ATTACHMENT F. Electric Utility Contact Information Utility Name. For Office Use Only

Similar documents
Effective: September 10, 2006 Vermont Attachment 1 to Rule Public Service Board Page 1 of 6

PacifiCorp Original Sheet No. 476 FERC Electric Tariff, Substitute 6 th Rev Volume No. 11 APPENDIX 2 TO SGIP

Application for Small Generator Facility Interconnection Tier 2, Tier 3 or Tier 4 Interconnection

Physical Address: City: State: Zip Code:

FIT TIER 2 Application

Request for Payment Instructions Wholesale Distribution Access Tariff (WDAT) Attachment I - GIP

SYNCHRONOUS MACHINES

VOLTAGE REGULATOR AND PARALLEL OPERATION

DHANALAKSHMI COLLEGE OF ENGINEERING DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING EE ELECTRICAL MACHINES II UNIT-I SYNCHRONOUS GENERATOR

Understanding Power Factor and How it Affects Your Electric Bill. Presented by Scott Peele PE

HOLYOKE GAS & ELECTRIC DEPT S Distributed Generation Policy Effective: September 18, 2012

Unit 33 Three-Phase Motors

Three phase circuits

Module Title: Electrotechnology for Mech L7

2. A conductor of length 2m moves at 4m/s at 30 to a uniform magnetic field of 0.1T. Which one of the following gives the e.m.f. generated?

Equipment: Power Supply, DAI, Variable resistance (8311), Variable inductance (8321)

Rule Fast Track Analysis for National Life Insurance Co.

Equipment: Power Supply, DAI, Wound rotor induction motor (8231), Electrodynamometer (8960), timing belt.

Interconnection of Generators to EDI s Distribution System

Equipment: Power Supply, DAI, Synchronous motor (8241), Electrodynamometer (8960), Tachometer, Timing belt.

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva

Dakota Energy Cooperative, Inc. POLICY STATEMENT

Basics of Electricity

PowerFlex Dynamic Braking Resistor Calculator

PI734D - Technical Data Sheet

PI734B - Technical Data Sheet

TERMS AND CONDITIONS

Simple Methods for Calculating Short Circuit Current Without a Computer By Dennis McKeown, PE GE Senior System Application Engineer

Modeling and Testing of Unbalanced Loading and Voltage Regulation

PM734F - Technical Data Sheet Winding 28

Transient analysis of integrated solar/diesel hybrid power system using MATLAB Simulink

WIND TURBINE TECHNOLOGY

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

Transformer circuit calculations

4.1.1 Generator Owner Transmission Owner that owns synchronous condenser(s)

TABLE OF CONTENTS 1.0 INTRODUCTION PURPOSE DEVIATION INTERTIE PROTECTION REQUIREMENTS... 4

GENERATOR SELECTION. a. Three phase - 120/208V, 3 phase, 4W wye; 277/408, 3 phase, 4W wye; * 120/240V 3 phase, 4W Delta

MicroFIT Connection Application Guidelines

8 Speed control of Induction Machines

How To Understand And Understand The Electrical Power System

Modeling and Simulation of a Large Chipper Drive

Appendix N: GENERATOR DATA SHEET FOR SYNCHRONOUS GENERATORS CONNECTED TO PG&E ELECTRIC SYSTEM

Single-Phase AC Synchronous Generator

HOW HARMONICS HAVE CONTRIBUTED TO MANY POWER FACTOR MISCONCEPTIONS

BCI184E - Technical Data Sheet

UCI274C - Technical Data Sheet

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems

UCI274H - Technical Data Sheet

Science and Reactor Fundamentals Electrical CNSC Technical Training Group. Table of Contents

Induction Motor Theory

Rotary Phase Converters

POWER FACTOR CORRECTION

Power System review W I L L I A M V. T O R R E A P R I L 1 0,

NATIONAL CERTIFICATE (VOCATIONAL)

HCM434F - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

Power Factor Correction for Power Systems First Semester Report Spring Semester 2007

MODELING AND TESTING OF UNBALANCED LOADING AND VOLTAGE REGULATION. Prepared For: California Energy Commission Public Interest Energy Research Program

Chapter 3 AUTOMATIC VOLTAGE CONTROL

Cahier technique no. 196

3) What is the difference between "Insulating", "Isolating", and "Shielded Winding" transformers?

