Standard operating procedure

Size: px
Start display at page:

Download "Standard operating procedure"

Transcription

1 Standard operating procedure Title: Steps involved in outsourcing of services Status: PUBLIC Document no.: SOP/EMA/0083 Lead author Approver Effective date: Name: Caroline Maignen Name: Stefano Marino Review date: Signature: On file Signature: On file Supersedes: SOP/EMA/0083 ( ) Date: Date: TrackWise record no.: Purpose The purpose of this SOP is to set out the steps involved in outsourcing of services to ensure a consistent and documented approach to outsourcing across the Agency. 2. Scope This SOP shall guide all Divisions and Departments at the Agency. 3. Responsibilities It is the responsibility of the Authorising Officer concerned to ensure that steps are followed and documented. The Authorising Officer may appoint a to execute the project under his/her responsibility. The may also be the same person as the Authorising Officer. 4. Changes since last revision This SOP replaces SOP/ADM/0083 of 27 April The changes are minor and relate to terminology (Division, Department) and updated references to the Agency s Financial Regulation and its rules of implementation. There are no changes to the procedure itself. 5. Documents needed for this SOP The following forms for this SOP are required and can be found in the location identified: 30 Churchill Place Canary Wharf London E14 5EU United Kingdom Telephone +44 (0) Facsimile +44 (0) Send a question via our website An agency of the European Union European Medicines Agency, Reproduction is authorised provided the source is acknowledged.

2 Standard procurement contract templates for outsourcing including Exit Plan are available in Word, File, New, Contracts tab. Recommended templates for invitations to tender, tender documents, mandatory filing plan and appointment of committees can be found on the Procurement webpage. ACPC report templates are available in Word, File, New, Contracts tab and on the Procurement webpage. 6. Related documents Public Procurement Directive DIR/2004/18/EC (procurement microsite) Financial Regulation applicable to the budget of the European Medicines Agency applicable as of 1 January 2014 in particular Title V Procurement thereof (financial microsite) Rules for the implementation of certain provisions of the Agency s Financial Regulation applicable as of 1 January 2014 (financial microsite) SOP/EMA/0121: How to Conduct a Procurement Procedure (IQM microsite) Rules of Procedure of the Advisory Committee on Procurement and Contracts (financial microsite), as may be updated from time to time. Vade Mecum on Public Procurement Procedures in the Commission (procurement microsite) Guidelines for Staff and Managers on Outsourcing, 21 October 2005 (procurement microsite) Information Note on Service Level Agreements (SLAs), 3 March 2010 (procurement microsite) Regulation (EC) No 45/2001 on the protection of individuals with regard to the processing of personal data by the European Union institutions and bodies (data protection microsite) 7. Definitions In this SOP, the following definitions apply: Authorising Officer (): The Authorising Officer of the Agency is the Executive Director but powers may be delegated by the Executive Director to an Authorising Officer by delegation. The Authorising Officer implements the Agency s budget in accordance with the financial rules of the Agency, on his/her own responsibility and within the limits of the appropriations authorised. The Authorising Officer is responsible for implementing revenue and expenditure in accordance with the principles of sound financial management and for ensuring that the requirements of legality and regularity are complied with. The Authorising Officer acts in accordance with the Charter of tasks and responsibilities of authorising officers by delegation. Exit Plan: a contractual document which ensures that, on expiry or termination of the contract, the services shall continue without interruption and/or degradation of the deliverables. It also ensures that where the services or any part of them are being migrated to an exit transferee such migration takes place in a project managed, professional and orderly manner with minimal business disruption. An exit plan is prepared at the outset of the contract and is an integral contractual annex. Ex post evaluation: This refers to activities conducted to evaluate the human and financial resources allocated and the results obtained to verify their consistency with the initial objectives. SOP/EMA/0083, Page 2/6

3 Outsourcing: a long-term, results orientated relationship with an external service provider, which is organisationally and economically independent, for activities traditionally performed within an organisation and which constitutes a complete business process to be undertaken with a degree of management control and risk. Outsourcing is usually undertaken to save money, improve quality and/or free resources for other core activities. Procurement decision: This is a document signed by the Authorising Officer of his/her decision to start a procurement procedure. It will refer to the strategic and/or legal context of the procurement (e.g. Work Programme, ESB or EEB decision etc). It will indicate the expected deliverables of the contract and objectives to be achieved, any particular risks or milestones. In case of re-tendering it shall indicate whether or not an ex post evaluation of the performance of the contract to date has been carried out. : the person who is responsible for the planning and execution of the project, ensuring its success by minimising risks. In some cases the may be the same person as the Authorising Officer. Service Level Agreement (SLA): a contractual document which defines the standard, quality and/or the way that services are to be provided. An SLA can/may be an integral contractual annex. Sponsor: the person who is ultimately responsible for the project. Stakeholder: a party who might be affected by the outsourcing. SOP/EMA/0083, Page 3/6

