Streambank stabilization, streambank fencing, nuisance species control, riparian zone management

Size: px
Start display at page:

Download "Streambank stabilization, streambank fencing, nuisance species control, riparian zone management"

Transcription

1 Streambank stabilization, streambank fencing, nuisance species control, riparian zone management Stream Restoration Cost Estimates BRIAN BAIR USDA Forest Service Gifford-Pinchot National Forest 1262 Hemlock Road Carson, WA Session Three ABSTRACT The Wind River watershed in Washington State poses restoration challenges characteristic of Pacific Northwest watersheds, and is used here to exemplify the difficulties in estimating restoration costs on both small and large scales. This paper emphasizes the major influences on the cost of restoring the Wind River drainage, and the factors that can wreak havoc on cost estimation. Also discussed are the roles played by watershed analysis and stream surveys. INTRODUCTION The Wind River Watershed is located on the west slope of the Cascade Mountains in the Gifford Pinchot National Forest, Southwestern Washington State. The watershed contains 150,000 acres and drains into the Columbia River at river mile 155, approximately 10 miles upstream of Bonneville Dam (Figure 1). The Wind River ecosystem is a typical west-slope Cascade environment, with average annual precipitation ranges from less than 60 per year in the southeast portion of the watershed to over 120 per year in the west and northwest. Approximately 75% of the annual precipitation falls between November and March. Because the watershed lies in the western Cascades at elevations ranging from less than 100 feet to nearly 4,000 feet, both rain and snow are common during the winter months (Coffin 2001). The predominant land management activity within the Wind River watershed has been timber harvest. Timber harvest within the basin began in the late 1800 s. Splash dams were constructed on the main stem Wind River and tributaries to stockpile and transport logs down stream to the mills along the Columbia River. Riparian areas were targeted for harvest due to the large quantities of old growth timber and access to the stream (Figure 2). The U.S. Forest Service (USFS) manages 89% of the land within the Wind River watershed. The Northwest Forest Plan Record of Decision categorizes the Wind River Basin as a Tier 1 Key Watershed that provides critical habitat for anadromous salmonids. Federal management will largely determine the quality of habitat in the Wind River watershed. 104

2 Figure 1. Wind River watershed, Skamania County, Washington Figure U.S. Department of War aerial photograph of the Upper Wind River (river mile 20 25), Skamania County, Washington Most populations of salmonids that historically occupied the Wind River watershed are considered depressed (WDF et al. 1993). Shipherd Falls, which is 4.3 miles upstream from the historic mouth of the Wind River, was a natural barrier to all anadromous fish except steelhead (Bryant 1949); summer steelhead were dominant and numerous above this barrier. The U.S. Fish and Wildlife Service (USFWS et al. 1951) estimated the summer steelhead run size was 3,250 with an escapement of 2,500 spawning adults. The current number of wild summer steelhead spawning in the Wind River has been reduced to approximately 200 adults in recent years (Rawding 1997). In addition, a fall race of chinook that dominated the lower reach of the Wind River is depressed and composed of a substantial number of stray hatchery fish (WDF et al. 1993). Anadromous fish losses have been attributed to adverse ocean conditions, the construction of Bonneville Dam, timber harvest, and rural development of the upper watershed (WDW et al. 1990). These activities in the upper watershed have severely impacted riparian areas and stream channels in several key steelhead sub watersheds. Poor upland, riparian, channel conditions cumulatively produce maximum water temperatures exceeding 24 C (75 F), risk of increased peak flows and increased sedimentation (USFS 1996). Estimating Costs Deciding where to spend allocated money to restore a watershed is critical. Stream surveys, sub-basin assessments and watershed analysis were used to evaluate limiting factors in the Wind River. Fish habitat and water quality have been negatively impacted by past riparian timber harvest, stream clean-outs, road building and regeneration harvest within the rain-on-snow zone. Alluvial reaches within the main-stem Wind River and tributaries, which contain the majority of steelhead spawning habitat, have been significantly impacted. Many of these reaches were disturbed over 80 years ago, yet habitat and water quality have not recovered and in some cases are getting worse. In the Wind River, the USFS has taken a watershed approach to restoration. In 1992, the Wind River watershed was assessed and the USFS, USFWS and Underwood Conservation District (UCD) initiated cooperative habitat restoration projects in The Wind River Restoration Team (WRRT) was formed in 1994 in response to the decline of steelhead within the Wind River basin. The team includes technical specialists from the UCD, USFWS, Washington 105