Equipment: Power Supply, DAI, Universal motor (8254), Electrodynamometer (8960), timing belt.

Lab 14: 3-phase alternator.

Electricity Terminology. Simplifying energy management

SECTION 4 ELECTRIC MOTORS UNIT 17: TYPES OF ELECTRIC MOTORS

Synchronous generators are built in large units, their rating ranging from tens to hundreds of megawatts.

Section 10. Application Manual for NEMA Motors. Special Applications

100% Stator Ground Fault Detection Implementation at Hibbard Renewable Energy Center. 598 N. Buth Rd 3215 Arrowhead Rd

ABB ! CAUTION. Type COQ Negative Sequence Generator Relay. (50/60 Hertz) J. Instruction Leaflet

INDUCTION MOTOR PERFORMANCE TESTING WITH AN INVERTER POWER SUPPLY, PART 2

SUSTAINABLE TECHNOLOGY

Variable Frequency Drives - a Comparison of VSI versus LCI Systems

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS

Three-phase AC circuits

Synchronous motor. Type. Non-excited motors

PI144K - Winding 311 APPROVED DOCUMENT. Technical Data Sheet. Generator Solutions AS

PI044E - Winding 311 APPROVED DOCUMENT. Technical Data Sheet

Renewable Energy Laboratory for Engineering Students

ET 332b Ac Electric Machines and Power Systems

Keywords: synchronous generator, synchronous motor, automatic voltage regulator, V- curves, synchronizing power, hunting, excitation system

SYNCHRONOUS MACHINE TESTING WITH MOTOR CIRCUIT ANALYSIS INSTRUMENTATION

ST Style Generator. Owners/Operators Manual

Reactive Power and Importance to Bulk Power System OAK RIDGE NATIONAL LABORATORY ENGINEERING SCIENCE & TECHNOLOGY DIVISION

Selecting Current Transformers Part 1 By Darrell G. Broussard, P.E.

Digital Energy ITI. Instrument Transformer Basic Technical Information and Application

Introduction. Harmonics and IEEE 519 Page 1 of 19

Interconnection Application For Residential and Commercial Power Systems 10 kw or Smaller

Short Circuit Current Calculations

Line Reactors and AC Drives

The Importance of the X/R Ratio in Low-Voltage Short Circuit Studies

3-Phase AC Calculations Revisited

How to Turn an AC Induction Motor Into a DC Motor (A Matter of Perspective) Steve Bowling Application Segments Engineer Microchip Technology, Inc.

Michelin North America

Simulation of Ungrounded Shipboard Power Systems in PSpice

Welcome to Linear Controls Quarterly Training

EEL303: Power Engineering I - Tutorial 4

Chapter 24. Three-Phase Voltage Generation

Application Information

APPLICATION NOTE. Increasing PV Hosting Capacity on LV Secondary Circuits with the Gridco System empower TM Solution

Electric Rate Schedule

Voltage Unbalance and Motors

Transcription:

