Electrical Wiring Technical Bulletin



Similar documents
PANELIZED HOME INSTALLATION GUIDELINE

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

GENERAL WIRING RULES FOR HOUSES

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

Cooktop Low-Profile Ventilation Hoods

March 14, Installation of Bay, Bow and Garden Windows

The minimum reinforcement for the stem wall is the placement of:

DE Frame with C Series Sidelight

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

8/18/14. Introduction to. Framing. Terminology and Concepts

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

INSTALLATION OF A BAY WINDOW

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

Typical Finished Basement Details

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

HOW TO INSTALL A BEAUTIFUL NEW KITCHEN

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

Premier & Deluxe 3-Season Room Sliding Glass Door

Best Barns USA Assembly Book

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

Guidelines for Earthquake Bracing Residential Water Heaters

The better way to build TM. Installation Manual. EXTERIOR WALL SIPs

Guidelines for Earthquake Bracing of Residential Water Heaters

All-Season Sunroom Sliding Glass Door Installation Instructions

Mark Cramer Inspection Services, Inc.

Acumen Enterprises, Inc.

2.9 WINDOW & DOOR BUCKS

DETAILED INSTALLATION GUIDE

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

GENERAL ELECTRICAL REQUIREMENTS

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

Installing Window and Door Mouldings

HfHMD uses LP SmartSide siding and trim.

Built to Last. Built for Beauty. Good. Solid. Logix. TM

**ATTENTION** WE DO NOT PROMOTE OR ENCOURAGE YOU TO DO YOUR OWN ELECTRICAL WIRING!!! IT IS BY FAR THE MOST DANGEROUS THING YOU CAN ATTEMPT

Georgia Association of Home Inspectors

Typical Finished Basement Details

Brick Veneer Construction

Set-Up Instructions. (Liner-Based System) UL LISTED. Important Read set-up instructions before assembly. Report any shortages within 72 hours

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

PDmB, Inc. Definitions

Sun Windows General Information Sun New Construction Window Installation Instructions

Installation Instructions For Slider Casement Air Conditioners

Installation Instructions

Packaged Terminal Air Conditioner Wall Sleeve Installation

Installation Guide. Bath and Wall Surrounds SERIES B

AUTHORIZATION TO MARK

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

WAYNESBORO AREA SCHOOL DISTRICT CURRICULUM BASIC HOME REPAIR

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

Installation Instructions

PUBLIC RESTROOMS, DESIGN INTENT

Policy on Water Heater Installations Policy No. UPC Effective: September 1, 1995 Revised: February 10, 1996

INSTALLATION INSTRUCTIONS

How To Build A Basement House

AMERICAN GOTHIC PLAYHOUSE

Uniform Construction Code (UCC) Building Permit Application Package

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

MGB Chrome Bumper Conversion

How to Install GoBoard:

H-Stud Area Separation Wall System

Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows

Pre-Drywall Inspection Report

The WANZ Guide to Window Installation

Inspection Item COMMENTS

COMPREHENSIVE PROPERTY INSPECTIONS

Builder Specifications for Solar Ready Homes

PANEL CONCEPTS LLLP.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Air Conditioner Duct Construction & Repair

Table of Contents. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.

Crawford Inspection Services C.C.B. #

Plans will call for one of two soffit/fascia details:

RSMeans. Business Solutions

Clad Direct Glaze Window Installation Instructions

SAMPLE INSTRUCTIONS. Best Barns USA Assembly Book. the Denver. 12'x 12' or 12'x16' Revised November 29, 2010

INSTALL INSTRUCTIONS KK-C-HVAC-1 HVAC UNIT CHEVROLET/GMC VANS FOR

Chapter 36 - STRAW BALE CONSTRUCTION SECTION PURPOSE. SECTION SCOPE. SECTION DEFINITIONS.

