PAS 1192-3 Specification for information management for the operational phase of assets using building information modelling

Similar documents
PAS :2014. Specification for information management for the operational phase of assets using building information modelling

PAS :2014. Specification for information management for the operational phase of assets using building information modelling

The Asset Information Model using BIM

The Performance Gap. Is there a performance gap and if so is there a solution? Rob Manning. BSc(Hons) CEng FCIBSE. BIS BIM Core Team.

Building the Asset Information Model

BIM: Transitioning the Industry through Education. Adam Matthews Education Lead UK Government BIM Task Group

Legal, Contractual Considerations with BIM 360 Review

2do Congreso Latinoamericano «BIM LATAM 2015» BIM: Estrategia gubernamental de implementación en el Reino Unido y la Comunidad Europea.

Government Soft Landings. Deborah Rowland Head of Property Asset Management Building Services Summit 27 th November 2014

PGN 03/15 Building Information Modelling (BIM)

The Role of the BIM Coordinator

Core Fittings C-Core and CD-Core Fittings

ISO 9001:2015 vs. ISO 9001:2008

Specification for information management for the capital/delivery phase of construction projects using building information modelling

ISO 14001:2004 vs. ISO 14001:2015

Environmental footprinting of products The policy outlook

NBS and the BIM Toolkit. Stefan Mordue, Architect & NBS Business Solutions Consultant RIBA Enterprises

Environmental footprinting of products. The policy outlook

FOOD SAFETY SYSTEM CERTIFICATION FSSC 22000

The contents of OHSAS are listed below, followed by brief notes on each of the main subheadings.

EPRR: BCP - Checklist

CPIx on Line. Pre-Contract Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date:

ISO 14001:2015: Key Changes

A Practical Approach to BIM April 23 rd 2015

Quality Management Standard BS EN ISO 9001:

CPIx on Line. Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Supporting the HMG Construction Strategy.

IAF Mandatory Document

FOOD SAFETY SYSTEM CERTIFICATION FSSC 22000

ISO 9000 Introduction and Support Package: Guidance on the Documentation Requirements of ISO 9001:2008

Company Management System. Business Continuity in SIA

A Review ISO 9001:2015 Draft

Building Information Modelling and collaborative construction

Services Output Specification

AUCKLAND TRANSPORT ASSET MANAGEMENT FRAMEWORK

Government Soft Landings Explained. Deborah Rowland, Government Property Unit Ecobuild 5 th March 2014

Client information note Assessment process Management systems service outline

CQI briefing note. Annex SL

Senate. SEN15-P17 11 March Paper Title: Enhancing Information Governance at Loughborough University

Employer s Information Requirements Version Core Content and Guidance Notes

CE Marking to BS EN

This paper has been provided by Dave Waller and Simone McCarthy (Invest in Oxfordshire Team) who will introduce this item.

Need to optimize your assets? Be proactive with ISO

CCSAPAB2 Develop and agree objectives for archaeological projects

What changes will ISO 9001:2015 bring?

For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems

INTRODUCTION TO ISO 9001 REVISION - COMMITTEE DRAFT

Information Governance Policy A council-wide information management policy. Version 1.0 June 2013

Building the Single Market for Green Products. Dr. Michele Galatola Product team leader DG Environment Sustainable Production and Consumption Unit

How to gain and maintain ISO certification

The role will require the management of consultancy and in-house teams in the successful execution of the estates strategy.

JOB DESCRIPTION Facilities Manager Soft Services. RESPONSIBLE FOR: Team Leaders and Contract Support staff

Version No: 2 Date: 27 July Data Quality Policy. Assistant Chief Executive. Planning & Performance. Data Quality Policy

RIBA Plan of Work 2013: Consultation document. You are invited to complete the online questionnaire by 12 August 2012.

BOARD MEETING. The Reporting and Monitoring of Safety and Quality Care Quality Commission Regulation 19 (Outcome 17) Complaints

COLLABORATING THROUGH STANDARDS

13 ENVIRONMENTAL AND SOCIAL MANAGEMENT SYSTEM

Implementation of ANSI/AAMI/IEC Medical Device Software Lifecycle Processes.

Navigating ISO 9001:2015

IAM Endorsed Training

BIM Strategy for NHSScotland

How To Manage Assets

This is Document Schedule 5 Part 1 referred to in this Contract SCOTTISH MINISTERS REQUIREMENTS SCHEDULE 5 PART 1 QUALITY MANAGEMENT SYSTEM

Management of Physical Assets

From COBie to Asset Management

Making Sense of Climate Change - for businesses and consumers: measuring greenhouse gas emissions ( carbon footprint )

BIM FOR FACILITIES MANAGEMENT: EVALUATING BIM STANDARDS IN ASSET REGISTER CREATION AND SERVICE LIFE PLANNING

Building Information Modelling

Environmental Management Systems. A brief introduction to the nature and benefits of ISO14001:2015

IRIS International Railway Industry Standard

quality, health & safety and environment training and consulting

Enterprise Architecture Governance Procedure

ITIL and ISO/IEC How ITIL can be used to support the delivery of compliant practices for Information Security Management Systems

Quality Agreement Template

ISO 55001:2014 Asset Management System 5-Day Training Course (IAM Certified)

How To Use Concerto.Com

Standards for management of technical risks and their applications

NHS Derby City and NHS Derbyshire County. Overview of handover and closedown process