ATTACHMENT F CATEGORY 2 GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 20 KW BUT LESS THAN OR EQUAL TO 150 KW Also Serves as Application for Category 2 Net Metering (Note: Category 2 Net Metering Program only available to Renewable Generator Projects) Electric Utility Contact Information Utility Name Interconnection Coordinator Utility Street Address Utility Street Address Interconnection Hotline: XXX.XXX.XXXX Interconnection Email: xxxx@xxx.com For Office Use Only Application No. Date & Time Application Received Customer / Account Information Electric Utility Customer Information: ( As shown on utility bill ) Customer Name ( Last, First, Middle): Customer Mailing Address: Customer E-Mail Address: ( optional ) Electric Service Account # Electric Service Meter Number: Are you applying for the Net Metering Program? Yes No Are you interested in selling Renewable Energy Credits (REC's) Yes No Will you have an Alternative Electric Supplier? Yes No Notes: Enter name ONLY if your energy is supplied by a 3rd party, not the utility. You must apply to both the Distribution Utility and your Alternate Energy Provider (if applicable) for Net Metering Alternative Electric Supplier Name Physical Site Service Address (if not Billing Address): Generation System Site Information Annual Site Requirements Without Generation in Kilowatthours Peak Annual Site Demand in Kilowatts (only for customers billed on demand rates) kwh/year kw/year Attached Site Plan: Page # Attached Electrical One-Line Drawing (See the Appendix D for a sample Inverter Type Project) Page # (Per MPSC Order in Case No. U-15787- The one-line diagram must be signed and sealed by a licensed professional engineer, licensed in the State of Michigan or by an electrical contractor licensed by the State of Michigan with the electrical contractor's license number noted on the diagram.) Synchronous/Induction Generators: Must fill out Appendix A or B and provide a Detail One-Line Diagram Page # See Appendix E and F for a sample the Detail One-Line Diagram for Synchronous or Induction projects Note: The following information on these system components shall appear on the preliminary Detail One-Line Diagram Breakers - Rating, location and normal operating status (open or closed) Buses - Operating voltage Capacitors - Size of bank in Kvar Circuit Switchers - Rating, location and normal operating status (open or closed) Current Transformers - Overall ratio, connected ratio Fuses - normal operating status, rating (Amps), type Generators - Capacity rating (kva), location, type, method of grounding Grounding Resistors - Size (ohms), current (Amps) Isolating transformers - Capacity rating (kva), location, impedance, voltage ratings, primary and secondary connections and method of grounding Potential Transformers - Ratio, connection Reactors - Ohms/phase Relays - Types, quantity, IEEE device number, operator lines indicating the device initiated by the relays. Switches - Location and normal operating status (open or closed), type, rating Tagging Point - Location, identification Page 1 of 9

CATEGORY 2 GENERATOR INTERCONNECTION APPLICATION FOR ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 20 KW BUT LESS THAN OR EQUAL TO 150 KW Also Serves as Application for Category 2 Net Metering (Note: Category 2 Net Metering Program only available to Renewable Generator Projects) Generation System - Manufacturer Information System Type ( Solar, Wind, Biomass, Methane Digester, etc): Generator Type ( Inverter, Induction, Synchronous): Total Generator(s) Nameplate DC Rating (Solar Only): Total Generator(s) Nameplate AC Rating: Expected Annual Output in Kilowatthours AC Output Operating Voltage: Generator Wiring Configuration ( Single Phase, Three Phase): Is the Inverter tested to IEEE1547.1? Inverter Based Systems: Manufacturer Model ( Name / Number ) Inverter Output Power Rating (kw) No. of Inverter(s) Induction & Synchronous Based Systems Manufacturer Model ( Name / Number ) Yes No o Not Applicable kw kw kwh/year Installation Information Project Single Point of Contact: ( Electric Utility Customer, Developer, or other ) Name: Company ( If Applicable ): Phone Number: E-Mail Address: Requested In Service Date: Licensed Professional Engineer Name (If applicable) Licensed Electrical Contractor Name (If applicable) Electrical Contractor/PE Phone #: Electrical Contractor/PE E-Mail: Customer and Contractor Signature and Fees Attached $100 Interconnection Application Fee or Attached $100 combined Interconnection & Net Metering Program application fees (Check # / Money Order #) ($75 Interconnection Application Fee plus $25 fee required if selecting net metering) ( Sign and Return complete application with Application Fee to Electric Utility Contact ) To the best of my knowledge, all the information provided in this Application Form is complete and correct. Customer Project Developer/Contractor (If Applicable) Note: Refer to the applicable "Michigan Electric Utility Generator Interconnection Procedures" for a detailed explanation of the Interconnection Process, Fees, Timelines, and Page 2 of 9

APPENDIXES Appendix A: Technical Information for Synchronous-Type Generators Appendix B: Technical Information for Induction-Type Generators Appendix C: Sample Site Plan Appendix D: Sample One-Line diagram for Inverter Type Project Appendix E: Sample One-Line diagram for Synchronous Type Project Appendix F: Sample One-Line diagram for Induction Type Project Page 3 of 9