4 8. Process map(s)/ flow chart(s) Start 9. Start planning the transition to outsourcing company. 1. Identify services to be outsourced and discuss with Hdiv/Ddep. Analyse benefits and disadvantages of outsourcing and budget/ cost benefit. Discuss if any staff affected and alternative employment. 2. Identify sponsor and project manager, project team, other resources required, stakeholders. Hold discussions with stakeholders. 10. Finalise contract and Annexes for signature. Ensure financial commitment is in place. 11. Make arrangements for incoming contractor: training etc, exchange of knowledge from outgoing contractor, if applicable. 12. Within 6 months of contract signature or earlier, finalise SLA and Exit Plan. 3. Prepare project initiation document setting out business case and financial impact analysis, objectives, scope, acceptance criteria, assumptions, constraints, risks, controls, timescale. Agree budget line and confirm budget is available. 13. Contract management: performance review. Keep records of meetings. Monitor services. Keep Contract annexes up to date. 14. Audit of contract and/or benchmarking. 4. Submit to Hdiv for approval and document decision. ED makes final decision. Agree to proceed? No 15. Update contract: price reviews, reviews of SLA, changes to services. Yes 5. Decide on procurement procedure and timetable. Prepare procurement decision and ex post evaluation (if applicable). 16. Before end of contract: evaluate whether to continue with outsourcing. Prepare ex post evaluation. Document lessons learned. Proceed? Yes 17. Go out to tender again. No 6. Conduct procurement procedure in accordance with SOPs. 18. Implement exit arrangements: Ensure transfer of knowledge to new incoming contractor, if applicable. 7. Submit to ACPC for opinion 8. Make award decision on outcome of tender. Proceed? Yes End SOP/EMA/0083, Page 4/6

5 9. Procedure Step Action Responsibility 1. Identify services to be outsourced and discuss with Head of Department, if applicable, and Head of Division. Analyse benefits and disadvantages of outsourcing and budget/cost benefit. Discuss if any staff affected and alternative employment. 2. Identify sponsor, project manager and project team, other resources required, stakeholders. Hold discussions with stakeholders. 3. Prepare project initiation document setting out business case and financial impact analysis, objectives, scope, acceptance criteria, assumptions, constraints, risks, controls, timescale, service levels required. Agree budget line and confirm budget is available. 4. Submit project initiation document to Heads of Division for approval and document the decision. Based on approval of the Heads of Division, the Executive Director makes the final decision whether or not to proceed with the outsourcing. Such decision is documented. If the project is approved, continue with step 5. If the project is not approved, the procedure ends here. 5. Decide procurement procedure to be followed and establish timetable. Provide advance information of planned procurement to the Contracts and Procurement team in Legal Department. Drafting and signature of procurement decision. In case of re-tender, provision of ex post evaluation report, taking into account any lessons learned. 6. Conduct procurement procedure in accordance with relevant SOPs (see 5. Documents needed for this SOP). Head of Department Head of Division / / Heads of Division Executive Director 7. Submit to ACPC for opinion. 8. Make award decision on outcome of the tender, based on ACPC s opinion. Keep relevant staff members informed. If decision is to proceed, continue with step 9. If the decision is not to proceed, the procedure ends here. 9. Start planning the transition to the outsourcing company. Keep relevant staff members informed. 10. Following relevant SOPs, finalise contract and annexes for signature. Ensure financial commitment is in place. 11. Make arrangements for incoming contractor: e.g. training, exchange of knowledge from outgoing contractor, if applicable. Keep relevant staff members informed. SOP/EMA/0083, Page 5/6

6 12. Within 6 months of contract signature or earlier, finalise SLA and Exit Plan and other annexes. 13. Conduct contract management and carry out performance review. Keep records of meetings. Monitor services. Ensure contract annexes are kept up-to-date. 14. Audit of contract and/or benchmarking. Appointed auditor or benchmarker 15. Update contract: price reviews, review of SLA, exit plan, review if changes to services are required. 16. Before end of contract, evaluate whether to continue with outsourcing. Prepare ex post evaluation and document any lessons learned. If it is decided to continue with outsourcing, continue with step 17. If it is decided to no longer outsource the service, continue with step Launch a new tender and return to step Implement exit arrangements, ensure transfer of knowledge to new incoming contractor, as applicable. 10. Records All tender documentation and other records relating to procurement procedures will be collected and maintained by the electronically in Document Records Electronic Archive Management, ensuring appropriate levels of security in the folders of the relevant Division/Department, and in hard copy in the Division of the Authorising Officer or in the Agency s official off-site storage facility. The shall conserve the supporting documentation for the relevant period as stated in the Agency s Business Classification Scheme. The shall also retain in the same way and for the same duration all project initiation documents in relation to the outsourcing. SOP/EMA/0083, Page 6/6

Standard operating procedure

Standard operating procedure Standard operating procedure Title: How to conduct a procurement procedure Status: PUBLIC Document no.: SOP/EMA/0121 Lead author Approver Effective date: 04.09.14 Name: Caroline Maignen Name: Stefano Marino

More information

Standard operating procedure

Standard operating procedure Standard operating procedure Title: Audit programmes and internal audits conducted by the Audit Advisory Function Status: PUBLIC Document no.: SOP/EMA/0025 Lead author Approver Effective date: 29/07/2014

More information

Standard operating procedure

Standard operating procedure Standard operating procedure Title: Review and revision of effective work instructions Status: PUBLIC Document no.: SOP/EMA/0034 Approver Effective date: 10-Jul-13 Name: Mario Benetti Name: Guido Rasi

More information

Standard operating procedure

Standard operating procedure Standard operating procedure Title: Review and revision of effective standard operating procedures Status: PUBLIC Document no.: SOP/EMA/0013 Approver Effective date: 10-Jul-13 Name: Mario Benetti Name:

More information

Standard operating procedure

Standard operating procedure Standard operating procedure Title: Evaluation procedure for eligibility of patients', consumers' and healthcare professionals organisations Status: Public Document no.: SOP/H/3390 Lead author Approver

More information

Standard operating procedure

Standard operating procedure Standard operating procedure Title: Handling invoice payment within deadline of 30 days (Standard Payments) Status: PUBLIC Document no.: SOP/EMA/0135 Lead author Approver Effective date: 18-FEB-2015 ame:

More information

Business Resources. QCF Units of Assessment Final NVQ Units April 2010

Business Resources. QCF Units of Assessment Final NVQ Units April 2010 Business Resources QCF Units of Assessment Final NVQ Units April 2010 6 Graphite Square Vauxhall Walk London SE11 5EE T: 0207 0919620 F: 0207 0917340 Info@skillscfa.org www.skillscfa.org Contents No. Title

More information

Procurement, Contracting and Contract Management Policy

Procurement, Contracting and Contract Management Policy Procurement, Contracting and Contract Management Policy Corporate policy 8.4 Responsible Officer: Group Manager Accounting and Taxation Policy Custodian: Chief Finance Officer Division: Finance and Resources

More information

PROJECT MANAGEMENT FRAMEWORK

PROJECT MANAGEMENT FRAMEWORK PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to

More information

Standard operating procedure

Standard operating procedure Standard operating procedure Title: Eligibility to the centralised procedure for medicinal products for human use Status: PUBLIC Document no.: SOP/H/3462 Lead author Approver Effective date: 05-FEB-16

More information

Shona Morrison, OPCC Policy Development Manager. This is a Controlled Document

Shona Morrison, OPCC Policy Development Manager. This is a Controlled Document Title: POLICE AND CRIME COMMISSIONER FOR THAMES VALLEY CONTRACT MANAGEMENT STRATEGY Version: 3.0 Authors: Master Copy: Section: Document Status: Authorized By: Shona Morrison, OPCC Policy Development Manager

More information

Project Management Framework

Project Management Framework Information Services Project Management Framework October 2003 Document ID No. Page 1 of 1 Contents 1. Introduction Page 3 2. Use of Framework Page 3 3. Project Register and Monitoring Page 4 4. Project

More information

OVERSTRAND MUNICIPALITY

OVERSTRAND MUNICIPALITY C 3 / 001 OVERSTRAND MUNICIPALITY CONTRACT MANAGEMENT POLICY Approved by Council 28 May 2015 Implementation date: 1 July 2015 TABLE OF CONTENTS C 3 / 002 1. PRE-AMBLE 2 2. DEFINITIONS 3 3. ABBREVIATIONS

More information

We released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions

We released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions We released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions 1. Change Control Principles Schedule 24: Change Control

More information

Work plan for GMP/GDP Inspectors Working Group for 2016

Work plan for GMP/GDP Inspectors Working Group for 2016 21 December 2015 EMA/INS/GMP/738756/2015 Compliance and Inspection Work plan for GMP/GDP Inspectors Working Group for 2016 Chairperson: Status David Cockburn January 2016 1. Meetings scheduled for 2016

More information

Internal Audit Report. Chief Executive s Unit. Review of Contract Management

Internal Audit Report. Chief Executive s Unit. Review of Contract Management Internal Audit Report Chief Executive s Unit Review of Contract Management February 2010 CONTENTS 1. BACKGROUND 1 Page 2. AUDIT SCOPE AND OBJECTIVES 1 3. AUDIT APPROACH 1 4. AMENDED PROCESS 2 5. SUMMARY

More information

THE COMPLETE GUIDE TO PERFECT PROJECT MANAGEMENT

THE COMPLETE GUIDE TO PERFECT PROJECT MANAGEMENT THE COMPLETE GUIDE TO PERFECT PROJECT MANAGEMENT 1 CONTENTS Introduction 3 Prince2 5 Every as a project tool 6 Major development and building work 7 Further reading and information..9 2 THE COMPLETE GUIDE

More information

1. Background and business case

1. Background and business case 1. Background and business case This section explains the context and why the project is being undertaken. It provides the justification for investing the time and resources in the project. 1.1 Reasons

More information

EU PAS Register Guide

EU PAS Register Guide 29 March 2016 EMA/613603/2012 (currently ENCePP E-Register of Studies) The EU PAS Register is temporarily hosted on the ENCePP website www.encepp.eu 1. Introduction... 2 2. ENCePP E-Register as a temporary

More information

SUFFOLK COUNTY COUNCIL PROCUREMENT RULES. Version 2 Jan 2016. Page 1 of 19

SUFFOLK COUNTY COUNCIL PROCUREMENT RULES. Version 2 Jan 2016. Page 1 of 19 SUFFOLK COUNTY COUNCIL PROCUREMENT RULES 2015 Version 2 Jan 2016. Page 1 of 19 TABLE OF CONTENTS 1. Introduction and Definitions... 3 2. Scope... 4 3. General Principles... 5 4. Responsibilities... 7 5.

More information

Reflection paper on the Use of Interactive Response Technologies (Interactive Voice/Web Response Systems) in Clinical Trials

Reflection paper on the Use of Interactive Response Technologies (Interactive Voice/Web Response Systems) in Clinical Trials 1 2 3 5 August 2011 EMA/INS/GCP/600788/2011 Compliance and Inspection 4 5 6 7 Reflection paper on the Use of Interactive Response Technologies (Interactive Voice/Web Response Systems) in Clinical Trials

More information

Crosswalk Between Current and New PMP Task Classifications

Crosswalk Between Current and New PMP Task Classifications Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the

More information

Proposal Negotiation. a guide. Constantine Vaitsas, vaitsas@help-forward.gr

Proposal Negotiation. a guide. Constantine Vaitsas, vaitsas@help-forward.gr Proposal Negotiation a guide Constantine Vaitsas, vaitsas@help-forward.gr Presentation Outline Proposal Time Scale Negotiation Process Legal Negotiations Financial Negotiations Technical Negotiations NEF

More information

Adoption by GCP Inspectors Working Group for consultation 14 June 2011. End of consultation (deadline for comments) 15 February 2012

Adoption by GCP Inspectors Working Group for consultation 14 June 2011. End of consultation (deadline for comments) 15 February 2012 10 December 2013 EMA/INS/GCP/600788/2011 Compliance and Inspection Reflection paper on the use of interactive response technologies (interactive voice/web response systems) in clinical trials, with particular

More information

Reflection paper on GCP compliance in relation to trial master files (paper and/or electronic) for management, audit and inspection of clinical trials

Reflection paper on GCP compliance in relation to trial master files (paper and/or electronic) for management, audit and inspection of clinical trials 1 2 3 15 June 2015 EMA/INS/GCP/636736/2012 Good Clinical Practice Inspectors Working Group (GCP IWG) 4 5 6 7 Reflection paper on GCP compliance in relation to trial master files (paper and/or electronic)

More information

Video surveillance policy (PUBLIC)

Video surveillance policy (PUBLIC) 29 July 2015 EMA/133708/2015 Administration Division POLICY/0046 POLICY/0046 Effective Date: 01/01/2015 Review Date: 01/01/2018 Supersedes: Version 1 1. Introduction and purpose For the safety and security

More information

Quick Response (QR) codes in the labelling and package leaflet of centrally authorised 1 medicinal products

Quick Response (QR) codes in the labelling and package leaflet of centrally authorised 1 medicinal products 22 July 2015 EMA/493897/2015 Human Medicines Evaluation Division Quick Response (QR) codes in the labelling and package leaflet of centrally authorised 1 medicinal General principles of acceptability and

More information

Network Rail Infrastructure Projects Joint Relationship Management Plan

Network Rail Infrastructure Projects Joint Relationship Management Plan Network Rail Infrastructure Projects Joint Relationship Management Plan Project Title Project Number [ ] [ ] Revision: Date: Description: Author [ ] Approved on behalf of Network Rail Approved on behalf

More information

Demonstrate and apply knowledge of project management in

Demonstrate and apply knowledge of project management in Demonstrate and apply knowledge of project management in mechanical engineering 22918 version 2 Page 1 of 5 Level 6 Credits 15 Purpose This unit standard is intended primarily for use in diploma courses

More information

SCHEDULE 16. Exit Plan. sets out the strategy to be followed on the termination (including Partial Termination) or expiry of this Agreement; and

SCHEDULE 16. Exit Plan. sets out the strategy to be followed on the termination (including Partial Termination) or expiry of this Agreement; and SCHEDULE 16 Exit Plan 1. Scope 1.1 This schedule: (A) sets out the strategy to be followed on the termination (including Partial Termination) or expiry of this Agreement; and requires the Service Provider

More information

Overview of the Transfer of Undertakings (Protection of Employment) Regulations 2006

Overview of the Transfer of Undertakings (Protection of Employment) Regulations 2006 TUPE Overview of the Transfer of Undertakings (Protection of Employment) Regulations 2006... 1 Service Provision Changes... 1 Employer Liability Information... 2 Liability for Failure to Inform and Consult

More information

Welsh Government Response to the Report of the National Assembly for Wales Public Accounts Committee on Grant Management in Wales Final Report

Welsh Government Response to the Report of the National Assembly for Wales Public Accounts Committee on Grant Management in Wales Final Report Welsh Government Response to the Report of the National Assembly for Wales Public Accounts Committee on Grant Management in Wales Final Report The Welsh Government appreciates both the time and effort

More information

5.2. 5.2 Template for IT Project Plan. Template for IT Project Plan. [Project Acronym and Name]

5.2. 5.2 Template for IT Project Plan. Template for IT Project Plan. [Project Acronym and Name] 231 5.2 Template for IT Project Plan Name of the Tool: Source: Usage: Description: Template for IT Project Plan GIZ This template has been designed as a tool to support the planning of IT projects for

More information

End of consultation (deadline for comments) 14 October 2009. Adoption by Committee for advanced therapies 15 October 2010

End of consultation (deadline for comments) 14 October 2009. Adoption by Committee for advanced therapies 15 October 2010 15 October 2010 EMA/CAT/418458/2008/corr. Committee for advanced therapies (CAT) Procedural advice on the certification of quality and nonclinical data for small and medium sized enterprises developing

More information

Capital Works Construction Project. [Insert Project Title] [Insert Sponsoring Agency]

Capital Works Construction Project. [Insert Project Title] [Insert Sponsoring Agency] Capital Works Construction Project [Insert Project Title] [Insert Sponsoring Agency] Detailed Business Case Commercial - in- Confidence [Insert Date] Table of Contents 1. Executive Summary --------------------------------------------------------------------------------------------------

More information

ESKITP7145.01 Manage IT service delivery performance metrics

ESKITP7145.01 Manage IT service delivery performance metrics Overview This sub-discipline covers the competencies required to manage the monitoring, analysis and communication of IT service delivery performance metrics. Monitoring service level performance is a

More information

EU Clinical Trials Register. www.clinicaltrialsregister.eu. An agency of the European Union

EU Clinical Trials Register. www.clinicaltrialsregister.eu. An agency of the European Union EU Clinical Trials Register www.clinicaltrialsregister.eu An agency of the European Union The EU Clinical Trials Register provides public access to information from the European Union (EU) clinical trial

More information

To be used in conjunction with the Invitation to Tender for Consultancy template.

To be used in conjunction with the Invitation to Tender for Consultancy template. GUIDANCE NOTE Tendering for, choosing and managing a consultant Using this guidance This information is not intended to be prescriptive, but for guidance only. Appointing consultants for relatively small

More information

Guidance for the format and content of the protocol of non-interventional post-authorisation safety studies

Guidance for the format and content of the protocol of non-interventional post-authorisation safety studies 26 September 2012 EMA/623947/2012 Patient Health Protection Guidance for the format and content of the protocol of non-interventional post-authorisation Introduction From 10 January 2013, marketing authorisation

More information

Programme Governance and Management Plan Version 2

Programme Governance and Management Plan Version 2 PROCESS FOR CHANGE - Detailed Design Programme Governance and Management Plan Version 2 1 INTRODUCTION In October 2008, the Council approved the selection of seven opportunity themes to take forward from

More information

We released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions

We released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions We released this document in response to a Freedom of Information request. Over time it may become out of date. Department for Work and Pensions SCHEDULE 12 EXIT AND SERVICE TRANSFER ARRANGEMENTS 1. Introduction

More information

Outsourcing. Definitions. Outsourcing Strategy. Potential Advantages of an Outsourced Service. Procurement Process

Outsourcing. Definitions. Outsourcing Strategy. Potential Advantages of an Outsourced Service. Procurement Process CIPS takes the view that the outsourcing of services to specialist providers can often lead to better quality of services and increased value for money. Purchasing and supply management professionals should

More information

Guidance notes and templates for Project Technical Review involving Independent Expert(s)

Guidance notes and templates for Project Technical Review involving Independent Expert(s) Guidance notes and templates for Project Technical Review involving Independent Expert(s) FP7 Collaborative Projects, Networks of Excellence, Coordination and Support Actions Version 18/12/2007 Disclaimer

More information

CODE OF PRACTICE DEALING WITH THE RELATIONSHIP BETWEEN THE NATIONAL AUDIT OFFICE AND THE COMPTROLLER AND AUDITOR GENERAL

CODE OF PRACTICE DEALING WITH THE RELATIONSHIP BETWEEN THE NATIONAL AUDIT OFFICE AND THE COMPTROLLER AND AUDITOR GENERAL CODE OF PRACTICE DEALING WITH THE RELATIONSHIP BETWEEN THE NATIONAL AUDIT OFFICE AND THE COMPTROLLER AND AUDITOR GENERAL The Budget Responsibility and National Audit Act received Royal Assent in March

More information

CCG: IG06: Records Management Policy and Strategy

CCG: IG06: Records Management Policy and Strategy Corporate CCG: IG06: Records Management Policy and Strategy Version Number Date Issued Review Date V3 08/01/2016 01/01/2018 Prepared By: Consultation Process: Senior Governance Manager, NECS CCG Head of

More information

SCHEDULE 8 Generalist Project Services Framework 2015

SCHEDULE 8 Generalist Project Services Framework 2015 SCHEDULE 8 Generalist Project Services Framework 2015 Nominal Insurer And Schedule 8 (Project Services Framework) Page: 1 of 6 Schedule 8 Generalist Project Services Framework Contents Overview... 3 1.

More information

Procurement of communications support for the launch of Healthy Schools London

Procurement of communications support for the launch of Healthy Schools London REQUEST FOR DIRECTOR DECISION DD923 Title: Procurement of communications support for the launch of Healthy Schools London Executive Summary: The Healthy Schools London programme ( HSL Programme ) is one

More information

DG RTD COMMON AUDIT SERVICE SPECIFIC PRIVACY STATEMENT EXTERNAL AUDIT AND CONTROL

DG RTD COMMON AUDIT SERVICE SPECIFIC PRIVACY STATEMENT EXTERNAL AUDIT AND CONTROL DG RTD COMMON AUDIT SERVICE SPECIFIC PRIVACY STATEMENT EXTERNAL AUDIT AND CONTROL Version Date Description of changes Page 1.1 21 August 2014 New online location in the Participant Portal (as the file

More information

Internal Audit at the University of Cambridge.

Internal Audit at the University of Cambridge. Internal Audit at the University of Cambridge. Contents Introduction to Deloitte 1 Our team 2 What is Internal Audit? 4 Our approach to Internal Audit 5 Authority and reporting lines 7 Planning 8 Ad Hoc

More information

BUDGET HEADING 04 03 01 05 CALL FOR PROPOSALS VP/2014/002

BUDGET HEADING 04 03 01 05 CALL FOR PROPOSALS VP/2014/002 EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Social dialogue, Industrial Relations BUDGET HEADING 04 03 01 05 Information and training

More information

FMCF certification checklist 2014-15 (incorporating the detailed procedures) 2014-15 certification period. Updated May 2015

FMCF certification checklist 2014-15 (incorporating the detailed procedures) 2014-15 certification period. Updated May 2015 FMCF certification checklist 2014-15 (incorporating the detailed procedures) 2014-15 certification period Updated May 2015 The Secretary Department of Treasury and Finance 1 Treasury Place Melbourne Victoria

More information

NSW Government Digital Information Security Policy

NSW Government Digital Information Security Policy NSW Government Digital Information Security Policy Version: 1.0 Date: November 2012 CONTENTS PART 1 PRELIMINARY... 3 1.1 Scope... 3 1.2 Application... 3 1.3 Objectives... 3 PART 2 CORE REQUIREMENTS...

More information

EudraVigilance stakeholder change management plan

EudraVigilance stakeholder change management plan 26 October 2015 EMA/797114/2014 Information Management Division Consultation of Project Maintenance Group 1 15 July 2015 Consultation of Eudravigilance Expert Working Group 23 September 2015 Consultation

More information

Course Guide Project Management Package

Course Guide Project Management Package Duration: Time: Payment: Venue: 19 weeks 7.30am to 10.30am MasterCard, VISA, Cheque, EFT, and/or cash 293 Princes Hwy, St Peters NSW 2044 Days/Dates: Fee: Enquiries: Wednesday mornings - commencing on

More information

Compilation of individual product-specific guidance on demonstration of bioequivalence

Compilation of individual product-specific guidance on demonstration of bioequivalence 17 December 2014 EMA/CHMP/736403/2014 Committee for Medicinal Products for Human Use (CHMP) Compilation of individual product-specific guidance on demonstration of bioequivalence Initial batch of individual

More information

The EU portal and database

The EU portal and database The EU portal and database ECPC General Assembly - 20 June 2015 Presented by Laura Pioppo Clinical and Non-clinical Compliance Service An agency of the European Union Table of contents Legal basis CT programme

More information

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO

Australian National Audit Office. Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO Australian National Audit Office Report on Results of a Performance Audit of Contract Management Arrangements within the ANAO Commonwealth of Australia 2002 ISBN 0 642 80678 0 10 December 2002 Dear Mr

More information

Resources Based, Manufacturing and Consumer Goods Industries Chemicals Industry

Resources Based, Manufacturing and Consumer Goods Industries Chemicals Industry EUROPEAN COMMISSION Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs Resources Based, Manufacturing and Consumer Goods Industries Chemicals Industry Version March 2015 QUESTIONS

More information

MODULE 6 - CASH AND BANK MANAGEMENT

MODULE 6 - CASH AND BANK MANAGEMENT FINANCIAL TOOLKIT FOR RECIPIENTS OF EU FUNDS FOR EXTERNAL ACTIONS - Real life story Our NGO, Green Cross, was based in the UK and managed several projects funded by EU grants. One of our projects ran in

More information

Guideline on good pharmacovigilance practices (GVP)

Guideline on good pharmacovigilance practices (GVP) 9 April 2013 EMA/816573/2011 Rev 1* Guideline on good pharmacovigilance practices (GVP) Module II Pharmacovigilance system master file (Rev 1) Draft of first version finalised by the Agency in collaboration

More information

BUDGET HEADING 04 03 01 05 CALL FOR PROPOSALS VP/2015/002

BUDGET HEADING 04 03 01 05 CALL FOR PROPOSALS VP/2015/002 EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Social dialogue, Industrial Relations BUDGET HEADING 04 03 01 05 Information and training

More information

1.1 An initial request to enter into a contractual arrangement may be initiated by either Massey University or another party (Other Party).

1.1 An initial request to enter into a contractual arrangement may be initiated by either Massey University or another party (Other Party). CONTRACT MANAGEMENT PROCEDURE Section Risk Management Contact Risk Manager Last Review February 2013 Next Review February 2016 Approval Not required Procedures Contract Initiation Request Mandatory Guidance

More information

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >

PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name

More information

Questions & answers on signal management

Questions & answers on signal management 23 October 2015 EMA/261758/2013 Inspections and Human Medicines Pharmacovigilance Division This document addresses a number of questions which stakeholders, in particular marketing authorisation holders

More information

Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013

Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013 EUROPEAN COMMISSION European Social Fund Guidance on standard scales of unit costs and lump sums adopted under Article 14(1) Reg. (EU) 1304/2013 Version of June 2015 Please consult http://ec.europa.eu/esf/sco

More information

BANKING UNIT BANKING RULES OUTSOURCING BY CREDIT INSTITUTIONS AUTHORISED UNDER THE BANKING ACT 1994

BANKING UNIT BANKING RULES OUTSOURCING BY CREDIT INSTITUTIONS AUTHORISED UNDER THE BANKING ACT 1994 BANKING UNIT BANKING RULES OUTSOURCING BY CREDIT INSTITUTIONS AUTHORISED UNDER THE BANKING ACT 1994 Ref: BR/14/2009 OUTSOURCING BY CREDIT INSTITUTIONS AUTHORISED UNDER THE BANKING ACT 1994 INTRODUCTION

More information

Management and Leadership. Level 5 NVQ Diploma in Management and Leadership (QCF)

Management and Leadership. Level 5 NVQ Diploma in Management and Leadership (QCF) Management and Leadership Level 5 NVQ Diploma in Management and Leadership (QCF) 2014 Skills CFA Level 5 NVQ Diploma in Management and Leadership (QCF) Page 1 Level 5 NVQ Diploma in Management and Leadership

More information

Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme

Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2: Rules and Procedures for the Swiss-Polish Cooperation Programme Annex 2 is an integral part of the Framework Agreement between the Swiss Federal Council and the Government of the Republic of Poland

More information

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management

Retained Fire Fighters Union. Introduction to PRINCE2 Project Management Retained Fire Fighters Union Introduction to PRINCE2 Project Management PRINCE2 PRINCE stands for: PRojects IN Controlled Environments and is a structured method which can be applied to any size or type

More information

BUDGET HEADING 04.03.03.03 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES OF UNDERTAKINGS CALL FOR PROPOSALS

BUDGET HEADING 04.03.03.03 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES OF UNDERTAKINGS CALL FOR PROPOSALS EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Labour Law BUDGET HEADING 04.03.03.03 INFORMATION, CONSULTATION AND PARTICIPATION OF REPRESENTATIVES

More information

Business Continuity Management Policy

Business Continuity Management Policy Business Continuity Management Policy Business Continuity Policy Version 1.0 1 Version control Version Date Changes Author 0.1 April 13 1 st draft PH 0.2 June 13 Amendments in line with guidance PH 0.3

More information

All reports. 1. Governance Service receive draft report Name of GSO Andrew Charlwood

All reports. 1. Governance Service receive draft report Name of GSO Andrew Charlwood DELEGATED POWERS REPORT NO. SUBJECT: Children s Centre Management Information System - Retender Control sheet All of the following actions MUST be completed at each stage of the process and the signed

More information

CASE 8: Procurement of public key infrastructure

CASE 8: Procurement of public key infrastructure CASE 8: Procurement of public key infrastructure Uni. Athens / CERES Country / region Netherlands Short description This is the case of an integrated central e-government infrastructure for issuing and

More information

MODULE 7 - ACCOUNTING

MODULE 7 - ACCOUNTING FINANCIAL MANAGEMENT TOOLKIT FOR RECIPIENTS OF EU FUNDS FOR EXTERNAL ACTIONS MODULE 7 MODULE 7 - Real life story The project Human Relief and Rights was run by a public sector organisation which had its

More information

EMA esignature capabilities: frequently asked questions relating to practical and technical aspects of the implementation

EMA esignature capabilities: frequently asked questions relating to practical and technical aspects of the implementation August 2013 EMA/264709/2013 EMA esignature capabilities: frequently asked questions relating to practical and technical aspects of the implementation This question and answer document aims to address the

More information

The Project Management Life Cycle By Jason Westland (A book review by R. Max Wideman)

The Project Management Life Cycle By Jason Westland (A book review by R. Max Wideman) The Project Management Life Cycle By Jason Westland (A book review by R. Max Wideman) 11/17/07 Introduction Editor's Note: We liked so much of this book that we asked for the author's permission to quote

More information

APPENDIX C. Internal Audit Report South Holland District Council Project Management

APPENDIX C. Internal Audit Report South Holland District Council Project Management APPENDIX C Internal Audit Report South Holland District Council Project Management Date: 20th December 2012 Contents Introduction and Scope 1 Executive Summary Assurance Opinion Key Messages 2 3 Management

More information

THE PROJECT MANAGEMENT KNOWLEDGE AREAS

THE PROJECT MANAGEMENT KNOWLEDGE AREAS THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human

More information

Intelligent Procurement

Intelligent Procurement Intelligent Procurement Lessons and pitfalls Making a Difference - Construction - Stewart Heaney Divisional Director Construction, CPD Making a Difference Construction Procurement Stewart Heaney Divisional

More information

Guideline on good pharmacovigilance practices (GVP)

Guideline on good pharmacovigilance practices (GVP) 1 2 20 February 2012 EMA/541760/2011 3 4 Guideline on good pharmacovigilance practices (GVP) Module I Pharmacovigilance systems and their quality systems Draft finalised by the Agency in collaboration

More information

URBACT III Programme Manual

URBACT III Programme Manual URBACT III Programme Manual Fact Sheet 2E Network Management Table of contents Fact Sheet 2E 0. Introduction... 1 1. Roles and responsibilities of Lead and Project Partners... 2 2. The legal framework...

More information

Smart Meters Programme Schedule 2.5. (Security Management Plan) (CSP South version)

Smart Meters Programme Schedule 2.5. (Security Management Plan) (CSP South version) Smart Meters Programme Schedule 2.5 (Security Management Plan) (CSP South version) Schedule 2.5 (Security Management Plan) (CSP South version) Amendment History Version Date Author Status v.1 Signature

More information

Outsourcing. Knowledge Summary

Outsourcing. Knowledge Summary Knowledge Summary Outsourcing P&SM professionals should have the knowledge and skills required to manage the outsourcing process and to advise colleagues of the most appropriate solution to obtain best

More information

Risk Management & Business Continuity Manual 2011-2014

Risk Management & Business Continuity Manual 2011-2014 ANNEX C Risk Management & Business Continuity Manual 2011-2014 Produced by the Risk Produced and by the Business Risk and Business Continuity Continuity Team Team February 2011 April 2011 Draft V.10 Page

More information

BUDGET HEADING 04.03.01.08 CALL FOR PROPOSALS. Support for social dialogue VP/2014/001

BUDGET HEADING 04.03.01.08 CALL FOR PROPOSALS. Support for social dialogue VP/2014/001 EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Social dialogue, Industrial Relations BUDGET HEADING 04.03.01.08 Industrial relations

More information

Information Commissioner's Office

Information Commissioner's Office Information Commissioner's Office IT Procurement Review Ian Falconer Partner T: 0161 953 6480 E: ian.falconer@uk.gt.com Last updated 18 June 2012 Will Simpson Senior Manager T: 0161 953 6486 E: will.g.simpson@uk.gt.com

More information

PROJECT MANAGEMENT PLAN CHECKLIST

PROJECT MANAGEMENT PLAN CHECKLIST PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,

More information

BUDGET HEADING 04.03.01.08 CALL FOR PROPOSALS. Support for social dialogue VP/2015/001

BUDGET HEADING 04.03.01.08 CALL FOR PROPOSALS. Support for social dialogue VP/2015/001 EUROPEAN COMMISSION Employment, Social Affairs and Inclusion DG Employment and Social Legislation, Social Dialogue Social dialogue, Industrial Relations BUDGET HEADING 04.03.01.08 Industrial relations

More information

RECORDS MANAGEMENT POLICY

RECORDS MANAGEMENT POLICY [Type text] RECORDS MANAGEMENT POLICY POLICY TITLE Academic Year: 2013/14 onwards Target Audience: Governing Body All Staff and Students Stakeholders Final approval by: CMT - 1 October 2014 Governing Body

More information

Aberdeen City Council IT Disaster Recovery

Aberdeen City Council IT Disaster Recovery Aberdeen City Council IT Disaster Recovery Internal Audit Report 2014/2015 for Aberdeen City Council January 2015 Terms or reference agreed 4 weeks prior to fieldwork Target Dates per agreed Actual Dates

More information

Business Continuity Management

Business Continuity Management Business Continuity Management Standard Operating Procedure Notice: This document has been made available through the Police Service of Scotland Freedom of Information Publication Scheme. It should not

More information

Part 1 Checklist. Feasibility 2. Investigation 9. Design 18. Construction 26

Part 1 Checklist. Feasibility 2. Investigation 9. Design 18. Construction 26 Part 1 Checklist Process Page 2 9 Design 18 26 Page 1 FEASIBILITY 1. Establishment 1.1 Establishment Recognise problem, need or opportunity. Formulate goal and objectives. Prepare project charter. Obtain

More information

Procurement Journey Notes - GB - Version 8. Procurement Journey - SOC Mitigation

Procurement Journey Notes - GB - Version 8. Procurement Journey - SOC Mitigation Procurement Journey - SOC Mitigation The following notes should be considered when developing/ implementing all procurement strategies. It considers the strategy subject and determines whether enhanced

More information

The Clinical Trials Regulation EU No 536/2014: and Phase I trials

The Clinical Trials Regulation EU No 536/2014: and Phase I trials The Clinical Trials Regulation EU No 536/2014: and Phase I trials EUFEMED, Brussels, 20 May 2015 Presented by Fergus Sweeney Head, Inspections and Human Medicines Pharmacovigilance An agency of the European

More information

GEM CSU - IT Services Change Control Policy

GEM CSU - IT Services Change Control Policy Please note, once downloaded or printed, the document will be deemed as uncontrolled and its validity should be checked prior to use. This document is due for review by the date shown below. After this

More information

Frequently Asked Questions - Trainees at the EMA

Frequently Asked Questions - Trainees at the EMA 09 May 2016 EMA/298474/2016 Administration Content 1. Applying for a traineeship at the Agency... 1 2. Practical information about London... 2 3. Your first day at the Agency... 3 4. Being a trainee at

More information

Annex A: Pre-Qualification Questionnaire Core Questions

Annex A: Pre-Qualification Questionnaire Core Questions Annex A: Pre-Qualification Questionnaire Core Questions This Pre-Qualification Questionnaire ( PQQ ) has been issued by the Authority in connection with a competitive procurement conducted under the Public

More information

CHECKLIST for Job Handover

CHECKLIST for Job Handover CHECKLIST for Job Handover This handover framework has been developed based to ensure that a consistent and thorough handover process is undertaken by those who are entering a new job/area. By following

More information

Procurement Routes. Curtin University of Technology

Procurement Routes. Curtin University of Technology Procurement Routes An Overview Curtin University of Technology Overview of Principal Routes Traditional / conventional design led Design and construct Management (Fee) Traditional Client appoints consultants

More information

Good Research Practice

Good Research Practice Page 1 of 8 The Royal Veterinary College Introduction Preface Good Research Practice Funding bodies need to be assured of the quality and validity of research they fund and ensure their contractors are

More information