3 Department of Fish and Wildlife (WDFW), U.S. Geological Survey (USGS), Washington Trout and the Yakama Nation. Acknowledging that watershed-scale restoration can only be successful if all stakeholders are involved, the UCD, in cooperation with Skamania County and the WRRT, facilitated the development of the Wind River Watershed Council in The group is comprised of representatives of landowners, businesses, logging companies, government agencies, conservation groups, schools, and others. The restoration projects completed to date are products of stream surveys ( ), a sub-basin assessment (1992) and watershed analysis (1996 and 2001) conducted by the USFS. Projects on private lands are products of stream surveys conducted by UCD and USFWS. The goals of these projects are to accelerate the recovery of water quality and fish habitat in which wild Wind River steelhead evolved. These goals will be achieved by utilizing a holistic, community-based watershed restoration approaches on both public and private lands. Past restoration efforts within the watershed have addressed degraded streams, riparian areas, and hill-slopes. An adaptive management strategy has permitted partners to build upon past successes in restoring degraded water quality and habitat within the Wind River sub-basin. On-going collection and analysis of biological, physical habitat, and water quality data will fill information gaps on private and public lands. This information is necessary to assess watershed processes and success of past restoration efforts and to identify future restoration needs. Coordination and education of land owners, the community, and other stakeholders is an important part of achieving restoration goals and preserving wild steelhead within the watershed. The goals of restoration efforts in the Wind River have been to accelerate the recovery of riparian, in-stream habitat and water quality in which the steelhead evolved. The objectives to accomplish these goals are: reduce road densities, reforest, and rehabilitate riparian areas, flood plains, and stream channels. The USFS, USFWS, Bonneville Power Administration and UCD have made significant progress in restoring hydraulic processes and rehabilitation of critical habitat. Since 1992, approximately 100 miles of road have been stabilized or storm-proofed, 35 miles have been decommissioned, 120 acres of flood plain have been reclaimed, 300 riparian acres have been planted and 3,000 pieces of large woody debris (LWD) have been placed back in 8 river miles of stream. In addition, the USFWS and UCD have initiated restoration on private lands with the implementation of two demonstration projects. One is a reforestation project along Martha Creek near Stabler, and the other is a riparian and channel rehabilitation project on the Wind River. Funding was recently secured to conduct additional projects in the privately owned portion of the watershed. These activities will assist landowners with riparian and channel restoration, slope stabilization and erosion control. Stream Restoration Cost For the purposes of this presentation, three types of restoration projects will be discussed: stream bank stabilization, channel rehabilitation and riparian reforestation. The majority of stream bank stabilization projects within the Wind River consist of constructing large woody debris revetments; log cribs, bank barbs and groins. Several projects have included rock groins or bank barbs and are included in cost estimates. Stream channel rehabilitation consists of a myriad of activities ranging from total channel reconstruction to reconstructing log jams that serve as channel slope grade controls to maintain or restore flood plain 106

4 connectivity. Riparian reforestation activities include planting conifers, hard woods and shrubs with conventional hand crews to transplanting whole trees and shrubs with heavy equipment. Costs for bank stabilization on public lands within the Wind River range from approximately $46,000 to $222,000 per river mile. For channel rehabilitation, the USFS cost range from $41,000 to $137,000 per river mile with a mean of $86,000 per river mile. Riparian reforestation cost range from approximately $4,000 to almost $8,000 per mile, and with and average of $5,000 a river mile, or $110 per acre. Major Factors Affecting Cost Estimation Scope, treatment intensity and stream size: Large projects tend to have lower cost per river mile. Planning, design, National Environmental Policy Act (NEPA) requirements, equipment mobilization cost on small bank stabilization projects (< 3,000 ) can exceed implementation cost, which quickly drive up the cost per river mile. Large scale projects (1 9 river miles) absorb or significantly reduce the implementation to fixed cost ratio and are more efficient. Treatment intensity varies from site to site. Again using bank stabilization as an example, 200 of bank may be treated with a single log jam/bank barb, while another site with 200 of unstable bank may take a series of barbs and floodplain contouring to stabilize the site. The size of the stream can make a significant difference in the cost. Typically, planning, design, regulatory coordination and treatment intensity radically increase with stream size and are inversely proportional to stream order. Access: Access to the project site usually dictates the equipment type and labor intensity. In some areas where material such as large woody debris could not be hauled directly to a site, helicopters are typically used. Cost for heavy helicopters can cost upward of $8,000 an hour. Material availability: Although the USFS manages almost 90% of the watershed and the timber contained within it, obtaining the quantity and quality of large wood can be a challenge. Trees that are cut to put in the river are no different than those being cut to send to the mill; the same regulations apply to both. Type of contract: The type of contract can greatly influence the project cost. Hourly equipment rental (with operator) contracts are the cheapest; however the liability associated with the work greatly increases as well as the time and personnel it takes to direct the on the ground work. Construction contracts can cost up to 50% more than equipment rental contracts; however, the contractor assumes the responsibility. Time: The amount of time to complete the project is affected by all of the factors mentioned above. In addition, the permitting process (hydraulic permits, NEPA, endangered species consultation) can be very time consuming. For example, conducting the appropriate level of NEPA may take a year or more, especially if endangered species or significant cultural resources are involved. Figure 3 provides an example of common access and material availability issues. This is Wind River at river mile 24, where work on three river miles of stream has been completed this year. Riparian areas were thinned and then hauled or yarded directly into the river. Approximately 2,000 trees were then used to install grade controls, construct logjams, and reconstruct meanders at a cost of $65,000 a river mile. Figure 4 shows a project that took place in an area that was experiencing channel 107

