Lower Dungeness River Estuarine & Floodplain Restoration



Similar documents
Background Information: The Mamquam River Floodplain Restoration Project

How To Manage Water Resources In The Yakima Basin

ESRI_UC_2015_No843_Integrating Flood Risk Management and Salmon Habitat Restoration_CampbellSW

SKAGIT COUNTY HABITAT IMPROVEMENT PLAN

Dungeness River Comprehensive Flood Hazard Management Plan 2009

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

AN INITIATIVE TO IMPROVE

Angora Fire Restoration Activities June 24, Presented by: Judy Clot Forest Health Enhancement Program

THE DUNGENESS WATER EXCHANGE. Washington Water Trust March 13, 2013 Sequim Realtors

Streambank stabilization, streambank fencing, nuisance species control, riparian zone management

DRAFT SOUTH FORK SKYKOMISH RIVER

Napa River Restoration Projects

The Dungeness Water Exchange Mitigation Guidance Document. April 2013

Gold Ray Dam Interagency Technical Team Meeting

Chum Salmon recovery in Oregon tributaries to the lower Columbia River. Kris Homel Chum Reintroduction Coordinator

COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N

Appendix C. Project Opportunities. Middle Twisp River (RM )

INNOVATION IN FLOW RESTORATION AND WATER BANKING CASE STUDY: DUNGENESS WATER EXCHANGE

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

Arapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape

OVERVIEW MIDDLE CREEK FLOOD DAMAGE REDUCTION AND ECOSYSTEM RESTORATION PROJECT October 3, 2012 INTRODUCTION

The Teton Creek Restoration Project Summary:

CHAD R. GOURLEY SPECIALTY EMPLOYMENT

King Fire Restoration Project, Eldorado National Forest, Placer and El Dorado Counties, Notice of intent to prepare an environmental impact statement.

Habitat Opportunities in the Duwamish Transition Zone

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Floodplain Connectivity in Restoration Design

Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report. Department of Ecology Grant No. G

NPS Burned Area Emergency Response (BAER) and Burned Area Rehabilitation (BAR) in the Southern California Landscape

Cedar River Side Channel PL84-99 Replacement Project

Stream Restoration Account of Flood and Drought Response Fund Grant Program Guidance May 2014

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

ANGORA FIRE RESTORATION PROJECT

San Juan County / WRIA2 Lead Entity Program for Salmon Recovery

Flood Risk Management

Flood Risk Management

Restoration Planning and Development of a Restoration Bank

Prepared By: Tom Parker Geum Environmental Consulting, Inc.

Post-Flood Assessment

U.S. Fish and Wildlife Service will invest $15 million for post-sandy cleanup and marsh restoration on Long Island

Section 4 General Strategies and Tools

121 FERC 62,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Public Utility District No. 1 of Project No Chelan County

Subsidence Mitigation Through Rice Cultivation Research Project Goals:

COWLITZ 2016 ANNUAL PROJECT REVIEW MEETING. Centralia College, Walton Science Center May 19, p.m.

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

UTILITIZATION OF ECOHYDROLOGIC MODELS IN FLOODPLAIN FISH PASSAGE AND HABITAT RESTORATION EVALUATION

PROJECT INFORMATION REPORT REHABILITATION OF FLOOD CONTROL WORKS ROCK CREEK LEVEE NAC Table of Contents

King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction

Addendum D. Nomination of Moody Wash ACEC

Habitat rehabilitation for inland fisheries

Assessing Rivers for Restoration Purposes. Ann L. Riley Waterways Restoration Institute

4.2 Buena Vista Creek Watershed

Watershed Program: A Little Known but Powerful Solution for Integrated Estuarine Restoration

ALTERNATIVE SOURCES OF FUNDING FOR

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

How To Plan A Flood Control Project In The Skagit River Basin

NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT

Steelhead Recovery in San Juan and Trabuco Creeks Watershed

Coastal Monitoring Program for Salmon and Steelhead

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum

GLOSSARY OF TERMS CHAPTER 11 WORD DEFINITION SOURCE. Leopold

HCP Team Meeting. November 18, icfi.com

Tracking Progress in Restoring the Willamette River Floodplain

Cheakamus River October 2003 Flood Restoration Project (04.Ch.03)

30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT

Transcription:

PARTNERS: Clallam County; Jamestown S Klallam Tribe; WA Department of Fish & Wildlife; US Army Corps of Engineers; US Fish & Wildlife Service; WA Department of Transportation; WA Department of Ecology; North Olympic Lead Entity for Salmon; North Olympic Land Trust; PCC Farmland Trust; Local Businesses & Property Owners Lower Dungeness River Estuarine & Floodplain Restoration Wednesday April 8, 2015

Dungeness dikes

Why restore estuary and lower channel? ISSUES: Increased flood hazard risk. Increased riverbed load instability and riverbed rise. Loss of primary spawning habitat. ESA Listed fish: Chinook, summer chum, bulltrout. Lost tidal prism - sediment fills in the bay. Impaired water quality. Chronic shellfish closures. Loss of critical habitat on Pacific flyway.