Appendix A Synchronous Generators Generator Information a. Generator Nameplate Voltage a. b. Generator Nameplate Watts or Volt-Amperes b. c. Generator Nameplate Power Factor (pf) c. d. RPM d. Technical Information e. Minimum and Maximum Acceptable Terminal Voltage e. f. Direct axis reactance (saturated) f. g. Direct axis reactance (unsaturated) g. h. Quadrature axis reactance (unsaturated) h. i. Direct axis transient reactance (saturated) i. j. Direct axis transient reactance (unsaturated) j. k. Quadrature axis transient reactance (unsaturated) k. l. Direct axis sub-transient reactance (saturated) l. m. Direct axis sub-transient reactance (unsaturated) m. n. Leakage Reactance n. o. Direct axis transient open circuit time constant o. p. Quadrature axis transient open circuit time constant p. q. Direct axis subtransient open circuit time constant q. r. Quadrature axis subtransient open circuit time constant r. s. Open Circuit saturation curve s. t. Reactive Capability Curve showing overexcited and underexcited limits (Reactive Information if non-synchronous) t. u. Excitation System Block Diagram with values for gains and time constants (Laplace transforms) u. v. Short Circuit Current contribution from generator at the Point of Common Coupling v. w. Rotating inertia of overall combination generator, prime mover, couplers and gear drives w. x. Station Power load when generator is off-line, Watts, pf x. y. Station Power load during start-up, Watts, pf y. z. Station Power load during operation, Watts, pf z. Page 4 of 9

Appendix B Induction Generators Generator Information a. Generator Nameplate Voltage a. b. Generator Nameplate Watts or Volt-Amperes b. c. Generator Nameplate Power Factor (pf) c. d.rpm d. Technical Information e. Synchronous Rotational Speed e. f. Rotation Speed at Rated Power f. g. Slip at Rated Power g. h. Minimum and Maximum Acceptable Terminal Voltage h. i. Motoring Power (kw) i. j. Neutral Grounding Resistor (If Applicable) j. k. I 2 2 t or K (Heating Time Constant) k. l. Rotor Resistance l. m. Stator Resistance m. n. Stator Reactance n. o. Rotor Reactance o. p. Magnetizing Reactance p. q. Short Circuit Reactance q. r. Exciting Current r. s. Temperature Rise s. t. Frame Size t. u. Design Letter u. v. Reactive Power Required in Vars (No Load) v. w. Reactive Power Required in Vars (Full Load) w. x. Short Circuit Current contribution from generator at the Point of Common Coupling x. y. Rotating inertia, H in Per Unit on kva Base, of overall combination generator, prime mover, couplers and gear drives y. z. Station Power load when generator is off-line, Watts, pf z. aa. Station Power load during start-up, Watts, pf aa. bb. Station Power load during operation, Watts, pf bb. Page 5 of 9

Appendix C: Sample Site Plan - Provided for Reference Only Customer Name: Project Site Address: Site Plan Prepared By: Prepared Date: Page 6 of 9

Appendix D - Sample One Line Drawing for Net Metering Inverter Based Generators NOTE: One-line diagram must be signed and sealed by a licensed Professional Engineer, licensed in the State of Michigan or by an electrical contractor licensed by the State of Michigan Customer Name: Project Site Address: Licensed Professional Engineer Name (If applicable): Licensed Professional Engineer Signature: Electrical Contractor License Number: Date: Page 7 of 9

Appendix E: Sample One-Line Drawing for Synchronous Generators (Not Required for Flow-Back) NOTE: One-line diagram must be signed and sealed by a licensed Professional Engineer, licensed in the State of Michigan or by an electrical contractor licensed by the State of Michigan Customer Name: Project Site Address: Licensed Professional Engineer Name (If applicable): Licensed Professional Engineer Signature: Electrical Contractor License Number: Date: Page 8 of 9

Appendix F: Sample One-Line Drawing for Induction Generators (Not Required for Flow-Back) NOTE: One-line diagram must be signed and sealed by a licensed Professional Engineer, licensed in the State of Michigan or by an electrical contractor licensed by the State of Michigan Customer Name: Project Site Address: Licensed Professional Engineer Name (If applicable): Licensed Professional Engineer Signature: Electrical Contractor License Number: Date: Page 9 of 9