5 Figure 3. The Mining Reach riparian and stream channel restoration project, Skamania County, Washington Figure 4. Trout Creek restoration, Wind River watershed, Skamania County, Washington down-cutting. The damage was the result of three historical actions. First, all of the timber alongside the creek was cut, and then the upper watershed was logged. The cumulative effects of these actions decreased bank stability and are thought to have increased peak flows. Finally, the proverbial straw that broke the camel s back logjams that were thought to be migration barriers to steelhead were removed, which resulted in downcutting or incision and subsequent lateral migration of the stream channel. The project area contained very young stands of trees; therefore there was little onsite material available for construction. Trees were salvaged from a wind blown stand of trees 20 miles away, stockpiled nearby and then a helicopter was used to fly the trees to the project site. The difficulties involved in importing the trees to the site almost tripled the cost per river mile compared to the previous example. Restoration cost for rehabilitation of this project ranged between $140,000 and $150,000 per river mile. Refining Cost Estimates Table 1 shows a range of cost for restoration. For planning, design, and NEPA, costs range from $21,000 to $110,000 per river mile. The mean is about $70,000 for the planning phase. Material acquisition and material transportation to project sites can become one of the most expensive components of stream restoration. Trees and LWD have been primarily used for restoration in the Wind River. Boulders and rock have also been used in certain circumstances. Obviously projects with ample on-site material cost significantly less than projects that involve extensive haul distances or helicopter transport. For material transport equipment, the use of a helicopter greatly increases the cost, to at least $64,000 per river mile and often as much as $150,000 per river mile. If material can be ground transported to the site, the cost can drop down to as low as $17,000 a river mile. These costs do not reflect the cost of trees. If purchasing trees is necessary, the material costs may exceed $145,000/ river mile. Labor costs are typically access-driven. Depending on the site, labor cost can range from $17,000 per mile if access is limited or drop to $112 per river mile if access to sites is not restricted. Riparian planting and thinning is typically the most labor intensive 108

6 Table 1. Typical restoration costs ItemHigh end Low end Reasonable mean (cost/river mile) (cost/river mile) (cost/river mile) Plan, design & NEPA $110,040 $21,833 $68,880 Materials (trees) $64,900 $14,747 $20,566 Mobilization $8,200 $1,333 $2,777 Equipment $122,000 $17,333 $20,800 Labor $17,167 $112 $5,000 Riparian planting/ $7,646 $3,893 $5,512 maintenance Instream structure $24,640 $4,760 $5,600 maintenance Total $354,593 $64,011 $129,135 aspect of stream restoration. Riparian planting, which is arguably always needed in conjunction with streambank stabilization, runs $4,000 to $7,000 per river mile. Maintenance of riparian and in-stream improvements are important. Monitoring of plant survival and growth plots in riparian areas along the Wind River and tributaries have shown that mortality of newly planted trees can approach 60%. Vegetation management is needed to control the competing vegetation and browse from ungulates. Streams are dynamic and some level of maintenance of in-stream structures must also be maintained. Unfortunately, it is rare for most projects to receive sufficient funding for adequate monitoring or maintenance. Another issue that can greatly affect the cost of the project is whether the equipment is rented hourly or included in a construction contract. A typical hourly equipment rental contract may include the hiring of a timber faller, a tracked excavator, and bulldozer with operators. The work is directed by the designer. In contrast to hourly equipment rentals, construction contracts require extensive, detailed plans ( blueprints ) for the contractor to follow. Cost for construction contracted in-stream work can significantly increase cost due to the extent of design specifications, site and contract preparation. In addition, site variances are typically the norm and not the exception which can wreak havoc with the best designs. Site variances can never be fully anticipated and typically lead to costly modifications. Experience has demonstrated that construction type contracts can cost over seven times that of equipment rental contracts and the results can be less than acceptable. Table 2 provides examples of three projects: Trout Creek, which is approximately one river mile; Panther Creek, which is about 2/10ths of a river mile; and the Mine Reach, which totaled approximately 3 river miles. Looking at cost per river mile, there are some significant differences between the three projects. Trout Creek was the most expensive, because material access was limited to the project sites. Heavy helicopters were needed 109

7 Table 2. Project budgets: Trout Creek, Panther Creek and Mine Reach Trout Creek Unit Unit cost Days/acres/logs Cost Plan, design & NEPA per acre $39,300 Excavator per day $20, Dozer per day 820 $0 Riparian thinning per acre 900 $0 Labor crew per day $9,000 Planting per acre $330 Helicopter per log $41,625 heavy helicopter $7,500/day Log haul per log $14,375 $4.5/log/mile rootwads attached Move in/out in & out $8,000 Materials bulk $4,000 Rig per month $220 Total cost $137,650 Cost/rm river mile 1.1 $137,650 Panther Creek Unit Unit cost Days/acres/logs Cost Plan, design & NEPA per acre $3, Excavator per day $3, sticks per day Dozer per day 820 $0 Riparian thinning per acre 900 $0 Labor crew per day $600 Planting per acre $22 Helicopter per log $0 Log haul per log $3,