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN Fax: Re-Roofing: Asphalt Shingles

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

MONTGOMERY COUNTY EXECUTIVE REGULATION Offices of the County Executive. 101 Monroe Street. Rockville, Maryland 20850

glass & Glazing Products

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

Residential Roofing Guide

Tundra Series Windows January 2016

Shingle Installation Guide

GreenGuard Housewrap Installation Guide

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

LIGHT FLOOR AND WALL FRAMING

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

GARDEN WINDOW GLAZING AND DE-GLAZING INSTRUCTIONS

Window Installation Instructions

800 Communications Circuits

Single Family Residential Basement Finish

Home Inspection Report

Construction Technologies Career Field Pathways and Course Structure

Building Code Inspections and Fees

Transcription:

Electrical Wiring Technical Bulletin Overview In general, SIP construction is easier and more cost effective when things are planned and thought out before the panels are manufactured. This process will reduce the installation time in the field saving valuable time and money. Wiring in SIPs is no different than conventional construction electrical wiring. When an electrical installation in SIPs is forethought, not an afterthought, the installation will be much faster and easier. You have the option of ordering your SIPs panel package with custom installed electrical chases per your electrical drawings, factory installed generic electrical chases or you can order your panels without electrical chases and field install them in the locations necessary. Let s start out by understanding where the 1 diameter generic factory installed wire chases are located in the panel, where to drill for chases and when to do the drilling. When this drilling is done properly, the electrician should be able to wire a SIP building in about the same time as a stick-built building, or even faster as they become experienced working with the Innova Panel System. Factory Installed Wire Chases In the wall panels, Innova can include generic horizontal chases at the 16 level AFF (for outlets) and at the 44 level AFF (for switches and counter height outlets). Vertical chases, which are typically located 4 O.C., allow wire to run vertically though the wall panels to access switch locations and at other locations as needed to provide vertical wiring options for the electrician. (See figure G-10). (All wire chases are marked on the OSB or cement board surface with a 1 wide black ink marker.) Innova typically installs wire chases according to this standard, but for an additional charge, wire chases can be installed to exactly match an electrical plan. Custom wire chase placement per an electrical plan is done while the panel layout drawings are being designed. A detailed electrical plan would be required at that time to ensure proper coordination with the manufacturing process. Installing electrical chases in the field is a simple process that is detailed in this document. In roof panels, wire chases can be factory installed upon request. (Adding wire chases to roof panels will be done at a small additional charge.) When a building has a cathedral ceiling with a SIP roof, having wire chases installed in the panels will make wiring for lighting, fans, smoke detectors, etc. easier. Wiring can be run from an interior wall or can be run in conduit along an exposed overhead beam or hidden in a soffit used to conceal ductwork. There are many different options depending on the building use and floor plan. The roof ridge can also be used to run wiring from roof panel to roof panel as necessary. (See figure G-1 below) The roof ridge area is then filled with expandable foam (provided with kit) and the ridge piece (provided with kit) is installed, after the electrical wiring has been inspected by the building inspector.

Required Field Installed Chases and Holes As the structural insulated panels are installed, the SIP installer will need to provide an open chase way for the electrician by drilling the sill and top plates, and any lumber connecting splines as necessary to create access for the electrical wiring chases installed in the panels at the factory. If this step is skipped during panel installation, it is possible to cut and drill for access to the chases afterward, but it is much easier and faster to do this drilling during installation. When the electrician comes to the building site, they will review the electrical plan and wire run options to determine which chases to use. Most SIP buildings will still have stick-framed or metal stud framing for interior walls and conventional concrete floor systems, which give additional flexibility for wiring installations. Wiring is simplified if major horizontal wire runs take place in the floor systems, using horizontal panel chases for local runs only. When concrete slabs are installed, we recommend that the vertical chases in the panels be installed in the field to ensure proper alignment with the electrical slab rough-in. When the horizontal wire circuits must continue from one wall to another intersecting wall, the electrician can use a vertical chase to go up and over, then back down into the intersecting wall panel, or the electrician could cut a notch into the inside corner at the height of the wire chase then use this notch to pull the wire around the corner and into the intersecting wall. Wire Installation The recommended sequence for wiring is to first locate the outlet, switch, and other box locations. The locations are then marked on the interior OSB or cement board panel skin with a marker. (Boxes should be offset from the wire chase location so the box will not block the chase following installation.) Typically the electrician will use a tool like a RotoZip (figure G-3) and a template to cut the panel for the electrical boxes. After the openings are cut, the electrician will use a putty knife to pry out the cut panel and EPS foam as necessary to accommodate the electrical box. Care should be taken in not removing too much of the EPS insulation. The electrician will then fold over the end of the wire and push or pull the wire through the chases as required for the circuits. If needed, wires can be pulled using a fish tape or by a vacuum and string. Finally, the ends of the pulled wire will be inserted into the boxes and the boxes will be mounted using surface type fasteners. See detail G-2. After rough wiring is complete and the electrical boxes are mounted on the SIPs panel, carefully seal around the box using expanding foam sealant. Also, use expanding foam sealants to seal both used and unused chases at the top and bottom of the panels and anywhere else that chase openings are accessible.

