CONTROL AND COMMUNICATIONS PART 2 TA 73/97 MOTORWAY EMERGENCY TELEPHONES SUMMARY



Similar documents
Motorway Incident Detection and Automatic Signalling (MIDAS)

lighting road markings Part 2 td 89/08 use of passively safe signposts, lighting columns and traffic signal posts to bs en 12767: 2007

INTERIM ADVICE NOTE 65/05 DESIGN OF VEHICLE RECOVERY OPERATIONS AT ROAD WORKS

w. e. t f

CONTROL AND COMMUNICATION PART 6 TA 83/05

Vehicular Access to All-Purpose Trunk Roads

Traffic Management During Construction

Remote Monitoring and Control of Traffic Control Equipment via a Telecommunications Network

MCH 1352 Issue D February 2002

DRAINAGE PART 5 HA 40/01 DETERMINATION OF PIPE AND BEDDING COMBINATIONS FOR DRAINAGE WORKS SUMMARY

EDGE OF PAVEMENT DETAILS

HIGHWAY STRUCTURES: INSPECTION AND MAINTENANCE PART 8 BA 54/94 LOAD TESTING FOR BRIDGE ASSESSMENT

CHAPTER. Traffic Signs Manual. Part 1: Design. Traffic Safety Measures and Signs for Road Works and Temporary Situations

DRAINAGE PART 3 HA 102/00 SPACING OF ROAD GULLIES SUMMARY

Utilities and existing services

Code of Practice on Noise from Audible Intruder Alarms 1982

HIGHWAYS ASSET MANAGEMENT STRUCTURES TEAM GUIDANCE NOTE SMT/GN/03/10 TECHNICAL APPROVAL

The Delivery Hub health, safety and environment Raising the bar 2 Traffic management entry and exit

Emergency Telephone Systems

Siting Of Inductive Loops For Vehicle Detecting Equipments At Permanent Road Traffic Signal Installations

Route Optimisation / Traffic Signals Efficiency

Delineation. Section 4 Longitudinal markings

PREPARATION AND SCHEMES IMPLEMENTATION PART 2 HD 19/03 ROAD SAFETY AUDIT SUMMARY

Volume 1 NJUG GUIDELINES ON THE POSITIONING AND COLOUR CODING OF UNDERGROUND UTILITIES APPARATUS

ITS specification Jointing chambers and pull pits (ITS-02-02)

INTERIM ADVICE NOTE 179/14

Safety performance of traffic management at major motorway road works

Requirements for the Attachment of Communication Cable Facilities on PPL Poles

GUIDELINES FOR WORKING ON ROADS

Upgrading Path to High Speed Fiber Optic Networks

2015 No. insert ROADS. The Trunk Roads T1, T3 and T7 (York Street Interchange) Order (Northern Ireland) 2015

Road Safety Auditor Certification Compliance with EC Directive 2008/96/EC

Performance Specification for Pedestrian Facilities at Temporary Standalone Traffic Signals

THE TRAFFIC SIGNS REGULATIONS AND GENERAL DIRECTIONS 2002 LIST OF DIAGRAMS AND HOW THEY DIFFER FROM THE TSRGD 1994 SCHEDULE 1 - WARNING SIGNS

Appendix A: Basic network architecture

Use of Automatic Traffic Counters for Event Monitoring. Executive Summary Report. Project co-funded by the European Commission DG TREN

DRAFT PLANNING THE OPENING OF A ROAD PROJECT GUIDELINE 1

[Area] Technology Managing Agent Contractor Contract. Service Information. Annex SI 0 Glossary

Scope: Communications and Electronic Systems addressed in this section include:

Geometric Design of Major/Minor Priority Junctions

Roads for All. The Trunk Road Network. Disability Equality Scheme. and. Action Plan

Transportation Management Plan Template

CHAPTER VIII LINE PLANT SYSTEM COMMUNICATION THROUGH RE CABLE

AUSTAR Multi Dwelling Unit Installation Guidelines 2008

Date: March Technology Management & Maintenance Manual

Maximum speed. Stop and Give way to Manually operated temporary No entry for give way traffic on STOP and GO signs vehicular traffic major road