8 Table 2. Project budgets: Trout Creek, Panther Creek and Mine Reach (cont d.) Panther Creek Unit Unit cost Days/acres/logs Cost Move in/out in & out $500 Materials bulk $5 Rig per month $11 Total cost $7,478 Cost/rm $41,544 Mine Reach Unit Unit cost Days/acres/logs Cost Plan, design & NEPA per acre $36,680 Excavator per day $65, sticks per day Dozer per day $26,240 skid 55 sticks/day Riparian thinning per acre $18, trees/day Labor crew per day $6,000 Planting per acre $27,500 Helicopter per log $0 Log haul per log $0 Move in/out in & out $1,000 Materials bulk $4,000 Rig per month $440 Total cost $184,860 Cost/rm river miles 3 $61,620 to stockpile logs near the project sites which were placed with an excavator. The helicopter could have been used to do the placement, but it would have raised the cost from $333 per log to over $1,100 per log. In contrast the Mine Reach restoration project utilized onsite materials acquired from second growth riparian stands of timber, which dramatically reduced project cost. The NEPA analysis for many of the projects used as examples in this presentation were grouped to reduce costs and may not reflect typical cost for projects on a similar scale. Individually, any one of these projects 111

9 could have NEPA cost up to $60,000 or $110,000 per river mile. LARGER SCALE COST ESTIMATES Can we estimate river work on a watershed scale? On a watershed scale, it is definitely possible to estimate costs for river work. However, good stream survey data and watershed analysis or assessments are essential for prioritizing projects and estimating costs on a watershed scale. Without knowledge of existing watershed conditions and a sense of project priorities, cost estimates would be baseless and serve little utility. Planning projects on the watershed level can lead to incremental cost savings relative to NEPA, consultation and design, as in the project examples discussed above. However, before projects are lumped into a single NEPA document for the sake of cost savings, considerable public outreach and forethought should go into the decision. For instance, restoration for three different streams that added up to about seven river miles was combined into one NEPA document which substantially reduced cost and increased efficiency. However, if one of the stream segments or a portion of the project was controversial and then appealed, it would have resulted in a delay of the other two projects. Therefore the cost savings of grouping projects should be weighed with the potential risk. Can we estimate costs on Evolutionarily Significant Unit (ESU), state, or regional scales? This is less likely. Gross generalizations could be made to approximate restoration cost per region. However, the differences in limiting factors and treatment methods would differ radically from region to region and ESU to ESU. For instance, addressing limiting factors on the west side of the Cascade Mountains may predominantly involve culvert removals for fish passage, riparian and channel rehabilitation. Whereas on the east side of the Cascades, limiting factors associated with cattle grazing, irrigation diversions and sediment runoff from cultivation are addressed. Cost could be extrapolated from watersheds within each ESU. However, the cost range would be so large that cost estimation on an ESU or regional scale may be of little use or may over or underestimate the cost which would undoubtedly under serve the resource and potentially squander taxpayer money. CONCLUSION The best way to maintain confidence in cost estimates on large scales is to only make approximations at the fifth field watershed level or lower. This limits the area of interest to around 250,000 acres, where it is still possible to take into account the specific conditions in the watershed. In addition, it is important to have funding for the projects that will span several years, allowing time for project planning and environmental permitting. It is possible, however, that standardized costs estimated for large areas (watersheds and greater) may never be appropriate, and that working from the individual conditions at each restoration site may be the only way to develop reasonable estimates of project costs. REFERENCES Bryant, F.G A survey of the Columbia River and its tributaries with special reference to its fishery resources. 2: Washington streams from the mouth of the Columbia River to and including the Klickitat River (Area 1). U.S. Fish and Wildlife Service. Spec. Sci. Rep. No

10 REFERENCES (cont d.) Coffin, B Water Withdrawals in the Wind River An Analysis in Support of the Wind River Watershed Analysis and Wind River Water Quality Restoration Plan. USFS Mt. Adams Ranger District, Washington. Rawding, D.J Stock status update for steelhead in the lower Columbia River, Washington. Washington Department of Fish and Wildlife, Olympia, WA. U.S. Fish and Wildlife Service and Washington Department of Fisheries Lower Columbia River fisheries development program, Wind River area, Washington. U.S. Forest Service Wind River basin watershed analysis. Wind River Ranger District, Carson, Washington. Washington Department of Fisheries, Washington Department of Wildlife, and Western Washington Treaty of Indian Tribes Washington State salmon and steelhead stock inventory. Olympia, WA. Washington Department of Wildlife, Confederated Tribes and Bands of Yakima Indian Nation, and Washington Department of Fisheries Wind River subbasin salmon and steelhead production plan. Olympia, WA. 113

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002 Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon

More information

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the

More information

Determination of NEPA Adequacy (DNA)

Determination of NEPA Adequacy (DNA) DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT MEDFORD DISTRICT OFFICE GRANTS PASS RESOURCE AREA 2164 NE SPALDING AVENUE GRANTS PASS, OR 97526 Determination of NEPA Adequacy (DNA) Office: Grants

