Data Management Model. Potential Component of the Thames River Water Management Plan
|
|
|
- Benedict Martin
- 10 years ago
- Views:
Transcription
1 WISKI Water Quality / Quantity Data Management Model Potential Component of the Thames River Water Management Plan
2 Background Goal of the Thames River Water Management Plan: Improve water quality of the Thames River watershed and reduce the river s impact on Lake St. Clair, Detroit River and Lake Erie. - Need to understand nutrient enrichment in the Thames River Watershed through h identification of baseline conditions, trends and gaps.
3 Purpose Compilation of water quality and quantity data identified as a priority by the Water Quality and Quantity working group in Data needs to be: Compiled in a standardized and comprehensive manner Assembled and Maintained in a reliable, secure and flexible web-based database. Managed and shared through greater coordination by partners in the watershed.
4 Kister s / WISKI Industry standard, environmental data management and reporting software. Used by several conservation authorities and agencies in Ontario UTRCA / LTVCA have implemented water quantity data and begun looking at for water quality and ecological data.
5 Proposed Implementation Team formation of members from the watershed using or working with water data. UTRCA lead, using and adding to existing infrastructure (related to Flood Forecasting and Warning) to create central shared repository and tools. Comprehensive project proposed, approximately 1 year duration with 8 components including some optional elements.
6 Project Components 1. Project Initiation Identify all water based groups in watershed to serve on project team. Develop and recruit a dedicated contract position dedicated to work on technical components of data management related to project. Software acquisition iti and setup
7 Project Components 2. Background Data Compilation Develop a water quality data inventory, including meta-data for Thames River Watershed (current and historical) 3. Evaluation of Data Develop a database development strategy that will be used to prioritize what is incorporated into system.
8 Project Components 4. Database Development / Data Import Structure and import data into the system (KiWQM), user training for partner agencies. 5. Data Processing Development of interfaces and security protocols to allow ongoing import and export of data through web interface. Identification and development of analysis routines
9 Project Components 6. Data Maintenance Develop a process for maintaining the database and applications which will allow for ongoing g data transfer from various partner custodians Seek endorsement from Seek endorsement from partners
10 Project Components 7. Data Collection Assessment of data collection methods that could benefit from use of mobile water measurement applications associated with the system Examine the feasibility of community based monitoring network.
11 Project Components 8. Partner Workshop Conduct a workshop to demonstrate the structure and uses of the database and web application / basic training Foster broad participation from those with data.
12 Deliverables Inventory of all surface and groundwater quality data Populated database of surface water quality, groundwater and ecological parameters Interactive website for output and input of data
13 Deliverables Feasibility study of a community-based monitoring network for water quality Development and implementation of collaborative data submission, data management, data protection and data access procedures Training session and workshop
Whisky & Soda vs. WISKI & SODA. Eastern CA Collaborative Sharing WISKI with your Neighbours 1
Whisky & Soda vs. WISKI & SODA Eastern CA Collaborative Sharing WISKI with your Neighbours 1 Eastern CA Collaborative Sharing WISKI With Your Neighbours Christine McClure, Quinte Conservation Gord Mountenay,
Kingdom of Thailand: Strengthening Integrated Water and Flood Management Implementation
Technical Assistance Report Project Number: 46231 Policy and Advisory Technical Assistance (PATA) December 2012 Kingdom of Thailand: Strengthening Integrated Water and Flood Management Implementation (Financed