PART 3 TD 50/04 THE GEOMETRIC LAYOUT OF SIGNAL- CONTROLLED JUNCTIONS AND SIGNALISED ROUNDABOUTS SUMMARY

Traffic Signs Manual CHAPTER. Traffic Safety Measures and Signs for Road Works and Temporary Situations Part 2: Operations

PART 6 HA 113/05 DRAINAGE

Specifying an IT Cabling System

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

CODE OF PRACTICE NINE

FAST TUTORIALS FOR TIME-CHALLENGED TECHNICIANS

[Area] Technology Managing Agent Contractor Contract. Service Information. Annex SI 27 Regional Control Centre Technical Support Service

M8 M73 M74 Motorway Improvements Project

Broadband deployment and sharing other utilities infrastructure A Department for Business Innovation and Skills (BIS) discussion paper

Special Specification 6033 Computerized Transportation Management System

ADC Structured Cabling Solutions

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

Ref: MDA/2009/010 Issued: 16 February 2009 at 10:30

The Delivery Hub health, safety and environment Raising the bar 9 Underground service avoidance

Withdrawal of ESM 108 Emergency Telephone Systems

ELEVATOR TRAVELING CABLE - DESIGN EVOLUTION

Draft Terms of References (ToRs) for Road Asset Management Act ROAD ASSET MANAGEMENT ACT

How To Implement A Ucmc Communications System

Networks. The two main network types are: Peer networks

Appendix A - Cost Estimate Spreadsheet

Engineers Edge, LLC PDH & Professional Training

Multiplexing on Wireline Telephone Systems

Article 17(1) of Directive 2010/40/EU, National Report for Ireland. 26 August 2011

For business. Wiring your business for broadband. What happens when copper is required?

4. Other Information Signs CHAPTER 4

White Paper. Sensor Technologies for the Protection of remote assets

BROADBAND TRANSMISSION CAPACITY INDICATORS WTIM September 2012, Bangkok, Thailand

SUMMARY OF CORRECTION TA 85/01 Volume 6, Section 1, Part 3 GUIDANCE ON MINOR IMPROVEMENT TO EXISTING ROADS

Eastern RTMC.

nr 28 nr 68 nr 4 nr 1

6. Warning Signs CHAPTER 6

Narrowband and Broadband Access Technologies

Building over or close to a public sewer

DESCRIPTION OF WORK:

Workplace Transport Safety Reversing Vehicles Information Sheet What are the dangers associated with reversing vehicles? Why is reversing a problem?

No Phone Line System. Quick Start Guide NPL II. 1.0 Installation

Safety Engineering Policy Memorandum

Interfacing electrification and system reliability. Earthing of AC and DC railways 4,10,13

Security & Surveillance Cabling Systems

ICTCBL2065B Splice and terminate optical fibre cable for carriers and service providers

CalMod Design-Build Electrification Services

Fundamentals of Telecommunications

Wireless monitoring of our road network: Current application and future opportunity Uncovering the potential of wireless sensing

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

MGL Avionics CAN bus interface for Trig Avionics TT21/TT22 transponders

Public Switched Telephone System

APPENDIX A: ASSET INFORMATION STRATEGY

GO/GN3677. Guidance on Operational Criteria for the Provision of Lineside Telephony. Following GSM-R Introduction. Rail Industry Guidance Note

CAN/ULC-S Installation of Fire Alarm Systems Amendment 1. Canadian Fire Alarm Association (CFAA) D. GOODYEAR FIRE CONSULTING

Guidance for Electrical Contractors on Emergency Lighting Legislation

Release: 1. RIIOHS302A Implement traffic management plan

Optical Cable Pre-Construction Survey. Keywords Stationary Reel Method, empty innerducts, sub-ducts, microducts, Intermediate-feed manholes

How To Understand The Concept Of Circuit Switching

Transcription:

DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 9 SECTION 4 NETWORK - TRAFFIC CONTROL AND COMMUNICATIONS SYSTEMS DESIGN PART 2 TA 73/97 MOTORWAY EMERGENCY TELEPHONES SUMMARY This Advice Note describes the design and provision of emergency telephones. It also contains advice on the siting of emergency telephones. INSTRUCTIONS FOR USE This is a new document to be inserted into the manual. 1. Insert TA 73/97 into Volume 9 Section 4. 2. Archive this sheet as appropriate. Note: A quarterly index with a full set of Volume Contents Pages is available separately from the Stationery Office Ltd.