More information

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate

More information

Coldwater Heritage Partnership Implementation Grant Final Report Morrison Run Watershed Restoration Project Western Pennsylvania Conservancy Project Summary The goal of the Morrison Run Watershed Restoration

More information

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum Final Report Dixie Creek Restoration Project Funded by Plumas Watershed Forum Plumas Corporation January 2009 1 Background FR-CRM staff presented this project to the Dixie Valley Landowners Association

More information

Gold Ray Dam Interagency Technical Team Meeting

Gold Ray Dam Interagency Technical Team Meeting Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,

More information

How To Manage Water Resources In The Yakima Basin

How To Manage Water Resources In The Yakima Basin Yakima Basin Integrated Water Resource Management Plan October 23, 2014 Presented by Derek Sandison, Director Office of Columbia River Photo Courtesy of Tom Ring Basin size: 6,155 sq. miles Population:

More information

HFQLG Project Evaluation Form

HFQLG Project Evaluation Form HFQLG Evaluation Form Names: Watershed Restoration Defensible Fuel Profile Zone Loyalton Pines Wildland Urban Interface Fuels Reduction Types: Watershed Restoration - Implemented pond and plug restoration

More information

121 FERC 62,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Public Utility District No. 1 of Project No. 637-044 Chelan County

121 FERC 62,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Public Utility District No. 1 of Project No. 637-044 Chelan County 121 FERC 62,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Project No. 637-044 Chelan County ORDER MODIFYING AND APPROVING LAKE CHELAN FISHERY PLAN,

More information

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE

REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 LEECH WATER SUPPLY AREA RESTORATION UPDATE Making a difference... together Agenda Item #9 REPORT #RWSC 2013-17 REPORT TO REGIONAL WATER SUPPLY COMMISSION MEETING OF WEDNESDAY, SEPTEMBER 4, 2013 SUBJECT LEECH WATER SUPPLY AREA RESTORATION UPDATE

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

Angora Fire Restoration Activities June 24, 2007. Presented by: Judy Clot Forest Health Enhancement Program

Angora Fire Restoration Activities June 24, 2007. Presented by: Judy Clot Forest Health Enhancement Program Angora Fire Restoration Activities June 24, 2007 Presented by: Judy Clot Forest Health Enhancement Program California Tahoe Conservancy Independent California State Agency within the Resources Agency Governed

More information

The Teton Creek Restoration Project Summary:

The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project Summary: The Teton Creek Restoration Project area extends for approximately one mile upstream from the Cemetery Road Bridge and includes the Aspen Pointe, The Aspens

More information

Streambank stabilization, streambank fencing, nuisance species control, riparian zone management

Streambank stabilization, streambank fencing, nuisance species control, riparian zone management Streambank stabilization, streambank fencing, nuisance species control, riparian zone management Stream Habitat Restoration Cost Considerations MARK COCKE, Civil Engineer Natural Resources Conservation

More information

21. Soil and Water: Restoration

21. Soil and Water: Restoration 21. Soil and Water: Restoration Goal: Maintain and restore the biological, physical and chemical integrity of the Tongass National Forest waters. Objectives: Complete hydrologic condition assessments and

More information

Appendix C. Project Opportunities. Middle Twisp River (RM 7.8 18.12)

Appendix C. Project Opportunities. Middle Twisp River (RM 7.8 18.12) Appendix C Project Opportunities Middle Twisp River (RM 7.8 18.12) This table describes project opportunities by project area. Locator maps of the project opportunities are included below the table. Reach

More information

Assessment of the White Salmon Watershed Using the Ecosystem Diagnosis and Treatment Model

Assessment of the White Salmon Watershed Using the Ecosystem Diagnosis and Treatment Model Assessment of the White Salmon Watershed Using the Ecosystem Diagnosis and Treatment Model Draft Final Report For the Period: November 2003 to December 2004 May 2005 Brady Allen Fishery Biologist and Patrick

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested

More information

ANGORA FIRE RESTORATION PROJECT

ANGORA FIRE RESTORATION PROJECT ANGORA FIRE RESTORATION PROJECT U.S. Forest Service LAKE TAHOE BASIN MANAGEMENT UNIT Duncan Leao Vegetation Management Planner Richard Vacirca Forest Aquatics Biologist 3 PHASES OF FIRE REHAB Phase I Rehab:

More information

COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N

COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N Submitted by the National Park Service Point Reyes National Seashore Point Reyes Station, California, 94956 Project Description: Muddy

More information

Section 4 General Strategies and Tools

Section 4 General Strategies and Tools Section 4 General Strategies and Tools Key planning issues for WRIA 35 have been identified in Sections 5 and 6 in the areas of water supply, instream flow, water quality, and aquatic habitat. General

More information

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices

Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to

More information

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1 COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B

More information

Lower Dungeness River Estuarine & Floodplain Restoration

Lower Dungeness River Estuarine & Floodplain Restoration PARTNERS: Clallam County; Jamestown S Klallam Tribe; WA Department of Fish & Wildlife; US Army Corps of Engineers; US Fish & Wildlife Service; WA Department of Transportation; WA Department of Ecology;