WATER MANAGEMENT IN BULGARIA. Atanaska Tuntova [email protected] Director of East Aegean River Basin Directorate, Bulgaria
WATER MANAGEMENT IN BULGARIA Atanaska Tuntova [email protected] Director of East Aegean River Basin Directorate, Bulgaria The national water management in Bulgaria has a long history Common state water
City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events
City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events May 29, 2014 Presented by: Berta Krichker M.Eng., FEC, P.Eng. Manager of Stormwater Unit Environmental and Engineering
action plan water for life water for life action plan 1
action plan water for life water for life action plan 1 ISBN 978-0-7785-7672-3 November 2009 2 water for life action plan TABLE OF CONTENTS Introduction 3 Alberta Water Council renewal recommendations
NAPA COUNTY WATERSHED SYMPOSIUM
Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath
MiCorps 101. Presented by Paul Steen. MiCorps Program Manager
MiCorps 101 Presented by Paul Steen MiCorps Program Manager MiCorps Team Laura Kaminski Katherine Hollins Marcy Knoll Wilmes Gary Kolhepp Dina Klemens Paul Steen, Ph.D. Jason Frenzel Scott Brown Jean Roth
REQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS LOWER GREAT MIAMI RIVER NUTRIENT MANAGEMENT PROJECT INTRODUCTION On behalf of a partnership of Water Resource Recovery Facilities (WRRFs) WRRFs and other stakeholders with permitted
TITLE: [Name of municipality] Storm Water Abatement Feasibility Study
TITLE: [Name of municipality] Storm Water Abatement Feasibility Study PROBLEM/NEED: [Name of watershed] is an area of [##] acres, surrounding [name of waterbody]. [Name of waterbody] has been assessed
9.1. Adequacy of Available Data and Monitoring Efforts
9. DATA MANAGEMENT Data management is a crucial aspect of successful implementation of the ARB IRWMP and its component projects. This section discusses the adequacy of available data and monitoring efforts,
CITY OF PACIFIC GROVE PUBLIC WORKS DEPARTMENT
CITY OF PACIFIC GROVE PUBLIC WORKS DEPARTMENT REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES Stormwater LID Infrastructure Plan PROPOSAL SUBMITTAL DEADLINE DATE: March 22, 2016 TIME: 4:00 pm LOCATION:
GRDC. Global Runoff Data Centre. Facilitator between Runoff Data Providers and Data Users
GRDC Global Runoff Data Centre Facilitator between Runoff Data Providers and Data Users Second UN-SPIDER Workshop Disaster Management and Space Technology Bridging the Gap 13 15 October 2008 Bonn, Germany
Problems and Measures Regarding Waste 1 Management and 3R Era of public health improvement Situation subsequent to the Meiji Restoration
Quality Assurance for Hydrometric Network Data as a Basis for Integrated River Basin Management
Quality Assurance for Hydrometric Network Data as a Basis for Integrated River Basin Management FRANK SCHLAEGER 1, MICHAEL NATSCHKE 1 & DANIEL WITHAM 2 1 Kisters AG, Charlottenburger Allee 5, 52068 Aachen,
Water Budgets and Climate Change Guidance, Web Application CC Training and Case Study
Water Budgets and Climate Change Guidance, Web Application CC Training and Case Study OCCIAR and Northern Conservation Authorities March 26-27, 2012 Mike Garraway, MNR Centre of Excellence for Water Quantity
Minnesota Health Insurance Exchange (MNHIX)
Minnesota Health Insurance Exchange (MNHIX) Project Status Report Week Ending: 09-19-2012 Page - 1 Executive Summary The Executive Summary provides an executive level review of general project activities,
Water Conservation, Efficiency and Productivity: Principles, Definitions, Performance Measures and Environmental Indicators
Water Conservation, Efficiency and Productivity: Principles, Definitions, Performance Measures and Environmental Indicators Final Report Prepared by: Water Conservation, Efficiency and Productivity Definitions
Greater Los Angeles County Region
Attachment 6 Greater Los Angeles County Region IRWM Implementation Grant Proposal Monitoring, Assessment, and Attachment 6 consists of the following items: Monitoring, Assessment, and. The purpose of this
Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets
SUPPORTING INFORMATION ASSOCIATED WITH THE ALLOCATION PRIORITIES FOR CLEAN WATER FUND BOARD Table 2: State Agency Recommendations Agency of Agriculture, Food and Markets 1 Agriculture AAFM On-Farm Implementation