DESIGN MANUAL FOR ROADS AND BRIDGES TA 73/97 THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND Motorway Emergency Telephones Summary: This Advice Note describes the design and provision of emergency telephones. It also contains advice on the siting of emergency telephones.

Part 2 TA 73/97 Registration of Amendments REGISTRATION OF AMENDMENTS Amend Page No Signature & Date of Amend Page No Signature & Date of No incorporation of No incorporation of amendments amendments

Registration of Amendments Volume 9 Section 4 Part 2 TA 73/97 REGISTRATION OF AMENDMENTS Amend Page No Signature & Date of Amend Page No Signature & Date of No incorporation of No incorporation of amendments amendments

DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 9 SECTION 4 NETWORK - TRAFFIC CONTROL AND COMMUNICATIONS SYSTEMS DESIGN PART 2 TA 73/97 MOTORWAY EMERGENCY TELEPHONES Contents Chapter 1. Introduction 2. References 3. Enquiries

Part 2 TA 73/97 Chapter 1 Introduction 1. INTRODUCTION 1.1 General 1. This Advice Note describes the design and provision of emergency telephones. It also contains advice on the siting of emergency telephones. 1.2 Scope 2. This Advice Note is applicable to the design and provision of emergency telephones within the National Motorway Communications Systems. It can be used within motorway communications, motorway construction and improvement schemes. 1.4 Implementation 7. The appropriate Annex should be used forthwith on all motorway communications, motorway construction and improvement schemes currently being prepared provided that, in the opinion of the Overseeing Organisation, this would not result in significant additional expense or delay progress. Design Agents should confirm its application to particular schemes with the Overseeing Organisation. 3. The specific requirements for each Overseeing Organisation are contained in the relevant Annex to this Advice Note, they are as follows: Annex A for England. Annex B for Scotland. Annex C for Wales. Annex D for Northern Ireland. 4. This Advice Note is intended to be used by Overseeing Organisation staff, their consultants, Agents and maintenance contractors. 1.3 Related Standards and Advice Notes 5. There are no Technical Directives related to the design of emergency telephones. References for the standard of provision applicable to each Overseeing Organisation is given in the appropriate Annex. 6. The following Advice Notes are of relevance: TA 70: Introduction TA 71: Design and Implementation (Overview) TA 72: National Motorway Communications Systems (NMCS) 1/1

Part 2 TA 73/97 Chapter 2 References 2. REFERENCES TA 70: Introduction (DMRB 9.2.1) TA 71: Design and Implementation (Overview) (DMRB 9.3.1) TA 72: National Motorway Communications Systems (NMCS)(DMRB 9.4.1) 2/1

Part 2 TA 73/97 Chapter 3 Enquiries 3. ENQUIRIES Approval of this document for publication is given by the undersigned: Director of Traffic Systems and Signing Division Highways Agency Tollgate House Houlton Street Bristol BS2 9DJ R EASTMAN Director of Traffic Systems and Signing Division The Deputy Chief Engineer Roads Directorate The Scottish Office Industry Department New St Andrew s House Edinburgh EH1 3TG J INNES Deputy Chief Engineer The Director of Highways Welsh Office Y Swyddfa Gymreig Crown Buildings Cathays Park Cardiff CF1 3NQ K THOMAS Director of Highways Assistant Technical Director Department of the Environment for Northern Ireland Roads Service Clarence Court 10-18 Adelaide Street D O HAGAN Belfast BT2 8GB Assistant Technical Director All technical enquiries or comments on this document should be sent in writing as appropriate to the above. 3/1

DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 9 SECTION 4 NETWORK - TRAFFIC CONTROL AND COMMUNICATIONS SYSTEMS DESIGN PART 2 TA 73/97 Annex A (England only) MOTORWAY EMERGENCY TELEPHONES Contents Chapter 1. Introduction 2. Siting of Telephones 3. Telephone Infrastructure 4. Telephone Equipment 5. Telephone System 6. Glossary 7. References

Volume 9 Section 3 Part 1 TA 71/97 Annex A (England only) Chapter A1 Introduction A1. INTRODUCTION A1.1 General Volume 9 1. This Annex is for the specific requirement of motorway communications in England. DMRB Structure 2. Section 1 of Volume 9 of the Design Manual for Roads and Bridges (DMRB) contains Technical Directives (TD) which detail the Standards of Provision. 3. Section 2 onwards contains Technical Advice (TA) Notes which reflect current practice in the field of motorway communications and control. Design Loop 4. Figure A1.1a shows the Design Loop illustrating the general sequence in the iterative design process which starts with the design for emergency telephones and signals followed by transmission and control office designs. Last in the cycle is the design of the infrastructure that will be required to support all communications equipment and systems. Glossary 5. A Glossary of Terms is given in Chapter A8. Standard Drawings and Specifications 6. Standard MCX and MCY drawings and MCH and TR specifications are issued by the Highways Agency (HA). Figure A1.1a Structure of Volume 9 of the Design Manual for Roads and Bridges A1/1

Part 2 TA 73/97 Annex A (England only) Chapter A2 Siting of Telephones A2. SITING OF TELEPHONES A2.1 Overview 1. This chapter details the siting of Motorway Emergency Telephones on standard dual carriageway motorways 2. The standard for Link Roads and for provision on All Purpose trunk roads will be specified in future Standards and Advice Notes. A2.2 General Between Junctions 1. Motorway telephones are normally installed at 1.5km ±10% intervals on the verge adjacent to the hard shoulders. On 4 or more lane motorways, the spacing is normally reduced to 1km ± 10%. On dual carriageway sections of motorways, telephones are normally provided in pairs opposite each other. This minimises the risk of a stranded motorist seeing only the telephone on the other carriageway and attempting to cross the motorway. 2. To discourage motorists who break down near the start or finish of the motorway from leaving it to obtain assistance, telephones should be provided within the first and last 300m. These telephones are sited first, followed by telephones at junctions. The remaining lengths of motorway are then infilled with telephones at even spacing within the 1.5km ± 10% limit. Junctions and Interchanges 3. At junctions, it is desirable to provide one pair of telephones each side of the junction. They should be sited approximately 300m beyond the slip roads. This position should coincide with a signal. 4. A further pair of telephones should be sited in the centre of the junction to minimise the risk of stranded motorists crossing slip roads to reach a telephone. 5. The arrangement of telephones within interchanges should eliminate the need for stranded motorists to cross slip roads. It is necessary to ensure that any motorist approaching a merge with traffic on his left (or who has just passed a diverge to his left) will be able to see either a telephone or a telephone symbol on a marker post. 6. Telephones should be sited so that it does not appear easier to get to a telephone which is not the safest to reach. Additional Considerations 7. Where hard shoulders have discontinuities telephones should be provided on every continuous stretch of hard shoulder unless otherwise agreed with the Highways Agency (HA). In situations where no hard shoulder exists, lay-bys should be provided at telephone sites. 8. Where telephones are located within the verge, provision should be made for an area of paving as shown on MCX 0143. 9. To achieve maximum visibility, care should be taken to avoid siting telephones near structures (eg, bridge piers), particularly where these are close to the hard shoulder on left hand bends. 10. There are maintenance, safety and other advantages in siting telephones and signals opposite each other. When tentative sites chosen for telephones and signals do not coincide they should be checked and adjusted if practical. 11. Telephones should not be sited at positions where it is dangerous to stop. 12. There are difficulties in installing telephones on viaducts, bridges or elevated sections. It is preferable to avoid these sites where practicable. However, where this is not possible, the mounting of the telephones and the routing of the cables should be provided for when designing the bridge. 13. Where a telephone is provided behind a safety fence, its orientation should be as shown on MCX 0135. 14. Where safety fence is not provided and there is a risk of users falling down a step or slope near a telephone, guard railing should be provided. A2/1