More information

AN INITIATIVE TO IMPROVE

AN INITIATIVE TO IMPROVE L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN

More information

DRAFT SOUTH FORK SKYKOMISH RIVER

DRAFT SOUTH FORK SKYKOMISH RIVER DRAFT SOUTH FORK SKYKOMISH RIVER 9 levees and revetments / Approximately 1.1 miles of river bank are armored Revetments provide limited, localized erosion protection, but impact habitat Frequent and costly

More information

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016 Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016 James L. McIntire Washington State Treasurer Summary The State of Washington offered green bonds to investors in September 2015, with approximately

More information

STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208

STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208 STANDARDS FOR RANGELAND HEALTH ASSESSMENT FOR SAGEHEN ALLOTMENT #0208 RANGELAND HEALTH STANDARDS - ASSESSMENT SAGEHEN ALLOTMENT #0208 STANDARD 1 - UPLAND WATERSHED This standard is being met on the allotment.

More information

Addendum D. Nomination of Moody Wash ACEC

Addendum D. Nomination of Moody Wash ACEC Addendum D Nomination of Moody Wash ACEC Moody Wash ACEC is hereby nominated by Citizens for Dixie s Future to: BLM St. George Field Office 345 East Riverside Drive St. George, UT 84790 Moody Wash is a

More information

Chapter 9. Selected Watershed Initiatives in the Great Basin Region

Chapter 9. Selected Watershed Initiatives in the Great Basin Region Chapter 9 Selected Watershed Initiatives in the Great Basin Region The Great Basin contains vast areas of sparsely populated desert lands. Lacking an ocean drainage, the Great Basin is a hydrologic sink

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Past and Current Research on Natural Resource Issues in the Blue Mountains

Past and Current Research on Natural Resource Issues in the Blue Mountains Past and Current Research on Natural Resource Issues in the Blue Mountains Recreation, Hunting, Access Livestock Production (and Wild Ungulate Ecology) Restoration Timber Harvest, Production Biodiversity,

More information

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14. Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust

More information

Plumas Watershed Forum. Review of Ongoing Projects. Updated 10/1/008

Plumas Watershed Forum. Review of Ongoing Projects. Updated 10/1/008 Plumas Watershed Forum Review of Ongoing Projects Updated 10/1/008 Hosselkus II Restoration Project Approved Funding: $80,000 (A funds) Expended By 10/1/08: $79,603 This pond-and-plug creek restoration

More information

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk

1 Introduction. 1.1 Key objective. 1.2 Why the South Esk 1 Introduction 1.1 Key objective The aim of this study is to identify and assess possible options for improving the quality of the river channel and habitats in the River South Esk catchment whilst helping

More information

Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report. Department of Ecology Grant No. G1400656.

Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report. Department of Ecology Grant No. G1400656. Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report Department of Ecology Grant No. G1400656 Submitted by: Walla Walla Watershed Management Partnership Walla Walla, WA Walla Walla

More information

Project Theory-Climate Change and Traditional Ecological Knowledge Adaption in the Klamath Basin

Project Theory-Climate Change and Traditional Ecological Knowledge Adaption in the Klamath Basin Project Theory-Climate Change and Traditional Ecological Knowledge Adaption in the Klamath Basin Frank K. Lake Lead Science and TEK Mentor for project Education 1995 B.S. University of California, Davis.

More information

Stream Restoration Post-Implementation Annual Monitoring Report Year 2: 2013 Covering the Period of July 2012 to July 2013

Stream Restoration Post-Implementation Annual Monitoring Report Year 2: 2013 Covering the Period of July 2012 to July 2013 NCDA&CS - North Carolina Forest Service Stream Restoration Post-Implementation Annual Monitoring Report Year 2: 2013 Covering the Period of July 2012 to July 2013 For the N.C. Division of Water Quality

More information

Year 2 7-15-10 Post Restoration Monitoring Summary Rock Creek Project Monitoring and Analysis conducted by Bio-Surveys,LLC. Contact: strask@casco.

Year 2 7-15-10 Post Restoration Monitoring Summary Rock Creek Project Monitoring and Analysis conducted by Bio-Surveys,LLC. Contact: strask@casco. Year 2 7-15-10 Post Restoration Monitoring Summary Rock Creek Project Monitoring and Analysis conducted by Bio-Surveys,LLC. Contact: [email protected] Project Sponsors include: The City of Corvallis Oregon

More information

STREAMFLOW RESTORATION PRIORITY AREAS

STREAMFLOW RESTORATION PRIORITY AREAS STREAMFLOW RESTORATION PRIORITY AREAS Synopsis The Water Resources Department and the Department of Fish and Wildlife jointly identified priority areas for streamflow restoration in basins throughout the

More information

King Fire Restoration Project, Eldorado National Forest, Placer and El Dorado Counties, Notice of intent to prepare an environmental impact statement.

King Fire Restoration Project, Eldorado National Forest, Placer and El Dorado Counties, Notice of intent to prepare an environmental impact statement. This document is scheduled to be published in the Federal Register on 12/24/2014 and available online at http://federalregister.gov/a/2014-30158, and on FDsys.gov [3410-11- P] DEPARTMENT OF AGRICULTURE

More information

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit

More information

Background Information: The Mamquam River Floodplain Restoration Project

Background Information: The Mamquam River Floodplain Restoration Project Background Information: The Mamquam River Floodplain Restoration Project The Mamquam River Floodplain Restoration project is being undertaken in partnership with the Squamish River Watershed Society, Fisheries

More information

Neversink River East Branch

Neversink River East Branch Neversink River East Branch Management Unit 10 Summary of Post-Flood Recommendations Intervention Level Full restoration of the stream reach including the eroding bank site between Station 38380 and Station

More information

RESTORING streams to reduce flood loss

RESTORING streams to reduce flood loss RESTORING streams to reduce flood loss Flood Loss Reduction the Natural Way Flood disasters have become a regular Floods can devastate local occurrence. One in your community may have communities. threatened

More information

Floodplain Connectivity in Restoration Design

Floodplain Connectivity in Restoration Design Floodplain Connectivity in Restoration Design 2015 Symposium on Restoration in a Contaminated Environment: Lessons Learned and Challenges in Moving Forward Part II April 2015 Karin Boyd Applied Geomorphology,

More information

EFB 496.10/696.03 Online Wetland Restoration Techniques Class Syllabus

EFB 496.10/696.03 Online Wetland Restoration Techniques Class Syllabus EFB 496.10/696.03 Wetland Restoration Techniques Online Class Syllabus SUNY-ESF College of Environmental Science and Forestry Summer Session II 2015 Wetland Restoration Techniques is a graduate and undergraduate

More information

Habitat Opportunities in the Duwamish Transition Zone

Habitat Opportunities in the Duwamish Transition Zone Duwamish Blueprint: Habitat Opportunities in the Duwamish Transition Zone November 13, 2014 Presentation to the WRIA 9 Watershed Ecosystem Forum Elissa Ostergaard, Planning and Stewardship Coordinator

More information

Wildlife Habitat Conservation and Management Program

Wildlife Habitat Conservation and Management Program Wildlife Habitat Conservation and Management Program Manual for Counties and Cities Oregon Department of Fish and Wildlife 2015 Table of Contents 1. Introduction Purpose of the habitat program Objective

More information

Napa River Restoration Projects

Napa River Restoration Projects Napa River Restoration Projects Shaun Horne, Napa County, [email protected] Jeremy Sarrow, Napa County, [email protected] The Napa River flows though one of the most scenic landscapes

More information

USDA Forest Service Proposed Soil and Water Restoration Categorical Exclusions Frequently Asked Questions 2013-09-05 Table of Contents

USDA Forest Service Proposed Soil and Water Restoration Categorical Exclusions Frequently Asked Questions 2013-09-05 Table of Contents USDA Forest Service Proposed Soil and Water Restoration Categorical Exclusions Frequently Asked Questions 2013-09-05 Table of Contents What is the Final Rule implemented by the Forest Service?... 2 Why

More information

The Economics of Culvert Replacement: Fish Passage in Eastern Maine

The Economics of Culvert Replacement: Fish Passage in Eastern Maine The Economics of Culvert Replacement: Fish Passage in Eastern Maine Introduction The Natural Resources Conservation Service (NRCS) in Maine is working with Project SHARE (Salmon Habitat and River Enhancement)

More information

2012 Program Report. Agricultural Group Drainage Program

2012 Program Report. Agricultural Group Drainage Program 2012 Program Report Agricultural Group Drainage Program Accomplishments: It was a successful year for the drainage program. We were able to complete two new projects and seven maintenance projects throughout

More information

Post-Flood Assessment

Post-Flood Assessment Page 1 of 7 Post-Flood Assessment CHAPTER 4 AGENCY COORDINATION Agency coordination is an essential element for the operation of the flood management systems in the Central Valley. Due to the nature of

More information

Prepared By: Tom Parker Geum Environmental Consulting, Inc.

Prepared By: Tom Parker Geum Environmental Consulting, Inc. Prepared By: Tom Parker Geum Environmental Consulting, Inc. Topics covered: Definition of riparian and floodplain restoration Floodplain attributes as a basis for developing criteria for restoration designs

More information

FORESTED VEGETATION. forests by restoring forests at lower. Prevent invasive plants from establishing after disturbances

FORESTED VEGETATION. forests by restoring forests at lower. Prevent invasive plants from establishing after disturbances FORESTED VEGETATION Type of strategy Protect General cold adaptation upland and approach subalpine forests by restoring forests at lower Specific adaptation action Thin dry forests to densities low enough

More information

Habitat rehabilitation for inland fisheries

Habitat rehabilitation for inland fisheries Habitat rehabilitation for inland fisheries FAO FISHERIES TECHNICAL PAPER 484 Global review of effectiveness and guidance for rehabilitation of freshwater ecosystems Cover photos : Left: excavation of

More information

3. The submittal shall include a proposed scope of work to confirm the provided project description;

3. The submittal shall include a proposed scope of work to confirm the provided project description; QIN Shoreline Master Program Project Summary The Shoreline Master Program (SMP) development process for the Quinault Indian Nation (QIN) includes the completion of inventory and analysis report with corresponding

More information

18 voting members 44 stakeholders 114 email list. Senators: Wyden & Merkley Representative DeFazio

18 voting members 44 stakeholders 114 email list. Senators: Wyden & Merkley Representative DeFazio 18 voting members 44 stakeholders 114 email list Senators: Wyden & Merkley Representative DeFazio State Representative Krieger State Senators: Roblan, Johnson, and Kruse Governor Brown s office County

More information

Resolving complex issues with large scale river restoration; a case study: the San Joaquin River in California

Resolving complex issues with large scale river restoration; a case study: the San Joaquin River in California IWA Publishing 2011 Water Practice & Technology Vol 6 No 4 doi:10.2166/wpt.2011.074 Resolving complex issues with large scale river restoration; a case study: the San Joaquin River in California William

More information

Using an All lands Framework for Conservation of Ecosystem Services

Using an All lands Framework for Conservation of Ecosystem Services Using an All lands Framework for Conservation of Ecosystem Services Robert Deal USDA Forest Service - PNW Research Station, Portland, OR Nikola Smith USDA Forest Service - Pacific Northwest Region, Portland,

More information

How To Plan A Buffer Zone

How To Plan A Buffer Zone Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other

More information

HCP Team Meeting. November 18, 2015. icfi.com

HCP Team Meeting. November 18, 2015. icfi.com HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next

More information

SKAGIT COUNTY HABITAT IMPROVEMENT PLAN

SKAGIT COUNTY HABITAT IMPROVEMENT PLAN SKAGIT COUNTY HABITAT IMPROVEMENT PLAN Public Works Department Natural Resources Division August 2012 Mission To create and advance restoration strategies that support Skagit County goals for promoting

More information

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY EXECUTIVE SUMMARY Project Background Located in southwestern Pennsylvania, Crooked Creek is a major tributary of the Allegheny River, entering near Ford City in Armstrong County. It is rich in natural

More information

Steelhead Recovery in San Juan and Trabuco Creeks Watershed

Steelhead Recovery in San Juan and Trabuco Creeks Watershed Steelhead Recovery in San Juan and Trabuco Creeks Watershed Are there fish now? Overview Final San Juan and Trabuco Creeks Watershed Management Plan Fish & Game Implementation NOAA Steelhead Recovery and

More information

Passive Restoration 101: Framework and Techniques Overview. Amy Chadwick, Great West Engineering August 26, 2015 Butte, America

Passive Restoration 101: Framework and Techniques Overview. Amy Chadwick, Great West Engineering August 26, 2015 Butte, America Passive Restoration 101: Framework and Techniques Overview Amy Chadwick, Great West Engineering August 26, 2015 Butte, America What Defines Passive Restoration? Process-based, nature-driven Minimal equipment

More information

Arapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape

Arapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape Arapaho & Roosevelt National Forests 2013 Flood: Long-term Recovery in a Changed Landscape Spring 2014 The flood of September 2013 changed the landscape of the Boulder and Canyon Lakes Ranger Districts.

More information

4.2 Buena Vista Creek Watershed

4.2 Buena Vista Creek Watershed Buena Vista Creek Watershed 4.2 Buena Vista Creek Watershed Watershed Overview The Buena Vista Creek Watershed is the fourth-largest system within the Carlsbad Hydrologic Unit. The watershed extends approximately

More information

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the

More information

Colorado Natural Heritage Program

Colorado Natural Heritage Program CNHP s mission is to preserve the natural diversity of life by contributing the essential scientific foundation that leads to lasting conservation of Colorado's biological wealth. Colorado Natural Heritage

More information

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008

Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008 Ruby River Grayling - Gravel Spawning Beds Monitoring Report January 2008 In partnership with Montana Department of Fish, Wildlife, and Parks (FWP), American Wildlands, and Wildlife Forever, the Madison

More information

May 9, 2005. Draft Environmental Impact Statement for Power Fire Restoration Project (CEQ# 050111)

May 9, 2005. Draft Environmental Impact Statement for Power Fire Restoration Project (CEQ# 050111) UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION IX 75 Hawthorne Street San Francisco, CA 94105 John Berry Forest Supervisor Eldorado National Forest 100 Forni Road Placerville, CA. 95667 May 9, 2005

More information

Potential Economic Benefits to Santa Ana River Watershed of Forest Restoration. Barbara Wyse, Senior Economist

Potential Economic Benefits to Santa Ana River Watershed of Forest Restoration. Barbara Wyse, Senior Economist Potential Economic Benefits to Santa Ana River Watershed of Forest Restoration Barbara Wyse, Senior Economist July 25, 2012 Presentation Overview Purpose / Motivation for Study Scope Approach FINDINGS!

More information

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan

Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Revising the Nantahala and Pisgah Land Management Plan Preliminary Need to Change the Existing Land Management Plan Throughout the Plan 1. There is a fundamental need for the revised plan to address how

More information