Section 19. Basin-wide Mitigation Action Plans
Section 19. Basin-wide Mitigation Action Plans This Mitigation Plan identifies twelve specific hazards that could affect the Basin. Section 20 of this Plan set forth mitigation action plans to be carried
3. The submittal shall include a proposed scope of work to confirm the provided project description;
QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding
Michigan Wetlands. Department of Environmental Quality
Department of Environmental Quality Wetlands are a significant component of Michigan s landscape, covering roughly 5.5 million acres, or 15 percent of the land area of the state. This represents about
City of Calgary KISTERS KISTERS Overview Overview. KISTERS Software Solutions Water, Energy and Environmental Data May 19, 2015
KISTERS Software Solutions Water, Energy and Environmental Data May 19, 2015 Who is KISTERS? Applications Modular Solutions Current Technologies Working with Your Data Discussion Applications Hydrometric
Bolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council. July 8, 2014
Bolton Resource Management Tract Management Plan TRCA Delegation to Town of Caledon Council July 8, 2014 TRCA AUTHORITY MEETING #6/13: THAT the draft Bolton Resource Management Tract Management Plan dated
Environmental Engineering Senior Consultant (Austin, TX and South Miami, FL)
June 12, 2015 Environmental Engineering Senior Consultant (Austin, TX and South Miami, FL) Overview of Clients: The Everglades Foundation (www.evergladesfoundation.org), a non-profit organization dedicated
MUNICIPALITY OF HASTINGS HIGHLANDS STRATEGIC PLANNING QUESTIONNAIRE
MUNICIPALITY OF HASTINGS HIGHLANDS STRATEGIC PLANNING QUESTIONNAIRE Council is in the process of developing a Strategic Plan for the period of 2015-2019 and would like your input. The intent of the Strategic
Data Management Plan. Klamath Inventory and Monitoring Network. Natural Resource Report NPS/KLMN/NRR 2007/012
National Park Service U.S. Department of the Interior Natural Resource Program Center Data Management Plan Klamath Inventory and Monitoring Network Natural Resource Report NPS/KLMN/NRR 2007/012 ON THE
Facility management briefing checklist
Facility management briefing checklist The checklist has been prepared as a complementary document to BS 8536:2010 Facility management briefing. Code of practice. BS 8536 is a standard for facility designers,
Asset Support Contract Model Service Information. Annex 25 Integrated Asset Management
Asset Support Contract Model Annex 25 Integrated Asset Management Page A25-1 SERVICE INFORMATION FOR ASC CONTRACT ANNEX 25 CONTENTS AMENDMENT SHEET Amend. No. Issue Date Amendments Initials Date Page A25-2
ITIL Roles Descriptions
ITIL Roles s Role Process Liaison Incident Analyst Operations Assurance Analyst Infrastructure Solution Architect Problem Manager Problem Owner Change Manager Change Owner CAB Member Release Analyst Test
DESIGN DATABASE MANAGMENT SYSTEM FOR IGAD-HYCOS TERMS OF REFERENCE
WMO IGAD EC Intergovernmental Authority on Development (IGAD) Hydrological Cycle Observing System (HYCOS) Project IGAD-HYCOS DESIGN DATABASE MANAGMENT SYSTEM FOR IGAD-HYCOS 1. Background TERMS OF REFERENCE
Plan for the Establishment of ASEM Water Resources Research and Development Center
2011/05/04 Plan for the Establishment of ASEM Water Resources Research and Development Center I. Background As one of the fundamental natural resources and strategic economic resources, and a key component
INSTALLATION OF AN AUTOMATED EARLY WARNING SYSTEM FOR ANNOTTO BAY
TERMS OF REFERENCE INSTALLATION OF AN AUTOMATED EARLY WARNING SYSTEM FOR ANNOTTO BAY A Community Disaster Risk Reduction Project funded through the Building Disaster Resilient Communities Project (ODPEM)
POSITION STATEMENT ON DIVERSIONS AND BULK REMOVAL OF WATER FROM THE GREAT LAKES BASIN
POSITION STATEMENT ON DIVERSIONS AND BULK REMOVAL OF WATER FROM THE GREAT LAKES BASIN INTRODUCTION The Muskoka Watershed Council has, for the past seven years, researched, evaluated documented, and published
RE: 2014 Asset Management Plan. OBJECTIVE: To present Council with an Asset Management Plan and recommended implementation strategy moving forward.