Chapter A2 Siting of Telephones Volume 9 Section 4 Part 2 TA 73/97 Annex A (England only) Recabling/Upgrading 15. Where existing telephones are being replaced, the replacement telephones should be located within 10 metres of the existing site where possible. This will allow the same telephone address to be used and also the existing cable ducts can be re-used without significant changes to cable lengths. Where this is not possible, due either to an omission in the original design or a change in policy since the original design was implemented, justification for a departure from the above standard should be submitted to the HA. A2.3 Safety 1. Marker posts occur at intervals of 100m in the motorway verge. They are marked with an arrow and a telephone symbol showing the direction the stranded motorist should travel to the nearest safe to reach emergency telephone. On all schemes, the location of these symbols should be checked by the Design Agent and renewed if incorrect. 2. The concept of safe to reach should be borne in mind by all designers. The stranded motorist should not be tempted to cross or stray into any carriageway to reach a telephone. A telephone that is sited in the middle of a junction should not be signed as the nearest safe to reach telephone on any marker posts other than those in the middle of that junction. 3. If necessary, extra telephones should be provided to dissuade the stranded motorist from crossing a carriageway or slip road. Fatalities have occurred due to pedestrians on the carriageway trying to find a telephone. A2.4 Problem Areas 1. The HA should be consulted at an early stage on the standards of provision, location, access and design of telephones in the following situations: (i) (ii) (iii) (iv) Link roads Narrow hardshoulders Discontinuous hardshoulders Where concrete barrier is used. A2/2

Part 2 TA 73/97 Annex A (England only) Chapter A3 Telephone Infrastructure A3. TELEPHONE INFRASTRUCTURE A3.1 Civil 1. The installation of Emergency Telephones is detailed on MCX 0143 and 0811. 2. At sites where the motorway is on an embankment a guard rail should be provided for the safety of users. 3. At sites where the motorway is in cutting a retaining wall may need to be constructed around the telephone hardstanding. 4. A preformed plastic chamber is installed adjacent to the telephone post. This chamber contains a Cable Joint Enclosure. In the event of damage to the telephone post the telephone can be disconnected at the CJE allowing the replacement of the post without disturbing the cable network. A3.2 Communications/Electrical 1. The telephone is connected via a quad cable to the local cable joint enclosure (CJE) which is in turn connected to the longitudinal cable. Connection details at the telephone are shown on MCX 0135. 2. A CJE is installed in the chamber adjacent to the telephone post. The purpose of this CJE is to isolate the telephone instrument from the cable network for testing and commissioning, it also allows for the replacement of either the telephone or the local quad cable. A coil of quad cable is housed in this chamber to allow for retermination. 3. Labelling details for Emergency Telephones are shown on MCX 0147. A3/1

Part 2 TA 73/97 Annex A (England only) Chapter A4 Telephone Equipment A4. TELEPHONE EQUIPMENT A4.1 Typical Arrangement 1. Table A4.1a lists the equipment required for an Emergency Telephone. Equipment Type Qty Telephone Housing 611D 1 Telephone Instrument 352 1 Telephone Post 71 1 Lightening and Transient 21A 1 Protection Device (iii) (iv) Where traffic management is in operation and the use of telephones has been deemed unsafe by the Project Manager or by the Police. In this case, either telephones are disabled or additional temporary telephones are provided. In these situations options include having breakdown recovery vehicles which provide a free tow to the end of the road works site, and temporary CCTV. Where damage to cables or other motorway communications equipment causes telephones to be out of service. The responsibility to cover the telephones with the Not in Use bags will normally be with the specialist Regional Maintenance Contractor (RMC) in these circumstances. Table A4.1a 2. The Lightning Protection Device Type 21A is fitted between the connection cable pair and earth. 3. Figure A4.1a shows schematic details for telephones within an NMCS2 installation: (i) (ii) Remote Site - Figure A4.1a (i); Responder Site - Figure A4.1a (ii). A4.3 Breakdown Contractor s Caravan 1. On major schemes where a free tow breakdown recovery service is to be provided, the Project Manager should arrange for a telephone link to be installed between the breakdown contractor s caravan and the police Control Office. This will be undertaken by the RMC as additional works and will be charged to the scheme. A4.2 Telephones Not in Use 1. Telephone Not in Use bags are available as Bulk Purchase items to cover telephones in the following situations: (i) (ii) When telephones have been installed but not commissioned. This is particularly important on upgrading contracts when existing telephones remain working adjacent to the new telephones. Where telephones have been decommissioned, but not replaced by new telephones. A4/1

Chapter A4 Telephone Equipment Volume 9 Section 4 Part 2 TA 73/97 Annex A (England only) Figure A4.1a Schematic diagram for Emergency Telephone Installation A4/2

Part 2 TA 73/97 Annex A (England only) Chapter A5 Telephone System A5. TELEPHONE SYSTEM A5.1 Introduction 1. There are 2 telephone systems currently in operation: 4. Unlike the NMCS1 Responder which connects both signals and telephones, the NMCS2 Phase 3 Responder is a dedicated telephone-only device. (i) (ii) Phase 2 Telephone System; Phase 3 Telephone System. A5.4 Phase 2 to Phase 3 Telephone Conversion A5.2 Phase 2 Telephone System 1. The NMCS1 telephone system is also known as the Phase 2 Telephone System. 2. Phase 2 telephones operate using NMCS1 Responders (Type 700A) via one of two NMCS1 Central Processors (CP). 3. The CP acts like a clearing house within a Control Office Area by searching for telephone addresses and routing calls to that Control Office (CO). The CP forwards calls to the three operational lines in sequence. It can answer up to three calls at a time, if more than three calls are present at any one time the additional calls are handled on an omnibus circuit. This omnibus circuit is also used in an equipment failure mode. 1. Upgrading of motorway communications for NMCS1 to NMCS2 normally involves the concurrent operation of Phase 2 and Phase 3 Telephone Systems. 2. To enable the conversion, NMCS1 Responders (Type 700A) are replaced by NMCS1 Telephone-Only Responders until changeover from Phase 2 to Phase 3 telephone systems, and by 21-bit NMCS2 Transponders to replace existing NMCS1 Responder Signalling capacity. A5.5 Further Information 1. For information on the design of Phase 2 and Phase 3 telephone systems, refer to TA 72: National Motorway Communications Systems. A5.3 Phase 3 Telephone System 1. The NMCS2 telephone system is known as the Phase 3 telephone system. 2. Phase 3 telephones are connected to Telephone Responders which are controlled by Telephone Line Controllers (TLC). 3. Each TLC controls the switching of a telephone circuit allowing the Operator at the CO the speak to particular phones, and to hold and disconnect callers as required. A5/1