Side channels

Side channel/dike comparison

Greater Access to the Floodplain: Increases the bed stability by decreasing channel velocities Provides additional sediment storage outside the main channel (improves water quality) Allows for stable meander developments Black cottonwood and western red cedar will be available to recruit into the river Provides connection to over 200 combined acres of floodplain (Rivers End/Towne Roads)

Research and Studies Historical Estuary and Lower River Reconstruction (Collins et al, in process) D.R. Comprehensive Flood Control Management Plan (Clallam County, 1990) Recommended Restoration Projects for the D.R. (D.R. Management Team, 1997) Salmon Life History Studies (Jamestown S Klallam Tribe, 1998 & 2003) Physical Processes, Human Impacts, and Restoration Issues of the Lower D.R. (Bureau of Reclamation, 2002) Dungeness Bay circulation studies (Rensel, 2003) Riparian Land Protection Strategy (D. R. Restoration Work Group, 2003) Numerical Modeling Study of Levee Setback Alternatives for Lower D.R., WA (Bureau of Reclamation 2007) Dungeness River Comprehensive Flood Hazard Management Plan (Clallam County, 2009) Dungeness River Channel Design Project (Jamestown S Klallam Tribe, 2013) Draft Integrated Project Report &Environmental Assessment (Army Corps of Engineers, 2015)

Restoration Recommended Reestablish functional channel and floodplain in the lower 2.6 miles through levee management and constriction abatement. Recommended Restoration Projects for the Dungeness River, RRWG, adopted by the DRMT in 1998 Recommended Restoration Projects for the Dungeness River, 1997. Salmon & Steelhead Habitat Limiting Factors Analysis, 1999. Summer Chum Initiative, April 2000. Chinook Salmon Recovery Plan, 2001. Elwha-Dungeness Watershed Plan (WRIA 18 ), May 2005. Puget Sound Salmon Recovery Plan, 2007. No. Olympic Peninsula Lead Entity Three Year Work Plan, 2008. Dungeness River Comprehensive Flood Hazard Management Plan, 2009. Dungeness River Management Team s restoration priority.

Community Benefits: Decreased flood hazards Lower community flood insurance premiums Improved water quality will benefit shellfish closure areas

Benefits to Salmon fall chinook, coho, pink, summer chum, steelhead, bull trout, cutthroat trout Greater stability in mainstem spawning habitat (chinook, chum, lower river pink) Reduced velocities, increases habitat for rearing/migration (chinook, chum, coho, pink, steelhead, and bull trout) Side channels/meanders developed, increases habitat for rearing and migration (chinook, chum, coho, pink, steelhead, and bull trout) Large woody debris available, increased habitat for rearing and migration (chinook, chum, coho, pink, steelhead, and bull trout)

Restored Estuary & Floodplain Benefits All Species with Special Status: Dungeness Pink Salmon Puget Sound Chinook Summer Chum Salmon Bull Trout Harlequin Duck Peregrine Falcon Pileated Woodpecker Olive-sided Flycatcher Great Blue Heron Willow Flycatcher Vaux s Swift Hooded Merganser Bald Eagle Band-tailed Pigeon Merlin Red-legged Frog

Estuarine and River Restoration: A Series of Phased Projects The Lower Dungeness River Estuarine and Floodplain Restoration Project work consists of several phases and many interrelated projects.

First Phase Rivers End River s End properties

River s End Road, January 2002

Restoration Benefits Affordable Housing Housing Authority of Clallam Co. Utilized 4 Rivers End Houses in Spring 2007. 152 292 404 512

Restoration & Reuse & Revegetation

Reconnection

Marsh Connection Increases Fish Habitat Dungeness River Mouth

Second Phase Middle Army Corp Levee Floodplain Restoration

Problem Increased channel confinementcause streambed level rise (aggradation); Increased bedload instabilitycause water quality impacts (WDOH Shellfish Closure Areas); Increased flood risk 2007 ACOE Levee, RM 1

2133 Towne Road Before Surplus Structures. Reuse Materials. Salvage Materials. Decommission Well, Septic. After

2747 Towne Road Before Surplus Structures. Reuse Materials. Salvage Materials. Decommission Well, Septic. House on the move After

2753 Towne Road Before Reuse Shop. Demolition House. Decommission Well, Septic. After

2755 & 2131 Towne Road Pending Removal: MOA between USACE and partnering agencies to deconstruct buildings upon historic significance documentation.

Towne Road Restoration Contracted Clallam Co. Chain Gang and WDNR Work Crews.

Towne Road Restoration Removed Fence along levee and between partner properties, per USACE requirements. Before Before After

Towne Road Restoration Removal of non-native plant species/noxious weeds: Himalayan Blackberry, Canada Thistle, English Ivy, Poisonous Hemlock, Ornamental Bamboo, by work crews.

Towne Road Restoration Improved Fence across former driveways to deter motorized traffic use.

Towne Road Restoration Extensive reforestation and replanting work on WDFW & County properties.

Lower Dungeness River Restoration Footprint

Where are we now? Purchase parcels from willing sellers (complete) Write Environmental Assessment (draft issued by Army Corps of Engineers) Gather Input to Reconfigure Towne Road (underway) Design and Construct New Levee (next steps)

Lower Dungeness Restoration Project Schedule We were here We are here We will soon be here Then we will be here Preparation 2002-2014 Preliminary Design 2015 Design 2015-2016 Construction 2017 Properties purchased Army Corps of Engineers study released County-Corps Agreement Spring/summer Request for Proposal Process Structures decommissioned Towne Road considered BOCC issues Request for Proposal for design Spring/summer Floodplain reforested Preliminary designs considered Design firm hired Summer Construction Design begins Late summer/fall

Back to the Future Thank you.