THE COMPLETE GUIDE TO PERFECT PROJECT MANAGEMENT



Similar documents
Demonstrate and apply knowledge of project management in

NZQA registered unit standard version 2 Page 1 of 5. Develop and implement a project plan to deliver on an Infrastructure works contract

An Introduction to PRINCE2

Level: 3 Credit value: 5 GLH: 28 Relationship to NOS:

PROJECT MANAGEMENT FRAMEWORK

Association for Project Management Business Management System

Project Management. From small self contained projects through to major change projects. Brought to you by Project Agency

DIPLOMA IN INTERNATIONAL PUBLIC FINANCIAL MANAGEMENT

An Introduction to the PRINCE2 project methodology by Ruth Court from FTC Kaplan

Syllabus 2nd Edition

Check. They re Chartered. Chartered Project Managers

Importance of Project Schedules. matter what happens on a project. projects, especially during the second half of projects

Central Agency for Information Technology

Standard operating procedure

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management

POSITION DESCRIPTION Number: PD:

EXAM EXEMPLAR QUESTIONS

Pearson Education Limited 2003

PROJECT MANAGER. Grade: Salary:

Introductory Certificate. The APM Project Fundamentals Qualification

JOB DESCRIPTION. Procurement and Contract Management Advisor. Commercial Procurement, Property, and Contracts Team

Before starting it is worth considering what we mean by the term project - basically it can be defined as:

ACCREDITATION. APM Corporate CASE STUDY

LSB Procurement Framework

The principles, processes, tools and techniques of project management

PROCUREMENT MANAGER Support Services. Salary range 30,843 to 33,315 (Subject to Job Evaluation)

Certified Project Management Professional VS-1079

OPERATIONAL PROJECT MANAGEMENT (USING MS PROJECT)

Construction Project Management and Quantity Surveying Degree Apprenticeships

Position Description. Te Aho o Te Kura Pounamu. Purpose Statement

JOB DESCRIPTION. Position Title and Number: Senior Procurement Officer (100618) Health, Wellbeing & Commissioning

The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy.

Abar Solutions Petroleum Consultancy & Training Qualified From KPC Training & Consulting Services Provider. Code Period Language Start End Location

1. Background and business case

BUSINESS OCR LEVEL 3 CAMBRIDGE TECHNICAL. Cambridge TECHNICALS BUSINESS PROJECT MANAGEMENT CERTIFICATE/DIPLOMA IN K/502/5459 LEVEL 3 UNIT 18

Chapter 1.7 Project Management. 1. Project financing is one of the step of project management- State True or False

Head of Engineering Job Description

BOARD NOTICE COUNCIL FOR THE BUILT ENVIRONMENT. Notice No

General Notes Time allowed 1 hour. Answer all 60 multiple choice questions Use the proforma answer sheet provided.

Verification of need. Assessment of options. Develop Procurement Strategy. Implement Procurement Strategy. Project Delivery. Post Project Review

Having a Project Support Office

Application Information Pack CRM Project Manager

Assessment guide. Certificate IV in Project Management BSB41507

ownership We increase return on investment by We deliver reliable results by engaging

Procurement Transformation Division. Procurement guidance. Engaging and managing consultants. Includes definitions for consultants and contractors

Quality Manual. This manual is proprietary and no part thereof shall be copied without written authorisation from the company. Ref: Quality Manual.

Chapter 2: Project Time Management

CLICK TO OPEN FOOD AUTHENTICITY FIVE STEPS TO HELP PROTECT YOUR BUSINESS FROM FOOD FRAUD

Internal Audit. Capital Projects. May Final Report

Internal Audit Report Project Management

A. Statement of Accountability

The evolution of the Safety Management Information System (SMIS)

FSDT Project Management Session. Worksheets and Planning Tools

technical tips and tricks

UK-London: IT services: consulting, software development, Internet and support 2011/S CONTRACT NOTICE. Services

Job Description and Person Specification. Post Number: HCI.C24 JE Ref: JE028

NFSA Project Management Guidelines

Services for professional procurement. Be better informed, make better decisions. Trading House Qualification System (THQS)

Contract Management Guideline

5. Creating a Gantt Chart

RICS/SCSI Professional Guidance, Ireland. Appointing a project manager. 1st edition, guidance note. 1 P a g e

Advanced Project Management Incl. MS Projects 5 DAYS

RIBA Plan of Work 2013: Consultation document. You are invited to complete the online questionnaire by 12 August 2012.

