LAKE OHRID CONSERVATION PROJECT (Case Study on Monitoring &Evaluation)



Similar documents
THE DRIN RIVER BASIN

Water resources management in Republic of Macedonia The new approach

Lake Ohrid. Experience and Lessons Learned Brief. 1. Description of Lake Ohrid and Its Watershed. 1.1 Introduction and Background

HYDROLOGY OF THE TRANSBOUNDARY DRIN RIVER BASIN

Demonstration Site Concept

Green Infrastructure Case Study Template

TURKEY ANATOLIA WATERSHED REHABILITATION PROJECT Sedat Kadioglu Ministry of Environment Abdulmecit Yesil Ministry of Agriculture and Rural Affairs

Climate Change and Sri Lanka. Ajith Silva Director/ Policy and Planning Ministry of Environment and Natural Resources Sri Lanka

Barents Euro Arctic Council. Seventh Meeting of Environment Ministers

Presentation on Water Quality Conservation in Community

International Cooperation in Water Management and Pollution Control in the Danube River Basin. Joachim Bendow ICPDR Executive Secretary

Kristina Veidemane, Baltic Environmental Forum Panevezys,

Water Environmental Management in Cambodia

Eshete Dejen (PhD) Lake Tana and it s environment: Threats for sustainable management

case study 7: south east queensland healthy waterways partnership

Mediterranean-Mare Nostrum Nature and Culture Common Destiny

4 th WORLD WATER FORUM. Risk Management in the Iullemeden Aquifer System. 4th World Water Forum, Mexico 2006

Toxic Municipal Waste Water Treatment

The current institutional and legal context for biodiversity conservation and management is characterised by the following features:

Experience in Wetlands restoration and conservation concerning natural water retention measures. Ministry of Environment and Water, Bulgaria

How To Assess The Vulnerability Of The Neman River To Climate Change

Water Management in Cuba: Problems, Perspectives, Challenges and the Role of the Cuban Academy of Sciences

WATER: ENVIRONMENTAL SCIENCE Syllabus

Water management planning for Naurzum National Nature Reserve, Kazakhstan. Abstract. By Y. A. Bragin

ENVIRONMENTAL SCIENCE CURRICULUM for CLASS IX to X

Finance, Mining & Sustainability. The Gamsberg Zinc Project South Africa

Mu Koh Chang Coral Reef Demonstration Site: Lessons Learned and Challenges

ENVIRONMENTAL IMPACT ASSESSMENT REPORT

The European Union and the Western Balkans. Environment and Natural Resources

INTEGRATED NATIONAL ADAPTATION PILOT República de Colombia INAP

STATE UNIVERSITY OF NEW YORK COLLEGE OF TECHNOLOGY CANTON, NEW YORK COURSE OUTLINE ESCI INTRODUCTION TO ENVIRONMENTAL SCIENCE

Impacts of air pollution on human health, ecosystems and cultural heritage

Broken Arrow Public Schools AP Environmental Science Objectives Revised

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

PRESENTATION 2 MAJOR ENVIRONMENTAL PROBLEMS

WATER MANAGEMENT IN BULGARIA. Atanaska Tuntova Director of East Aegean River Basin Directorate, Bulgaria

Partnership in Environmental Governance. Swedish Environmental Protection Agency

The Philippines WAVES pilot ecosystem accounts

Barents Euro-Arctic Council (BEAC) Working Group on Environment Swedish Chairmanship Work Programme Subgroup for Nature Protection

ARIMNet 2 Call

How To Be Sustainable With Tourism

How To Manage Protected Areas

How To Study Access To Water Supply And Wastewater Service In Gjirokastra

REPUBLIC OF TURKEY MINISTRY OF FORESTRY AND WATER AFFAIRS

How To Manage Water Resources

Natural Resource Management Profile

Establishing large-scale trans-boundaries MPA networks: the OSPAR example in North-East Atlantic

Terms of Reference for Rangeland Management Plan Preparation

BACHELORS DEGREE PROGRAMMES

STATEMENT OF CAPABILITY. Environmental Lab Technician

Developments in Turkey in the Context of Participatory Approach Based on River Basin Management. Nermin ÇİÇEK, Özge Hande SAHTİYANCI

Projects that promote the conservation and/or sustainable use of endemic species. 3

THE NATURAL RESOURCES AND ENVIRONMENT ORDINANCE (CAP LAWS OF SARAWAK, 1958 Ed.)