HALDIMAND COUNTY Report PW-GM-01-2014 of the General Manager of Public Works For Consideration by RE: 2014 Asset Management Plan OBJECTIVE: To present Council with an Asset Management Plan and recommended
Professional environmental sustainability solutions. www.gomesconsulting.com [email protected] +1 (416) 993-7039
Professional environmental sustainability solutions www.gomesconsulting.com [email protected] +1 (416) 993-7039 1 Firm Profile Consulting firm specializing in environmental management issues: Sustainability
Quality assurance for hydrometric network data as a basis for integrated river basin management
Water in Celtic Countries: Quantity, Quality and Climate Variability (Proceedings of the Fourth InterCeltic Colloquium on Hydrology and Management of Water Resources, Guimarães, Portugal, July 2005). IAHS
The 25 Year Saskatchewan Water Security Plan. February 2013
The 25 Year Saskatchewan Water Security Plan February 2013 OUTLINE Challenges The Plan The Agency Implications for Agriculture Water Security Plan Development Consultation in 2011 with 174 individuals
Virginia Commonwealth University Rice Rivers Center Data Management Plan
Virginia Commonwealth University Rice Rivers Center Data Management Plan Table of Contents Objectives... 2 VCU Rice Rivers Center Research Protocol... 2 VCU Rice Rivers Center Data Management Plan... 3
EXPLORING THE CAVERN OF DATA GOVERNANCE
EXPLORING THE CAVERN OF DATA GOVERNANCE AUGUST 2013 Darren Dadley Business Intelligence, Program Director Planning and Information Office SIBI Overview SIBI Program Methodology 2 Definitions: & Governance
Environmental Data Management Programs
Hydrologic Engineering Centre (HEC) Software CD Collection of programs, developed by the U.S. Army Corps of Engineers Environmental Data Management Programs Name: HEC-DSS Package Purpose: Data Storage
Terms of Reference. I. Objective of Assignment
Terms of Reference Project Title: CBC Local Sourcing for Partnerships Project Project Number: CBC/ICF: 101 Date: 11 th November 2015 Deadline for application: 1 st December 2015 Assignment title: National
PROJECT TRACKING and CONTROL
PROJECT TRACKING and CONTROL 1 Outline of Project Tracking & Control 2 Project Planning & Control Context 3 Realistic and Measurable Plans Create Measurable Plans! 4 Data Sources for Project Tracking 5
LAKE OHRID CONSERVATION PROJECT (Case Study on Monitoring &Evaluation)
GLOBAL ENVIRONMENTAL FACILITY World Bank ALBANIAN NATIONAL ENVIRONMENTAL AGENCY MACEDONIAN MINISTRY OF ENVIRONMENT AND TERRITORY PLANNING Dr. Lirim Selfo Project Coordinator, Albania Mr. Dejan Panovski
STATEMENT OF WORK. NETL Cooperative Agreement DE-FC26-02NT41476
STATEMENT OF WORK NETL Cooperative Agreement DE-FC26-02NT41476 Database and Analytical Tool for the Management of Data Derived from U. S. DOE (NETL) Funded Fine Particulate (PM 2.5 ) Research PROJECT SCOPE
The 10 Knowledge Areas & ITTOs
This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading
Report for 2003PA14B: Spruce Creek Watershed Keystone Project
Report for 2003PA14B: Spruce Creek Watershed Keystone Project There are no reported publications resulting from this project. Report Follows Abstract: This proposal seeks support for a graduate assistant
Presentation Program Outline
Presentation Program Outline IRWM Program Background San Diego IRWM Planning 2013 IRWM Update Integrated Flood Management Flood Management Planning Study IRWM Program Background What is IRWM? Collaborative
Research Data Management (RDM) Roadmap August 2012 January 2014
Research Data Management (RDM) Roadmap August 2012 January 2014 Information Services RDM Policy Implementation Committee University of Edinburgh November 2012: Version 1.0 Document Status This is a living
JASPERS Networking Platform
JASPERS Networking Platform Promoting climate change adaptation, risk prevention and management in the Water Sector UK Emergency Warning System Rachel Brisley, Technical Director & Sophie Dusting, Analyst
ICT Project Management
THE UNITED REPUBLIC OF TANZANIA PRESIDENT S OFFICE PUBLIC SERVICE MANAGEMENT ICT Project Management A Step-by-step Guidebook for Managing ICT Projects and Risks Version 1.0 Date Release 04 Jan 2010 Contact
MODULE 5. MODULE 5: Spatial Data Discovery and Access. www.nlwra.gov.au
MODULE 5: Spatial Data Discovery and Access Building capacity to implement natural resources information management systems. www.nlwra.gov.au MODULE 5 Table of Contents Guide for managers...ii Context...ii
MAPPING MINNEAPOLIS URBAN TREE CANOPY. Why is Tree Canopy Important? Project Background. Mapping Minneapolis Urban Tree Canopy.