Figure G- 1 Romex wiring installation between roof panels in roof ridge prior to foam and ridge cap piece installation Figure G-2 Figure G-3 Other Options for Wire Access Installing electrical chases in the field is a simple process. Many experienced SIP installers order the Innova building kits without electrical chases and install the chases in the field when installing the SIP panels. This is totally a matter of preference to the installer. Innova will manufacture the panels to the client s preference as long as the requirements are coordinated at the time of order. When no pre-cut panel chases are provided, there are various other options for field installation of the chases. A 1 round chase may be installed in the panel using a heated 1 steel ball bearing. Locate the area for the necessary switch or receptacle box and cut the necessary opening in the panel as described in the paragraph above. Place a 1 x 1 x 1 piece of metal angle into the panel opening pushing the angle into the midpoint of the panel. After the panel is installed and prior to installing the top plate a 1 ball bearing is heated using a portable torch. (See figure G-4) Using a level, mark a vertical line at the top inside face of the panel that is plumb with the desired electrical box location. Using vice grips the heated ball is then placed at the desired location at the top of the panel in the EPS foam area. Once the ball is positioned with your location mark, release the ball. (See figure G-5) If the panel is properly installed (plumb), the ball will melt the EPS foam to create a perfect plumb 1 round wire chase. The ball bearing will melt down to the angle positioned in the electrical box location and exit the panels face falling to the ground. Another method for field installing electrical chases is to lay the panel on its side, locate the box location on the panel face. Using a chalk line, mark the chase location on the panel face. Using a 1 conduit or #9 rebar, heat the end with a portable torch. When the end is red hot, insert the hot point into the EPS edge of the panel following the chalk line to the desired location. Remember to keep the conduit straight so that you have a properly aligned chase when finished. You can also use a long flexible drill bit to field drill the chases (see figure G-6) Additionally flush mounted chases such as WireMold can also be used for electrical options. (See figure G-7) Exposed conduit which conforms to local code requirements can also be used

as an option for garages and other industrial installations. (See figure G-8) In rooms where there is an aesthetic issue, like Foyers or dining rooms, it may be possible to locate the electrical outlets horizontally in the baseboard (local codes permitting), just above the floor. This makes the electrical outlet nearly go away visually since it no longer contrast with the wall color and doesn t present itself as an object intruding on the wall. (See figure G-9) Important Notes Standard Romex type wire, labeled as NM-B should be used. The wire should be sized by an electrical engineer and be of sufficient wire gauge as required for the anticipated maximum amperage loading of the building. Installing recessed lighting or can lights in a SIP roof is NOT recommended. If you wish to use recessed lighting, restrict these fixture locations to framed soffits and framed ceiling areas of the building. Figure G-4 Figure G-5 Figure G-6 Figure G-9 Baseboard Outlets Figure G-8 Commercial Wire Mold Figure G-7 Flush Mounted Wire Mold

Figure G-10