Amherst County Public Schools. AP Environmental Science Curriculum Pacing Guide. College Board AP Environmental Science Site

CORPORATE POLICY STATEMENT NO. 12 MANAGEMENT OF PEST ANIMALS

The implementation of the European Union Environmental Liability Directive

Supported by the French Fund for Global Environment

Environmental Law Enforcement in Zimbabwe. Farai Michael Nyahwa

Coral Triangle Initiative (CTI) on Coral Reefs, Fisheries and Food Securities

Environmental Engineering Senior Consultant (Austin, TX and South Miami, FL)

Water Quality and Water Usage Surveys

Aquatic Ecosystems Restoration

Appendix A. The Marine Life Protection Act (MLPA)

TOUR DE TABLE CANADA

Chapter 9. Selected Watershed Initiatives in the Great Basin Region

Sihwa Tidal Power Plant: a success of environment and energy policy in Korea

Proposed Terms of Reference for EIA studies

Visitor management strategy

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY

Michigan Wetlands. Department of Environmental Quality

United States-Peru Environmental Cooperation Work Program

Towards sustainable and strategic management of water resources

National Policy on Water Resources Restoration in Thailand

Data Management Model. Potential Component of the Thames River Water Management Plan

EUROPEAN WATER RESOURCES AND POLICY

Plan for the Establishment of ASEM Water Resources Research and Development Center

Ecosystem perspective on ORs & OCTs

How To Get A Degree In Environmental Science

no-entry only research and monitoring activities no-take zones incorporates other non-extractive uses

Human Impacts on the World Ocean

TERMS OF REFERENCE. ASSIGNMENT INFORMATION Position Title:

Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives

PROJECT INFORMATION SHEET DETERGENT PHOSPHATES PRODUCTS AND ACTIVITIES

Observatory monitoring framework indicator data sheet

Urban Waters and River Restoration. Pinja Kasvio, Finnish Environment Institute, SYKE RESTORE North Region Closing Seminar 14.8.

LIFE ORIENTATION DOCUMENT

The Colorado River Delta

How To Manage Water Quality In Korea

Lebanon Hotspot Report: the Garbage Mountain

Transcription:

GLOBAL ENVIRONMENTAL FACILITY World Bank ALBANIAN NATIONAL ENVIRONMENTAL AGENCY MACEDONIAN MINISTRY OF ENVIRONMENT AND TERRITORY PLANNING Dr. Lirim Selfo Project Coordinator, Albania Mr. Dejan Panovski PIU Director, FYROM Some Data on Lake Ohrid LAKE OHRID CONSERVATION PROJECT (Case Study on Monitoring &Evaluation) Location Area Maximum depth South West of Balkan Peninsula 358 km 2 (1/3 belongs to Albanian side and 2/3 to Macedonian side) 289 m

Shoreline Maximum length Maximum width 88 km 30 km 14. 5 km Altitude from the sea level 695 m Watershed area ; originally- 1.042 km 2, actually- 1.487 km 2 Sateska). (starting from 1962, after diversion of River Effective size of watershed is substantially larger including Lake Macro and Micro Prespa watershed because 46% of total inflows in the Lake Ohrid are coming from these lakes. (200 m higher than Ohrid) 40 rivers and torrents draining in the lake Only one surface outflow from Lake Ohrid is River Drini i Zi (Black Drin) with a mean discharge of 22.2 m 3 (72%). 28% by evaporation.

Environmental significance One of the oldest lakes in the world; 2-4 million years old, One of the largest biological reserves in the Europe possessing unique flora and fauna extinct elsewhere, thanks its oligotrophic state, 17 fish species from which 10 are endemic, 5 particular endemic species, restricted to small areas of lake offering special micro ecological systems, Because of its reach history and unique flora and fauna, Lake Ohrid was declared in 1980 a UNESCO World Cultural and Natural Heritage Site Economic Activities Agriculture production (viticulture, fruit trees plantation, livestock) Industrial plants (mining, ore processing, textile, metals, plastics, food ) Tourism

Major Transboundary Threats to the Lake Ohrid lake s water exchange only every 60 years increasing amount of phosphorus discharged in the lake by human activities ( 150 t/y and should be reduced to 100 t/y to conserve oligotrophic state of the lake, only 25 % of urban waste waters are treated before discharging into the lake, non point sources of pollution ( chemicals used in agriculture, erosion ), untreated industrial waste waters, overfishing, overcutting of trees around lake overgrazing by goats and sheep. The Project Total amount 4.392.000 $US, from which; GEF grant 4.100.000 $US ( 1.840.000 $US for Albanian Government and 2.260.000$US for Macedonian Government) Albanian contribution Macedonian contribution 142.000 $US 150.000 $US

Project implementation period: 3 years, starting from March 1999. Responsible agencies: Albanian National Environmental Agency and Macedonian Ministry of Environment and Territory Planning. Project Objective The primary objective of the Project is to develop the basis for the joint management and protection of Lake Ohrid by the Albanian and Macedonian Governments and people of two countries. By establishing a basis for joint management of lake, the Project will promote cost-effective solutions to transboundary natural resources management and pollution problems, and provide basis for the sustainable economic development of the watershed. Project Structure Project Components and achievements during one year and half of its implementation The project consist of 4 components: 1. Institutional Strengthening (351.000 $US).

The objective: strengthening the capacity of public officials at all levels in the Lake Ohrid watershed for effective enforcement country s environmental laws, regulations, standards and policies. The achievements: establishment of joint (Alb.-Mac.) Institutional Strengthening Task Force (ISTF) and organization of meetings Sectorial Working Groups for reviewing the policy, legislation and enforcement and production of respective reports. Agreement of responsible local structures for the enforcement of Law on Fishery and its regulation (labeling and licenses and fishery control). Agreement of the joint ISTF for unification of same articles of regulation on fishery of both countries and submission to respective government for final approval. Preparation of the Report on the Present Environmental Policy Framework and the Related Administrative and Enforcement System (to be completed by October 2000)

2. Monitoring Program (1.900.000 $US from which 946.000 $US for Albania). (Fig. of sampling station in Lake Ohrid) The objective: Establishing a comprehensive bi-national Monitoring Program to inform the public and local officials, and to provide the environmental information necessary for effective and rational planning and decision making. The achievements: Establishing the joint Monitoring Task Force (MTF). Preparation of the Joint Protocol on the methodology of sampling and analyzing. Implementation of Monitoring Program and reporting the results to the public. Construction of measuring profiles to the tributaries of Lake Ohrid. Preparation of Executive Designee for Monitoring Laboratory to be constructed in Pogradec. Preparation of technical specification for equipment to be installed in the Monitoring Lab. Recruitment of technical staff for the Lab. And truing program for them. Base line study on the Lake Ohrid (to be completed by October 2000).

3. The Participatory Watershed Management Approach (1.900.000 $US). The objective: mobilization the groups within the watershed to transform the strategic program developed in the feasibility study into an action plan. The approach involves developing a participatory watershed management committee and using pilot projects to demonstrate cost-effectiveness of measures, and know-how to implement them. The achievement: Preparation and distribution to communities and stakeholders two brochures; on LOCP and Feasibility Study on LOCP Strategic Action Plan (SAP). Meeting with target groups on watershed management for introduction LOCP mainly focused on Participatory Approach and identification of candidates for Water Management Committee (WMC). Training of selected people from local authorities, and communities on institutional and legal aspects of environmental protection, environmental issues in the Lake Ohrid Watershed area. International technical assistance on development of watershed management approach. Establishment of WMC with participation of representatives of main social and economic activities in the watershed including media and local NGOs.

4. Public Awareness and Participation (250.000 USD) The Objective: (I) Increase public awareness on environmental issues related to Lake Ohrid, and (II) Increase community participation in activities to conserve and protect Lake Ohrid and its watershed. The achievements: 30 projects granted and implemented by 16 local NGOs. A NGO Need Assessment survey was carried out by the staff of this component and respective report published in Albanian and English. Four training courses for local NGOs encompasses the topics as NGO management, writing a project-proposal, monitoring evaluation, reporting, communication, facilitation, public participation, etc. The three lingual bulletin of the Project (Albanian, English, Macedonian). Monthly newsletter. Main Products: a considered numbers of activities involving the community, students, citizens, posters, ecoguide of Pogradec region, booklets on the species of the lake, leaflets on environmental issues, TV and broadcast debates, TV spots, cultural activities.

5. Lake Ohrid Management Board. Was established on November 20, 1996 on the base of MOU between Albanian and Macedonian Governments. It is consisted of twelve members, six of each party, convened two times per year. Some of decisions and recommendations: Establishment of joint ISTF and MTF, yearly work plans and respective budgets. Joint statement on the construction of sewage water treatment plant in Pogradec. Fulfillment of planned activities under the Project during the one year and half of its life. Proposal to respective Governments for opening new border pass in the Ohrid Lake region for facilitating the free circulation of people in two sides of the Lake. Adoption of June 21, as Lake Ohrid Day. 6. Monitoring and Evaluation 10

Monitoring and Evaluation is not an ex-post assessment exercise, but an integral part of project design. Monitoring is a critical input to the project components (watershed management, public awareness and institutional strengthening ). Monitoring is the key tool to measure the achievement of project development objectives. Monitor the critical ecological and water quality parameters. Inform public about the health of the lake and threats to it. Provide official with reliable environmental data for planning and decision making. Measure progress made by the project as a whole in achieving its development objectives. 7. Monitoring and Evaluation Indicators PDO: Conserve and protect Lake Ohrid natural resources and biodiversity. Indicators Maintain phosphorous below levels for oligotrophic state. Reduced nutrients (N&P) and microbiological loads (E. Coli) in the tributaries. Maintain key ecological indicators of ecosystem health within safe limits. 11

PDO: Develop effective bi-national cooperation Indicator: Lake Ohrid Management Board is fully functional and empowered to make and/or affect decision concerning wareshed. October 16, 2000 12