MAPPING MINNEAPOLIS URBAN TREE CANOPY Why is Tree Canopy Important? Trees are an important component of urban environments. In addition to their aesthetic value, trees have significant economic and environmental
7.0 Stream Restoration
7.0 Stream Restoration 7.1 Issue Statements One of the primary concerns of residents in the Bassett Creek watershed is the maintenance of the natural beauty of the creek in residential and recreational
North Branch Chicago River Watershed-Based Plan
North Branch Chicago River Watershed-Based Plan EXECUTIVE SUMMARY In Lake County, the Lake County Stormwater Management Commission (SMC) is responsible for managing Lake County s water resources. The North
The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004)
The Project Management Knowledge Areas as defined by PMI (PMBOK, 2004) is the processes required to ensure that the various elements of the project are properly coordinated. the processes required to ensure
Network Planning & Optimization. Caltex Designs for Growth
Network Planning & Optimization Caltex Designs for Growth Astrid Tuin Solutions Manager LLamasoft, Inc. Henry Brunekreef Associate Director Logiworx Pty Ltd Who We Are Caltex Australia's leading transport
Executive Summary for deliverable D7.1: Establish specification for data acquisition and standards used including a concept for local interfaces
Electronic Health Records for Clinical Research Executive Summary for deliverable D7.1: Establish specification for data acquisition and standards used including a concept for local interfaces Project
Project Plan (Statement of Work) Data Management Framework PJSM1009
Project Plan (Statement of Work) Data Management Framework PJSM1009 1. DOCUMENT INFORMATION, CONTENT & PURPOSE 1.1 Document Purpose This Statement of Work (SoW) describes the approach to and the management
Summary: Introduction
Summary: Melbourne Water has a range of responsibilities in the Port Phillip and Westernport region, including responsibilities for the protection and restoration of waterways and, in collaboration with
CLINICAL RESEARCH GENERIC TASK DESCRIPTIONS
Purpose Purpose Purpose Primary responsibility for implementation, coordination, evaluation, communication and/or management of research studies. May involve more than one study or multiple sites within
Global Earth Observation Integrated Data Environment (GEO-IDE) Presentation to the Data Archiving and Access Requirements Working Group (DAARWG)
Global Earth Observation Integrated Data Environment (GEO-IDE) Presentation to the Data Archiving and Access Requirements Working Group (DAARWG) Ken McDonald Data Management Integration Architect National
STATEMENT OF CAPABILITY. Environmental Lab Technician
BELIZE MARINE CONSERVATION AND CLIMATE ADAPTATION PROJECT (MCCAP) Grant No: P131408 Ministry of Forestry, Fisheries and Sustainable Development STATEMENT OF CAPABILITY Environmental Lab Technician The
Colorado Department of Health Care Policy and Financing
Colorado Department of Health Care Policy and Financing Solicitation #: HCPFRFPCW14BIDM Business Intelligence and Data Management Services (BIDM) Appendix B BIDM Project Phases Tables The guidelines for
Origins and causes of river basin sediment degradation and available remediation and mitigation options. Feedback from the Riskbase workshop
Origins and causes of river basin sediment degradation and available remediation and mitigation options Feedback from the Riskbase workshop Corinne Merly 1, Olivier Cerdan 1, Laurence Gourcy 1 Emmanuelle
HR Technology Trends By Wilson Ten [email protected]. SandFil International Right Talents, Right Results
HR Technology Trends By Wilson Ten [email protected] TM Right Talents, Right Results What are the new challenges in HR? They Don t Understand We Can Deliver Deloitte's Aligned at the Top study says: "there
SAMPLE CHAPTERS UNESCO EOLSS SURFACE WATER MONITORING. Masanori Ando Musashino University, Japan
SURFACE WATER MONITORING Masanori Ando Musashino University, Japan Keywords: surface water, monitoring, sampling, monitoring program, monitoring location, sampling programs, flow measurement, sampling
Alabama Water Agencies Working Group
Alabama Water Agencies Working Group - - Overview and Update- - The Business of Water Phenix City, AL October 21, 2015 Patrick O Neil, Geological Survey of Alabama Developing a Strategic Plan for National