconsin Department of Transportation FDM 2-15-1 Project Integration Management December 11, 2014 1.1
US Army Corps of Engineers Los Angeles District. Rio Salado Oeste Salt River-Phoenix, Arizona FEASIBILITY REPORT SUMMARY
US Army Corps of Engineers Los Angeles District Rio Salado Oeste Salt River-Phoenix, Arizona FEASIBILITY REPORT SUMMARY U.S. Army Corps of Engineers South Pacific Division, Los Angeles District September
Design-Build Process for Project Managers
Vermont Agency of Transportation Design-Build Process for Project Managers This document provides guidance on the preliminary engineering and procurement process and roles and responsibilities of key personnel
The City of Ottawa Flood Hazards
The City of Ottawa Flood Hazards The City of Ottawa is located in North Central LaSalle County, approximately 45 miles West of Joliet and 90 miles South of Rockford. The primary water course and sources
USACE Dam Safety Program Current Approach & Methodology
USACE Dam Safety Program Current Approach & Methodology Siamac Vaghar, PE, MASCE Chief, Geotechnical Engineering Section Dam Safety Program Manager US Army Corps of Engineers New England District Corps
TABLE OF CONTENTS. This document was prepared by. URS Group, Inc. 200 Orchard Ridge Drive, Suite 101 Gaithersburg, MD 20878. In Association with:
Delaware and Susquehanna River Basin Flood Data Assessment Pennsylvania May 2008 Federal Emergency Management Agency Department of Homeland Security 500 C Street, SW Washington, DC 20472 TABLE OF CONTENTS
CHAPTER 4 TYPES OF COST ESTIMATES
CHAPTER 4 TYPES OF COST ESTIMATES 1. INTRODUCTION All projects, both construction and environmental restoration, require cost estimates to plan and budget the project efficiently. Numerous estimates are
Department of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 5105.77 October 30, 2015 DCMO SUBJECT: National Guard Bureau (NGB) References: See Enclosure 1 1. PURPOSE. Pursuant to the authority vested in the Secretary of Defense
DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH ST, SW, ROOM 10M15 ATLANTA, GEORGIA 30303-3490
DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH ST, SW, ROOM 10M15 ATLANTA, GEORGIA 30303-3490 CESAD-CG REPLY TO ATIENTION OF: 12 Jan 2015 MEMORANDUM FOR Commander,
Oklahoma Governor s Water Conference
Oklahoma Governor s Water Conference COL Michael Teague District Commander Tulsa District US Army Corps of Engineers 27 October 2010 US Army Corps of Engineers Tulsa District Over 600 people Arkansas River
Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs
US Army Corps of Engineers Hydrologic Engineering Center Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs October 1966 Approved for Public Release. Distribution Unlimited.
Prepared by. Drew Davidge
Flood Damage Estimation in the Upper Thames River Watershed CFCAS project: Assessment of Water Resources Risk and Vulnerability to Changing Climatic Conditions Project Report VII. August 2005 Prepared
March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633
ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER
Quality Assurance/Quality Control Plan. Division of Transportation Solutions
Quality Assurance/Quality Control Plan Division of Transportation Solutions January 2009 Table of Contents MISSION STATEMENT 3 GENERAL POLICY 3 QA/QC RESPONSIBILITIES 4 PROJECT DESIGNER 4 DELDOT S PROJECT
Post-Flood Assessment
Page 1 of 7 Post-Flood Assessment CHAPTER 4 AGENCY COORDINATION Agency coordination is an essential element for the operation of the flood management systems in the Central Valley. Due to the nature of
Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note 7. 14 April 2000
Project Management Project Management Public Private Partnership Guidance Note 7 14 April 2000 Guidance Note 7 14 April 2000 Project Management Contents Section Page I INTRODUCTION...1 SCOPE AND PURPOSE
Proposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
Environmental Data Management Programs
Hydrologic Engineering Centre (HEC) Software CD Collection of programs, developed by the U.S. Army Corps of Engineers Environmental Data Management Programs Name: HEC-DSS Package Purpose: Data Storage
THE CITY OF MEMPHIS, TENNESSEE ACTION PLAN FOR DISASTER RECOVERY
THE CITY OF MEMPHIS, TENNESSEE ACTION PLAN FOR DISASTER RECOVERY DRAFT FOR PUBLIC REVIEW Proposed Uses of Supplemental CDBG Disaster Recovery Grant Funding Authorized by the Supplemental Appropriations
Belgrade School District No. 44 2015 Invitation to Submit Bids For School Accounting, Payroll, and Human Resources Software
Belgrade School District No. 44 2015 Invitation to Submit Bids For School Accounting, Payroll, and Human Resources Software Prepared by Business Administration BELGRADE PUBLIC SCHOOLS INVITATION TO SUBMIT
A Presentation to the Houston Hispanic Architects and Engineers
A Presentation to the Houston Hispanic Architects and Engineers Alan J. Potok, P.E. Director, Engineering and Construction Division Harris County Flood Control District February 6, 2014 Agenda Overview
EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA
EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA René Leclerc Geomorphologist Robert C. MacArthur, Ph.D., P.E. Principal Headwaters
How To Plan A Flood Control Project In The Skagit River Basin
U.S. Army Corps of Engineers Seattle District SKAGIT RIVER FLOOD RISK MANAGEMENT AND ECOSYSTEM RESTORATION FEASIBILITY STUDY SKAGIT COUNTY, WASHINGTON Feasibility Scoping Meeting Read Ahead Report August
3. The submittal shall include a proposed scope of work to confirm the provided project description;
QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding