Planning Policy and Guidance on Flooding and Coastal Erosion



Similar documents
NEW DEVELOPMENT AND EMERGENCY FLOOD PLANS

FLOOD RISK RECENT TRENDS AND POLICY RESPONSES

Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency.

PLANNING APPLICATION: 12/00056/APP

Guideline: A risk assessment approach to development assessment in coastal hazard areas

Flood Risk & Surface Water Management. Page 1 of 20

SECTION 10.0 MANAGEMENT UNIT 5: HORNSEA

PLANNING. Planning Policy Statement 25: Development and Flood Risk Practice Guide

Planning Advice Note Guidance on Producing a Flood Emergency Plan. For planning applicants and developers to accompany a planning application

Preliminary Environmental Information Report: Appendix 16.C. Flood Warning and Evacuation Plan

11.4 Voluntary Purchase House Raising and Flood Proofing

DWELLING ADJACENT TO 2, FIELD LANE, MORTON, NR GAINSBOROUGH, LINCOLNSHIRE.

New Brunswick s Flood Risk Reduction Strategy. Province of New Brunswick PO 6000, Fredericton NB E3B 5H1.

Coastal Erosion Risk Mitigation Strategies applied in a Small Island Developing State: The Barbados Model

SUFFOLK COASTAL DISTRICT COUNCIL DOMESTIC FLOOD PROTECTION POLICY

Planning Policy Statement 15 (PPS 15) Planning and Flood Risk

4.14 Netherlands. Interactive flood risk map of a part of the province of Gelderland in the Netherlands. Atlas of Flood Maps

SUBJECT: Housing Development Proposals Outside of Local Development Plan (LDP) Development Boundaries.

Anchorage All-Hazard Mitigation Plan October 2004

FLOOD RISK STATEMENT IN SUPPORT OF THE CONNECTING HERNE BAY AREA ACTION PLAN PREFERRED OPTIONS DOCUMENT

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region

Mr & Mrs Clarke Proposed Development at The River House, Balderstone Flood Risk Assessment

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Climate Change Toolkit 07 Designing for Flood Risk

Town of Chatham Department of Community Development

H 5478 S T A T E O F R H O D E I S L A N D

Implementing a Coastal Settlement Boundary

Association of State Flood Managers Annual Conference Wednesday, June 4, 2014

The Planning System and Flood Risk Management

Wye and Usk Catchment Flood Management Plan. Summary Report January managing flood risk

Presentation by Michael Wade. Crown Representative for Insurance at the Cabinet Office of the UK Government. National Flood Conference Washington DC

Resolution XII.13. Wetlands and disaster risk reduction

With a combination of soaking rain, flying debris, high winds, and tidal surges, Hurricanes and tropical storms can pack a powerful punch.

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

London Borough of Merton Local Flood Risk Management Strategy

Oregon. Climate Change Adaptation Framework

Flood Risk Management Plans

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

chapter 9 conduct a climate change

Barre City City-wide Policy and Program Options

R enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179

Humber and the English East Coast Tuesday 26 th April 2011

United States Postal Service Climate Change Adaptation Plan

NOAA COASTAL SERVICES CENTER Strategic Plan: 2010 to 2015

How To Write A New Bill On Flood Management In Scotland

INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies

NYSDEC Optional Additional Language Model Local Law for Flood Damage Prevention Optional Additional Language

Strategic Flood Risk Assessment

Section E2 Coastal Engineering: Reconstruction Management and Mitigation

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Strategic Flood Risk Assessment Update 2015

A. Flood Management in Nevada

Disaster Risk Reduction and Building Resilience to Climate Change Impacts

US Army Corps of Engineers Authorities and Programs

Chapter 2 Spatial Portrait

Objective 4: Enhanced community education, flood awareness and preparedness

OURIMBAH FLOOD RESPONSE PLAN

ITEM 8(a) MANAGEMENT COMMITTTE 2 JUNE 2015

Strategic Flood Risk Assessment (SFRA) Level 1

Why should communities invest in resiliency? What are the steps communities can take to become more resilient?

Littleport Co-located Schools

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka

London Borough of Croydon Local Flood Risk Management Strategy

Hazards of the Jamaican Coastline ERODING BEACHES: A RESPONSE TO RISING SEA LEVEL?

Proposed Re-development, At 321 London Road, Wyberton. Flood Risk Assessment - Revised

National Planning Policy for Waste

BC Ministry of Environment

Homes and Environment Scrutiny Committee. (Environment & Transport)

Macro water sharing plans the approach for unregulated rivers

COASTAL DEVELOPMENT PERMIT

Useful information to help you protect your home or business from the risks of flooding

Presentation by Michael Wade. Old Library, Lloyd s

River Basin Management in Croatia

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Financing sustainable and resilient water and sanitation infrastructure in African cities

The Planning System and Flood Risk Management

MITIGATION STRATEGY OVERVIEW

SECTOR ASSESSMENT (SUMMARY): CLIMATE CHANGE. 1. Sector Performance, Problems, and Opportunities

Post-Flood Assessment

Cambridge House, Henry Street, Bath BA1 1UR

Flood Evacuation Plan

Transcription:

Planning Policy and Guidance on Flooding and Coastal Erosion James Hooker (MRTPI) Senior Planning Manager Welsh Government RTPI Cymru - Water and Flooding Seminar Tuesday 20 th November 2012

Overview Planning Policy Wales TAN14: Coast TAN15: Flood Risk DAM Maps Zone C2 Zone C1 - Justification Test Assessing Flood Consequence Flooding Consequences Role of EAW & LPA Responsibility Notification Direction A bit late?

Planning Policy Wales Chapter Five Heritage & Coast [Coastal] areas subject to constraints or considered unsuitable for development may include those where conservation or enhancement of the natural and historic environment requires development to be limited, where visual intrusion will need carefully to be considered and where there may be risks of erosion, flooding or land instability. options for coastal defence may include a policy of managed set back

Shoreline management plans will establish long-term local policy frameworks for the management of coastal risk. The priorities contained within them should influence and inform the preparation of development plans. Before major developments are permitted it will be essential to demonstrate that a coastal location is required. Where development is considered to satisfy this test it should be designed so as to be resilient to the effects of climate change over its lifetime.

New coastal development should not generally be permitted in areas which would need expensive engineering works, either to protect developments on land subject to erosion by the sea or to defend land which might be inundated by the sea. There is also the need to consider the possibility of such works causing a transfer of risks to other areas, bearing in mind also that erosion and the risk of inundation are likely to be exacerbated by climate change.

Chapter 13 Minimising & Managing Environmental Risks How much water? June 2012 panoramio.com EA River Gauge River Leri nr Dolybont

Flood Risk Flood risk, whether inland or from the sea, is a material consideration in land use planning. Local planning authorities should recognise that it will be inappropriate to locate certain types of development such as schools, hospitals, residential development and emergency services within some areas defined as being of high flood hazard. In such areas, local planning authorities should ensure that only appropriate land allocations are made during the preparation of development plans.

Government resources for flood and coastal defence projects are directed at protecting existing developments and are not available to provide defences in anticipation of future development. Panarimo.com

A sustainable approach to flooding will therefore involve the avoidance of development in flood hazard areas and, where possible or practical, the encouragement of managed retreat, the creation of wash-lands and flood plain restoration.

TAN14 Coastal Planning It is for each LPA to consider and define the most appropriate coastal zone in its area. Proposals for development need to consider the potential need for remedial and defence works and the likely effects on physical & biological processes along the coast. Development plan policies should not provide for development on the coast which does not require a coastal location.

TAN14 - continued Policies will specifically be needed to control or restrict development in: low lying coastal areas; on land close to eroding cliffs or other eroding coastline; and on land subject to instability. Onus rests on the developer to provide sufficient and appropriate information to demonstrate that proposed sites can be safely developed without significant adverse effects.

TAN15: Development & Flood Risk Development Advice Maps (September 2009) Based on EA s flood maps, and identify the 0.1% extreme flood risk area. 0.1% flood outline is divided into two zones: C1 areas of the floodplain which are developed and served by significant infrastructure, including flood defences C2 areas of the floodplain without significant flood defence infrastructure

Online Development Advice Maps DAM maps are now available online at http://data.wales.gov.uk/apps/floodmapping/

TAN15 Zone C2 Figure 1 (page 5) identifies that only less vulnerable development should be considered in Zone C2. Section 6 identifies that In Zone C the tests outlined in sections 6 & 7 will be applied, recognising, however that highly vulnerable development and Emergency Services in Zone C2 should not be permitted.

Section 9 (Summary of Policy Requirements) states in respect to Zone C2: Developer 3 Developer 1 The flooding consequences associated with Emergency Services and highly vulnerable development are not considered to be Developer 2 acceptable. Plan allocations should not be made for such development and planning applications not proposed.

TAN15 Zone C1 Section 6 Justification Test i) Local authority regeneration initiative or stategy [development plan] required to sustain an existing settlement, or, ii) contribute to key employment objectives supported by the local authority, and other key partners to sustain an existing settlement or region, and, iii) concurs with the aims of PPW and meets the definition of previously developed land; and,

iv) Potential consequences of a flooding event for the particular type of development have been considered, and in terms of the criteria contained in sections 5 and 7 and appendix 1 found to be acceptable.

TAN15 Appendix 1 Assessing Flooding Consequences A1.12 A site should only be considered for development if the following conditions can be satisfied: -Flood defences shown to be structurally adequate under extreme overtopping conditions - Cost of future maintenance for all new/approved mitigation measures must be accepted by the developer and agreed with the Environment Agency - Developer must ensure that future occupiers are aware of flooding risks and consequences

- Effective flood warnings are provided at the site. - Escape/Evacuation routes are shown be the developer to be operational under all conditions.

- Development is designed to minimise structural damage during a flood event, and is flood proofed to enable it to be returned to its prime use quickly in the aftermath of the flood.

-No flooding elsewhere Table A1:14 Threshold for which development should be designed to be flood free. Table A1:15 Thresholds for residual risk in extreme 0.1% flood event.

Role of EAW/ LPA responsibility EAW will provide technical advice on the content of a flood consequence assessment. EAW may object where from a technical perspective there is an unacceptable risk in flood risk management terms. EAW will not comment on the acceptability of emergency access and egress. Response letters clearly state: Your Authority, in liaison with other appropriate bodies, should ensure that you are satisfied with the identified access/egress routes and their acceptability for emergency access purposes.

LPA is therefore responsible for determining that escape and evacuation routes are shown by the developer to be operational under all conditions.

Notification Direction New requirement for local planning authorities to refer applications for emergency services or highly vulnerable development, where the whole of the land where the development is proposed to be located, is within flood zone C2, shown on the development advice map (DAM). In cases consisting of residential development, the threshold for requiring notification is set at 10 or more dwellings, including flats.

Thank you Introductory Briefing: Transport www.wales.gov.uk James Hooker james.hooker@wales.gsi.gov.uk