Part 2 TA 73/97 Annex A (England only) Chapter A6 Glossary A6. GLOSSARY Bulk Purchase Standard items of motorway communications equipment are purchased by the Highways Agency in quantity. This ensures the equipment conforms to the relevant specifications, is available from several sources and benefits from economies of scale. Cable Joint Enclosure (CJE) Environmentally sealed enclosure housed in underground chambers used to contain cable terminations, and in some cases, loading coils. CJE are available in the following types: Type Use No of Cables to Comments 15 be Accommodated 1 Longitudinal 40 3 x 40 pair Unloaded. pair joint 2 Longitudinal 40 3 x 40 pair As 15-1, with additional pair joint module providing 22 circuits loaded at 22mH. 3 Longitudinal 40 3 x 40 pair As 15-1, with additional pair joint module providing 6 circuits loaded at 88mH. 4 Longitudinal 40 3 x 40 pair As 15-1, with additional pair joint module providing 28 circuits loaded at 22mH. L Local distribution 3 x 40 pair and 6 x quad RSI Rural signal 4 x quad interface HFC High frequency 4 x carrier quad carrier joint F Optical Fibre 3 x 24 fibre Cables Note: Type RSI are housed in Cabinets Type 609 Central Processor (CP) The main computer used in the Computer Centre, used to control, via the Control Offices, the motorway telephone and signals a number of COs. CPs in current use are: CP303 (Ferranti Argus) at Coleshill CP305 (Ferranti Argus) at Westhoughton The CP is the central component in an NMCS1 system. Closed Circuit Television (CCTV) A system using remotely controlled television cameras to monitor traffic patterns at sites susceptible to traffic congestion such as tunnels junctions and interchanges. The images are transmitted from the camera to the Control Office (CO) over the fibre optic cable infrastructure. Control Office (CO) The Control Office (CO) is the location from where the Highways Agency s motorway communications equipment, for the motorways in a given Police Force Area, are controlled. The CO is used by the Police Authority for day-to-day control of motorway traffic. More than thirty Police Authorities are involved in operating the national system, each Police Authority being issued with a code of practice approved by the Association of Chief Police Officers, in order to standardise the use of motorway signals for each region. Longitudinal Cable The 40 pair copper and 24 fibre cables (two separate cables) running parallel to the motorway in the duct network, each pair and fibre is dedicated to a specific purpose. Historically 20 pair NMCS1 and 30 pair NMCS2 cables were direct buried. The 20/30 pair copper cables may be augmented by composite copper/ optical fibre cables dedicated to CCTV or carrier circuits. Motorway Emergency Telephone A telephone provided by the Highways Agency in the verge of motorways and all-purpose roads for use in the event of an incident or vehicle breakdown. Emergency telephones are linked, via the NMCS, to police Control Offices. National Motorway Communications System 1 (NMCS1) A combined signalling and telephone system controlled from Regional and National central processors, installed up to 1988. National Motorway Communications System 2 (NMCS2) A system using locally based distributed processing to control telephones and signals, installed from 1988. A6/1

Chapter A6 Glossary Omnibus Circuit A telecommunications circuit which is available to a group of users at all times. Generally, there is no hierarchy and no one user has control of the circuit. Phase 2 Telephone System The system of telephones installed along motorways as part of the first generation National Motorways Communications System, controlled by the Central Processor for call identification and switching. Volume 9 Section 4 Part 2 TA 73/97 Annex A (England only) Telephone Responder A motorway based mini telephone exchange controlling the connection of telephones with an NMCS2 Control Office. 21-bit Transponder This item of equipment is a derivative of the Standard Transponder (ST), modified to allow communication with an NMCS1 Central Processor, to enable control of NMCS2 signals in a NMCS1 Control Office (CO) Area. Phase 3 Telephone System The system of telephones installed along motorways as part of the second generation National Motorways Communications System (NMCS2). Quad Cable A 4 wire cable in which all the wires are twisted (laid) together, rather than in 2 pairs. This reduces cross pair interference where the pairs are used as the same channel. Regional Maintenance Contractor (RMC) A Contractor responsible for the day to day maintenance of instation and outstation equipment. Also has first line responsibilities for the transmission equipment in their region. Responder An NMCS1 outstation which controls telephones and signals. Telephone Line Controller (TLC) An NMCS2 telephone system instation unit. The TLC links an Operator s Interface to the Inter Panel Link Unit and controls the outstation telephone status and switching on one of a set of parallel circuits serving all, or a selection of, responders within a Control Office Area. Telephone Not in Use bags A plastic covering for placing over motorway emergency telephones which have not been commissioned. The bags carry the legend Not in Use and are secured with a padlock. They are Bulk Purchase items. Telephone Only Responder A device used in conjunction with 21-bit Transponders. It can drive up to 8 Phase 2 telephones from 2 NMCS1 Responder addresses. A6/2

Part 2 TA 73/97 Annex A (England only) Chapter A7 References A7. REFERENCES The 21-bit Transponder translates and interprets messages received from NMCS1 and controls the signal accordingly. The term 21-bit is derived from the NMCS1 21 bit word length. MCX Drawings TA 72: National Motorway Communications Systems (DMRB 9.4.1) A7/1