Sub-section Content. 1 Formalities - Post title: Risk Consultant - Reports to: Head of Group Risk - Division: xxx - Location: xxx

Page 5. The Adult Social Services and Health Committee. The Strategic Director of Adult Social Services, Housing and Health

To join Achilles UVDB, visit call +44 (0) or

Network Rail Infrastructure Projects Joint Relationship Management Plan

PROJECT insights IDENTIFYING POTENTIAL SHOW STOPPERS. PROJECT INSIGHTS Whitepaper 1 DUE DILIGENCE ENGINEERS

Measuring Contractors Performance Using KPIs GUIDANCE NOTES FOR FACILITIES MANAGERS

Project Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee

OCR LEVEL 3 CAMBRIDGE TECHNICAL

How To Manage A Business Continuity Strategy

CONTENTS. Introducing the Charter page 2. Charter in Action page 3. Key Partners page 3. Challenge to Employers page 4. Voluntary Commitments page 4

BOARD CHARTER. Its objectives are to: provide strategic guidance for the Company and effective oversight of management;

PERFORMANCE MANAGEMENT

Insurance and compensation in the event of injury in Phase I clinical trials

Clients in Construction Best Practice Guidance

Information governance strategy

Delivering e-procurement Local e-gov National e-procurement Project Overarching Guide to e-procurement for LEAs

Setting Standards Achieving Success

Do not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room.

FRAMEWORK BRIEF. Document Storage, Scanning & Related Services

Information Security Policies. Version 6.1

Transcription:

THE COMPLETE GUIDE TO PERFECT PROJECT MANAGEMENT 1

CONTENTS Introduction 3 Prince2 5 Every as a project tool 6 Major development and building work 7 Further reading and information..9 2

THE COMPLETE GUIDE TO PERFECT PROJECT MANAGEMENT What skill set should you need to deliver projects effectively? Are you aware of the stages to follow in successfully managing projects? There is no magic formula for ensuring that a project is successful, but there are well proven techniques available to help plan and manage projects. Fundamentally, project management is about adopting a structured approach to what you should do instinctively. Project management gives you a framework. For example, at certain points in the process it prompts you to take a step back and reflect on progress and what options are available. School projects could include: Relocating an office Changing the IT system Extending the kitchen Procuring mobile classrooms Every type of project is a finite process, with a definite start and end; projects always need to be managed in order to be successful. There are many formal project management methodologies that combine a framework or approach with a set of project tools and guidelines. Some are proprietary approaches developed by consulting firms and software houses whilst others are in the public domain. They vary in scale and complexity but all are based around a small core of common 3

principles. Whenever we decide we want to do something, go somewhere, build something or achieve something, we need to ask: What are we trying to do? When will we start? What do we need? Can we do it alone or do we need help? How long will it take and when should it finish? How much will it cost? The project management methodology describes how a project is divided into manageable stages, enabling efficient control of resources and regular progress monitoring throughout the project. Some common reasons why projects fail to deliver are: Lack of co-ordination of resources and activities Lack of communication with interested parties Poor estimation of duration and costs Insufficient measurable criteria used Inadequate planning of resources, activities and scheduling Lack of control over progress Lack of quality control, resulting in the delivery of products that are unacceptable Without a project management method those who commission, manage and work on it may have different ideas about how things should be organised and when the different aspects of the project will be completed. Those involved will not be clear about how much responsibility, authority and accountability they have and consequently there will often be confusion surrounding the project. Without a management method projects are rarely completed on time and within acceptable cost. A good project management method will guide the project through a controlled, well-managed, visible set of activities to achieve the desired results. 4