WRITTEN STATEMENT OF SERVICE /TERMS AND CONDITIONS OF SERVICE

Information retention and disposal guide. Date: 31 October 2014 Version: 2.0

Subject Area 1 Project Initiation and Management

EDUCATION PPP PROJECTS Pre-FINANCIAL CLOSE KEY STAGE REVIEW SCOTTISH EXECUTIVE FINANCIAL PARTNERSHIPS UNIT

ASSET INFORMATION REQUIREMENTS

Updated SIT1 functionality (annex to SIT Approach Document) request for SEC Panel approval

Australian Transport Council. National Standard for the Administration of Marine Safety SECTION 4 SURVEYS OF VESSELS

Self Assessment Risk Management Toolkit Summary

Managing BIM as an Asset for Building Owners/Operators

FAQs about PAS , A Specification for securityminded building information modelling, digital built environments and smart asset management

Certification criteria for. Internal QMS Auditor Training Course

APPENDIX 50. Enterprise risk management - Risk management overview

How to Upgrade SPICE-Compliant Processes for Functional Safety

FSSC Certification scheme for food safety systems in compliance with ISO 22000: 2005 and technical specifications for sector PRPs PART II

How To Manage Risk In Ancient Health Trust

Asset Management and Maintenance Audits

IMAS First Edition 01 September 2012 Amendment 1, May 2013

Roles & Grades Rate Cards and Applicable SFIA Skills

CONSOLIDATED VERSION IEC Medical device software Software life cycle processes. colour inside. Edition

Procurement Strategy for Business Critical software contract

Asset Support Contract Model Service Information. Annex 25 Integrated Asset Management

Transcription:

PAS 1192-3 Specification for information management for the operational phase of assets using building information modelling David Churcher - Hitherwood Consulting John Sands - BSRIA 1

PAS 1192-3 Overview of BIM Level 2 Scope of the project PAS 1192-3 Contents of the PAS 2

Overview of BIM Level 2 The seven pillars of (BIM) wisdom PAS 1192-2 PAS 1192-3 BS 1192-4 (due for release Summer 2014) BIM Protocol GSL (Government Soft Landings) Digital Plan of Work due for release March 2015 Classification due for release March 2015 3

Relationship of PAS 1192-2 and PAS 1192-3 4

Essential components to develop the models Requirements Models PAS 1192-3 Asset PAS 1192-2 Project 5

Scope of the project Project brief Detailed technical brief from CIC on behalf of the BIM Task Group Relationship to PAS 1192-2 Length of the PAS Timescale Kick-off meeting: 11 th July 2013 Completion: 7 th February 2014 Publication originally scheduled: 7 th March 2014 Process Individual consultation Steering group Public consultation 6

PAS 1192-3 PAS publicly available specification What has to be achieved, not how to achieve it Normative and informative text - shall and should Limited shelf life 7

Contents 0 Introduction 1 Scope 2 Normative references 3 Terms, definitions and acronyms 4 Asset information management process 5 CDE and AIM 6 Roles and responsibilities 7 Information exchange Annexes List of figures List of tables 8

Clause 0 Introduction Background and context A Level 2 document, so assumes a certain level of knowledge Substantive issues, e.g. Why we have focused on the word asset Overarching requirements to be considered Roles and responsibilities Processes, procedures and activities Risks related to organizational decision making Exchange of information with stakeholders 9

Clause 1 Scope Exception to the scope Data content of an asset information model Being at BIM Level 2 relies on the PAS Applying the PAS does not necessarily mean the organization is at BIM Level 2 10

Clause 2 Normative references Only 2 normative references Normative = the requirements Informative = recommendations and explanatory notes 11

Clause 3 Terms and definitions Builds on the terms defined in PAS 1192-2 Some terms have been refined 12

Clause 4 Asset information management process Organizational information requirements (OIR) Asset information requirements (AIR) Asset information model (AIM) The AIR is not the EIR 13

Organizational information requirements (OIR) 14

Asset information requirements (AIR) 15

Asset information model (AIM) 16

Exchange of data and information with the AIM 17

The AIR is not the EIR 18

Clause 5 CDE and AIM The original CDE from BS 1192:2007 AIM : Governance reporting Triggers The complete asset information management process Asset information flow 19

Governance: Project Information Model CDE Modified from BS1192:2007 20

Asset Information Model: Governance Reporting Level 2 Files Validated & Verified with RAG Reporting before publishing as Files and Data 21

Triggers Receiving information during major works project Deciding to manage asset information according to the PAS Evaluating performance of an asset Planned or reactive maintenance work Minor works (repairs, component replacements) End-of-life works (decommissioning, mothballing) Change in regulations relating to the asset Change in organizational requirements for the asset Change in owner, operator or maintainer 22

The complete asset information process 23

Asset information flow PAS 55/ISO 55000 Standards Compliant Defined Organisational Information Requirements Integrated Information Reporting Project Supply Information Enterprise System Integration Service Supply Information Asset Information Model (AIM) 24

Clause 6 Roles and responsibilities Data manager ISO/TS 8000-150 Asset information manager Defined in PAS 1192-2 25

Clause 7 Information exchange To reflect the AIR To suit the organisation s needs To suit the organisation s processes 26

Thank you for listening david.churcher@hitherwood.co.uk john.sands@bsria.co.uk www.bsria.co.uk 27