PRINCE2 Prince2 is a project management methodology developed by the UK government and used extensively as the de facto project management standard for public projects. The stages in applying a project management approach are summarised below and various techniques are used including charts, activity lists and risk registers (see samples below). A Gantt -- or bar -- chart lists all activities and shows times required, dependencies between the activities and milestone points. The critical path is the sequence of activities which determines the shortest possible time to complete the project. Any delay of an activity on this critical path directly impacts on the planned completion date. Launching your project Consider who needs to be consulted and what for; putting the business case together; governance structure consult and involve governors; leadership team Defining the project Identify who does what; define responsibilities. Scheduling and budgeting List all activities; identify milestones and estimate time for each activity; identify critical path (those activities which have to be completed by the due date in order to complete the project on time). Managing project risks Carry out a full risk analysis and document it in a risk register (see am example at the end of this guidance document); regularly review each risk to ensure you are managing them. Running the project Spend time communicating with key stakeholders and how you may need to influence and communicate with them. Project tracking and monitoring Use Gantt chart (or simulate one in Excel) to monitor progress against the plan; use the milestone dates to check the project is where it should be and correct the project plan; agree a system for project changes have an agreed system for 5

monitoring and approving changes; use change control forms and obtain formal sign off by the sponsor. Reporting project status Keep accurate records of your project for audit purposes and to ensure you have documents which enable you to monitor changes; distribute action points against each item on the agenda and circulate within 24 hours of progress meetings. Project closure Invite key stakeholders, sponsor, and project team to the post project review; assess whether risks were managed well and whether you delivered against time, budget and quality requirements. EVERY AS A PROJECT TOOL Though Every was not designed specifically as a project management tool, it was developed to help schools manage: A large number of different activities involving multiple suppliers and internal stakeholders Activities involving people operating at different levels Communication across teams who are spread across different locations The secure storage and remote access of documents The need to create robust inspection-proof audit trails The need to report on spend and work done quickly and at short notice The need to manage multiple contracts and suppliers The need to progress planned work whilst also dealing with issues arising in a timely and effective manner Every is widely used in schools to assist in the management of medium-sized projects with the reasons being given by schools including: Every automatically creates audit trails, so the project manager can see when work was assigned to different team members/suppliers and what communication has taken place under each activity It provides a mean of communication to all project members/suppliers 6

It automatically sends email alerts to key project team members, helping to minimise the risk of deadlines slipping It provides a horizon of upcoming activities to aid the project manager It offers reporting tools, meaning reports for project sponsors, governors, funding agencies It links to a guidance library, meaning project managers have a dedicated space where they can check legislative requirements It offers unlimited off-site secure document storage; enabling the storage of risk registers, tender documents etc. Schools do not have the budget/see the need to invest in specific project management software when they are already using Every as a contract management/asset management/premises management system For many project managers, it is quicker and easier to use than Excel MAJOR DEVELOPMENT AND BUILDING WORK In the context of major school development and building work, the project manager will be appointed at the beginning of a project and will assist the client in developing the project brief and then selecting, appointing and co-ordinating the project team. He or she will then usually represent the client throughout the entire development process, managing the requirements of the client, consultants, contractors and other stakeholders. The Royal Institution of Chartered Surveyors defines the activities and tasks commonly undertaken by the project manager as: Identifying needs and developing the client brief Leading and managing project teams Identifying and managing project risks Establishing communication and management protocols 7

Managing the feasibility and strategy stages Establishing the project budget and programme Co-ordinating legal and other regulatory consents Advising on the selection/appointment of the project team Managing the integration and flow of design information drawings, specifications Managing the preparation of design and construction programmes/schedules and critical path networks Advising on alternative procurement strategies design and build, different types of contract Advising on risk management strategy Conducting tender evaluation and contractor selection Establishing time, cost, quality and function control benchmarks Controlling, monitoring and reporting on project progress Administering consultant appointments and construction contracts 8

FURTHER READING AND INFORMATION The Association of Project Managers: www.apm.org.uk The APM are committed to developing and promoting project and programme management. It offers: Membership Qualifications Events Publications Online services Chartered Institute of Personnel and Development The CIPD brings together research, practical advice and guidance, professional development and rigorous professional standards to drive better capabilities and understanding in how organisations of all types operate. Every Get a trial period of our Business Management system for free. We also offer a range of resources, guides and training. 9